![Page 1: K. Long, 16 June, 2015 MICE Muon Beam. Beam line and decay solenoid: Pressure reducing valves: Fitted to Q7—9; To be fitted to Q4—6 Upstream MLI: Plan.](https://reader034.fdocuments.net/reader034/viewer/2022051415/56649d445503460f94a2093f/html5/thumbnails/1.jpg)
K. Long, 18 April 2023
MICE Muon Beam
![Page 2: K. Long, 16 June, 2015 MICE Muon Beam. Beam line and decay solenoid: Pressure reducing valves: Fitted to Q7—9; To be fitted to Q4—6 Upstream MLI: Plan.](https://reader034.fdocuments.net/reader034/viewer/2022051415/56649d445503460f94a2093f/html5/thumbnails/2.jpg)
Beam line and decay solenoid: Pressure reducing valves:
Fitted to Q7—9; To be fitted to Q4—6
Upstream MLI: Plan to fit as presented at review; Cool down scheduled to take place over Easter:
Clear instructions to baby sitters: Shutdown and make safe if there are issues that can not be
resolved without presence of expert
Volunteers required! LC has plan (see later), but manpower is short (usual
‘suspects’!)
![Page 3: K. Long, 16 June, 2015 MICE Muon Beam. Beam line and decay solenoid: Pressure reducing valves: Fitted to Q7—9; To be fitted to Q4—6 Upstream MLI: Plan.](https://reader034.fdocuments.net/reader034/viewer/2022051415/56649d445503460f94a2093f/html5/thumbnails/3.jpg)
Target: Production of jugs etc. has started:
Welding and grinding jigs: AC @ RAL
Production of parts has started: Bearing blanks: RH @ IC
Test welding/test grinding: Hope for:
Welding this week; Send to grinders next week