Jar Filling Machine
Customer: -
M/s. ------------------------------ --------------------------------------------,
---------------------------------------------
Canadian Crystaline Water India Limited, 7,B Parivakkam Road, Leevathy Nagar. SeneerKupam Chennai 600 056 Email: service@canadianclear.com, www.canadian clear.com Service: 044 2836 99 00 98410 05743 9445070207
http://www.canadian/
EVATS/2PLC Page-01
CONTENTS
Sl. No. Description Page
01 PREFACE 03
02 TRANSPORATION 05
03 SITE REQUIREMENT 06
04 SAFTY PROCEDURES 07
05 TECHNICAL DATAS. 09
06 TECHNICAL SPECFICATIONS 10
07 MACHINE DESCRPTION 11
08 MACHINE CONSTRUCTION 15
09 UTLITY DETAILS 17
10 INSTALLATION 18
11 ASSEMBLY & PRODUCTION 20
INSTRUCTION 12 PUTTING INTO OPERATION 23
13 CLEANING
24
Contents Page-02
Sl. No. Description. Page
14 TROUBLE ELEMINATIONS 25
15 MAIUNTENANCE INSTRUCTIONS 27
16 ELECTRICAL SYSTEM 30
17 SPARE PARTS 32
18 RECOMMENDED SPARES. 36
***
EVATS/2PLC Page-03
01. PREFACE
First, we sincerely thank you very much for your selection of our EVATS
series Jar Filling 2 PLC.
With its characteristics of smartness running and energy saving, we believe
EVATS/2 PLC will greatly streamline your production process. We are
producing various ranges in Jar Filling Machines.
By entrusting Canadian Clear to design, Engineering, Manufacture and
supply of Automatic Bottling Machine you have become yet another
happy client of the Canadian Clear Industrial group.
Canadian Clear equipment is backed with the latest and hi-tech technology
from all round the world to produce quality equipment to meet with
International Standards. It is a must that the system be maintained and
operated as per the details in the operational manual.
Shivsu Canada Pure Fillers Pvt. Ltd is one of the members of the Shivsu
Group of Companies. Shivsu incorporated the state of art technology in
design engineering of the systems being manufactured.
In order to that you will better understand to correctly operate and
maintain our products. This manual provides you necessary information
on the Technical, Installation, Functioning, Maintenance and spares of our
Rotary Water Filling Machine.
We request you to read the whole manual prior to the first putting up into
operation and to get your operating staff familiarized with the routine repair
and maintenance work of the machine. This will help to achieve the
efficiency offered by the machine.
Preface Page-04
The Machine must be handled carefully during transportation, installation
and use. This coupled with proper lubrication and maintenance will enable
you to achieve the efficiency. Necessary training will be given to your
operators when our technicians carry out the erection and at the time of
handing over.
Jar Filling Machine overhauling & repair work must be done by well trained
your specialties. However, should you need our support and service, please
intimate planned service to us in due time.
This manual has to be treated as confidential. The information given here
cannot be copied, or improperly used for given to a third party without our
confirmation. We are constantly working on further developments.
Therefore, we reserve the right to change the design and technologies.
Please understand that claims cannot be made based on the statements
and pictures in this manual.
***
EVATS/2PLC Page-05
02. TRANSPORTATION
The Jar Filling Machine, which is supplied by M/s. Shivsu Canada
Pure Fillers Pvt. Ltd., is compact design. Some of auxiliaries used
dismantled from the machine for transportation purpose.
The transport dimensions specified in the machine connection diagram give
the outer dimensions of the machine body. Please consider clear passages
to prevent any damages to the machine.
When moving the machine into the prepared foundation it is necessary to
move the machine to the desired location only on movable rollers.
Do not use any other suspension than the suspension bolts provided for
this purpose. To avoid any accidents, lift and move only in the prescribed
manner. Industrial safety codes and regulations must also to follow.
***
EVATS/2PLC Page-06
03. SITE REQUIREMENT
A. Site Selection
Please choose an environment with low humidity, low air pollution and low
temperature variation. Make sure there is sufficient space for installation
and maintenance. Otherwise there may be bumps or difficulty in work.
Keep the environment around the machine clean and avoid direct sunshine
and unstable voltage, which may make the product unstable and lead to
cell damage.
B. Civil Works.
1. Clean finished floor for the machine at the proposed site of erection of the plant.
2. Drainage: Proper drainage facilities be constructed from the machine and connected to the main drain
3. Proper ventilation. C. Electrical Connection.
Suitable electrical points should be provided for connecting the machine.
***
EVATS/2PLC Page-07
04. SAFETY PROCEDURES
A. General Information
The Safety Summary describes the general requirement and condition for
safe installation, operation and maintenance of Machine. The operator shall
read, understand and observe all the safety measures listed in this Manual.
B. Machinery Safety
- Before connecting the machine to the main, please make sure that the
rated voltage of this machine is in compliance with local power system.
- Please strictly follow the relevant national electronic manuals and
standards of your country.
- Emergency stop button of the machine is located on the control panel.
Please make sure this button functions properly or not.
- The grounding wire of the machine shall comply with relevant national
standards.
C. Personnel Safety
All potentially dangerous areas inside and around the machine are clearly
marked with safety designs. Guarantee the safety installation, operation
and maintenance personnel. Please strictly follow the requirements below:-.
Do not put your hands into moving parts of the machine during
production.
Safety Procedures Page-08
Do not climb onto the machine when it is operation. The moving parts
of the machine may cause vibration, thus danger of slipping off and
falling down exist.
Do not place sundries or other tools on surface of the machine, which
may fall into the machine and cause failure or danger.
When entering the machine for servicing, inspections, and cleaning,
makes sure the machine is shut down and pressure in airlines is
relieved.
Strictly stick to the general directions of the labour safety regulation,
when repairs are done on the filling machine (labour safety regulation -
ASVO).
The maintenance staff must cut off power supply and discharge the air
source before entering the machine.
Check the flow of water to the machine at required pressure.
Check the power leakage regularly. If there is cut off the power supply
immediately.
The operator shall be familiarized with the safety warning signs and
read the manual carefully. Contact our technical department if help is
needed.
The Figure-1 is defines the Safety signs with their corresponding potential
consequence provide.
***
EVATS/2PLC Page-09
05. TECHNICAL DATAS
01. Model. : EVATS/2 PLC
02. Serial No. :
03. Year of Manufacture. :
03. Type of Design. : SHIVSU
04. Type of machine. : Tunnel type Machine.
05. Capacity. : 120 GPH @ 5 Gallon.
06. Feed. : Through Infeed Conveyor.
07. Filling System. : by High & Low Pressure Valves
08. Product to be filled. : Treated water
***
EVATS