  • KALYAN DOMBIVLI MUNICIPAL

    CORPORATION

    PRE FEASIBILITY REPORT

    For

    Proposed Integrated Solid Waste Management

    Facility at Umbarde, Kalyan

    Prepared By

    ABC Techno Labs India Pvt. Ltd. QCI NABET Accredited (Certificate No. NABET / EIA / 1316 / RA001)

    Corporate Office: No.2, 2nd

    Street, Thangam Colony, Anna Nagar West, Chennai 600040.

    Tamil Nadu, India.

    Tel: 044 26161123 / 24 / 25

    Mumbai Office: A/355, Balaji Bhavan, Plot No. 42 A, Sector 11, CBD Belapur,

    Navi Mumbai 400614, Maharashtra. India

    Tel: 022 27580055 / 44

    www.abctechnolab.com mumbai@abctechnolab.com

  • Project name: Integrated Solid Waste Management Facility at Umbarde

    ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 2

    Contents

    CHAPTER 1-EXECUTIVE SUMMARY .................................................................................................................. 4

    CHAPTER 2-IDENTIFICATION OF THE PROJECT AND PROJECT PROPONENT ...................................................... 6

    2.1 IDENTIFICATION OF THE PROJECT .................................................................................................................. 6

    2.1.1 Details of the Project Proponent ...................................................................................................... 6

    Table 2. 1 Details of Project Proponent ....................................................................................................................... 7

    2.2 DEMOGRAPHIC DETAILS OF KDMC ............................................................................................................... 7

    2.2.1 City Profile ......................................................................................................................................... 7

    2.3 BRIEF DESCRIPTION OF NATURE OF THE PROJECT ............................................................................................ 8

    2.4 NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY OR REGION ...................................................... 8

    2.5 EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT ......................................................... 9

    Table 2. 2 Employment generation details .................................................................................................................. 9

    CHAPTER 3-PROJECT DESCRIPTION ................................................................................................................ 10

    3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS, IF ANY ........................................... 10

    3.2 LOCATION ............................................................................................................................................... 10

    Table 3. 1 Land use break up details ......................................................................................................................... 10

    Figure3. 1: Project location ................................................................................................................................... 11

    Figure 3. 2 - 500 m Radius Satellite Image ............................................................................................................ 12

    Figure 3. 3 10 Km radius satellite image ............................................................................................................ 13

    3.3 ENVIRONMENTAL SETTINGS ....................................................................................................................... 14

    Table 3. 2 Environmental Settings of the project site ............................................................................................... 14

    3.4 DETAILS OF ALTERNATIVE SITE.................................................................................................................... 15

    3.5 SIZE AND MAGNITUDE OF PROJECT ............................................................................................................. 15

    3.6 PROJECT DESCRIPTION WITH PROCESS DETAILS: ............................................................................................ 15

    Table 3.4- Proposed units: ......................................................................................................................................... 21

    3.7 RAW MATERIAL REQUIREMENT: ................................................................................................................. 21

    Table 3. 5- Raw Material Requirement...................................................................................................................... 21

    3.8 RESOURCE OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED IN THE PROJECT, IF ANY, ..................................... 22

    3.9 AVAILABILITY OF WATER ITS SOURCE, ENERGY/ POWER REQUIREMENT AND SOURCE........................................... 22

    3.9.1 Water requirement ............................................................................................................................. 22

    Table 3. 6- Fresh Water Requirement ....................................................................................................................... 22

  • Project name: Integrated Solid Waste Management Facility at Umbarde

    ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 3

    3.9.2 Power Requirement ............................................................................................................................ 22

    Table 3. 7- Power Requirement ................................................................................................................................. 22

    Table 3. 8- DG sets details ......................................................................................................................................... 23

    CHAPTER 4-SITE ANALYSIS ............................................................................................................................. 24

    4.1 SITE CONNECTIVITY .................................................................................................................................. 24

    Table 4.1-Connectivity details ................................................................................................................................... 24

    4.2 LANDFORM, LAND USE AND LAND OWNERSHIP ............................................................................................. 26

    4.3 TOPOGRAPHY .......................................................................................................................................... 26

    4.4 EXISTING LAND USE PATTERN ..................................................................................................................... 26

    4.5 CLIMATE AND RAINFALL ............................................................................................................................ 26

    4.6 SOCIAL INFRASTRUCTURE AVAILABLE............................................................................................................ 26

    CHAPTER 5-PLANNING BRIEF ......................................................................................................................... 27

    5.1 PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, TRANSPORTATION ETC.) TOWN AND COUNTRY

    PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION ............................................................................................... 27

    5.2 POPULATION PROJECTION .......................................................................................................................... 27

    5.3 LAND USE PLANNING ................................................................................................................................ 28

    5.4 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL) ................................................................... 28

    CHAPTER 6-PROPOSED INFRASTRUCTURE ..................................................................................................... 29

    6.1 PLANNING BRIEF ...................................................................................................................................... 29

    6.2 GREEN BELT ............................................................................................................................................ 29

    6.3 CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD / RAIL / METRO / WATER WAYS ETC.) .............................. 30

    6.4 DRINKING WATER MANAGEMENT ............................................................................................................... 30

    6.5 SEWERAGE SYSTEM .................................................................................................................................. 30

    6.6 SOLID WASTE MANAGEMENT ..................................................................................................................... 30

    6.8 POWER REQUIREMENT & SUPPLY/SOURCE ................................................................................................... 30

    CHAPTER 7-REHABILITATION AND RESETTLEMENT (R&R) PLAN ..................................................................... 31

    CHAPTER 8-PROJECT SCHEDULE & COST ESTIMATES ...................................................................................... 32

    Table no. 8.1- Cost estimates .................................................................................................................................... 32