IVBSS Program Overview and Accomplishments
Presented by:
Jim Sayer
UMTRIITS America 2007 Annual Meeting & Exposition
Palm Springs, CA
June 6, 2007
ITS America 2007 Annual Meeting June 6, 2007
2
The Team
ITS America 2007 Annual Meeting June 6, 2007
3
What is IVBSS FOT?
• UMTRI-led cooperative agreement with U.S. DOT– National Highway Traffic Safety Administration
(NHTSA) and Federal Motor Carrier Safety Administration (FMCSA)
• Develop integrated crash warning systems in light vehicles and heavy trucks
• 4-year, $31.6M program– $25M from U.S. DOT, $6.6M from project partners
ITS America 2007 Annual Meeting June 6, 2007
4
IVBSS Subsystems
• Forward crash warning– Address rear-end crashes
• Lateral drift warning– Address lane/road departure crashes
• Lane change/merge warning– Address lane change crashes
• Curve Speed Warning– Address road departures in curves
– Light vehicle platform only
ITS America 2007 Annual Meeting June 6, 2007
5
The Vehicles
• Two fleets of vehicles– 16 cars (Honda Accord EX)– 10 trucks (International 8600 Series)
ITS America 2007 Annual Meeting June 6, 2007
6
Program Vehicles and Timing
EngineeringDevelopment
Vehicles
Prototype Vehicles
Pilot Vehicles
Extended Pilot FOT
FOTData
Collection
Nov ‘05 Nov ‘06 Nov ‘07 April ’08 Aug ’08 Sept ‘09
Phase I Phase II
ITS America 2007 Annual Meeting June 6, 2007
7
The Integration Challenge
• IVBSS evaluates integration from a variety of perspectives:– Enhanced performance of any one subsystem– Enhanced safety with multiple threats– Benefits of a fully integrated driver-vehicle
interface– The role of the surrounding environment on a
driver’s decision to perform certain actions
ITS America 2007 Annual Meeting June 6, 2007
8
Value of the IVBSS FOT
• Evaluate driver assistance/warning systems– Objective data on system performance– Objective data on system utilization– Objective data on accident reduction potential– Subjective data on willingness to buy and use
• Fundamental data on driver/traffic behavior– With and without the systems– Ability to address a multitude of questions
ITS America 2007 Annual Meeting June 6, 2007
9
Summary of Progress
• Systems Engineering– Functional partitioning– System architectures developed– Interface control documentation– Functional requirements– System performance specification
IVB
SS
Sy
ste
m C
AN
Bu
s (5
00
K)
Driv
er
Fa
ce
Ca
me
ra
Sh
are
d
Ca
me
ras
La
tera
l Drift
Wa
rnin
g
(LD
W) M
od
ule
CM
OS
C
am
era
Ce
llula
rA
nte
nn
a
IVB
SS
Drive
r D
isplay
Yaw
Ra
te
Sen
so
r
Ine
rtial
Sen
so
rs
Fro
nt
Lo
ng
R
an
ge
GP
SA
nte
nn
aD
igita
l M
ap
Cu
rve
Sp
ee
d
Wa
rnin
g
(CS
W) M
od
ule
Ga
tew
ay
Da
ta
Ac
qu
isitio
n
Sy
ste
m (D
AS
) M
od
ule
Veh
icle
CA
N B
us
- Hig
h S
pe
ed
Veh
icle
CA
N B
us
- Lo
w S
pe
ed
(NI C
ha
ss
is)
(cR
IO)
(cR
IO)
FC
WA
rbD
VI
WarningEnabled
FC
W C
AN
Bu
s (5
00
K)
LC
M C
AN
Bu
s (5
00K
)
Haptic Controller
OE
M
Au
dio
S
ystem
AudioController
Right Side Vision Module
CM
OS
Ca
me
ra
Forward Vision Platform
Left Side Vision Module
CM
OS
Ca
me
ra
Sn
oo
ze
Vo
lum
e
Sen
sit-
Ivity
(2)
De
velopm
ent Veh
icle Arch
itecture
D. B
ezzina, M. G
abel
Re
v 2.7 De
cemb
er 5, 2006
Printed C
opies of T
his Docum
ent A
re Not C
ontro
lled
LC
M
Am
p
MP
3 P
layer
Sid
e
Mirro
r (Ico
ns)
CM
OS
C
am
era
S/R
R
ear
Left
Ba
ck
S/R
Re
ar R
igh
tB
ack
SA
M V
S/R
R
ear
Left
Sid
e
S/R
Re
ar R
igh
t S
ide
SA
M V
S/R
F
ron
tL
eftS
ide
S/R
Fro
nt
Rig
ht
Sid
e
SA
M VH
eadrest
Speakers
VS
A
ITS America 2007 Annual Meeting June 6, 2007
10
Summary of Progress
• Subsystem Development– Subsystem hardware purchases– Subsystem modeling– Concepts of operation– Build-up of development vehicles– Arbitration development
ITS America 2007 Annual Meeting June 6, 2007
11
Summary of Progress
• DVI Development– DVI prototype hardware development– Testing of tone characteristics– Significant simulator upgrades– Simulator testing
• Vehicle Integration– Six light vehicles being built– Mule vehicle and one tractor built
ITS America 2007 Annual Meeting June 6, 2007
12
Summary of Progress
• Verification Test Procedures– Collaboration with U.S. DOT/Volpe/NIST– Test procedures developed – Test plan generated – Simulations have been developed
• Phase 1 Testing– First trips to test tracks have taken place– Jury drives to take place soon
ITS America 2007 Annual Meeting June 6, 2007
13
Summary of Progress
• Data Acquisition System (DAS) – Prototype DASs built– Plans for FOT DASs under development– Data sharing network defined and being set-up
ITS America 2007 Annual Meeting June 6, 2007
Concluding Remarks
• Accomplishments to Date:– Extensive subsystems development– Prototype vehicle builds and system testing– Verification test procedures and preliminary testing– DVI testing and development
• Activities in 2007– Perform the verification testing– FOT planning– Jury drives and in-vehicle DVI evaluations