Jet AirPresentationways
-
Upload
amit-kumar -
Category
Documents
-
view
218 -
download
0
description
Transcript of Jet AirPresentationways
![Page 1: Jet AirPresentationways](https://reader035.fdocuments.net/reader035/viewer/2022062500/5695cf3f1a28ab9b028d4342/html5/thumbnails/1.jpg)
Aman KumarVishwanath Jha
Niraj MahapatraAnkur Aggarwal
Amit Kumar
![Page 2: Jet AirPresentationways](https://reader035.fdocuments.net/reader035/viewer/2022062500/5695cf3f1a28ab9b028d4342/html5/thumbnails/2.jpg)
Introduction: Maintenance Management
• Boeing supplied its MPT to Jet Airways
• MPT is maintenance performance toolbox of software solutions
• MPT gives quick access to streamline the cumbersome process of
customizing online maintenance manual
• Jet Airways engineering and Maintenance facility includes C checks
upgraded further to D checks
• Carries its maintenance activities at night halting statins at Chennai,
Kolkata and Bangalore.
![Page 3: Jet AirPresentationways](https://reader035.fdocuments.net/reader035/viewer/2022062500/5695cf3f1a28ab9b028d4342/html5/thumbnails/3.jpg)
Technical Dispatch Reliability
• Having the highest reliability rate of 99.2 % and above
• Maintenance operation can be divided into 3 categories:
Line maintenance
C or phase 10 checks(C checks)
Heavy maintenance checks(D checks)
![Page 4: Jet AirPresentationways](https://reader035.fdocuments.net/reader035/viewer/2022062500/5695cf3f1a28ab9b028d4342/html5/thumbnails/4.jpg)
Line Maintenance
• Consists of
Routine, Scheduled maintenance checks
Preflight, daily and overnight checks
any diagnostic and routine repairs
![Page 5: Jet AirPresentationways](https://reader035.fdocuments.net/reader035/viewer/2022062500/5695cf3f1a28ab9b028d4342/html5/thumbnails/5.jpg)
C Checks
• Carried out after a maximum of 4800 flight hours
takes an average of 8 days for its Boeing Aircraft
• Sometimes results in a loss of service for a period of up to 10 days
• Leased a maintenance facility at Bangalore from HAL on its Boeing
Aircraft
![Page 6: Jet AirPresentationways](https://reader035.fdocuments.net/reader035/viewer/2022062500/5695cf3f1a28ab9b028d4342/html5/thumbnails/6.jpg)
Heavy Maintenance or D checks
• Consists of more complex inspections
• Servicing of Aircrafts that require longer maintenance period
• Follows a prescheduled agenda of major overhauls defined in the Aircraft
manual
• Based on number of flights flown by the Aircraft or the age of the Aircraft
• A typical D check may result in a loss of service of a Boeing 737 aircraft
for approx. 45 days
• Currently carried by the US FAA and the DGCA
![Page 7: Jet AirPresentationways](https://reader035.fdocuments.net/reader035/viewer/2022062500/5695cf3f1a28ab9b028d4342/html5/thumbnails/7.jpg)
Cost control Measures
• Cost of quality depends upon
Prevention
Appraisal
Internal Failure
External Failure
• TQM
• TPM
• Preventive Maintenance can be used
![Page 8: Jet AirPresentationways](https://reader035.fdocuments.net/reader035/viewer/2022062500/5695cf3f1a28ab9b028d4342/html5/thumbnails/8.jpg)
Areas of quality Management and Operational Strategy
• Operations Strategy
Planning, analyzing, implementation and control
Decisions that relate to the design of a process and infrastructure
needed to support it.
Quality, assurance and control approaches
Make great products and services & to deliver service quality
Make the product to Deliver products when serviced
Ability to deal with dynamic market demand
Long term competitive strategies with Corporate strategies
Flexibility
![Page 9: Jet AirPresentationways](https://reader035.fdocuments.net/reader035/viewer/2022062500/5695cf3f1a28ab9b028d4342/html5/thumbnails/9.jpg)
Total Quality Maintenance Customer Satisfaction Value Fitness for use Support Employee Involvement Cultural Changes Teams1. Problem solving teams2. special purpose teams3. self-managed teams Continuous improvement in performance PDSA (Plan-Do-Study-Act) Lean system can be used
![Page 10: Jet AirPresentationways](https://reader035.fdocuments.net/reader035/viewer/2022062500/5695cf3f1a28ab9b028d4342/html5/thumbnails/10.jpg)
Bath Tub Curve• Used in order to maintain and ensure the system reliability
Raliability
![Page 11: Jet AirPresentationways](https://reader035.fdocuments.net/reader035/viewer/2022062500/5695cf3f1a28ab9b028d4342/html5/thumbnails/11.jpg)
Maintenance
• It has established a maintenance hanger complex with workshop
and allied facilities at Mumbai.
• The cost of the maintenance hanger and related workshops and
engineering facilities is US Dollar 15 Million.
• The hanger is used for C checks, line checks, storage, and minor
rectification of engines and workshops for composite structural
repairs.
![Page 12: Jet AirPresentationways](https://reader035.fdocuments.net/reader035/viewer/2022062500/5695cf3f1a28ab9b028d4342/html5/thumbnails/12.jpg)
THANK YOU