Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018
Project ManagementEIND 53062017_1
![Page 2: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/2.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018
OutlineInstructor: Associate Professor Anwar Abu-Zarifa (PhD)Office: New Administration Building, Department of Mechanical & Industrial EngineeringLecture: Sun, Tue 09:30 – 11:00 K517 (Male, 101)
Sun, Tue 12:30 – 14:00 I602 (Female, 201)Office Hrs.: (Sa, Mo, We)Email: [email protected]: Wysocki, Robert K., Effective Project Management, 5nd Edition, Wiley Publishing, 2009Grading:Midterm 30% Project 25%Final exam 45%
![Page 3: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/3.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 3
Introduction to project management, Definition and characteristics ofa project, Management Functions, Project management andsuccess-making factors, Project manager and his/her role.
Project Planning, Project planning and its functions, Why projectplanning, The stages of the project planning process, Projectbudgeting, Project organizing, structuring, and scheduling.
Project Monitoring, Evaluating, and Control, Project control, thecontrol cycle, Earned Value Technique.
Project Close-Out, System testing and start –up, Inspection, records. Microsoft Project Application. Human aspects, Motivation, time management, Communications.
Topics
![Page 4: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/4.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 4
Chapter 1 What Is a Project?
![Page 5: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/5.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 5
A project is a sequence of unique, complex, and connected activitieshaving one goal or purpose and that must be completed by a specific time, within budget, and according to specifications.
What is a Project?
- Effective Project Management , Wysocki
![Page 6: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/6.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 6
A project is a temporary endeavor undertaken to create a unique product, service, or result
-- Project Management Body of Knowledge (PMBOK), 2004
A project is a combination of human and nonhuman sources pulled together in a temporary organization to achieve a specified purpose.
-- Cleland and Kerzner, 1985
![Page 7: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/7.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 7
Projects Vary in Size and Scope• NASA shuttle launch• Building a boat• Building a hospital• Organizing the Olympic games• Developing a new software program• Getting a university degree
![Page 8: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/8.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 8
What is Project Management?
Project management is a set of principles and tools for
•Defining•Planning•Executing•Controlling•Completing a PROJECT
![Page 9: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/9.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 9
Why is Project Management Important?
• Organize your approach• Generate a credible schedule• Track progress and control your project• Identify where to focus your efforts • Identify problems early – before they are
crises• Saves you TIME….MONEY
![Page 10: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/10.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 10
• 66% of all IT projects fail, come in over budget or run past the original deadline
• Every year, $55 billion is wasted on failed IT projects in the U.S.
Fail15%
Over time or over budget
51%
Succeed34%
Source: Chaos Chronicles 2015, The Standish Group
continue
Only one in three software projects will turn out to be successful. According to Standish Group’s 2015 Chaos report, 66% of technology projects (based on the analysis of 50,000 projects worldwide) end in partial or total failure. More surprisingly, these statistics have been the same for the last five years, the report shows. Furthermore, 17% of large IT projects go so badly that they can threaten the very existence of a company.
![Page 11: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/11.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 11
Circa 530 kilometers cables are necessary for A380.The cables were (by the first design) only few centimeters short.This Deferens caused by Airbus a loss of 4,8 Billions Euro. Cause: incompatibility of Software(In Germany and Spain Catia V4, in France Catia V5)
CAD- Incompatibility causes by Airbus a loss of Billions
Managementfailure:
Project-Coordinationwas poor
![Page 12: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/12.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 12
Engineer activities
PM
Sale
HR, Manag.
Training, educationother
Design,Manufacturing,Evaluation
Research
![Page 13: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/13.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 13
• Projects are oriented towards a goal.• There is something unique about every
project.• Projects have a finite duration.• Projects require coordination of
interrelated activities.
Project Management Criteria
![Page 14: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/14.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 14
Project Characteristics• Defined goal• Primary sponsor or customer• Set of activities
– Unique, complex, sequenced• Start & finish
– Temporary, time frame for completion• Limited resources
– Dollars, people• Uncertainty, risk
![Page 15: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/15.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 15
Defining a Project• Sequence of Activities• Complex Activities• Connected Activities• One Goal• Specified Time• Within Budget• According to Specification
![Page 16: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/16.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 16
• Project management is a set of principles and tools for– Defining– Planning– Executing– Controlling . . . and – Completing a PROJECT
What is Project Management?
![Page 17: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/17.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 17
What is Project Management?
• PM is the application of knowledge, skills, tools and techniques to project activities in order to meet project requirements. (PMI)
• PM– is an art.– is a science.– has a set of tools and methods.
![Page 18: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/18.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 18
Three Disciplines
![Page 19: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/19.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 19
What Is a Program?
• A collection of projects• NASA
![Page 20: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/20.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 20
Scope Triangle
ScopeQuality
Cost Time
Resources
The Scope Triangle: Time, Cost, Resources
![Page 21: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/21.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 21
Project Creep (Wysocki)• Scope creep
– any change not in original plan– IT particularly prone to creep– major challenge for PMs
• Hope creep– will catch up next week..(The team members
“hope” they can catch up by the next report period or project team meeting to be back on schedule)
• Effort creep– 95-99% complete but never 100%– Feature creep
• team member adds features
![Page 22: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/22.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 22
Classification by Project CharacteristicsRiskBusiness ValueLengthComplexityTechnologyNumber of DepartmentsCost
![Page 23: IUGAZA PM 20171 CH1.pptsite.iugaza.edu.ps/aabuzarifa/files/IUGAZA-PM_20171_CH11.pdf · 2017. 9. 23. · Dr. Anwar Abu-Zarifa . Islamic University of Gaza . D epartment of Mechanical](https://reader035.fdocuments.net/reader035/viewer/2022071611/614ad7e812c9616cbc69ad9b/html5/thumbnails/23.jpg)
Dr. Anwar Abu-Zarifa . Islamic University of Gaza . Department of Mechanical & Industrial Engineering © 2017/2018 23
Classification by Project Type
SoftwareHardwareRecruiting & hiring