ISE4 Integrated Demo

9
ISE4 Integrated Demo Ver 2 May 11, 2005

description

ISE4 Integrated Demo. Ver 2 May 11, 2005. Revised Arrangements Demo Scenario. Design agent Export AP 216 hull form Navy Import hull form - into Focus DB then to ASSET Run ASSET to do ship arrangements - will add decks, pilot house, machinery spaces, also define requirements - PowerPoint PPT Presentation

Transcript of ISE4 Integrated Demo

Page 1: ISE4 Integrated Demo

ISE4 Integrated Demo

Ver 2

May 11, 2005

Page 2: ISE4 Integrated Demo

May 11, 2005

ISE4 Integrated Demo 2

Revised Arrangements Demo Scenario• Design agent

– Export AP 216 hull form

• Navy – Import hull form - into Focus DB then to ASSET– Run ASSET to do ship arrangements - will add decks, pilot house,

machinery spaces, also define requirements– Output to Focus DB, Export AP 215

• Design agent– Import, complete ship arrangement– Add equipment

• Navy– Import back to LEAPS for vulnerability tool assessment– Generate recommendation

• Build yard– Import, fix arrangement

Page 3: ISE4 Integrated Demo

May 11, 2005

ISE4 Integrated Demo 3

Revised Arrangements Demo Scenario

Initial ASSETArrangement

+ Requirements(LEAPS)

Build Yard

Design Agent

AP 216 Hull

Initial Arrangement

Complete Arrangement + Equipment

Vulnerability Analysis(LEAPS)

Vulnerability Report

Page 4: ISE4 Integrated Demo

May 11, 2005

ISE4 Integrated Demo 4

ISE4 Integrated Demo

ArrangementRequirements

(LEAPs)Initial

Arrangement(Tribon) Updated Initial

Arrangement(Sener) Initial Electrical

System Design(KSSI)

Ship checkProject?

Detailed StructuralDesign

(Intergraph) FEM Analysis(EB)

Structural DesignFeedback

(Intergraph) NeutralManufacturing

(ISPE) Yard SpecificManufacturing

(EB & Intergraph )

Page 5: ISE4 Integrated Demo

May 11, 2005

ISE4 Integrated Demo 5

ISE4 Demo Scenario• ASSET mission and compartment requirements generated in LEAPS (P21)

• Create initial compartment and equipment arrangement (Tribon XML)– Include importing vendor data for main engine - CPC + AP 203– Incorporate Atlantec SBIR demonstration to import equipment?

• Update arrangement (Sener – P21)– Structural update required which impacts tank size (mission requirement)– Or incorporate Ship Check results to drive structural change

• Demonstrate Initial Electrical System design (KSSI)– Electronic system in Pilot House

• Transfer arrangements to detailed design (Intergraph)

• Extract structure for analysis (Intergraph)

• FEM analysis of Engine Room (EB)

• Feedback from Analysis (Ingr)

• Extract Structure for Manufacturing (Ingr)

• Develop neutral structural manufacturing model (ISPE)

• Generate yard-specific manufacturing data (EB, Ingr)– Compare EB and Avondale manufacturing outputs

Page 6: ISE4 Integrated Demo

May 11, 2005

ISE4 Integrated Demo 6

Demo Scenario Issues

• Better way to integrate Electrical into demo?

• Reason that arrangements are updated – Ship Check doesn’t fit with Initial Arrangement scenario

• If LEAPS does not provide initial ASSET data– Could provide reason arrangements are updated – Claim Navy Analysis programs determined xxx

Page 7: ISE4 Integrated Demo

May 11, 2005

ISE4 Integrated Demo 7

Eng Analysis Demo Scenario

AP 203P21

Shipyard(Add to CPC, CAD)

Vendor

Equip arrangement

Ship ProductModel(ISDP)

AP 227P28

Equip arrangement

AP 215P28

Compartmentation

AP 216P21

AP 218P28

AP 209P28

CPCCAD Parts

Analysis

(COG, weight,location)

AP 209 /218P28 GUID, doc URL

Feedback

Page 8: ISE4 Integrated Demo

May 11, 2005

ISE4 Integrated Demo 8

Notional Mediators RequiredAP ARM -> AIM AIM-ARM ARM-> 209 AIM

P21

216 Eng Analysis Eng Analysis

215 Arrangements Arrangements

218 Eng Analysis

227 Eng Analysis

209 Eng Analysis ??

Page 9: ISE4 Integrated Demo

May 11, 2005

ISE4 Integrated Demo 9

Mediators Required

209 218 216 215227 203/PLM

ARM

AIM

P28 P28

P28

P28 P28 P28

P21 P21 P21

P28

P21

P28