IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management...
Transcript of IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management...
![Page 1: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/1.jpg)
IVD Inspection Technical Updates
1 Copenhagen, Denmark 18-21 September 2017
![Page 2: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/2.jpg)
Inspections Overview
2 Copenhagen, Denmark 18-21 September 2017
![Page 3: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/3.jpg)
3 Copenhagen, Denmark 18-21 September 2017
• Stage 1 Inspection:
• Desktop review of QMS;
• Or onsite one day inspection ONLY if inspectors are in the region;
• Report provided to the company.
• Stage 2 Inspection
• Generally a 3 day inspection onsite;
• Lead Inspector and at least one other inspector (Technical expert or co-inspector);
• A draft report is left onsite at close of meeting, with a
detailed report sent to the manufacturer within 30 days.
Inspections Overview
![Page 4: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/4.jpg)
4 Copenhagen, Denmark 18-21 September 2017
• Harmonisation (with PQ Medicines/Vaccines/Vector Control
and MDSAP)
• Transparency (clarify rules and requirements)
• Adhering to set timelines (time to schedule, onsite and PQ
requirements).
• Current turn around time for the entire process is
• 350 - 270 days for full review
• 100 - 180 days for abridged
Objectives
![Page 5: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/5.jpg)
5 Copenhagen, Denmark 18-21 September 2017
• PQDx_014 Information for Manufacturers on the Inspection of
Manufacturing Site(s)
• ISO 13485:2003 and 2016 Medical Devices-Quality
management systems – Requirements for regulatory purposes
• ISO 14971:2007 Medical devices-Application of risk
management to medical devices
• IMDRF and GHTF Documents
Reference and Guidance documents
![Page 6: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/6.jpg)
6 Copenhagen, Denmark 18-21 September 2017
Assessment Types
![Page 7: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/7.jpg)
7 Copenhagen, Denmark 18-21 September 2017
Full Assessment
Dossier review Site inspection Laboratory evaluation
Dossier incomplete
PREQUALIFICATION DECISION
Dossier complete
Dossier screening
Priority product
Yes
No
Maintenance of PQ Status
![Page 8: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/8.jpg)
8 Copenhagen, Denmark 18-21 September 2017
Abridged procedure
Site inspection Laboratory evaluation
Priority product
Yes
No
Maintenance of PQ Status
PREQUALIFICATION DECISION
Review on-site
dossier aspects
![Page 9: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/9.jpg)
9 Copenhagen, Denmark 18-21 September 2017
• Fully implemented quality management system (design &
development, manufacturing including quality control, storage,
distribution)
• Risk management to meet ISO 14971:2007
• Product stable to meet "harsh" conditions (hot, wet, dry, dusty)
• Products undergoing prequalification must be in routine
manufacturing
• Sufficient capacity to ensure reliable delivery
Requirements for Inspection
![Page 10: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/10.jpg)
10 Copenhagen, Denmark 18-21 September 2017
• Fully implemented quality management system (design &
development, manufacturing including quality control, storage,
distribution)
• Meets ISO 13485:2003 requirements with the transition to 2016
version underway
• Competence of personnel
• Work environment (determined and established)
• Quality control processes follow risk management results, quality
control plan established, performance tested according to claims in
instruction for use
• Storage conditions, temperature and humidity, validated for
intermediates, components and kit, real time data required
Quality Management System
![Page 11: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/11.jpg)
11 Copenhagen, Denmark 18-21 September 2017
• Risk management to meet ISO 14971:2007
• Throughout product lifecycle
• Risk management for product realisation
(design, manufacturing, storage,
transportation), user and patient
• Risk management file
• Risk management plan
• Risk analysis
• Risk evaluation and control
• Residual risk acceptable?
Risk management
![Page 12: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/12.jpg)
12 Copenhagen, Denmark 18-21 September 2017
• Product stable to meet "harsh" conditions (hot, wet, dry, dusty)
• Transportation studies (simulate "worst" conditions)
• Long term stability at limiting conditions
• In-use stability studies (open vial)
• Data to support all claims available on-site
• Note: product labelling (component, kit and shipping box)
Product Stability
![Page 13: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/13.jpg)
13 Copenhagen, Denmark 18-21 September 2017
• Transfer from R&D to production completed
• Established and evaluated suppliers
• Validated processes (acceptance ranges determined, in-process controls established)
• Trained personnel (requirements determined, training plan, records)
• Standard batch sizes
• Established "out-of-specification" process
• Batch manufacturing records established (include all manufacturing information, full traceability of material and equipment)
Routine Manufacturing
![Page 14: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/14.jpg)
14 Copenhagen, Denmark 18-21 September 2017
Inspection Process
Stage 1
Plan
Stage 2
Inspection
2 rounds CAP
Ready for
Inspection
Compliant
(<7 level 4 NC)
(Seek techn.
assistance)
Recommendation for
PQ
No
Yes
Yes
No
Dossier Screening
Dossier Review
List of
questions
Compliant?
2 rounds CAP
Yes
No
No
No
Terminate
Yes
Terminate
![Page 15: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/15.jpg)
15 Copenhagen, Denmark 18-21 September 2017
• Application
• Dossier review (QM documentation part)
• Inspection Cycle:
• Evaluation of readiness for inspection (stage 1) • Desktop of additional documentation (Certificates, recent audit
reports, quality procedures, SOP, summary of sold product...)
• Stage 1 inspection (1 inspector day to inspect state of QMS implementation, facility, competence of staff, critical suppliers incl. outsourced activities, internal audit and management committment / review)
• Initial (Stage 2) Inspection
• Special inspection (confirm implementation of CAP); onsite inspection, if required
• Re-Inspection (risk based, after 3-5 years)
Onsite Inspection
![Page 16: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/16.jpg)
16 Copenhagen, Denmark 18-21 September 2017
Abridged Inspection
![Page 17: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/17.jpg)
17 Copenhagen, Denmark 18-21 September 2017
• Aim:
• To avoid duplication
• Reduce time
• Reduce cost
• When:
• If a stringently assessed regulatory version is submitted for
prequalification
• If a non-stringently assessed (rest of world) regulatory
version of the product is submitted for prequalification
assessment but a stringently assessed regulatory version
also exists (no difference between the two versions)
![Page 18: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/18.jpg)
18 Copenhagen, Denmark 18-21 September 2017
• Stringently Assessed
• Approved by a GHTF founding member regulatory authority and assessed at a level comparable to that required by WHO
• Competent Authorities from the Member States of the European Union • Directive 98/79/EC on in vitro diagnostic medical devices
• Associated Notified Bodies
• FDA
• Health Canada
• Japanese Ministry of Health, Labour and Welfare
• TGA
![Page 19: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/19.jpg)
19 Copenhagen, Denmark 18-21 September 2017
PQ Stage
Full assessment
Abridged assessment
Dossier review Yes No
Site inspection Full Inspection Abridged inspection (information
package requested)
Laboratory evaluation Yes Yes
Full and Abridged Inspections
![Page 20: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/20.jpg)
20 Copenhagen, Denmark 18-21 September 2017
• Less time spent on site
• Fewer inspectors (usually one inspector and one technical
expert)
Objectives of Abridged Inspections
![Page 21: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/21.jpg)
21 Copenhagen, Denmark 18-21 September 2017
Element Required documents
Quality
Management
System
Quality Manual
Staff organigram
Change control procedure
Complaint handling and vigilance procedure
Audit report of most recent regulatory inspection/audit
Current certificates
Product Labelling (IFU, component labels and box labels)
Photographs of kit, box including contents, kit components
and accessories
Manufacturing
Floor plan
Manufacturing flowchart including in/process control points
List of significant suppliers (including type of supply)
Outsources processes
Required information – Full and Abridged
Inspection
![Page 22: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/22.jpg)
22 Copenhagen, Denmark 18-21 September 2017
• Inspection team determined
• Communication with manufacturer (suitable inspection dates,
required documentation)
• Manufacturer to agree on the inspection team (Brief CVs
provided)
• Inspection plan provided one to two week prior to the
inspection
Inspection planning
![Page 23: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/23.jpg)
23 Copenhagen, Denmark 18-21 September 2017
• Opening meeting, end of day discussions, full transparency
• Open exchange of information between WHO and
Manufacturer throughout the entire process
• Inspection and tour of the site to review the manufacturing
process
• Manufacturing of the WHO product is required
• Accessibility to all requested documents and records
• Sampling process with risk based emphasis
• Review and confirmation of raw data related to the dossier
submission including all validations, stability studies and
performance data
The onsite Inspection
![Page 24: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/24.jpg)
24 Copenhagen, Denmark 18-21 September 2017
• Closing meeting to discuss any findings
• A list of findings is left onsite for the manufacturer to begin
CAPA preparation
• A report is issued within 30 days of the site inspection unless
otherwise informed.
• Grading of any nonconformities is independently reviewed
before the final report is released
End of Inspection
![Page 25: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/25.jpg)
25 Copenhagen, Denmark 18-21 September 2017
• Reports are complied by the lead inspector
• Approval and release of the report is by the WHO authorized
approver
Post Inspection
![Page 26: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/26.jpg)
26 Copenhagen, Denmark 18-21 September 2017
• Required to be submitted within 30 days of receipt of report
• Root cause analysis
• Correction
• Corrective action
• Timeline and responsible person/department
• Evaluation of the effective implementation of the
corrective action
• Two rounds of CAPA are allowed
Corrective action plan
![Page 27: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/27.jpg)
27 Copenhagen, Denmark 18-21 September 2017
• Based on the GHTF Model
GHTF/SG3/N19:2012
‘Quality management system – Medical devices – Nonconformity
Grading System for Regulatory Purposes and Information
Exchange’.
Grading nonconformities - Levels 1 to 5.
Grading of nonconformities
![Page 28: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/28.jpg)
28 Copenhagen, Denmark 18-21 September 2017
Grading is a two-step process:
Step 1: Grading matrix
The clauses of the ISO 13485 standard are divided into two categories
1. Indirect QMS impact: ‘ISO 13485:2003 clauses 4.1 – 6.3:
• enablers for the QMS processes to operate
• considered to have indirect influence on medical device safety and performance
Starts at Level 1.
2. Direct QMS impact: ‘ISO 13485:2003 clauses 6.4 – 8.5:
• direct influence on design and manufacturing controls
• have direct influence on medical device safety and performance.
Starts at level 3.
How the grading works
![Page 29: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/29.jpg)
29 Copenhagen, Denmark 18-21 September 2017
Step 2: Escalation Rules – raises NC up one level
• subsequent inspection - same finding
• absence of documented process
• nonconforming product on the market
e.g. a Level 3 nonconformity left uncorrected will
automatically be escalated to a Level 4 nonconformity at a
subsequent inspection.
Note: Fabrication of information / data is graded as Level 5
and the inspection can be terminated.
![Page 30: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/30.jpg)
30 Copenhagen, Denmark 18-21 September 2017
• If the following findings occur:
• One or more level 5 nonconformities or
• Seven or more level 4 nonconformities
• Result:
• Corrective action plan review
• Possible follow-up inspection
• Notice of Concern (NOC)
Determination of critically defective QMS
![Page 31: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/31.jpg)
31 Copenhagen, Denmark 18-21 September 2017
7
35
11
25
14
33
0
5
10
15
20
25
30
35
40
Number of inspection Number of products reviewed
2017
2016
2015
Inspection statistics
![Page 32: IVD Inspection Technical Updates• ISO 13485:2003 and 2016 Medical Devices-Quality management systems – Requirements for regulatory purposes • ISO 14971:2007 Medical devices-Application](https://reader035.fdocuments.net/reader035/viewer/2022071112/5fe7d64ddcff2f3f072ca5ed/html5/thumbnails/32.jpg)
Where to find information
32 Copenhagen, Denmark 18-21 September 2017
• Contact us by email
• Sign up for our mailing list
By emailing [email protected]
• Check our website
http://www.who.int/diagnostics_lab
oratory/evaluations/en/