8/6/2019 ITS Test Document
1/17
International Turnkey Systems
Technical Test Document
Project/Application:
< CR 81772Cash Sales & Receipts layout >
Prepared For:
EMTS-Nigeria
Prepared By:< Telecom QC>
Version Number:
-
8/6/2019 ITS Test Document
2/17
Technical Test Document
Document Control
Change Record
Date Author Version Change Reference
06-02-2011
Rania Ramzy 1.0 Initial
Reviewers
Name Department / Position
Distribution
CopyNo.
Name Location
References
DocumentVersionNumber
Customer /Author Name
Document Name Comments
Contact PersonsWhom to contact in case of any clarification or questions
Name Mail Phone
Rania Ramzy [email protected]
ITS Confidential Page 2 of 17
-
8/6/2019 ITS Test Document
3/17
Technical Test DocumentTable of Contents
1 INTRODUCTION ............................................................................... 4
1.1 P URPOSE AND SCOPE ............................................................................................. 41.2 I NTENDED AUDIENCE .............................................................................................. 41.3 D EFINITIONS AND ACRONYMS.................................................................................... 4
2 TEST COVERAGE ............................................................................. 5
2.1 T EST MODULES AND ASSOCIATED REPORTS .................................................................... 52.2 T EST T YPES COVERED ............................................................................................ 52.3 C OMPLETION CRITERIA............................................................................................ 5
3 TEST DELIVERABLES ........................................................................ 6
4 RESOURCES REQUIRED .................................................................... 6
5 TECHNICAL TESTS ........................................................................... 7
5.1 P ROGRAM NAME: ARMPAAC P AYMENT ROUTINE ......................................................... 7 TEST CASE # 1: < Check that Report from ARMPAAC routine displayedsuccessfully> ................................................................................................... 7
< 1.1 B USINESS REQUIREMENTS > ................................................................................. 75.2 P ROGRAM NAME: ARMPACSC ASH SALE ROUTINE .................................................... 11
TEST CASE # 1: ............................................................................... 11
6 REVIEW AND APPROVAL OF TESTS .................................................. 16
7 TEST EXECUTION ........................................................................... 16
8 TEST RESULTS ............................................................................... 16
9 APPENDIX ..................................................................................... 17
ITS Confidential Page 3 of 17
-
8/6/2019 ITS Test Document
4/17
Technical Test Document
1 Introduction
1.1 Purpose and Scope
1.2 Intended Audience
1.3 Definitions and Acronyms
Sr. No Definitions Acronyms
1.
2.3.
ITS Confidential Page 4 of 17
-
8/6/2019 ITS Test Document
5/17
Technical Test Document
2 Test Coverage
2.1 Test Modules and Associated Reports This sub-section specifies details about files for each module / sub module,associated interfaces, and the related Tests.
Sr. File Names1.
2.
3.
4.
2.2 Test Types Covered This sub-section identifies the testing coverage that will be followed.
-
8/6/2019 ITS Test Document
6/17
Technical Test Document
3 Test Deliverables This sub-section identifies the Deliverables and the associated departments thatthese deliverables must be provided.
Sr. Deliverables To Whom(PL/PM/Quality/Customer)
1. TTD Quality, PM2. Code CMA3.
4 Resources Required The estimate of all the resources required to implement the integration testingshall be detailed in the project plan. The schedules for testing shall be specifiedin the Microsoft Project file for the Project.
ITS Confidential Page 6 of 17
-
8/6/2019 ITS Test Document
7/17
Technical Test Document
5 Technical Tests
5.1 Program Name: ARMPAAC Payment routine
ProgramNumber
Program Name/Type Version Number Version Date
ARMPAAC/FE
Processing Type Process Mode
_Online _Batch _Update _Insert _Query
TEST CASE # 1: < Check that Report from ARMPAAC routine displayed successfully>
Test Case Description Check that Report from ARMPAAC routine displayed successfully with correct amounts and layout
Test Case Pre-requisitesThere is receipt number generated from ARMPAAC routine
Requirement section inDesign < 1.1 Business Requirements >
Testing Steps
StepNo. Execution Steps Test Data Expected Result
PASS/FAIL
C1 C2 C3 C4 C5
ITS Confidential Page 7 of 17
-
8/6/2019 ITS Test Document
8/17
Technical Test Document
1.
Login to ORACLE forms Open ARMPAAC routine Query with CONTRNO
CONTRNO=1000008183
Contract Info retrieved successfully P
2. Navigate to Paymentstab page
Select any Receiptnumber
Press Print Receiptbutton
Receipt no=56120
Report displayed correctly with TABS standards F P
ITS Confidential Page 8 of 17
-
8/6/2019 ITS Test Document
9/17
Technical Test Document
3. Check that data onreport displayedcorrectly form tables::
select subno ,receiptno ,
logdate , a. contrno , name,
applied ,po_box ,id_type ,
b . currency currency2 ,MODEPAY , b . CHEQUE_NO ,b . CRCARDNO , b . CRCARD_EXPDATE , b . CRCARD_ISSUER , PAIDLOC ,BANK_BRANCH ,Building ,addrs_block ,street ,
a. region ,governate ,cheque_issuer ,
Data retrieved correctly from tables which is consistwith data displayed on report
P
ITS Confidential Page 9 of 17
-
8/6/2019 ITS Test Document
10/17
Technical Test Document
case when b . modepay in( 'CH' , 'CC' ) then b . note elsenull end ch_cc_holder ,logname , pay_deskfrom crm_departementa,
adm_log0009 bwhere a. contrno =b . contrno and b . contrno = '1000008183'
and ReceiptNo = 56120 ;
ITS Confidential Page 10 of 17
-
8/6/2019 ITS Test Document
11/17
Technical Test Document
5.2 Program Name: ARMPACSCash Sale routine
ProgramNumber
Program Name/Type Version Number Version Date
ARMPACS/FE
Processing Type Process Mode
_Online _Batch _Update _Insert _Query
TEST CASE # 1:
Testing Steps
StepNo. Execution Steps Test Data Expected Result
PASS/FAIL
C1 C2 C3 C4 C5
ITS Confidential Page 11 of 17
-
8/6/2019 ITS Test Document
12/17
Technical Test Document
1.
Login to ORACLE forms Open ARMPACS routine Enter the CONTRNO Select the Service Code Enter Payment Mode Press Save button to
complete the
transaction
CONTRNO=1000008181
Transaction completed successfully and reportdisplayed automatically
P
2. Check that report openedsuccessfully
Report displayed correctly with TABS standards. P
ITS Confidential Page 12 of 17
-
8/6/2019 ITS Test Document
13/17
Technical Test Document
3. Check that data onreport displayedcorrectly form tables::
Data appear in report is correct data as appear indata base
P
ITS Confidential Page 13 of 17
-
8/6/2019 ITS Test Document
14/17
Technical Test Document
ITS Confidential Page 14 of 17
-
8/6/2019 ITS Test Document
15/17
Technical Test Document*: P - Expected and observed behavior is same. F - Expected and observed behavior is different. This is classified as a defect. C1|C2|C3|C4|C5 Test CyclesNote:
1. Please make replicas of the above table for each test case2. Test case numbers are to be unique irrespective of programs
ITS Confidential Page 15 of 17
-
8/6/2019 ITS Test Document
16/17
Technical Test Document
6 Review and Approval of Tests Test Cases Review and Approval (to be done before testing starts):
Prepared By/Date: Reviewed By/Date: Approved By/Date:
7 Test Execution
All Test Cases have been executed (Y/N)
All defects have been closed (Y/N)
Any other comments:< any comment should be added >
Test ExecutionReviewedBy/Date:
Test ExecutionApprovedBy/Date:
8 Test ResultsTC
NO.
Status Error Description No of Testcycles
Comments
1. < >
2. < >
3.
4.
ITS Confidential Page 16 of 17
-
8/6/2019 ITS Test Document
17/17
Technical Test Document
9 Appendix
ITS Confidential Page 17 of 17