Jordan, March 2012
RENEWABLE ENERGY DEVELOPMENT IN TUNISIARENEWABLE ENERGY DEVELOPMENT IN TUNISIA
Moncef HARRABIMoncef HARRABI
![Page 2: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/2.jpg)
I. TUNISIAN ENERGY CONTEXT
The Tunisian Energy Context is characterized by :The Tunisian Energy Context is characterized by :
High growing in international oil price.High growing in international oil price.
Limited potential of national hydrocarbon resources.Limited potential of national hydrocarbon resources.
Rapid increase in energy demand. Rapid increase in energy demand.
Annual energy subsidy increase.Annual energy subsidy increase.
![Page 3: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/3.jpg)
TUNISIAN ENERGY CONTEXT
Installed capacityInstalled capacity The distribution of the 3% RE Based The distribution of the 3% RE Based power capacity is as followspower capacity is as follows
Gas share in Electricity production is 98% Gas share in Electricity production is 98%
![Page 4: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/4.jpg)
TUNISIAN ENERGY CONTEXT
1.INSTITUTIONAL FRAMEWORK
A- Organisation and Regulation
Main institutions : MIT / STEG, STEG ER, ANME, ...
Supervision : The Ministry of Industry and Trade is
responsible for the supervision of :
- Energy policy : Hydrocarbons, electricity and RE.
- Regulation : by laws and decrees.
-Tariffs.-Electricity sector :
• Liberalisation of electricity production (1996).
• STEG : monopoly of Electricity and Gas Transport and
Distribution.
![Page 5: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/5.jpg)
TUNISIAN ENERGY CONTEXT
INSTITUTIONAL FRAMEWORK
B- Specific Regulation framework for Renewable
Objectives : Allow electricity production from renewable energies and
access to the grid.
Main features of Energy Conservation law (February 2009) :
• Residential, tertiary and industrial sectors.
• Exclusivity sale to STEG.
• Limited to 30% of electricity production exceed.
• Tariffs : STEG sales Tariffs
Role of STEG :
• Connect private installation when fulfilling technical
conditions .
• Transport electricity to consumption point.
![Page 6: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/6.jpg)
Tunisia has invested a great effort in the development of energy conservation and RE, by installing specific financing scheme and laws for RE and EE and creating research center dedicated to RE, in order to :
Diversify the means of power generation.
Reduce fuel consumption and CO2 emissions.
Introduce new technologies.
Open new perspectives for the integration of new sectors in the local industry.
Develop regional and international cooperation.
Introduction of renewable energy must take into account stability and reliability of the national grid.
II. PRESENT SITUATION OF RE3.RE DEVELOPMENT STRATEGY
![Page 7: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/7.jpg)
1 800 kWh/m²/year
North
2 600 kWh/m²/year
South
Important Solar PotentialImportant Solar Potential
PRESENT SITUATION OF RE4.SOLAR RESOURCES IN TUNISIA
Solar radiation varies from
![Page 8: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/8.jpg)
Good wind potentialGood wind potential
PRESENT SITUATION OF RE
Wind ATLASWind ATLAS
Wind speed Wind speed (m/s)(m/s)
![Page 9: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/9.jpg)
Sidi Daoud Wind farm : Installed capacity 54 MW
(11 MW in 2000, 9 MW in 2003 and 34 MW in 2009)
Sidi Daoud
PRESENT SITUATION OF RE
5.WIND ENERGY
Integration RE rate in installed capacity varies from 0.4 in 2000 to 1.7 % in 2010Integration RE rate in installed capacity varies from 0.4 in 2000 to 1.7 % in 2010
![Page 10: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/10.jpg)
PRESENT SITUATION OF RE
6.WIND ENERGY
Bizerte Wind farm Stage A
120 MW : has just started in the last days ( February 2012).
Kechabta
Metline
![Page 11: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/11.jpg)
13 000 households, 200 rural
schools,
90 pump stations of drinking
water.
PRESENT SITUATION OF RE
7.SOLAR ENERGY
Rural Electrification and pump stations
![Page 12: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/12.jpg)
Project : 1 000 Solar Buildings.
Achievements : 1700 kWp in
2011.
Prosol Elec Project (Roof top)
PRESENT SITUATION OF RE
SOLAR ENERGY
![Page 13: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/13.jpg)
Prosol Elec Project (Roof top)
Financial mechanism
Customer : 10% initial investment,
STEG : Inverter,
FNME : 30%,
MEDREC :10%,
Credit Bank : 30 % Easy payment of a credit
without interest through electricity bill
PRESENT SITUATION OF RE
SOLAR ENERGY
![Page 14: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/14.jpg)
PRESENT SITUATION OF RE
8.SOLAR WATER HEATING
Prosol Thermique
Total installed surface in 2012 is estimated to be 700 000 m2
![Page 15: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/15.jpg)
PRESENT SITUATION OF RE
SOLAR WATER HEATING
INCITATIVES MEASURES
Allocation, by FNME, of direct subsidy covering 20% of
the SWH price : with a limit of :
200 DT for 200 liters capacity;
400 DT for 300 liters and more SWH capacity.
Credit sale over 5 years, with a covering of 30
bimonthly deadlines, through the STEG invoice ,
STEG guarantee credit recovery,
![Page 16: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/16.jpg)
Solar Energy
Creation of a Tunisian company specialized in the manufacture of
solar photovoltaic modules “NR-SOL” :
Production capacity: 25 MWp per year.
Target market: Tunisia, Europe and Africa.
Wind Energy
Tunisian company “SOCOMENIN Wind Towers” specialized in the
fabrication of tubular towers for the main wind turbine manufactures.
Production capacity: 150 towers per year.
PRESENT SITUATION OF RE
9.INDUSTRIAL INTEGRATION
![Page 17: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/17.jpg)
III.RE PROJECT DEVELOPMENT
1.WIND ENERGY
Bizerte Wind farm stage B
70 MW under construction, start up : the end 2012
Total capacity in Bizerte Farm will reach 190 MW
Energy production : 600 GWh/year
Kechabta
Metline
![Page 18: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/18.jpg)
RE PROJECT DEVELOPMENT
WIND ENERGY
End 2012
Total Installed Capacity in Tunisia : 244 MW.
Integration ratio of RE :
Installed capacity : 7 %.
Energy production: 5.5 %.
![Page 19: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/19.jpg)
RE PROJECT DEVELOPMENT
2.SOLAR ENERGY
Rooftops
Period : 2012 – 2016.
Planned capacity : 13 MW.
Energy produced : 23 GWh/year.
![Page 20: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/20.jpg)
RE PROJECT DEVELOPMENT
SOLAR ENERGY
PV Power Plant 10 MW
Planned to be in operation in 2014.
![Page 21: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/21.jpg)
RE PROJECT DEVELOPMENTSOLAR ENERGY
CSP Power Plant
Planned capacity : 50 MW
Planned to be in operation in
2016-2017.
![Page 22: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/22.jpg)
RE PROJECT DEVELOPMENT3.HYDRO POWER
Pumped-Storage System : STEP
Planned capacity : 400 - 500 MW.
Feasibility study contract was
signed 10 days ago.
Planned to be in operation in 2018.
![Page 23: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/23.jpg)
40 projects including RE projects
and Energy Efficiency initiatives.
Total investment : 2300 M€.
Total reduction of national energy
consumption : 22%.
The share of renewable energies
in the total capacity is planned to
be 16 % in 2016.
RE project represent 71% of the
total TSP.
IV. RENEWABLE ENERGY PERSPECTIVES
THE TUNISIAN SOLAR PLAN -2016-
Energy Efficiency 15%
Renewable Energy
Support and assistance
![Page 24: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/24.jpg)
Renewable Power Production : 1 000 MW in 2016 4 700 MW in 2030
RENEWABLE ENERGY PERSPECTIVES
TARGET OF TUNISIAN SOLAR PLAN
Wind Solar Others
![Page 25: Jordan, March 2012 RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI.](https://reader035.fdocuments.net/reader035/viewer/2022062619/5517ff7055034693228b4b73/html5/thumbnails/25.jpg)