John F. Kennedy Middle School Page 1 of 2 March 25, 2020Addition and Renovations Supplement No. 3
SUPPLEMENT NO. 3JOHN F. KENNEDY MIDDLE SCHOOL
ADDITION AND RENOVATIONSSTATE PROJECT NO. 049-0140 RNV
GILBANE JOB NO. J08621.000
Bid Packages: (All)
Note: Use the below link to access the complete supplement including all attachments:https://dn.gilbaneco.com/?linkid=KZi4zr6VWWVzo0YKoavymbl4PgD7GAC8VIfODS6ncAGbVD1eLJic7g
The following items are hereby made part of the bid documents for the John F. Kennedy Middle School Project in Enfield, CT:
GENERAL
1. The bid date and time has changed for ONLY the following bid packages:
Bid Package Revised Due Date & Time04A Masonry Thursday April 9th, 2020 @ 10:00AM05A Structural Steel Thursday April 9th, 2020 @ 10:00AM05B Misc. Metals – Set Aside MBE Thursday April 9th, 2020 @ 10:00AM
07A Roofing Thursday April 9th, 2020 @ 10:00AM08A Glass & Glazing Thursday April 9th, 2020 @ 10:00AM08B Doors Frames & Hardware Thursday April 9th, 2020 @ 10:00AM09A Drywall & General Trades Thursday April 9th, 2020 @ 10:00AM
11B Kitchen Equipment Thursday April 9th, 2020 @ 10:00AM21A Fire Protection Thursday April 9th, 2020 @ 10:00AM22A Plumbing Thursday April 9th, 2020 @ 10:00AM23A HVAC Thursday April 9th, 2020 @ 10:00AM26A Electrical and Fire Alarm Thursday April 9th, 2020 @ 10:00AM
26B Telecommunications, Data and Audio/VisualSet Aside MBE
Thursday April 9th, 2020 @ 10:00AM
31A Sitework & Paving Thursday April 9th, 2020 @ 10:00AM
Sealed bids must be delivered to Gilbane’s Glastonbury Office before or by the close of the bid period. Late bids with be rejected and returned unopened.
a. The bid date and time remains unchanged for the balance of the bid packages.
2. The Gilbane Project Manual dated 03/10/2020 R2 has been reissued, the following documents have been edited;a. 00 11 13 Advertisement for Bids R2 dated 03/25/20b. 00 42 26-EX.A Proposal Form Exhibit A R2 dated 03/25/20
3. Bid RFI Log dated 03/25/2020 has been issued.
4. Public Bid Opening Logistics: Upon careful consideration by both Gilbane and the Town of Enfield as it relates to the current situation revolving around COVID-19, please be advised of the following changes to the public bid opening process;
John F. Kennedy Middle School Page 2 of 2 March 25, 2020Addition and Renovations Supplement No. 3
a. The bid opening will be held via live video conference ONLY. Bidders will NOT be permitted to attend the bid opening in person.
b. The live video conference of the public bid opening will open for bidders to join at the specified bid due date/time.
c. The live video conference of the public bid opening will begin thirty (30) minutes after the specified bid due date/time.
d. Bids will be opened and publicly read aloud in order by Bid Package within the specified wave of Bid Package due date/time indicated on the attached revised 00 42 26-EX.A Proposal Form – Exhibit A R2.
e. Access Information for Live Video Conference of Bid Opening:i. Join URL: https://zoom.us/j/364774283
ii. Meeting ID: 364-774-283
SPECIFIC SCOPE OF WORK
1. BP04A – Masonry
a. Add Specific Scope #32: Reference the PCB Abatement Plans Note “1A” and “2A”. for removal of existing masonry adjacent to PCB caulking. The hazardous abatement company will remove and dispose of all hazardous material including hazardous masonry. This bid package shall complete the masonry repairs (tooth in) as required to restore the brick, CMU and Glazed block to match existing. Include demolition of existing masonry beyond what is called out to be removed as hazardous waste to allow for a full tooth in of the masonry. Reference RFI 64 for further clarification on the tooth in requirements in regards to the PCB note “2A”.
REMINDERS
1. Please be advise that the bid location has CHANGED. Sealed bids for the John F Kennedy Middle School Project will be received by Gilbane Building Company at Gilbane Building Company’s Glastonbury Office, 208 New London Turnpike Glastonbury, CT 06033 until the specified bid due date/time. Reference the attached map of Gilbane’s Office location.
2. Bid Bonds: Each Bid shall be accompanied by a bid security in the form of a Bid Bond in an amount not less than Ten Percent (10%) of the total amount of the base bid. Said surety shall be issued by a surety that is licensed to do business in the State of Connecticut and is rated A-(VII) or better by A.M. Best. The bid security shall be drawn in favor of Gilbane Building Company.
3. Bidders shall EXCLUDE the cost of Payment and Performance Bonds from their base bid. Provide an ADD ALTERNATE in Section I of the Proposal Form for the cost of Payment and Performance Bonds.
4. Submit all RFIs via email to Nate Gengarella ([email protected])
All other terms and conditions remain unchanged. Acknowledge your receipt and inclusion of this Supplement on the proposal form in the space provided.
Sincerely,GILBANE BUILDING COMPANY
Stephanie GreenmanPreconstruction Manager
Cc: Project Team – GilbaneFile
---------------------------------------------End of Supplement #3 ---------------------------------------------
Gilbane Office208 New London TurnpikeGlastonbury, CT 06033 ----------------------------------Enter through the first door
on the right as you arefacing the building.
ENTER HERE
JOHN F. KENNEDY MIDDLE SCHOOLADDITION AND RENOVATIONSSTATE PROJECT NO. 049-0140 RNVGILBANE JOB NO. J08621.000
REVISED BID LOCATION: GILBANE OFFICE - 208 NEW LONDON TURNPIKE GLASTONBURY, CT 06033