8/18/2019 ITP for Electrical Conduit Installation.revb
1/3
20.Jan.2012 V.H.PHONG J.Y.JEONG K.J.LIM
07.Dec.2011 V.H.PHONG J.Y.JEONG K.J.LIM
Date Drawn Checked Approved
Owner :
Owner's Engineer :
Contractor :
For Information
A For Information
AES-VCM MONG DUONG
POWER COMPANY LIMITED
Rev. Details of Revision
B
oosan Heavy Industries
Vietnam
Dung Quat Economic Zone,
Binh Thuan, Binh Son, Quang Ngai,
Vietnam
T +84 55 5618 900
F +84 553 618 950
http://www.aes.com/aes/index?page=home
-
8/18/2019 ITP for Electrical Conduit Installation.revb
2/3
Rev. B
2 of 3
This note is only applicable for AES-VCM Mong Duong
Detailed Legend
S : Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong
except for the first or last operation on the basis of each process. AES-VCM Mong Duong
could check the operation, if he is present at the site during the inspection by Doosan.
R : Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document
attesting to the satisfactory performance of the related test or inspection for review by
AES-VCM Mong Duong.
W : Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to
decide whether they will attend such inspection or not.
H : Hold Point / Downstream construction and other activities shall not proceed
T10206-QE01-P0ZEN__-040201
DOOSAN
AES-VCMITP for Electrical Conduit Installation
Doc. No.
Contractor
http://www.aes.com/aes/index?page=homehttp://www.aes.com/aes/index?page=home
-
8/18/2019 ITP for Electrical Conduit Installation.revb
3/3
Doc. No.
Contractor
A Sign A Sign A Sign
H W R
H S S
H W W
H W W
Abbreviation : S: Surveillance R: Report Review W: Witness Inspection H: Hold Inspection
Note : All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications
3.0 Steel conduit installation Construction Drawing Inspection Sheet
ITP for Electrical conduit installation
DOOSAN AES-VCM Remarks
AES-VCM
T10206-QE01-P0ZEN__-040201
Quality RecordProject Specification
Construction Drawing
Rev. B
DOOSAN Page 3
Verification Document
Inspection Sheet
Construction Drawing
PVC installation for Duct Bank ( before pouring concrete)
1.0
KKS Description
4.0
Material Approval
Verify installed location
Applicable Code &
Standard Documentation
Inspection & Test Activities
SubcontractorOper. No.Item Name
2.0
Inspection Process
page3