With reference of M/s Hyder Safety Inspection Ref No.47 herewith attached corrective action which are implemented at site. Picture no.5 This area is already backfilled. Picture No.06 Provided edge protection around the trench with “A” Frame.

description

hh

Transcript of julius 475

With reference of M/s Hyder Safety Inspection Ref No.47 herewith attached corrective action which are implemented at site.Picture no.5This area is already backfilled.

Picture No.06Provided edge protection around the trench with A Frame.

Picture No.07Provided steel bridge for the workers for safe crossing of excavation.

Picture no.08Provided edge protection to the deep trench

Picture no.09Provided edge protection to the deep trench besides A2 road

Picture no.10Provide green mesh with wire ropes and edge protection provided with warning tapes and nylon ropes.

Picture no.11Provided standard and lengthy ladder inside the trench for safe access and egress

Picture no.12Removed the damaged wire and provided a new one for safe working

Picture no.13All man holes are protected with suitable barriers as shown in below pictures

Picture no.14

Picture no.15Manhole in that particular area was finished and another manhole steel bridge provided as safe access .

Picture no.16 Villa is protected with public protection

Picture no: 19Provided public protection to under construction villa

Picture no.20Provided edge protection to the deep trench with A frame

Picture no.21Given TBT to the operatives about the importance and use of PPE please check the attachments providedPicture no.22Removed the sewer from the toilet and provided adequate water facilities and the toilet are cleaning regularly

Picture no.23Provided edge protection to the deep trench with warning tape and nylon rope