    Project : ITCC APPARTMENTS

    Subject : BMS I nput / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel

    AI DI AO DO

    Plumbing & Fire Protection

    Combined Potable Water & Fire Water Tanks

    1 Tank Low Level 1 From Tank Float Switch

    2 Tank High Level 1 From Tank Float Switch

    3 Motorized valve feedback 1 From the valve

    4 Main water Tank Incoming Water Flow [Water Meter] 1 Flow Meter

    5 Motorized valve control 1 Relay Output From BMS

    6 Tank water volume reading 1 Relay Output From BMS

    7 Tank Level (%) Monitor 1 (4-20)mA from the Level Indicator

    Total per Unit 3 3 0 1

    Total for all Units 6 6 0 2

    Total Combined Potable water and Fire Water Tanks Points

    Grey Water Tanks

    1 Tank Low Level 1 From Tank Float Switch2 Tank High Level 1 From Tank Float Switch

    3 Potable Make-up Incoming Water Flow 1 Solenoid valve

    4 Influent Dirt Interceptor SHOCKED Alarm 1 Float Switch

    5 Tank water volume reading 1 Relay Output From BMS

    6 Tank Level (%) Monitor 1 (4-20)mA from the Level Indicator

    Total per Unit 3 3 0 0

    Total for all Units 12 12 0 0

    Total Grey Water Tanks Points

    Underground Fountain Water Tank No. 1 for Fountains Nos. 1 & 2

    1 Tank Quick Fill Level 1 From Tank Float Switch

    2 Tank Running Level 1 From Tank Float Switch

    3 Tank Safe Off Level 1 From Tank Float Switch

    4 Motorized valve feedback 1 From the valve

    5 Main water Tank Incoming Water Flow [Water Meter] 1 Flow Meter

    6 Motorized valve control 1 Relay Output From BMS

    7 Tank water volume reading 1 Relay Output From BMS

    8 Tank Level (%) Monitor 1 (4-20)mA from the Level Indicator Total per Unit 3 4 0 1

    Total for all Units 3 4 0 1

    Total Underground Fountain Water Tanks No. 1 Points

    4

    24

    8

    2

    RemarksBACnet

    Network

    Thermostat

    1

    Software

    IntegrationItem Point DescriptionQty.

    14

    Required Points OPCClient

    1 of 9

  • 7/27/2019 Itcc Cluster Bms Io Pg

    2/9

    Project : ITCC APPARTMENTS

    Subject : BMS Input / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel

    AI DI AO DORemarks

    BACnet

    Network

    Thermostat

    Software

    IntegrationItem Point DescriptionQty.

    Required Points OPCClient

    Sump Pumps-SP1 [1-Duty & 1-Standby] - 4 Lift Sta.

    1 Pump on/off Status 2 From Pump Control Panel

    2 Pump Trip Status 1 From Pump Control Panel

    3 Pressure in the Common Discharge Header 1 Liquid Pressure Sensor

    4 Pump Auto / Manual Status 1 From Pump Control Panel

    5 Sump High & Low Level 2 From Tank Float Switch

    Total per Unit 1 6 0 0

    Total for all Units 4 48 0 0

    Total Sump Pumps Points

    Sump Pumps-SP2 [1-Duty & 1-Standby] - 14 Lift Sta.

    1 Pump on/off Status 2 From Pump Control Panel

    2 Pump Trip Status 1 From Pump Control Panel

    3 Pressure in the Common Discharge Header 1 Liquid Pressure Sensor

    4 Pump Auto / Manual Status 1 From Pump Control Panel

    5 Sump High & Low Level 2 From Tank Float Switch

    Total per Unit 1 6 0 0

    Total for all Units 14 168 0 0

    Total Sump Pumps Points 182

    52

    8

    28

    2 of 9

  • 7/27/2019 Itcc Cluster Bms Io Pg

    3/9

    Project : ITCC APPARTMENTS

    Subject : BMS I nput / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel

    AI DI AO DORemarks

    BACnet

    Network

    Thermostat

    Software

    IntegrationItem Point DescriptionQty.

    Required Points OPCClient

    Diesel Fuel Transfer Pumps + Bulk Storage Tank [1-Submersible Pump Duty & 1-Manual Pump Standby] -5 sets

    1 Pump On/Off Status 1 From Pump Control Panel

    2 Fuel flow status 1 Flow switch

    3 Pump Trip Alarm 1 From Pump Control Panel

    4 Pump Auto / Manual Status 1 From Pump Control Panel

    5 Pump Start/stop command 1 Relay Output From BMS

    6 Discharge header pressure switch 1 Liquid pressure switch

    7 Discharge header pressure 1 Liquid pressure sensor

    8 Pump motor temperature high 1 From Pump Control Panel

    9 Bulk Storage Tank Fuel Level 1 From Pump Control Panel

    10 Bulk Storage Tank Low Level Alarm 1 From Pump Control Panel

    Total per Unit 2 7 0 1

    Total for all Units 10 35 0 5

    Odor Control Unit, Chlorination Unit & Coloring Dye Unit of Grey Water Treatment Plant (1 unit each plant x 4 nos. plants)

    1 Dosing Pump On/Off Status 1 From Grey Water Treatment Plant Panel

    2 Chemical flow status 1 Flow switch

    3 Dosing Pump Trip Alarm 1 From Grey Water Treatment Plant Panel

    4 Dosing Pump Auto / Manual Status 1 From Grey Water Treatment Plant Panel

    5 Dosing Pump Start/stop command 1 Relay Output From BMS

    6 Chemical Tank Level 1 From Grey Water Treatment Plant Panel

    7 Chemical Tank Low Level Alarm 1 From Grey Water Treatment Plant Panel

    TOTAL 0 6 0 1Total Odor Control, Chlorination, Coloring Dye Units Points 0 72 0 12

    Total Odor, Chlorination, Coloring Dye Units Points

    Air Purification Unit (Aerator) - 2 no. each Grey Water Treatment Plant

    1 Aerator On/Off /Fault Status 3 From Grey Water Treatment Plant Panel

    TOTAL 0 3 0 0

    Total Aerator Unit Points 0 24 0 0

    Total Aerator Unit Points

    Chlorination Unit, PH Control Unit & Sanitizer Unit of Fountains [1 unit each for 2 fountain system]

    1 Dosing Pump On/Off Status 1 From Fountain Control Panel

    8

    24

    12

    5

    50

    84

    3 of 9

  • 7/27/2019 Itcc Cluster Bms Io Pg

    4/9

    Project : ITCC APPARTMENTS

    Subject : BMS I nput / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel

    AI DI AO DORemarks

    BACnet

    Network

    Thermostat

    Software

    IntegrationItem Point DescriptionQty.

    Required Points OPCClient

    2 Chemical flow status 1 Flow switch

    3 Dosing Pump Trip Alarm 1 From Fountain Control Panel

    4 Dosing Pump Auto / Manual Status 1 From Fountain Control Panel

    5 Dosing Pump Start/stop command 1 Relay Output From BMS

    6 Chemical Tank Level 1 From Fountain Control Panel

    7 Chemical Tank Low Level Alarm 1 From Fountain Control Panel

    TOTAL 0 6 0 1

    Total Odor Control Unit Points 0 36 0 6

    Total Odor Control Unit Points

    Potable water pumps-DP-1 [2-Duty&1-Standby]- 4 sets

    1 Pump On/Off Status 1 VFC From Pump Control Panel

    2 Water flow status 1 Flow switch

    3 Pump Trip Alarm 1 VFC From Pump Control Panel

    4 Pump Auto / Manual Status 1 VFC From Pump Control Panel5 Pump Start/stop command 1 Relay Output From BMS

    6 Discharge header pressure switch 1 Liquid pressure switch

    7 Discharge header pressure 1 Liquid pressure sensor

    8 Pump motor temperature high 1 From Pump Control Panel

    TOTAL 2 5 0 1

    Total Potable Water Pumps Points 8 60 0 12

    Total Potable Water Pumps Points

    Non-Potable water pumps-DP-1 [2-Duty&1-Standby]- 4 sets1 Pump On/Off Status 1 VFC From Pump Control Panel

    2 Water flow status 1 Flow switch

    3 Pump Trip Alarm 1 VFC From Pump Control Panel

    4 Pump Auto / Manual Status 1 VFC From Pump Control Panel

    5 Pump Start/stop command 1 Relay Output From BMS

    6 Discharge header pressure switch 1 Liquid pressure switch

    7 Discharge header pressure 1 Liquid pressure sensor

    8 Pump motor temperature high 1 From Pump Control Panel

    TOTAL 2 5 0 1Total Non-Potable Water Pumps Points 8 60 0 12

    Total Non-Potable Water Pumps Points

    12

    80

    6

    42

    12

    80

    4 of 9

  • 7/27/2019 Itcc Cluster Bms Io Pg

    5/9

    Project : ITCC APPARTMENTS

    Subject : BMS I nput / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel

    AI DI AO DORemarks

    BACnet

    Network

    Thermostat

    Software

    IntegrationItem Point DescriptionQty.

    Required Points OPCClient

    Fountain No. 1 - Pumps [F1A & F1B]

    1 Pump On/Off Status 1 From Pump Control Panel

    2 Water flow status 1 Flow switch

    3 Pump Trip Alarm 1 From Pump Control Panel

    4 Pump Auto / Manual Status 1 From Pump Control Panel

    5 Pump Start/stop command 1 Relay Output From BMS

    6 Discharge header pressure switch 1 Liquid pressure switch

    7 Discharge header pressure 1 Liquid pressure sensor

    8 Pump motor temperature high 1 From Pump Control Panel

    TOTAL 2 5 0 1

    Total Fountain No. 1- Water Pumps Points 4 10 0 2

    Total Fountain No. 1- Water Pumps Points

    Fountain No. 3 - Pumps [F3A & F3C]

    1 Pump On/Off Status 1 From Pump Control Panel

    2 Water flow status 1 Flow switch

    3 Pump Trip Alarm 1 From Pump Control Panel

    4 Pump Auto / Manual Status 1 From Pump Control Panel

    5 Pump Start/stop command 1 Relay Output From BMS

    6 Discharge header pressure switch 1 Liquid pressure switch

    7 Discharge header pressure 1 Liquid pressure sensor

    8 Pump motor temperature high 1 From Pump Control Panel

    TOTAL 2 5 0 1

    16

    2

    2

    5 of 9

  • 7/27/2019 Itcc Cluster Bms Io Pg

    6/9

    Project : ITCC APPARTMENTS

    Subject : BMS I nput / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel

    AI DI AO DORemarks

    BACnet

    Network

    Thermostat

    Software

    IntegrationItem Point DescriptionQty.

    Required Points OPCClient

    Total Fountain No. 3- Water Pumps Points 4 10 0 2

    Total Fountain No. 3- Water Pumps Points

    Filter Pumps for Potable Water Filter, [2-pumps x 4 nos. Filters]

    1 Pump On/Off Status 1 From Pump Control Panel

    2 Water flow status 1 Flow switch

    3 Pump Trip Alarm 1 From Pump Control Panel

    4 Pump Auto / Manual Status 1 From Pump Control Panel

    5 Pump Start/stop command 1 Relay Output From BMS

    6 Discharge header pressure switch 1 Liquid pressure switch

    7 Pump motor temperature high 1 From Pump Control Panel

    TOTAL 4 5 0 1

    Total Filter Pumps for Potable WaterFilters -Points 32 40 0 8

    Total Filter Pumps for Potable Water Filters -Points

    Filter Pumps for Grey Water Treatment Plant, [2-pumps x 4sets]

    1 Pump On/Off Status 1 From Pump Control Panel

    2 Water flow status 1 Flow switch

    3 Pump Trip Alarm 1 From Pump Control Panel

    4 Pump Auto / Manual Status 1 From Pump Control Panel

    5 Pump Start/stop command 1 Relay Output From BMS

    6 Discharge header pressure switch 1 Liquid pressure switch

    7 Pump motor temperature high 1 From Pump Control Panel

    TOTAL 1 5 0 1Total Filter Pumps for Grey Water Treatment Plant -Points 4 40 0 8

    Total Filter Pumps for Grey Water Treatment Plant -Points

    Filter Pumps for Fountains No. 1 & 2 ,[1-Duty & 1-Standby]

    1 Pump On/Off Status 1 From Pump Control Panel

    2 Water flow status 1 Flow switch

    3 Pump Trip Alarm 1 From Pump Control Panel

    4 Pump Auto / Manual Status 1 From Pump Control Panel

    5 Pump Start/stop command 1 Relay Output From BMS6 Discharge header pressure switch 1 Liquid pressure switch

    7 Pump motor temperature high 1 From Pump Control Panel

    TOTAL 1 5 0 1

    8

    80

    8

    52

    2

    16

    6 of 9

  • 7/27/2019 Itcc Cluster Bms Io Pg

    7/9

  • 7/27/2019 Itcc Cluster Bms Io Pg

    8/9

    Project : ITCC APPARTMENTS

    Subject : BMS I nput / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel

    AI DI AO DORemarks

    BACnet

    Network

    Thermostat

    Software

    IntegrationItem Point DescriptionQty.

    Required Points OPCClient

    Sand Filters for Fountain No. 3

    1 High D P of Sand Filters 1 DP Differential Pressure Switch from Fountain

    Control Panel

    TOTAL 1 0 0 0

    Total Sand Filter for Fountain No. 3 -Points 1 0 0 0

    Total Sand Filter for Fountain No. 3-Points

    Fountain Basins for Fountains Nos. 1, 2 & 3

    1 Fountain Basin Level (%) Monitor 1 (4-20)mA from the Level Indicator

    2 Fountain Basin Low Level 1 From Basin Float Switch

    TOTAL 1 1 0 0

    Total Fountain Basin for Fountains Nos. 1,2 &3- Points 12 12 0 0

    Total Fountain Basins for Fountains Nos. 1,2&3 - Points

    Electric Water Heaters [EWH]

    1 EWH On/Off Status 1 From Building Local Control Panel

    TOTAL 0 1 0 0

    Total Electric Water Heaters -Points 0 58 0 0

    Total Electric Water Heaters -Points

    Diesel Driven Fire pumps

    1 Pump On/Off Status 1 From Diesel Pump Control Panel

    2 Water flow status 1 Flow switch

    3 Pump Trip Alarm 1 From Diesel Pump Control Panel

    4 Pump Auto / Manual Status 1 From Diesel Pump Control Panel

    5 Pump Start/stop command 1 Relay Output From BMS

    6 Low diesel tank level 1 Level switch

    7 Low charge batteries 1 From Diesel Pump Control Panel

    8 Low pressure discharge switch 1 Liquid pressure switch

    9 Low pressure switch 1 Liquid pressure switch

    TOTAL 8 1

    Total Diesel Driven Fire Pumps Points 0 8 0 1

    Total Diesel Driven Fire Pumps Points

    1

    12

    1

    58

    9

    24

    1

    58

    8 of 9

  • 7/27/2019 Itcc Cluster Bms Io Pg

    9/9

    Project : ITCC APPARTMENTS

    Subject : BMS Input / Output List - Plumbing & Fir e Protection Note: Fire Protection Control with Fire Alarm Panel

    AI DI AO DORemarks

    BACnet

    Network

    Thermostat

    Software

    IntegrationItem Point DescriptionQty.

    Required Points OPCClient

    Electric Fire pumps (Electric Driven Fire Pump & Jockey Pump)

    1 Pump On/Off Status 1 From Pump Control Panel

    2 Water flow status 1 Flow switch

    3 Pump Trip Alarm 1 From Pump Control Panel

    4 Pump Auto / Manual Status 1 From Pump Control Panel

    5 Pump Start/stop command 1 Relay Output From BMS

    6 Pump motor temperature high 1 From Pump Control Panel

    7 Low pressure discharge switch 1 Liquid pressure switch

    8 Low pressure switch 1 Liquid pressure switch

    TOTAL 1 6 1

    Total Eelctric Driven Fire Pumps Points 2 12 0 2

    Total Electric Driven Fire Pumps Points

    2

    16

    9 of 9