ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

26
ITS Procurement Workshop ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges

Transcript of ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

Page 1: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

ITS Procurement Workshop

Module 2: ITS Procurement Characteristics and Challenges

Page 2: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Horror Stories

• “Burying the Software Contractor”• “A Risky Proposition”

Page 3: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

“Burying the Software Contractor”

• VDOT disaster – project folded• WSDOT – one year late, $$$$ lost

Page 4: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

“A Risky Proposition”

• Project delayed 6 months.

• ITS Division got a black eye in the view of the Commissioner

• System Integrator bore all costs of testing.

• System Integrator went out of business.

Page 5: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Horror Stories:Lessons Learned

• Don’t “bury” your software developer!

• Select software developer based on qualifications.

• Don’t shift all the risk to a system integrator.

Page 6: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Workshop Terminology

• Acquisition• Procurement• Work Structure• Method of Award• Contract Type

Page 7: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Workshop Terminology

• Acquisition– Comprises the complete cycle from

concept to installation and (sometimes) maintenance and operations.

• Procurement– A step in acquisition. Includes the

work and contract “structures”, contractor selection and payment structure.

Page 8: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Workshop Terminology

• Work Structure– How is the work allocated to

contracts. Are multiple contracts used?

• Method of Award– How the contractor is selected.

• Qualifications, cost, combined qualifications and cost.

Page 9: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Workshop Terminology

• Contract Type – How the contractor is paid.

• Fixed Price, Cost Reimbursement, Incentive

Page 10: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Federal Contract Terminology

• “… the supervising, inspecting, actual building, and all expenses incidental to the construction or reconstruction of a highway...”

Construction

Page 11: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Engineering and Design Services

• “planning, preparation of detailed design, specifications, and cost estimates”

Federal Contract Terminology

Page 12: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

• Allows states to use their own processes to procure projects that are NOT defined as construction under federal rules.

Common Rule

Federal Contract Terminology

Page 13: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

• “Special Experimental Project 14” - encourages and solicits innovative procurement and project delivery practices of all types

SEP 14

Federal Contract Terminology

Page 14: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Procuring ITS Projects

• FHWA determined that many ITS projects are not considered Construction (10-6-99 Memo)

• If it is not Construction, then method of contract award does not have to be low-bid

Page 15: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Terminology Review

• Acquisition• Procurement• Work Structure• Method of Award• Contract Type

• Legal Framework– Construction– Engineering and

Design Services– Common Rule– SEP 14

Page 16: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Exercise 1: Traditional Vs. ITS Projects

• Maturity of the Technology• Design Criteria• How Described• Design Life• Client vs. Vendor Knowledge• Progress Visibility• Procurement Process

Page 17: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Lessons Learned

• ITS is different from traditional projects.

• Different nature implies a different approach to:– project management– procurement

Page 18: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Exercise 2

If Architects Had to Work like Programmers

Page 19: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Architects as Programmers

• Part 1 Discussion– Can you identify any missing

requirements?– Is there enough information to correct

deficiencies of the existing house?– What are the main functions for the

new house?

Page 20: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Architects as Programmers

• Part 2 Discussion– What are the implications to

designing for the 1952 Gibson refrigerator?

– How could siding specification (aluminum, vinyl, composite) be improved?

– Who makes decisions on design?

Page 21: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Review Questions

• Given that the specifications for this house are problematic, how should the contractor and client work together?

• Should this be a low bid selection?• How would this affect

procurement?

Page 22: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

What’s The Point?

• We would never try to design a house like this. But this is how we have been procuring ITS.

• And, you cannot specify ITS as readily as you can a house.

Page 23: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Lessons Learned

• It is difficult to describe things completely using words - there are often things missing, misinterpretations and conflicts.

• Need a process that allows iterative approach to complex requirements development. More iterative than traditional approach - why?

Page 24: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Virginia DOT-Video

Page 25: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Virginia DOT-Lessons Learned

• One impetus for change is FAILURE• Definition of a “construction”

project– Wireless construction– Fiber = construction

• Separate the ITS Work• Look at other department’s or

agency’s IT procurement process

Page 26: ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.

ITS Procurement Workshop

Break - 15 Minutes