KAPIT-BAHAY 2.0
Transcript of KAPIT-BAHAY 2.0
![Page 1: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/1.jpg)
KAPIT-BAHAY 2.0SELF-BUILD CONCRETE HOUSE
Dimensions:6.0x6.0m
Area: 36sqm
Maximum no of occupants: 10
Maximum no. of story: 2
![Page 2: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/2.jpg)
KAPIT-BAHAY 2.0SELF-BUILD CONCRETE HOUSE
![Page 3: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/3.jpg)
KAPIT-BAHAY 2.0SELF-BUILD CONCRETE HOUSE
![Page 4: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/4.jpg)
KAPIT-BAHAY 2.0SELF-BUILD CONCRETE HOUSE
![Page 5: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/5.jpg)
KAPIT-BAHAY 2.0SELF-BUILD CONCRETE HOUSE
![Page 6: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/6.jpg)
KAPIT-BAHAY 2.0SELF-BUILD CONCRETE HOUSE
![Page 7: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/7.jpg)
Modernizing the Bahay KuboThe Evolution of KAPIT-BAHAY
TRADITIONAL
![Page 8: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/8.jpg)
TRADITIONAL TEMPORARY(ISIGURO DAAN)
Modernizing the Bahay KuboThe Evolution of KAPIT-BAHAY
![Page 9: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/9.jpg)
PERMANENT(KAPIT-BAHAY)
Modernizing the Bahay KuboThe Evolution of KAPIT-BAHAY
![Page 10: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/10.jpg)
BUILDING BACK BETTER
![Page 11: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/11.jpg)
BUILDING BACK BORING
![Page 12: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/12.jpg)
BUILDING BACK TOBASICS
![Page 13: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/13.jpg)
![Page 14: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/14.jpg)
ROBELITO AND SARAH
HOUSE F O R E V E R
![Page 15: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/15.jpg)
JASTIP W4 Meeting24 March 2016
10:00-12:00E-522D, Uji Campus
Mary Ann A. EspinaUniversity of the Philippines
Kazuyoshi NishijimaDPRI Kyoto University
Keiko SakodaWorld Bank DRM Hub Tokyo
![Page 16: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/16.jpg)
JASTIP W4 MeetingTopics discussed:
PDCA cyclefor the enhancement of the
resilience of vernacular constructions in the Philippines.
PDCA = Plan, Do, Check and Act
Main Results or Future Plan
![Page 17: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/17.jpg)
JASTIP W4 Meeting
At present:
· Plan in PDCA: UP Diliman has developed a guideline and
design template for resilient vernacular housing construction after the typhoon Yolanda, in
collaboration with KU-DPRI.
![Page 18: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/18.jpg)
JASTIP W4 MeetingPlan 2016-17FY
· Do in PDCA: UPD will build samples/prototypes of
abovementioned construction under DOST project. Four samples are anticipated: i.e.
constructed by professional and non-professional with proper and substandard
construction material.
![Page 19: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/19.jpg)
JASTIP W4 MeetingPlan 2016-17FY
· Check in PDCA: DPRI-KU investigates the guideline, design and
constructions in terms of wind-resistant (and possibly seismic-resistant) performance from science and
engineering perspective, using anemometers and wind pressure measurement systems, as well as material
strength test device are mobilized. DPRI-KU also investigates effective ways to implement the guideline into practice through policy making and
risk perception perspective.
![Page 20: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/20.jpg)
JASTIP W4 MeetingPlan 2016-17FY
· Act in PDCA: UPD and DPRI-KU, if necessary, make changes in the
guideline and design in accordance with the findings obtained above.
![Page 21: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/21.jpg)
JASTIP W4 MeetingPlan 2016-17FY
The following activities were agreed to link totwo other existing projects:
DOST funded project and
World Bank Technical Assistance on National Building Code Update
in the following components:
![Page 22: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/22.jpg)
JASTIP W4 MeetingComponent 1 :
S&TWind and Seismic
Analysis
Component 2 :
ArchitectureImproved House
Design
Component 3 :
Risk Perception People's Decision-Making Analysis
Component 4 :
Policy ReflectionPropose Revision to the Building Code
![Page 23: KAPIT-BAHAY 2.0](https://reader033.fdocuments.net/reader033/viewer/2022061507/58678b951a28ab61568b8c1d/html5/thumbnails/23.jpg)
JASTIP W4 Meeting
Maraming salamat