April 24, 2013 John Snell
The Green Community Experience in Lincoln, MA
Lincoln, Massachuse/s
!
Residen2al • Community Forum • Low Carbon Diet groups • Document residenFal
inventory • Assess energy use
Our “Inconvenient Truth” Phase
Municipal • Organize uFlity bills • Request Municipal
energy audits • Architecture 2030
Town bylaw • IdenFfy solar sites
Town Hall renova2on -‐55% less energy use
Photo credit: Colantanio ConstrucFon
Lincoln Community Forum
!
Residen2al • 20% savings target • Sign Pledge
• NSL Energy Audits • Do 1 thing
• Install energy monitors • Share data
• Review savings results • ParFcipate in NSTAR
community program • Develop Greening
Lincoln website
Our Green Communi2es Phase
Municipal • 20% savings target • Web-‐based controls • Replace oil with gas • Steam conversion • Repair historic window • Air Source Heat Pump • BaTery management • Lease hybrid cars • Lease electric car • ATend DOER’s regional
meeFngs
Green Community Investments
!
16% Energy Savings aRer 4 years
!"!!!!
!5,000!!
!10,000!!
!15,000!!
!20,000!!
!25,000!!
2008! 2009! 2010! 2011! 2012!
MMBT
U/&Ye
ar&
Lincoln&Total&Energy&Use&Trends&
Pierce!House!
Library!
Public!Safety!
Town!Hall!
Smith!Building!
Hartwell!Buildings!
Brooks!Building!
Town %&ChangeBuildings 2012Pierce&House 92%Library 939%Public&Safety 923%Town&Hall 948%
School %'ChangeBuildings 2012Smith'Building 724%Hartwell'Buildings 22%Brooks'Building 715%
ResidenFal • NSTAR Green Offering • Solarize MA with
Wayland and Sudbury • More than 1.2 MW for
single family homes in the three communiFes
• No condos or other non-‐profits
• Solar Bylaw
• MAPC Procurement • Condos or other non-‐
profits?
Our Solar Phase
Municipal • Power OpFons
• 1.2 MW for Lincoln Sudbury High School
• Solarize MA • No municipal faciliFes
• MAPC Procurement • In progress
The many faces of solar energy
ResidenFal • Troubleshoot high
electricity use households
• Nest thermostats? • Install web-‐accessible,
hard wired electricity monitors
• Town-‐wide survey regarding next steps
Our Building Performance Phase
Municipal • Interval data
retrocommission pilot project • Library • Schools
• Install web-‐enabled thermostats in small buildings
Maximize Building Performance
!