Project : ITCC APPARTMENTS
Subject : BMS I nput / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel
AI DI AO DO
Plumbing & Fire Protection
Combined Potable Water & Fire Water Tanks
1 Tank Low Level 1 From Tank Float Switch
2 Tank High Level 1 From Tank Float Switch
3 Motorized valve feedback 1 From the valve
4 Main water Tank Incoming Water Flow [Water Meter] 1 Flow Meter
5 Motorized valve control 1 Relay Output From BMS
6 Tank water volume reading 1 Relay Output From BMS
7 Tank Level (%) Monitor 1 (4-20)mA from the Level Indicator
Total per Unit 3 3 0 1
Total for all Units 6 6 0 2
Total Combined Potable water and Fire Water Tanks Points
Grey Water Tanks
1 Tank Low Level 1 From Tank Float Switch2 Tank High Level 1 From Tank Float Switch
3 Potable Make-up Incoming Water Flow 1 Solenoid valve
4 Influent Dirt Interceptor SHOCKED Alarm 1 Float Switch
5 Tank water volume reading 1 Relay Output From BMS
6 Tank Level (%) Monitor 1 (4-20)mA from the Level Indicator
Total per Unit 3 3 0 0
Total for all Units 12 12 0 0
Total Grey Water Tanks Points
Underground Fountain Water Tank No. 1 for Fountains Nos. 1 & 2
1 Tank Quick Fill Level 1 From Tank Float Switch
2 Tank Running Level 1 From Tank Float Switch
3 Tank Safe Off Level 1 From Tank Float Switch
4 Motorized valve feedback 1 From the valve
5 Main water Tank Incoming Water Flow [Water Meter] 1 Flow Meter
6 Motorized valve control 1 Relay Output From BMS
7 Tank water volume reading 1 Relay Output From BMS
8 Tank Level (%) Monitor 1 (4-20)mA from the Level Indicator Total per Unit 3 4 0 1
Total for all Units 3 4 0 1
Total Underground Fountain Water Tanks No. 1 Points
4
24
8
2
RemarksBACnet
Network
Thermostat
1
Software
IntegrationItem Point DescriptionQty.
14
Required Points OPCClient
1 of 9
-
7/27/2019 Itcc Cluster Bms Io Pg
2/9
Project : ITCC APPARTMENTS
Subject : BMS Input / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel
AI DI AO DORemarks
BACnet
Network
Thermostat
Software
IntegrationItem Point DescriptionQty.
Required Points OPCClient
Sump Pumps-SP1 [1-Duty & 1-Standby] - 4 Lift Sta.
1 Pump on/off Status 2 From Pump Control Panel
2 Pump Trip Status 1 From Pump Control Panel
3 Pressure in the Common Discharge Header 1 Liquid Pressure Sensor
4 Pump Auto / Manual Status 1 From Pump Control Panel
5 Sump High & Low Level 2 From Tank Float Switch
Total per Unit 1 6 0 0
Total for all Units 4 48 0 0
Total Sump Pumps Points
Sump Pumps-SP2 [1-Duty & 1-Standby] - 14 Lift Sta.
1 Pump on/off Status 2 From Pump Control Panel
2 Pump Trip Status 1 From Pump Control Panel
3 Pressure in the Common Discharge Header 1 Liquid Pressure Sensor
4 Pump Auto / Manual Status 1 From Pump Control Panel
5 Sump High & Low Level 2 From Tank Float Switch
Total per Unit 1 6 0 0
Total for all Units 14 168 0 0
Total Sump Pumps Points 182
52
8
28
2 of 9
-
7/27/2019 Itcc Cluster Bms Io Pg
3/9
Project : ITCC APPARTMENTS
Subject : BMS I nput / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel
AI DI AO DORemarks
BACnet
Network
Thermostat
Software
IntegrationItem Point DescriptionQty.
Required Points OPCClient
Diesel Fuel Transfer Pumps + Bulk Storage Tank [1-Submersible Pump Duty & 1-Manual Pump Standby] -5 sets
1 Pump On/Off Status 1 From Pump Control Panel
2 Fuel flow status 1 Flow switch
3 Pump Trip Alarm 1 From Pump Control Panel
4 Pump Auto / Manual Status 1 From Pump Control Panel
5 Pump Start/stop command 1 Relay Output From BMS
6 Discharge header pressure switch 1 Liquid pressure switch
7 Discharge header pressure 1 Liquid pressure sensor
8 Pump motor temperature high 1 From Pump Control Panel
9 Bulk Storage Tank Fuel Level 1 From Pump Control Panel
10 Bulk Storage Tank Low Level Alarm 1 From Pump Control Panel
Total per Unit 2 7 0 1
Total for all Units 10 35 0 5
Odor Control Unit, Chlorination Unit & Coloring Dye Unit of Grey Water Treatment Plant (1 unit each plant x 4 nos. plants)
1 Dosing Pump On/Off Status 1 From Grey Water Treatment Plant Panel
2 Chemical flow status 1 Flow switch
3 Dosing Pump Trip Alarm 1 From Grey Water Treatment Plant Panel
4 Dosing Pump Auto / Manual Status 1 From Grey Water Treatment Plant Panel
5 Dosing Pump Start/stop command 1 Relay Output From BMS
6 Chemical Tank Level 1 From Grey Water Treatment Plant Panel
7 Chemical Tank Low Level Alarm 1 From Grey Water Treatment Plant Panel
TOTAL 0 6 0 1Total Odor Control, Chlorination, Coloring Dye Units Points 0 72 0 12
Total Odor, Chlorination, Coloring Dye Units Points
Air Purification Unit (Aerator) - 2 no. each Grey Water Treatment Plant
1 Aerator On/Off /Fault Status 3 From Grey Water Treatment Plant Panel
TOTAL 0 3 0 0
Total Aerator Unit Points 0 24 0 0
Total Aerator Unit Points
Chlorination Unit, PH Control Unit & Sanitizer Unit of Fountains [1 unit each for 2 fountain system]
1 Dosing Pump On/Off Status 1 From Fountain Control Panel
8
24
12
5
50
84
3 of 9
-
7/27/2019 Itcc Cluster Bms Io Pg
4/9
Project : ITCC APPARTMENTS
Subject : BMS I nput / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel
AI DI AO DORemarks
BACnet
Network
Thermostat
Software
IntegrationItem Point DescriptionQty.
Required Points OPCClient
2 Chemical flow status 1 Flow switch
3 Dosing Pump Trip Alarm 1 From Fountain Control Panel
4 Dosing Pump Auto / Manual Status 1 From Fountain Control Panel
5 Dosing Pump Start/stop command 1 Relay Output From BMS
6 Chemical Tank Level 1 From Fountain Control Panel
7 Chemical Tank Low Level Alarm 1 From Fountain Control Panel
TOTAL 0 6 0 1
Total Odor Control Unit Points 0 36 0 6
Total Odor Control Unit Points
Potable water pumps-DP-1 [2-Duty&1-Standby]- 4 sets
1 Pump On/Off Status 1 VFC From Pump Control Panel
2 Water flow status 1 Flow switch
3 Pump Trip Alarm 1 VFC From Pump Control Panel
4 Pump Auto / Manual Status 1 VFC From Pump Control Panel5 Pump Start/stop command 1 Relay Output From BMS
6 Discharge header pressure switch 1 Liquid pressure switch
7 Discharge header pressure 1 Liquid pressure sensor
8 Pump motor temperature high 1 From Pump Control Panel
TOTAL 2 5 0 1
Total Potable Water Pumps Points 8 60 0 12
Total Potable Water Pumps Points
Non-Potable water pumps-DP-1 [2-Duty&1-Standby]- 4 sets1 Pump On/Off Status 1 VFC From Pump Control Panel
2 Water flow status 1 Flow switch
3 Pump Trip Alarm 1 VFC From Pump Control Panel
4 Pump Auto / Manual Status 1 VFC From Pump Control Panel
5 Pump Start/stop command 1 Relay Output From BMS
6 Discharge header pressure switch 1 Liquid pressure switch
7 Discharge header pressure 1 Liquid pressure sensor
8 Pump motor temperature high 1 From Pump Control Panel
TOTAL 2 5 0 1Total Non-Potable Water Pumps Points 8 60 0 12
Total Non-Potable Water Pumps Points
12
80
6
42
12
80
4 of 9
-
7/27/2019 Itcc Cluster Bms Io Pg
5/9
Project : ITCC APPARTMENTS
Subject : BMS I nput / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel
AI DI AO DORemarks
BACnet
Network
Thermostat
Software
IntegrationItem Point DescriptionQty.
Required Points OPCClient
Fountain No. 1 - Pumps [F1A & F1B]
1 Pump On/Off Status 1 From Pump Control Panel
2 Water flow status 1 Flow switch
3 Pump Trip Alarm 1 From Pump Control Panel
4 Pump Auto / Manual Status 1 From Pump Control Panel
5 Pump Start/stop command 1 Relay Output From BMS
6 Discharge header pressure switch 1 Liquid pressure switch
7 Discharge header pressure 1 Liquid pressure sensor
8 Pump motor temperature high 1 From Pump Control Panel
TOTAL 2 5 0 1
Total Fountain No. 1- Water Pumps Points 4 10 0 2
Total Fountain No. 1- Water Pumps Points
Fountain No. 3 - Pumps [F3A & F3C]
1 Pump On/Off Status 1 From Pump Control Panel
2 Water flow status 1 Flow switch
3 Pump Trip Alarm 1 From Pump Control Panel
4 Pump Auto / Manual Status 1 From Pump Control Panel
5 Pump Start/stop command 1 Relay Output From BMS
6 Discharge header pressure switch 1 Liquid pressure switch
7 Discharge header pressure 1 Liquid pressure sensor
8 Pump motor temperature high 1 From Pump Control Panel
TOTAL 2 5 0 1
16
2
2
5 of 9
-
7/27/2019 Itcc Cluster Bms Io Pg
6/9
Project : ITCC APPARTMENTS
Subject : BMS I nput / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel
AI DI AO DORemarks
BACnet
Network
Thermostat
Software
IntegrationItem Point DescriptionQty.
Required Points OPCClient
Total Fountain No. 3- Water Pumps Points 4 10 0 2
Total Fountain No. 3- Water Pumps Points
Filter Pumps for Potable Water Filter, [2-pumps x 4 nos. Filters]
1 Pump On/Off Status 1 From Pump Control Panel
2 Water flow status 1 Flow switch
3 Pump Trip Alarm 1 From Pump Control Panel
4 Pump Auto / Manual Status 1 From Pump Control Panel
5 Pump Start/stop command 1 Relay Output From BMS
6 Discharge header pressure switch 1 Liquid pressure switch
7 Pump motor temperature high 1 From Pump Control Panel
TOTAL 4 5 0 1
Total Filter Pumps for Potable WaterFilters -Points 32 40 0 8
Total Filter Pumps for Potable Water Filters -Points
Filter Pumps for Grey Water Treatment Plant, [2-pumps x 4sets]
1 Pump On/Off Status 1 From Pump Control Panel
2 Water flow status 1 Flow switch
3 Pump Trip Alarm 1 From Pump Control Panel
4 Pump Auto / Manual Status 1 From Pump Control Panel
5 Pump Start/stop command 1 Relay Output From BMS
6 Discharge header pressure switch 1 Liquid pressure switch
7 Pump motor temperature high 1 From Pump Control Panel
TOTAL 1 5 0 1Total Filter Pumps for Grey Water Treatment Plant -Points 4 40 0 8
Total Filter Pumps for Grey Water Treatment Plant -Points
Filter Pumps for Fountains No. 1 & 2 ,[1-Duty & 1-Standby]
1 Pump On/Off Status 1 From Pump Control Panel
2 Water flow status 1 Flow switch
3 Pump Trip Alarm 1 From Pump Control Panel
4 Pump Auto / Manual Status 1 From Pump Control Panel
5 Pump Start/stop command 1 Relay Output From BMS6 Discharge header pressure switch 1 Liquid pressure switch
7 Pump motor temperature high 1 From Pump Control Panel
TOTAL 1 5 0 1
8
80
8
52
2
16
6 of 9
-
7/27/2019 Itcc Cluster Bms Io Pg
7/9
-
7/27/2019 Itcc Cluster Bms Io Pg
8/9
Project : ITCC APPARTMENTS
Subject : BMS I nput / Output List - Plumbing & Fi re Protection Note: Fire Protection Control with Fire Alarm Panel
AI DI AO DORemarks
BACnet
Network
Thermostat
Software
IntegrationItem Point DescriptionQty.
Required Points OPCClient
Sand Filters for Fountain No. 3
1 High D P of Sand Filters 1 DP Differential Pressure Switch from Fountain
Control Panel
TOTAL 1 0 0 0
Total Sand Filter for Fountain No. 3 -Points 1 0 0 0
Total Sand Filter for Fountain No. 3-Points
Fountain Basins for Fountains Nos. 1, 2 & 3
1 Fountain Basin Level (%) Monitor 1 (4-20)mA from the Level Indicator
2 Fountain Basin Low Level 1 From Basin Float Switch
TOTAL 1 1 0 0
Total Fountain Basin for Fountains Nos. 1,2 &3- Points 12 12 0 0
Total Fountain Basins for Fountains Nos. 1,2&3 - Points
Electric Water Heaters [EWH]
1 EWH On/Off Status 1 From Building Local Control Panel
TOTAL 0 1 0 0
Total Electric Water Heaters -Points 0 58 0 0
Total Electric Water Heaters -Points
Diesel Driven Fire pumps
1 Pump On/Off Status 1 From Diesel Pump Control Panel
2 Water flow status 1 Flow switch
3 Pump Trip Alarm 1 From Diesel Pump Control Panel
4 Pump Auto / Manual Status 1 From Diesel Pump Control Panel
5 Pump Start/stop command 1 Relay Output From BMS
6 Low diesel tank level 1 Level switch
7 Low charge batteries 1 From Diesel Pump Control Panel
8 Low pressure discharge switch 1 Liquid pressure switch
9 Low pressure switch 1 Liquid pressure switch
TOTAL 8 1
Total Diesel Driven Fire Pumps Points 0 8 0 1
Total Diesel Driven Fire Pumps Points
1
12
1
58
9
24
1
58
8 of 9
-
7/27/2019 Itcc Cluster Bms Io Pg
9/9
Project : ITCC APPARTMENTS
Subject : BMS Input / Output List - Plumbing & Fir e Protection Note: Fire Protection Control with Fire Alarm Panel
AI DI AO DORemarks
BACnet
Network
Thermostat
Software
IntegrationItem Point DescriptionQty.
Required Points OPCClient
Electric Fire pumps (Electric Driven Fire Pump & Jockey Pump)
1 Pump On/Off Status 1 From Pump Control Panel
2 Water flow status 1 Flow switch
3 Pump Trip Alarm 1 From Pump Control Panel
4 Pump Auto / Manual Status 1 From Pump Control Panel
5 Pump Start/stop command 1 Relay Output From BMS
6 Pump motor temperature high 1 From Pump Control Panel
7 Low pressure discharge switch 1 Liquid pressure switch
8 Low pressure switch 1 Liquid pressure switch
TOTAL 1 6 1
Total Eelctric Driven Fire Pumps Points 2 12 0 2
Total Electric Driven Fire Pumps Points
2
16
9 of 9