JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD NO WORK DESCRIPTION OWNER COMMENCEMENT DATE CURRENT STATUS September 18, 2020 - (Track Record Updated) 1. SUPPLY OF HUMIDUR FP PAINT & HUMICLEAN FASTART SDN BHD / SHELL September 15, 2020 In Progress 2. HUMIDUR REVALIDATION PROCESS FOR SHELL FASTART SDN BHD / SHELL September 15, 2020 In Progress 3. SUPPLY OF HUMIDUR FP PAINT FASTART SDN BHD / SHELL September 14, 2020 In Progress 4. SUPPLY OF HUMIDUR FP PURE WHITE BB TECH SERVICES S/B September 7, 2020 Completed 5. SUPPLY OF HUMIDUR FP PURE WHITE DIALOG September 2, 2020 Completed 6. SUPPLY OF HUMIDUR FP PURE WHITE STEEL HAWK September 1, 2020 Completed 7. SUPPLY OF HUMIDUR FP PURE WHITE STEEL HAWK September 1, 2020 Completed 8. SUPPLY OF HUMIDUR FP GREY WHITE PFLNG1 September 1, 2020 Completed 9. SUPPLY OF HUMIDUR FP PURE WHITE HRSB ENGINEERING & CONSTRUCTION S/B August 26, 2020 Completed 10. SUPPLY OF HUMIDUR FP JET BLACK INNOCORR OFFSHORE S/B August 24, 2020 Completed 11. SUPPLY OF HUMIDUR FP PAINT FASTART SDN BHD / SHELL August 24, 2020 Completed 12. SUPPLY OF HUMIDUR FP PAINT & HUMICLEAN FASTART SDN BHD / SHELL August 24, 2020 Completed

Transcript of JURUNATURE SDN. BHD COMPANY CURRENT TRACK RECORD · 2020. 9. 18. · jurunature sdn. bhd. - company...

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    1. SUPPLY OF HUMIDUR FP PAINT & HUMICLEAN FASTART SDN BHD /

    SHELL

    September 15, 2020 In Progress

    2. HUMIDUR REVALIDATION PROCESS FOR SHELL FASTART SDN BHD /

    SHELL

    September 15, 2020 In Progress

    3. SUPPLY OF HUMIDUR FP PAINT FASTART SDN BHD /

    SHELL

    September 14, 2020 In Progress

    4. SUPPLY OF HUMIDUR FP PURE WHITE BB TECH SERVICES

    S/B

    September 7, 2020 Completed

    5. SUPPLY OF HUMIDUR FP PURE WHITE DIALOG

    September 2, 2020 Completed

    6. SUPPLY OF HUMIDUR FP PURE WHITE STEEL HAWK

    September 1, 2020 Completed

    7. SUPPLY OF HUMIDUR FP PURE WHITE STEEL HAWK

    September 1, 2020 Completed

    8. SUPPLY OF HUMIDUR FP GREY WHITE PFLNG1

    September 1, 2020 Completed

    9. SUPPLY OF HUMIDUR FP PURE WHITE HRSB ENGINEERING & CONSTRUCTION S/B

    August 26, 2020 Completed

    10. SUPPLY OF HUMIDUR FP JET BLACK INNOCORR OFFSHORE

    S/B

    August 24, 2020 Completed

    11. SUPPLY OF HUMIDUR FP PAINT FASTART SDN BHD /

    SHELL

    August 24, 2020 Completed

    12. SUPPLY OF HUMIDUR FP PAINT & HUMICLEAN FASTART SDN BHD /

    SHELL

    August 24, 2020 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    13. SUPPLY OF HUMIDUR FP PURE WHITE BB TECH SERVICES

    S/B

    August 24, 2020 Completed

    14. SUPPLY OF HUMIDUR FP PAINT & HUMICLEAN FASTART SDN BHD /

    SHELL

    August 19, 2020 Completed

    15. SUPPLY OF HUMIDUR FP PAINT & HUMICLEAN FASTART SDN BHD /

    SHELL

    August 19, 2020 Completed

    16. SUPPLY OF HUMIDUR FP PAINT FASTART SDN BHD /

    SHELL

    August 13, 2020 Completed

    17. SUPPLY OF HUMIDUR FP PAINT FASTART SDN BHD /

    SHELL

    August 11, 2020 Completed

    18. SUPPLY OF HUMIDUR FP QR ASIAN SEALAND

    OFFSHORE & MARINE PTE LTD

    August 10, 2020 Completed

    19. SUPPLY OF HUMIDUR FP PURE WHITE HRSB ENGINEERING & CONSTRUCTION S/B

    August 10, 2020 Completed

    20. SUPPLY OF HUMIDUR FP PAINT FASTART SDN BHD /

    SHELL

    August 7, 2020 Completed

    21. SUPPLY OF HUMIDUR FP PURE WHITE BB TECH SERVICES

    S/B

    August 4, 2020 Completed

    22. SUPPLY OF HUMIDUR FP PURE WHITE PFLNG1

    July 22, 2020 Completed

    23. SUPPLY OF HUMIDUR FP, ME PAINTS & HUMICLEAN FASTART SDN BHD /

    SHELL

    July 21, 2020 Completed

    24. SUPPLY OF HUMIDUR FP PURE WHITE DIALOG

    July 15, 2020 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    25. SUPPLY OF HUMIDUR FP PURE WHITE HRSB ENGINEERING & CONSTRUCTION S/B

    July 5, 2020 Completed

    26. SUPPLY OF PPE ITEMS PETROSAINS July 3, 2020 Completed

    27. SUPPLY OF PPE ITEMS PETROSAINS July 3, 2020 Completed

    28. SUPPLY OF PPE ITEMS PETROSAINS July 3, 2020 Completed

    29. SUPPLY AND DELIVERY OF JOTUN PAINT PILOT II TO SEOB WAREHOUSE JOHOR PORT

    SAPURA OFFSHORE SDN BHD

    July 2, 2020 Completed

    30. SUPPLY OF HUMIDUR FP PAINT FASTART SDN BHD /

    SHELL

    July 1, 2020 Completed

    31. SUPPLY OF HUMIDUR ME AGATE GREY FASTART SDN BHD /

    SHELL

    June 30, 2020 Completed

    32. SUPPLY OF MATERIAL & HUMIDUR TRAINING FOR DIALOG PCOGD / DIALOG June 23, 2020 Completed

    33. HUMIDUR APPLICATION AT PCOGD – TRAINING FOR HRSB TEAM

    PCOGD / HRSB ENGINEERING &

    CONSTRUCTION SDN BHD

    June 22, 2020 Completed

    34. HUMIDUR APPLICATION AT PCOGD – TRAINING FOR BB TECH TEAM PCOGD / BB TECH

    SERVICES SDN BHD June 18, 2020 Completed

    35. PASSIVE FIRE PROTECTION WORKS FOR C/01/FB/1051 – ONGC KG-DWN 98/2 CPP & LQ PROJECT

    SAPURA FABRICATION (INDIA PROJECT

    OFFICE)

    June 15, 2020 In Progress

    36. SUPPLY OF HUMIDUR FP PAINTS – COLZA YELLOW & GREY WHITE FASTART SDN BHD /

    SHELL

    June 15, 2020 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    37. SUPPLY AND DELIVERY OF JOTUN PILOT II PAINT TO SEOB PASIR GUDANG FOR YUNLIN OFFSHORE WINDFARM PROJECT

    SAPURA OFFSHORE SDN BHD TAIWAN

    BRANCH

    June 9, 2020 Completed

    38. SUPPLY OF HUMIDUR FP PAINTS – COLZA YELLOW, PALE GREEN, PASTEL ORANGE, JET BLACK & HUMICLEAN

    FASTART SDN BHD / SHELL

    June 5, 2020 Completed

    39. PROVISION OF CISCO-MERAKI WIRELESS SYSTEM SOLUTION FOR HESS NETWORK MIGRATION PROJECT

    HESS EXPLORATION AND PRODUCTION

    MALAYSIA B.V.

    June 3, 2020 In Progress

    40. SUPPLY OF MOXA PENGERANG

    REFINING SDN BHD

    June 1, 2020 Completed

    41. VARIATION ORDER TO INCLUDE ADDITIONAL QUANTITY - HAND SANITIZER 500ML & NITRILE GLOVES (X3)

    PETRONAS NASIONAL BERHAD

    May 20, 2020 Completed

    42. SUPPLY OF HUMIDUR FP PAINTS – COLZA YELLOW & GREY WHITE FASTART SDN BHD /

    SHELL

    May 15, 2020 Completed

    43. PROVISION OF AUDIO-VISUAL (AV) & ELECTRICAL MAINTENANCE AND SUPPORT SERVICES

    HESS EXPLORATION

    May 12, 2020 In Progress

    44. SUPPLY OF HUMIDUR FP PAINTS – JET BLACK INNOCORR OFFSHORE

    SDN BHD

    May 12, 2020 Completed

    45. SUPPLY OF HUMIDUR TC & FP PAINTS TO MGC BRUNEI BLNG

    May 7, 2020 Completed

    46. SUPPLY OF SPRING HANGER (UNISON) PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG)

    May 5, 2020 Completed

    47. SUPPLY OF HUMIDUR FP PAINTS – PALE GREEN FASTART SDN BHD /

    SHELL

    May 5, 2020 Completed

    48. VARIATION ORDER TO INCLUDE ADDITIONAL QUANTITY - HAND SANITIZER 500ML & NITRILE GLOVES (X2)

    PETRONAS

    May 5, 2020 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    49. VARIATION ORDER TO INCLUDE ADDITIONAL QUANTITY AND ITEM - HAND SANITIZER 500ML & NITRILE GLOVES (X1)

    PETRONAS

    April 25, 2020 Completed

    50. SUPPLY OF HUMIDUR FP & ME PAINTS FASTART SDN BHD /

    SHELL

    April 22, 2020 Completed

    51. PROVISION OF MEDICAL SUPPLY TO PETRONAS - SUPPLY OF MEDICAL ITEMS: 3-PLY SURGICAL MASK, HAND SANITIZER 5L & HAND SANITIZER 500ML

    PETRONAS

    April 18, 2020 Completed

    52. EPCC FOR KINARUT - ERB WEST COMPRESSOR UPGRADING PROJECT (U-BOLT VDI)

    SAPURA FABRICATION SDN BHD

    April 16, 2020 Completed

    53. SUPPLY OF HUMIDUR FP & ME PAINTS FASTART SDN BHD /

    SHELL

    April 16, 2020 Completed

    54. SUPPLY OF HUMIDUR FP PAINTS – PALE GREEN FASTART SDN BHD /

    SHELL

    March 31, 2020 Completed

    55. SUPPLY OF MEDICAL SUPPLIES AND EQUIPMENT FOR YAYASAN PETRONAS - DIGITAL NON-CONTACT THERMOMETER (PM9000)

    YAYASAN PETRONAS

    March 29, 2020 Completed

    56. PFP WORK – ACCELARATION, BURN MARKS AND ADDITIONAL SURFACE AREA (FABRICATION OF JAMNAGAR BERTH A2 PROJECT)

    RELIANCE / SAPURA FABRICATION SDN

    BHD March 20, 2020

    Completed

    57. SUPPLY OF HUMIDUR PAINTS – COLZA YELLOW & GREY WHITE FASTART SDN BHD /

    SHELL March 18, 2020 Completed

    58. SUPPLY OF HUMIDUR ME FOR PUTERI NILAM EAGLESTAR

    SHIPMANAGEMENT (L) PTE LTD

    March 17, 2020 Completed

    59. SUPPLY OF HUMIDUR FP PETRONAS FLOATING

    LNG (PFLNG1) March 13, 2020 Completed

    60. SUPPLY OF HUMIDUR ME FOR PUTERI DELIMA - ADDITIONAL EAGLESTAR

    SHIPMANAGEMENT (L) PTE LTD

    March 11, 2020 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    61. SUPPLY OF WELDING ELECTRODE – ONGC KG-DWN 98-2 CPP & LQ SAPURA FABRICATION

    SDN BHD (INDIA 98/2 PROJECT

    March 11, 2020 Completed

    62. SUPPLY OF HUMIDUR ME FOR PUTERI DELIMA EAGLESTAR

    SHIPMANAGEMENT (L) PTE LTD

    March 6, 2020 Completed

    63. HUMIDUR TRAINING FOR FIXED TEAM PAINTING CAMPAIGN PCSB / UBF TSM ENGINEERING

    February 27, 2020 Completed

    64. SUPPLY OF WELDING ELECTRODE – HESS PHASE 3 SAPURA FABRICATION

    SDN BHD February 27, 2020 Completed

    65. SUPPLY OF HUMICLEAN FASTART SDN BHD /

    SHELL

    February 27, 2020 Completed

    66. SUPPLY OF AUDIOCODE IP PHONE ENQUEST

    February 26, 2020 Completed

    67. SUPPLY AND APPLY OF PASSIVE FIRE PROTECTION (PFP) WORKS FOR BERGADING CPP – MRU INTEGRATION PROJECT

    MMHE

    February 26, 2020 Completed

    68. SUPPLY OF WELDING ELECTRODE – PEGAGA DEVELOPMENT PROJECT SAPURA OFFSHORE

    SDN BHD February 24, 2020 Completed

    69. SUPPLY OF WELDING ELECTRODE – BERGADING CPP-MRU PROJECT MMHE February 19, 2020 Completed

    70. SUPPLY OF HUMIDUR ME PAINTS FASTART SDN BHD /

    SHELL

    February 14, 2020 Completed

    71. PROVISION OF PASSIVE FIRE PROTECTION REMEDIAL WORKS BLNG

    February 13, 2020 In Progress

    72. PURCHASE OF SPEAKER EXXONMOBIL

    February 11, 2020 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    73. SUPPLY OF HUMIDUR FP PAINTS TRANSFAME SDN BHD

    / SHELL

    February 11, 2020 Completed

    74. PROVISION TO SUPPLY IT HARDWARE AND CONSUMABLES HESS

    February 10, 2020 In Progress

    75. SUPPLY REGULATING VALVE - FSO GOLDEN STAR – MACHINERY PURCHASE 062

    MMHE

    January 20, 2020 Completed

    76. SUPPLY OF HUMIDUR ME PAINTS TO QESS ENERGY SUPPORT SERVICES SDN BHD

    BSP

    January 20, 2020 Completed

    77. HUMIDUR APPLICATION ON V-5403 VESSEL AT PCSB KERTEH CERGAS BERSATU /

    PCSB

    January 18, 2020 Completed

    78. SUPPLY AND DELIVERY OF PIPE SUPPORT (I-ROD AND COUNTERSUNK BOLT C/W NUT)

    SAPURA ENERGY BERHAD

    January 17, 2020 Completed

    79. PROVISION TO PURCHASE SPRING HANGER FOR WD A05 FLOWLINES UPGRADE

    PETROFAC

    January 10, 2020 Completed

    80. PROVISION TO PURCHASE PIPE SUPPORT MATERIALS FOR WD A05 MODIFICATIONS (U-BOLT FIX AND I-ROD)

    PETROFAC

    January 10, 2020 Completed

    81. PROVISION OF ASSAI MAINTENANCE RENEWAL (JAN-DEC 2020) SAPURAOMV UPSTREAM

    (SARAWAK) INC

    January 9, 2020 In Progress

    82. SUPPLY OF HUMIDUR PAINTS TO MGC BRUNEI BLNG

    January 8, 2020 Completed

    83. STRUCTURAL WORKS FOR CPP TOPSIDE AND LSF FOR KASAWARI GAS DEVELOPMENT PROJECT

    MMHE / PCSB

    December 26, 2019 In Progress

    84. SUPPLY OF SWITCH ETHERNET MOXA PENGERANG POWER

    SDN BHD

    December 23, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    85. STRUCTURAL, MECHANICAL AND PIPING WORKS FOR BERGADING CPP-MRU MMHE / HESS

    December 23, 2019 In Progress

    86. PASSIVE FIRE PROTECTION (PFP) WORK FOR PEGAGA CPP TOPSIDE MDC OIL & GAS LTD /

    SAPURA FABRICATION SDN BHD

    December 18, 2019 In Progress

    87. SITE VISIT WORK FOR HELIDECK SURFACE COATING REPAIR PV DRILLING & WELL

    SERVICES CORP / PETRONAS

    December 13, 2019 Completed

    88. ADDITIONAL SURFACE AREA FOR PFP WORK – FIRE WATER TOWER (FABRICATION OF JAMNAGAR BERTH A2 PROJECT)

    SAPURA FABRICATION SDN BHD

    December 12, 2019

    Completed

    89. SUPPLY OF HUMIDUR ME PAINTS FASTART SDN BHD /

    SHELL

    December 6, 2019 Completed

    90. SUPPLY OF HUMIDUR PAINTS TO QESS ENERGY SUPPORT SERVICES SDN BHD

    BSP

    December 5, 2019 Completed

    91. SUPPLY OF HUMIDUR ME PAINTS TRANSFAME SDN BHD

    / SHELL

    December 5, 2019 Completed

    92. SUPPLY OF WELDING ELECTRODE – FSO GOLDEN STAR MMHE

    December 2, 2019 Completed

    93. SUPPLY OF WELDING ELECTRODE – PEGAGA CPP TOPSIDE SAPURA FABRICATION

    SDN BHD

    November 20, 2019 Completed

    94. SUPPLY AND DELIVERY OF RELIEF VALVE, CAST BRONZE, 6 BAR (KORVAL) DNOW AUSTRALIA PTY LTD / SHELL

    November 18, 2019 Completed

    95. SUPPLY OF WELDING ELECTRODE – YUNLIN OFFSHORE WIND FARM SAPURA OFFSHORE SDN BHD (TAIWAN

    BRANCH)

    November 15, 2019 Completed

    96. ADOBE SUBSCRIPTION RENEWAL LICENSE 2019 - 2020

    PETRONAS CHEMICALS

    DERIVATIVES SDN BHD

    November 12, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    97. SUPPLY OF WELDING ELECTRODE – ONGC KG-DWN 98-2 CPP & LQ SAPURA FABRICATION

    SDN BHD (INDIA 98/2 PROJECT)

    November 7, 2019

    Completed

    98. HUMIDUR FP APPLICATION FOR MOCK-UP PROJECT AT PCOGD PCOGD / B.B TECH

    SERVICES SDN BHD November 5, 2019 Completed

    99. SUPPLY OF SANDISK EXTREMEPRO 128GB PENGERANG

    REFINING COMPANY SDN BHD

    October 27, 2019 Completed

    100. SUPPLY OF WELDING ELECTRODE – ONGC KG-DWN 98-2 CPP & LQ SAPURA FABRICATION

    SDN BHD (INDIA PROJECT OFFICE)

    October 25, 2019 Completed

    101. ADDITIONAL SURFACE AREA FOR PFP WORK (FABRICATION OF JAMNAGAR BERTH A2 PROJECT)

    SAPURA FABRICATION SDN BHD

    October 23, 2019

    Completed

    102. SUPPLY OF WELDING ELECTRODE – PEGAGA CPP TOPSIDE SAPURA FABRICATION

    SDN BHD October 18, 2019

    Completed

    103. SUPPLY OF BATTERIES ENQUEST October 17, 2019

    Completed

    104. PFP MAINTENANCE WORK AT GUMUSUT KAKAP TOPSIDE SABAH SHELL PETROLEUM

    COMPANY LIMITED October 17, 2019

    Completed

    105. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT (ITEM 660-730 ONLY)

    MMHE October 10, 2019

    Completed

    106. SUPPLY AND DELIVER WIRELESS KEYBOARD AND LAPTOP STAND FOR PETRONAS LUBRICANTS MARKETING (M) SDN BHD

    PETRONAS LUBRICANTS

    MARKETING (M) SDN BHD

    October 7, 2019

    Completed

    107. SUPPLY AND DELIVERY OF E&I BULK MTO FOR MEPA INFILL OCTOBER (DELTA WITH AFC) (POWER & INSTRUMENT CABLE) – COST PLUS

    DAYANG ENTERPRISE SDN BHD / MURPHY

    October 4, 2019

    Completed

    108. SUPPLY NU BOLT (GRIP/NON-GRIP) FOR SOGT PRESSURE VESSEL REDUDANCY PROJECT

    EVOLUSI BERSATU SDN BHD / PCSB

    October 4, 2019

    Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    109. SUPPLY NU BOLT C/W I-ROD FOR SOGT GTC SEAL GAS LINE EVOLUSI BERSATU

    SDN BHD / PCSB October 3, 2019

    Completed

    110. STRUCTURAL WORKS FOR BOKOR CPP TOPSIDES – SVOA NO.4 MMHE October 2, 2019

    In Progress

    111. SUPPLY OF WELDING ELECTRODE FOR ONGC KG-DWN 98-2 CPP & LQ PROJECT

    SAPURA FABRICATION SDN BHD

    September 25, 2019

    Completed

    112. SUPPLY OF HUMIDUR PAINTS AT MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

    BLNG September 24, 2019

    Completed

    113. SUPPLY OF WELDING ELECTRODE FOR PEGAGA PROJECT SAPURA FABRICATION

    SDN BHD September 18, 2019

    Completed

    114. PROCUREMENT OF INSTRUMENT CABLE LOC-PETROFAC MALAYSIA MENARA PRESTIGE

    PETROFAC (PM304-MALAYSIA) LIMITED

    August 21, 2019

    Completed

    115. SUPPLY AND DELIVERY OF SURFACE BOOK 2 i7 16GB

    PETRONAS LUBRICANTS

    INTERNATIONAL SDN BHD

    August 21, 2019

    Completed

    116. SUPPLY OF WELDING ELECTRODE FOR JX NIPPON LAYANG DEVELOPMENT PROJECT

    SAPURA OFFSHORE SDN BHD

    August 19, 2019 Completed

    117. SSJ - PROVISION OF DRY ICE MACHINE RENTAL BRUNEI LNG SDN BHD August 7, 2019

    In Progress

    118. SUPPLY OF WELDING ELECTRODE FOR ENI MERAKES DEVELOPMENT PROJECT

    SAPURA OFFSHORE SDN BHD

    August 7, 2019

    Completed

    119. SUPPLY OF HUMIDUR TC PAINTS AT MGC BRUNEI BLNG August 6, 2019

    Completed

    120. SUPPLY OF WELDING ELECTRODE FOR FABRICATION OF PEGAGA CPP PROJECT

    SAPURA FABRICATION SDN BHD

    August 2, 2019

    Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    121. SURFACE PREPARATION USING HiCO2 DRY ICE BLASTING FOR C-6942 EO TANK

    DIALOG / PCOGD July 28, 2019 Completed

    122. PROVISION OF ELECTRODE FOR KINARUT WEST – BASE SCOPE & LABUAN YARD

    SAPURA PINEWELL SDN BHD

    July 11, 2019 Completed

    123. PURCHASE OF COMPUTER HARDWARE

    EXXONMOBIL EXPLORATION AND

    PRODUCTION MALAYSIA INC.

    July 11, 2019 Completed

    124. STRUCTURAL WORKS FOR JACKET, BRIDGE AND APPURTENANCES FOR BOKOR CPP-JACKET

    MMHE July 4, 2019 Completed

    125. PROVISION TO SUPPLY MANPOWER, EQUIPMENTS, TOOLS AND CONSUMABLES FOR PFP COATING FOR RSDV (ADDITIONAL WORK)

    SAPURA PINEWELL / KPOC

    July 2, 2019 Completed

    126. SUPPLY OF WELDING ELECTRODE FOR PEGAGA CPP TOPSIDE PROJECT SAPURA FABRICATION

    SDN BHD June 25, 2019 Completed

    127. SUPPLY OF HUMIDUR FP PLURAL PAINTS TO PT. BREDERO SHAW INDONESIA SHAWCOR

    SINGAPORE PTE LTD June 25, 2019 Completed

    128. SUPPLY AND DELIVERY OF INSTRUMENT BULK MATERIALS FOR MEPA 11 FLOWLINE INTERIM (INSTRUMENT CABLES) – COST PLUS

    DAYANG ENTERPRISE SDN BHD / MURPHY

    June 20, 2019 Completed

    129. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE June 20, 2019 Completed

    130. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE June 20 , 2019 Completed

    131. SUPPLY AND DELIVERY OF KOBE ELECTRODE FOR FSO GOLDEN STAR MMHE June 17, 2019 Completed

    132. SUPPLY OF WELDING ELECTRODE FOR ONGC KG-DWN 98-2 SAPURA FABRICATION

    SDN BHD June 14, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    133. SUPPLY AND DELIVERY OF GASKET MALAYSIAN REFINING

    COMPANY June 10, 2019 Completed

    134. SUPPLY OF HUMIDUR PAINTS TO QESS ENERGY SUPPORT SERVICES SDN BHD

    BSP May 30, 2019 Completed

    135. SUPPLY OF HUMIDUR PAINTS TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

    BLNG May 30, 2019 Completed

    136. SUPPLY AND DELIVERY OF ELECTRICAL CABLE WOODGROUP /

    EMEPMI May 29, 2019 Completed

    137. SUPPLY OF WELDING ELECTRODE FOR ONGC KG-DWN 98-2 SAPURA FABRICATION

    SDN BHD May 27, 2019 Completed

    138. SUPPLY AND DELIVERY OF MATERIALS FOR WHEATHER SHELTER (INSTRUMENT CABLES) – COST PLUS (GOPA)

    DAYANG ENTERPRISE SDN BHD / MURPHY

    May 24, 2019 Completed

    139. SUPPLY OF HUMIDUR FP BRUSH TRANSFAME SDN BHD May 24, 2019 Completed

    140. REPAIR OF PFP COATING FOR C/01/FB/1039 – EPCC + I FFD HESS PHASE 2 FACILITIES, NMB

    SAPURA FABRICATION SDN BHD / HESS EXPLORATION

    May 24, 2019 Completed

    141. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTIVE COMPOUND FOR SSB/SSPC

    SARAWAK SHELL BERHAD

    May 23, 2019 Completed

    142. FABRICATION AND INSTALLATION OF GRILLAGE, DEAD MAN ANCHOR, LINK BEAMS AND REMOVAL LSF SEAFASTENING AND GRILLAGE FOR BOKOR CPP TOPSIDE

    MMHE May 15, 2019 In Progress

    143. SUPPLY AND APPLY OF PFP WORKS FOR BOKOR CPP TOPSIDE MMHE May 15, 2019 Completed

    144. SUPPLY OF HUMIDUR PAINTS TO QET BSP May 14, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    145. SUPPLY OF HUMIDUR FP COATING BLACK FOR SS PUTERI INTAN EAGLESTAR

    SHIPMANAGEMENT (L) PTE LTD

    May 7, 2019 Completed

    146. PROVISION TO SUPPLY MANPOWER, EQUIPMENTS, TOOLS AND CONSUMABLES FOR PFP COATING FOR RSDV

    SAPURA PINEWELL / KPOC

    April 29, 2019 Completed

    147. PASSIVE FIRE PROTECTION WORK FOR CONSTRUCTION OF BERTH A2 AT MARINE TERMINAL, JAMNAGAR, INDIA

    SAPURA FABRICATION SDN BHD

    April 22, 2019 Completed

    148. SUPPLY AND DELIVERY OF CABLE SARAWAK SHELL

    BERHAD April 25, 2019 Completed

    149. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE April 23, 2019 Completed

    150. FABRICATION AND INSTALLATION SEAFASTENING AND LOADOUT ACTIVITIES FOR GK PHASE 2

    MMHE April 18, 2019 Completed

    151. SUPPLY OF HUMICLEAN TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

    BLNG April 16, 2019 Completed

    152. STRUCTURAL WORKS FOR JACKET, BRIDGE AND APPURTENANCES FOR BOKOR CPP-JACKET

    MMHE April 12, 2019 Completed

    153. SUPPLY OF HUMIDUR FP QR SARAWAK SHELL

    BERHAD April 5, 2019 Completed

    154. SUPPLY OF HUMIDUR ME BRUSH SARAWAK SHELL

    BERHAD April 5, 2019 Completed

    155. SUPPLY AND DELIVERY OF STUD BOLT FOR DULANG C PIPING UPGRADE (PACKAGE OTHERS)

    CARIMIN / PETRONAS CARIGALI

    April 4, 2019 Completed

    156. SUPPLY AND DELIVERY OF STUD BOLT FOR DULANG C PIPING UPGRADE (PACKAGE FLOWLINE/WELLHEAD)

    CARIMIN / PETRONAS CARIGALI

    April 3, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    157. SUPPLY OF HUMIDUR FP PAINTS TO QET BSP April 1, 2019 Completed

    158. MANPOWER SUPPLY (44 PAX) FOR JACKET BOKOR PROJECT MMHE March 29, 2019 Completed

    159. PURCHASE OF COMPUTER HARDWARE

    EXXONMOBIL EXPLORATION AND

    PRODUCTION MALAYSIA INC.

    March 29, 2019 Completed

    160. PROVISION OF TENSILE TEST ON HELIDECK NETTING TRANSFAME SDN BHD March 29,2019 Completed

    161. PRIMAVERA LICENSE RENEWAL PETRONAS

    TECHNICAL SERVICES SDN BHD

    March 26, 2019 Completed

    162. PAN MALAYSIA FIELD JOINT COATING SERVICES SARAWAK SHELL BERHAD / SAPURA

    ENERGY March 21, 2019 Completed

    163. SUPPLY OF WELDING ELECTRODE FOR BOKOR CPP PROJECT SAPURA OFFSHORE

    SDN BHD March 22, 2019 Completed

    164. CABLING & TV INSTALLATION FOR FGVT WAR ROOMS FELDA GLOBAL

    VENTURES HOLDINGS BERHAD

    March 20, 2019 Completed

    165. SUPPLY OF HUMIDUR TC PAINTS TO QET BSP March 20, 2019 Completed

    166. SUPPLY OF HUMIDUR FP PAINTS AND HUMICLEAN TO QET BSP March 20, 2019 Completed

    167. SUPPLY AND DELIVERY OF STICKER / STENCIL FOR VESSEL (STATIC PTS-34) PETRONAS CARIGALI March 19, 2019 Completed

    168. PROVISION OF SUPPLY, COMMISSIONING OF HEAT SHIELD AND ROOF SHIELD FOR LIFEBOAT-D

    CARIGALI HESS March 7, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    169. SUPPLY AND DELIVERY OF ELECTRICAL CABLE SARAWAK SHELL

    BERHAD March 5, 2019 Completed

    170. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD

    BLNG March 5, 2019 Completed

    171. SUPPLY OF HUMIDUR PAINTS TO TRANSFAME SDN BHD SARAWAK SHELL

    BERHAD March 4, 2019 Completed

    172. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD

    BLNG February 28, 2019 Completed

    173. SUPPLY AND DELIVERY OF WATER SHUT OFF VALVE 5K 125A (KORVAL) CHEE FATT CO. PTE

    LTD February 22, 2019 Completed

    174. SUPPLY OF HUMIDUR PAINTS TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

    BLNG February 22, 2019 Completed

    175. SUPPLY OF HUMIDUR PAINTS TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

    BLNG February 20, 2019 Completed

    176. SUPPLY OF WELDING ELECTRODE FOR EPCI OF GALLAF SAPURA FABRICATION

    SDN BHD February 20, 2019

    Completed

    177. SUPPLY OF WELDING ELECTRODE FOR BOKOR TOPSIDE MMHE February 14, 2019 Completed

    178. SUPPLY OF HUMIDUR ME COATING FOR SS PUTERI ZAMRUD EAGLESTAR

    SHIPMANAGEMENT (L) PTE LTD

    February 14, 2019 Completed

    179. SUPPLY OF HUMIDUR FP COATING FOR SS PUTERI ZAMRUD EAGLESTAR

    SHIPMANAGEMENT (L) PTE LTD

    February 14, 2019 Completed

    180. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) February 11, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    181. PASSIVE FIRE PROTECTION RECTIFICATION WORK FOR MALIKAI SABAH SHELL PETROLEUM

    COMPANY LIMITED February 11, 2019 Completed

    182. PASSIVE FIRE PROTECTION TEST PANEL (EARLY MOB) FOR HESS PHASE 2 PROJECT

    SAPURA FABRICATION SDN BHD / HESS EXPLORATION

    February 7, 2019 Completed

    183. SUPPLY OF HUMIDUR TC PAINTS AND TO QET BSP February 7, 2019 Completed

    184. PASSIVE FIRE PROTECTION TEST PANEL (EARLY MOB) HESS / SAPURA February 7, 2019 Completed

    185. SUPPLY OF IT HARDWARE & CONSUMABLES HESS February 1, 2019 Completed

    186. PROVISION OF ASSAI ONSITE SOFTWARE MAINTENANCE RENEWAL (JANUARY-DECEMBER 2019)

    SAPURA EXPLORATION &

    PRODUCTION (SARAWAK) INC.

    January 31, 2019 Completed

    187. SUPPLY OF WELDING ELECTRODE FOR EPC OF GOREK SAPURA FABRICATION

    SDN BHD January 28, 2019 Completed

    188. SUPPLY OF WELDING ELECTRODE FOR EPC OF LARAK SAPURA FABRICATION

    SDN BHD January 28, 2019 Completed

    189. SUPPLY OF WELDING ELECTRODE FOR EPC OF BAKONG SAPURA FABRICATION

    SDN BHD January 28, 2019 Completed

    190. SUPPLY OF WELDING ELECTRODE FOR HESS PHASE 2 SAPURA FABRICATION

    SDN BHD January 25, 2019 Completed

    191. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE January 25, 2019 Completed

    192. SUPLLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE January 22, 2019 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    193. SUPPLY AND DELIVERY OF INSTRUMENT CABLES – COST PLUS (GOPA) DAYANG ENTERPRISE

    / MURPHY January 16, 2019 Completed

    194. SUPPLY OF WELDING ELECTRODE – PEGAGA PROJECT SAPURA FABRICATION

    SDN BHD January 15, 2019 Completed

    195. SUPPLY OF FOXIT PHANTOM PDF BUSINESS ADDITION FELDA GLOBAL

    VENTURES HOLDINGS BERHAD

    January 11, 2019 Completed

    196. SUPPLY OF HUMIDUR PAINTS FOR DARAT PROJECT E38 AND E15 TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD

    BLNG December 28, 2018 Completed

    197. SUPPLY OF WELDING ELECTRODE FOR JAMNAGAR PROJECT SAPURA FABRICATION

    SDN BHD December 26, 2018 Completed

    198. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) December 24, 2018 Completed

    199. SUPPLY OF WELDING ELECTRODE FOR PEGAGA JACKET SAPURA FABRICATION

    SDN BHD

    November 23, 2018 Completed

    200. SUPPLY AND DELIVERY OF CABLE INSTRUMENT (ADDITIONAL) FOR HUC MODIFICATION AT D18MP-A FOR D28 PHASE 1 PROJECT

    PETRONAS CARIGALI December 17, 2018 Completed

    201. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD

    BLNG December 6, 2018 Completed

    202. PROVISION OF CISCO HARDWARE & SUPPORT SERVICES TO REFRESH NETWORK SYSTEM

    HESS December 6, 2018 In Progress

    203. PROVISION OF SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION WORK FOR ZETUNG TOPSIDE – HESS PHASE 2 PROJECT

    SAPURA FABRICATION SDN BHD / HESS EXPLORATION

    December 5, 2018 Completed

    204. SUPPLY OF WELDING ELECTRODE FOR PEGAGA JACKET SAPURA FABRICATION

    SDN BHD November 23, 2018 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    205. PROVISION OF SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION WORK FOR ZETUNG TOPSIDE

    HESS / SAPURA November 22, 2018 Completed

    206. PROVISION OF SERVER SOFTWARE, LICENSES AND SERVICES FOR MURPHY’S OPERATIONS

    MURPHY November 22, 2018 Completed

    207. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) November 11, 2018 Completed

    208. SUPPLY OF HUMIDUR PAINT FOR MESPLT GUMUSUT DEVELOPMENT AND MALIKAI STORE

    SABAH SHELL PETROLEUM

    November 9, 2018 Completed

    209. SUPPLY OF WELDING ELECTRODE FOR BOBE PROJECT SAPURA PINEWELL

    SDN BHD October 18, 2018 Completed

    210. SUPPLY OF WELDING ELECTRODE FOR NOC GALLAF PROJECT SAPURA FABRICATION

    SDN BHD October 17, 2018 Completed

    211. MATERIAL FRO TELCO SATELLITE ANTENNA PEDESTAL AT WPPA – COST PLUS (ANTI-SLIP)

    DAYANG ENTERPRISE / MURPHY

    October 17, 2018 Completed

    212. PFP RECTIFICATION WORK FOR ST. JOSEPH SEA HIBISCUS SDN

    BHD October 16, 2018 Completed

    213. PROVISION OF ELECTRONIC OFFICE APPLICATION LEAVE FOR PTTEP HK OFFSHORE LIMITED

    PTTEP HK OFFSHORE LIMITED

    October 12, 2018 Completed

    214. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE October 12, 2018 Completed

    215. SUPPLY OF WELDING ELECTRODE FOR EPC OF GOREK SAPURA FABRICATION

    SDN BHD October 9, 2018 Completed

    216. SUPPLY OF PRIMARY UNIT REGULATOR VALVE 20K 50A WITH GAUGE (KORVAL)

    PFLNG October 4, 2018 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    217. SUPPLY OF WELDING ELECTRODE FOR EPC OF BAKONG SAPURA FABRICATION

    SDN BHD September 25, 2018 Completed

    218. SUPPLY AND DELIVERY ELECTRICAL MATERIAL FOR DULANG V-507 SEPARATOR CONTROL UPGRADE

    PETRONAS CARIGALI September 23, 2018 Completed

    219. SUPPLY AND DELIVERY OF CABLE AND ACCESSORIES FOR DULANG WELL FLOW MEASUREMENT B23SL DULANG B PLATFORM

    PETRONAS CARIGALI September 21, 2018 Completed

    220. SUPPLY OF SWA CABLE DAYANG ENTERPRISE

    SDN BHD September 14, 2018 Completed

    221. SUPPLY OF HUMIDUR PAINTS FOR MESPLT GUMUSUT DEVELOPMENT SABAH SELL PETROLEUM

    August 30, 2018 Completed

    222. SUPPLY & DELIVERY OF TOOLS AND CONSUMABLE (WELDING ELECTRODE) FOR MAINTENANCE, CONSTRUCTION AND MODIFICATION (MCM)

    (SKG) SAPURA FAB-BORNEO

    SEAOFFSHORE JV / PETRONAS CARIGALI

    August 28, 2018 Completed

    223. SUPPLY OF HUMIDUR PAINTS TO MGC BRUNEI FOR BLNG CSIP USAGE BLNG August 20, 2018 Completed

    224. SUPPLY OF INSTRUMENT CABLE FOR SAPA INFILL E & I BULK MATERIAL – COST PLUS

    DAYANG ENTERPRISE SDN BHD

    August 2, 2018 Completed

    225. SUPPLY OF 3M 8515 N95 DISPOSABLE RESPIRATOR PETRONAS GAS

    BERHAD July 31, 2018 Completed

    226. SUPPLY OF HUMIDUR FP COATING FOR LNG PUTERI NILAM EAGLESTAR

    SHIPMANAGEMENT (L) PTE LTD

    July 27, 2018 Completed

    227. RENTAL OF DRY-ICE BLASTING SYSTEM FOR 3 MONTHS EVERSOLVE July 23, 2018 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    228. SUPPLY OF HUMIDUR PAINTS FOR U7200 TRESTLE STRUCTURE B/P ACTIVITIES

    EVERSOLVE July 23, 2018 Completed

    229. SUPPLY & DELIVERY OF KOBE ELECTRODE FOR INVENTORY STOCK MMHE July 20, 2018 Completed

    230. PROVISION OF PASSIVE FIRE PROTECTIONS (PFP) FOR BR-A PLATFORM REPSOL

    REPSOL July 19, 2018 Completed

    231. STRUCTURAL WORKS FOR BOKOR CPP TOPSIDES PETRONAS CARIGALI July 18, 2018 Completed

    232. PROVISION OF SUPPLY OF MANPOWER, MATERIALS AND EQUIPMENT FOR INSTALLATION OF A60 RATED FIRE INSULATION WORK AT SELIGI

    ENQUEST July 18, 2018 Completed

    233. SUPPLY AND DELIVERY OF CABLES FOR SUMANDAK SELATAN INFILL PROJECT

    PETRONAS CARIGALI July 13, 2018 Completed

    234. SUPPLY OF DISPOSABLE RESPIRATOR (REPEAT ORDER) MALAYSIAN REFINING

    COMPANY July 13, 2018 Completed

    235. SUPPLY AND DELIVERY OF CABLE INSTRUMENTATION FOR HUC MODIFICATION AT D18MP-A FOR HOST TIE IN DE-BOTTLENECKING FOR D18 PHASE 2 PROJECT

    PETRONAS CARIGALI July 12, 2018 Completed

    236. SUPPLY OF SWA CABLE TAI CREST

    RESOURCES July 11, 2018 Completed

    237. PROVISION OF SUPPLY INSTRUMENT CONTROL CABLE FOR TIONG-A ICP 2.0 PROJECT AT TIONG-A PLATFORM

    PETRONAS CARIGALI July 10, 2018 Completed

    238. SUPPLY OF ELECTRODE FOR BOKOR-BETTY – BASE SCOPE SAPURA PINEWELL

    SDN BHD / PETRONAS CARIGALI

    July 4, 2018 Completed

    239. SUPPLY OF DISPOSABLE RESPIRATOR MALAYSIAN REFINING

    COMPANY July 3, 2018 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    240. PROVISION OF MOXA DEVICES PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) July 2, 2018 Completed

    241. PROVISION OF SUPPLY FIBRE OPTIC CABLE FOR TIONG-A ICP 2.0 PROJECT AT TIONG-A PLATFORM

    PCSB June 26, 2018 Completed

    242. SUPPLY OF ELECTRODE NC36L FOR BOKOR BETTY – BASE SCOPE SAPURA PINEWELL

    SDN BHD / PETRONAS CARIGALI

    June 13, 2018 Completed

    243. PASSIVE FIRE PROTECTION WORKS FOR ANJUNG BDEWC May 30, 2018 Completed

    244. SUPPLY OF DRAKA CABLE PETRONAS CHEMICALS ETHYLENE

    May 22, 2018 Completed

    245. SUPPLY OF HEAT BARRIER PANEL FOR AHU AND VSAT ANTENNA HEAT PROTECTION AT EAST BELUMUT PLATFORM

    NEWFIELD May 17, 2018 Completed

    246. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) May 15, 2018 Completed

    247. SUPPLY AND RENTAL OF ADDITIONAL DMR HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) May 15, 2018 Completed

    248. PURCHASE ADOBE CREATIVE CLOUD PETRONAS GAS

    BERHAD May 2, 2018 Completed

    249. SUPPLY & DELIVERY OF DRAKA CABLE FOR FSU NAUTICA MUAR (BENTARA) EPOMS April 27, 2018 Completed

    250. SUPPLY OF SPARE PART FOR 2WAY CONTROL VALVE (KORVAL) PFLNG April 26, 2018 Completed

    251. SUPPLY OF KOBE ELECTRODE FOR HESS PHRASE II HESS April 17, 2018 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    252. PROVISION FOR RENEWAL OF ANNUAL SUBSCRIPTION FOR AUTOCAD COMMERCIAL

    PETRONAS TECHNICAL SERVICES

    SDN BHD April 23, 2018 Completed

    253. SUPPLY OF BREAKING LOAD TENSILE TEST FOR HELIDECK NETTING GK MALIKAI – COST PLUS

    PETRA RESOURCES SDN BHD / PCSB

    April 12, 2018 Completed

    254. CONFIGURATION OF ADDITIONAL CHANNEL AND FREQUENCY FOR LEASING PORTABLE RADIOS

    PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) April 11, 2018 Completed

    255. PROVISION OF MAINTENANCE RENEWAL (SOLARWINDS AND VEEAM)

    EXXONMOBIL EXPLORATION AND

    PRODUCTION MALAYSIA INC.

    April 11, 2018 Completed

    256. SUPPLY OF ID CARD PRINTER FOR HSE SAPURA

    EXPLORATION AND PRODUCTION

    April 10, 2018 Completed

    257. SUPPLY OF KOBE ELECTRODE FOR HESS PHRASE II HESS April 10, 2018 Completed

    258. PROVISION OF MAINTENANCE RENEWAL (PRIMAVERA P6 ENTERPRISE) PETRONAS

    TECHNICAL SERVICES March 28, 2018 Completed

    259. PROVISION OF LCV ACTUATOR AND PLC NETWORK PETROFAC (PM304-MALAYSIA) LIMITED

    March 27, 2018 Completed

    260. SUPPLY OF INSTRUMENT CABLE (REPEAT ORDER) AFS-887 – SATELLITES TURNAROUND (SATURN) PROJECT - GuF

    EMEPMI March 23, 2018 Completed

    261. PROVISION OF IT PERIPHERALS PETRONAS TECH

    TRAINING March 19, 2018 Completed

    262. SUPPLY OF HUMIDUR FP PAINTS TO QET BSP March 14, 2018 Completed

    263. SUPPLY MATERIALS AND APPLICATION FIRE PROOFING MATERIALS ON NEW LOADING PLATFORM STRICTURES FOR SPR 2 PROJECT FIRE PROOFING APPLICATION ON NEW JETTY PLATFORM STRUCTURES

    BLNG March 7, 2018 In Progress

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    264. SUPPLY OF HUMIDUR PAINTS FOR UNIT 7200 LNG RUNDOWN LINE (GRE CLADDING) PAINTING WORK

    BLNG February 26, 2018 Completed

    265. PROVISION TO SUPPLY IT HARDWARE & CONSUMABLES HESS EXPLORATION AND PRODUCTION

    MALAYSIA B.V February 21, 2018 Completed

    266. PROVISION OF ADOBE SOFTWARE PETRONAS

    CHEMICALS GROUP BERHAD

    February 20, 2018 Completed

    267. SUPPLY OF WELDING ELECTRODE FOR STRUCTURAL INSTALLATION FOR SSB PAN MALAYSIA 2018

    SSB February 12, 2018 Completed

    268. SUPPLY OF INSTRUMENT CABLE (REPEAT ORDER) GUNTONG PRODUCTION OPTIMIZATION - GuD

    EMEPMI February 9, 2018 Completed

    269. SUPPLY OF HUMIDUR PAINTS - WESCO SHELL PHILIPPINES EXPLORATION B.V

    February 5, 2018 Completed

    270. PROVISION OF MOXA DEVICES PETRONAS GAS

    BERHAD January 30, 2018 Completed

    271. SUPPLY OF HEAT SHIELD PANEL FOR BLUE BRUSKER AT DUYONG LQ PETRONAS CARIGALI January 24, 2018 Completed

    272. PROVISION TO SUPPLY & DELIVER OF PIPELINE TAPE FOR PCSB-SBO PETRONAS CARIGALI

    SDN BHD January 23, 2018 Completed

    273. ASSAI CALL-OFF MAITENANCE AND SUPPORT SERVICES SAPURA

    EXPLORATION AND PRODUCTION

    January 12, 2018 Completed

    274. PROVISION OF DESIGN, SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION FOR BOD HTI – PROVISION BUNGA PAKMA ACCOMODATION WORK BOAT GANGWAY PROJECT

    REPSOL December 12, 2017 Completed

    275. SUPPLY OF HUMIDUR PAINTS FOR U7200 TRESTLE STRUCTURE B/P ACTIVITIES

    BLNG November 29, 2017 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    276. SUPPLY OF HUMIDUR FP PAINTS TO MGC BSP November 17, 2017 Completed

    277. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD

    (PENGERANG) November 11, 2017 Completed

    278. FLARE TOWER PFP REINSTATEMENT FOR KIKEH MURPHY September 11, 2017 Completed

    279. PROVISION OF PASSIVE FIRE PROTECTION FOR M1 TOPSIDE MAINTENANCE AND STRUCTURAL REPAIR

    PETRONAS August 25, 2017 Completed

    280. SUPPLY OF PAINT-MANUFACTURER “ACOTEC & HUMIDUR” SHELL August 24, 2017 Completed

    281. PROVISION OF MOTOROLA PORTABLE RADIO AND ACCESSORIES PETRONAS CARIGALI

    SND BHD August 24, 2017 Completed

    282. PROVISION OF MOTOROLA ACCESSORIES OCEAN MIGHT SDN

    BHD August 22, 2017 Completed

    283. PROVISION OF MOTOROLA PORTABLE RADIO ACCESSORIES SAPURA

    EXPLORATION AND PRODUCTION

    August 14, 2017 Completed

    284. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC – F06

    SHELL August 9, 2017 Completed

    285. SUPPLY OF MATERIALS AND SPARE PARTS FOR BERGADING-CPP FRESH WATER GENERATOR FOR NORTH MALAY BASIN FULL FIELD DEVELOPMENT

    HESS August 7, 2017 Completed

    286. SUPPLY OF AVAYA PABX TELECOMMUNICATION HARDWARE AND ACCESSORIES

    HESS August 4, 2017 Completed

    287. PROVISION FOR MATLAB SOFTWARE MAINTENANCE SUPPORT FOR 2 YEARS HESS EXPLORATION AND PRODUCTION

    MALAYSIA B.V August 3, 2017 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    288. PROVISION OF MOTOROLA ACCESSORIES REPSOL OIL AND GAS

    MALAYSIA LTD July 24, 2017 Completed

    289. PURCHASE OF IT PERIPHERALS

    EXXONMOBIL EXPLORATION AND

    PRODUCTION MALAYSIA INC.

    July 19, 2017 Completed

    290. RECTIFICATION OF MISALIGNED STEAM TURBINE PIPING ST 8100 AT ACRYLIC PLANT

    BASF July 13, 2017 Completed

    291. PROVISION OF PASSIVE FIRE PROTECTION (PFP) COATING FOR BO-D RISER SPLASH ZONE SECTION FOR BUNGA PAKMA DEVELOPMENT PROJECT – REPSOL 2017

    REPSOL July 10, 2017 Completed

    292. HIRING OF DRY ICE BLASTING VENDOR FOR CARRYING OUT DI BLASTING AT BLNG-CSIP FOR TA 2017

    BLNG June 24, 2017 Completed

    293. PROVISION OF TELWIN ENERGY 650 START BATTERIES SAPURA

    EXPLORATION AND PRODUCTION

    June 22, 2017 Completed

    294. PROVISION FOR DESIGN, FABRICATE, SUPPLY AND INSTALLATION ASSISTANCE/SUPERVISION FOR HEAT SHIELD FOR SAPAWI PROJECT

    MURPHY June 21, 2017 Completed

    295. PROVISION OF HAYAMIM AVA ELECTRONIC WHITEBOARD AND ACCESSORIES HESS EXPLORATION AND PRODUCTION

    MALAYSIA B.V June 1, 2017 Completed

    296. PURCHASE OF IT PERIPHERALS PETRONAS

    DAGANGAN BERHAD May 22, 2017 Completed

    297. PURCHASE OF IT PERIPHERALS PETRONAS

    PENAPISAN (MELAKA) May 8, 2017 Completed

    298. PROVISION OF PASSIVE FIRE PROTECTION SUBCONTRACTING WORK BDEWC April 21, 2017 Completed

    299. PROVISION OF MAINTENANCE RENEWAL OF SECURITY SYSTEM (FIREWALL-CYBEROAM)

    SAPURA EXPLORATION AND

    PRODUCTION April 20, 2017 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    300. PURCHASE OF IT PERIPHERALS SAPURA

    EXPLORATION AND PRODUCTION

    April 14, 2017 Completed

    301. SUPPLY AND DELIVERY OF PRINTER EPOMS April 5, 2017 Completed

    302. SUPPLY AND DLEIVERY SAMSUNG MOBILE SMARTPHONES EPOMS March 15, 2017 Completed

    303. PROVISIONAL OF SUPERVISION, LABOUR SUPPLY, RENTAL OF MACHINERY AND SCAFFOLDING FOR INSULATION WORK AT LEMONGRASS PROJECT

    BASF March 3, 2017 Completed

    304. JUNIPER NETWORK SUPPORT

    EXXONMOBIL EXPLORATION AND

    PRODUCTION MALAYSIA INC.

    February 22, 2017 Completed

    305. FIRE PROOFING REPAIR FOR U-7420 c/w ALL MATERIALS EQUIPMENT & MANPOWER FOR U-7420

    BLNG January 25, 2017 Completed

    306. PURCHASE OF TELECON/NETWORK EXXONMOBIL December 14, 2016 Completed

    307. PROVISION TO SUPPLY IT HARDWARE & CONSUMABLES HESS November 25, 2016 Completed

    308. RECTIFICATION OF MISALIGNMENT STEAM TURBINE PIPE STAGE 1 BASF November 11, 2016 Completed

    309. PURCHASE OF COMPUTER EQUIPMENT EXXONMOBIL November 1, 2016 Completed

    310. SUPPLY AND DELIVERY OF SAMSUNG MOBILE SMARTPHONES PETRONAS

    TECHNICAL TRAINING SDN BHD

    October 28, 2016 Completed

    311. SUPPLY OF RIBBON ZEBRA PETRONAS CHEMICAL

    DERIVATIVES SDN BHD

    October 25, 2016 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    312. SUPPLY OF RIBBON ZEBRA PETRONAS CHEMICAL

    DERIVATIVES SDN BHD

    October 24, 2016 Completed

    313. PASSIVE FIRE PROTECTION WORK FOR SK310 B15 DEVELOPMENT PETRONAS CARIGALI September 28, 2016 Completed

    314. PROVISION VSAT SERVICES SAPURA KENCANA SK

    GEOTECHNICS August 22, 2016 Completed

    315. SUPPLY OF KOBE ELECTRODE FOR SK310 B15 DEVELOPMENT - TOPSIDE PETRONAS CARIGALI August 16, 2016 Completed

    316. PASSIVE FIRE PROTECTION WORKS FOR BNJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT

    PETRONAS CARIGALI June 8, 2016 Completed

    317. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC – WORKSCOPING AT E11, F23, F13 AND F06

    SHELL May 18, 2016 Completed

    318. CONTRACT NO: UI50960 - SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC

    SHELL April 1, 2016 Completed

    319. PROVISION OF VIV STRAKES FOR MALIKAI’S PIPELINE SHELL March 16, 2016 Completed

    320. PROVISION OF VSAT COMMUNICATION SERVICES & WIRELESS RADIO SERVICES FOR KBM CLUSTER FIELD DEVELOPMENT

    COASTAL ENERGY January 28, 2016 Completed

    321. PROVISION OF NAVAL ARCHITECTURE AND MARINE ENGINEERING FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BOKOR PHASE 3A PROJECT

    PETRONAS CARIGALI November 2, 2015 Completed

    322. PASSIVE FIRE PROTECTION WORKS FOR TTJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT

    PETRONAS CARIGALI October 23, 2015 Completed

    323. PROVISION OF 14” PIPELINE RISER COMPACT FLANGE INSPECTION AND TESTING WORKS FOR KPOC – RM 500,000

    KPOC September 18, 2015 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    324. PROVISION OF FJC SERVICES FOR SHELL MALIKAI PACK B – USD 700,000 SHELL September 10, 2015 Completed

    325. PASSIVE FIRE PROTECTION WORKS FOR EPCIC OF REMOTE WHPS FOR FULL FIELD DEVELOPMENT, NORTH MALAY BASIN PROJECT

    HESS September 8, 2015 Completed

    326. PROVISION OF VSAT COMMUNICATION SERVICES FOR SKE’S DRILLING RIG SAPURA KENCANA

    ENERGY September 1, 2015 Completed

    327. PROVISION OF NAVAL ARCHITECTURE SERVICES FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BARAM HELIDECK PROJECT

    PETRONAS CARIGALI September 1, 2015 Completed

    328. PROVISION AND SUPPLY OF HDPF WITH SEA SLEEVE & INTRAFUSE FOR PROCUREMENT CONSTRUCTION & COMMISSIONING (PCC) OF REGASTIFICATION TERMINAL 2 PIPELINE PROJECT – USD 35,000

    CPM GROUP July 28, 2015 Completed

    329. SUPPLY OF STRAKES AND BENDS FOR SHELL GUMUSUT PHASE 2 SHELL July 6, 2015 Completed

    330. SUPPLY OF STRAKES AND STRAPS FOR SHELL GUMUSUT PHASE 2 SHELL June 16, 2015 Completed

    331. SUPPLY OF PIPELINE FIELD JOINT ANTI-CORROSION COATING SYSTEM FOR BESAR PIPELINE INSTALLATION – PCSB YEAR 2015

    PETRONAS CARIGALI May 12, 2015 Completed

    332. TO SUPPLY AND DELIVER CORROSION INHIBITOR TOTE TANK (TTJT-A) FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORMS (WHP)

    PETRONAS CARIGALI May 6, 2015 Completed

    333. TO SUPPLY AND DELIVER WASH WATER STORAGE TANK FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORM

    PETRONAS CARIGALI April 29, 2015 Completed

    334. PASSIVE FIRE PROTECTION WORKS FOR PCC OF BESAR-A WHP TOPSIDE PETRONAS CARIGALI April 24, 2015 Completed

    335. PROVISION OF VSAT COMMUNICATION SERVICES TOTAL E&P MALAYSIA October 1, 2014 Completed

    336. PROVISION OF WASTE DISPOSAL MANAGEMENT FOR BINTULU OPERATIONS BC PETROLEUM SDN

    BHD October 1, 2014 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    337. VSAT SATELITE TELECOMMUNICATION SYSTEM AND SERVICES FOR BOKOR PHASE 3A

    SCHLUMBERGER September 29, 2014 Completed

    338. TO SUPPLY AND DELIVER ATMOSPHERIC TANKS FOR EPCIC OF LAYANG DEVELOPMENT FACILITIES

    JX NIPPON September 17, 2014 Completed

    339. SUPPLY OF SERVIWRAP PETRONAS CARIGALI August 8, 2014 Completed

    340. PROVISION OF PASSIVE FIRE PROTECTION FOR WELLHEAD PLATFORM BLOCK PM 307 BERTAM FILED DEVELOPMENT

    LUNDIN PETROLEUM July 16, 2014 Completed

    341. PROVISION OF COMMUNICATION & ASTRO SERVICE SYSTEM FOR EPV PETRONAS CARIGALI July 7, 2014 Completed

    342. ELECTRODE (KOBELCO) FOR WHEATSTONE PROJECT LNG PLANT – MODULE FABRICATION ISBL

    SAPURAKENCANA July 3, 2014 Completed

    343. SUPPLY AND DELIVERY OF CABLES & ACCESSORIES FOR HUC FOR CENDOR PHASE 2 DEVELOPMENT PROJECT, BLOCK PM304

    KENCANA PETROLEUM

    May 28, 2014 Completed

    344. VSAT SERVICES FOR TALISMAN MALAYSIA’S OFFSHORE PRODUCTION PLATFORMS

    TALISMAN MALAYSIA May 1, 2014 Completed

    345. PROVISION OF 3RD PARTY SERVICES FOR PASSIVE FIRE PROTECTION AT FIREWALL EAST BELUMUT PLATFORM

    MMC OIL & GAS April 30, 2014 Completed

    346. DISPOSAL OF SCRAP METAL ITEMS DUE TO MAINTENANCE, DAMAGE METTALIC PARTS, USED SPARE PARTS, OBSOLETE AND EXPIRED MATERIAL

    PETRONAS PENAPISAN (MELAKA)

    SDN BHD April 21, 2014 Completed

    347. FABRICATION WORKS, SUPPLY OF MATERIAL, EQUIPMENT & MANPOWER AND DELIVERY OF PERMANENT FLANGE PROTECTOR & STUDBOLT FOR SSB PROJECT

    TL OFFSHORE SDN BHD

    April 16, 2014 Completed

    348. PROVISION OF FIXED VSAT SERVICES FOR UMW NAGA JACK-UP RIGS FOR UMW OFFSHORE DRILLING SDN BHD

    UMW OFFSHORE DRILLING

    April 1, 2014 Completed

    349. PROVISION OF VSAT SYSTEM SERVICES FOR EVA-NMB GAS PIPELINE INSTALLATION

    GOM RESOURCES SDN BHD

    April 1, 2014 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    350. M03PQ-A V-3030 AND 3040 STRUCTURE FRAMING PFP COATING REPAIR (OPTION NO.1)

    SHELL February 12, 2014 Completed

    351. PROVISION OF FIXED VSAT SERVICES FOR COASTAL ENERGY’S MOBILE PRODUCTION UNIT, THE EP5 AND EP6

    COASTAL ENERGY January 1, 2014 Completed

    352. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM FOR MAIN WORK BARGES / VESSELS 2014 – 2016 – TL OFFSHORE SDN BHD

    TL OFFSHORE January 1, 2014 Completed

    353. M03PQ-A VESSEL V-6210 PFP COATING SHELL December 27, 2013 Completed

    354. PASSIVE FIRE PROTECTION SYSTEM ON DIESEL STORAGE TANK COLUMN T-S16270 AT KIKEH UNITL SCOPE COMPLETE

    MURPHY November 28, 2013 Completed

    355. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG C STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

    EMEPMI November 13, 2013 Completed

    356. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG B STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

    EMEPMI November 13, 2013 Completed

    357. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR TABU A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

    EMEPMI October 28, 2013 Completed

    358. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR PALAS A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

    EMEPMI October 28, 2013 Completed

    359. SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM

    EMEPMI October 25, 2013 Completed

    360. PROVISION FOR REMOVAL AND INSTALLATION OF EPOXY-TYPE PASSIVE FIRE PROTECTION FOR HELANG INTEGRATED PLATFORM (HIP)

    MMC OIL & GAS October 22, 2013 Completed

    361. MODIFICATION AND FABRICATION OF NEW GRILLAGES / SKID RADOIL ONSHORE SUPPORT SYSTEM FOR J-LAY TOWER - SASB

    SAPURA ACERGY SDN BHD

    September 12, 2013 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    362. PROVISION OF FIREWALL UPGRADE (PFP COATING) FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM

    EMEPMI September 6, 2013 Completed

    363. PROVISION OF FIELD JOINT COATING SERVICES FOR EVA PROJECT 2013 HESS August 10, 2013 Completed

    364. PROVISION OF FIXED VSAT SERVICES FOR ATWOOD MANTA AND COASTAL ENERGY

    ATWOOD August, 2013 Completed

    365. SUBCONTRACT WORKS FOR PASSIVE FIRE PROTECTION WORKS FOR DAMAR-A PLATFORM

    EMEPMI July 29, 2013 Completed

    366. PROVISION OF FIELD JOINT COATING SERVICES FOR TUKAU PROJECT 2013 HESS July 18, 2013 Completed

    367. PROVISION OF VSAT SERVICES FOR BUMI ARMADA AT-300 VESSEL BUMI ARMADA June, 2013 Completed

    368. PROVISION OF STABILIZED VSAT SERVICES FOR PERISAI PETROLEUM ON THE PERISAI KAMELIA

    PERISAI PETROLEUM June, 2013 Completed

    369. SUPPLY AND DELIVER OF SLIDING PLATE FOR FABRICATION OF KBB TOPSIDES (BOAQ) - MMHE

    KPOC May 23, 2013 Completed

    370. PROVISION OF PASSIVE FIRE PROTECTION FOR SHELL D12 & LAILA FIELD DEVELOPMENT - THHE

    SARAWAK SHELL BERHAD

    May 9, 2013 Completed

    371. PROVISION OF SUPPLY & SERVICE OF HBE COATING APPLICATION FOR 16” X 22KM DAMAR-A TO LAWIT-A CRA PIPELINE – TL OFFSHORE SDN BHD

    EMEPMI May 2, 2013 Completed

    372. PROVISION OF RISER CLAMP & FLANGE PROTECTOR FOR 16” X 52KM GAS EXPORT PIPELINE FROM PLEM & LAWIT A PLATFORM – GOM RESOURCES SDN BHD

    HESS EXPLORATION & PRODUCTION MALAYSIA B.V

    April 29, 2013 Completed

    373. PROVISION OF HEAT SHIELD FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM – SHAPADU ENERGY & ENGINEERING

    EMEPMI April 2013 Completed

    374. SUPPLY AND INSTALLATION OF HEAT SHIELD FOR KINABALU KNPG-B - MMHE

    PETRONAS CARIGALI SDN BHD

    April 2013 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    375. OFFSHORE CARRY OVER WORKS FOR PIPING OF TAPIS-Q TOPSIDES - MMHE EMEPMI April 2013 Completed

    376. PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS B WI HTI PIPE SUPPOR TSTOP (AFS003B) – SHAPADU ENERGY & ENGINEERING SDN BHD

    EMEPMI April 2013 Completed

    377. PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS C PLATFORM TOPSIDE (EXCLUDE LER) - SHAPADU ENERGY & ENGINEERING SDN BHD

    EMEPMI April 2013 Completed

    378. PROVISION OF FABRICATION AND DELIVERY OF 16” SE-PA RISER LOAD BEARING CLAMP AND SLIDING CLAMP FOR MOC YEAR 2013 PIPELINES INSTALLATION - SAPURA KENCANA PETROLEUM C/O TL OFFSHORE SDN BHD

    MURPHY SARAWAK OIL. CO. LTD

    April 2013 Completed

    379. SUPPLY AND DELIVER OF CEILING FINISHES - SUSPENDED CEILING SYSTEM SOUTH ACIS OIL & GAS DEVELOPMENT PROJECT (REPEAT ORDER) - BROOKE DOCKYARD & ENGINEERING WORKS CORPORATION

    BROOKE DOCKYARD & ENGINEERING

    WORKS CORPORATION

    March 18, 2013 Completed

    380.

    ENGINEERING,SUPPLY OF MATERIAL, MANUFACTURING, FABRICATION, INSTALLATION AND MODIFICATION OF FIBERGLASS GRATINGS, STAIRTREADS AND GRE HANDRAILS FOR DAMAR A SUBSTRUCTURE PROJECT – MMHE

    EMEPMI March 13, 2013 Completed

    381. PROVISION OF 3LPE FIELD JOINT COATING ON 12” & 10” LINEPIPE SERVICES FOR SIAKAP NORTH PETAI (SNP) DEVELOPMENT PROJECT

    MURPHY SNP March 11, 2013 Completed

    382. PROVISION OF FIELD JOINT COATING SERVICES FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE

    EMEPMI March 8, 2013 Completed

    383. SUPPLY & DELIVERY OF FIELD JOINT ANTI CORROSION COATING SYSTEM HEAT SHRINK SLEEVE (RAYCHEM WPC100) FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE

    EMEPMI March 8, 2013 Completed

    384. PROVISION OF PIPELINE FIELD JOINT INFILL MATERIAL FOR TAPIS EOR & DAMAR GAS DEVELOPMENT PROJECT Y2013

    EMEPMI March 7, 2013 Completed

    385. PROVISION OF FIRE PROTECTION (PFP) AND INSULATION WORK FOR WEST DESARU TOPSIDES - THHE FABRICATORS SDN BHD

    AQUATERRA ENERGY LIMITED

    March 7, 2013 Completed

    386. M03 DAMAGED FPF COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    387. M01 DAMAGED PFP COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed

    388.

    PROVISION OF SUPPLY AND DELIVERY OF MONEL WELDING INTEGRATED TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR EARLY PRODUCTION SCHEME (EPS), INTEGRATED GAS DEVELOPMENT (IGD) PROJECT, NORTH MALAY BASIN (NMB) FIELD – GOM RESOURCES SDN BHD

    HESS EXPLORATION & PRODUCTION

    MSIA B.V. March 2013 Completed

    389. PROVISION OF FIELD JOINT COATING SERVICES FOR HESS 2013 PROJECT – GOM RESOURCES

    HESS February 26, 2013 Completed

    390. PROVISION TO SUPPLY AND DELIVER CRUDE OIL WASHING MACHINE (COW MACHINE) SUPPLY FOR BERANTAI OPERATION - PETROFAC

    PETRONAS January 29, 2013 Completed

    391. SUBCONTRACTOR FOR PASSIVE FIRE PROTECTION WORKS FOR KBB TOPSIDES - MMHE

    KPOC January 21, 2013 Completed

    392. ARCHITECTURAL INSULATION PACKAGE SUPPLY OF M90 FIRETEX FOR GREATER EKOFISK AREA 2/4 - SMOE

    CONOCO PHILIPS January 15, 2013 Completed

    393. PROVISION OF 3RD CAMPAIGN SEA-FASTENING WORKS OF J-LAY AND PES TOWER ON BOARD SAPURA 3000 – SAPURA ACERGY SDN BHD

    SHELL January 11, 2013 Completed

    394. PROVISION OF SUPPLY AND DELIVERY OF CEILING FINISHES – SUSPENDED CEILING FOR SOUTH ACIS PROJECT – BROOKE DOCKYARD AND ENGINEERING WORKS.

    MURPHY January 10, 2013 Completed

    395. DESIGN, FABRICATION & DELIVERY OF FIREWALL FOR DAMAR-A TOPSIDE MMHE

    EMEPMI January 08, 2013 Completed

    396. SUPPLY OF PAINT EMEPMI December 27, 2012 Completed

    397. E & I WORKS-FABRICATION AND INSTALLATION FOR F14DR-A TOPSIDES & F14/F29 PROCESS MODULE – MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.

    SHELL December 17, 2012 Completed

    398. STRUCTURE WORKS FOR DAMAR-A PLATFORM (TOPSIDE) - MMHE EMEPMI November 12, 2012 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    399. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.

    KPOC October 18, 2012 Completed

    400.

    SUPPLY, DELIVERY, AND INSTALLATION SUPERVISION OF COMPOSITE MATERIALS (FIBERGLASS) & ACCESSORIES FOR WAVE ZONE GRATING FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM, EMEPMI EPCM BROWNFIELD PROJECT.

    EMEPMI October 5, 2012 Completed

    401. SUPPLY AND DELIVER OF OFFICE EQUIPMENT (HS1146630X FIRE FIGHTING SUIT) HS1146630X FIRE FIGHTING SUIT

    UNIVERSITI TELNOLOGI

    PETRONAS, TRONOH PERAK

    October 2012 Completed

    402. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (BOAQ)(5.12M002B) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.

    KPOC September 24, 2012 Completed

    403. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.

    KPOC September 24, 2012 Completed

    404. PROVISION OF FABRICATION 18” AND 12” FLEXIJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

    SHELL September 13, 2012 Completed

    405. PROVISION OF FABRICATION 8” AND 10” STRESSJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

    SHELL September 12, 2012 Completed

    406. PROVISION OF FIELD JOINT COATING SERVICES FOR 8" AND 10" MALIKAI PIPELINE – GOM RESOURCES

    SHELL September 11, 2012 Completed

    407. PROVISION OF FABRICATE AND SUPPLY OF WS2 UPPER MAST ELEMENT 2 LIFTING PAD EYE FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

    SHELL September 5, 2012 Completed

    408.

    PROVISION OF FABRICATE AND SUPPLY OF NEW 18” ESCALATOR TROLLEY INSERTS, ACCESS TO HPU BOOST PUMPS, WS2 LOWER MAST ELEMENT 2, WS2 HINGE HATCH COVER, WS1 RAIN PROTECTION IMPROVEMENT FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

    SHELL September 5, 2012 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    409. PROVISION OF STABILIZED VSAT SATELLITE COMMUNICATIONS FOR SAPURAACERGY ON THE SAPURA3000

    SAPURAACERGY September, 2012 Completed

    410. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL August 30, 2012 Completed

    411. PROVISION OF DISPOSAL OF DAMAGED KOSMO, IVECO AND MAN BUSES AND ITS COMPONENTS – SYARIKAT PRASANA NEGARA BERHAD

    SPNB August 29, 2012 Completed

    412. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TAPIS Q TOPSIDE – MMHE SDN BHD

    EMEPMI August 28, 2012 Completed

    413. SUPPLY AND DELIVERY OF HSS (WPC100M) FOR MALIKAI PIPELINE – GOM RESOURCES

    SHELL August 18, 2012 Completed

    414. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TELOK A TOPSIDES – MMHE SDN BHD

    EMEPMI August 9, 2012 Completed

    415. PROVISION OF VSAT SERVICES IN GULF OF MEXICO – SAPURA ACERGY SDN BHD

    SAPURA ACERGY August 9, 2012 Completed

    416. PROVISION OF FIELD JOINT COATING SERVICES AND SUPPLY OF ANTICORROSSION TAPE (SERVIWRAP M30B) FOR 6" X 7.6KM BEKOK-A TO TIONG-A PIPELINE INSTALLATION – GOM RESOURCES

    PETRONAS August 2, 2012 Completed

    417. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S TABU A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY

    EMEPMI July 31, 2012 Completed

    418. SUPPLY AND DELIVER OF HEAVY DUTY ANTI SLIP STEP COVER – TALISMAN MALAYSIA LIMITED

    TALISMAN July 12, 2012 Completed

    419. PROVISION OF TELECOMMUNICATION SYSTEM FOR TOISA PALADIN – FUGRO GEODETIC (M) SDN BHD

    FUGRO GEODETIC July 12, 2012 Completed

    420. FABRICATION AND INSTALLATION OF STRUCTURE WORKS FOR PACKAGE 1, DECK NORTH AND MISC FOR TAPIR R TOPSIDES PROJECT - MMHE SDN BHD

    EMEPMI July 10, 2012 Completed

    421. SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) AND PACKAGE B: B-193 A-P FOR (PGC & AGRU) – SIME DARBY ENGINEERING SDN BHD

    OIL AND NATURAL GAS CORPORATION

    LTD (ONGC) July 07, 2012 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    422. SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) – SIME DARBY ENGINEERING SDN BHD

    OIL AND NATURAL GAS CORPORATION

    LTD (ONGC) July 04, 2012 Completed

    423. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S PALAS A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY

    EMEPMI July 04, 2012 Completed

    424. SUPPLY AND DELIVER OFSLIDING PLATE FOR FABRICATION ON KBB TOPSIDES (BOAQ) - MMHE

    KPOC July 02, 2012 Completed

    425. TO SUPPLY MATERIALS, EQUIPMENT, CONSUMABLES, TOOLS AND MANPOWER FOR COOLING MANIFOLD RELOCATION FOR GUMUSUT KAKAP, J LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD

    SHELL June 12, 2012 Completed

    426. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF VESSEL DLB264 – GOM RESOURCES

    GOM RESOURCES June 11, 2012 Completed

    427. PROVISION OF PULLING & REMOVE CABLE FOR LNGC SERI ALAM – MMHE SDN. BHD.

    MISC May 21, 2012 Completed

    428. SUPPLY, FABRICATE AND DELIVERY SEA FASTENING FOR CARGO BARGE FOR LAN DO DEVELOPMENT PROJECT – SAPURA ACERGY SDN BHD

    TNK VIETNAM BV May 17, 2012 Completed

    429. PROVISION OF FIELD JOINT COATING SERVICES FOR MOC TRANSPORTATION AND INSTALLATION OF OFFSHORE PIPELINES AND FACILITIES FOR YEAR 2012 – TL OFFSHORE SDN BHD

    MURPHY OIL May 9, 2012 Completed

    430. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT PM318-PUTERI FWS PIPELINE REPLACEMENT PROJECT - NEWFIELD

    NEWFIELD April 9, 2012 Completed

    431. PROVISION OF VSAT TELECOMMUNICATION AND SERVICES FOR PETRONAS CARIGALI SDN BHD – IPERINTIS SDN BHD

    IPERINTIS April 6, 2012 Completed

    432. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - SCHLUMBERGER GROUP

    SCHLUMBERGER April 4, 2012 Completed

    433. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - HALLIBURTON ENERGY SERVICES (M) SDN BHD

    HALLIBURTON April 4, 2012 Completed

    434. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF HEAVY LIFT PIPE LAY VESSEL LTS3000

    L & T SAPURA April 1, 2012 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    435. DESIGN, FABRICATION AND DELIVERY OF FIREWALL FOR TELOK A & B PROJECT – MMHE SDN BHD

    SHELL March 23, 2012 Completed

    436. COMMISSIONING OF STABILISED VSAT SERVICES AND VPN ONBOARD MV. WANGSAMAJU – OCEANTECH GEOMATICS

    OCEANTECH GEOMATIC

    March 14, 2012 Completed

    437. PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION TAPE (SERVIWRAP M30B) FOR KEBABANGAN DEVELOPMENT PROJECT – GLOBAL OFFSHORE MALAYSIA

    KPOC March 13, 2012 Completed

    438.

    SUPPLY AND DELIVERY OF HANGER FLANGE, RISER GUARD AND RISER CLAMP FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR PETRONAS CARIGALI SKO PIPELINE REJUVENATION PROJECT. – CARIMIN ENGINEERING SERVICES

    PETRONAS March 12, 2012 Completed

    439. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL March 5, 2012 Completed

    440. SUPPLY AND DELIVERY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR TCOT PWSU TAIL END & REMEDIAL WORK FOR EMEPMI EPCM BROWNFIELD PROJECT – PERUNDING RANHILL WORLEY

    EMEPMI March 1, 2012 Completed

    441. PROVISION OF FIELD JOINT COATING FOR SOGT PROJECT – ALAM SWIBER PETRONAS February 27, 2012 Completed

    442. PROVISION OF FIELD JOINT COATING AND SUPPLY OF HSS (RAYCHEM WPC100M) FOR EMEMPI’S TAPIS EOR REJUVENATION AND TELOK DEVELOMENT PROJECT. – TL OFFSHORE SDN BHD

    EMEPMI February 24, 2012 Completed

    443. DESIGN, ENGINEERING, AND DELIVERY OF FAIRINGS & THRUST COLLARS FOR DRILLING RISERS – SONGA OFFSHORE

    PETRONAS February 22, 2012 Completed

    444. PROVIDING STABILISED VSAT SYSTEM FOR SEMI-SUBMERSIBLE RIG, OCEANROVER FOR DEEPWATER PROJECT, KIKEH – DIAMOND OFFSHORE

    MURPHY OIL February 14, 2012 Completed

    445. PROVISION OF VSAT SYSTEM AND PROVIDING VPN RENTAL SERVICES FOR DLB264 – GLOBAL OFFSHORE MALAYSIA

    GLOBAL OFFSHORE February 09, 2012 Completed

    446. PIPELINE AND SPOOLS FIELD JOINT COATING SERVICES FOR LAN DO DEVELOPMENT PROJECT VIETNAM – SAPURA ACERGY SDN BHD

    TNK VIETNAM BV January 20, 2012 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    447.

    PROVISION FOR DETAILED DESIGN ENGINEERING SERVICES FOR PACKAGE THIRD PARTY VERIFICATION OF GUE H RATED FIREWALL TO WITH STAND 30-MINUTES JET FIRE FOR TELOK GAS DEVELOPMENT PROJECT – PERUNDING RANHILL WORLEY SDN BHD

    EMEPMI December 29, 2011 Completed

    448. PROVISION OF INSTALLATION AND MAINTENANCE OF VPN INTERNET SERVICES – ASIAN SUPPLY BASE SDN BHD

    ASIAN SUPPLY BINTULU

    December 21, 2011 Completed

    449. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT M01 AND E11 FOR TI-FIX AND IR PROJECT - SHELL

    SHELL December 21, 2011 Completed

    450. SUPPLY MANPOWER, EQUIPMENTS AND MATERIALS FOR PM329 EAST PIATU TOPSIDES – KENCANA HL SDN BHD

    NEWFIELD December 1, 2011 Completed

    451. E & I FABRICATION, INSTALLATION, TESTING, PRE-COMMISSIONING WORK, FOR TAPIS EOR PROJECT (PACKAGE B AND PACKAGE C) – MMHE SDN BHD

    EMEPMI December, 2011 Completed

    452. PIPING FABRICATION AND INSTALLATION FOR TAPIS Q LIVING QUARTERS – MMHE SDN BHD

    EMEPMI November, 2011 Completed

    453. SUPPLY OF H120 FIRE/BLAST WALL FOR KEBABANGAN TOPSIDES – SIME DARBY ENGINEERING SDN BHD

    KPOC November 25, 2011 Completed

    454. PROVISION OF FIELD JOINT COATING FOR BCOT PROJECT – ALAM SWIBER PETRONAS October 10, 2011 Completed

    455. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION CASTING FOR SDV ON BUNGA RAYA-B – APEX ENERGY SDN. BHD.

    TALISMAN September 27, 2011 Completed

    456. PROVISION OF PASSIVE FIRE PROTECTION (PFP) SERVICES FOR PCC OF TOPSIDES AND PIPELINE FOR PM318 PUTERI PIPELINE RESTORATION PROJECT – KENCANA HL SDN BHD

    NEWFIELD September 15, 2011 Completed

    457.

    PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIAL (SERVIWRAP) FOR 14” AND 24” EXPORT PIPELINE SHORE APPROACH INSTALLATION FOR KEBABANGAN NORTHERN HUB DEVELOPMENT – PBJV GROUP SDN BHD

    PETRONAS CARIGALI SDN BHD

    September 15, 2011 Completed

    458.

    PROVISION OF PASSIVE FIRE PROTECTION (PFP), TOOLS/ EQUIPMENT & MATERIALS TO REMOVE THE DEGRADED PFP & APPLICATION OF NEW PFP AT M3PQ-A LIVING QUARTER WEST WALL – SARKU ENGINEERING SERVICES SDN. BHD.

    SHELL September 15, 2011 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    459. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR HELANG TOPSIDES (E-9550 & E-9650) – MONT TRINITY

    NIPPON OIL September 12, 2011 Completed

    460.

    PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR INTRAGRATED TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES (TIONG A) PROJECT – GLOBAL OFFSHORE MALAYSIA SDN BHD

    NEWFIELD August 17, 2011 Completed

    461. PROVISION OF REMOVAL, REPAIR & REINSTATEMENT OF BLASTWALL ON M3P-Q PLATFORM – DAYANG ENTERPRISE & SSB

    SHELL August 5, 2011 Completed

    462. DESIGN, MANUFACTURE AND SUPPLY OF VIV SUSPRESSION STRAKES FOR BLOCK 06.1 PHASE III PROJECT – LAN DO DEVELOPMENT PROJECT – RANHILL WORLEYPARSONS SDN BHD

    BP EXPLORATION OPERATING CO. LTD

    August 3, 2011 Completed

    463.

    PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR SKO PIPELINE REPLACEMENT PROJECT – TARGET ENERGY CO. (M) SDN. BHD.

    PETRONAS CARIGALI SDN BHD

    July 25, 2011 Completed

    464. FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH) TAPIS-R DECK (SOUTH), TAPIS-R LIVING QUARTERS & BRIDGES SKID BEAM AND TAPIS-Q DECK – MMHE SDN. BHD.

    EMEPMI July 15, 2011 Completed

    465. FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH), TAPIS-Q DECK, MISCELLANEOUS WORKS TAPIS-Q – MMHE SDN. BHD.

    EMEPMI July 3, 2011 Completed

    466. SUPPLY, DELIVERY AND INSTALLATION OF STRAKES FOR GUMUSUT KAKAP JUMPERS - FMC

    SHELL June 17,2011 Completed

    467. PROVISION OF PIPELINE FIELD JOINT COATING WORKS FOR THE FABRICATION SERVICES OF FLOWLINE JUMPER – LABUAN SHIPYARD

    SAPURA ACERGY/ SHELL

    April 14, 2011 Completed

    468. PROVISION OF PIPELINE INFIELD FIELD JOINT COATING FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD

    PETRONAS CARIGALI SDN BHD

    April 12, 2011 Completed

    469.

    PROVISION OF PIPELINE ANTI CORROSION MATERIAL (SERVIWRAP) FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD

    PETRONAS CARIGALI SDN BHD

    March 31, 2011 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    470. PROVISION OF FIELD JOINT COATING SERVICES FOR F28DR-A/F6K-A PIPELINE PROJECT – TL OFFSHORE SDN BHD

    SHELL March 18, 2011 Completed

    471.

    FABRICATION AND INSTALLATION OF STRUCTURAL WORKS FOR TOPSIDES A-Q COMPRISING PART OF SURVEY, DESIGN, ENGINEERING, PROCUREMENT, FABRICATION, LOAD OUT, TIE-DOWN/SEAFASTENING, TRANSPORTATION, INSTALLATION, HOOK-UP, TESTING, COMMISSIONING (EPCIC) OF PROCESS PLATFORM FOR B-193 PROJECT – SIME DARBY ENGINEERING

    OIL AND NATURAL GAS CORPORATION

    LTD (ONGC) February 25, 2011 Completed

    472. PROVISION OF PIPELINE MATERIALS WITH SEA SLEEVES C/W EQUIPMENT FOR NEWFIELD’S EAST PIATU INSTALLATION – TL OFFSHORE SDN BHD

    NEWFIELD February 24, 2011 Completed

    473. PROVISION OF PASSIVE FIRE PROTECTION SERVICES) FOR NEWFIELD'S EAST PIATU'S JACKET & TOPSIDES - KENCANA HL

    NEWFIELD February 11, 2011 Completed

    474. PROVISION OF FIELD JOINT COATING AND INFILL MATERIALS FOR PUTERI PIPELINE RESTORATION PROJECT – TL OFFSHORE SDN BHD

    NEWFIELD February 11, 2011 Completed

    475. PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR CAKERWALLA OFFSHORE - SHAPADU ENERGY & ENGINEERING SDN BHD

    CARIGALI HESS February 1, 2011 Completed

    476. PROVISION OF FIELD JOINT COATING, SUPPLY AND INSTALLATION OF CANUSA GTS-PP WRAPID SLEEVE FOR CILIPADI PIPELINE PROJECT – TL OFFSHORE SDN BHD

    SHELL January 17, 2011 Completed

    477. REPAIR WORKS OF BLASTWALL AND FIREWALL FOR MODULE 3 KUMANG TOPSIDE - OFFSHORE WORKS

    PETRONAS CARIGALI SDN BHD

    December 13, 2010 Completed

    478. DESIGN, CONSTRUCT, SUPPLY AND DELIVERY OF NOISE ATTENUATORS AND EXPANSION SPOOLS FOR F13 PROCESSING MODULE GLYCOL REBOILER SKID AT E11P-B PLATFORM

    SARAWAK SHELL BERHAD

    November 24, 2010 Completed

    479.

    FABRICATION AND INSTALLATION OF THE MOORING PORCHES, CHAIN JACK GANTRIES AND ASSOCIATED PLATFORMS, AND INSTALLATION OF FAIRLEAD FOUNDATIONS FOR GUMUSUT KAKAP FPS HULL (36010863) AT MALAYSIA MARINE AND HEAVY ENGINEERING

    SHELL / MISC November 12, 2010 Completed

    480. SUBCONTRACT FOR STRUCTURAL WORKS FOR PROCESS PLATFORM FOR B -193 PROJECT AT SIME DARBY ENGINEERING

    OIL AND NATURAL GAS CORPORATION

    LTD (ONGC) October 22, 2010 Completed

    481. DESIGN, FABRICATE AND SUPPLY FIRE RATED ROLLER SHUTTER FOR KINABALU NAG DEVELOPMENT PROJECT (KNPG-B) - MMHE

    PETRONAS CARIGALI SDN BHD

    October 21, 2010 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    482. SUPPLY AND DELIVERY OF SAFETY EQUIPMENTS FOR SAMARANG (PHASE 1 – ACCELERATED DRILLING) DEVELOPMENT PROJECT – KENCANA PETROLUEM

    PETRONAS CARIGALI SDN BHD

    October 6, 2010 Completed

    483. PROVISION OF BR-B REPLACEMENT – RISER PIPE, CLAMP AND I-TUBE – FIELD JOINT COATING

    TALISMAN September 20, 2010 Completed

    484. DESIGN, FABRICATE AND SUPPLY OF BLASTWALL FOR LIVING QUARTERS FOR JACKETS OF PM329 EAST PIATU DEVELOPMENT PROJECT – KENCANA HL

    NEWFIELD September 17, 2010 Completed

    485. PROVISION OF PIPELINE FIELD JOINT COATING SERVICES AND INFILL MATERIALS FOR PETRONAS CARIGALI’S SKO PIPELINE PROJECT – TL OFFSHORE

    PETRONAS CARIGALI SDN BHD

    September 7, 2010 Completed

    486. PROVISION OF FLOWLINE AND RISER FIELD JOINT COATING SERVICES FOR GUMUSUT KAKAP PROJECT – SAPURA ACERGY

    SHELL August 6, 2010 Completed

    487. UMBRELLA CONTRACTS FOR SALE OF SSB/SSPC SCRAP METAL (600865) SARAWAK SHELL

    BERHAD August 3, 2010 Completed

    488. PROVISION OF THE SERVICE FOR DISPOSAL OF SURPLUS MATERIALS FOR PETRONAS GROUP OF COMPANIES FOR YEAR 2010-2013 (UMBRELLA CONTRACT)

    PETROLIAM NASIONAL BERHAD

    July 28, 2010 Completed

    489. SUPPLY AND DELIVERY OF INSTRUMENT FIRE & GAS CABLES FOR MRU - BUNGA ORKID DEV. PROJECT FOR SDE

    TALISMAN MALAYSIA LIMITED

    July 23, 2010 Completed

    490. PROVISION OF PIPELINE FIELD JOINT COATING AND INFILL MATERIAL FOR ST. JOSEPH PIPELINE INSTALLATION ON E3 – TL OFFSHORE

    SABAH SHELL PETROLUEM CO. LTD

    July 22, 2010 Completed

    491. SUPPLY AND DELIVER OF INSTRUMENT CABLES & GLANDS FOR EMEMPI’S SELIGI AND SEMANGKUK PIPELINE REPLACEMENT PROJECT

    RANHILL WORLEY PARSONS

    June 29, 2010 Completed

    492. STRUCTURAL WORK ~(5-TOPSIDES) - EPCIC OF (5) WELLHEAD PLATFORM FOR B-193 PROJECT – SDE

    OIL AND NATURAL GAS CORP. LTD

    (ONGC) June 12, 2010 Completed

    493. SUPPLY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR GUNTONG E AIR UTILITY SYSTEM UPGRADE PROJECT

    RANHILL WORLEY PARSONS

    May 27, 2010 Completed

    494. SUPPLY OF CABLES FOR INTERGRATED PROCUREMENT AND CONSTRUCTION DEVELOPMENT PROJECT (PHASE 1)

    SIME DARBY May 18, 2010 Completed

    495. PROVISION OF FIELD JOINT COATING SERVICES FOR DEVIL’S CREEK DEVELOPMENT PROJECT

    SAPURA ACERGY May 15, 2010 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    496. SUPPLY OF SERVI-WRAP ANTI-CORROSION MATERIALS SARAWAK SHELL May 13, 2010 Completed

    497. SUPPLY OF INSTRUMENT CABLES & CABLE GLANDS FOR TAPIS PUMP FIRE AND GAS SYSTEM UPGRADE PROJECT - EMEPMI

    RANHILL WORLEY PARSONS

    May 4, 2010 Completed

    498. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM INCLUDING LAN/WAN – TL OFFSHORE SDN BHD

    TL OFFSHORE May 1, 2010 Completed

    499. SUPPLY, FABRICATE, INSTALL AND PRE-COMMISSION ONE UNIT OF GYM ROOM FOR BRE

    TALISMAN MALAYSIA LIMITED

    April 29, 2010 Completed

    500. DESIGN, SUPPLY, APPLICATION AND INSTALLATION OF PASSIVE FIRE PROTECTION (PACKAGE NO.SF03) FOR GUMUSUT KAKAP SEMI-FPS PROJECT

    MMHE April 21, 2010 Completed

    501. APPLICATION OF FOAM INSULATION FOR CAMERON INTERNATIONAL (M) SYSTEM SDN BHD

    CAMERON INTERNATIONAL (M)

    SDN BHD April 10, 2010 Completed

    502. FIELD JOINT COATING WORK AT TLO FOR 2010 MURPHY PIPELINE PROJECT MURPHY OIL CORP March 16, 2010 Completed

    503. FIELD JOINT COATING WORK AT GLOBAL OFFSHORE MALAYSIA FOR 2010 PETRONAS PIPELINES PROJECT

    PETRONAS CARIGALI March 16, 2010 Completed

    504. SUPPLY OF CABLES FOR F23R-A CILIPADI GAS FIELD DEVELOPMENT PROJECT

    PFCE March 15, 2010 Completed

    505. PASSIVE FIRE PROTECTION FOR SARAWAK SHELL E-8 PLATFORM SARAWAK SHELL March 15, 2010 Completed

    506. DISPOSAL & REMOVAL OF SCRAP MATERIALS FROM MMHE SARAWAK SHELL March 15, 2010 Completed

    507. SALE OF USED/SCRAP MATERIALS AND EQUIPMENT MLNG March 10, 2010 Completed

    508. THERMOCOUPLE CABLE FOR BUNGA ORCHID-A TALISMAN MALAYSIA March 9, 2010 Completed

    509. HEAT SHIELD PANELS FOR ABU FIELD PETRONAS CARIGALI March 3, 2010 Completed

    510. SUPPLY AND APPLICATION OF PFP FOR F23DR-A CILIPADI PROJECT AT RFSB FOR PFCE

    SARAWAK SHELL BERHAD

    February 28, 2010 Completed

    511. J-LAY TOWER REFURBISHMENT PROJECT (STRUCTURAL WORKS) FOR SAPURA ACERGY

    SHELL / MISC February 25, 2010 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    512. SUPPLY OF LIGHT WATER STATION PETRONAS CARIGALI February 5, 2010 Completed

    513. BLASTING AND PAINTING FOR JLT STRUCTURE SERVICES FOR GUMUSUT AT SAPURA ACERGY

    SHELL/ MISC January 28 2010 Completed

    514. SUPPLY OF HEATSHIELDS TO CILIPADI PROJECT AT RFSB FOR PFCE SARAWAK SHELL December 28 2009 Completed

    515. DISPOSAL OF EXXON MOBIL OBSOLETE, PROJECT SURPLUS, AND USED MATERIALS

    EMEMPI December 8, 2009 Completed

    516. S-LAY FIELD JOINT COATING CONTRACT FOR GUMUSUT PIPELINE AT SAPURA ACERGY

    SHELL / MISC November 26, 2009 Completed

    517. SUPPLY AND APPLICATION OF PFP FOR TANGGA BARAT CPP TOPSIDE @ MMHE

    PETRONAS CARIGALI November 3, 2009 Completed

    518. DISPOSAL OF TML SLOW MOVING AND OBSOLETE GOODS AT KSB (SCRAP METAL)

    TALISMAN October 30, 2009 Completed

    519. SUPPLY OF BLASTWALL FOR F23 (CILIPADI) AT RAMUNIA YARD @ PFCE SARAWAK SHELL October 21, 2009 Completed

    520. SUPPLY OF BLASTWALL TO J.R MCDERMOTT FOR THE KIPPER TUNA PROJECT

    ESSO AUSTRALIA August 25, 2009 Completed

    521. SUPPLY OF INSTRUMENT, FIRE & GAS, ELECTRICAL AND TELECOM CABLES TO PFCE AT RAMUNIA FABRICATION YARD FOR 23 TOPSIDE PROJECT

    SARAWAK SHELL August 24, 2009 Completed

    522. SUPPLY OF AIMS RFP MUDMAT SYSTEM FOR NEWFIELD’S WEST BELUMUT WELLHEAD JACKET AT KENCANA HL

    NEWFIELD July 31, 2009 Completed

    523. SUPPLY OF CHEMICALS – TRIETHYLENE GLYCOL – 99.9%, 235 KGS DRUM UNDER PRICE AGREEMENT WITH PETRONAS CARIGALI

    PETRONAS CARIGALI July 15, 2009 Completed

    524. ELECTRICAL AND INSTRUMENTATION FABRICATION & HOST TIE & HOOK-UP COMMISSIONING OF GUA FLAREBOOM REPLACEMENT AT BOUSTEAD PENANG SHIPYARD S/B

    EXXON MOBIL June 22, 2009 Completed

    525. FABRICATION OF INSTRUMENT GAS SKID FOR KUMANG PROJECT AT SDE PETRONAS CARIGALI June 15, 2009 Completed

    526. FIELD JOINT COATING WORK AT TLO FOR 2009 PETRONAS PIPELINE PROJECT

    PETRONAS CARIGALI June 8, 2009 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    527. SUPPLY OF SERVIWRAP TO TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI May 15 , 2009 Completed

    528. FIELD JOINT COATING WORK AT TLO FOR BEKOK-DULANG PROJECT FOR PETRONAS PIPELINE PROJECT

    PETRONAS CARIGALI April 17, 2009 Completed

    529. FIELD JOINT COATING WORK AT TLO FOR WEST LUTONG PROJECT FOR PETRONAS PIPELINE PROJECT

    PETRONAS CARIGALI March 6, 2009 Completed

    530. FIELD JOINT COATING WORK AT TLO FOR BETTY BAKAU PROJECT FOR PETRONAS PIPELINE PROJECT

    PETRONAS CARIGALI February 12, 2009

    Completed

    531. PASSIVE FIRE PROTECTION FOR B11 LQ & HELIDECK AT BDEWC, SARAWAK SARAWAK SHELL

    BERHAD February 11, 2009 Completed

    532. PASSIVE FIRE PROTECTION FOR PC-4 RISER AT BD11 DR-A PLATFORM FOR MMHE

    PETRONAS CARIGALI January 19, 2009 Completed

    533. SUPPLY OF ELECTRICAL AND INSTRUMENTATION CABLES FOR F23 VLAP COMPRESSION AT SDE

    SARAWAK SHELL BERHAD

    January 5, 2009 Completed

    534. MARK AND CUT STEEL STRUCTURAL WORKS FOR MCR-A PROJECT AT MMHE MMHE JV WITH

    TECHNIP January 2, 2009 Completed

    535. FABRICATION OF STRUCTURAL WORKS FOR EAST MODULE TOPSIDES OF GUMUSUT KAPAP AT MMHE

    SHELL AND MISC December 31, 2008 Completed

    536. E & I AND PIPING WORK AT MMHE FOR TANGGA BARAT CPP TOPSIDES PETRONAS CARIGALI December 24, 2008 Completed

    537. PASSIVE FIRE PROTECTION FOR B-11 TOPSIDES AT BROOKE DOCK YARD SARAWAK SHELL

    BERHAD December 19, 2008 Completed

    538. SUPPLY OF KOBE ELECTRODES FOR F23-RA TOPSIDES AT RFSB SARAWAK SHELL

    BERHAD December 19, 2008 Completed

    539. INSTRUMENTATION & FGS & TELECON JUNCTION BOX – DULANG B AT KENCANA HL

    PETRONAS CARIGALI November 4, 2008 Completed

    540. SUPPLY OF TOTE TANKS PETRONAS CARIGALI October 29, 2008 Completed

    541. SUPPLY OF FIRE RATED WINDOWS FOR KUMANG AND TANGGA BARAT AT SDE

    PETRONAS CARIGALI October 21, 2008 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    542. SUPPLY OF INSTRUMENT CABLES FOR FPSO RUBY AT MMHE MISC October 15, 2008 Completed

    543. STRUCTURAL FABRICATION WORK FOR TANGGA BARAT AT MMHE PETRONAS CARIGALI October 13, 2008 Completed

    544. SUPPLY AND INSTALL KUMANG BLASTWALL/ FIREWALL COMPLETE SYSTEM INCLUDING PFP AT SDE TO MEET FIRE RATINGS

    PETRONAS CARIGALI October 10, 2008 Completed

    545. SUPPLY OF ELECTRICAL AND INSTRUMENTATION (E&I) CABLES FOR KUMANG AND TANGGA BARAT AT SDE

    PETRONAS CARIGALI September 27, 2008 Completed

    546. PIPING FABRICATION WORK FOR B11 KA TOPSIDE @ MMHE SARAWAK SHELL

    BERHAD September 16, 2008 Completed

    547. SUPPLY OF PERSONNEL TRANSFER BASKET AND CABLE GLAND / FITTINGS TO MURPHY OIL

    MURPHY SARAWAK OIL CO. LTD

    September 15, 2008 Completed

    548. FIELD JOINT COATING WORK FOR CPOC PIPELINES AT TLO PETRONAS CARIGALI September 10, 2008 Completed

    549. PASSIVE FIRE PROTECTION FOR PLUTO PROJECT @ RFSB WOODSIDE ENERGY August 15, 2008 Completed

    550. FIELD JOINT COATING WORK AT TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT

    SARAWAK SHELL BERHAD

    August 1, 2008 Completed

    551. SUPPLY OF CANUSA HSS TO TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT

    SARAWAK SHELL BERHAD

    July 22, 2008 Completed

    552. SUPPLY OF DOUBLE SKIN HEAT SHIELDS FOR B11 KA PROJECT AT MMHE SARAWAK SHELL

    BERHAD June 30, 2008 Completed

    553. PASSIVE FIRE PROTECTION OF ANDP-D AT RFSB PETRONAS CARIGALI June 30, 2008 Completed

    554. SUPPLY OF SERVIWRAP FOR CPOC PIPELINE TO TLO PETRONAS CARIGALI June 26, 2008 Completed

    555. E&I, PIPING, MECHANICAL & STRUCTURAL FABRICATION FOR KUMANG CLUSTER DEVELOPMENT / TANGGA BARAT PROJECT @ SDE

    PETRONAS CARIGALI June 11, 2008 Completed

    556. DESIGN, SUPPLY, FABRICATION AND INSTALL NEW FIRE AND BLASWALL FOR BR-A

    TALISMAN MALAYSIA LIMITED

    May 23, 2008 Completed

  • JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD

    NO WORK DESCRIPTION OWNER COMMENCEMENT

    DATE CURRENT STATUS

    September 18, 2020 - (Track Record Updated)

    557. PASSIVE FIRE PROTECTION OF GOPA-GOPB AT KHL MURPHY SARAWAK

    OIL CO. LTD May 8, 2008 Completed

    558. SUPPLY AND DELIVERY OF CONCRETE MATRESSES, SLEEPERS, LIFTING FRAME FOR 24” ANDR-A/TCOT PIPELINE FOR TLO

    PETRONAS CARIGALI April 30, 2008 Completed

    559. ELECTRICAL AND INSTRUMENTATION FABRICATION WORK AT RFSB ON ANGSI –D PLATFORM

    PETRONAS CARIGALI April 24, 2008 Completed

    560. PFP for F23 AND F6 AT BROOKE DOCKYARD, KUCHING, SARAWAK SARAWAK SHELL

    BERHAD April 11, 2008 Completed

    561. SUPPLY OF POWER & INSTRUMENTATION CABLES MURPHY SARAWAK

    OIL CO. LTD April 10, 2008 Completed

    562. SUPPLY OF HEATSHIELDS TO CLOUGH FOR MONTARA PROJECT IN THAILAND

    CLOUGH (THAILAND) CO. LTD

    April 10, 2008 Completed

    563. FIELD JOINT COATING SERVICES FOR TALISMAN PIPELINE INSTALLATION TALIMAN MALAYSIA

    LIMITED April 10, 2008 Completed

    564. FIELD JOINT COATING FOR PETRONAS CARIGALI 2008 PIPELINE INSTALLATION AT TLO FOR 5 PIPELINES