Job Hazard and Risk Assessment
![Page 2: Job Hazard and Risk Assessment](https://reader036.fdocuments.net/reader036/viewer/2022081805/543fd8f2afaf9fef098b4ad1/html5/thumbnails/2.jpg)
Job Hazard and Risk Assessment ITEM
NO. HAZARD HAZARD EFFECT
EFFEC
T PROB RISK MINIMIZE RISK BY
RESIDUAL
RISK
1
Caliper tool string
becomes stuck
while running
Caliper inside well
bore
Unable to pull tool
string. Follow
procedures to pull
out of weak point
Low Low Low
Detailed engineering
drawings are made
available of all possible
'risk' areas. Minimize
flat shoulders on tools
and centralizers
Low
2
Wireline cable is
damage or broken
while in hole.
Master or crown
valve closed while
in hole
Wireline cable parts
causing possible
personnel injury.
Caliper and wireline
lost downhole
High Low Low
All crane operations will
be suspended over or
near wireline unit while
in operation. Sheave
wheel guards will be
securely fastened.
Constant monitoring of
wireline cable during
operation.
Proper wireline cable
maintenance
Low
3 Wireline sheave
fails
Possible injury to
personnel. Loss of
tools and /or
damage to wireline
cable
High Low Low
Visual check of
sheaves is
implemented prior too
and during operation.
Correct mounting and
usage of sheave is
carried out
Low
![Page 3: Job Hazard and Risk Assessment](https://reader036.fdocuments.net/reader036/viewer/2022081805/543fd8f2afaf9fef098b4ad1/html5/thumbnails/3.jpg)
ITEM
NO. HAZARD HAZARD EFFECT
EFFEC
T PROB RISK MINIMIZE RISK BY
RESIDUAL
RISK
4
Damage caliper tool
string while rigging
up or rigging down
Injury to personnel
and equipment Low Low Low
Good communication
established with all key
personnel prior too and
during wireline
operation.
Low
5 Hydraulic failure
(Power pack )
Unable to retrieve
tools from well bore Low Low Low
Power pack
maintenance perform
before all operations.
Visual inspection
perform during
operations
Low
6 Failure of tools
while in hole
Delayed or unable
to carry out
operation
Low Low Low
All tools and equipment
to perform caliper
operation to be check
prior to load out to well
site.
Low
Job Hazard and Risk Assessment
![Page 4: Job Hazard and Risk Assessment](https://reader036.fdocuments.net/reader036/viewer/2022081805/543fd8f2afaf9fef098b4ad1/html5/thumbnails/4.jpg)
Job Hazard and Risk Assessment
ITEM
NO. HAZARD HAZARD EFFECT
EFFEC
T PROB RISK MINIMIZE RISK BY
RESIDUAL
RISK
7 Pull out of weak
point
Loss of caliper tool
string in hole create
fishing operation.
Broken cable
causes injury
Med Low Low
Ensure weight indicator
is functioning
effectively. All potential
hang up areas are
minimized and well
documented. Cable
head built to proper pull
out or weak point
Low
8
Caliper damage,
failure or loss due to
debris left in hole
after milling
operations
Caliper tool string
lost or operation
delay due to
hazard's downhole
Med Low Low
Survey to be carried
out with potential
hazards in mind.
Logging speed >TBD
ft/min.
Low
9
Electronic depth
measurement
system
Caliper tool string
lost or damage due
to in-accurate depth
correlation.
Low Low Low
Check depth system
prior to running in hole.
Ensure mechanical
back-up working
properly. Correlate with
known tubulars, casing
collars or BHA
Low
![Page 5: Job Hazard and Risk Assessment](https://reader036.fdocuments.net/reader036/viewer/2022081805/543fd8f2afaf9fef098b4ad1/html5/thumbnails/5.jpg)
ITEM
NO. HAZARD HAZARD EFFECT
EFFEC
T PROB RISK MINIMIZE RISK BY
RESIDUAL
RISK
10 Manual handling
and lifting
Possible personnel
injuries incurred
and/or damage to
equipment.
Med Low Low
Correct lifting
techniques to be used,
crane to be used for
heavy and awkward
lifts.
Low
11 Damage rubber
packer
Steam comes out
from Lubricator and
possible with H2S
gas
Low Low Low
Check rubber packer
before usage. Service
BOP for every run. If
rubber packer swell
during operation and
more steam comes out,
use pack-off pump to
squeeze the rubber and
diminish rubber packer
wireline hole.
Low
Job Hazard and Risk Assessment