6/18/2016 1
KAIZEN PROJECT
DEPARTMENT : Training (Automation)
PROJECT NUMBER : 2
PROJECT TITLE :
Cleaning dust particles from optical beam
reflector of optical mouse & prevent it from
malfunctioning.
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 2
PROJECT NO : 1
TITLE : Effective utilization of Hydraulic
training kit & Reduction of oil leakage/wastage.
BENEFITS :
•Avoid extra time for searching components.
•Avoid wastage of time for placement of components.
•Maximum utilization of class duration.
•Reduce hydraulic oil wastage
•Saving electricity
SUMMARY OF COMPLETED PROJECT
Sanjay Humania [www.sanjayhumania.com]
3
OUR FUNCTIONAL TEAM
Sanjay
Humania
Mr. V.M Bankar Sir
(Sr. Engineer)
Yes! WE WILL..
Training (LCA)
Mr. Sumeet
Singh Samanta
Mr. Ashutosh
KumarMr. Bijayanand
Satapathy
6/18/2016 Sanjay Humania [www.sanjayhumania.com]
6/18/2016 4
PROJECT PLAN
PROJECT START: 1st AUG 2014.
PROJECT COMPLETED : 31st OCT 2015.
(UNDER 3 MONTHS TIME VALIDATION CYCLE)
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 5
WHY THIS PROJECT
1. To reduce malfunctioning of mouse
pointer.
2. To increase student & mouse
performance.
3. To enhance proper handling &
utilization of mouse.
4. To reduce time during using a
software & other applications.
5. To increase utilization of class hours.
6. Quality improvements in learning &
trainingSanjay Humania
[www.sanjayhumania.com]
6/18/2016 6
1.1 PROBLEM IDENTIFICATION
1. While practicing software,
malfunctioning of mouse occurs.
2. Problem in left and right click.
3. Mouse pointer deflected from its original
path.
4. Changing of mouse is not possible, on
the spot.
5. Student irritate and give unsatisfied
feedback at the end of courses.
6. Decreasing in quality in learning &
training.
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 7
1.2 SELECTION OF PROBLEM
1)Quality reducing in learning
& training.
2)Student un-satisfaction.
3)Student performance.
4)Utilization of optical mouse.
5)Time wastage.
6)Kit/system failures.
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 8
1.3 DEFINING THE PROBLEM
1. Due to heavy and continuous use of mouse-
Malfunctioning of left & right of a mouse
started.
2. Due to dust particles-
Optical reflector start malfunctioning.
3. Proper software utilization time reduces-
Poor mouse pointer control.
4. Trainee & students irritated-
Mouse is not working properly.
5. Un-satisfaction of trainees & students.
Less practice time and malfunctioning of mouse.
6. Quality in learning & training reduces.
Less practice time and malfunctioning of mouse.Sanjay Humania
[www.sanjayhumania.com]
6/18/2016 9
Why Why AnalysisBrain Storming Sessions
1.4 ANALYSIS OF PROBLEM
TOOLS USED FOR ANALYSIS
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 10
Brainstorming is a group or individual creativity
technique by which efforts are made to find a conclusion
for a specific problem by gathering a list of ideas
spontaneously contributed by its member(s)
Brain Storming Sessions
So we all trainee engineer discussed on the
above mentioned 1.2 SELECTION OF
PROBLEM & 1.3 DEFINING THE PROBLEM
And come to few conclusion and results. We
have also prepared a Project Plan /CHART
discussed in next slide.
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 11
Project Plan /CHART
Collecting
Information of
present situation
Planning
Identify
Problems
Reality
CheckMake Changes Verify Changes
Measure
Results
Make this
the Standard
Celebrate
Do It
Again
Results:
A new way of work
Start
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 12
1.4.1 ANALYSIS OF PROBLEM
1) Quality reducing in learning & training.
Root cause is PCs and infrastructure not fully
utilized.
2) Student un-satisfaction.
Root cause is optical mouse fault.
3) Student performance.
Root cause is shortage of time due to
malfunctioning of optical mouse.
4) Utilization of optical mouse.
Root cause is not proper cleaning and
handling.
5) Kit/system failures.
Root cause is faulty peripherals of PCs & kits.
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 13
1.4.2(a) ANALYSIS OF PROBLEM
W
H
Y
W
H
Y
A
N
A
L
Y
S
I
S
Optical mouse malfunctioning !
Optical ray deflection !
Lack of transparency in optical ray
guide
Dust particles on optical ray guide
Proper cleaning
Quality improvements in
learning & training
why
why
KAIZEN
why
why
why
why
Dusty flooring in class rooms
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 14
1.5 IDENTIFICATION OF CAUSES
SR.
NO. MAJOR ACTIVITY CAUSE
1) Time consumption Faulty Mouse
2) Student performanceMalfunction on mouse
control
5)Quality improvements in
learning & trainingLack of all the above topics
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 15
1.6 FINDING OUT THE ROOT CAUSE
Need systematic & continuous
evaluating process for all problems
Lack of fault finding, cleaning
& handling of mouse.
Sanjay Humania [www.sanjayhumania.com]
• Approx. price of a optical mouse we used in our practical class room is Rs. 425/-
• Total class room is XXX
• Total PCs is XXX
• 40% mouse malfunction in periodically.
• 10% to 20% are replaced by hardware networking.
• After a month again malfunctioning started.
6/18/2016 16
1.7 DATA ANALYSIS
* Mouse price information is collected from http://www.naaptol.com/mouse/hcl-usb-optical-mouse/p/3682827.html
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 17
1.7 DATA ANALYSIS
Cost per unit
Mouse we use in
our Lab.
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 18
1.7 DATA ANALYSIS
Cost per unit
Mouse we use in
our Lab.
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 19
1.8 DEVELOPING SOLUTIONS
1.Solution of “root cause” is to clean optical
ray crystal guide inside optical mouse
periodically. Minimum with in interval of 3
to 4 month.
2.If we are planning to change mouse, then we
should replace it with a new one. We should
not repair the faulty one. Because repairing
cost is more and no guarantee of working
properly.
3.Air cleaning can be done in minimum cost.
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 20
1.8 DEVELOPING SOLUTIONS
Open a single screw on the backside of the mouse
Clean internal circuit with air flow
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 21
KAIZEN PROCESS
.
ACTION BY WHOM BY WHEN STATUS
Oil wastage is stopped by
using oil try
By Sr. Engineer
(Mr. V. M.
Bankar)
12-NOV-14Oil wastage
reduces upto 85%
Hose oil wastage is
checked by using oil
bucket
By Me &
Mr.Vinod
Wairagade
(Trainee)
25-NOV-14Oil wastage
reduces upto 80%
Component arrangement
& allocating fixed place
By Me &
Mr.Gyan C.
Majhi (Trainee)
27-NOV-14
Searching time
reduces upto
100%
Labeling, arranging and
preparing proper data
sheets for components
By Me &
Mr.Vinod
Wairagade
(Trainee)
02-DEC-14Quality increases
upto 90%
Making arrangement of
theory & practical classes
in same classroom
By Me &
Mr.Animesh Kala
(Trainee)
10-JAN-15Class room
utilization 100%
Dividing total class
strength in to groups
By Me &
Mr.Avinash
Khandagale
28-JAN-15Training kit
utilization 100% Sanjay Humania
[www.sanjayhumania.com]
6/18/2016 22
1.9 FORESEEING PROBABLE RESISTANCE
1.Availability of casual
2.Time apart from daily class schedule
3.Internet (needed for proper
documentation)
4.Implementing the solution for the
problem & checking the results is time
consuming
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 23
1.10 IMPLEMENTATION PROCESS
Open the back screw with a screw driver
Upper portion is detached
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 24
1.10 IMPLEMENTATION PROCESS
Left click button
Right click button
LED
Optical sensor IC
Optical ray guide is under this PCB
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 25
1.10 IMPLEMENTATION PROCESS
Backside of the PCB
Optical ray guide
Optical Lens
Optical sensor
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 26
1.10 IMPLEMENTATION PROCESS
Cleaning optical sensor IC with air flow
Cleaning optical ray guide with air flow (up side)
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 27
1.10 IMPLEMENTATION PROCESS
Cleaning LED with air flow
Cleaning optical ray guide with air flow (down side)
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 28
1.10 IMPLEMENTATION PROCESS
Fixing up all components in mouse
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 29
1.10 TRIAL IMPLEMENTATION AND
CHECKING THE PERFORMANCE
1. After implementing all our solutions all working
perfectly.
2. Same cleaning process should be done minimum
in 3 to 4 months.
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 30
1.10 TRIAL IMPLEMENTATION AND CHECKING THE PERFORMANCE
“Hi, I am a faculty of ECAD, Pneumatics & Panel designing. Previously I was very frustrated with my PCs mouse. Maximum optical mouse was malfunctioning. After “Mouse cleaning kaizen project, 70% of my problem is solved. Thanks to Sanjay sir ! ”
______________________________
Mr. Sumeet Singh SamantaSanjay Humania
[www.sanjayhumania.com]
6/18/2016 31
1.10 TRIAL IMPLEMENTATION AND CHECKING THE PERFORMANCE
“Hello, I am a faculty of VLSI & PLC. Previously I was very much irritated with my lab PCs & mouse. 80% of optical mouse were faulty. After “Sanjay sirs kaizen project, all my problem is solved and mouse are working properly. Thanks to Sanjay sir ! ”
__________________Mr. Ashutosh Kumar
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 33
1.12. FOLLOW UP & REVIEW
1. Regularly we are maintaining all rules
implementation after kaizen.
2. Feedback are taken from every student after
complication of each batch.
3. Regularly I check, component list with tray list.
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 34
2.00 RESULTS
1. Class room & Hydraulic kit is now 100%
utilized in its maximum usable time.
2. Student feedback is good.
3. Oil leakage reduced
4. Oil wastage reduced
5. Experiment time increase per individual
student
6. Less maintenance cost for hydraulic kit
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 35
2. 1 TANGIBLE BENEFITS
1. Consider a piece of hydraulic equipment losing six cubic
centimetres of oil per minute (1 centimeter³ = 0.001 litre).
2. Over 6 hours/day, the loss is 0.36 litres, which perhaps is
not a significant amount. But over a month this equates
to 9.36 litres, and 112.32 litres over the course of a year.
3. Assuming a fluid cost of Rs 5020/20 litre, so Rs 251 per
litre, the annual cost is around Rs 28,192 approx.
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 36
2.2 CONTRIBUTION TO GREEN EARTH
1. Less oil wasted so less pollution
2. Student are mentally less stress during theory & practical
class
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 37
2. 3 INTANGIBLE BENEFITS
1. Saving time
2. Saving money
3. Increasing profit
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 38
2.4 SPECIAL GAINS (LEARNINGS) FOR
MEMBERS
Developed the Kaizen approach of problem
solving
Developed a spirit of TEAMWORK
Developed enhanced environmental awareness
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 39
2.5 FUTURE PROJECT PLANS
LIST OF PROJECTS
1) Effective utilization of Hydraulic training kit
Sanjay Humania [www.sanjayhumania.com]
6/18/2016 41
2.7 ACKNOWLEDGEMENT
OUR SPECIAL THANKS TO
Mr. H.D Kapse Sir (M.D. Sir)
Mr. J.D Bagul Sir (Manager Sir)
Mr. V.M. Bankar Sir (Sr. Engineer)
For giving a chance to participate in training on
KAIZEN,
&
My group member
Mr. Vinod Sir
Mr. Avinash Sir
Mr. Gyan Sir
Mr. Animesh Sir
For helping me in my project..Sanjay Humania
[www.sanjayhumania.com]
6/18/2016 42
SUMMARY OF O TAGS AS ON DATE
No of O
tag raised
No of
O tag
implemented
No of
O tag
pending
NIL NIL NIL
Completed
In Process
SUMMARY OF O TAGS FOR CURRENT
MONTH
No of O
tag
raised
No of
O tag
implemented
No of
O tag
pending
NIL NIL NIL