ITP for Electrical Conduit Installation.revb

download ITP for Electrical Conduit Installation.revb

of 3

Transcript of ITP for Electrical Conduit Installation.revb

  • 8/18/2019 ITP for Electrical Conduit Installation.revb

    1/3

    20.Jan.2012 V.H.PHONG J.Y.JEONG K.J.LIM

    07.Dec.2011 V.H.PHONG J.Y.JEONG K.J.LIM

    Date Drawn Checked Approved

    Owner :

    Owner's Engineer :

    Contractor :

    For Information

     A For Information

      AES-VCM MONG DUONG

    POWER COMPANY LIMITED

    Rev. Details of Revision

    B

      oosan Heavy Industries

    Vietnam

    Dung Quat Economic Zone,

    Binh Thuan, Binh Son, Quang Ngai,

    Vietnam

    T +84 55 5618 900

    F +84 553 618 950

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 ITP for Electrical Conduit Installation.revb

    2/3

    Rev. B

    2 of 3

    This note is only applicable for AES-VCM Mong Duong

    Detailed Legend

    S : Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong

    except for the first or last operation on the basis of each process. AES-VCM Mong Duong

    could check the operation, if he is present at the site during the inspection by Doosan.

    R  : Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document

    attesting to the satisfactory performance of the related test or inspection for review by

     AES-VCM Mong Duong.

    W : Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to

    decide whether they will attend such inspection or not.

    H : Hold Point / Downstream construction and other activities shall not proceed

    T10206-QE01-P0ZEN__-040201

    DOOSAN

    AES-VCMITP for Electrical Conduit Installation

    Doc. No.

    Contractor 

    http://www.aes.com/aes/index?page=homehttp://www.aes.com/aes/index?page=home

  • 8/18/2019 ITP for Electrical Conduit Installation.revb

    3/3

    Doc. No.

    Contractor 

    A Sign A Sign A Sign

    H W R

    H S S

    H W W

    H W W

    Abbreviation : S: Surveillance R: Report Review W: Witness Inspection H: Hold Inspection

    Note :  All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications

    3.0 Steel conduit installation Construction Drawing Inspection Sheet

    ITP for Electrical conduit installation

    DOOSAN AES-VCM Remarks

    AES-VCM

    T10206-QE01-P0ZEN__-040201

    Quality RecordProject Specification

    Construction Drawing

    Rev. B

    DOOSAN Page 3

    Verification Document

    Inspection Sheet

    Construction Drawing

    PVC installation for Duct Bank ( before pouring concrete)

    1.0

    KKS Description

    4.0

    Material Approval

    Verify installed location

    Applicable Code &

    Standard Documentation

    Inspection & Test Activities

    SubcontractorOper. No.Item Name

    2.0

    Inspection Process

    page3