ENGINEERING DATA TRANSMITTAL
2. To: (Receiving Organization)
5. Proj./Prog./Dept./Div.: DST Operations
3. From: (Originat ing Organization)
6 . Design Author i ty/ Design Agent/Cog. SST Retrieval W-320
W-320
For Approval and Release
Engr.: J. W. Bailey
11. Receiver Remarks: ITA. Design Baseline D o c m n t ? [ I Yes [ X I NO
IAI item NO.
IE) Titie or Desctiptim of Data Transmined
IC) ID1 IBI DocumentlDrawing No. Rev.
NO. NO.
1
4. Related EDT No.:
NA
NA 7. Purchase Order No.:
HNF-2219 0 Project W-320 Backup 1000 CFM Portable Exhausters Acceptance for Beneficial Use
9. Equip./Cwnponent No.:
10. System/Bldg./Faci Lity:
12. Major Assrn. Dug. No.:
H-14-102610 13. Perrnit/Perrnit Appl icat ion No.:
14. Required Response Date:
POR-007/POR-008
General
NA
July 25, 1998
Approval Reason Otigi- Receir
nator Trans- Dispo- Dispo- mitts1 sition sition
Desig- "ator
1,2
Appmval Designator IF) , S. Q, D or NIA Eee WHGCM-3-5,
rec.12.7)
Disposition (HI & (I) Rearon for Transminsi (GI 1. Approval 4. Review 1. Approved 4. Reviewed nolcomment 2. Release 5. Post-Review 2. Approved wlcomment 5. Reviewed wlcomment 3. Information 6. Dist. IReceipt Actnow. Requiredl 3. Disapproved wlcomment 6. RBCeipt acknowledged
ED-7400-172-2 (05/96) GEF097
ED-74001 72-1
s HNF-2219, Rev. 0
Project W-320 Backup 1000 CFM Portable Exhausters Acceptance for Beneficial Use
O.D. Nelson NHC, Richland, WA 99352 U.S. Department o f Energy Contract DE-AC06-96RL13200
EDT/ECN: 624764 UC: 510 Org Code: 8C452 Charge Code: D2M65 B&R Code: EW3130010 Total Pages: 30 CTLm 7[Zc/qg\
Key Words: use (ABU), Waste Tank Vent i la t ion, 241-C-106, 241-AY-102
Abstract: This document i s t o i d e n t i f y the Project W-320 1000 CFM por tab le exhauster documentation required t o be turned over from the Projects Organization t o the Tank Farm Operations as p a r t o f the acceptance o f the 1000 CFM portable exhausters f o r benef ic ia l use.
Project W-320, Portable Exhauster, Acceptance f o r Benef ic ia l
TRADEMARK DISCLAIMER. trade name, trademark, manufacturer, or otherwise, does not necessarily cons t i t u te or imply i t s endorsement, r e c m n d a t i o n , or favor ing by the United States Government or any agency thereof o r i t s contractors o r subcontractors.
Reference herein t o any speci f ic c m r c i a l product, process, o r service by
P r in ted i n the United States of America. Control Services, P.O. Box 950, Mailstop H6-08, Richland UA 99352, Phone ( 5 0 9 ) 372-2420; Fax ( 5 0 9 ) 376-4989.
To obtain copies o f t h i s docunent, contact: Document
E
7 i a q 4 8 RelMse Approval Date
Approved for Public Release
A-6400-073 (01197) GEF321
HNF-2219 Rev. 0
TABLE OF CONTENTS
. . . . . . . . . . . . . . . . . . . . . . . . 1.0 PURPOSE . . . . . 1
2.0 BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
3.0 TURNOVER RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
4.0 REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
5.0 INDEX OF ABU DOCUMENTATION . . . . . . . . . . . . . . . 2
APPENDIX A -DOCUMENTATION REQUIRED FOR ACCEPTANCE FOR BENEFICAL USE
APPENDIX B -PUNCHLIST ITEMS FOR THE BACK-UP 1000 CFM PORTABLE EXHAUSTERS ACCEPTANCE FOR BENEFICIAL USE
i
HNF-2219 Rev. 0
TITLE: "Project W-320, Backup 1000 CFM Portable Exhausters Acceptance for Beneficial Use"
KEYWORDS: Project W-320, Portable Exhauster, Acceptance for Beneficial Use (ABU), Waste Tank Ventilation, 241-C-106,241-AY-102
1 .o
2.0
PURPOSE
The purpose of this document is to identify the Project W-320 Backup 1000 CFM Portable Exhauster documentation required to be turned over, be issued, or readily retrievable from the Projects organization to Tank Farm Operations prior to the acceptance of the new systems for beneficial use. The responsibilities for completion and a roadmap to each turnover item is listed in AppendixA of this document. Appendix B contains a Punchlist which identifies the documentation that will be turned over following HNF-2219 "Backup 1,000 cfm Portable Exhausters POR-007-Skid E & POR-008-Skid F Acceptance for Beneficial Use" approval. Reference 1 requires turnover acceptance of Structures, Systems and Components (SSCs) with a punchlist or open item be approved by the Tank Farm Transitions Project Director.
BACKGROUND
Reference 1 requires the project end user to identify and approve a listing of Acceptance for Beneficial Use (ABU) requirements at the beginning of a project. At turnover, the end user accepts the SSCs for beneficial use based on the delivery of operable SSCs and satisfactory completion of the previously defined ABU requirements.
Project W-320 was initiated prior to the implementation of this administrative procedure, therefore a listing of the ABU requirements was not made at the beginning of the project. Although at a late stage in the project, this document now serves as both the listing of ABU requirements for the Project W-320 Backup 1000 CFM Portable Exhausters and the turnover of required documentation.
The 1,000 cfm portable exhausters were originally procured for TWRS Saltwell pumping activities. During the saltwell pumping of tanks with the potential for Hydrogen gas generation, portable exhausters were to be used to ventilate out the dome space. By doing this, the Hydrogen gas concentration would be kept lower than the lower flammable limit for hydrogen. This would mitigate the danger presented by a explosion due to the presence of Hydrogen gas. However, Saltwell pumping schedule allows Tank Waste Remediation System (TWRS) Operations the use of the 1,000 cfm portable exhausters as needed. TWRS Operations requires the use of these exhausters as backup ventilation systems during and after Waste Retrieval Sluicing System activities as addressed in the Memorandums of Agreement identified in this document. This is a strategy developed by W-320 to meet the requirements of the Authorization Basis safety class functional requirements imposed after the ventilation upgrades provided by W-320 were designed, procured and installed.
1
HNF-2219 Rev. 0
This ABU is one of several prepared by Project W-320 in preparation of WRRS activities Reference 2 is the project master ABU and references all W-320 ABU's.
3.0 TURNOVER RESPONSIBILITIES
In general, all Safety SSC design and installation requires plant (Double Shell Tank Engineering) concurrence on documentation. Comments will be generated by Double Shell Tank Engineering (DSTE) on designated documentation in Appendix A. DSTE concurrence will follow resolution of comments and inception of any required equipment modifications.
The following defines the Plant and Project reesponsibilities after turnover and before closeout of the ABU exceptions identified in Appendix B.
If during the exceptions closeout, process SSC deficiencies (e.g. OTP failures, FDC criteria non-conformance or SEL compliances) are identified, the Project shall correct the deficiencies.
If after turnover, SSC failures occur due to mis-operation or other causes not the responsibility of the Project, corrective actions shall be the plants responsbility.
4.0 REFERENCES
1. HNF-IP-0842, Volume IV, Section 3.12, Acceptance of Sfructures, Systems, and Components for Beneficial Use, Revision 1.
2. W-320 Master ABU, HNF-SD-W320-ABU-002.
5.0 INDEX OF ABU DOCUMENTATION
This index is intended to serve two purposes:
0 Provides a "Roadmap" to be used by Tank Farm Operations personnel to access all the required turnover documentation for Project W-320.
To document formal turnover of Project W-320 Backup 1000 CFM Portable Exhausters to Tank Farm Operations for beneficial use.
0
2
HNF-2219 Rev. 0
APPENDIX A:
DOCUMENTATION REQUIREMENTS FOR THE ACCEPTANCE FOR BENEFICIAL USE FOR THE BACKUP 1000 CFM PORTABLE EXHAUSTERS
A- 1
HNF-2219 Rev. 0
DESCRIPTION RESPONSIBLE SUPPLIER
Attachment A: "Documentation Required for Acceptance for Beneficial Use Checklist for the Backup 1000 CFM Portable Exhausters"
Project Title: 1 .OOO CFM Portable Exhausters
ACCEPTANCE AUTHORITY
POR-O07/Skid E & POR-O08/Skid F
[XI Portable Exhausters ABU Checklist
JX] Engineering Task Plan/Project Management Plan
[XI Activity Schedule NHClM Cremonini
COGEMPJKV Scott (SW Shaw)
NHC/JW Lentsch
(OD Nelson)
See EDT
RE Raymond
RE Raymond
[X] Authorization Basis Amendment Package
[XI TWRS Safety Equipment List ECN
JN/A] Operation Safety Document(s) - or update existing
[XI Technical Safety Requirement Changes
~
[XI Basis of Interim Operation Addendum 1
NHC/JW Lentsch RE Raymond
NHC/JW Lentsch RE Raymond
NHC/JW Lentsch RE Raymond
I NHCNW Lentsch RE Raymond I
[XI Design Criteria - (Functional Design Criteria)
[XI Design Criteria - (Design Basis Document)
JX] System Design Descriptions
[XI Acceptance Test Procedures
[XI Acceptance (Final) Test Report
[XI Operational Test Procedures
rX1 Environmental Impact Statement
COGEMPJKV Scott RE Raymond (SW Shaw)
NHCNW Lentsch RE Raymond
NHCNW Lentsch RE Raymond
CogemalKV Scott RE Raymond (SW Shaw)
CogemalKV Scott RE Raymond (SW Shaw)
NHC/JW Lentsch RE Raymond
NHC/JW Lentsch RE Raymond
~
[XI Safety Class Evaluation Document I NHC/JW Lentsch I RE Raymond ~~
[XI Compliance Implementation Plan I NHC/JW Lentsch RE Raymond I
A-2
HNF-2219 Rev. 0
[XI Finding of no Significant Impact (FONSI)
JX] Environmental Report (Environmental Assessment)
[XI Environmental Permit
JN/A] Hazardous Waste Disposal PlanlProcedures
JN/A] Solid Waste Disposal PlanlProcedure
[XI Stress/Seismic Analysis Calculations
JX] Stress/Design Report
[XI Design Specifications/Report
NHCNW Lentsch RE Raymond
NHCNW Lentsch RE Raymond
NHCNW Lentsch RE Raymond (JW Bailey)
Cogema/KV Scott RE Raymond (SW Shaw)
NHC/JW Lentsch RE Raymond
NHC/JW Lentsch RE Raymond
JX] Equipment SpecificationslReport
JX] Procurement Specifications
JN/A] Construction Specifications
NHCNW Lentsch RE Raymond
NHC/JW Lentsch RE Raymond
A-3
[XI USQs NHC/JW Lentsch RE Raymond
HNF-2219 Rev. 0
DESCRIPTION RESPONSIBLE ACCEPTANCE SUPPLIER AUTHORITY
[XI Software Configuration Management Plan
[XI System Requirements Specification
[XI Software Design Description
[XI Software ValidationNerification
LMHC/RE Larson RE Raymond (TD Kaiser)
CogemalKV Scott RE Raymond (SW Shaw)
CogemalKV Scott RE Raymond (SW Shaw)
CogemalKV Scott RE Raymond (SW Shaw)
JX] Training Plan NHC/JW Lentsch
JN/A] Training Manuals
JX] Training of Operating Crews
JN/A] Training of Maintenance Crews
JX] Training OJT NHC/JW Lentsch
NHC/JW Lentsch
TJ Kelly
TJ Kelly
TK Kelly
[XI Operating and Maintenance Manuals
A-4
Cogema/KV Scott TJ Kelley (SW Shaw) DB Smet
[XI Process Control Plan
[XI Operating Procedures
[XI Alarm Response Procedures
[XI Surveillance Procedures
[XI Calibration Procedures
[XI Preventative Maintenance Procedures
NHC/JW Lentsch RE Raymond TJ Kelley
NHC/JW Lentsch TJ Kelley (PA Young)
NHC/JW Lentsch TJ Kelley (PA Young)
NHCNW Lentsch TJ Kelley (PA Young)
CogemalKV Scott DB Smet (SW Shaw)
Cogema/KV Scott DB Smet (SW Shaw)
[XI RepaidMaintenance Procedures CogemalKV Scott DB Smet (SW Shaw)
[XI Functional Test Procedures COGEMNKV Scott TJ Kelley (SW Shaw)
H N F-22 1 9 Rev. 0
DESCRIPTION RESPONSIBLE ACCEPTANCE SUPPLIER AUTHORITY 11 [XI Instrument List
[XI Inspection Plan NHCNW Lentsch
[XI QAPP (Project and TWRS) NHC/JW Lentsch
[N/A] QAP,P
I NHC/JW Lentsch DB Smet I RE Raymond
RE Raymond
[XI Vendor Information Files
[XI Master Equipment List
[XI Spare Parts List
[XI Spare Parts in Stock I1
A-5
NHCNW Lentsch DB Smet
NHC/JW Lentsch DB Smet
NHC/JW Lentsch DB Smet
NHCNW Lentsch DB Smet
/RE Raymond
HNF-2219 Rev 0
Table A-I: Checklist Description Items for Backup 1000 CFM Portable Exhausters
ENGINEERING
'ortable Exhausters ABU :hecklist
Engineering Task PlanlProject Management Plan
Activity Schedule
Basis for Interim Operation (BIO) Addendum 1
HNF-2219 Rev 0, Backup 1000 CFM Portable Exhausters POR-007-Skid E & POR-008-Skid F Acceptance for Beneficial Use
See the W-320 Master ABU (Ref 2).
Memorandum of Agreement for Portable Exhauster Use by W320. (Numatec Letter 86620-98-003)*
Memorandum of Agreement for Portable Generator Use by W320. (Numatec Letter 8C620-98-004)*
Memorandum of Agreement for Storage of Portable Exhausters POR-007-SKID E and POR-008-SKID F at FMEF (Numatec Letter 8C620-98-005).*
HNF-3029 Rev 0, Deployment of Backup Portable Exhausters POR-007-Skid E & POR-008-Skid F for W320 Use. This document includes installation work plans for installation of the exhuasters on 106-C and 102-AY primary tanks and 102-AY annulus as appendicies.*
BIO Addendum I was turned over with the W-320 Master ABU (Reference 2).
Authorization Basis Clarification 98-031, "W320/Stack Monitoring".*
SW Shaw
DG Baide
OD Nelson
DG Baide
ABU Sign Off
Pre-Start Up
Pre-Start up
Pre-Start Up
Not Applicable
Not Applicable
Not Applicable
Not Applicable
*Document Reaui res Concurrence from DST Engineerlng A - 6
HNF-2219 Rev 0
Authorization Basis Amendment Package
TWRS Safety Equipment List
Operational Safety Documents - or update existing
Technical Safety Requirement Changes
Safety Class Evaluation Document
~
BIO Addendum 1 Compliance Implementation Plan
Design Criteria (FDC)
Design Criteria (Design Basis Document)
System Design Description
See the W-320 Master ABU (Reference 2)
See the W-320 Master ABU (Reference 2).
See the W-320 Master ABU (Reference 2).
See the W-320 Master ABU (Reference 2).
Authorization Basis Clarification
See the W-320 Master ABU (Reference 2).
Log #98-031*
See the W-320 Master ABU (Reference 2).
HNF-SD-WM-DB-035 Rev 1 "Functional Requirements for Portable Exhauster Systems to be used during Saltwell Pumping".
See Procurement Specification
The System Design Description is comprised of Vendor Manuals, Functional Requirements, and Software Design Description.
DG Baide Pre-Start Up Not Applicable
Not Applicable
Not Applicable
Not Applicable
*Document Ream res Concurrence f rom DST Engineerlng A-7
HNF-2219 Rev 0
kceptance Test Drocedures
Acceptance (Final) Test Report
Operational Test Procedures
Environmental Impact Statement
VI File 50024
96675.ATP.007, Rev 1, ATP ForA Continuous Use, Portable 1000 CFM Exhauster (POR-O07/Skid E)
96675.ATP.008, Rev 0, ATP ForA Continuous Use, Portable 1000 CFM Exhauster (POR-O08/Skid F)
HNF-2686, Portable Exhauster POR-O07/Skid E Acceptance Test Procedure.
HNF-2687, Portable Exhauster POR-O08/Skid F Acceptance Test Procedure.
VI File 50024
Fabrication Document Package, Portable Exhauster Systems
Contract #DW-SBDA00562 Volume 1, Section 6.
HNF-2688, Portable Exhauster POR-O07/Skid E Acceptance Test Report.
HNF-2689, Portable Exhauster POR-O08/Skid F Acceptance Test Report.
See the W-320 Master ABU (Reference 2).
NOTE: OTP's will be prepared and released, but will only be performed if Portable Exhausters are installed.
See the W-320 Master ABU (Reference 2).
CR 10
CR 10
CR 10
CR 10
*Document Reaui res Concurrence from DST Engineering A-8
6-V
0 hat] 6 LZZ-JNH
HNF-2219 Rev 0
Construction Specification
Essential Material Specification
The portable exhausters were designed/fabricated per procurement specification HNF-S-0490 Rev 1, "A portable exhauster system for waste tank ventilation".
See Procurement Specification Not Applicable
Not Applicable
*Document Requires Concurrence from DST Engineering A-10
HNF-2219 Rev 0
11 Final Design Drawings -1-14-1 02577, Sheet 1, Rev 0, "1000 CFM Portable I I I Not Applicable Exhauster Outline Views: Elevations, Filter ACC Side & Wet End'
4-14-1 02577, Sheet 2, Rev 0, "1000 CFM Portable Exhauster Outline Views: Plans And Sections"
H-14-102577, Sheet 3, Rev 0, "1000 CFM Portable Exhauster Outline Views: Elevations, Control Side & Fan End'
H-14-102578, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Final Assembly-Parts Lisi'
H-14-102578, Sheet 2, Rev 0, "1000 CFM Portable Exhauster Final Assembly"
H-14-102578, Sheet 3, Rev 0, "1000 CFM Portable Exhauster Heater Housing Weldment: Top Weather Cover"
H-14-102578, Sheet 4, Rev 0, "1000 CFM Portable Exhauster Heater Housing Weldment: Side Weather Cover"
H-14-102578, Sheet 5, Rev 0, "1000 CFM Portable Exhauster Weldment: Leveling JacK'
H-14-102578, Sheet 6, Rev 0, "1000 CFM Portable Exhauster Weldment & Assembly: GEMS Sensor"
H-14-102579, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Assembly: Upper Stack'
H-14-102579, Sheet 2, Rev 0. "1000 CFMPortable Exhauster Assembly: Upper StacK'
*Document Requires Concurrence from DST Engineerlng A-11
HNF-2219 Rev 0
Final Design Drawings (Continued)
H-14-102579, Sheet 3, Rev 0, "1000 CFM Portable Exhauster Weldment: Stack, Upper
H-14-102579, Sheet 4, Rev 0, "1000 CFM Portable Exhauster Weldment & Assembly Details"
H-14-102580, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Assembly: Elec Cabinet MTG Conduit Frame"
H-14-102582, Sheet 1, Rev 0 , "1000 CFMPortable Exhauster Heat Trace Cable"
H-14-102586, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Assembly: Press Transmiffers, lnstr Tubing & lnsul Weather Covers"
H-14-102587, Sheet 1, Rev 0 , "1000 CFM Portable Exhauster Electrical Assembly and Conduit Layout"
H-14-102587, Sheet 2, Rev 0, "1000 CFM Portable Exhauster Electrical Assembly and Conduit Layout"
H-14-102587, Sheet 3, Rev 0, "1000 CFM Portable Exhausters Electrical Conduit Run Diagram"
H-14-102589, Sheet 1, Rev 0 , "1000 CFMPortable Exhauster Weldment: Sealpoi'
H-14-102590, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Weldment: Peristalic Pump Enclosure"
H-14-102591, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Weldment: Sealpot, Drain, & Peristolic Pump Piping"
I I I Not Applicable
*Document ReQui res Concurrence from DST Engineering A- 12
HNF-2219 Rev 0
-inal Design Drawings :Continued)
I -1-14-102592, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Weldment: "Inlet Spoor
H-14-102592, Sheet 2, Rev 0, "1000 CFM Portable Exhauster Weldment: Inlet Transition"
H-14-102592, Sheet 3, Rev 0, "1000 CFM Portable Exhauster Weldment: Outlet Transition"
H-14-102592, Sheet 4, Rev 0, "1000 CFM Portable Exhauster Weldment & Assembly: Outlet Spoor
H-14-102592, Sheet 5, Rev 0, "1000 CFM Portable Exhauster Weldment & Assembly: Discharge Transition"
H-14-102593, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Fan Wheel Shaft Assy Mounting Base"
H-14-102593, Sheet 2, Rev 0, "1000 CFM Portable Exhauster Fan Wheel Shaft Assy Mounting Base"
H-14-102594, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Weldment: Heater Section"
H-14-102595, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Fan Shaft"
H-14-102598, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Weldment: Stack, Lower"
H-14-102600. Sheet 1-2, Rev 0, "1000 CFM Portable Exhauster Weldment & Assembly: Glycol/Demister System"
*Document Reaui res Concurrence from DST Engineerlng A-13
\lot Applicable
HNF-22 1 9 Rev 0
Final Design Drawings (Continued)
-I-14-102600, Sheet 3, Rev 0, “1000 CFM Portable Exhauster Weldment: Glycol Expansion Tank
i-14-102607, Sheet 1, Rev 0, “1000 CFM Portable Exhauster Electrical Wire Run/Conduit Schedule”
H-14-102607, Sheet 2, Rev 0 , “1000 CFM Portable Exhauster Electrical Wire Run/Conduit Schedule”
H-14-102609, Sheet 1, Rev 0, “1000 CFM Portable Exhauster Elementaty Diagrams ‘‘
H-14-102609, Sheet 2, Rev 0, “1000 CFM Portable Exhauster Control Cabinet Modules ‘I
H-14-102609, Sheet 3, Rev 0, “1000 CFM Portable Exhauster Connection Diagrams “
H-14-102609, Sheet 4, Rev 0, “1000 CFM Portable Exhauster Connection Diagrams ‘‘
H-14-102609, Sheet 5, Rev 0, “1000 CFM Portable Exhauster Connection Diagrams ‘I
H-14-102609, Sheet 6, Rev 0, “1000 CFMPortable Exhauster Connection Diagrams ‘‘
H-14-102609, Sheet 7, Rev 0, “1000 CFM Portable Exhauster Connection Diagrams “
H-14-102609, Sheet 8, Rev 0 , “1000 CFM Portable Exhauster Connection Diagrams ‘I
I Not Applicable
*Document Reaui res Concurrence from DST Engineerlng A-14
HNF-2219 Rev 0
Final Design Drawings (Continued)
Installation drawings
Installation Work Plan
~~
Field Verified As-Built Project Drawings
H-14-102613, Sheet 3, Rev 0, “1000 CFM Portable Exhauster Alarm Control Panel Sub-panel Layout & Detail”
H-14-102614, Sheet 1, Rev 0, “1000 CFM Portable Exhauster lntrinsic Barrier Panel Assembly & Parts List”
H-14-102614, Sheet 2, Rev 0, “7000 CFM Portable Exhauster Intrinsic Barrier Panel Sub-panel Layout & Details”
See the W-320 Master ABU (Reference 2) ~
See Activity Schedule. HNF-3029 includes appendicies with Work Package Plans, Drawings.
Prepare ECN to ”As-Built“ H-14-102593 “Fan Wheel Shaft Assembly Mounting Base”. *
OD Nelson
S.W Shaw
Pre-Start Up
Pre-Start Up
~
Not Applicable
Not Applicable
Not Applicable
*Document Requires Concurrence from DST Engineerlng A-16
HNF-2219 Rev 0
Interface Control Drawings
Impacted Essential Facility Drawings
P & IDS
Instrument Loop Drawings
Installation DrawingslECNs for portable exhausters at 241- C-106, Tank 241-AY-102 & 241-AY-102 Annulus.*
H-2-818506 Rev 0, Sheets 1,2,3 241-C-106 Portable Installation.
H-2-818507 Rev 0, Sheets 1,2,3 241-AY-102 Portable Exhauster Installation for tank and annulus".
H-2-818673 Rev 1, Sheet 1 Electrical C-Farm Partial Site Plan.
H-2-818694 Rev 2, Sheet 1 Electrical AY-Farm Partial Site Plan.
NOTE: These drawings can not be field verified until the exhausters are installed in the field.
~~
The Portable Exhauster do not have interface control drawings associated with it.
See the W-320 Master ABU (Reference 2) ~
H-14-102736, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Backup Emergency Exhauster P&IDt
H-14-102737, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Backup Emergency Tank Exhauster P&ID"
H-14-102738, Sheet 1, Rev 0, "1000 CFM Portable Exhauster Backup Emergency Annulus Exhauster P &ID"
The Portable Exhauster equipment does not have any instrument loop diagrams. All instrument connections are shown on P&ID and electrical drawinas
JW Bailey 9t Exhauster Jse
Not Applicable
Not Applicable
Not Applicable
Not Applicable
*Document Reaui res Concurrence from DST Englneerlng A-17
HNF-2219 Rev 0
System Drawings
Drawing Tree
Incorporate Outstanding ECNs
CGI Packages
~
USQ's
The Portable Exhauster does not have system drawings associated with it.
The Portable Exhauster does not have a drawing tree.
Incorporate "As-Built'' ECN for H-14-102593 (See Field Verified As-Built Drawings above).*
CGI-WTF-35, Commercial Grade Item Dedication for the exhaust fan bearings and coupling on Exhauster Skids POR-007 and POR-008.*
CGI-DST-G-30, Commercial Grade Item Dedication for the Exhaust Fan on Portable Exhauster Skids POR-007 and
HNF-2980 Rev 0, Safety Class Procurement Evaluation For Project W320 Portable Exhausters"
POR-008
TF-97-1013, Rev 0. "Revision to Procurement Specification for 1000-CFM Portable Exhauster to Resolve NCR #5488i"'
See the W-320 Master ABU (Reference 2)
SW Shaw
JR Kriskovich
JR Kriskovich
Pre-Start Up
Pre-Start Up
Pre-Start Up
II Not Applicable
1 Not Applicable
Not Applicable
Not Applicable
*Document Requires Concurrence from DST Engineering A-18
61-V
dQV
02-v
0 6KZ-JNH
d n WlS-aJd
0 6 t ZZ-JNH
HNF-2219 Rev 0
PROCUREMENT
Vendor Information Files
Master Equipment List
VI #50024, "Portable Exhauster System/lOOO SCFM'
See W-320 Master ABU (Reference 2).
Prepare ECN to HNF-2328, Revision 0, Project W-320 Master Equipment List*
See W-320 Master ABU (Reference 2).
See W-320 Master ABU (Reference 2).
Spare Parts List
Spare Parts in Stock
*Document Requires Concurrence from DST Engineering A-22
HNF-2219 Rev 0
APPENDIX B
PUNCHLIST ITEMS FOR THE BACKUP 1000 CFM PORTABLE EXHAUSTERS ACCEPTANCE FOR BENEFICIAL USE
B - 1
HNF-2219 Rev 0
Punchlist Item Document Number and Title Responsible Individual
Table B-1: Portable Exhauster Acceptance for Beneficial Use Documentation Requirements Punchlist
Anticipated ORR Core Turnover Date Reauirement
4ctivity Schedule
Field Verified As-Builts Project Drawings
ENGINEERING
Prepare and Release of ECN for As-Built of H-14-102593, “Fan Wheel Shaft Assembly Mounting Base”
SW Shaw
106, Tank 241-AY-102 & 241-AY-102 Annulus.
H-2-818506 Rev 0, Sheets 1,2,3 241-C-106 Portable Installation.
H-2-818507 Rev 0, Sheets 1,2,3 241-AY-102 Portable Exhauster Installation for tank and annulus”.
H-2-818673 Rev 1, Sheet 1 Electrical C-Farm Partial Site Plan.
H-2-818694 Rev 2, Sheet 1 Electrical AY-Farm Partial Site Plan.
NOTE: These drawings can not be field verified until the exhausters are installed in the field.
’re-Start Up Not Applicable
Use
B - 2
HN F-22 1 9 Rev 0
Document Number and Title Responsible Anticipated Individual Turnover Date
Review ECN for As-Built of H-14-102593, "Fan Wheel Shaft Assembly Mounting Base"
Release of HNF-2980 Rev 0, Safety Class Procurement Evaluation For Project W320 Portable Exhausters
CGI-WTF-35, Commercial Grade Item Dedication for the exhaust fan bearings and coupling on Exhauster Skids POR- 007 and POR-008.
HNF-3097. Rev, 0, "Software Configuration Managment Plan for the 1000 CFM Portable Exhausters"
DG Baide Pre-Start Up
JR Kriskovich Pre-Start Up
JR Kriskovich Pre-Start Up
TD Kaiser Pre-Start Up
Punchlist Item ORR Core Requirement Addressed
Not Appllicable
Not Applicable
Not Appllcable
CR 2, 8, 13, 18, 19
Field Verified As-Built Drawings-DST Engineering Review
CGI Packages
Review and Approve Authorization Basis Clarification Letter Pre-Start Up
Review and Revise/Approve DG Baide Pre-Start Up
DG Baide 98-031
Software Configuration Management Plan
Not Applicable
Not Applicable
DST Engineering Review
DST Engineering Review
Memorandum of Agreement for Portable Exhauster Use by W320. (Numatec Letter 8C620-98-003)
Memorandum of Agreement for Portable Generator Use by W320. (Numatec Letter 8C620-98-004) I I Memorandum of Agreement for Storage of Portable Exhausters POR-007-SKID E and POR-008-SKID F at FMEF (Numatec Letter 8C620-98-005).
8-3
HNF-2219 Rev 0
~
Master Instrument List
Replace Insulation
Quality Assurance
iTER (W-320) - Responsible
Individual
DG Baide
Prepare ECN to HNF-2520, “Project W-320 Instrument List.
Replace Insulation on Portable Exhauster POR-007 and POR- 008.
Ensure that there are no outstanding NCRs against POR-007 or POR-008.
ABU - BACKUP 1000 CFM PORTABLE EXHA - ORR Core
Requirement Addressed
Not Applicable
Anticipated Turnover Date
Punchlist Item I Document Number and Title
Pre-Start Up DST Engineering Review
Review and approve VI File 50024, “1,000 CFM Portable Exhauster Vendors Definitive Design Report 96675.2 Rev 2,
Review CGI-WTF-35, Commercial Grade Item Dedication for the exhaust fan bearings and coupling on Exhauster Skids POR-007 and POR-008.
DST Engineering Review
DG Baide Pre-Start UP Not Applicable
Review HNF-2980 Rev 0, Safety Class Procurement Evaluation For Proiect W320 Portable Exhausters
DG Baide Pre-Start Up DST Engineering Review
Not Applicable
Review and Approve Calc W-320-24-038, “DBE Analysis for the 1000 CFM Portable Exhausters.
Review and Approve HNF-3029 Rev 0, Deployment of Backup Portable Exhausters POR-007-Skid E & POR-008-Skid F for c W320 Use
DG Baide Pre-Start Up DST Engineering Review
Not Applicable
DG Baide Pre-Start Up Not Applicable DST Engineering Review
Incorporate As-Built Incorporate “As-Built” ECN for H-14-102593 (See Field
Prepare ECN to HNF-2328, “Project W-320 Master Equipment List” to add portable exhauster components as an appendix.
SW Shaw Pre-Start Up Master Equipment List Not Applicable
Not Applicable
Not Applicable
Pre-Start Up
Pre-Start Up
TD Kaiser
TD Kaiser
MJ Bailey Pre-Start Up Not Applicable
8-4