Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico.
-
Upload
francis-taylor -
Category
Documents
-
view
214 -
download
0
Transcript of Jan. 17. - 18., 2008 Risk Management Eckhard Hinrichsen, GLO Mexico.
Jan. 17. - 18., 2008
Risk ManagementEckhard Hinrichsen, GLO Mexico
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 2
Contents
1. Risk Management Services
2. Clients, References
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 3
• Risk Analysis, Quantitative or Qualitative
• HAZOP (Facilitating or “Part of Team”)
• “What if”, FMECA Analyses, LOPA, SIL Studies
• Environmental Risk Analysis
• AIM / RBI / RCM / RBM
• Training Courses
Risk Management ServicesGLO Mexico
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 4
Risk ManagementRequirements:SEMARNAT (Mexican Environmental Agency)
•Requires that all Industrial Installations perform a Risk Analysis, to be updated at least every 5 years.
•Issues a Guideline for how to perform the Risk Analysis and how to select the type (probabilistic, deterministic, ..), depending the size and type of the Installation.
CRE (e.g. LNG Terminals)
PEMEX, Multinationals
•Internal Procedures and Guidelines, NRF’s
International Codes and Standards
•API’s, IEC, OSHAS, NFPA, ..
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 5
Risk ManagementTools:• “RISK”
In-house development, integrated tool for to facilitate Risk Analysis as per PEMEX requirements.
• Fault Tree Manager
• PHAST
Consequence Analysis, dispersion, fire, explosion modelling (DNV)
• Shell FRED
similar to PHAST
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 6
Risk Group Staff:
• Permanent: 8
• Free Lance: 5 - 10
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 7
Contents
1. Risk Management Services
2. Clients, References
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 8
• PEMEX• PGPB, 120 Units in 4 Gas Complexes, 2006
• PEP, Offshore Platforms
• PEP Region Norte, Various Onshore Installations, ongoing
• PEP Region Sur, Vent Study of Nitrogene Removal Unit, Dynamic Process Simulation, Fully quantitative risk analysis
• DEMAR• Subsea Pipelines
• Upgrade Metering Platform Cayo Arcos, ongoing
• ICA Fluor• Risk Analysis, LNG Import Terminal Manzanillo, Dec./2007
Risk Management ServicesClients, References (1/2)
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 9
• El Paso / TDF: LPG Transport System Burgos – Monterrey, • Participation in HAZOP
• Vent Study, Fire Fighting System analysis
• Availability Analysis
• Hydraulic Study, Waterhammer
April 2006, ongoing
• Termigas: Tuxpan LPG Terminal, Manoeuvrability Study, 2004• Ship Simulation in Hamburg
Risk Management ServicesClients, References (2/2)
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 10
Conclusions
1. GLO Mexico offers a complete range of risk analysis services
2. More than 10 years experience
3. Emphasis on oil and gas, onshore and offshore
4. Environmental Risk analysis offered too
5. Experienced staff and latest tools available
America´s Workshop - EH Certification, Pipelines | Jan. 17. - 18., 2008 | No. 11
Thank you for your attention!