Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

27
Impact of 2005 Energy Impact of 2005 Energy Policy Act Policy Act An Independent Power An Independent Power Provider View Provider View Louisiana State University Energy Louisiana State University Energy Summit 2005 Summit 2005 October 20, 2005 October 20, 2005 Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation Michael Bradley President NewSouth Energy

description

Impact of 2005 Energy Policy Act An Independent Power Provider View Louisiana State University Energy Summit 2005 October 20, 2005. Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation. Michael Bradley President NewSouth Energy. Who is Calpine?. - PowerPoint PPT Presentation

Transcript of Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Page 1: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Impact of 2005 Energy Policy Act Impact of 2005 Energy Policy Act An Independent Power Provider ViewAn Independent Power Provider View

Louisiana State University Energy Summit 2005Louisiana State University Energy Summit 2005October 20, 2005October 20, 2005

Jeanne ConnellySenior Vice President – Government AffairsCalpine Corporation

Michael BradleyPresident

NewSouth Energy

Page 2: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Who is Calpine?Who is Calpine?

• 90 power plants in 21 states

• 27,000 megawatts

• Largest cogenerator in United States

• NewSouth Energy LLC– 11 states in the Southeast

– 6,000 megawatts operational

Page 3: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

History of Energy BillHistory of Energy Bill

• Energy Bill – Decade in the making

• Early Issues – Stranded costs and starting dates

• Later Issues – Increasing supplies

• Controversial Issues - Competition

Page 4: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Highlights - ReliabilityHighlights - Reliability

• Establishes Electricity Reliability Organizations (EROs)

• FERC jurisdiction

• Stakeholder boards

Page 5: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Highlights – Transmission ExpansionHighlights – Transmission Expansion

• FERC authority – Back-stop siting

– Transmission jurisdiction over munis and co-ops

– Establishment of incentive-based rates

• PMAs authorized to join RTOs

• Accelerated depreciation for transmission lines

Page 6: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Highlights – Participant FundingHighlights – Participant Funding

• Last in line, immediate beneficiary must pay

• Southeast utilities wanted federal mandate that

FERC must approve participant funding

• Bill allows, but does not require approval

Page 7: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Highlights – Native LoadHighlights – Native Load

• Load Serving Entities (LSEs)– Federal right to transmission access for Native Load

(ownership or contract)– FERC must facilitate transmission planning to meet reasonable

needs of LSEs

• Does not apply to RTOs / ISOs with FTR allocations approved by 1/1/05

• FERC has authority to review whether utility has over-reserved transmission

Page 8: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Highlights – PUHCA Repeal & FERC Merger ReviewHighlights – PUHCA Repeal & FERC Merger Review

• FERC authorized to approve:– Holding company mergers– Transfers of generation assets– Transactions involving assets of $10 million and

above subject to review

• FERC required to ensure transactions do not result in cross-subsidization

Page 9: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Highlights – PURPA ReformHighlights – PURPA Reform

• Utilities not required to purchase power from QFs if they have access to– Non-discriminatory transmission and– Competitive wholesale markets

• Utilities not required to sell power to QFs if:– There are competitive retail suppliers willing and able to sell– Utilities not required to sell electricity in their service territory

• Existing Contracts not affected• New cogeneration QFs required to meet stricter thermal

standards

Page 10: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Highlights – Market ManipulationHighlights – Market Manipulation

• New FERC rules on price transparency• New FERC rules prohibiting manipulative / deceptive

behavior• Civil and criminal penalties increased

Page 11: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Highlights – LNG ProvisionsHighlights – LNG Provisions

• FERC exclusive authority to site LNG facilities– States retain existing authority to review under Clean Air Act, Clean

Water Act, etc.

• FERC promulgates rule on NEPA pre-filing process• FERC must consult with appropriate state agencies on safety• Codifies FERC policy on open access to LNG supply

(Hackberry)

Page 12: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Highlights – Natural Gas Supply ProvisionsHighlights – Natural Gas Supply Provisions

• Royalty relief from marginal property and deep wells• Permitting process streamlined for development on federal

lands and for oil refiners• Assistance to oil / gas production states for coastal

restoration• Inventory of oil and gas reserves in Outer Continental Shelf• Accelerated depreciation for gas gathering and distribution

lines

Page 13: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Highlights – Economic DispatchHighlights – Economic Dispatch

• Economic Dispatch – security constrained dispatch of all

generation, regardless of ownership

• DOE must conduct study of benefits

• FERC must convene regional joint boards to report on

reliability and affordability impacts

Page 14: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Highlights – Clean Coal & Gasification IncentivesHighlights – Clean Coal & Gasification Incentives

• Investment tax credit for clean coal generation

• R&D funding for clean coal technologies

• DOE grants for advanced coal projects

• Loan guarantees for at least 5 petcoke gasification projects

• DOE cost-sharing for clean energy projects– Ex: Gasification, coke production, oxidization combustion, etc.

Page 15: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Highlights – Nuclear EnergyHighlights – Nuclear Energy

• Provides a Production Tax Credit

• Extends Price-Anderson Act liability protection

• Provides reimbursement of costs due to regulatory delays

• Provides DOE funding for R & D and Next-Generation plants

Page 16: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Conclusion to HighlightsConclusion to Highlights

• 1700 page bill – many other provisions

• Regulations will be key

• Favorable to neutral impact on IPP sector

Page 17: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

New Generation for Next 15 YearsNew Generation for Next 15 Years

Over the next 15 years, gas turbine generation will

continue to be the principal power plant technology

deployed.

Page 18: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Opportunities / Challenges:• Gas turbine technology - Improvements in environmental

and generation efficiency performance must continue• IGCC technology – Must be developed and deployed

effectively• Natural gas and synthetic gas - Optimum mix must be found

New Generation for Next 15 YearsNew Generation for Next 15 Years

Page 19: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

New Generation for Next 15 YearsNew Generation for Next 15 Years

Opportunities / Challenges (con’t.)

• “New nuclear” – A sound gameplan must be proven and

effectively executed

• Generation efficiencies – Must optimize efficient use of NG

PORTIONS OF 2005 ENERGY POLICY ACT REFLECT

THESE OPPORTUNITIES AND CHALLENGES

Page 20: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

New Generation for Next 15 YearsNew Generation for Next 15 Years

Some demand data:• Over next 20 years, new generation needs in U.S.

~400,000 MWs

• In last 10 years, ~140,000 MWs of gas power plants

came on-line in U.S. (~ 165,000MWs Total)

Page 21: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

New Generation for Next 15 YearsNew Generation for Next 15 Years

COMPANY NET MW’s

Total COAL CCGT OTHERSouthern 41,497 22,781 7,366 11,349

AEP 40,042 28,334 2,379 9,329

TVA 33,252 17,407 0 15,845

FPL 31,990 1,002 12,028 18,960

Calpine 27,000 0 23,000 4,000

Selected U.S. Power Generators

173,781

Page 22: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

New Generation for Next 15 YearsNew Generation for Next 15 Years

The High Reliability / Capacity Technology Choices

Coal Gasification

Pulverized Coal

Natural Gas

Nuclear

CCGT

Page 23: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

New Generation for Next 15 YearsNew Generation for Next 15 Years

NGCC IGCC PC

$ / KW 440 1,550 1,290HHV HR 7,200 8,700 8,690Cap $ / MWH 8.2 31.7 27.4O&M $ / MWH 3.5 9.1 8.9Fuel $ / MWH 43.2 14.0 14.0Emissions $ / MWH 0.1 1.5 2.9Total $ / MWH 55.0 56.3 53.2Capacity $ / KWMo 4.8 18.5 16.0

New Build Economics

Page 24: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Comparative Emissions DataComparative Emissions Data

0.00

0.50

1.00

1.50

2.00

2.50

CCGT New IGCC New PC

lb/M

WH

(exc

ept H

g, 1

0-7

lb/M

WH

)

SO2

NOx

PM10

CO

Hg

Page 25: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Natural Gas Fuel Supply*• World NG consumption (20 years)

– 84 tcfe (1999) to 162 tcfe (2020)

• World NG Reserves– Proven Reserves (2002) = 5,451 tcfe– Undiscovered Reserves (2002) = 5,196 tcfe

• Reserves-to-Production Ratio– Proven – Proven and Undiscovered

New Generation for Next 15 YearsNew Generation for Next 15 Years

44 Years

86 Years

Page 26: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

Coal Fuel Supply*

• World Coal consumption projected to grow from 4.7 billion

tons (1999) to 6.8 billion tons (2020)

• World Recoverable Reserves

– 1,089 billion tons

• Years to exhaust at current consumption - 230 years

New Generation for Next 15 YearsNew Generation for Next 15 Years

Page 27: Jeanne Connelly Senior Vice President – Government Affairs Calpine Corporation

• LNG Provisions• Natural Gas Provisions• Economic Dispatch• Clean Coal and Gasification Incentives• Nuclear

2005 EPAct Highlights2005 EPAct Highlights