Table 2.1 - Number and Value of Projects Awarded by Status of Contractors as of March 2014.
Jumlah Bilangan
Jumlah Nilai Projek (RM j)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
2012 7,781 125,190.25 1,958 18,361.29 5,674 91,613.55 1 144.86 148 15,070.55Jan. / Jan. 566 6,962.64 153 2,115.47 408 4,639.47 1 144.86 4 62.84Feb. / Feb. 621 10,840.39 133 1,742.64 478 8,576.69 - - 10 521.06Mac./ Mar. 666 21,575.65 127 1,892.00 527 14,505.99 - - 12 5,177.66Apr. / Apr. 675 7,517.69 122 1,469.23 539 5,590.96 - - 14 457.5Mei. / May. 761 11,759.59 206 1,584.67 541 9,790.80 - - 14 384.12Jun. / Jun. 634 8,529.54 166 2,023.27 449 5,940.72 - - 19 565.55Jul. / Jul. 760 13,176.02 240 1,651.72 508 11,302.43 - - 12 221.87Ogos. / Aug. 563 5,561.53 142 1,140.10 415 4,339.66 - - 6 81.77Sep. / Sep. 670 9,256.78 217 996.35 437 6,279.29 - - 16 1,981.14Okt./ Oct. 686 14,260.45 158 986.74 509 8,308.15 - - 19 4,965.56Nov./ Nov. 610 8,597.47 147 1,826.70 456 6,578.74 - - 7 192.03Dis./ Dec 569 7,152.50 147 932.4 407 5,760.65 - - 15 459.45
2013 7,273 116,905.83 1,778 22,244.29 5,381 80,039.32 0 0.00 114 14,622.22
Jan. / Jan. 652 9,239.02 154 2,523.73 492 5,739.81 - - 6 975.48Feb. / Feb. 612 6,725.34 228 1,850.17 379 4,722.72 - - 5 152.45Mac./ Mar. 696 19,373.12 152 3,246.78 526 9,444.92 - - 18 6,681.42Apr. / Apr. 680 13,729.56 180 3,556.46 492 9,531.06 - - 8 642.04Mei. / May. 683 8,333.94 173 1,601.79 499 5,775.86 - - 11 956.29Jun. / Jun. 555 7,431.13 113 915.38 432 6,371.58 - - 10 144.17Jul. / Jul. 718 7,387.81 188 1,346.41 516 5,465.71 - - 14 575.69Ogos. / Aug. 531 9,165.67 112 1,683.48 409 7,027.26 - - 10 454.93Sep. / Sep. 587 8,690.19 119 1,261.83 460 7,163.27 - - 8 265.09Okt./ Oct. 594 9,336.30 132 1,448.71 448 6,668.29 - - 14 1,219.30Nov./ Nov. 528 11,842.52 129 1,631.39 394 7,823.67 - - 5 2,387.46Dis./ Dec 437 5,651.23 98 1,178.16 334 4,305.17 - - 5 167.9
2014 671 12,545.99 131 1,991 537 9,774 0 0 3 781Jan. / Jan. 352 6,836.70 69 1,025.51 280 5,030.06 - - 3 781.13Feb. / Feb. 250 3,364.17 51 872.65 199 2,491.52 - - - -Mac./ Mar. 69 2,345.12 11 92.7 58 2,252.42 - - - -
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding. Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
Tahun Year
Jadual 2.1 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor Pada Mac 2014.
Projek Swasta / Private Projects
Status kontraktor / Status of Contractors
Kontraktor Asing / Foreign Contractors
Projek Kerajaan Government Projects
Kontraktor Tempatan / Local Contractors
Projek Swasta / Private ProjectsProjek Kerajaan Government ProjectsTotal Project
Value (RM m)Total Number
of Projects
Jadual 2.2 - Bilangan dan Nilai Projek Diawad Berdasarkan Kategori Pada Mac 2014. Table 2.2 - Number and Value of Projects Awarded By Category as of March 2014.
Total Number of Projects
Total Project Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
2012 7,781 125,190.27 2,246 33,071.45 2,735 40,535.56 913 7,297.09 1,887 44,286.17 Jan. / Jan. 566 6,962.64 162 1,403.86 197 3,469.92 87 308.71 120 1,780.15 Feb. / Feb. 621 10,840.39 188 3,042.67 227 2,399.86 61 708.43 145 4,689.43
Mac./ Mar. 666 21,575.64 210 2,918.06 249 3,549.76 70 529.39 137 14,578.43 Apr. / Apr. 675 7,517.70 201 3,061.45 256 2,252.94 57 441.5 161 1,761.81 Mei. / May. 761 11,759.60 187 3,237.76 259 3,662.06 95 804.99 220 4,054.79 Jun. / Jun. 634 8,529.55 172 2,670.00 223 3,186.28 85 924.3 154 1,748.97
Jul. / Jul. 760 13,176.02 187 2,995.13 243 3,823.83 82 419.18 248 5,937.88 Ogos. / Aug. 563 5,561.54 176 2,169.99 201 1,762.27 67 550.62 119 1,078.66
Sep. / Sep. 670 9,256.77 233 2,817.99 222 4,272.60 68 814.51 147 1,351.67 Okt./ Oct. 686 14,260.46 186 2,834.52 237 6,743.98 89 467.8 174 4,214.16 Nov./ Nov. 610 8,597.47 187 2,982.97 194 2,488.82 78 901.31 151 2,224.37
Dis./ Dec 569 7,152.49 157 2,937.05 227 2,923.24 74 426.35 111 865.852013 7,273 116,905.84 2,047 35,288.42 2,669 48,817.59 657 8,994.07 1,900 23,805.76
Jan. / Jan. 652 9,239.01 171 2,612.08 238 3,424.97 65 592.07 178 2,609.89 Feb. / Feb. 612 6,725.35 142 1,940.49 190 2,469.71 76 792.67 204 1,522.48
Mac./ Mar. 696 19,373.13 206 2,620.37 254 11,684.85 61 1,903.99 175 3,163.92 Apr. / Apr. 680 13,729.55 195 2,842.70 249 4,441.61 68 2,497.35 168 3,947.89 Mei. / May. 683 8,333.94 223 3,747.28 221 2,186.83 75 424.75 164 1,975.08 Jun. / Jun. 555 7,431.12 137 2,104.45 219 3,530.46 43 272.46 156 1,523.75
Jul. / Jul. 718 7,387.83 192 2,230.89 284 3,397.08 63 848.39 179 911.47 Ogos. / Aug. 531 9,165.67 164 3,920.43 208 3,350.15 31 311.13 128 1,583.96
Sep. / Sep. 587 8,690.18 173 3,686.17 236 3,302.14 43 372.63 135 1,329.24 Okt./ Oct. 594 9,336.30 155 3,521.35 223 2,581.03 49 363.42 167 2,870.50 Nov./ Nov. 528 11,842.53 175 4,379.10 179 5,901.27 42 345.45 132 1,216.71
Dis./ Dec 437 5,651.23 114 1,683.11 168 2,547.49 41 269.76 114 1,150.872014 671 12,545.97 207 4,931.78 268 4,616.50 56 279.76 140 2,717.93
Jan. / Jan. 352 6,836.69 113 3,036.56 140 2,107.72 30 144.86 69 1,547.55 Feb. / Feb. 250 3,364.17 82 1,756.13 90 567.68 20 83.23 58 957.13 Mac./ Mar. 69 2,345.11 12 139.09 38 1,941.10 6 51.67 13 213.25
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
Total may not necessarily add up due to rounding.
Kategori Pembangunan Projek / Project Category
Kediaman / ResidentialBukan Kediaman Non Residential
Infrastruktur Infrastructure
Jumlah Bilangan Projek
Jumlah Nilai Projek (RM j)
Tahun Year
Kemudahan Sosial Social Amenities
Jadual 2.3 - Bilangan dan Nilai Projek Pembinaan Diawad Mengikut Julat Nilai Projek dan Gred Pendaftaran Kontraktor Bagi Tahun 2012 Table 2.3 - Number and Value of Project Awarded By Project Value Range and Contractor Registration Grade For 2012
Gred Julat Nilai Projek (RM juta)Melebihi
0.5 hingga 1Melebihi
1 hingga 5Melebihi
5 hingga 10Melebihi
10 hingga 50Melebihi
50 hingga 100Melebihi
100 hingga 300Melebihi
300 hingga 500Melebihi
500 hingga 1,000Melebihi 1,000 Jumlah
Grade Project Value Range (RM mill ion) Exceeding
0.5 to 1 Exceeding
1 to 5 Exceeding
5 to 10 Exceeding
10 to 50 Exceeding 50 to 100
Exceeding 100 to 300
Exceeding 300 to 500
Exceeding 500 to 1,000 Exceeding 1,000 Total
Bilangan Kontraktor /No. of Contractors 30 27 3 2 - - - - - 62
Bilangan Projek / No. of Projects 30 30 4 2 - - - - - 66
Nilai Projek (RM j) / Project Value (RM m) 28.79 60.28 28.69 40.93 - - - - - 158.69
Bilangan Kontraktor / No. of Contractors 27 30 5 2 - - - - - 64
Bilangan Projek / No. of Projects 29 30 5 2 - - - - - 66
Nilai Projek (RM j) / Project Value (RM m) 21.41 67.13 33.49 36.67 - - - - - 158.70
Bilangan Kontraktor / No. of Contractors 255 279 32 15 - - - - - 581
Bilangan Projek / No. of Projects 321 322 35 17 - - - - - 695
Nilai Projek (RM j) / Project Value (RM m) 249.89 670.15 243.62 327.46 - - - - - 1,491.12
Bilangan Kontraktor / No. of Contractors 274 439 13 10 - - - - - 736
Bilangan Projek / No. of Projects 348 568 14 11 - - - - - 941
Nilai Projek (RM j) / Project Value (RM m) 282.46 1,065.42 100.47 158.56 - - - - - 1,606.91
Bilangan Kontraktor / No. of Contractors 130 640 67 26 - 1 - - - 864
Bilangan Projek / No. of Projects 170 873 71 31 - 1 - - - 1,146
Nilai Projek (RM j) / Project Value (RM m) 127.29 2,454.01 487.52 573.78 - 179.5 - - - 3,822.10
Bilangan Kontraktor / No. of Contractors 79 244 221 38 - 1 - - - 583
Bilangan Projek / No. of Projects 116 370 274 40 - 1 - - - 801
Nilai Projek (RM j) / Project Value (RM m) 85.89 1,018.67 1,982.40 698.41 - 155.85 - - - 3,941.22
Bilangan Kontraktor / No. of Contractors 251 741 450 800 197 110 15 9 4 2,577
Bilangan Projek / No. of Projects 400 1327 589 1191 247 134 15 10 4 3,917
Nilai Projek (RM j) / Project Value (RM m) 297.58 3,507.49 4,335.51 27,256.15 17,071.65 21,714.32 5,671.20 7,033.93 11,908.28 98,796.11
Bilangan Kontraktor / No. of Contractors 8 19 10 34 13 14 4 3 2 107
Bilangan Projek / No. of Projects 14 37 15 44 14 15 4 4 2 149
Nilai Projek (RM j) / Project Value (RM m) 9.34 85.93 107.52 1,026.98 1,038.04 2,266.47 1,662.15 2,885.66 6,133.34 15,215.43
Bilangan Kontraktor / No. of Contractors 1,054 2,419 801 927 210 126 19 12 6 5,574
Bilangan Projek / No. of Projects 1,428 3,557 1,007 1,338 261 151 19 14 6 7,781
Nilai Projek (RM j) / Project Value (RM m) 1,102.65 8,929.08 7,319.22 30,118.94 18,109.69 24,316.14 7,333.35 9,919.59 18,041.62 125,190.28
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.Total may not necessarily add up due to rounding.
G3
G4
G5
G1
G2
Note : Figures are subject to change due to late notification.
Jumlah Total
G6
G7
Asing Foreign
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Jadual 2.3 - Bilangan dan Nilai Projek Pembinaan Diawad Mengikut Julat Nilai Projek dan Gred Pendaftaran Kontraktor Bagi Tahun 2013 Table 2.3 - Number and Value of Project Awarded By Project Value Range and Contractor Registration Grade For 2013
Gred Julat Nilai Projek (RM juta)Melebihi
0.5 hingga 1Melebihi
1 hingga 5Melebihi
5 hingga 10Melebihi
10 hingga 50Melebihi
50 hingga 100Melebihi
100 hingga 300Melebihi
300 hingga 500Melebihi
500 hingga 1,000Melebihi 1,000 Jumlah
Grade Project Value Range (RM mill ion) Exceeding
0.5 to 1 Exceeding
1 to 5 Exceeding
5 to 10 Exceeding
10 to 50 Exceeding 50 to 100
Exceeding 100 to 300
Exceeding 300 to 500
Exceeding 500 to 1,000 Exceeding 1,000 Total
Bilangan Kontraktor / No. of Contractors 17 9 2 1 - - - - - 29
Bilangan Projek / No. of Projects 17 10 2 1 - - - - - 30
Nilai Projek (RM j) / Project Value (RM m) 10.58 24.37 11 14.8 - - - - - 60.75
Bilangan Kontraktor / No. of Contractors 26 22 5 3 - - - - - 56
Bilangan Projek / No. of Projects 30 23 5 3 - - - - - 61
Nilai Projek (RM j) / Project Value (RM m) 22.29 45.22 34.48 46.11 - - - - - 148.10
Bilangan Kontraktor / No. of Contractors 322 205 26 16 - - - - - 569
Bilangan Projek / No. of Projects 389 248 28 18 - - - - - 683
Nilai Projek (RM j) / Project Value (RM m) 293.52 545.47 186.37 323.4 - - - - - 1,348.76
Bilangan Kontraktor / No. of Contractors 133 483 17 8 1 - - - - 642
Bilangan Projek / No. of Projects 164 656 17 8 1 - - - - 846
Nilai Projek (RM j) / Project Value (RM m) 124.48 1,253.93 115.41 115.17 60 - - - - 1,668.99
Bilangan Kontraktor / No. of Contractors 105 539 81 45 2 1 - - - 773
Bilangan Projek / No. of Projects 139 776 87 48 2 1 - - - 1,053
Nilai Projek (RM j) / Project Value (RM m) 102.12 2,220.89 599.09 930.6 123 148.8 - - - 4,124.50
Bilangan Kontraktor / No. of Contractors 70 190 210 32 1 - - - - 503
Bilangan Projek / No. of Projects 110 299 259 36 1 - - - - 705
Nilai Projek (RM j) / Project Value (RM m) 79.36 789.73 1,886.21 557.37 64 - - - - 3,376.67
Bilangan Kontraktor / No. of Contractors 217 692 438 735 206 123 15 7 1 2,434
Bilangan Projek / No. of Projects 373 1265 578 1150 229 160 17 8 1 3,781
Nilai Projek (RM j) / Project Value (RM m) 278.54 3,390.84 4,173.02 25,909.07 16,424.08 26,580.86 6,774.17 5,774.72 2,250.57 91,555.87
Bilangan Kontraktor / No. of Contractors 6 16 12 17 15 9 4 2 2 83
Bilangan Projek / No. of Projects 7 36 17 22 15 9 4 2 2 114
Nilai Projek (RM j) / Project Value (RM m) 5.5 88.72 119.57 484.95 1,103.84 1,703.12 1,465.59 1,619.75 8,031.19 14,622.23
Bilangan Kontraktor / No. of Contractors 896 2,156 791 857 225 133 19 9 3 5,089
Bilangan Projek / No. of Projects 1,229 3,313 993 1,286 248 170 21 10 3 7,273
Nilai Projek (RM j) / Project Value (RM m) 916.39 8,359.17 7,125.15 28,381.47 17,774.92 28,432.78 8,239.76 7,394.47 10,281.76 116,905.87
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
G1
G2
Asing Foreign
Jumlah Total
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
G3
G4
G5
Total may not necessarily add up due to rounding.
G6
G7
Jadual 2.3 - Bilangan dan Nilai Projek Pembinaan Diawad Mengikut Julat Nilai Projek dan Gred Pendaftaran Kontraktor Bagi Mac 2014 Table 2.3 - Number and Value of Project Awarded By Project Value Range and Contractor Registration Grade For March 2014.
Gred Julat Nilai Projek (RM juta)Melebihi
0.5 hingga 1Melebihi
1 hingga 5Melebihi
5 hingga 10Melebihi
10 hingga 50Melebihi
50 hingga 100Melebihi
100 hingga 300Melebihi
300 hingga 500Melebihi
500 hingga 1,000Melebihi 1,000 Jumlah
Grade Project Value Range (RM mill ion) Exceeding
0.5 to 1 Exceeding
1 to 5 Exceeding
5 to 10 Exceeding
10 to 50 Exceeding 50 to 100
Exceeding 100 to 300
Exceeding 300 to 500
Exceeding 500 to 1,000 Exceeding 1,000 Total
Bilangan Kontraktor / No. of Contractors 2 - - - - - - - - 2
Bilangan Projek / No. of Projects 2 - - - - - - - - 2
Nilai Projek (RM j) / Project Value (RM m) 5.8 - - - - - - - - 5.80
Bilangan Kontraktor / No. of Contractors 2 2 1 - - - - - - 5
Bilangan Projek / No. of Projects 2 2 1 - - - - - - 5
Nilai Projek (RM j) / Project Value (RM m) 1.48 3.8 7.46 - - - - - - 12.74
Bilangan Kontraktor / No. of Contractors 16 21 3 1 - - - - - 41
Bilangan Projek / No. of Projects 16 21 4 1 - - - - - 42
Nilai Projek (RM j) / Project Value (RM m) 12.2 47 27.46 17.84 - - - - - 104.50
Bilangan Kontraktor / No. of Contractors 11 46 3 3 - - - - - 63
Bilangan Projek / No. of Projects 13 54 3 3 - - - - - 73
Nilai Projek (RM j) / Project Value (RM m) 10.92 111.16 20.11 65.43 - - - - - 207.62
Bilangan Kontraktor / No. of Contractors 9 56 7 3 - 1 - - - 76
Bilangan Projek / No. of Projects 9 61 7 4 - 1 - - - 82
Nilai Projek (RM j) / Project Value (RM m) 6.36 187.87 42.66 72.53 - 190.44 - - - 499.86
Bilangan Kontraktor / No. of Contractors 14 28 28 6 - - - - - 76
Bilangan Projek / No. of Projects 17 32 41 6 - - - - - 96
Nilai Projek (RM j) / Project Value (RM m) 13.06 78.12 313.56 80.6 - - - - - 485.34
Bilangan Kontraktor / No. of Contractors 20 90 47 115 26 14 1 3 - 316
Bilangan Projek / No. of Projects 33 115 49 126 27 14 1 3 - 368
Nilai Projek (RM j) / Project Value (RM m) 24.26 288.88 355.43 2,960.87 1,814.80 2,476.01 358 2,170.72 - 10,448.97
Bilangan Kontraktor / No. of Contractors - 1 - - - 1 - 1 - 3
Bilangan Projek / No. of Projects - 1 - - - 1 - 1 - 3
Nilai Projek (RM j) / Project Value (RM m) - 4.65 - - - 275.1 - 501.38 - 781.13
Bilangan Kontraktor / No. of Contractors 74 244 89 128 26 16 1.00 4.00 - 582
Bilangan Projek / No. of Projects 92 286 105 140 27 16 1 4 - 671
Nilai Projek (RM j) / Project Value (RM m) 74.08 721.48 766.68 3,197.27 1,814.80 2,941.55 358.00 2,672.10 - 12,545.96
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.Total may not necessarily add up due to rounding.
Asing Foreign
Jumlah Total
G2
G3
G7
G1
Note : Figures are subject to change due to late notification.
G5
G6
G4
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Jadual 2.4 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Julat Nilai Projek Pada Mac 2014.
Jumlah Bilangan Projek
Jumlah Nilai Projek (RM juta)
Total Number of Projects
Project Value Range (RM million)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
2012 7,781 125,190.29 1,959 18,506.18 5,822 106,684.11Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,428 1,102.65 451 367.70 977 734.95 Melebihi 1 hingga 5 / Exceeding 1 to 5 3,557 8,929.09 957 2,388.01 2600 6,541.08 Melebihi 5 hingga 10 / Exceeding 5 to 10 1,007 7,319.21 218 1,578.61 789 5,740.60 Melebihi 10 hingga 50 / Exceeding 10 to 50 1,338 30,118.94 254 5,822.76 1084 24,296.18 Melebihi 50 hingga 100 / Exceeding 50 to 100 261 18,109.70 48 3,311.37 213 14,798.33 Melebihi 100 hingga 300 / Exceeding 100 to 300 151 24,316.14 30 4,702.31 121 19,613.83 Melebihi 300 hingga 500 / Exceeding 300 to 500 19 7,333.36 1 335.42 18 6,997.94 Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 14 9,919.58 - - 14 9,919.58 Melebihi 1,000 / Exceeding 1,000 6 18,041.62 - - 6 18,041.62 2013 7,273 116,905.87 1,778 22,244.31 5,495 94,661.56Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,229 916.39 321 245.26 908 671.13 Melebihi 1 hingga 5 / Exceeding 1 to 5 3,313 8,359.17 919 2,266.16 2394 6,093.01 Melebihi 5 hingga 10 / Exceeding 5 to 10 993 7,125.14 199 1,392.31 794 5,732.83 Melebihi 10 hingga 50 / Exceeding 10 to 50 1,286 28,381.47 240 5,400.73 1046 22,980.74 Melebihi 50 hingga 100 / Exceeding 50 to 100 248 17,774.93 54 3,866.49 194 13,908.44 Melebihi 100 hingga 300 / Exceeding 100 to 300 170 28,432.78 40 6,371.48 130 22,061.30 Melebihi 300 hingga 500 / Exceeding 300 to 500 21 8,239.77 4 1,853.88 17 6,385.89 Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 10 7,394.46 1 848.00 9 6,546.46 Melebihi 1,000 / Exceeding 1,000 3 10,281.76 - - 3 10,281.76 2014 671 12,545.97 131 1,990.85 540 10,555.12Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 92 74.08 19 19.00 73 55.08 Melebihi 1 hingga 5 / Exceeding 1 to 5 286 721.48 56 154.52 230 566.96 Melebihi 5 hingga 10 / Exceeding 5 to 10 105 766.68 17 116.27 88 650.41 Melebihi 10 hingga 50 / Exceeding 10 to 50 140 3,197.28 32 819.46 108 2,377.82 Melebihi 50 hingga 100 / Exceeding 50 to 100 27 1,814.80 4 265.90 23 1,548.90 Melebihi 100 hingga 300 / Exceeding 100 to 300 16 2,941.55 3 615.70 13 2,325.85 Melebihi 300 hingga 500 / Exceeding 300 to 500 1 358.00 - - 1 358.00 Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 4 2,672.10 - - 4 2,672.10 Melebihi 1,000 / Exceeding 1,000 - - - - - -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Projek Kerajaan Government Projects
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.Note : Figures are subject to change due to late notification.
Total may not necessarily add up due to rounding.
Julat Nilai Projek (RM juta) Project Value Range (RM million)
Table 2.4 - Number and Value of Projects Awarded By Status of Contractors and Project Value Range as of March 2014.
Projek Swasta Private Project
Jadual 2.5 - Bilangan Projek Diawad Berdasarkan Julat Nilai Projek dan Kategori Pembangunan Projek Pada Mac 2014. Table 2.5 - Number of Projects Awarded By Project Value Range and Project Category as of March 2014.
Melebihi 0.5 hingga 1
Melebihi 1 hingga 5
Melebihi 5 hingga 10
Melebihi 10 hingga 50
Melebihi 50 hingga 100
Melebihi 100 hingga 300
Melebihi 300 hingga 500
Melebihi 500 hingga 1000
Melebihi 1,000
Exceeding 0.5 to 1
Exceeding 1 to 5
Exceeding 5 to 10
Exceeding 10 to 50
Exceeding 50 to 100
Exceeding 100 to 300
Exceeding 300 to 500
Exceeding 500 to 1,000
Exceeding to 1,000
2012 7,781 1,428 3,557 1,007 1,338 261 151 19 14 6
Kediaman Residential
2,246 334 965 305 485 109 42 4 2 -
Bukan Kediaman Non Residential
2,735 478 1247 356 486 86 68 8 6 -
Kemudahan Sosial Social Amenities
913 208 475 92 112 17 7 2 - -
Infrastruktur Infrastructure
1,887 408 870 254 255 49 34 5 6 6
2013 7,273 1,229 3,313 993 1,286 248 170 21 10 3
Kediaman Residential
2,047 254 819 305 507 90 69 3 - -
Bukan Kediaman Non Residential
2,669 446 1226 384 444 92 59 9 7 2
Kemudahan Sosial Social Amenities
657 135 336 76 79 13 12 5 1 -
Infrastruktur Infrastructure
1,900 394 932 228 256 53 30 4 2 1
2014 671 92 286 105 140 27 16 1 4 0
Kediaman Residential
207 17 79 32 55 15 8 - 1 -
Bukan Kediaman Non Residential
268 39 122 44 49 8 3 1 2 -
Kemudahan Sosial Social Amenities
56 14 27 11 4 - - - - -
Infrastruktur Infrastructure
140 22 58 18 32 4 5 - 1 -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kategori Pembangunan ProjekProjek Project Category
Jumlah Bilangan Projek
Total Number of Projects
Jadual 2.6 - Nilai Projek Diawad Berdasarkan Julat Nilai Projek dan Kategori Pembangunan Projek Pada Mac 2014. Table 2.6 - Value of Projects Awarded By Project Value Range and Project Category as of March 2014.
Melebihi 0.5 hingga 1
Melebihi 1 hingga 5
Melebihi 5 hingga 10
Melebihi 10 hingga 50
Melebihi 50 hingga 100
Melebihi 100 hingga 300
Melebihi 300 hingga 500
Melebihi 500 hingga 1000
Melebihi 1,000
Exceeding 0.5 to 1
Exceeding 1 to 5
Exceeding 5 to 10
Exceeding 10 to 50
Exceeding 50 to 100
Exceeding 100 to 300
Exceeding 300 to 500
Exceeding 500 to 1,000
Exceeding to 1,000
2012 125,190.29 1,102.65 8,929.10 7,319.21 30,118.94 18,109.70 24,316.13 7,333.35 9,919.59 18,041.62
Kediaman Residential
33,071.45 272.69 2,415.16 2,255.58 11,341.17 7,398.71 6,726.71 1,484.10 1,177.33 -
Bukan Kediaman Non Residential
40,535.58 363.96 3,222.53 2,568.34 10,659.50 5,954.75 11,008.01 2,969.64 3,788.85 -
Kemudahan Sosial Social Amenities
7,297.08 161.67 1,149.84 658.44 2,427.21 1,172.82 1,004.45 722.65 - -
Infrastruktur Infrastructure
44,286.18 304.33 2,141.57 1,836.85 5,691.06 3,583.42 5,576.96 2,156.96 4,953.41 18,041.62
2013 116,905.85 916.40 8,359.16 7,125.14 28,381.46 17,774.93 28,432.78 8,239.76 7,394.46 10,281.76
Kediaman Residential
35,288.43 192.87 2,163.55 2,234.88 11,968.45 6,256.90 11,314.93 1,156.85 - -
Bukan Kediaman Non Residential
48,817.60 332.34 3,114.41 2,774.07 9,096.15 6,778.45 10,378.79 3,313.48 4,998.72 8,031.19
Kemudahan Sosial Social Amenities
8,994.08 100.62 791.18 529.92 1,802.78 887.02 1,929.69 2,104.87 848 -
Infrastruktur Infrastructure
23,805.74 290.57 2,290.02 1,586.27 5,514.08 3,852.56 4,809.37 1,664.56 1,547.74 2,250.57
2014 12,545.99 74.08 721.49 766.70 3,197.28 1,814.80 2,941.55 358.00 2,672.09 0.00
Kediaman Residential
4,931.77 12.6 206.2 243.34 1,305.30 1,063.41 1,467.55 - 633.37 -
Bukan Kediaman Non Residential
4,616.51 31.25 311.88 316.24 1,030.04 479.29 552.47 358 1,537.34 -
Kemudahan Sosial Social Amenities
279.77 14.29 70.57 83.4 111.51 - - - - -
Infrastruktur Infrastructure
2,717.94 15.94 132.84 123.72 750.43 272.1 921.53 - 501.38 -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kategori Pembangunan Projek Project Category
Jumlah Nilai Projek (RM j)
Project Value Range (RM m)
Jadual 2.7 - Bilangan Projek Diawad Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2014. Table 2.7 - Number of Projects Awarded By Site Location and Value Range as of March 2014.
Jumlah Bilangan Projek
Total Number of Projects
2012 7,781 1,160 306 153 386 344 554 574 599 55 1,504 337 476 514 819
Melebihi 0.5 hingga 1 Exceeding 0.5 to 1
1,428 226 39 29 79 67 111 94 135 13 201 74 92 65 203
Melebihi 1 hingga 5 Exceeding 1 to 5
3,557 495 167 80 201 160 302 260 315 30 610 182 197 206 352
Melebihi 5 hingga 10 Exceeding 5 to 10
1,007 147 43 19 51 43 73 87 64 5 201 34 79 81 80
Melebihi 10 hingga 50 Exceeding 10 to 50
1,338 231 49 22 48 56 50 102 70 6 351 30 84 126 113
Melebihi 50 hingga 100 Exceeding 50 to 100
261 33 5 1 3 10 12 23 11 1 93 12 11 21 25
Melebihi 100 hingga 300 Exceeding 100 to 300
151 24 3 2 4 7 5 7 4 - 36 4 11 13 31
Melebihi 300 hingga 500 Exceeding 300 to 500
19 2 - - - - 1 1 - - 7 1 1 1 5
Melebihi 500 hingga 1,000 Exceeding 500 to 1,000
14 1 - - - - - - - - 3 - 1 1 8
Melebihi 1,000 Exceeding 1,000
6 1 - - - 1 - - - - 2 - - - 2
2013 7,273 1,348 268 133 308 330 516 509 572 59 1,397 280 467 456 630
Melebihi 0.5 hingga 1 Exceeding 0.5 to 1
1,229 240 47 24 63 61 96 83 115 6 190 62 73 72 97
Melebihi 1 hingga 5 Exceeding 1 to 5
3,313 585 143 75 141 129 300 223 307 28 562 117 197 208 298
Melebihi 5 hingga 10 Exceeding 5 to 10
993 174 35 12 55 53 64 79 68 8 197 39 77 59 73
Melebihi 10 hingga 50 Exceeding 10 to 50
1,286 267 34 18 41 72 44 91 70 14 329 54 87 80 85
Melebihi 50 hingga 100 Exceeding 50 to 100
248 57 6 3 5 9 8 15 11 2 55 5 23 19 30
Melebihi 100 hingga 300 Exceeding 100 to 300
170 20 3 1 3 5 3 17 1 1 58 2 9 11 36
Melebihi 300 hingga 500 Exceeding 300 to 500
21 3 - - - - - - - - 4 - 1 5 8
Melebihi 500 hingga 1,000 Exceeding 500 to 1,000
10 2 - - - 1 1 - - - 2 - - 1 3
Melebihi 1,000 Exceeding 1,000
3 - - - - - - 1 - - - 1 - 1 -
Johor Kedah
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Julat Nilai Projek (RM juta)
Value Range (RM mill ion)
Kelantan MelakaNegeri
SembilanPahang
Total may not necessarily add up due to rounding.
Pulau Pinang
Note : Figures are subject to change due to late notification
PerlisPerak Wilayah
PersekutuanSelangor Sabah SarawakTerengganu
Jadual 2.7 - Bilangan Projek Diawad Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2014. Table 2.7 - Number of Projects Awarded By Site Location and Value Range as of March 2014.
Jumlah Bilangan Projek
Total Number of Projects
Johor Kedah
Julat Nilai Projek (RM juta)
Value Range (RM mill ion)
Kelantan MelakaNegeri
SembilanPahang
Pulau Pinang
PerlisPerak Wilayah
PersekutuanSelangor Sabah SarawakTerengganu
2014 671 133 16 20 20 40 42 55 54 3 115 34 38 38 63
Melebihi 0.5 hingga 1 Exceeding 0.5 to 1
92 17 1 1 2 4 6 12 6 - 17 5 5 1 15
Melebihi 1 hingga 5 Exceeding 1 to 5
286 62 5 10 10 20 25 21 30 1 41 17 11 14 19
Melebihi 5 hingga 10 Exceeding 5 to 10
105 18 4 7 3 10 5 12 9 - 16 3 8 5 5
Melebihi 10 hingga 50 Exceeding 10 to 50
140 26 6 1 4 6 3 9 8 2 34 8 10 13 10
Melebihi 50 hingga 100 Exceeding 50 to 100
27 5 - - - - 1 1 1 - 6 1 1 4 7
Melebihi 100 hingga 300 Exceeding 100 to 300
16 4 - 1 1 - 1 - - - 1 - 3 - 5
Melebihi 300 hingga 500 Exceeding 300 to 500
1 - - - - - - - - - - - - - 1
Melebihi 500 hingga 1,000 Exceeding 500 to 1,000
4 1 - - - - 1 - - - - - - 1 1
Melebihi 1,000 Exceeding 1,000
- - - - - - - - - - - - - - -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Note : Figures are subject to change due to late notification Total may not necessarily add up due to rounding.
14.4%
3.9%2.0%
4.2% 4.4%7.1%
7.4% 7.7%
0.7%
19.4%
4.3%
6.1% 6.6%
10.5%
18.5%
3.7%
1.8%
4.2% 4.5%
7.1% 7.0% 7.9%
0.8%
19.3%
3.8%
6.4% 6.3%
8.7%
19.8%
2.4%
3.0%
3.0% 6.0% 6.3% 8.2% 8.0%0.4%
17.0%5.1% 5.7% 5.7% 9.4%
0
200
400
600
800
1,000
1,200
1,400
1,600
Johor Kedah Kelantan Melaka Negeri Sembilan
Pahang Pulau Pinang Perak Perlis Selangor Terengganu Sabah SarawakWilayah
Persekutuan
Bilangan Projek Mengikut Lokasi Tapak
Total of Projects According to Site Location 2012
2013
Mar-14
[ No. ]
Jadual 2.8 - Nilai Projek Diawad Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2014. Table 2.8 - Value of Projects Awarded By Site Location and Value Range as of March 2014.
2012 125,190.24 19,717.11 2,630.25 1,254.19 2,853.03 5,065.97 4,432.08 6,487.83 4,122.44 349.87 31,545.52 3,525.15 6,407.55 9,575.98 27,223.27
Melebihi 0.5 hingga 1 Exceeding 0.5 to 1
1,102.63 171.77 29.62 22.75 57.80 46.89 83.71 70.99 101.86 9.56 157.56 58.90 67.36 48.62 175.24
Melebihi 1 hingga 5 Exceeding 1 to 5
8,929.10 1,194.66 430.98 210.47 505.18 405.32 723.39 664.18 781.11 87.17 1,547.00 449.41 558.22 546.47 825.54
Melebihi 5 hingga 10 Exceeding 5 to 10
7,319.20 1,068.26 322.26 140.36 364.44 322.82 529.26 607.12 449.44 40.61 1,465.06 236.70 603.10 603.36 566.41
Melebihi 10 hingga 50 Exceeding 10 to 50
30,118.94 5,230.03 1,079.02 460.77 1,184.08 1,228.75 1,026.39 2,208.57 1,413.11 145.53 8,142.81 685.69 1,792.66 2,934.77 2,586.76
Melebihi 50 hingga 100 Exceeding 50 to 100
18,109.67 2,272.51 349.72 94.84 226.71 698.75 864.08 1,638.71 761.25 67.00 6,249.11 791.45 720.37 1,535.62 1,839.55
Melebihi 100 hingga 300 Exceeding 100 to 300
24,316.15 3,854.22 418.65 325.00 514.82 925.43 813.60 888.33 615.67 - 5,988.92 855.20 1,655.75 2,506.69 4,953.87
Melebihi 300 hingga 500 Exceeding 300 to 500
7,333.35 648.22 - - - - 391.65 409.93 - - 2,802.81 447.80 331.00 464.15 1,837.79
Melebihi 500 hingga 1,000 Exceeding 500 to 1,000
9,919.59 509.19 - - - - - - - - 2,654.42 - 679.09 936.30 5,140.59
Melebihi 1,000 Exceeding 1,000
18,041.61 4,768.25 - - - 1,438.01 - - - - 2,537.83 - - - 9,297.52
2013 116,905.88 18,456.74 2,290.93 1,073.68 2,515.27 4,564.24 4,019.10 8,932.43 3,711.89 859.32 27,692.73 4,685.86 6,406.18 14,660.59 17,036.92
Melebihi 0.5 hingga 1 Exceeding 0.5 to 1
916.39 176.29 34.57 18.64 47.38 44.18 70.46 59.57 90.42 4.50 138.96 44.11 57.16 51.43 78.72
Melebihi 1 hingga 5 Exceeding 1 to 5
8,359.18 1,461.63 375.30 165.40 385.37 329.97 766.14 558.21 777.76 64.54 1,398.11 284.04 560.51 522.83 709.37
Melebihi 5 hingga 10 Exceeding 5 to 10
7,125.14 1,264.07 240.23 84.33 407.94 393.43 451.17 566.52 470.00 61.01 1,418.74 268.75 540.50 432.53 525.92
Melebihi 10 hingga 50 Exceeding 10 to 50
28,381.49 5,847.69 656.09 417.23 811.54 1,597.52 908.98 1,962.22 1,378.46 313.03 7,944.58 1,086.25 1,788.06 1,729.01 1,940.83
Melebihi 50 hingga 100 Exceeding 50 to 100
17,774.91 3,851.55 415.64 199.46 386.22 607.73 611.18 1,048.29 758.25 116.24 4,144.52 359.82 1,636.64 1,490.44 2,148.93
Melebihi 100 hingga 300 Exceeding 100 to 300
28,432.78 3,349.82 569.10 188.62 476.82 782.78 402.84 2,487.05 237.00 300.00 9,641.37 351.65 1,428.35 1,805.49 6,411.89
Melebihi 300 hingga 500 Exceeding 300 to 500
8,239.77 1,326.26 - - - - - - - - 1,701.06 - 394.96 2,008.58 2,808.91
Melebihi 500 hingga 1,000 Exceeding 500 to 1,000
7,394.47 1,179.43 - - - 808.63 808.33 - - - 1,305.39 - - 880.34 2,412.35
Melebihi 1,000 Exceeding 1,000
10,281.75 - - - - - - 2,250.57 - - - 2,291.24 - 5,739.94 -
Julat Nilai Projek (RM juta) Value Range (RM million)
Jumlah Nilai Projek (RM j)
Project Value Range (RM m)
Total may not necessarily add up due to rounding.Note : Figures are subject to change due to late notification
Melaka Wilayah
PersekutuanPahangJohor Sabah Sarawak
Pulau Pinang
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Selangor
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kedah Kelantan TerengganuPerak PerlisNegeri
Sembilan
Jadual 2.8 - Nilai Projek Diawad Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2014. Table 2.8 - Value of Projects Awarded By Site Location and Value Range as of March 2014.
Julat Nilai Projek (RM juta) Value Range (RM million)
Jumlah Nilai Projek (RM j)
Project Value Range (RM m)
Melaka Wilayah
PersekutuanPahangJohor Sabah Sarawak
Pulau Pinang
SelangorKedah Kelantan TerengganuPerak PerlisNegeri
Sembilan
2014 12,546.00 2,842.82 177.04 284.17 388.74 271.16 1,253.12 391.50 372.49 84.00 1,561.17 329.05 791.89 1,112.64 2,686.21
Melebihi 0.5 hingga 1 Exceeding 0.5 to 1
74.08 12.18 0.68 0.84 1.46 3.39 5.12 10.08 3.92 - 16.42 3.90 3.63 0.63 11.83
Melebihi 1 hingga 5 Exceeding 1 to 5
721.49 146.46 15.77 25.90 20.87 43.41 63.69 55.92 77.63 1.64 96.59 53.07 29.81 40.41 50.32
Melebihi 5 hingga 10 Exceeding 5 to 10
766.70 124.47 25.60 55.09 22.57 82.84 39.19 98.47 63.14 - 111.19 18.84 51.71 37.93 35.66
Melebihi 10 hingga 50 Exceeding 10 to 50
3,197.29 652.00 134.99 33.90 57.17 141.52 69.17 163.71 167.00 82.36 817.70 188.24 227.35 249.33 212.85
Melebihi 50 hingga 100 Exceeding 50 to 100
1,814.80 359.96 - - - - 68.73 63.32 60.80 - 371.40 65.00 71.42 282.96 471.21
Melebihi 100 hingga 300 Exceeding 100 to 300
2,941.55 859.67 - 168.44 286.67 - 157.96 - - - 147.87 - 407.97 - 912.97
Melebihi 300 hingga 500 Exceeding 300 to 500
358.00 - - - - - - - - - - - - - 358.00
Melebihi 500 hingga 1,000 Exceeding 500 to 1,000
2,672.09 688.08 - - - - 849.26 - - - - - - 501.38 633.37
Melebihi 1,000 Exceeding 1,000
- - - - - - - - - - - - - - -
Note : Figures are subject to change due to late notificationNota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
15.7%
2.1% 1.0%
2.3% 4.0% 3.5% 5.2%
3.3% 0.3%
25.3%
2.8%
5.1%
7.6%
21.7%
15.8%
2.0% 0.9% 2.2% 3.9% 3.4%
7.6%
3.2% 0.7%
23.7%
4.0%
5.5%
12.5% 14.6%
22.7%
1.4% 2.3% 3.1% 2.2% 10.0% 3.1% 3.0% 0.7% 12.4% 2.6% 6.3% 8.9%
21.3%
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
Johor Kedah Kelantan Melaka Negeri Sembilan Pahang Pulau Pinang Perak Perlis Selangor Terengganu Sabah Sarawak Wilayah Persekutuan
Nilai Projek Mengikut Lokasi Tapak
Value of Projects According to Site Location 2012 2013 41699
[ RM b ]
Jadual 2.9 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Julat Nilai Projek Pada Mac 2014. Table 2.9 - Number and Value of Projects Awarded By Status of Contractors and Value Range as of March 2014.
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
2012 7,781 125,190.28 149 15,215.43 7,632 109,974.85
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,428 1,102.64 14 9.34 1,414 1,093.30
Melebihi 1 hingga 5 / Exceeding 1 to 5 3,557 8,929.09 37 85.93 3,520 8,843.16
Melebihi 5 hingga 10 / Exceeding 5 to 10 1,007 7,319.21 15 107.52 992 7,211.69
Melebihi 10 hingga 50 / Exceeding 10 to 50 1,338 30,118.95 44 1,026.98 1,294 29,091.97
Melebihi 50 hingga 100 / Exceeding 50 to 100 261 18,109.69 14 1,038.04 247 17,071.65
Melebihi 100 hingga 300 / Exceeding 100 to 300 151 24,316.14 15 2,266.47 136 22,049.67
Melebihi 300 hingga 500 / Exceeding 300 to 500 19 7,333.35 4 1,662.15 15 5,671.20
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 14 9,919.59 4 2,885.66 10 7,033.93
Melebihi 1,000 / Exceeding 1,000 6 18,041.62 2 6,133.34 4 11,908.28
2013 7,273 116,905.87 114 14,622.23 7,159 102,283.64
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,229 916.39 7 5.5 1,222 910.89
Melebihi 1 hingga 5 / Exceeding 1 to 5 3,313 8,359.16 36 88.72 3,277 8,270.44
Melebihi 5 hingga 10 / Exceeding 5 to 10 993 7,125.15 17 119.57 976 7,005.58
Melebihi 10 hingga 50 / Exceeding 10 to 50 1,286 28,381.47 22 484.95 1,264 27,896.52
Melebihi 50 hingga 100 / Exceeding 50 to 100 248 17,774.93 15 1,103.84 233 16,671.09
Melebihi 100 hingga 300 / Exceeding 100 to 300 170 28,432.78 9 1,703.12 161 26,729.66
Melebihi 300 hingga 500 / Exceeding 300 to 500 21 8,239.76 4 1,465.59 17 6,774.17
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 10 7,394.47 2 1,619.75 8 5,774.72
Melebihi 1,000 / Exceeding 1,000 3 10,281.76 2 8,031.19 1 2,250.57
2014 671 12,545.99 3 781.13 668 11,764.86
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 92 74.08 - - 92 74.08
Melebihi 1 hingga 5 / Exceeding 1 to 5 286 721.48 1 4.65 285 716.83
Melebihi 5 hingga 10 / Exceeding 5 to 10 105 766.70 - - 105 766.7
Melebihi 10 hingga 50 / Exceeding 10 to 50 140 3,197.28 - - 140 3,197.28
Melebihi 50 hingga 100 / Exceeding 50 to 100 27 1,814.80 - - 27 1,814.80
Melebihi 100 hingga 300 / Exceeding 100 to 300 16 2,941.55 1 275.1 15 2,666.45
Melebihi 300 hingga 500 / Exceeding 300 to 500 1 358.00 - - 1 358
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 4 2,672.10 1 501.38 3 2,170.72
Melebihi 1,000 / Exceeding 1,000 - - - - - -
Kontraktor Asing / Foreign Contractors Kontraktor Tempatan / Local Contractors
Total may not necessarily add up due to rounding.Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Julat Nilai Projek (RM juta) Value Range (RM mill ion)
Jumlah Bilangan Projek Total Number of
Projects
Jumlah Nilai Projek (RM juta)
Project Value Range (RM m)
2012 7,781 1,160 306 153 386 344 554 574 599 55 1,504 337 476 514 819
Kediaman Residential
2,246 343 128 46 107 87 164 199 207 6 510 58 101 81 209
Bukan Kediaman Non Residential
2,735 448 98 54 151 123 205 232 184 13 465 131 158 172 301
Kemudahan Sosial Social Amenities
913 94 39 21 44 49 85 52 90 19 118 56 74 62 110
Infrastruktur Infrastructure
1,887 275 41 32 84 85 100 91 118 17 411 92 143 199 199
2013 7,273 1,348 268 133 308 330 516 509 572 59 1,397 280 467 456 630
Kediaman Residential
2,047 399 88 22 97 103 138 160 217 16 478 44 63 71 151
Bukan Kediaman Non Residential
2,669 553 88 33 106 116 162 218 193 14 505 126 175 154 226
Kemudahan Sosial Social Amenities
657 75 23 22 30 23 58 39 45 18 104 32 64 55 69
Infrastruktur Infrastructure
1,900 321 69 56 75 88 158 92 117 11 310 78 165 176 184
2014 671 133 16 20 20 40 42 55 54 3 115 34 38 38 63
Kediaman Residential
207 29 11 7 7 20 17 16 16 - 47 6 9 8 14
Bukan Kediaman Non Residential
268 61 3 8 6 9 17 20 29 1 37 15 13 15 34
Kemudahan Sosial Social Amenities
56 11 - 2 1 2 4 9 2 - 6 4 3 5 7
Infrastruktur Infrastructure
140 32 2 3 6 9 4 10 7 2 25 9 13 10 8
Selangor
Total may not necessarily add up due to rounding. Note : Figures are subject to change due to late notification
Perlis SabahTerengganu
Jadual 2.10 - Bilangan Projek Diawad Berdasarkan Lokasi Tapak dan Kategori Pembangunan Projek Pada Mac 2014. Table 2.10 - Number of Projects Awarded By Site Location and Project Category as of March 2014.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kedah KelantanJohorKategori Pembangunan Projek Project Category
Jumlah Bilangan Projek
Total Number of Projects
PahangMelakaNegeri
SembilanPerak
Pulau Pinang
Wilayah Persekutuan
Sarawak
Jadual 2.11 - Nilai Projek Diawad Berdasarkan Lokasi Tapak dan Kategori Pembangunan Projek Pada Mac 2014. Table 2.11 - Value of Projects Awarded By Site Location and Project Category as of March 2014.
2012 125,190.25 19,717.12 2,630.26 1,254.19 2,853.02 5,065.97 4,432.09 6,487.83 4,122.44 349.88 31,545.51 3,525.16 6,407.53 9,575.98 27,223.27
Kediaman Residential
33,071.45 6,742.86 769.49 196.04 710.50 833.40 995.78 3,197.88 1,063.19 28.02 11,018.24 208.52 955.59 1,007.38 5,344.56
Bukan Kediaman Non Residential
40,535.57 5,264.23 1,198.65 709.82 1,224.47 1,543.57 1,425.49 2,380.57 1,840.13 100.82 7,975.45 1,920.19 1,289.66 4,912.41 8,750.11
Kemudahan Sosial Social Amenities
7,297.06 615.15 196.57 160.28 356.94 320.71 1,270.52 354.34 342.41 53.78 1,076.01 438.08 745.12 567.80 799.35
Infrastruktur Infrastructure
44,286.17 7,094.88 465.55 188.05 561.11 2,368.29 740.30 555.04 876.71 167.26 11,475.81 958.37 3,417.16 3,088.39 12,329.25
2013 116,905.90 18,456.75 2,290.93 1,073.69 2,515.28 4,564.24 4,019.09 8,932.44 3,711.89 859.32 27,692.73 4,685.87 6,406.16 14,660.59 17,036.92
Kediaman Residential
35,288.42 7,661.61 606.74 314.77 799.69 1,483.53 901.85 3,493.72 1,317.73 93.16 10,499.04 257.11 930.45 741.84 6,187.18
Bukan Kediaman Non Residential
48,817.62 6,758.67 947.55 86.95 919.46 1,652.31 1,021.83 2,039.74 1,150.54 350.88 11,905.70 3,681.32 2,579.14 8,772.76 6,950.77
Kemudahan Sosial Social Amenities
8,994.09 1,783.31 72.80 90.26 156.45 568.97 411.31 178.79 528.01 208.30 1,415.12 215.83 389.81 1,329.59 1,645.54
Infrastruktur Infrastructure
23,805.77 2,253.16 663.84 581.71 639.68 859.43 1,684.10 3,220.19 715.61 206.98 3,872.87 531.61 2,506.76 3,816.40 2,253.43
2014 12,546.00 2,842.82 177.05 284.17 388.73 271.16 1,253.12 391.50 372.48 84.00 1,561.15 329.06 791.91 1,112.64 2,686.21
Kediaman Residential
4,931.79 1,180.30 99.14 66.83 29.96 183.13 128.19 205.38 60.64 - 904.35 15.91 334.99 148.86 1,574.11
Bukan Kediaman Non Residential
4,616.50 1,428.93 25.19 43.55 50.49 45.97 899.08 106.31 200.84 47.82 318.67 139.13 109.51 239.66 961.35
Kemudahan Sosial Social Amenities
279.77 32.44 - 3.36 1.49 7.16 20.09 43.21 4.92 - 16.36 19.5 3.44 62.04 65.76
Infrastruktur Infrastructure
2,717.94 201.15 52.72 170.43 306.79 34.9 205.76 36.6 106.08 36.18 321.77 154.52 343.97 662.08 84.99
Kategori Pembangunan Projek
Project Category
Jumlah Nilai Projek (RM j)
Total Project Value (RM m)
Note : Figures are subject to change due to late notificationNota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Wilayah Persekutuan
Perlis SarawakPulau
PinangMelaka
Negeri Sembilan
Terengganu SabahJohor SelangorKelantan PerakPahangKedah
Jadual 2.12 - Bilangan Projek Diawad Berdasarkan Lokasi Tapak dan Sektor Pada Mac 2014. Table 2.12 - Number of Projects Awarded By Site Location and Sector as of March 2014.
2012 7,781 1,160 306 153 386 344 554 574 599 55 1,504 337 476 514 819
Projek Kerajaan Government Projects
1,959 146 72 57 81 78 170 97 170 35 141 123 215 224 350
Projek Swasta Private Projects 5,822 1,014 234 96 305 266 384 477 429 20 1,363 214 261 290 469
2013 7,273 1,348 268 133 308 330 516 509 572 59 1,397 280 467 456 630
Projek Kerajaan Government Projects
1,778 167 94 70 70 47 186 65 126 32 173 110 206 184 248
Projek Swasta Private Projects
5,495 1,181 174 63 238 283 330 444 446 27 1,224 170 261 272 382
2014 671 133 16 20 20 40 42 55 54 3 115 34 38 38 63
Projek Kerajaan Government Projects
131 11 4 5 2 - 12 17 11 3 9 22 11 11 13
Projek Swasta Private Projects 540 122 12 15 18 40 30 38 43 - 106 12 27 27 50
PerlisMelakaNegeri
SembilanPahang Perak
Pulau Pinang
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Johor Kedah KelantanSektor Sector
Jum. Bilangan Projek
Total Number of Projects
Total may not necessarily add up due to rounding.Note : Figures are subject to change due to late notification
TerengganuWilayah
PersekutuanSarawakSelangor Sabah
25.2% 24.4%
19.5%
74.8% 775.6%
80.5%
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
2012 2013 Mar 2014
Bilangan Projek Mengikut Sektor
Number of Projects According to Sector
Kerajaan / Government
Swasta / Private
[ No. ]
Jadual 2.13 - Nilai Projek Diawad Berdasarkan Lokasi Tapak dan Sektor Pada Mac 2014. Table 2.13 - Value of Projects Awarded By Site Location and Sector as of March 2014.
2012 125,190.25 19,717.11 2,630.26 1,254.19 2,853.03 5,065.97 4,432.08 6,487.83 4,122.44 349.87 31,545.51 3,525.16 6,407.54 9,575.98 27,223.28
Projek Kerajaan Government Projects
18,506.16 1,702.52 596.86 520.78 673.94 837.24 1,573.70 747.86 880.21 235.50 1,298.71 1,256.88 3,089.52 3,484.51 1,607.93
Projek Swasta Private Projects
106,684.09 18,014.59 2,033.40 733.41 2,179.09 4,228.73 2,858.38 5,739.97 3,242.23 114.37 30,246.80 2,268.28 3,318.02 6,091.47 25,615.35
2013 116,905.87 18,456.74 2,290.93 1,073.68 2,515.27 4,564.24 4,019.09 8,932.42 3,711.90 859.33 27,692.72 4,685.87 6,406.17 14,660.60 17,036.91
Projek Kerajaan Government Projects
22,244.31 2,945.85 748.01 600.67 562.31 555.71 1,440.64 974.90 1,102.00 401.36 2,842.27 1,074.06 2,783.53 3,580.95 2,632.05
Projek Swasta Private Projects
94,661.56 15,510.89 1,542.92 473.01 1,952.96 4,008.53 2,578.45 7,957.52 2,609.90 457.97 24,850.45 3,611.81 3,622.64 11,079.65 14,404.86
2014 12,545.97 2,842.81 177.05 284.16 388.74 271.16 1,253.11 391.50 372.48 84.00 1,561.16 329.05 791.90 1,112.64 2,686.21
Projek Kerajaan Government Projects
1,990.84 155.32 92.19 209.65 289.87 - 116.57 59.86 122.63 84.00 154.11 206.71 215.92 98.75 185.26
Projek Swasta Private Projects
10,555.13 2,687.49 84.86 74.51 98.87 271.16 1,136.54 331.64 249.85 - 1,407.05 122.34 575.98 1,013.89 2,500.95
Sektor Sector
Jumlah Nilai Projek (RM juta)
Total Project Value ( RM mill ion)
Perak
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Total may not necessarily add up due to rounding.Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Note : Figures are subject to change due to late notification
PahangWilayah
PersekutuanSabahSelangorPerlisPulau Pinang SarawakTerengganuKelantan Melaka
Negeri Sembilan
Johor Kedah
14.8% 19.0%
15.9%
85.2%
81.0%
84.1%
0
20
40
60
80
100
120
2012 2013 Mar 2014
Nilai Projek Mengikut Sektor
Value of Projects According to Sector
Kerajaan / Government
Swasta / Private
[ RM billion ]
Jadual 2.14 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Kategori Pembangunan Projek Pada Mac 2014. Table 2.14 - Number and Value of Projects Awarded By Status of Contractors and Project Category as of March 2014.
Bilangan Number
Nilai (RM juta)
Value (RM mill ion)
Bilangan Number
Nilai (RM juta)
Value (RM mill ion)
Bilangan Number
Nilai (RM juta)
Value (RM mill ion)
Bilangan Number
Nilai (RM juta)
Value (RM mill ion)
2012 7,781 125,190.28 1,958 18,361.32 5,674 91,613.54 1 144.86 148 15,070.56
Kediaman / Residential 2,246 33,071.44 202 1,647.26 2,032 30,900.05 - - 12 524.13
Bukan Kediaman / Non Residential 2,735 40,535.58 315 3,218.70 2,316 31,357.87 1 144.86 103 5,814.15
Kemudahan Sosial / Social Amenities 913 7,297.08 677 3,660.94 231 3,609.29 - - 5 26.85
Infrastruktur / Infrastructure 1,887 44,286.18 764 9,834.42 1,095 25,746.33 - - 28 8,705.43
2013 7,273 116,905.85 1,778 22,244.30 5,381 80,039.33 - - 114 14,622.22
Kediaman / Residential 2,047 35,288.42 119 2,174.48 1,913 32,834.54 - - 15 279.40
Bukan Kediaman / Non Residential 2,669 48,817.60 316 3,057.29 2,284 33,897.38 - - 69 11,862.93
Kemudahan Sosial / Social Amenities 657 8,994.08 449 5,676.25 206 3,139.43 - - 2 178.40
Infrastruktur / Infrastructure 1,900 23,805.75 894 11,336.28 978 10,167.98 - - 28 2,301.49
2014 671 12,545.97 131 1,990.85 537 9,773.99 - - 3 781.13
Kediaman / Residential 207 4,931.78 16 269.02 190 4,387.66 - - 1 275.10
Bukan Kediaman / Non Residential 268 4,616.49 44 420.07 224 4,196.42 - - - -
Kemudahan Sosial / Social Amenities 56 279.77 30 193.30 26 86.47 - - - -
Infrastruktur / Infrastructure 140 2,717.93 41 1,108.46 97 1,103.44 - - 2 506.03
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Kontraktor Tempatan Local Contractors
Kontraktor Asing Foreign Contractors
Projek Swasta Private Project
Projek Kerajaan Government Projects
Projek Kerajaan Government Projects Kategori Pembangunan
Projek Project Category
Jumlah Bilangan Projek
Total Number of Projects
Jumlah Nilai Projek (RM juta)
Total Project Value (RM mill ion)
Note : Figures are subject to change due to late notificationJumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Projek Swasta Private Project
Total may not necessarily add up due to rounding.
98.1%
98.4%
99.6%
1.9%
1.6%
0.4%
2012
2013
Mar 2014
Bilangan Projek Mengikut Status Kontraktor
Number of Projects According to Status of Contractors
87.8%
87.5%
93.8%
12.2%
12.5%
6.2%
2012
2013
Mar 2014
Nilai Projek Mengikut Status Kontraktor
Value of Projects According to Status of Contractors
Kontraktor Tempatan / Local Contractors Kontraktor Asing / Foreign Contractors
Jadual 2.15 - Bilangan dan Nilai Projek Diawad Berdasarkan Jenis Kontrak dan Kategori Pembangunan Projek Pada Mac 2014. Table 2.15 - Number and Value of Projects Awarded By Type of Contract and Project Category as of March 2014.
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
2012 7,781 125,190.28 7,336 113,188.73 252 7,565.69 122 3,680.01 41 497.19 30 258.66
Kediaman Residential
2,246 33,071.44 2,178 31,337.74 44 1,135.53 13 355.10 8 198.34 3 44.73
Bukan Kediaman Non Residential
2,735 40,535.58 2,598 36,338.22 76 1,672.70 37 2,410.11 13 69.20 11 45.35
Kemudahan Sosial Social Amenities
913 7,297.08 856 6,575.27 41 513.72 12 116.12 3 91.39 1 0.58
Infrastruktur Infrastructure
1,887 44,286.18 1,704 38,937.50 91 4,243.74 60 798.68 17 138.26 15 168.00
2013 7,273 116,905.87 6,938 97,755.14 194 6,370.13 87 12,194.71 23 92.03 31 493.86
Kediaman Residential
2,047 35,288.42 1,996 34,263.93 36 740.21 9 148.17 3 48.96 3 87.15
Bukan Kediaman Non Residential
2,669 48,817.60 2,554 39,142.28 50 738.73 39 8,777.05 11 26.54 15 133.00
Kemudahan Sosial Social Amenities
657 8,994.09 621 7,833.23 24 790.07 8 160.43 3 6.44 1 203.92
Infrastruktur Infrastructure
1,900 23,805.76 1,767 16,515.70 84 4,101.12 31 3,109.06 6 10.09 12 69.79
2014 671 12,545.97 651 12,173.05 9 175.79 7 182.62 2 8.00 2 6.51
Kediaman Residential
207 4,931.78 201 4,797.58 5 127.44 1 6.76 - - - -
Bukan Kediaman Non Residential
268 4,616.50 258 4,475.38 3 37.39 4 89.73 2 8.00 1 6.00
Kemudahan Sosial Social Amenities
56 279.76 56 279.76 - - - - - - - -
Infrastruktur Infrastructure
140 2,717.93 136 2,620.33 1 10.96 2 86.13 - - 1 0.51
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification Total may not necessarily add up due to rounding.
Konvensional Conventional
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kategori Pembangunan Projek
Project Category
Jumlah Bilangan Projek
Total Number of Projects
Jumlah Nilai Projek (RM j) Total Project Value (RM m)
Jenis Kontrak / Type of Contract
Reka & Bina Design & Build
Bina, Kendali & Pindah Built, Operate & Transfer
(BOT)Turnkey
Engineering, Procurement, Construction and
Commissioning (EPCC)
Jadual 2.16 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Pengkhususan Kerja Pada Mac 2014. Table 2.16 - Number and Value of Projects Awarded By Status of Contractors and Work Specialisation as of March 2014.
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
2012 7,781 125,190.30 1,958 18,361.32 5,674 91,613.55 1 144.86 148 15,070.57
Bangunan / Building 4,985 72,168.66 926 6,824.69 3,976 60,923.92 1 144.86 82 4,275.19
Kejuruteraan Awam / Civil Engineering 2,164 37,491.30 870 9,151.76 1,265 24,794.59 - - 29 3,544.95
Elektrik / Electrical 342 9,226.90 92 1,653.21 232 2,147.77 - - 18 5,425.92
Mekanikal / Mechanical 290 6,303.44 70 731.66 201 3,747.27 - - 19 1,824.51
2013 7,273 116,905.85 1,778 22,244.30 5,381 80,039.32 - - 114 14,622.23
Bangunan / Building 4,319 77,382.19 687 9,877.73 3,565 63,509.48 - - 67 3,994.98
Kejuruteraan Awam / Civil Engineering 2,379 25,135.94 967 10,961.06 1,392 11,542.51 - - 20 2,632.37
Elektrik / Electrical 301 7,095.31 70 1,055.89 211 3,799.86 - - 20 2,239.56
Mekanikal / Mechanical 274 7,292.41 54 349.62 213 1,187.47 - - 7 5,755.32
2014 671 12,545.98 131 1,990.86 537 9,773.99 - - 3 781.13
Bangunan / Building 428 9,282.49 61 715.32 366 8,292.07 - - 1 275.10
Kejuruteraan Awam / Civil Engineering 201 2,336.56 64 1,200.37 136 1,131.54 - - 1 4.65
Elektrik / Electrical 20 239.85 2 36.78 18 203.07 - - - -
Mekanikal / Mechanical 22 687.08 4 38.39 17 147.31 - - 1 501.38
Pengkhususan Kerja Work Specialisation
Jumlah Bilangan Projek Total
Number of Projects
Jumlah Nilai Projek (RM j)
Total Project Value
(RM m)
Total may not necessarily add up due to rounding.Note : Figures are subject to change due to late notification
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Kontraktor Tempatan Local Contractors
Kontraktor Asing Foreign Contractors
Projek Kerajaan Government Projects
Projek Swasta Private Project
Projek Swasta Private Project
Projek Kerajaan Government Projects
58%
66%
74%
30%
22%
19%
7%
6%
2%
5%
6%
5%
2012
2013
Mar 2014
Nilai Projek Mengikut Pengkhususan Kerja
Value of Projects By Work Specialisation
Bangunan / Building Kejuruteraan Awam / Civil Engineering Elektrik / Electrical Mekanikal / Mechanical
64%
59%
64%
28%
33%
30%
4%
4%
3%
4%
4%
3%
2012
2013
Mar 2014
Bilangan Projek Mengikut Pengkhususan Kerja
Number of Projects By Work Specialisation
Jadual 2.17 - Bilangan dan Nilai Projek Diawad Berdasarkan Jenis Kerja dan Pengkhususan Kerja Pada Mac 2014. Table 2.17 - Number and Value of Projects Awarded By Type of Work and Work Specialisation as of March 2014.
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
2012 7,781 125,190.28 6,145 113,819.10 533 3,234.64 177 2,372.53 334 2,771.61 250 1,617.83 342 1,374.57
Bangunan / Building 4,985 72,168.65 4,222 67,917.41 184 1,187.52 133 1,110.19 87 609.84 75 348.02 284 995.67
Kejuruteraan Awam / Civil Engineering 2,164 37,491.31 1,519 32,199.26 287 1,775.67 26 1,162.74 155 1,501.71 139 665.72 38 186.21
Elektrik / Electrical 342 9,226.89 222 8,536.36 37 165.53 15 95.69 49 383.70 12 24.96 7 20.65
Mekanikal / Mechanical 290 6,303.43 182 5,166.07 25 105.92 3 3.91 43 276.36 24 579.13 13 172.04
2013 7,273 116,905.85 5,644 106,848.03 571 4,261.62 136 1,097.98 277 1,618.92 377 1,494.35 268 1,584.95
Bangunan / Building 4,319 77,382.20 3,748 73,986.59 136 781.72 97 661.86 24 155.53 96 495.08 218 1,301.42
Kejuruteraan Awam / Civil Engineering 2,379 25,135.94 1,517 19,365.87 374 3,127.43 25 325.10 163 1,143.85 261 921.66 39 252.03
Elektrik / Electrical 301 7,095.31 208 6,637.75 35 251.08 10 88.75 31 64.50 10 33.83 7 19.40
Mekanikal / Mechanical 274 7,292.40 171 6,857.82 26 101.39 4 22.27 59 255.04 10 43.78 4 12.10
2014 671 12,545.97 526 10,916.20 48 717.07 13 204.84 26 472.40 28 118.31 30 117.15
Bangunan / Building 428 9,282.49 363 8,905.12 18 70.75 9 101.64 4 58.04 10 67.04 24 79.90
Kejuruteraan Awam / Civil Engineering 201 2,336.56 138 1,235.24 26 619.49 1 6.49 17 402.97 15 49.13 4 23.24
Elektrik / Electrical 20 239.84 13 122.84 2 17.36 3 96.71 1 2.10 1 0.83 - -
Mekanikal / Mechanical 22 687.08 12 653.00 2 9.47 - - 4 9.29 2 1.31 2 14.01
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Pengkhususan Kerja Work Specialisation
Jumlah Bilangan Projek Total
Number of Projects
Jumlah Nilai Projek (RM j)
Total Project Value
(RM m)
Penyelenggaraan Maintenance
Projek Baru New Project
Naik Taraf Upgrading
Baik Pulih Repair
Ubah Suai Renovation
Jenis Kerja / Type of Work
Pembesaran Expansion
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.Note : Figures are subject to change due to late notification
Jadual 2.18 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Jenis Kontrak Pada Mac 2014. Table 2.18 - Number and Value of Projects Awarded By Status of Contractors and Type of Contract as of March 2014.
Bilangan Number
Nilai (RM j) Value
(RM m)
Bilangan Number
Nilai (RM j) Value
(RM m)
Bilangan Number
Nilai (RM j) Value
(RM m)
Bilangan Number
Nilai (RM j) Value
(RM m)
2012 7,781 125,190.28 1,958 18,361.32 5,674 91,613.54 1 144.86 148 15,070.56
Konvensional / Conventional 7,336 113,188.74 1,804 14,330.38 5,416 87,624.98 1 144.86 115 11,088.52
Reka & Bina / Design & Build 252 7,565.68 100 3,004.70 131 1,862.38 - - 21 2,698.60
Turnkey 122 3,680.02 41 927.10 70 1,492.51 - - 11 1,260.41
Built, Operate & Transfer (BOT) 41 497.19 7 24.28 34 472.91 - - - -
Engineering, Procurement, Construction and Commissioning (EPCC)
30 258.65 6 74.86 23 160.76 - - 1 23.03
2013 7,273 116,905.87 1,778 22,244.31 5,381 80,039.33 0 0.00 114 14,622.23
Konvensional / Conventional 6,938 97,755.15 1,659 17,744.69 5,186 72,951.21 - - 93 7,059.25
Reka & Bina / Design & Build 194 6,370.13 88 3,651.35 93 1,315.42 - - 13 1,403.36
Turnkey 87 12,194.71 18 818.36 63 5,237.18 - - 6 6,139.17
Built, Operate & Transfer (BOT) 23 92.03 7 11.29 16 80.74 - - - -
Engineering, Procurement, Construction and Commissioning (EPCC)
31 493.85 6 18.62 23 454.78 - - 2 20.45
2014 671 12,545.97 131 1,990.85 537 9,773.99 0 0.00 3 781.13
Konvensional / Conventional 651 12,173.05 127 1,863.80 521 9,528.12 - - 3 781.13
Reka & Bina / Design & Build 9 175.80 1 68.73 8 107.07 - - - -
Turnkey 7 182.61 1 47.82 6 134.79 - - - -
Built, Operate & Transfer (BOT) 2 8.00 1 4.50 1 3.50 - - - -
Engineering, Procurement, Construction and Commissioning (EPCC)
2 6.51 1 6.00 1 0.51 - - - -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jenis Kontrak Type of Contract
Jumlah Bilangan Projek
Total Number of Projects
Jumlah Nilai Projek (RM j) Total Project Value (RM m)
Kontraktor Tempatan / Local Contractors Kontraktor Asing / Foreign Contractors
Projek Swasta Private Project
Projek Kerajaan Government Projects
Projek Swasta Private Project
Projek Kerajaan Government Projects
Note : Figures are subject to change due to late notificationJumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Jadual 2.19 - Bilangan dan Nilai Projek Diawad Berdasarkan Jenis Kerja dan Jenis Kontrak Pada Mac 2014. Table 2.19 - Number and Value of Projects Awarded By Type of Work and Type of Contract as of March 2014.
Bilangan Number
Nilai (RM j) Value
(RM m)
Bilangan Number
Nilai (RM j) Value
(RM m)
Bilangan Number
Nilai (RM j) Value
(RM m)
Bilangan Number
Nilai (RM j) Value
(RM m)
Bilangan Number
Nilai (RM j) Value
(RM m)
Bilangan Number
Nilai (RM j) Value
(RM m)
2012 7,781 125,190.29 6,145 113,819.11 533 3,234.65 177 2,372.53 334 2,771.60 250 1,617.83 342 1,374.57
Konvensional / Conventional 7,336 113,188.74 5,807 102,727.95 492 2,940.39 156 2,223.81 327 2,539.45 238 1,498.92 316 1,258.22
Reka & Bina / Design & Build 252 7,565.69 184 6,961.89 26 197.11 14 41.68 1 158.10 5 93.85 22 113.06
Turnkey 122 3,680.02 102 3,495.79 10 85.10 4 85.34 - - 5 12.64 1 1.15
Built, Operate & Transfer (BOT) 41 497.18 31 459.04 2 1.99 3 21.70 2 1.39 2 12.42 1 0.64
Engineering, Procurement, Construction and Commissioning (EPCC)
30 258.66 21 174.44 3 10.06 - - 4 72.66 - - 2 1.50
2013 7,273 116,905.89 5,644 106,848.03 571 4,262 136 1,097.97 277 1,618.93 377 1,494.36 268 1,584.96
Konvensional / Conventional 6,938 97,755.15 5,398 88,343.74 540 4,000.03 123 979.65 269 1,586.16 352 1,303.01 256 1,542.56
Reka & Bina / Design & Build 194 6,370.13 138 5,908.19 20 155.50 6 88.07 4 10.77 20 176.52 6 31.08
Turnkey 87 12,194.71 71 12,055.95 5 95.25 5 26.10 - - 2 8.66 4 8.75
Built, Operate & Transfer (BOT) 23 92.04 14 75.19 4 8.36 - - 1 1.26 2 4.66 2 2.57
Engineering, Procurement, Construction and Commissioning (EPCC)
31 493.86 23 464.96 2 2.50 2 4.15 3 20.74 1 1.51 - -
2014 671 12,545.96 526 10,916.20 48 717.06 13 204.84 26 472.39 28 118.32 30 117.15
Konvensional / Conventional 651 12,173.05 513 10,661.00 46 715.40 10 105.40 26 472.39 28 118.32 28 100.54
Reka & Bina / Design & Build 9 175.78 7 149.12 - - 1 10.96 - - - - 1 15.70
Turnkey 7 182.62 4 95.58 1 1.15 1 84.98 - - - - 1 0.91
Built, Operate & Transfer (BOT) 2 8.00 1 4.50 - - 1 3.50 - - - - - -
Engineering, Procurement, Construction and Commissioning (EPCC)
2 6.51 1 6.00 1 0.51 - - - - - - - -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jenis Kerja / Type of Work
Penyelenggaraan Maintenance
Projek Baru New Project
Naik Taraf Upgrading
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Note : Figures are subject to change due to late notification
Pembesaran Expansion
Jenis Kontrak Type of Contract
Jumlah Bilangan Projek Total
Number of Projects
Jumlah Nilai Projek (RM j)
Total Project Value
(RM m)
Baik Pulih Repair
Ubah Suai Renovation
Total may not necessarily add up due to rounding.
Jadual 2.20 - Bilangan dan Nilai Projek Diawad Berdasarkan Jenis Kerja dan Kategori Pembangunan Projek Pada Mac 2014. Table 2.20 - Number and Value of Projects Awarded By Type of Work and Projek Category as of March 2014.
Bilangan Number
Nilai (RM j) Value(RM m)
Bilangan Number
Nilai (RM j) Value
(RM m)
Bilangan Number
Nilai (RM j) Value
(RM m)
Bilangan Number
Nilai (RM j)
Value (RM m)
Bilangan Number
Nilai (RM j) Value
(RM m)
Bilangan Number
Nilai (RM j) Value
(RM m)
2012 7,781 125,190.29 6,145 113,819.11 533 3,234.64 177 2,372.53 334 2,771.61 250 1,617.84 342 1,374.56
Kediaman Residential
2,246 33,071.43 2,110 32,518.62 25 32.90 10 46.35 65 313.63 23 124.20 13 35.73
Bukan Kediaman Non Residential
2,735 40,535.58 2,131 36,211.58 125 915.34 100 872.33 81 712.68 41 687.74 257 1,135.91
Kemudahan Sosial Social Amenities
913 7,297.09 617 6,213.59 105 408.23 39 188.52 43 152.24 47 179.59 62 154.92
Infrastruktur Infrastructure
1,887 44,286.19 1,287 38,875.32 278 1,878.17 28 1,265.33 145 1,593.06 139 626.31 10 48.00
2013 7,273 116,905.85 5,644 106,848.03 571 4,261.62 136 1,097.97 277 1,618.92 377 1,494.34 268 1,584.97
Kediaman Residential
2,047 35,288.42 1,961 34,800.65 12 37.18 13 39.37 21 203.15 25 162.34 15 45.73
Bukan Kediaman Non Residential
2,669 48,817.59 2,121 45,574.08 133 492.79 73 653.23 73 424.28 60 292.15 209 1,381.06
Kemudahan Sosial Social Amenities
657 8,994.08 459 8,030.87 68 427.91 22 131.32 28 61.51 51 249.16 29 93.31
Infrastruktur Infrastructure
1,900 23,805.76 1,103 18,442.43 358 3,303.74 28 274.05 155 929.98 241 790.69 15 64.87
2014 671 12,545.97 526 10,916.20 48 717.06 13 204.84 26 472.39 28 118.32 30 117.16
Kediaman Residential
207 4,931.78 201 4,906.49 3 20.90 - - 1 2.56 2 1.83 - -
Bukan Kediaman Non Residential
268 4,616.49 205 4,247.64 17 85.61 10 102.41 6 50.27 6 35.51 24 95.05
Kemudahan Sosial Social Amenities
56 279.76 30 135.20 9 37.68 - - 4 51.12 7 33.65 6 22.11
Infrastruktur Infrastructure
140 2,717.94 90 1,626.87 19 572.87 3 102.43 15 368.44 13 47.33 - -
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Kategori Pembangunan Projek
Project Category
Jumlah Bilangan Projek
Total Number of Projects
Jumlah Nilai Projek (RM j)
Total Project Value
(RM m)
Note : Figures are subject to change due to late notificationTotal may not necessarily add up due to rounding.
Baik Pulih Repair
Penyelenggaraan Maintenance
Jenis Kerja / Type of Work
Projek Baru New Project
Naik Taraf Upgrading
Ubah Suai Renovation
Pembesaran Expansion
Jadual 2.21 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Jenis Kerja Pada Mac 2014. Table 2.21 - Number and Value of Projects Awarded By Status of Contractors and Type of Work as of March 2014.
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
Bilangan Number
Nilai (RM j) Value (RM m)
2012 7,781 125,190.31 1,958 18,361.33 5,674 91,613.54 1 144.86 148 15,070.58
Projek Baru / New Project 6,145 113,819.11 1,118 12,828.64 4,919 86,419.04 1 144.86 107 14,426.57
Naik Taraf / Upgrading 533 3,234.64 313 2,130.97 215 989.56 - - 5 114.11
Pembesaran / Expansion 177 2,372.54 38 131.27 132 1,890.72 - - 7 350.55
Penyelenggaraan / Maintenance 334 2,771.61 266 2,107.55 66 650.07 - - 2 13.99
Baik Pulih / Repair 250 1,617.84 147 837.17 101 740.96 - - 2 39.71
Ubah Suai / Renovation 342 1,374.57 76 325.73 241 923.19 - - 25 125.65
2013 7,273 116,905.84 1,778 22,244.30 5,381 80,039.31 - - 114 14,622
Projek Baru / New Project 5,644 106,848.03 918 16,441.29 4,638 76,074.34 - - 88 14,332.40
Naik Taraf / Upgrading 571 4,261.62 358 3,289.96 211 818.66 - - 2 153.00
Pembesaran / Expansion 136 1,097.97 29 191.80 103 825.81 - - 4 80.36
Penyelenggaraan / Maintenance 277 1,618.92 165 982.29 109 621.87 - - 3 14.76
Baik Pulih / Repair 377 1,494.34 251 1,059.33 125 433.68 - - 1 1.33
Ubah Suai / Renovation 268 1,584.96 57 279.63 195 1,264.95 - - 16 40.38
2014 671 12,545.96 131 1,990.85 537 9,773.98 - - 3 781.13
Projek Baru / New Project 526 10,916.20 77 1,151.79 447 8,987.93 - - 2 776.48
Naik Taraf / Upgrading 48 717.06 24 481.24 24 235.82 - - - -
Pembesaran / Expansion 13 204.84 - - 13 204.84 - - - -
Penyelenggaraan / Maintenance 26 472.39 8 240.62 17 227.12 - - 1 4.65
Baik Pulih / Repair 28 118.31 15 85.82 13 32.49 - - - -
Ubah Suai / Renovation 30 117.16 7 31.38 23 85.78 - - - -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jenis Kerja Type of Work
Kontraktor Tempatan Local Contractors
Kontraktor Asing Foreign Contractors
Projek Swasta Private Project
Projek Kerajaan Government Projects
Projek Swasta Private Project
Projek Kerajaan Government Projects
Jumlah Bilangan Projek
Total Number of Projects
Jumlah Nilai Projek (RM j)
Total Project Value (RM m)
Note : Figures are subject to change due to late notificationJumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.