wagman.com Construcon of the Johns Hopkins University (JHU) Pedestrian Bridge presented unique environmental challenges for Wagman’s Geotechnical Construcon group. The project is located at the University’s Homewood Campus in North Balmore, MD. The bridge is 345 feet long and consists of two abutments and 13 tower foundaons. Due to conservaon restricons in the scenic area, the work area was limited to 12 feet wide and was enclosed by a chain link fence. Any penetraon to the forest floor was limited to seven inch diameter holes for micropiles. As a result, the enre length of the drill bench was lined with a one to two foot thick mat of wood chips. Project JHU Pedestrian Bridge Location Baltimore, MD Project Type Micropiles Duration February 2016 - June 2016 Construction Costs $416,461 Owner Johns Hopkins University Johns Hopkins University Pedestrian Bridge, Homewood Campus KEY CHALLENGES & PROJECT DETAILS • Wagman encountered intense environmental consideraons. The site passes through a forest conservaon area and protected stream that are governed by Johns Hopkins University and the City of Balmore. • No contact was permied with any tree or tree canopy. Each tree had a pre-assigned damage price associated with it. • The project area had a steep slope. The slope was three feet in 10 feet, or approximately 13 degrees on each side of the creek.

Transcript of JHU Pedestrian Bridge

Page 1: JHU Pedestrian Bridge

wagman.com

Construction of the Johns Hopkins University (JHU) Pedestrian Bridge presented unique environmental challenges for Wagman’s Geotechnical Construction group. The project is located at the University’s Homewood Campus in North Baltimore, MD.

The bridge is 345 feet long and consists of two abutments and 13 tower foundations. Due to conservation restrictions in the scenic area, the work area was limited to 12 feet wide and was enclosed by a chain link fence. Any penetration to the forest floor was limited to seven inch diameter holes for micropiles. As a result, the entire length of the drill bench was lined with a one to two foot thick mat of wood chips.

Project JHU Pedestrian Bridge

Location Baltimore, MD

Project Type Micropiles

Duration February 2016 - June 2016

Construction Costs $416,461

Owner Johns Hopkins University

Johns Hopkins University Pedestrian Bridge, Homewood Campus

KEY CHALLENGES & PROJECT DETAILS• Wagman encountered intense environmental considerations. The site passes through a forest conservation area

and protected stream that are governed by Johns Hopkins University and the City of Baltimore. • No contact was permitted with any tree or tree canopy. Each tree had a pre-assigned damage price associated

with it. • The project area had a steep slope. The slope was three feet in 10 feet, or approximately 13 degrees on each side

of the creek.