keep the Co2 in the pattern. Russell County, Kansas EPCO ...
Transcript of keep the Co2 in the pattern. Russell County, Kansas EPCO ...
PARTNERS:The project is an industry-government consortium with industry partners being Murfin Drilling Co., Inc., the operator, John O. Farmer, Inc. and White Eagle Exploration, Inc. (partners), Kinder-Morgan CO 2
Company, LP, EPCO Carbon Dixoide Products, Inc., U.S. Energy Partners, LLC, and Transpetco Engineering. Government partners are U.S. Department of Energy, University of Kansas (Kansas Geological Survey and Tertiary Oil Recovery Project), and the State of Kansas (Dept. of Commerce). Seed money was provided by the Kansas Technology Enterprise Corporation (KTEC).
Miscible Flood
Demonstration ProjectRussell County, Kansas
CO2 Hall-Gurney
Field
Major Field Productionin Million Barrels
Major Field Productionin Million Barrels
Hall-Gurney155
Fairport55
Gorham96
Trapp236
CO2 Pilot Site
Hall-Gurney Field AreaLansing Structure Map
5 Miles
CO from Ethanol Plant2
The initial plan for supplying CO was to truck it 200 miles from Guymon, 2
Oklahoma. The construction of a new ethanol plant in Russell provides a close source of supply for the demonstration project, and possibly for small commercial floods in the area. U.S. Energy Partners, LLC, owner of the ethanol plant, and EPCO Inc. joined the project as a partners.
2003
Purpose of Demonstration:* Determine the technical and economic feasibility of CO 2
miscible flooding in the L-KC in central Kansas.* Develop reservoir data for the L-KC to facilitate future commercial CO floods.2
* Gain an understanding of the operations and costs involved in implementing a Co flood.2
2000
5 15 20 25 3010Porosity (%) Spectrum
Layer 1
Layer 2
Layer 3
Layer 4
Layer 5
Layer 6
Map View of Layer 2
CharacterizationAnd Simulation
Drill CO 2
Injection Well
1 mmLayer 2 2894.2Plug Phi %34.1 K md 113.9
Updated October 29, 2003
Pilot Well ConfigurationThe pilot project will include two oil producers, one CO injector 2
and two water injection containment wells. CO injected will 2
force remaining oil to the producers while water injection wells keep the Co in the pattern.2
2001
Ethanol PlantConstruction
Operations began Nov. 2001
USEP Ethanol Plant
2002
CO Injection2
Injection slated for Fall 2003Final reservoir simulation, installation of surface facilities and repressuring the reservoir will be the sequence of activities prior to CO injection. It is estimated 2
that it will take three to five years to inject the ~0.27 BCF of CO (15,700 tons) to 2
be injected and additional oil recovery is expected to be approximately ~20 MBO.
Well Testing &Repressure Pilot
Typical Wellbore Schematic1936 Vintage Hall-Gurney Well
10-3/4" @ 287'w/150 sx
6-5/8" @ 2874'w/100 sx
Tarkio
Topeka
Oread
Plattsmouth
Toronto
Lansing
DD 2897', OHC L-KC 'C'Compl Pot. 1498 BOPD6-3-1939
DD 2973', OHC L-KC "G"Compl Pot. 24 BOPD3-10-1952
Brief History:1939 OHC in L-KC "C"1952 Deepend to L-KC "G" (Commingled w/ "C")1974 Began uphole completions
2-3/8" tbg
WellboreUpgrades
Recomplete Colliver #10, 12, 13, 16 wells
EPCO and USEP Loc.
Murfin CO 2
Project Site
Scale in Miles
Russell
CO2 Project Well Pressures
0
200
400
600
800
1000
1200
1400
1600
3/1 3/31 4/30 5/30 6/29 7/29 8/28 9/27 10/27
Date
Mid
-pe
rfB
ott
om
Ho
leP
res
su
re(p
si)
CO2 I-1
CO2 Project #12
CO2 Project #18
CO2 Project #10
CO2 Project #16
CO2 Project #13
14S-13WRussell CountyKansas
Oil Producer
CO2 Injector
Water Injector
Murfin - Colliver
Scale (Feet)
66
0
13
20
19
80
26
40
CO2 Pilot 10-Acre Pattern
28
A-4
A-2
35
101
A1
12 13
6
1
67
4
123
5
6
4-W
5
11
14
20-W
2-W3
7 8
910
15
16
18
19
3
10
7
2 16 15
522 92 713
CO2 I-1
Currently oil well
MVE Carter
MVE Colliver
Murfin Colliver
Water Injector
Universityof Kansas