JZC Resume_Complete_REV
-
Upload
jessica-zeigler-cihlar -
Category
Documents
-
view
315 -
download
2
Transcript of JZC Resume_Complete_REV
Jessica L. ZeiglerJessica L. ZeiglerJessica L. ZeiglerJessica L. Zeigler----Cihlar, Cihlar, Cihlar, Cihlar, PrincipalPrincipalPrincipalPrincipal A IA , L E E D A P BD +C , N CA RBA IA , L E E D A P BD +C , N CA RBA IA , L E E D A P BD +C , N CA RBA IA , L E E D A P BD +C , N CA RB
Ms. Zeigler-Cihlar is a registered architect in Pennsylvania, New Jersey, New York, and Delaware, specializing in
architectural design, assessment and documentation projects in historic buildings and sites. Prior to founding Village
Architecture & Preservation, Ms. Zeigler-Cihlar spent over a decade as a Preservation Architect at John Milner
Associates, Inc., where she developed a diverse portfolio of preservation, rehabilitation and adaptive reuse projects.
While providing services in architectural design, Ms. Zeigler-Cihlar develops creative approaches to the sustainable
and responsible stewardship of historic properties, efficient use and reuse of space and resources, and
implementation of site-inspired aesthetic in new design. As a Historic Preservation Consultant, she has set quality
standards for documentation of historic buildings, develops sensitive design interventions for historic building
upgrades, and draws on years of collaboration with conservators in the assessment of historic materials.
Through her work with colleges and universities, religious facilities, municipalities, and private property owners, she
has had the pleasure of working on buildings ranging from the eighteenth to twenty-first centuries, representing the
Gothic to Tudor to Vernacular styles.
Representative ProjectsRepresentative ProjectsRepresentative ProjectsRepresentative Projects
Allee House Rehabilitation, Bombay Hook National Wildlife Refuge, Kent County, Delaware. Project Architect
for Condition Assessment for the 1753 Allee House and three outbuildings. Preparation of treatment guidelines,
keynoted drawings, and preservation recommendations in conjunction with structural and MEP assessments.
Preparation of a Preventative Maintenance Plan including photographs, quantities, and frequency of treatment for
areas to be repaired, in compliance with The Secretary of the Interior's Standards. Project Manager for subsequent
preparation of Construction Documents for the rehabilitation of the house, including brick masonry, wood shingle
roof, wood window repairs, and site drainage improvements. (with John Milner Associates)
Amity Art Studio Addition, Douglassville, Pennsylvania. Design and permit documentation for an enlarged studio
space at an existing carriage-house style art studio and wood shop. The new art studio includes a large north-facing
dormer for maximum lighting, French doors leading to outdoor seating and work area, and large windows for views
to the adjacent wooded yard, as well as a full bath, kitchenette, and storage closet.
Bard College Preservation Maintenance Plan, Annandale-on-Hudson, New York. Project Architect for Condition
Assessment and treatment recommendations for 50 historic buildings encompassing dormitories, laboratories,
mansions, gatehouses, administrative buildings, and private residences. Architectural assessment was included in a
campus-wide Preservation Maintenance Plan for the restoration and maintenance of historic buildings and
landscapes on Bard College's 550 acre campus. (with JMA)
Bellarmine Retreat Center Condition Assessment, Waynesboro, Pennsylvania. Project Architect for existing
conditions analysis and Summary Code Review for Loyola House, a c.1900 Shingle style retreat house. Assessment
of nonconformance with life safety and handicap accessibility codes, followed by recommendations for interior and
exterior renovations and upgrades. (with JMA)
Village Architecture & PreservationVillage Architecture & PreservationVillage Architecture & PreservationVillage Architecture & Preservation Jessica L. Zeigler-Cihlar
Blue Ball Barn Rehabilitation, Wilmington, Delaware. Assisting Preservation Architect for existing conditions
documentation of the early 1900s DuPont family Dairy Barn, in preparation for exterior restoration and interior
renovations as an exhibit and conference center. The award-winning project includes a new LEED-certified addition
designed by Wallace Roberts & Todd of Philadelphia. (with JMA)
Borough of Bally Municipal Building, Bally, Pennsylvania. Principal Architect for design and permit documentation
for a new municipal administrative building including police administration, municipal vehicle parking and
maintenance, file storage, and staff bunk room. (with Thomas L. Zeigler, PE, Inc.)
Boyertown Area Historical Society Condition Assessment, Boyertown, Pennsylvania. Interior and exterior
assessment of the ca. 1900 building, originally a residence and subsequently the home of St. Columbkill Roman
Catholic Church. Condition assessment and site documentation used to prepare repair recommendations for
treatment of existing features and finishes.
Brooke Elementary School Rehabilitation, Spring-Ford Area School District, Royersford, Pennsylvania. Design
and permit documentation for rehabilitation of two existing restrooms to bring them into ADA compliance. Project
involved coordination with the district’s Office of Maintenance & Operations and rapid turnaround to accommodate
the school calendar year.
Bucknell University Architectural Preservation Master Plan, Lewisburg, Pennsylvania. Preservation Architect for
preparation of Condition Assessment and Historic Summary for four buildings surrounding a historic campus
quadrangle in conjunction with a campus-wide architectural and landscape architectural Master Plan for the
treatment and use of historic buildings and landscapes. (with JMA)
Capitol Building Study, Richmond, Virginia. Assisting Preservation Architect for survey, assessment, and existing
conditions documentation of interior and exterior building conditions, in order to produce recommendations for the
restoration and repair of Thomas Jefferson’s 1780s capitol building. (with JMA)
Caramoor Center for Music and the Arts Preservation Plan, Katonah, New York. Preservation Architect for
preparation of existing conditions drawings illustrating areas of deterioration and vegetation damage to four historic
estate buildings, ca. 1930. Building deterioration was primarily focused on mission tile roofs and cement stucco walls,
particularly at the medieval Mediterranean-style Rosen House villa. The drawings were referenced in a preservation
plan and subsequent stucco repair project led by JMA conservators. (with JMA)
Cheltenham Township Historic Preservation Consulting, Montgomery County, Pennsylvania. Project Architect
for Historic Preservation Consulting to the Cheltenham Township Historical Commission, including attendance at
and documentation of public meetings and review of project applications. (with JMA)
Christ Church Cathedral Rehabilitation, Louisville, Kentucky. Assisting Preservation Architect for Design and
Construction Documents for interior decorative elements of the Cathedral, previously renovated by JMA.
Preservation Architect for Design and Construction Documents for the renovation of adjacent Dean’s Hall into a
handicapped-accessible day care, meeting space, and Sunday school facility. (with JMA)
Christ Church – Episcopal Addition, Reading, Pennsylvania. Project Architect for Design and Construction
Documents for a new entrance addition to the nineteenth-century brownstone cathedral. Work included a new
accessible garden approach, two-story entrance foyer, restrooms, elevator, and open staircase to the second floor
worship space. (with JMA)
Church of the Holy Trinity Master Plan Implementation Project, Philadelphia, Pennsylvania. Project Architect for
Design and Construction Documents for the implementation of a Facilities Master Plan for the 1859 brownstone
church on Rittenhouse Square. Proposed renovations include the addition of an elevator and egress stair tower and
installation of an interior ADA ramp, ADA-accessible restrooms, and classrooms for children's day care. Project
required coordination with and approval from the Philadelphia Historical Commission. (with JMA)
Village Architecture & PreservationVillage Architecture & PreservationVillage Architecture & PreservationVillage Architecture & Preservation Jessica L. Zeigler-Cihlar
City of Norwalk Comprehensive Historic Preservation Plan, Norwalk, Connecticut. Assisting Preservation
Architect for preparation of existing conditions drawings illustrating areas of deterioration in nine historic buildings
owned by the City, including an art studio, municipal meeting hall, town jail, visitor’s center, and the Lockwood-
Mathews Mansion Museum, among others. Building plans, elevations, and sections were prepared for inclusion in
the Preservation Plan, intended to guide the Norwalk Historical Commission in the repair and maintenance of its
historic resources. (with JMA)
Code Review and Architectural Consulting, Pottstown, Pennsylvania. Principal Architect and design consultant
for interior fitout and design projects for Thomas L. Zeigler, PE, Inc. Ongoing projects include residential,
commercial, municipal, and industrial clients throughout Montgomery, Delaware, and Berks Counties.
Colebrookdale Railroad Preservation Trust, Boyertown and Pottstown, Pennsylvania. Schematic Design
documentation for a new metal train station in Boyertown, as well as the relocation and rehabilitation of an existing
1887 train station reportedly designed by renowned Architect, Frank Furness, to Pottstown. The documentation
provided was submitted by the CRPT with grant applications to support the restoration of the Colebrookdale
Railroad and dual-station project as a scenic tourist destination in southeastern Pennsylvania. Following grant
approval, VA&P continues to provide preservation consulting and design services for preparation of bid documents
for the relocation and fitout of the Furness station.
Delaware Department of Transportation. Assisting Preservation Architect for locating, identifying and mapping all
historic structures in two Route 113 corridor counties, via Geographic Information Systems software. (with JMA)
Delaware State Hospital Fence, Wilmington, Delaware. Preservation Architect for existing conditions
documentation and Construction Documents for relocation of a historic iron fence and brick walls associated with
the rehabilitation of Interstate 295 south of the Delaware State Hospital. Project was completed in accordance with
Section 106 requirements for location of an adjacent burial ground. (with JMA)
Eden Day Spa and Salon, Collegeville, Pennsylvania. Design and Permit Documentation for interior fitout of an
existing retail space for use as a new 2,400 s.f. day spa. Project required close coordination with landlord and tenant
representatives to incorporate custom treatment and massage rooms, client locker areas and amenities, reception
area, staff office and break room, and specialty storage areas.
First Presbyterian Church Community Room Renovation, Pottstown, Pennsylvania. Design and Construction
Documentation for renovation of existing storage and abandoned restroom space into new pass-through kitchenette
and custom storage. Preparation of a three-dimensional computer model to use for fundraising and committee
presentations in seeking approval for redecorating of the existing Community Room, in collaboration with FPC
committee members.
Forum and Finance Building Restroom Rehabilitation, Capitol Complex, Harrisburg, Pennsylvania. Historic
Preservation Consultant to Chris Dawson Architect for the preservation design review of proposed renovations to
forty-four historic restrooms throughout the ca. 1930s Forum and Finance Buildings. Project involved in-depth
review of design development drawings, photographs, meeting minutes, and historic drawings for the preparation of
a memorandum of opinion relative to The Secretary of the Interior’s Standards for the Rehabilitation of Historic
Properties.
General Lafayette’s Quarters Documentation, Valley Forge National Historical Park, Valley Forge,
Pennsylvania. Project Architect for assessment of the roof structures on three sections of a house that was
reportedly inhabited by the Marquis de Lafayette during the 1777-1778 encampment at Valley Forge. Detailed
drawings produced in accordance with National Park Service standards, including both English and Metric
measurements. (with JMA)
Gonzaga Villa Rehabilitation, Cape May, New Jersey. Assisting Preservation Architect for Design Development,
Construction Documents, and Construction Administration for the $1.6 million renovation of an oceanfront retreat
for the Maryland Province of the Society of Jesus. Historic exterior features were restored, in addition to the
installation of upgraded bathrooms, kitchen, bedrooms, and building systems on the interior. (with JMA)
Village Architecture & PreservationVillage Architecture & PreservationVillage Architecture & PreservationVillage Architecture & Preservation Jessica L. Zeigler-Cihlar
Gregg Residence Pergola, West Chester, Pennsylvania. Project Architect for Design and Construction Documents
for a 300 square foot wood-framed pergola addition and landscape feature for a historic home in Chester County. (with JMA)
Historic Schuylkill Elementary School Adaptive Reuse Feasibility Study, Phoenixville, Pennsylvania. Project
Architect for existing conditions survey and assessment of a 1930 elementary school located in the Phoenixville Area
School District. Coordination with Friends of Schuylkill School and PASD Administrative staff to determine program
needs and design a plan for adaptive reuse of the school for Administrative offices. (with JMA)
Hollins University Campus Heritage Preservation Program, Roanoke, Virginia. Preservation Architect for
preparation of Condition Assessment, Architectural Design Standards and client-specific Treatment Guidelines in
compliance with The Secretary for the Interior’s Standards for the maintenance of historic structures on campus.
Review of case studies for historic campus buildings to verify appropriate treatment recommendations. (with JMA)
Independence National Historical Park Rehabilitation, Philadelphia, Pennsylvania. Project Architect for existing
conditions survey of landscape features and architectural elements for the preparation of repair and maintenance
recommendations. Preparation of layered site plans and maps indicating known and suspected archeological and
historical sites to be used as reference for rehabilitating the original historic landscape of the site. (with JMA)
Jackson’s Headquarters Museum Feasibility Study, Winchester, Virginia. Preservation Architect for existing
conditions documentation of the 1854 cottage used by General "Stonewall" Thomas Jackson as a headquarters
during the winter of 1861-1862. Assistance with Feasibility Study for the addition of an accessible approach,
entrance, and public restrooms for the museum. (with JMA)
The Jesuit Center Renovation Programming Study, Wernersville, Pennsylvania. Project Architect for existing
conditions documentation for the former Jesuit Novitiate of St. Isaac Jogues, built in 1930 on more than 250 acres.
Construction of a 25 s.f. working scale model of the building and surrounding landscape. Coordination with facility
and program staff for the preparation of a conceptual design to upgrade the building’s accommodations for spiritual
retreatants and retired Jesuit Community members. (with JMA)
Keystone Specific Chiropractic Center Fitout, Wyomissing, Pennsylvania. Design and Permit Documentation for
interior fitout, code compliance and accessibility upgrades to an existing office building for use as a new 1,350 s.f.
chiropractic office. Project required close coordination with municipal authorities for inclusion of an X-Ray Room and
required ADA improvements.
Kirkwood Camp & Conference Center Coop Hall Accessibility, Stroudsburg, Pennsylvania. Design and Permit
Documentation for rehabilitation of existing storage space and abandoned toilet rooms into new kitchen storage and
two new accessible restrooms within the existing Coop Dining Hall.
Lamb Tavern Springhouse Stabilization and Repair, Glenmoore, Pennsylvania. Project Architect for existing
conditions assessment/documentation and preparation of a scope of work for the stabilization of the 400 s.f.
collapsing historic springhouse. Work completed as part of an emergency grant from the National Trust for Historic
Preservation to the Wallace Township Historical Commission. (with JMA)
Leaf Creek House Rehabilitation, Douglassville, Pennsylvania. Design and Permit Documentation for the design
of accessibility and code-compliance upgrades to the pre-Civil War Colonial farmhouse for rehabilitation as business
offices and reception facilities. The design achieved minimal intrusion on the original floor plan of the 4,300 s.f.
building, which sits on 7 acres in beautiful Berks County. The project required sensitive treatment of significant
architectural features, such as a Mercer Tile fire place, as well as a Conditional Use Hearing presentation to the local
township and subsequent coordination with contractors relevant to scope adjustments.
Harleysville Residence, Lower Salford Township, Pennsylvania. Principal Architect for preparation of Schematic
Design documents for a 10,700 s.f. Mediterranean-style custom home. Project involved detailed collaboration with
the owner to incorporate very specific preferences for floor layout, interior progression, exterior approach, and
exterior views, while working within restrictions established by the county and a previously-established conservation
easement.
Village Architecture & PreservationVillage Architecture & PreservationVillage Architecture & PreservationVillage Architecture & Preservation Jessica L. Zeigler-Cihlar
Linfield Historical Resources Survey, Linfield, Pennsylvania. Assisting Preservation Architect for site survey and
case-by-case investigation to determine locations and characteristics of historically significant structures in the
Linfield and Limerick areas. (with JMA)
Old St. David’s Church at Radnor Restoration, Wayne, Pennsylvania. Preservation Architect for existing
conditions documentation of the 1715 church, suffering from structural and vegetation damage. Drawings were
included in an overall assessment and repair recommendations report for restoration of the building. (with JMA)
Phoenix Ferris Wheel Restoration, Phoenixville, Pennsylvania. Project Architect assisting with survey,
assessment, and documentation of hundreds of disassembled steel sections of the last remaining Phoenix Steel
Company ferris wheel in the country. Having been transported from Mississippi back to its original home in
Phoenixville, the ferris wheel is being restored under the stewardship of the Schuylkill River Heritage Center as a
centerpiece of Phoenixville Borough’s community development movement. (with TLZ PE)
Print Copy Design Solutions Rehabilitation, Trappe, Pennsylvania. Design and Permit Documentation for the
expansion of an existing print shop into a larger, 5,000 s.f. warehouse space. The design included accessibility and
fire protection upgrades, a customer service area, and storage space on two levels.
Rabbit Run Residence Restoration, Malvern, Pennsylvania. Design and Permit Documentation for the design of a
new sunroom for a Tudor-style home that suffered severe fire damage. The new sunroom design replicated existing
materials and details to the greatest extent possible to allow for seamless integration with the original home where
damaged features were restored.
Roosevelt Island Smallpox Hospital Stabilization, Roosevelt Island, New York. Preservation Architect for existing
conditions documentation of early 1850s Smallpox Hospital designed by James Renwick, Jr. JMA designed shoring
and stabilization of the hospital ruins as part of a larger project with Wallace Roberts & Todd to create a new public
park and landscape feature. (with JMA)
Salem Belleman’s Union Church Restoration, Mohrsville, Pennsylvania. Principal Architect for reconstruction of a
54-foot-high brick and cast stone bell tower previously rendered unusable due to masonry deterioration. Project
included matching existing materials and detailing of the 1922 tower, removal and protection of the historic 1,600 lb.
bell, coordination with the church’s Bell Tower Committee, and presentations to the Congregation. (with TLZ PE)
Sanctuary Counseling, Douglassville, Pennsylvania. Principal Architect for code interpretation and design of the
interior layout of a 5,300 s.f. counseling facility. Client requirements included private counseling offices, open
gathering areas, activity rooms, and enclosed porches for private reflection. Following completion of design
documents, an ink perspective rendering was created for the client’s use in advertising. (with TLZ PE)
Shenton Road Kitchen Expansion, West Chester, Pennsylvania. Design and Permit Documentation for a one-story
addition to a residential kitchen wing, to match the existing residence while maintaining existing roof lines and
exceptionally close site setbacks.
Shipley School Historic Resource Impact Study, Bryn Mawr, Pennsylvania. Preservation Architect in coordination
with MGA Partners for preparation of a Historic Resource Impact Study pertaining to proposed renovations and
additions to the historic Upper School/Administration Building and Carriage House and creation of a new dormitory
and campus quadrangle. (with JMA)
Spring-Ford Area School District Monument Signage, Royersford, Pennsylvania. Principal Architect for design of
a brick and cast stone monument for the primary entrance to the High School 10-12 Grade Center. Project involved
coordination with the district’s Office of Maintenance & Operations and collaboration with electronic message board
manufacturers to comply with the local zoning ordinance. Final deliverable consisted of a 3-dimensional computer
model of the monument and electronic sign. (with P. Richard Frantz, AIA)
Spring Ridge Corporate Campus, Wyomissing, Pennsylvania. Project Architect for preparation of construction
documents for a new three-story, 5,000 s.f. single-tenant office building to fit within an existing corporate park.
Project involved coordination with the project developer, future tenant, and associated fit-out consultants. (with Architectural Concepts, PC)
Village Architecture & PreservationVillage Architecture & PreservationVillage Architecture & PreservationVillage Architecture & Preservation Jessica L. Zeigler-Cihlar
St. Andrew’s Episcopal Church Renovations and Addition, Glenmoore, Pennsylvania. Assisting Preservation
Architect in preparation of construction documents for expansion of the historic nave, installation of a new narthex
and an accessible entrance ramp, and accessibility and fire protection upgrades to the circa 1833 church. (with JMA)
St. John the Baptist Rehabilitation, Pottstown, Pennsylvania. Design and Permit Documentation for an
accessible restroom within an existing space behind the sanctuary of the 1930 Byzantine Baptist Church, retaining
existing storage areas, circulation and an accessible entrance.
The Stone House Foundation Historic Structures Report, Stephens City, Virginia. Assisting Preservation
Architect for analysis and documentation of five Civil War-era structures for the purpose of creating an Interpretive
Visitors’ Center in downtown Stephens City. Assistance with preparation of a Historic Structure Report describing
existing conditions and discussing potential restoration and re-use of the Stone House. (with JMA)
Strawbridge & Clothier Department Store Rehabilitation, Philadelphia, Pennsylvania. Project Architect for
identification and protection of historic finishes and features, preparation of detailing for core and shell
rehabilitation, and Construction Administration during demolition and rehabilitation work. Inspection of exterior
stone facades, preparation of construction documents, and construction administration for exterior repair
implementation. Coordination with the building owner, NPS, and PHMC for appropriate and sensitive design of
interior spaces for retail and office tenants in compliance with The Secretary of the Interior’s Standards, USGBC LEED
Certification requirements, and the Federal Historic Preservation Tax Credit requirements. The core and shell
rehabilitation project, led by BLT Architects, won a Preservation Achievement Grand Jury Award from the
Preservation Alliance of Greater Philadelphia and LEED CS Gold certification from the USGBC in 2010. (with JMA)
Strawbridge & Clothier Masonry Rehabilitation and Bridge Removal Repairs, Philadelphia, Pennsylvania.
Assisting Preservation Architect for preparation of construction documents for restored façade at the location of a
former overhead pedestrian bridge; assessment of exterior masonry conditions; recommendations for phased repair,
maintenance, and rehabilitation; and construction administration services for exterior repairs to the 1928
department store building. (with JMA)
The Thomas Clarke House Preservation Plan, Princeton Battlefield, Mercer County, New Jersey. Assisting
Preservation Architect in the conclusion of a detailed study of the history, archeology, architectural evolution,
material deterioration, and potential rehabilitation of the 1772 Quaker home, which played a crucial role in the
Revolutionary War’s pivotal Battle of Princeton. Preservation Plan concluded in a multi-disciplinary presentation of
findings to representatives of the Clarke House Committee, Princeton Battlefield Society, and State of New Jersey in
preparation for the next phase of physical restoration. (with JMA)
Thomas Jefferson Building Condition Assessment, Capitol Hill, Washington, D.C. Historic Preservation
Consultant to Entech Engineering, Inc. for the condition assessment of exterior windows and masonry and the
Neptune Fountain at the ca. 1897 national monument. Project involved review of field survey notes, photographs,
and conservation reports for the preparation of a repair recommendation database.
Trinity House Apartments Occupied Renovations, Waynesboro, Pennsylvania. Project Architect for the
preparation of schematic design plans illustrating accessibility upgrades and exterior improvements to the 62,000
s.f. Section 8 housing project. Working closely with Chesapeake Community Advisors and CH&E Construction, Inc.,
the project team collaborated on an application to the Pennsylvania Housing Finance Agency, which included
drawings, energy audit, and detailed scope of work. (with Arch Concepts)
United States Naval Asylum Documentation, Philadelphia, Pennsylvania. Project Architect for Historic American
Building Survey (HABS) documentation of architectural elements of the building, in preparation for renovations to
the 1833 Biddle Hall following prolonged damage to the building due to fire and the elements. All survey sketches
and final drawings to be stored in the Library of Congress following project completion. http://www.loc.gov/pictures/item/pa0668/ (with JMA)
Village Architecture & PreservationVillage Architecture & PreservationVillage Architecture & PreservationVillage Architecture & Preservation Jessica L. Zeigler-Cihlar
United States Post Office of Boone Preservation Design Review, Boone, North Carolina. Project Architect for the
evaluation of proposed rehabilitation of the National Register-listed post office for postal, municipal, and visitors
center use. Subsequent preparation of a preservation design review memorandum for use by the Boone Town
Council in determining the appropriateness of the proposed work. (with JMA)
Upper Providence Residence Addition, Collegeville, Pennsylvania. Principal Architect for a 3-story, 2,300 s.f.
kitchen expansion and home renovation to an existing bungalow. The renovations include a master bedroom suite,
linen closet, laundry chute, great room, dining room, enlarged kitchen with breakfast bar, powder room, new
mudroom entrance and covered porch, future finished basement, and an additional 3-story interior staircase. All plan
elements designed to complement scale and character of existing residence, while protecting unique windows and
architectural features.
Varsity Hall, University of Virginia, Charlottesville, Virginia. Preservation Architect for existing conditions
documentation of the first university infirmary, built in 1858. Preparation of architectural and construction details for
stabilization of the brick building while being moved 185 feet to an alternative location on campus. (with JMA)
Wheeling Annex Architectural Survey, Wheeling, West Virginia. Preservation Architect for existing conditions
documentation and historical study of four mixed-use buildings located in the Wheeling Historic District. The
buildings were located adjacent to the Wheeling Court House and subsequently demolished to make way for the
Court House expansion. (with JMA)
Wilson Residence Addition, Reading, Pennsylvania. Project Architect for Design and Construction Documents for
a 1,200 square foot addition to a private residence in Exeter Township. Scope of work included a master bedroom
expansion, new master bath, closets, kitchen and living room expansion, music room, garage workshop, garden
storage, and deck. (with JMA)
Wycombe Train Station Restoration, Walton, Pennsylvania. Preservation Architect for existing conditions
documentation of historic train station. Assisted with coordination of PennDOT requirements for preparation of
construction documents to restore wood doors and windows, stained glass, slate roof, wood siding and trim, and
construct a new exterior wooden walkway. (with JMA)
EducationEducationEducationEducation
Bachelor of Architecture The Pennsylvania State University
� Studies in Early Pennsylvania Architecture and Restoration
� Sede di Roma study abroad in Rome, Italy
Professional Affiliations and CertificationsProfessional Affiliations and CertificationsProfessional Affiliations and CertificationsProfessional Affiliations and Certifications
Qualified as an Architect and Historic Architect by
National Park Service, 36 Code of Federal Regulations
Part 61 American Institute of Architects, member
NCARB Certified
U.S. Green Building Council LEED Accredited
Professional, Building Design and Construction
Specialty
National Association of the Remodeling Industry –
Building Industries Exchange, member
Preservation Alliance of Greater Philadelphia, member
Uwchlan Township Historical Commission, acting
member and Architectural Liaison
Uwchlan Township Planning Commission, ex officio
member
Preservation Pennsylvania, member
Delaware Valley Green Building Council (DVGBC),
member
Chester County Historic Preservation Network, member
Friends of the Daniel Boone Homestead, member
Colebrookdale Railroad Preservation Trust, corporate
member
PresentationsPresentationsPresentationsPresentations
Preservation & Restoration: What You Should Know - summary of benefits and incentives for undertaking rehabilitation
projects on historic properties. Presentation to a monthly meeting of the Pottstown Building Industries Exchange and
National Association of the Remodeling Industry (BIE-NARI). October, 2012.