JEMBATAN BBI

1
Pekerjaan : PEMBANGUNAN DAM PARIT Lokasi : BBU PADI, KLUET TIMUR T A : 2015 A 1 Pembersihan Lapangan 12.00 M2 A.2.2.1.9 14,850.00 Rp 178,200.00 Rp 2 Pemasangan Bauwplank 9.00 M1 A. 2.2.1.4 110,200.00 Rp 991,800.00 Rp 3 Adminitrasi dan Dokumentasi 1.00 Ls TAKSIR 1,000,000.00 Rp 1,000,000.00 Rp 4 Papan Nama Proyek 1.00 Ls TAKSIR 250,000.00 Rp 250,000.00 Rp 2,420,000.00 Rp B JEMBATAN I PEKERJAAN TANAH 1 Galian Tanah Biasa 16.64 M3 T.06 70,537.00 Rp 1,173,735.68 Rp 2 Urugan Tanah Bekas Galian 8.00 M3 T.14 34,485.00 Rp 275,880.00 Rp 1,449,615.68 Rp II PEKERJAAN PASANGAN 1 Pasangan Batu gunung 1 : 4 19.72 M3 A. 3.2.1.2 869,170.00 Rp 17,140,032.40 Rp 2 Pengecoran Plat beton - Beton K-250 3.69 M3 B.08 1,241,414.00 Rp 4,580,817.66 Rp - Besi Polos 163.84 kg A. 4.1.1.17 20,136.05 Rp 3,299,009.89 Rp - Bekisting 12.00 M2 B. 22 132,114.50 Rp 1,585,374.00 Rp 3 Plesteran 1 Pc : 4 Ps 14.30 M2 P.04 79,422.00 Rp 1,135,734.60 Rp 27,740,968.55 Rp III PEKERJAAN LAIN LAIN 1 Railing 14.00 m1 Ditaksir 300,000.00 Rp 4,200,000.00 Rp 2 Lubang Drainase 8.00 buah Ditaksir 50,000.00 Rp 400,000.00 Rp 4,600,000.00 Rp TAPAK TUAN APRIL 2015 CV. SARENA CONSULTANT Ir. PONIEM Direktris PEKERJAAN PERSIAPAN / AWAL RENCANA ANGGARAN BIAYA NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN HARGA ANALISA

description

JEMBATAN

Transcript of JEMBATAN BBI

Page 1: JEMBATAN BBI

Pekerjaan : PEMBANGUNAN DAM PARIT

Lokasi : BBU PADI, KLUET TIMUR

T A : 2015

A

1 Pembersihan Lapangan 12.00 M2 A.2.2.1.9 14,850.00Rp 178,200.00Rp

2 Pemasangan Bauwplank 9.00 M1 A. 2.2.1.4 110,200.00Rp 991,800.00Rp

3 Adminitrasi dan Dokumentasi 1.00 Ls TAKSIR 1,000,000.00Rp 1,000,000.00Rp

4 Papan Nama Proyek 1.00 Ls TAKSIR 250,000.00Rp 250,000.00Rp

2,420,000.00Rp

B JEMBATAN

I PEKERJAAN TANAH

1 Galian Tanah Biasa 16.64 M3 T.06 70,537.00Rp 1,173,735.68Rp

2 Urugan Tanah Bekas Galian 8.00 M3 T.14 34,485.00Rp 275,880.00Rp

1,449,615.68Rp

II PEKERJAAN PASANGAN

1 Pasangan Batu gunung 1 : 4 19.72 M3 A. 3.2.1.2 869,170.00Rp 17,140,032.40Rp

2 Pengecoran Plat beton

- Beton K-250 3.69 M3 B.08 1,241,414.00Rp 4,580,817.66Rp

- Besi Polos 163.84 kg A. 4.1.1.17 20,136.05Rp 3,299,009.89Rp

- Bekisting 12.00 M2 B. 22 132,114.50Rp 1,585,374.00Rp

3 Plesteran 1 Pc : 4 Ps 14.30 M2 P.04 79,422.00Rp 1,135,734.60Rp

27,740,968.55Rp

III PEKERJAAN LAIN LAIN

1 Railing 14.00 m1 Ditaksir 300,000.00Rp 4,200,000.00Rp

2 Lubang Drainase 8.00 buah Ditaksir 50,000.00Rp 400,000.00Rp

4,600,000.00Rp

TAPAK TUAN APRIL 2015

CV. SARENA CONSULTANT

Ir. PONIEMDirektris

PEKERJAAN PERSIAPAN / AWAL

RENCANA ANGGARAN BIAYA

NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN HARGAANALISA