100 Climate Solutions Project Campaign ~ 2016 REGIONS OF CLIMATE ACTION LED Street lighting R20 Secretariat 48, Chemin du Grand Montfleury 1295, Versoix, Geneva Switzerland Paris, September 2nd Mandate Letter FMDV, the International Alliance dedicated to support Local Governments to sustainably finance their urban development is committed to taking concrete action and to be an active partner in working to deliver the climate objectives committed to by the 175 signatory nations of the Paris Agreement. Low carbon, climate resilient and sustainable development is amongst the very highest of our priorities. For these reasons, we hereby adhere to the R20 Charter and we confirm that we share the values and objectives that this document describes. We welcome R20’s initiative to work alongside government, industry and investors in accelerating the emergence of low carbon climate resilient infrastructure projects. We hereby mandate R20 to explore opportunities for the development of such projects within our partners cities and regions. Through that call we received more than 45 projects from Latin America, Asia, Africa and Middle East. We confirm that these projects, and any projects that we may subsequently identify in reference to this mandate, are part of our sustainability strategy and contribute to the intended nationally determined contribution (INDC). In support of the mandate conferred by this letter, we hereby commit to work as an active partner alongside R20 and its partners in the design, financing and implementation of these projects. Yours sincerely, Habeau JeanFrançois Executive Director Supporting local authorities to access funding Summary Main stakeholders Location and population Mandating Authority : Social and environmental impact Expected project CAPEX : The project aims to replace the existing stock of grid based street lighting with solar and expand the network to cover unserved areas of the city. Currently only 8% of the streets in Kampala have street lights posing significant challenges in terms of safety particularly for women and children who often walk to and from their places of work. The project is expected to install 40,000 units over a 10 year period. Kampala City Solar Street Lighting Project Social impacts: Increased safety particularly for women and children, reduced road fatal- ities & accidents, increased business hours, savings on energy costs which will be used to finance other social services like health and education. Environmental Impacts: lower greenhouse gas emissions, increased share of renewable in the city energy mix, energy efficiency and security, reduced exposure to energy supply shocks Kampala Capital City Authority, Pedestrians, Motorists, Informal communities, Develop- ment Partners and City Residents Kampala Capital City, Uganda 1.5 million inh. Kampala Capital City Authority (KCCA) 47’324’000 €

Transcript of Kampala City Solar Street Lighting Project - … · 100 Climate Solutions Project Campaign ~ 2016...

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

REGIONS OFCLIMATE ACTION

LED Street lighting

 R20  Secretariat  48,  Chemin  du  Grand  Montfleury  1295,  Versoix,  Geneva  Switzerland    Paris,  September  2nd  

 

Mandate  Letter    FMDV,  the  International  Alliance  dedicated  to  support  Local  Governments  to  sustainably  finance  their  urban  development    is  committed  to  taking  concrete  action  and  to  be  an  active  partner  in  working  to  deliver  the  climate  objectives  committed  to  by  the  175  signatory  nations  of  the  Paris  Agreement.   Low   carbon,   climate   resilient   and   sustainable   development   is   amongst   the   very  highest   of   our   priorities.   For   these   reasons,   we   hereby   adhere   to   the   R20   Charter   and   we  confirm  that  we  share  the  values  and  objectives  that  this  document  describes.    

We   welcome   R20’s   initiative   to   work   alongside   government,   industry   and   investors   in  accelerating  the  emergence  of   low  carbon  climate  resilient   infrastructure  projects.  We  hereby  mandate  R20  to  explore  opportunities  for  the  development  of  such  projects  within  our  partners  cities  and  regions.  Through  that  call  we  received  more  than  45  projects  from  Latin  America,  Asia,  Africa  and  Middle  East.  

We   confirm   that   these   projects,   and   any   projects   that   we   may   subsequently   identify   in  reference  to  this  mandate,  are  part  of  our  sustainability  strategy  and  contribute  to  the  intended  nationally  determined  contribution  (INDC).   In  support  of  the  mandate  conferred  by  this   letter,  we  hereby  commit   to  work  as  an  active  partner  alongside  R20  and   its  partners   in   the  design,  financing  and  implementation  of  these  projects.    

Yours  sincerely,  

   

 

Habeau  Jean-­‐François    

Executive  Director  

Supporting local authoritiesto access funding

Summary

Main stakeholders

Location and population

Mandating Authority :

Social and environmental impact

Expected project CAPEX :

The project aims to replace the existing stock of grid based street lighting with solar and expand the network to cover unserved areas of the city. Currently only 8% of the streets in Kampala have street lights posing significant challenges in terms of safety particularly for women and children who often walk to and from their places of work. The project is expected to install 40,000 units over a 10 year period.

Kampala City Solar Street Lighting Project

Social impacts: Increased safety particularly for women and children, reduced road fatal-ities & accidents, increased business hours, savings on energy costs which will be used to finance other social services like health and education. Environmental Impacts: lower greenhouse gas emissions, increased share of renewable in the city energy mix, energy efficiency and security, reduced exposure to energy supply shocks

Kampala Capital City Authority, Pedestrians, Motorists, Informal communities, Develop-ment Partners and City Residents

Kampala Capital City, Uganda1.5 million inh.

Kampala Capital City Authority (KCCA)

47’324’000 €

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Project maturity ( IFC / World Bank Categories )

Expected energy / expenses savings 

Source of electricity :

STAGE 3 : Feasibility Studies

STAGE 2 : Pre-Feasibility Studies

Pre-feasibility study

Feasibility study

Building permits signed

Identified sources of fundings

Contract with municipality

Environmental impact study

STAGE 5 : Engineering / Construction / Commercial Operation

Comments

Engineering, Procurement and Construction Contractor

Operation and Maintenance Contractor 

STAGE 4 : Permitting / Financing / Contracts

Current installation

Number of Lighting points :

Mapping of the street lighting system :

STAGE 1 : Concept Development, Site identification

STAGE 1 : Concept Development, Site identification STAGE 2 : Pre-Feasibility Studies STAGE 3 : Feasibility Studies STAGE 4 : Permit t ing / Financing / Contracts STAGE 5 : Engineering/Construction/Commercial Operation

The solar street lighting project is a high priority project for the Kampala Climate Change Action Plan given its potential benefits to the city. The project is expected to be integrated with a city air quality monitoring system and WI FI hotspots to generate additional income to the city.

The current installation is 3,700 units comprising of mainly grid connected poles and only 170 solar based units. This installation covers only 8% of the paved road and street network in the city. An additional 700 units are under procurement with financing from internal sources

40 000

Grid connected

Yes

Yes

No

No

YES (delivering authority is KCCA)

No

Not yet chosen

Not yet chosen

No

The project is expected to realize an estimated 3 megawatts in energy savings on the national grid. The project is also estimated to provide US$2.9 million annually in savings on electricity expenses.