ISIS Upgrade Options

ISIS Accelerator Division

John Thomason

Page 2: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

0.24 MW ISIS

• Assumes an optimised 2RF system giving 300 µA in the synchrotron• 4/5 pulse pairs to TS-1 (192 kW) and 1/5 pulse pairs to TS-2 (48 kW)• Must keep beam to TS-2 for the foreseeable future

Page 3: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

Option Comments Beam Power(MW)

Neutron Yield

1(a) Add 180 MeV Linac Technical Issues ~ 0.4 1.7

1(b) Add 800 MeV RCS Operational Issues ~ 0.5 2.0

1(c) Upgrades 1(a) + 1(b) Technical/Operational Issues ~ 0.9 3.8

2 Add ~ 3 GeV RCS Recommended 1st Upgrade 1 3.2

3 Add ~ 6 GeV RCS Technical/Cost Issues 2 5.6

4 Upgrades 1+2 or 1+3 Technical/Operational Issues ~ 2 – 6 ~ 6.4 – 16.8

5 400 – 800 MeV Linac + 3 GeV RCS Recommended 2nd Upgrade 2 – 5 6.4 – 16.0

6 1.334 GeV Linac + Accumulator Ring Good “Green Field” Option 5 18.8

• Upgrade routes for ISIS are summarised in the table above. All designs are to be developed primarily for an optimised neutron facility, and should provide provision of an appropriate proton beam to the newly built TS-2. The list here is not exhaustive, but presents the main, reasonable routes that would provide a major boost in beam power. Primary considerations are the cost relative to a new facility and the impact on ISIS operations.

Upgrade Options

Page 4: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

Linac Upgrade

• Replaces oldest and probably most vulnerable part of ISIS accelerators• Increased energy (up to 180 MeV) gives increased intensity in synchrotron and more beam to target• Similar designs are already available e.g. CERN Linac4, J-PARC• Would require a new building and reconfiguration of the TS-1 neutron and muon targets

Page 5: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

180 MeV Injection(Steve Jago, Stuart Birch, Adrian McFarland)

• HEDS Line - DC Dipoles and Quadrupoles• Vertical “Sweeper” - Pulsed Dipole• Injection Septum - High Current DC Dipole• Injection Dipoles - 4 Pulsed Dipoles - Closed Orbit Bump• Stripping Foil

- Beam rigidity- Aperture

- Beam rigidity- Increased field/current/voltage- Stripping efficiency- Lifetime

Single Turn / Ferrite Core155 mm AperturePeak Field ~ 0.11 T for 70 MeVPeak Current ~ 12200 ARise / Fall Time ~ 80 µsFlat-top ~ 400 µs

Page 6: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

70 MeV Magnetic Model

• Calculated current - 12195 A• Actual current – 12200 A

• Calculated voltage - 175 V• Actual voltage ~ 250 – 300 V

Page 7: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

180 MeV Magnetic Model

• Peak field ~ 0.18 T for 180 MeV• Calculated current - 20725 A

• Calculated voltage - 290 V

Page 8: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

Power Supply

• I > 21000 A• Rise/fall ~ 80 µs• Flat-top ~ 400 µs• Possibility of tuneable gradient on “flat-top”

Current waveform

Voltage waveform

Page 9: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

180 - 800 MeV Acceleration

(Chris Prior)

• Initial calculations (done in 2003) show that 180 MeV injected beam should be cleanly accelerated to 800 MeV in the ISIS ring at intensity levels giving 0.5 MW on target• There should already be enough RF acceleration available in the ISIS ring to accommodate this (calculations were better optimised for fundamental only rather than dual harmonic acceleration)• Did not include transverse effects• Requires beam chopping

Page 10: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

• Based on a ~ 3 GeV RCS fed by bucket-to-bucket transfer from ISIS 800 MeV synchrotron (1MW)

• RCS design also accommodates multi-turn charge exchange injection to facilitate a further upgrade path where the RCS is fed directly from a 800 MeV linac (2 – 5 MW)

Recommended MW Upgrades

Page 11: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

RCS Rings(Chris Warsop, Grahame Rees, Dean Adams,

Ben Pine, Bryan Jones, Rob Williamson)

Page 12: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

Main topics to cover Longitudinal Calculations/Simulations for candidate FI Rings, then MTI

Build up MTI simulation 2D to 3D, then acceleration

Model Injection Magnet and Region (CST based, as profile monitors)

Transverse Space Charge and Working Point, Correction Schemes

Lattice Optimisation, Analysis, Correction

Instabilities: standard checks, e-p work

Collimation: outline designs, full simulations with activation

Review all main systems

Pull work together: comparisons Best lattice and ring size; RF and MMPS combinations

Estimated losses and activation

Started

Next

Uncertain Cover

Outline Work Plan

Page 13: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

Simulation Hardware

SCARF:• Linux only: Red Hat Enterprise 4.4• GNU, Intel, PGI compilers for Fortran, C, java• AMD, Intel, ATLAS, Goto BLAS, BLACS, ScaLAPACK, FFTW libraries• MPI is the parallel framework• 3 main sections of cluster• Can choose section or just submit• Access by grid certificate• Obtained from e-Science locally• ORBIT MPI installed as a module• Synchrotron Physics and Intense Beams Groups have purchased 17 nodes = 136 processors• Will be available soon after 16th February• Larger jobs possible using normal SCARF queues• Will still maintain access to 16 processor development rig

Page 14: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

Simulation Codes

ORBIT MPI:• Strip-foil injection, including painting and foil scattering• RF focusing and acceleration• Transport through various magnetic elements• Longitudinal and transverse impedances• Longitudinal, transverse, and three-dimensional space charge forces• Collimation and limiting apertures• Calculation of many useful diagnostic quantities• Parallel version of ORBIT available on SCARF

Set Development (Ben Pine):• Parallel version of Set running on SCARF• Currently 2D with space charge• Work advancing on adding 2.5D• Main goals this year: - Benchmarking against standards - Adding new 2D boundary conditions - Starting to think about full 3DAnd:• Add other software• Add other accelerator codes

Page 15: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

Visualization

• e-Science Application Development Group• Parallel visualization cluster• Expertise in data mining, computational steering• Could use existing tools if data put into nexus data format• http://www.nexusformat.org/Main_Page

Simulation hardware, code and visualization resources on site to dothe world-class accelerator physics required for ISIS upgrades

Page 16: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

800 MeV H- Linac(Grahame Rees, Ciprian Plostinar)

Design Parameters:

• Beam power for 2 MW, 30 Hz, 3.2 GeV RCS: 0.5 MW

• Beam pulse current before MEBT chopping: 43.0 mA

• Beam pulse current after MEBT chopping: 30.0 mA

• Number of injected turns for 370 m RCS: ~500 turns

• Beam pulse duration at the 30 Hz rep rate; ~700.0 μs

• Duty cycle for the extent of the beam pulse; ~2.1 %

• MEBT(in) normalised rms emittances: 0.25, 0.375 (π) mm mr

• MEBT(out) normalised rms emittances: 0.292, 0.42 (π) mm mr

• Cell equipartition transv/long phase shift ratios: 1.40

Page 17: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

Design Options

All options have the same 324 MHz, 74.8 MeV stage 1:

IEBTDTLMEBTRFQ 74.8 MeV

Options F (MHz) Stage 2 Stage 3 Stage 4

1 648 ScL 1 ScL 2 ScL 3

2 648 CCL ScL 2 ScL 3

3 972 ScL d ScL e ScL c

4 324-?-972 ScL a ScL b ScL c~200 MeV 800 MeV

Page 18: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

Beam Envelopes forOption 2

DTL CCL (193 MeV) ScL (800 MeV)

Page 19: ISIS Upgrade Options ISIS Accelerator Division John Thomason.

800 MeV H- LinacStudies Still Needed

1. MEBT comparisons

2. Selection of option

3. ScLa/b spoke cavities?

4. Refine stage matchings

5. Linac error effect study

6. Effect of failed cavities

7. Ring collimation line