Jim MarkeyCommercial/Industrial Construction Professional
A brief review of some of the projects I have directed since 2000.
Grand Rapids, MIFedEx Freight – New Distribution Facility, 2011
Size: 55,489 s.f. Land: 23.8 acres Cost: $3.8 mil Features:
Precast concrete exterior wall at offices Pre-engineered metal building warehouse 6,969 s.f. finished office and 1,880 s.f. office pod 93 dock doors 4-bay mechanic’s shop, wash bay and 2-lane fuel island
So. Brunswick N.J.FedEx Ground Distribution Ctr, 2008
Size: 219,092 s.f. Land: 27 acres Cost: $29.5 mil Features:
Precast concrete Structural steel frame and roof Finished office Vehicle maintenance facility Truck fueling island Security facility
Orion Township, MIFedEx Ground Distribution Ctr, 2007
Size: 193,660 s.f. Land: 25.7 acres Cost: $13.9 mil Features:
Precast concrete Structural steel frame Finished office Vehicle maintenance facility Truck fueling island Security facility
Clarksburg, WVFedEx Ground Distribution Ctr, 2006
Size: 39,383 s.f. Land: 7.5 acres Cost: $3.3 mil Features:
Pre-engineered metal building Split-face masonry office façade Infrared warehouse heating T5 Fluorescent warehouse lighting Abbreviated construction schedule
Kansas City, MOBunzl Distribution Center, 2004
Size: 102,119 s.f. Land: 8.1 acres Cost: $3.7 mil Features:
Cast-on-site Tilt-up concrete exterior walls Conventional structural steel framing 12 trailer positions with adjustable docks 1 drive-in door ESFR Sprinkler system
Birmingham, ALFedEx Ground Distribution Ctr, 2004
Size: 96,406 s.f. Land: 14.3 acres Cost: $3.8 mil Features:
Cast-on-site Tilt-up concrete wall exterior Conventional steel frame and roof 4,524 s.f. of finished office 24 dock doors and 7 drive-in doors
Kansas City, MOPalestine Missionary Baptist Church, 2003
Overall project consisted of expansion and improvements in the sanctuary, including construction of a balcony for additional seating, installation of a lift to the choir stand for handicapped choir members, and relocation of the sound and media room. Exterior renovations included construction of a new two-story classroom addition and an adjoining two-tier concrete parking facility. The following photos illustrate construction of the temporary retaining wall erected to protect adjacent residences while building new parking and education facilities at the site.
PMBC – Temporary retaining wall utilizing oak timbers and I-beams was constructed during excavation for the new two-tier Parking Garage and two-story Classroom Facility.
PMBC – I-beams were placed in drilled shafts then wall sections were constructed as excavation was completed.
Independence, MOShops at Eastland Center, 2002
Cast-on-site Tilt-up concrete exterior walls Thinset brick inlay on all exterior panels Conventional steel frame and roof 20,000 s.f. retail center Tenant finish for banking client
Blue Springs, MOLunar Bowl Recreation Facility, 2001
39,000 s.f. Recreation Center 32 Lane Bowling Facility Game room Full-service restaurant Cast-on-site Tilt-up concrete exterior walls Glass curtain entries Pre-engineering frame and roof
Sugar Creek, MOLaFarge New Cement Production Facility, 2000
Multiple slipform concrete storage towers Tallest finished structure over 400 ft Precast exterior wall office facility Two deepshaft mines for raw materials Production facilities constructed of structural steel, cast
concrete and masonry Constructed over hundreds of acres
Thank you.
This has been a sampling of the projects I have managed since the year 2000. Thanks for viewing my slideshow.
Feel free to contact me at: