jaypee cement project report

download jaypee cement project report

of 29

Transcript of jaypee cement project report

  • 7/29/2019 jaypee cement project report

    1/29

    DRONACHARYA COLLEGEOF ENGINEERING

    Greater No ida

    Presented By

    Sandeep Kumar

  • 7/29/2019 jaypee cement project report

    2/29

    Manu factu r ing Process Of Cement

  • 7/29/2019 jaypee cement project report

    3/29

    CONTENTS

    Manufacturing Process Of Cement (a) Mines

    (b) Blasting

    (c) Transportation

    (d) Crushing and transportation

    (e) Raw Mill

    (f) Raw Mill Silo

    (g) Preheater

    (h) Rotary Kiln

    (i) Cooler

    (j) Clinker Silo

    (j) Gypsum Mixing Tank

    (j) Cement Mill

    (k) Cement Mill Silo

    (l) Packing Plant

  • 7/29/2019 jaypee cement project report

    4/29

    CEMENT MANUFACTURING PROCESS

    Quarry face

    loaderdumper

    1. BLASTING2. TRANSPORT

    crushingconveyor

    storage at

    the plant

    3. CRUSHING & TRANSPORTATION

  • 7/29/2019 jaypee cement project report

    5/29

    CEMENT MANUFACTURING PROCESS

    preheating

    kiln

    coolingclinker

    2. BURNING

    storage at the

    plant

    conveyor

    Raw mill

    Raw mix

    1. RAW GRINDING

  • 7/29/2019 jaypee cement project report

    6/29

    CEMENT MANUFACTURING PROCESS

    clinker

    storage

    Gypsum and the secondary additives are added

    to the clinker.

    Finish grinding

    1. GRINDING

  • 7/29/2019 jaypee cement project report

    7/29

    CEMENT MANUFACTURING PROCESS

    silos

    bags

    dispatch

    2. STORAGE, PACKING, DISPATCH

    clinker

    storage

    Gypsum and the secondary additives are added

    to the clinker.Finish grinding

    1. GRINDING

  • 7/29/2019 jaypee cement project report

    8/29

    1.MINES

    1.MINES:-It is the area which is required for the extraction ofthe limestone,done by the mining engineers.

    Usually this mines is spread over a large area.

    Mines

  • 7/29/2019 jaypee cement project report

    9/29

    2.BLASTING

    2. BLASTING :-The raw materials that are used tomanufacture cement (mainly limestone and clay) are

    blasted and extracted from the quarry or mines.

    Mines

    loader

  • 7/29/2019 jaypee cement project report

    10/29

    5.GRINDING THROUGH THE RAW MILLS

    Ball mills is used for grinding the raw material (lime stone) in to

    small particles of 90 micron size. Ball mills consist of three chambers.

    (a) Dry Chamber- Moisture is removed from the raw material by passinghot air.

    (b)1st Chamber- Consist of balls size varying from (60mm to 90mm).

    (c)2nd Chamber- Consist of balls size varying from (25mm to 50mm).

    Ball mills consist of two diaphragm.

    (a) Intermediate diaphragm b Dischar e dia hra m.

    Raw mill

    conveyor

  • 7/29/2019 jaypee cement project report

    11/29

    BALL MILL SPEED

    Vcrit: critical speed balls stay on the mill wall due to centrifugal force

    NO GRINDING POSSIBLE!

    i

    crit

    D

    42.3

    V

    Vmax: maximum speed circa 75% of the criticalspeed

    i

    max

    D

    31.7V

    Di = diameter inside liners

  • 7/29/2019 jaypee cement project report

    12/29

    RAW MILL OR BALL MILL

  • 7/29/2019 jaypee cement project report

    13/29

    INTERMEDIATE DIAPHRAGM

    adjustable lifters

    diaphragm segment

    cone

    slotted plates

  • 7/29/2019 jaypee cement project report

    14/29

    DISCHARGEDIAPHRAGM

  • 7/29/2019 jaypee cement project report

    15/29

    6.RAW MILL SILO

    6.SILO:-Raw mill silo is a cylindrical building usedfor storing the grinded raw material in huge

    amount,before feeding it into the peheater.

    In K# 4 unit of the dalla cement factory two silo is

    used,having height about 75m.

    Blending Capacity- 1500tn

    Storing Capacity- 3000tn

    Each Silo having two parts

    1-Blending (Top),2-Storage(bottom)

  • 7/29/2019 jaypee cement project report

    16/29

    SILO

  • 7/29/2019 jaypee cement project report

    17/29

    7.PREHEATER

    PREHEATER:-Preheater is used for preheating and calcination ofthe ground raw material,before feeding it into the kiln.

    In K#4 unit four stage preheater are have been installed.

    Preheater is also used to increase the thermal efficiency of the hot gases

    and calcination of the lime stonewhich is fed in powder form.

    No. of preheater are inversely proportional to the length of the kiln.

    Capacity of the plant depend upon the no. of pre-heaters stage and size

    preheater

  • 7/29/2019 jaypee cement project report

    18/29

    SINGLE STAGE

    PRE-HEATERS

  • 7/29/2019 jaypee cement project report

    19/29

    8.ROTARY KILN

    KILN:-Kiln is used for making clinker after 60-70% calcinationin preheater section which is directly connected to kiln inlet

    In k#4 unit,kiln is inclined at 3% of the kiln length which is 68m

    long and 4.3m dia.

    Capacity of K#4 kiln is 1500TPD.

    The temp. at the inlet of the kiln is about 1000C and at outlet is

    about 1350C.

    kilnclinker

  • 7/29/2019 jaypee cement project report

    20/29

    ROTARY KILN

  • 7/29/2019 jaypee cement project report

    21/29

    COOLER:-Cools the hot clinker falling on it from kilnfrom 350 degree to 120 degree.

    Cold atmospheric air is blown through the duct fan on

    the slow moving bed,having reciprocating grates onwhich hot clinker falls and get cooled.

    After cooling the clinker from 1350C to about 200C andit is carried out through the cooler.

    9.COOLER

    cooler

    clinker

  • 7/29/2019 jaypee cement project report

    22/29

    COOLER

  • 7/29/2019 jaypee cement project report

    23/29

    10.CLINKER SILO

    CLINKER SILO:-Silo is the storage cylindrical tank ofabout 60m height in which the cliker is stored and transported

    by the convyer belt to the silo.

    Blending capacity-No. blending is needed.

    Storing capacity-14000tn

    conveyor

    clinker

    storage

  • 7/29/2019 jaypee cement project report

    24/29

    11.GYPSUM MIXING TANK

    After carrying out the clinker from the silo through the air slide

    gypsum and secondary additives is added to the clinker.

    Gypsum plays an important role in the setting time of the

    cement,it decreases the setting time of the cement and

    becomes easier to work with the cement.

    conveyor

    Gypsum is added to the clinker.

  • 7/29/2019 jaypee cement project report

    25/29

    12.CEMENT MILL

    Ball mills is used for grinding the mixture of cliker,gypsum andother additives.

    Ball mills consist of three chambers.

    (a)1st Chamber- Consist of balls size varying from (90mm to 60mm).

    (b)2nd Chamber- Consist of balls size varying from (50mm to 40mm).

    (c)3rd Chamber- consist of balls size varyingfrom(30mm to 20mm).

    Ball mills consist of two diaphragm.

    (a)Intermediate diaphragm no.1

    (b) Intermediate diaphragm no.2

    (c) Discharge diaphragm.

    Cement millconveyor

  • 7/29/2019 jaypee cement project report

    26/29

    CEMENT MILL

  • 7/29/2019 jaypee cement project report

    27/29

    13.CEMENT SILO

    CEMENT SILO:-After grinding the mixture of clinker andgypsum into fine powder,cement is manufactured and stored in

    the silo.

    In k#4 two silo are in use,having height about 70m.

    Capaci ty s ingle si lo -3500tn

    Total capacity -7000tn

    silo

    s

    14 PACKING PLANT

  • 7/29/2019 jaypee cement project report

    28/29

    14.PACKING PLANT

    Now at the last cement from the silo is carried out to

    the packing plant through the air slide and is packed in

    the polyster bags and loaded to the trucks using

    packing machine, belt conveyor , truck loader andtrains,send to different parts of the country.

    bags