keep the Co2 in the pattern. Russell County, Kansas EPCO ...

1
PARTNERS: The project is an industry- government consortium with industry partners being Murfin Drilling Co., Inc., the operator, John O. Farmer, Inc. and White Eagle Exploration, Inc. (partners), Kinder-Morgan CO 2 Company, LP, EPCO Carbon Dixoide Products, Inc., U.S. Energy Partners, LLC, and Transpetco Engineering. Government partners are U.S. Department of Energy, University of Kansas (Kansas Geological Survey and Tertiary Oil Recovery Project), and the State of Kansas (Dept. of Commerce). Seed money was provided by the Kansas Technology Enterprise Corporation (KTEC). Miscible Flood Demonstration Project Russell County, Kansas CO 2 Hall-Gurney Field Major Field Production in Million Barrels Major Field Production in Million Barrels Hall-Gurney 155 Fairport 55 Gorham 96 Trapp 236 CO2 Pilot Site Hall-Gurney Field Area Lansing Structure Map 5 Miles CO from Ethanol Plant 2 The initial plan for supplying CO was to truck it 200 miles from Guymon, 2 Oklahoma. The construction of a new ethanol plant in Russell provides a close source of supply for the demonstration project, and possibly for small commercial floods in the area. U.S. Energy Partners, LLC, owner of the ethanol plant, and EPCO Inc. joined the project as a partners. 2003 Purpose of Demonstration: * Determine the technical and economic feasibility of CO 2 miscible flooding in the L-KC in central Kansas. * Develop reservoir data for the L-KC to facilitate future commercial CO floods. 2 * Gain an understanding of the operations and costs involved in implementing a Co flood. 2 2000 5 15 20 25 30 10 Porosity (%) Spectrum Layer 1 Layer 2 Layer 3 Layer 4 Layer 5 Layer 6 Map View of Layer 2 Characterization And Simulation Drill CO 2 Injection Well 1 mm Layer 2 2894.2 Plug Phi %34.1 K md 113.9 Updated October 29, 2003 Pilot Well Configuration The pilot project will include two oil producers, one CO injector 2 and two water injection containment wells. CO injected will 2 force remaining oil to the producers while water injection wells keep the Co in the pattern. 2 2001 Ethanol Plant Construction Operations began Nov. 2001 USEP Ethanol Plant 2002 CO Injection 2 Injection slated for Fall 2003 Final reservoir simulation, installation of surface facilities and repressuring the reservoir will be the sequence of activities prior to CO injection. It is estimated 2 that it will take three to five years to inject the ~0.27 BCF of CO (15,700 tons) to 2 be injected and additional oil recovery is expected to be approximately ~20 MBO. Well Testing & Repressure Pilot Typical Wellbore Schematic 1936 Vintage Hall-Gurney Well 10-3/4" @ 287' w/150 sx 6-5/8" @ 2874' w/100 sx Tarkio Topeka Oread Plattsmouth Toronto Lansing DD 2897', OHC L-KC 'C' Compl Pot. 1498 BOPD 6-3-1939 DD 2973', OHC L-KC "G" Compl Pot. 24 BOPD 3-10-1952 Brief History: 1939 OHC in L-KC "C" 1952 Deepend to L-KC "G" (Commingled w/ "C") 1974 Began uphole completions 2-3/8" tbg Wellbore Upgrades Recomplete Colliver #10, 12, 13, 16 wells EPCO and USEP Loc. Murfin CO 2 Project Site Scale in Miles Russell CO2 Project Well Pressures 0 200 400 600 800 1000 1200 1400 1600 3/1 3/31 4/30 5/30 6/29 7/29 8/28 9/27 10/27 Date Mid-perf Bottom Hole Pressure (psi) CO2 I-1 CO2 Project #12 CO2 Project #18 CO2 Project #10 CO2 Project #16 CO2 Project #13 14S-13W Russell County Kansas Oil Producer CO2 Injector Water Injector Murfin - Colliver Scale (Feet) 660 1320 1980 2640 CO2 Pilot 10-Acre Pattern 28 A-4 A-2 3 5 10 1 A1 12 13 6 1 6 7 4 1 2 3 5 6 4-W 5 11 14 20-W 2-W 3 7 8 9 10 15 16 18 19 3 10 7 2 16 15 5 2 2 9 2 7 13 CO2 I-1 Currently oil well MVE Carter MVE Colliver Murfin Colliver Water Injector University of Kansas

Transcript of keep the Co2 in the pattern. Russell County, Kansas EPCO ...

PARTNERS:The project is an industry-government consortium with industry partners being Murfin Drilling Co., Inc., the operator, John O. Farmer, Inc. and White Eagle Exploration, Inc. (partners), Kinder-Morgan CO 2

Company, LP, EPCO Carbon Dixoide Products, Inc., U.S. Energy Partners, LLC, and Transpetco Engineering. Government partners are U.S. Department of Energy, University of Kansas (Kansas Geological Survey and Tertiary Oil Recovery Project), and the State of Kansas (Dept. of Commerce). Seed money was provided by the Kansas Technology Enterprise Corporation (KTEC).

Miscible Flood

Demonstration ProjectRussell County, Kansas

CO2 Hall-Gurney

Field

Major Field Productionin Million Barrels

Major Field Productionin Million Barrels

Hall-Gurney155

Fairport55

Gorham96

Trapp236

CO2 Pilot Site

Hall-Gurney Field AreaLansing Structure Map

5 Miles

CO from Ethanol Plant2

The initial plan for supplying CO was to truck it 200 miles from Guymon, 2

Oklahoma. The construction of a new ethanol plant in Russell provides a close source of supply for the demonstration project, and possibly for small commercial floods in the area. U.S. Energy Partners, LLC, owner of the ethanol plant, and EPCO Inc. joined the project as a partners.

2003

Purpose of Demonstration:* Determine the technical and economic feasibility of CO 2

miscible flooding in the L-KC in central Kansas.* Develop reservoir data for the L-KC to facilitate future commercial CO floods.2

* Gain an understanding of the operations and costs involved in implementing a Co flood.2

2000

5 15 20 25 3010Porosity (%) Spectrum

Layer 1

Layer 2

Layer 3

Layer 4

Layer 5

Layer 6

Map View of Layer 2

CharacterizationAnd Simulation

Drill CO 2

Injection Well

1 mmLayer 2 2894.2Plug Phi %34.1 K md 113.9

Updated October 29, 2003

Pilot Well ConfigurationThe pilot project will include two oil producers, one CO injector 2

and two water injection containment wells. CO injected will 2

force remaining oil to the producers while water injection wells keep the Co in the pattern.2

2001

Ethanol PlantConstruction

Operations began Nov. 2001

USEP Ethanol Plant

2002

CO Injection2

Injection slated for Fall 2003Final reservoir simulation, installation of surface facilities and repressuring the reservoir will be the sequence of activities prior to CO injection. It is estimated 2

that it will take three to five years to inject the ~0.27 BCF of CO (15,700 tons) to 2

be injected and additional oil recovery is expected to be approximately ~20 MBO.

Well Testing &Repressure Pilot

Typical Wellbore Schematic1936 Vintage Hall-Gurney Well

10-3/4" @ 287'w/150 sx

6-5/8" @ 2874'w/100 sx

Tarkio

Topeka

Oread

Plattsmouth

Toronto

Lansing

DD 2897', OHC L-KC 'C'Compl Pot. 1498 BOPD6-3-1939

DD 2973', OHC L-KC "G"Compl Pot. 24 BOPD3-10-1952

Brief History:1939 OHC in L-KC "C"1952 Deepend to L-KC "G" (Commingled w/ "C")1974 Began uphole completions

2-3/8" tbg

WellboreUpgrades

Recomplete Colliver #10, 12, 13, 16 wells

EPCO and USEP Loc.

Murfin CO 2

Project Site

Scale in Miles

Russell

CO2 Project Well Pressures

0

200

400

600

800

1000

1200

1400

1600

3/1 3/31 4/30 5/30 6/29 7/29 8/28 9/27 10/27

Date

Mid

-pe

rfB

ott

om

Ho

leP

res

su

re(p

si)

CO2 I-1

CO2 Project #12

CO2 Project #18

CO2 Project #10

CO2 Project #16

CO2 Project #13

14S-13WRussell CountyKansas

Oil Producer

CO2 Injector

Water Injector

Murfin - Colliver

Scale (Feet)

66

0

13

20

19

80

26

40

CO2 Pilot 10-Acre Pattern

28

A-4

A-2

35

101

A1

12 13

6

1

67

4

123

5

6

4-W

5

11

14

20-W

2-W3

7 8

910

15

16

18

19

3

10

7

2 16 15

522 92 713

CO2 I-1

Currently oil well

MVE Carter

MVE Colliver

Murfin Colliver

Water Injector

Universityof Kansas