June 23, 2021 COUNTY MANAGER’S PROPOSED FY2022–FY2024 CAPITAL IMPROVEMENT PLAN Joint Facilities Advisory Commission

Transcript of Joint Facilities Advisory Commission

Page 1: Joint Facilities Advisory Commission

June 23, 2021

COUNTY MANAGER’S PROPOSED FY2022–FY2024CAPITAL IMPROVEMENT PLAN

Joint Facilities Advisory Commission

Page 2: Joint Facilities Advisory Commission

2FY 2022 - FY 2024 PROPOSED CIP

Capital Plan for FY 2022 - 2024

PUBLIC/GOVERNMENT FACILITIES PARKS &

RECREATION

TECHNOLOGY & PUBLIC SAFETY

MAINTENANCE CAPITAL

STORMWATER & UTILITIES

METRO

TRANSPORTATION & ROADS

COMMUNITY CONSERVATION

Page 3: Joint Facilities Advisory Commission

3FY 2022 - FY 2024 PROPOSED CIP

Guiding Principles• Constrained approach, focusing on conservative projected growth in annual

General Fund debt service for the next few years.• Provides “bridge” to the next year of budget deliberations and the economic

recovery, and then return to our normal ten-year CIP (FY 2023 – FY 2032) process in late spring 2022

• Prioritize projects that address failing /end-of-life infrastructure• e.g., West Glebe Road Bridge, trails and bridges, technology systems, roofs and

hvac systems

• Meet legal and regulatory obligations• e.g., Metro

• Restart investments identified as part of planning processes• Neighborhood conservation, Crystal City

• Make technology and facilities investments with considerations of the new workplace environment post pandemic

Page 4: Joint Facilities Advisory Commission

4FY 2022 - FY 2024 PROPOSED CIP

How We Pay for the CIP

$1.25billion

FY 2022 – FY 2024

6%PAY-AS-YOU-GO

18%GENERAL OBLIGATION BONDS (COUNTY)

12%STATE & FEDERAL

18%TRANSPORTATION CAPITAL

FUND (TCF)

7%PREVIOUSLY APPROVED FUNDING

28%OTHER SOURCES(Utility Capital Funds, Utility GO Bonds,

Developer Contributions, Short-Term Finance, Tax Increment Financing,

Sanitary District Tax and Other Funding)

Notes: The majority of revenue for the CIP is restricted in uses and cannot be spent in other areas $62.535 million of the FY 2022 – FY 2024 CIP is a bond referendum that voters must approve in November 2021 before those projects can be funded

(excludes APS)

11%GRANTS

Page 5: Joint Facilities Advisory Commission

5FY 2022 - FY 2024 PROPOSED CIP

Proposed 2021 Bond Referenda• Community Infrastructure ($17.035 million)

• Neighborhood Conservation: $2.0M• Facilities Maintenance Capital: $4.605M• Courthouse Complex Renovations & Infrastructure:$8.0M• Courts/Police Building Improvements: $1.73M• Quincy Site Design: $0.7M

• Local Parks and Recreation ($6.8 million)• Arlington Boathouse: $0.8M• Bluemont Park Tennis Court Complex Replacement: $5.0M• Trail and Bridge Modernization Program: $1.0M

• Metro and Transportation ($38.7 million)• Metro: $20.7M• Paving: $17.5M• Bridge Maintenance and Replacement: $0.5M

• Total : $62.535MNote: Any amounts for an Arlington Public Schools bond referendum will be included upon an adopted request by the School Board.

Page 6: Joint Facilities Advisory Commission

6FY 2022 - FY 2024 PROPOSED CIP

Regional Commitments

METRO: $93.2 MILLION• Combination of GO Bonds ($63.3 million) and state transit aid ($29.9

million)• FY 2022 GO bonds will fund the County’s FY 2023 capital contributions

Note: Funding of $20.7 million is included in the November 2021 bond referendum package

Page 7: Joint Facilities Advisory Commission

7FY 2022 - FY 2024 PROPOSED CIP

Stormwater

STORMWATER FUND: $95.9 MILLION• $ 5.4 million for the Ballston Pond Watershed Retrofit

• $16.7 million for Cardinal Elementary School Stormwater Detention

• $26.8 million for the Spout Run Watershed• Watershed scale project to increase capacity of storm sewers and provide overland relief• Reduces the risk of potential lethal flooding to adjacent homes, roadways and buildings• Projects may include increased pipe diameters, detention, green overland flow features, and pump

systems.

Page 8: Joint Facilities Advisory Commission

8FY 2022 - FY 2024 PROPOSED CIP

UtilitiesUTILITIES FUND: $185.2 MILLION• Continued implementation of Solids Master Plan

• $58.2 million for Solids Master Plan Phases I-III

• $ 5.7 million for Gravity Transmission Mains

• $15.7 million for Washington Aqueduct Capital

Page 9: Joint Facilities Advisory Commission

9FY 2022 - FY 2024 PROPOSED CIP

General GovernmentTRANSPORTATION/STREET SAFETY: $710.1 MILLION (without Metro)Highlights include:

• $36 million for Paving ($12M annually)• Maintains Pavement Condition Index (PCI) level at approximately 79 (target range: 75 to 80)

• $48.2 million for Bridge Replacements and Renovations• Mix of new local, federal, state and previously approved funding

• Replacement of West Glebe Road and Mt. Vernon (Arlington Ridge Road) bridges

• Design & early construction for Shirlington Road Bridge (maintenance project already funded and likely to begin later this year)

• Bridge maintenance of $4.5 million for state of good repair for the remaining 33 vehicular or pedestrian bridges

• $95.4 million for Columbia Pike Multi-Modal

• $5 million for Vision Zero Street Safety Improvements Program• Majority comes from dedicated transportation funding sources to begin implementation efforts

Page 10: Joint Facilities Advisory Commission

10FY 2022 - FY 2024 PROPOSED CIP

General Government (cont.)TransportationTransit Highlights include:

• $57 million for the ART O&M facility

• $91.3 million for the Crystal City East Entrance

• $67.8 million for the Ballston West Entrance

• $1.4 million Courthouse Metro Elevator

Page 11: Joint Facilities Advisory Commission

11FY 2022 - FY 2024 PROPOSED CIP

General Government (cont.)PARKS & RECREATION: $34.3 MILLIONHighlights include:

• $4.8 million for Arlington Boathouse planning & design

• $6.3 millions for Bluemont Tennis and Picnic Shelter design & construction

• $1.7 million for Alcova Heights Phase II construction

• $0.715 million for Greenbrier/Yorktown Track replacement

• $4.6 million for Crystal City Parks and Public Space

• $5.4 million for synthetic turf• Barcroft, Rocky Run, Wakefield – replacements of existing turf; conversion of Thomas Jefferson upper field• Funding is from a combination of sources; APS anticipated to contribute to joint use fields

• $7.4 million for trail and bridge maintenance

Page 12: Joint Facilities Advisory Commission

12FY 2022 - FY 2024 PROPOSED CIP

General Government (cont.)COMMUNITY CONSERVATION: $23.5 MILLION• New Neighborhood Conservation bond funding: $6 million

• $2.0 million each year in GO bond funding is provided for new project funding. In addition, annual PAYG funding is provided to cover NC staff

• Existing balances & previously approved bond funding: $16.5 million • Funding will cover construction of projects previously approved during prior

Neighborhood Conservation funding rounds and that are scheduled to be completed over the next 1-3 years

Page 13: Joint Facilities Advisory Commission

13FY 2022 - FY 2024 PROPOSED CIP

General Government (cont.)TECHNOLOGY: $68.9 MILLIONHighlights include:

• $1 million for Conference Room Audio/Visual Equipment • Focused on buildings other than the Bozman Government Center

• $9.5 million for PC and server replacement

• $5.5 million for network equipment, security and software

• $10 million for public safety radios and fire defibrillators

• $14 million for Human Resources/Financial system refreshment (PRISM)

• $4 million for a Real Estate Assessment system and Land Records System in Circuit Court

Page 14: Joint Facilities Advisory Commission

2FY 2022-FY 2024 PROPOSED CIP

Key Considerations in Developing this CIP• Targeted Relocations to Facilitate Pending Projects • Regulatory Compliance• Addressing Operational Needs• Leverage Emerging Opportunities• Maintain State of Good Repair/Facilities Condition

Assessments (FCA's)• Applying Community Energy Plan Principles to

Ongoing Projects

Page 15: Joint Facilities Advisory Commission

3FY 2022-FY 2024 PROPOSED CIP

Facilities & Engineering Program

Bureau ($ millions) PAYG Bond Other* Total

FACILITIES DESIGN & CONSTRUCTION 1,431 10,430 11,114 22,975

FACILITIES MANAGEMENT 5,815 4,605 3,950 14,370

Total 3-year request 7,246 15,035 15,064 37,345

* Includes previously approved bonds, and other funding for Ballston Garage

Page 16: Joint Facilities Advisory Commission

4FY 2022 PROPOSED BUDGET

Key Accomplishments

Lubber Run Community Center

Lubber Run CC Pickleball Court

Fire Station 8 Design

1212 S. Irving Street Design

Wastewater Treatment PlantNew Hot Water Piping

Justice Center Boiler Replacement

CSW Boiler/Chiller/Pump Replacement

Fire #2 - Bi-fold doors replacements

Page 17: Joint Facilities Advisory Commission

COUNTY MANAGER’S PROPOSED FY 2022-FY 2024 CAPITAL IMPROVEMENT PROGRAM

County Board Work Session

Facilities Design & Construction

Page 18: Joint Facilities Advisory Commission

6FY 2022-FY 2024 PROPOSED CIP

Program SummaryFY 22 – FY 24

Proposed ($000s)Source of

Funds

Courthouse Complex Renovations

Courts/Police Building Improvements (Phase 1)

Quincy Site Design (formerly Buck)

26th & Old Dominion Stormwater

Ballston Public Parking Garage Floors 1-7

Crystal City Library

Facility Master Planning & Feasibility Studies

Gender Neutral Restroom Signage

Police Women’s Locker Room Expansion

Total

8,000

10,000

700

1,200

1,100

1,160

544

145

126

22,975

New Bonds

New Bonds/Other

New Bonds

Other

Other

PAYG

Other

PAYG

PAYG

Page 19: Joint Facilities Advisory Commission

7FY 2022-FY 2024 PROPOSED CIP

FUNDING: COMPLETION:

Courthouse Complex Renovations & Infrastructure

$8,000,000 FY 2024

• Relocate Fire Marshall’s & Battalion Chief’s Offices to one floor in 2020 14th Street North (includes infrastructure improvements).

• 1020 Hudson Street is beyond its useful life:• Requires significant investments• Has limited parking• No economic benefits for a renovation

• Vacating the building allows for redevelopment opportunities at the Clarendon site

Page 20: Joint Facilities Advisory Commission

8FY 2022-FY 2024 PROPOSED CIP

FUNDING: COMPLETION:

Courts/ Police Improvements$10,000,000 FY 2024

• Phased Implementation of 2018 study to include security, technology, and judicial compliance

• Construction of minimum of 2 Courtroom upgrades• Modifications to 12th floor to address security and

consolidation of judge's chambers • Design of the 4th floor to accommodate Juvenile & Domestic

Relations Court (JDR) needs

Page 21: Joint Facilities Advisory Commission

9FY 2022-FY 2024 PROPOSED CIP

FUNDING: COMPLETION:

Quincy Site Design$700,000 FY 2023

• Quincy 1 design funding includes:• Conversion of remainder of Quincy 1 warehouse to

relocate Fire vehicles/materials from Water Pollution Control Plant (WPCP)

• Relocation is needed to avoid impeding start of the WPCP Solids Master Plan construction (CY 25).

• Design implementation FY 23

Page 22: Joint Facilities Advisory Commission

10FY 2022-FY 2024 PROPOSED CIP

FUNDING: COMPLETION:

26th & Old Dominion Stormwater Compliance

FY 2024$1,200,000

• Stormwater Management Design and Construction• Comply with Land Disturbance Application (LDA) temporary

waiver expiring August 2023• Temporary salt facility completed in 2019 for $1.6M• Permanent facility was deferred • $800K available in previously approved bonds• New Funding $400,000

Page 23: Joint Facilities Advisory Commission

11FY 2022-FY 2024 PROPOSED CIP

FUNDING: COMPLETION:

Crystal City Library$1,160,000 FY 2023

• 1901 South Ball Street Site Plan includes developer provided 10-year lease with Arlington County

• 7,200 SF provides space for Crystal City Library• Library design and construction• Amenities may include collections, children’s area, artwork

exhibit space, and public computer terminals

Page 24: Joint Facilities Advisory Commission

COUNTY MANAGER’S PROPOSED FY 2022-FY 2024 CAPITAL IMPROVEMENT PROGRAM

County Board Work Session

Project Updates

Page 25: Joint Facilities Advisory Commission

Trade Center Optimization Plan Update

•Joint (APS & AC) Study to review the existing facilities, site layout and current operations and provide recommendations on space and site optimization• Study retained all existing uses on-site

•No viable solutions developed• Preliminary costs ($170M-$240M) and phasing (9-18 yrs) for all 3

concepts deemed infeasible• All concepts posed untenable operational challenges and compromises

•Next Steps• Evaluate relocation of non-site essential programs (TE&O, Police

Impound)• Consider alternative APS transportation models and/or operations

practices• Plan for future EV infrastructure and operations

Page 26: Joint Facilities Advisory Commission

ART Shirlington Operations & Maintenance Facility

Project Overview•Scope:

• Operations/dispatch and administration facility• Maintenance facility• Structured parking for 110 personal vehicles• Surface parking for up to 68 buses• Infrastructure to accommodate future electric-powered bus

fleet to include storage, maintenance and battery charging

•Schedule:•Design underway•Construction start Spring 2022•Opening Winter 2024/Spring 2025

Page 27: Joint Facilities Advisory Commission

ART Shirlington Operations & Maintenance FacilitySite Plan

Page 28: Joint Facilities Advisory Commission

COUNTY MANAGER’S PROPOSED FY 2022-FY 2024 CAPITAL IMPROVEMENT PROGRAM

County Board Work Session

Facilities Management

Page 29: Joint Facilities Advisory Commission

17FY 2022-FY 2024 PROPOSED CIP

Key Considerations in Developing Capital Maintenance Requests• Facility Condition Assessment (FCA)

• Provides basis for determining the building's conditions

• Identifies immediate and long-term maintenance needs

• Provides estimated one for one replacement values

• Actual replacements includes higher Energy Efficiency equipment

• On-the-ground insights are applied to supplement the FCA

• Identify equipment that is no longer supported by the manufacturer or compatible with replaced equipment, or

• Requiring excessive maintenance*DPR is developing a similar FCA process for evaluating their parks outdoor portfolio.

Page 30: Joint Facilities Advisory Commission

18FY 2022-FY 2024 PROPOSED CIP

Program SummaryFY 22 – FY 24

Proposed ($000s)Source of

Funds

Central Library MEP Replacement

Arlington Detention Facility VAV’s Replacement

Equipment Bureau Roof Replacement

Water-Sewer Street Admin. Restroom Refresh

Detention Facility Ventilation Systems

Court Square West Structural Concrete Repairs

Fire Station 2 HVAC Replacement

Fire Station 5 HVAC Replacement

Communication Facility Repairs – Lee Pumping Station

Total*

2,355

2,935

1,670

500

625

500

325

300

160

14,370

PAYG/Other

New Bonds

New Bonds

Other

Other

Other

Other

PAYG/Other

Other

*Total include $5,000 of PAYG for FY 23 and FY 24

Page 31: Joint Facilities Advisory Commission

19FY 2022-FY 2024 PROPOSED CIP

FUNDING: COMPLETION:

Central Library – Systems Upgrades

$2,355,000 FY 2022

• Replacement of the air handling unit in VA room and auditorium.

• Generator/transfer switch• Elevator modernization• Restrooms refresh• Project start August 2021

Page 32: Joint Facilities Advisory Commission

20FY 2022-FY 2024 PROPOSED CIP

FUNDING: COMPLETION:

Detention Facility – VAV Replacements

$2,935,000 FY 2023

• Replacement of existing pneumatic variable air volume (VAV) units to digital

• Upgrading the building automation system (BAS) for new VAV units• August 2021: Phase 1 construction start on Floors P2 - 4th • July 2022: Phase 2 construction start on Floors 5th – 12th

Page 33: Joint Facilities Advisory Commission

21FY 2022-FY 2024 PROPOSED CIP

FUNDING: COMPLETION:

Equipment Bureau Roof Replacement

$1,670,000 FY 2022

• Replacement of the roof and upgrade bay light fixtures to LED• Includes installation of solar panels• Solar panels will reduce utility costs• Construction Start March 2022

Page 34: Joint Facilities Advisory Commission

22FY 2022-FY 2024 PROPOSED CIP

FUNDING: COMPLETION:

Water Sewer AdministrationRestroom Refresh

$500,000 FY 2022

• Refreshment of the restroom facilities in the Water Sewer Streets (WSS) administrative building located at 4200 S. 28th Street.

• The restrooms are heavily used and need to be refreshed.• Project Start September 2021

Page 35: Joint Facilities Advisory Commission

23FY 2022-FY 2024 PROPOSED CIP

Energy Investments Across the CIP

Elements of 2019 CEP applied to

Facilities Projects

High Performance Buildings and Facilities• Carbon neutral features• High thermal efficiency options

in equipment replacements• Conversion of building lighting

systems to LED bulbs

Solar Panels• Solar panels

considered for roof replacements and building renovation

• Feasibility review of government sites for potential renewable energy

Electric Vehicle Infrastructure• Replacement of internal-

combustion-engine vehicles when feasible

Lubber Run

Fire Station 8

Fire Station 2 HVAC

Fire Station 5HVAC

1212 S. Irving

Equip. Bureau

Detention Facility VAV

WPCP HVAC

13 EV Station Installs

EV Engineering Study

Page 36: Joint Facilities Advisory Commission

14FY 2022 - FY 2024 PROPOSED CIP

Adhering to Debt Policies

8.1%8.6% 8.8%

9.1%9.4%

9.0% 8.9%

8.2%7.6% 7.4%

7.1%

0.0%

1.0%

2.0%

3.0%

4.0%

5.0%

6.0%

7.0%

8.0%

9.0%

10.0%

FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31

Debt Service as % of General Government Expenditures

NOT TO EXCEED

10%No bonds included after FY 2024

To be updated in FY 2023 – FY 2032 CIP

Page 37: Joint Facilities Advisory Commission

15FY 2022 - FY 2024 PROPOSED CIP

Existing CommitmentsProjects already underway that will continue

PUBLIC/GOVERNMENT FACILITIES• Including: Fire Station 8, Courthouse & Bozman Government Center, 1212

S. Irving Street Group Home

PARKS & RECREATION• Including: Jennie Dean Park, Long Bridge Aquatics and Fitness Facility, Alcova

Heights phase II, Gunston Bubble

STORMWATER• Including: Spout Run Watershed, Donaldson Run Tributary B Stream

Restoration, Ballston Pond, Cardinal (Reed) School

Page 38: Joint Facilities Advisory Commission

16FY 2022 - FY 2024 PROPOSED CIP

Existing Commitments (cont.)TRANSPORTATION• Including: Columbia Pike Multimodal Street Improvements, Columbia Pike

Transit Stations, Bridge Renovations, Ballston West Entrance, Ballston Multimodal, Transitway Extension to Pentagon City, Crystal City Streets, Lee Highway and Glebe Road Intersection

NEIGHBORHOOD CONSERVATION• Including: Over 20 projects spread throughout the County involving street

improvements, intersection improvements, parks, and beautification

UTILITIES• Including: Solids Master Plan, Fairfax Water Interconnection, Spout Run

Sanitary Sewer Relining, South Troy Street Water & Sewer Improvements

Page 39: Joint Facilities Advisory Commission

17FY 2022 - FY 2024 PROPOSED CIP

FY 2022-FY2024 CIP Feedback Summary

724participants(17 in Spanish)

We asked participants to rank their most important priorities in several key areas. Participants’ top choices in each area:

We asked participants rank the below items in their priority order for the upcoming CIP. The final rankings were:

Transit (6.07)

Parks & Recreation (6.68)

Energy & Sustainability (5.95)

Water/Wastewater Systems (6.2)

Technology (4.52)

Libraries (5.11)

Public Facilities (4.91)

Stormwater (5.62)

Roads (5.74) Fire Stations (4.19)

Streets1. Sidewalks (375)2. Pedestrian Crossings (327)3. Bike Lanes (302)4. Paving (254)

Parks1. Trails (506)2. Land Acquisition for Parks (355)3. Casual Use Space (345)

Infrastructure1. Maintaining water-sewer system (474)2. Maintaining our streets (376)3. Mitigating storm water damage (341)4. Keeping school and public transit

systems in operation (254)

Page 40: Joint Facilities Advisory Commission

18FY 2022 - FY 2024 PROPOSED CIP

FY 2022 - FY 2024 CIP TimelineMay 18 Proposed CIP presented to County Board

May – July Board Work Sessions• June 9: Schools

• May 25: Technology, Public Safety, Stormwater, Utilities• June 22: Debt, Metro, Transportation

• June 24: Government Facilities, Parks and Recreation, Community Conservation

June 29 Public Hearing

July (week of July 12th) Final Board Mark-Up

July 17 Board Adoption

Page 41: Joint Facilities Advisory Commission

24FY 2022-FY 2024 PROPOSED CIP

Questions?

Page 42: Joint Facilities Advisory Commission

25FY 2022-FY 2024 PROPOSED CIP

Back-Up Slides

Page 43: Joint Facilities Advisory Commission

ART ShirlingtonElectric Bus Charging – EV OptionA

Canopy / gantryfor charging

Chargingcabinets atcenter zone

• designed to accommodatefuture fleetelectrification

• looking at variousoptions

• flexible and eyefor the future

EV generator / transformer / switchgear /

panels

Canopycolumns atblue zones

Page 44: Joint Facilities Advisory Commission

SustainabilityArlington’s Facility Sustainability Policy Energy Efficient: 25% Savings vs Code3rd Party Sustainability Certification – pursuing LEED Silver

Passive Strategies:• High-Performance

Envelope• Window: Wall Ratio• Optimized Daylight

Active Strategies:• Low-Maintenance

HVAC• Solar-Ready• Fleet Electrification

Page 45: Joint Facilities Advisory Commission

COUNTY MANAGER’S PROPOSED FY 2022-FY 2024

CAPITAL IMPROVEMENT PROGRAM