    Karaganda Metallurgical Combine, now ArselorMittalTemirtau, is among the five largest

    metallurgical enterprises of the CIS countries, specializing in the manufacture of sheet metal.

    The date of his birth is une !, "#$%. &n this da', the blast furnace number " has given

    Kaza(hstan)s first cast iron. &ver the 'ears, combine into a powerful modern enterprise with a

    complete metallurgical c'cle, producing iron, steel, rolled metal and a wide assortment of

    destination, products, co(e production, raw materials for the construction industr', and consumer

    goods.A prere*uisite for the d'namic development of the plant was the favorable economic and

    geographical location+ the presence of closel' spaced deposits of iron and manganese ores of the

    Central and ast Kaza(hstan, Karaganda -asin co(ing coal, as well as promising areas of sales

    of steel products. Currentl', the Karaganda Metallurgical lant is an enterprise with a complete

    metallurgical c'cle, producing iron, steel, rolled products co(e plant

    Cold rolling mills used to produce thin sheets with specific properties that are impossible to

    obtain b' other means of production. The main feature of cold/rolling e*uipment is

    predominantl' coils/rolling method with the use of devices to create tension in the strip rolling

    0"1.To carr' out the process of rolling roll method in an' of the cold rolling mill machiner' shall be

    provided and mechanisms+ the accumulation of hot/etched before the camp rolls intended for

    cold rolling, the preparation of the roll and the front end of the strip otgib(u, uncoiling the strip

    with the creation of tension to the mill2 rolling to the desired compression, winding the rolled

    strip to the desired tension on the winder drum roll and transportation to the warehouse cold/

    rolled coils. All cold/rolling mills are provided with lubrication suppl' s'stems, the cooling

    medium in the wor(ing and bac(up rolls of the stands 03/41.

    The shop started in "#53, a wor(shop designed to produce tin plate coated with tin, chromium,

    aluminum, tin dimensional, tape and strips of pic(led, roofing and structural steel in sheets and

    rolls.

    late rolling mill number !, which produces a blac( sheet, tin plate electro/tin plating thic(ness

    of %."5 / %.!$ mm, width 6"3 / "%37mm, tin plate %."4 mm thic(, obtained b' the double/rolled,

    cold rolled steel sheet thic(ness of %.!4 / % , $! mm, the width of the 53% / "%%% mm. The

    production capacit' of 64% thousand tons of shop The shop+ $/stand rolling mill "7%% 8the

    ma9imum rolling speed of !! m : s, the mass of rolled coils to !% tons;, two units of electrol'tic

    cleaning, bell/t'pe furnaces for annealing recr'stallization of bands with a mass of cages up to

    "3% tons, two units of continuous annealing strips2 3/stand Temper/rolling and temper mill in

    "7%%, two training bands of the unit, three units of electrol'tic tinning units with autonomous

    cross/cutting, finishing with three branch units cross/cutting cold rolled sheet and plate, pac(ing

    units pac(s.The shop attached to the tin shop of cold rolling on the bac( of the territor' previousl' reserved

    for the e9pansion of the latter. It is a fourteen store' building span.

    lacement of au9iliar' facilities of the comple9 made in the following wa'+ most of the ob

  • 8/13/2019 Karaganda Metallurgical Combine

    2/3

    " / decoilers 3 / scissors, ! / st'(osvarochna'a machine, 7 / =oopbac( device, 4 /

    unwinder for porulonno' rolling $ / wor(ing stands, 6 / fl'ing shears, 5 / winder.

    >igure ".3 / Scheme of the continuous mill ?infinite? rolling

    SC ?Mittal Steel Temirtau? / the largest enterprise in the steel industr' of our

    countr'. The plant rec'cles annuall' about 3% million tons of crude oil produces

    7.! million tons of co(e, #.$ million tons of sinter, 4.3 million tons of pig iron,

    about $ million tons of steel and 7.4 million tons of sheet. Its products are e9portedto more than "% thousand customers in all former Soviet republics. Continuousl'

    improving, production based on the technical of progress and plans for scientific

    organization of the collective enterprise from month to month does and e9ceeds

    plans to release all (inds of products 01.

    The first government document on the construction of the Karaganda Metallurgical

    lant was signed in Moscow on April 34, "#73. It said that along with the

    preparation of pro

  • 8/13/2019 Karaganda Metallurgical Combine

    3/3

    In "#4# he gave the current CD / the first industrial facilit' plant. ul' !, "#$%

    issued b' Kaza(hstan)s first cast iron. This da' went down in histor' of metallurg',

    as the date of entr' into operation of the Karaganda Metallurgical lant.

    @ecember ", "#$% issued the first co(e batter' co(e Kaza(hstan, after !% da's was

    commissioned 3nd batter' in September "#$" / the third.

    Along with them were commissioned Coal preparation, sulfate, benzeneseparation.

    In @ecember "#$3 commissioning of co(e/oven batter' E 7, ul' "#$#, 6% 'ears.

    E 4,$. In April "#66 E 6 capacit' of " million tons of co(e per 'ear.

    In "#$!/$4 'ears. introduces a comple9 sinter plant number " in the 7/aglo

    machines sintering area of 64 m3 each. In "#64, the sinter plant number 3 in the

    three sintering machines sintering area of !"3 m3 each.

    As part of blast furnace / 7 blast furnaces, introduced for maintenance and,

    respectivel', in "#$%, "#$", "#6", "#64. In "#$7 he entered into the e9ploitation

    two $%% / ton open/hearth furnace.In "#6%/63 'ears. went into operation in the converter shop of the three converters

    with a capacit' of !%% tons each.

    As part of rolling production includes+ assembling shop, sheet rolling shop E "

    hot/rolled, E 3 cold rolled, E ! / Section of tin, surrendered in "#$$, "#$5, "#6!,

    "#5!.

    In "##5 came in, built/in hot/dip galvanizing plant and aluminizing.