ISO Managementsysteme Seminare & Audits AIAG CQI ......The new AIAG CQI-9, 4th Edition was...

31
ISO Managementsysteme Seminare & Audits AIAG CQI Standards TopQM-Systems ist lizenzierter Trainingspartner von: Automotive Support TopQM-Systems Online Training New CQI-9, 4 th Edition – Key Changes TopQM_online_lecture_new_CQI9_4.Edition_main_changes_V003_en.

Transcript of ISO Managementsysteme Seminare & Audits AIAG CQI ......The new AIAG CQI-9, 4th Edition was...

  • ISO Managementsysteme

    Seminare & Audits

    AIAG CQI Standards

    TopQM-Systems ist lizenzierter Trainingspartner von:

    Automotive Support

    TopQM-Systems Online Training

    New CQI-9, 4th Edition – Key Changes

    TopQM_online_lecture_new_CQI9_4.Edition_main_changes_V003_en.

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Co

    nte

    nt

    The Most Important Changes to the new CQI-9

    Seminar Possibilities with regards to the new CQI-9

    Summary / Conclusion

    Welcome and Introduction of Trainer Team

    3

    4

    5

    1

    In Closing7

    Sequence of the Online Training2

    Short Feedback Session: Q & A by the Trainer6

    Page 2

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Welcome and Introduction of Trainers

    Page 3

    Mirko Nowak

    Andreas Redaoui

    TopQM-Systems QM ExpertsAIAG CQI-Trainers / SpeakersAIAG CQI-Auditors

    CQI-9 Pioneers since 2006

    certified VDA-QMC TrainersVDA6.3 AuditorsIATF16949 1st & 2nd Party Auditors

    PSCR Trainers

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Sequence & Communication Rules

    Duration of Presentation ca. 1h - 45 min. presentation + 15 min. answering most important questions

    Page 4

    You have the possibility to pose questions briefly via Chat – we shall answer the top 5 questions at the end of thepresentation

    Share screen: please DO NOT share your screen – except if the moderator gives his permission

    Further Actions: please DO NOT activate RECORDING – this would be visible to all

    TEAMS Functions

    Begin Recording

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Sequence & Communication Rules

    After the Online Presentation you will receive:

    >the Presentation for download on our Home Page:www.topqm.de & www.topqm.com

    a

    Page 5

    Please switch your microphone to „MUTE"

    Please switch OFF your camera

    https://topqm.com/topqm-online-service-en/online-lecture-cqi-9-4th-edition

    https://topqm.de/topqm-online-service/online-vortrag-cqi-9-4th-edition

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    The Most Important Changes in the New CQI-9

    new 4. Edition

    June 2020

    Source: AIAG www.aiag.org, Southfield MI , USA

    Page 6

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    The new AIAG CQI-9, 4th Edition was officially released in June 2020And is officially published as:

    CQI-9, 4th Edition, Juni 2020

    This CQI Standard is officially registered under the following ISBN no.:

    ISBN 978 1 60534 44 9Source: AIAG www.aiag.org, Southfield MI , USA

    Page 7

    AIAG Product Code

    XO-CQI-9-4

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    The Most Important Changes in the New CQI-9

    Source: AIAG www.aiag.org, Southfield MI , USA

    Page 8

    October 2011

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 9

    Process Tables

    CARBON CORRECTION

    The Process Tables have remained, with onlyminor changes

    Already published in May 2014 as ERRATA Sheet

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 10

    CQI-9 4th Edition

    CQI-9 Structure NEW

    Cover Sheet

    Sections 1-3

    Section 4 Jobaudit

    Process TablesNo Changes in Structure

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 11

    Cover Sheet…has not had major

    changes in terms of content

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 12

    Cover Sheet – Audit Evaluation

    The system for Evaluation hasremained unchanged

    No Changes

    „Needs Immediate Action“:

    The methodology has become stricter! This means that the Responsible for Quality must be involved and must approve the respectivedeviations, as well as stop the productionwhen suspect parts are being produced

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 13

    Section 1-3

    Section 1 - Management Responsibility and Quality Planning

    Section 2 - Floor and Material Handling Responsibility

    Section 3 - Equipment

    No Structural Change

    Main Audit Questionnaire

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 14

    Generally unchanged, with exception of specific contentadditions, such as CP, Process Parameters ….

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 15

    Assessor QualificationsThe Assessor Qualifications for conducting HTSA audits havechanged!

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 16

    Die Mindestinhalte der Pyrometrie-Protokolle wurden aktualisiert

    Test report P 3.2.5 Instrument Calibration

    Test report P 3.4.7 TUS Report

    Test report P 3.3.5 SAT Report

    Some requirements have bee added with respect to minimum content of test reports, such as

    Point P3.2.5 (Instrument) and P3.3.5 (SAT) Accreditation Symbol on the test report if not performed inhouse Signatures are now possible in electronic form

    On the TUS report, more technical points were included

    Source: www.dakks.de Source: www.ilac.org

    International Laboratory Accreditation Cooperation

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 17

    RTDs (Resistance Temperature Detectors) are now included

    Section P 3.1 Thermocouples - RTDs (Resistance Temperature Detector / Device) are nowincluded, for example PT100

    Grace periods are now considered in sections for Instruments, SAT and TUS

    Grace periods are now considered in sections P3.2 Instrumentation, P3.3 SAT as well asP3.3 TUS, when calibration and test validities are exceeded (generally 14 days)

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 18

    Requirements for SAT have changed

    2 Possibilities for Test Thermocouples: temporary „or“ permanent (old Coparative Methode)

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 19

    Requirements for SAT have changed

    SAT Coparative Method: the High Limit Thermocouple is now used

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 20

    The Requirements for TUS have been supplemented

    The Requirements for TUS have been supplemented, for cases where the

    conventional TUS is not possible or impractical on the basis of furnace construction

    The requirements for calculating the necessary number of TUS

    Thermocouples for large furnace volumes was revised (refer to Table P3.4.1, Remark 1)

    The requirements regarding the number and positioning of the necessary TUS Thermocouples with regard to the respective work zones were newly described and betterpresented

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 21

    < 0,3m added

    Positioning is more clearly

    defined and graphically

    depicted (extract)

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 22

    The Layout of CQI-9 questions (Section 1-3) was restructured to more clearly specifiydetailed requirements

    The questions from the Main Audit Questionnaier were divided into individual questions, which are identical to the previously specified „Requirements and Guidance in the mainquestions.

    This means that the Auditor must increase the scope of the audit evidence to accommodatethe necessary details in the audit report

    Number of Requirements from the Main Audit Questionnaire from Section 1-3

    CQI-9 3.Edition CQI-9 4.Edition

    50 161

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 23

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 24

    The Layout of CQI-9 questions (Section 1-3) was restructured to more clearly specifiydetailed requirements

    1,4 Are heat treat process control plans up to date and reflecting current processing?Reference automotive industry Control Plan guidelines. The Control Plan may be specific for each part or part family or it can be process specific and

    written for each process. In any case it describes required controls and actions for each process step as well as periodic requirements to assure

    process is in control.

    RequirementsObjective

    EvidenceN/A

    Satis-

    factory

    Not Satis-

    factory

    Needs

    Immediate

    Action

    The organization shall incorporate the use of a documented Control Plan reflecting the

    current process.XXXXX x

    Control Plans shall address all process steps from part receipt to part shipment and

    identify all equipment used and all key heat treat process parameters as defined by the

    organization.XXXXX x

    A cross-functional team shall be used in the development of the Control Plan and shall be

    consistent with all associated documentation such as FMEAs, work instructions and shop

    travelers.XXXXX x

    All special characteristics as defined by the organization or its customers shall be

    identified, defined, and addressed in the applicable control plan. XXXXX x

    Sample sizes and frequencies for evaluation of process and product characteristics shall

    be addressed and shall be consistent with the minimum requirements listed in the

    applicable Process Table.XXXXX x

    Question IntensionMain Question

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 25

    Calibration Requirements for Refractometers was removed

    A1.11 3,2 Refractometers (typically used to check polymer quenchants and washer solutions) shall be verified prior to use (with

    distilled water) and calibrated annually (per manufacturer's requirements) at a minimum.

    CQI-9 3rd Edition

    OLD

    Exceptions in frequencies or test methods for the evaluation of

    product characteristics shall be documented in the customer

    approved PPAP control plan

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 26

    2 Risk Standards were referenced under „1.3 References“

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 27

    New VDA licensed TopQM Seminars in D & USAONLINE / E-Learning OFFENE Seminare Inhouse VOR-ORT

    AIAG VDA FMEA CQI-relevant

    Automotive Core Tools CQI-relevant

    VDA6.5 Produktauditor Brand-Neu – Seminare bereits ab 20.Juli 2020

    VDA Band 2 PPF VDA trainings coming soon

    PSCR Upgrade-Online / Offene – Inhouse-Seminare

    VDA6.3 zertifizierter Auditor Wochenseminar

    VDA6.3 Auditor Kartenverlängerung wir übernehmen die VDA-Antragsstellung

    Seminar Overview, Dates and Prices available: https://topqm.de/schulung-und-training

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 28

    CQI-9 3rd Edition

    CQI-9 4th EditionSummary / Conclusion

    These were some of the most important changes from the CQI-9 3rd Edition to the new CQI-9 4th Edition. Following, the conlusion from the point of view of TopQM-Systems

    Focus more on the Control Plan

    RTDs are included

    The basic structure of CQI-9 remains the same (Cover Sheet, Section 1-4, Process Tables)

    +

    +

    +

    Process Tables are greatly unchanged+

    SAT requirements must be reviewed with AIAG

    Too little space for evidence and comments in theExcel sheet for „objective Evidence“

    Deckblatt-Layout can be improved

    -

    -

    -

    Auditor Qualification raises questions-

    Reference to technical details increase theacceptance levels of the standard+

    An established standard world-wide+

    More focus on Key-/Monitor-/Control Processparameters+

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.June 2020

    Page 29

    TopQM CQI-9 Seminars world-wide (outside Europe)

    CQI-9 Implementation Heat Treat System Assessment

    CQI-11/CQI-12 Implementation Plating and Coating System Assessment

    CQI-15 / CQI-17 Implementation Welding- and Soldering System Assessment

    CQI-23 / CQI-27 Implementation Molding (Plastic) and Casting System Assessment

    More information and international contact see: https://topqm.com/courses-and-training/cqi-seminars-outside-europa

  • ISO Managementsysteme

    Seminare & Audits

    AIAG CQI Standards

    TopQM-Systems ist lizenzierter Trainingspartner von:

    Automotive Support

    Questions – Answers - Discussion

  • © TopQM-Systems Germany

    TopQM-Systems Online PresentationKey Changes to the new CQI-9, 4th Edition 10.10.2020

    Vielen Dank

    Für Ihre

    Aufmerksamkeit

    TopQM-Systems GmbH & Co. KG

    TopQM-Systems North America LLC

    Trainings, Audits & Quality

    Management

    313 Olivarri Drive

    Anderson SC 29621, USA

    Phone +1 864 332 4215

    [email protected]

    TopQM-CGP Mexico SA de CV

    Training, Audits and QM-Systems

    Villa Hermosa 145 Villas de la Aurora

    C.P. 25296, Saltillo, Coahuila

    Phone +52 844 415 7159

    [email protected]

    Trainings, Audits & QM-Systeme

    Oberer Schafackerweg 1

    D-74850 Schefflenz, Germany

    Phone +49 6293 9289888

    [email protected]

    Page 31