JIRA part of shipbuilding process
Agenda
• STX Europe, STX Finland, who we are and what we do?
• Shipbuilding working environment
• How we use JIRA of shipbuilding process
Page 2
JIRA part of shipbuilding process - Agenda
Corporate Structure
STX Corporation
EngineOffshore & Shipbuilding
STX Corporation
STX Europe
OSVFinlandFrance
RaumaShipyard
TurkuShipyard
ArctechAARC Cabins
70%
50%71%
30%
67% 70%
Life Cycle Services
Shipbuilding CompletionENG´n D
Finland – Cruise & Ferries LNGC Ice Breaker
Norway – OSVs Specialized Vessel
Vietnam - OSVs
China – Bulkers PCTC Drillship FSO Pipelayer
Romania – Bulkers OSVs
Brazil – OSVs
Korea – LNGC FPSO VLCC
Mega Container
France – Cruise & Ferries Naval Vessels
Shipbuilding
Other operations OSV
Helsinki RaumaTurku
LorientSt. Nazaire
Florø
Søviknes
AukraBrattvaagLangsten
Promar
BrailaTulcea
Brevik
Vung Tau
Cruise Vessels & Ferries
STX Europe
Page 6
STX Finland orderbook
Name Delivery Owner Yard
Polar Supply and Research Vessel (NB-1369)
II / 2012 DEA Rauma
Cruise Ferry (NB-1376) I / 2013 Viking Line Turku
Icebreaking Supply Vessels(NB-506 and 507)
II / 2013 Sovcomflot Helsinki
Fisheries Reseach Vessel(NB-1378)
II / 2012 MFMR of the Republic of Namibia
Rauma
Viking Line Cruise Ferry with LNG fuel to Baltic Sea
New generation cruise ferry
• abt 2600 man-years employment
• GT 57 000; gross tonnage
The most environmentally friendly big
passenger vessel today
• Uses LNG fuel
• No marine emissions, extremely low aerial emissions
• Wave forming and noise generation minimised
Viking Line
1250 Stateroom Cruise Ship for TUI Cruises
The sophisticated and highly innovative cruise ship
• Many environmentally friendly features, with a particular emphasis on the vessel's energy efficiency
• A wide variety of restaurants, a theatre, a spa, a nightclub and a large deck area which all are carefully designed to ensure a unique cruising experience for passengers of all ages.
• Abt. 5 500 man-years employment
• 2500 Passengers, 1000 Crew members
• GT 97 000
• Length abt. 295 m and breadthabt. 36 m
TUI Cruises
Baseline: Shipbuilding working environment
◦ Considerable part of ship production takes place outside the shipyard gates◦ The assembly is done at the shipyard◦ Ships are designed, assembled and outfitted in co-operation between shipyard and
supplier network◦ Network represents 75% of planning and production costs◦ STX Finland is responsible for and co-ordinates the activities; design, production,
assembly including material flows and schedules◦ STX Finland has long-term partnership agreements with selected first tier suppliers
Due to this:◦ Load of ICT varies in time and requests flexibility from all ICT partners◦ Supplier network is using STX IT systems over the internet◦ Some network users are working inside the shipyard using STX workstations◦ Network synergies to be considered in all ICT development
Infrastructure
laptops
desktops
servers
MF printers,others
Partnernetwork
mobile phones,phones
users
users
JIRA by STX Finland
28 March 2012
28 March 2012
Issue Types
28 March 2012
Issue Types
Search
Open ”Inspection”
Send for approval
Send drawing for approval
Send for approval
NOTE!!!! Assignee.....
Create comments (Sub-task) or Approve Drawing
Create comments
Approve drawing without comments
Note! When creating comments status of ”drawing card” is ”sent for approval” as far as all comment are created.
Create Sub-Task
Select ”Drawing for Approval Remark”
Send remarks
Remember assignee to Responsible
Drawing approved with remarks
Resolve remark
Accept proposal
Work done
Assignee !!!!
Accept remark
28 March 2012
Ambientia has made us add-on to Jira, which allows for example the sale of a area by iPad.
This add-on is a digital signature, which purpose is to verify the signature of the person responsible for JIRA application in STX's inspection and remarks processes
New fields were created on custom fields section and they based on add-on “User picker from project role”
JIRA and iPad
28 March 2012
28 March 2012
Thank You!