ISLAND INNOVATOR - PETROBALL

49
WWW.OOSENERGY.COM ISLAND INNOVATOR 6th Generation Drilling Rig Enhanced GM4000-WI Design Improved motion characteristics for harsh environment service

Transcript of ISLAND INNOVATOR - PETROBALL

Page 1: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

ISLAND INNOVATOR

6th Generation Drilling Rig

EnhancedGM4000-WI Design

Improved motion characteristics for harsh environment service

Page 2: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator-PresentationContent

Island Innovator - Rig Concept and Technical Presentation1

Rig Design Modifications - Improved Heave and Motion Characteristics2

Drilling Operations3

Well interventions4

Subsea capabilities5

Plug and abandonment6

Page 3: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island InnovatorWell intervention rig with full drilling capacity

GM 4000- WI Design

Purpose-built heavy well intervention vessel with full capabilities for drilling and Sub-sea operations:

▪ DnV +1A1 column-stabilized drilling unit (N)

▪ Dynpos-Autro

▪ Posmoor -Autro

▪ Crane (N)

▪ Heldk - SH

▪ Drilling Structure: NOV

Island Innovator on location for drilling operation

Page 4: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Drilling capabilityNOV Drilling Package for drilling and well construction

NOV Full drilling capacity derrick, heave compensated ram-rig type

Top drive:

▪ 590 mT , 1000 hp 188 rpm

▪ Max Torque 54 500 ft lbs

▪ Retractable yoke

Pipe racking

Racking in separate set-back tower - reduce risk objects falling onto drillfloor

Set-back capacity:

▪ 5 750 m

▪ 192 std 5 7/8” Pipe

▪ 16 std 9 ½” Collars

Derrick and topdrive Pipe handling

Fully automated NOV pipe handling system for drilling efficiency and safety

▪ Manipulatir arm

▪ Iron roughneck

▪ Catwalk machine

▪ Hydra racker

Page 5: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Reference list - Performance dataClients and wells drilled 2013 - 2018

Island Innovator - 21 Wells Drilled

Page 6: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Office facilities (1)Client offices and meeting rooms equipped for collaboration and Integrated Operations

Company mans office

▪ Spacious office facilities for operators and service compainies personnel

Clients interactive meeting room

▪ Clients meeting room with screens for real-time communication and collaboration

Page 7: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Office facilities (2)Office section designed for efficiency and communication

Collaboration room

▪ Spaceous collaboration room with work stations for client and 3rd party engineers

Office Facilities

▪ Large office capacity for both clients and for Island Drilling personnel

Page 8: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Office facilities (3)Office section designed for efficiency and communication

Meeting room

▪ Large meeting and video conference room▪ Can be devided into two separate rooms

Coffe corner

▪ Adjacent to the offices are the coffe and tea facilities for refreshments and relaxation

Page 9: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Mess room (1)Enjoy great meals in a relaxing environment

Mess room

▪ Spacious mess room with good capacity▪ Combination of small and larger tables

Hot meals

▪ Wholesome and nourishing food▪ Variety of hot meals, cold cuts and snacks

Page 10: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Mess room (2)Breakfast- lunch - dinner and supper

Main dining area Cold cuts bread & cereals

Enjoy a varied selection ofsalads, cold cuts, dessertsand cheeses suitable for

▪ Health and nutrition

▪ Allergic and religiousrequirements

Page 11: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Recreational room (1)Relaxing maritime environment

Main lounge Smoking lounge

Spacious well furnitured recreational rooms for crew, client and visitors

▪ Main lounge

▪ TV and multimedia entertainment

▪ Separate smokers lounge

Page 12: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Recreational room (2)Relaxing maritime environment

Recreation room

▪ Large lounge with many sitting groups for relaxation and individual leisure activities

Recreation room

▪ Games,magazines and books available▪ Video and multimedia entertainment

Page 13: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Accommodation for 120 POBNORSOK standard single man cabins with en-suite bathroms

Single man cabin Shower Toilet

Page 14: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Leisure activities (1)Varied leisure activities available

Gymnasium

▪ Spacious and wellell equiped gymnasium for exercicing and keeping fit

Music studioo

▪ A large variety of instruments and equipment available for recreational use

Page 15: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Leisure activities (2)Varied leisure activities available

Cinema room

▪ Separate cinema room with relaxing seating▪ Suited also for safety meetings and training

Shooting range

▪ Shooting range with exellent hunting grounds for big game

Page 16: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Specifications (1)Dimensions and capacities

Draft

▪ Operating draft

▪ Survival draft

▪ Transit draft

17,75 m

15,75 m

9,20 m

Displacement

▪ Operating displacement

▪ Survival displacement

▪ Transit displacement

36 400 mT

34 700 mT

26 700 mT

Main dimensions Storage capacities

▪ Overall length 104,5 m ▪ Ballast water 13 210 m3

▪ Overall width 65 m ▪ Fuel

▪ Main deck length 81,5 m - Pontoons 3 208 m3

▪ Main deck width 65 m - Surface 260 m3

▪ Helideck(diameter) 27,75 m ▪ Drilling water 2 038 m3

▪ Moonpool dimensions 21,95 m x 7 m ▪ Potable water 600 m3

▪ Active liquid mud (surface) 460 m3

▪ Reserve liquid mud (column)

▪ Bulk Bentonite/Barite

▪ Bulk cement

▪ Base oil storage

▪ Brine storage

400 m3

240 m3

240 m3

814 m3

1 526 m3

Variable load 4000 mT

Transit speed 8 knots

Page 17: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Specifications (2)Station keeping and machinery

Rated water depth 70 to 650 m. Currently equipped for 650m

Station keeping

▪ DP system

▪ Thrusters

▪ Thruster motors

▪ Mooring

Kongsberg Maritime SDP-22 + SDP-12 back-up

6 x Wärtsila LIPS type FS3500-536NU

6 x 3800 kW Siemens H-Compact plus. 0-720 RPM

4 double Rolls Royce winches for 90 mm wire

Machinery

▪ Engines

▪ Generators

▪ Emergency power

▪ Power distribution

6 x Wärtsila Vasa 12V32, 5110 kW ea, 720 RPM

6 x Siemens 1DK4536-8AL06-2, 4 840 kW ea, 6.6 kV 60Hz

1190 kW Mitsubishi S12R-MPTA.1 425 kVA

Newage Stamford PM734C

690V essential, 440V,230V

Accommodation 110 single bed cabins

Page 18: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Specifications (3)Safety equipment and drilling package

Safety equipment

▪ Life boats 4 x 60 persons. Free fall lifeboats

▪ Mob boats

▪ Life rafts

2 x Watercraft WHFRB 6.50 DJ

4 x 30 persons

Derrick

▪ Hook load capacity

▪ Base

▪ Height (internal)

▪ Cladding

▪ Racking capacity

650 ton (590 mT)

35 ft x 35 ft (10,7 m x 10,7 m)

160 ft (48,8 m)

0-14 m. 4,5 m at finger board level

7500 m, 270 std 5 7/8” DP + 12 std 9 1/2” DC. Belly boardinstalled

Drawworks NOV Cylinder Rig 4600 HP, Hydraulic active heave compensated

Rotary National VBJ-RST. 60,5’’ opening 1 000 mT

Traveling/ Crown block NOV sheave cluster - 590 mT

Page 19: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Specifications (4)Drilling package and cranage

Top Drive NOV HPS 750-E-AC-SG

590 mT, 1 000 hp

Max cont. torque: 54 500 ft.lbs at 0-94RPM

Max RPM: 188

Retractable NOV top drive yoke

Cyber base Drillers control NOV cabin system with two operating positions

Pipehandling system▪ Piperacker

▪ Iron roughneck

▪ Catwalk machine

▪ Manipulator arm

NOV hydraracker HR-III-XY

NOV MPT-200 with mud bucket. 200 KNm break out torque.

Range: 2 7/8” – 9 ¾”

NOV PR25-60LS with tail in arm. Fully equipped for tubular and riser

handling

NOV DFMA-P-2500. 3 ½” – 9 5/8” gripper head and 47” riser handlinghead

Page 20: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Specifications (5)Dimensions and capacities

BOP/ X-mas tree handling

▪ 2 x 60 mT overhead crane STB of Moon pool

▪ 300 mT BOP elevator system/ main skid

▪ 300 mT BOP skid - Designed to carry the BOP from parkedposition

to BOP elevator/ main skid

▪ 300 mT LMRP skid - Designed to carry the LMRP/ X-mas tree from parked position

to BOP elevator/ main skid

▪ 120 mT X-mas tree cantilever transportsystem

▪ 2 x work winches (1,5 mT, 1 x 10 mT) 1 cherry picker in moon pool

Cranes

▪ Platform crane 2 ea

▪ Pipehandler crane

NOV AHC (Active Heave Compensated knukcle boom craneC4475S.

Capacity: 165 mT

NOV Lattice crane T6179. Capacity: 80 mT

NOV Knuckle boom crane with 20” and 30” yoke + riseryoke

Capacity: 24,2 mT at 17,7 m. Max radius: 26,6m.

Page 21: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Specifications (6)BOP and marine riser package

Riser

▪ GE Vetco MR-6E 21’’ with KT ring adapter risersystem

▪ 50 ft joints - 6. 60 m

▪ 2 x 3’’ ID choke lines, 4’’ boost line. 2 x 2,3’’ ID hydraulic return lines

▪ 600 m riser (70 % with buoyancy)

BOP▪ BOP Stack

▪ Annular preventer

▪ Shear rams

▪ Pipe rams

▪ BOP control system

Cameron 18 ¾’’. 15K EVO stack

2 ea. Cameron DL, 18 ¾’’10K

2 ea. Extended double ram (Shear seal & CGS shear)

3 ea. Fixed and variable rams

Cameron EVO, Sub Sea Pods for all functions

Page 22: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Specifications (7)Mud treatment and Cuttings handling

Mud treatment and supply

▪ Mud pumps 3 x NOV HP-P-220, 2 229 hp, 4 257 l/min, 7500 psieach.

5 x Brandt VSM 300

M-I Swaco CD 1400 degasser

NOV fully automated mixing system

▪ Shale shakers

▪ Degasser

▪ Mud mixing

▪ Sack cutting machine

▪ Big-bag slitting machine

▪ Liquid mixing skid

Cuttings handling

▪ Screw conveyors from shakers to skip station ondeck

▪ Prepared for pneumatic cuttings collection/ transfer system e.g ‘’CleanCut’’

▪ Deck space for ‘’CleanCut’’ ISO pump rack orsimilar

Page 23: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator-PresentationContent

Island Innovator - Rig Concept and Technical Presentation1

Rig Design Modifications - Improved Heave and Motion Characteristics2

Drilling Operations3

Well interventions4

Subsea capabilities5

Plug and abandonment6

Page 24: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Low weight derrick arrangementOpen-faced well intervention derrick with full drilling rig capacity

NOV cylinder rig

Cylinder rig of ram-rig type with low centre of gravity

▪ Light weight derrick

▪ Separate set-back tower

▪ Bottom of set-back tower lowered to cellar deck level.

▪ Reduced centre of gravity

▪ Improved motion characteristics

Low centre of gravity derrick arrangement

Page 25: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Improved motion characteristicsLowered set-back further reduce centre of gravity

NOV cylinder rig

Cylinder rig of ram-rig type with low centre of gravity

▪ Light weight derrick

▪ Separate set-back tower

▪ Bottom of set-back tower lowered to cellar deck level.

▪ Reduced centre of gravity

▪ Improved motion characteristics

Low centre of gravity derrick arrangement

Page 26: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Improved motion characteristicsEnlarged buoyancy elements compared to initial design

Initial Design GM 4000

▪ Shorter buoyancy blisters on initial design▪ Less waterline area available at draft

Enhanced Design GM 4000 WI

▪ Main buoyancy blisters extended by 3 m▪ Larger sponsons fitted on pontoons

Page 27: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Enhanced Design GM 4000 WI

Island Innovator - Improved motion characteristicsAdditional buoyancy elements compared to initial design

Initial Design GM 4000

▪ Initial design built without buoyancy blisters on inward side of columns

▪ Additional secondary buoyancy blisters fitted on inward side of columns

Page 28: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Improved motion characteristicsGM 4000-WI enhanced design with additional buoyancy elements

Enhanced design

▪ Improved heave and motion charachteristics

▪ Extended operational window

▪ Primary Buoyancy blisters extended by 3 m in height for additional stability

▪ Additional secondary buoyancy blisters fitted on opposite side of columns

Heave - RAO Operations draft (17.50 m)

Page 29: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Winterization programDrilling in the Barenz Sea

Winterization items

▪ 1 Heat tracing pipes

▪ 2 Heating in doublebottom

▪ 3 Electrical heat mats onescape routes to lifeboatstations

▪ 4

▪ 5

▪ 6

▪ 7

Drilling under arctic conditions

Page 30: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator-PresentationContent

Island Innovator - Rig Concept and Technical Presentation1

Rig Design Modifications - Improved Heave and Motion Characteristics2

Drilling Operations3

Well interventions4

Subsea capabilities5

Plug and abandonment6

Page 31: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Drilling capabilityNOV Drilling Package for drilling and well construction

NOV Full drilling capacity derrick, heave compensated ram-rig type

Top drive:

▪ 590 mT , 1000 hp 188 rpm

▪ Max Torque 54 500 ft lbs

▪ Retractable yoke

Pipe racking

Racking in separate set-back tower - reduce risk objects falling onto drillfloor

Set-back capacity:

▪ 5 750 m

▪ 192 std 5 7/8” Pipe

▪ 16 std 9 ½” Collars

Derrick and topdrive Pipe handling

Fully automated NOV pipe handling system for drilling efficiency and safety

▪ Manipulatir arm

▪ Iron roughneck

▪ Catwalk machine

▪ Hydra racker

Page 32: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Mud processingMud handling capacity for drilling at high ROP

Sack store and mud mixing room Shaker room

Full mud processing capabilities for drilling

▪ 5 VSM 300 shakers

▪ Automated mud mixing

▪ Sack cutting machine and big-bag cutter

Page 33: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Drilling (1)Mud processing

Capabilities

Fully equipped for drilling operations without capacity limitations

▪ 5 each shakers 5 VSM 300 shakers

▪ Full flow capacity for large diameter hole sections at high ROP

▪ Redundancy for changing screens

▪ Remote operatedheader box

Shaker room

Page 34: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Drilling (2)Mud pumping capacity for drilling

Mud pump room Mud pump 1&2

Mud pumps and capacity

▪ 3 x NOV HP-P-220

▪ 229 hp

▪ 4257 l/min

▪ 7 500 psi

Page 35: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Drilling (3)Drillers cabin

NOV Cyberbase Drill floor - clear view from drillers cabin

Cyberbase - state of the art drilling control system

▪ Ergonomically optimizedoperators stations

▪ Elevated cabin, excellent view of drill floor

Page 36: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Drilling (#)Drillers cabin

Spaceus drillers cabinDrilling instrumentation

▪ Human Machine Interface

▪ Clear view

▪ Additional work desk for Tool pusher or 3rd party engineer

Page 37: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator-PresentationContent

Island Innovator - Rig Concept and Technical Presentation1

Rig Design Modifications - Improved Heave and Motion Characteristics2

Drilling Operations3

Well interventions4

Subsea capabilities5

Plug and abandonment6

Page 38: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Open-face derrick designFull capacity drilling derrick

CatwalkDrilling package Pipe racking tower

NOV 4000 HP Cylinder rig with hydraulic active heave compensation and separate pipiperacking tower

▪ 590 mT capacity

▪ Top drive

▪ Open design - no V-door

▪ Flat floor and catwalk

▪ Separate set-back tower

▪ Full access to drill floor and well centre

▪ Ideal for well intervention equipment handling

Page 39: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Well interventionCoiled tubing and wireline intervention

Capabilities

Large dedicated deck-space with capacity for holding three coiled tubing reels and asociaated equipment

▪ Easy acess for injector heads at two levels

▪ Utility station

▪ Fixed lines for HP fluids and well returns

Coiled Tubing

Page 40: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Well interventionCoiled tubing and wireline intervention

Capabilities

Large dedicated deck-space with capacity for holding three coiled tubing reels and asociaated equipment

▪ Easy acess for injector heads at two levels

▪ Utility station

▪ Fixed lines for HP fluids and well returns

Coiled Tubing

Page 41: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Well interventionCoiled tubing and wireline intervention

Capabilities

Large dedicated deck-space with capacity for holding three coiled tubing reels and asociaated equipment

▪ Easy acess for injector heads at two levels

▪ Utility station

▪ Fixed lines for HP fluids and well returns

Coiled Tubing

Page 42: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - well interventionsStarboard deck with large space for well intervention equipment

Aft view

▪ Reinforced deck with high load carrying capacity

Forward view

▪ Large space for coiled tubing breels and other intervention skids

Page 43: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Well testingFull support for well testing

Well testing

Dedicated area for test separator package with Utilities and manifold to burner booms

▪ Unit can remain onboard during transit

Test separator package

Page 44: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator-PresentationContent

Island Innovator - Rig Concept and Technical Presentation1

Rig Design Modifications - Improved Heave and Motion Characteristics2

Drilling Operations3

Well interventions4

Subsea capabilities5

Plug and abandonment6

Page 45: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Subsea completionsMoon pool and BOP bay

Subsea Capabilities

Designed for subsea template drilling and completions operations in the North Sea

▪ Large handling capacity for x-mas trees and equipment

▪ NOV handling equipment

▪ Moon pool accessible with subsea crane

Moon Pool and BOP/ X-mas Tree Handling Area

Page 46: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Starboard deckLarge space for handling of subsea trees and structures

Subsea Capabilities

Designed for template drilling and subsea completions/interventions

▪ Reinforced deck structure with load carrying capacity

▪ Skidding arrangement for storing and working

▪ Subsea crane for placement of structures in moon pool

Large skid deck for subsea equipment

Page 47: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Sub-sea construction capabilitiesNOV active heave compensated 165 mT knuckle boom crane

Sub sea crane Key features

Active heave compensated - Working Radius MainWinch:

▪ Max radius w/ 33 mt – 50 m internal lifts

▪ Max radius w/165 mt- 18 m internal lifts

▪ Max radius w/ 25.6 mt – 50 m sea lift

▪ Max radius w/ 165 mt – 12 m sea lift

▪ Max radius w/ 26 mt – 50 m AHC lift

▪ Max radius w/ 165 mt – 14 m AHC lift

Working Radius, Auxilary Winch, maximum:

▪ Max radius w/ 15 mt - 50,0 m (Internal and sea lift)

▪ Min radius 15 mt - 8,0 m (Internal and sea lift)

Page 48: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Subsea operations (1)ROV operations to increase efficiency and save rig-time

Isand Innovator ROV control room ROV control console

Spacious control room for ROV operations

▪ Fully equipped for sub sea installations and P&A operations

▪ Advanced ROV control console

Page 49: ISLAND INNOVATOR - PETROBALL

WWW.OOSENERGY.COM

Island Innovator - Subsea operations (2)ROV operations to increase efficiency and save rig-time

ROV Subsea operations ROV control

Onshore mission support centre with 24/7 service

▪ Real time remoteoperations

▪ Advanced tool kit for subsea work