Proc No. RC/ENC(AW)/ADA/AEE2/Kaleshwaram(Hyd)Reorg Dt.23-06-2020
Sub :- Irrigation & CAD Dept. - Kaleshwaram Project -Modified Reorganization Proposals of Kaleshwaram Project Construction Circle No.1, Siddipet of the Engineer-in-Chief, Kaleshwaram Project, Hyderabad unit - Orders-
Issued-Regarding
Ref: 1. G.O Ms No.15, l&CAD(Ser-11) Dept, Dt.22.05.2020 2. G.O Rt No.90, l&CAD(Ser-11) Dept, Dt.01 .06.2020
*****
The Government vide reference 1st cited have reorganized the Kaleshwaram
Project Circle No.1, Siddipet of Engineer-in-Chief, Kaleshwaram Project, Hyderabad
unit as per the Annexure I appended to the order along with the staffing pattern as
per Annexure II & Ill to the order, subject to redeployment of staff within the
sanctioned strength and effecting transfers as per his competency strictly in
conformity with the presidential order and in terms of G.O Ms No.12, l&CAD (P&B)
Dept, Dt.20.02.2016.
In accordance with the orders issued vide reference cited, the modified
reorganization orders are hereby issued in respect of Kaleshwaram Project Circle
No.1, Siddipet of Engineer-in-Chief, Kaleshwaram Project, Hyderabad as detailed
below.
Kaleshwaram Pro ject Construction Circle No.1 , Siddipet
The existing Kaleshwaram Project Construction Circle No.1 , Siddipet is
presently functioning with the following two divisions.
1. Kaleshwaram Project Construction Division No- 1, Siddipet with 4 Sub
Divisions. 2. Kaleshwaram Project Construction Division No-4, Kamareddy with 3 Sub
Divisions.
Hydrology & Investigation Division No.2 (Godavari Basin) Metpally is now
detached from Hydrology & Investigation Circle (Godavari Basin) Karimnagar and
converted as Kaleshwaram Project Construction Division No-8, Siddipet and ordered
to work under the control of Kaleshwaram Project Construction Circle No.1, Siddipet
of Engineer-in-Chief, Kaleshwaram project, Hyderabad unit.
2
Thus on modified reo · · . rganizat1on, the Kaleshwaram ProJ·ect Construct·1on Circle No 1 S'dd' · . , ' ipet will function with the following three Divisions.
1. Kaleshwaram Project Construction Div·1s·1on No- 1, Siddipet with 4 Sub Divisions.
2. Kaleshwaram Project c t . . . . . . . ons ruction D1v1s1on No-4, Kamareddy with 3 Sub D1v1s1ons.
3. Kaleshwaram Project Construction Division No-8, Siddipet with 3 Sub Divisions.
1 · Kaleshwaram Project Construction Division No.1 Siddipet with 4 Sub Divisions
The Kaleshwaram Project Construction Division No.1 Siddipet is presently
functioning with 4 Sub Divisions. There is no change in the existing setup of the division and its 4 Sub Divisions.
2. Kaleshwaram Project Construction Division No-4, Kamareddy with 3 Sub
Divisions
The Kaleshwaram Project Construction Division No-4, Kamareddy is
presently functioning with 3 Sub Divisions. There is no change in the existing
setup of the division and its 3 Sub Divisions.
3. Kaleshwaram Project Construction Division No-8 1 Siddipet with 3 Sub
Divisions
The existing Hydrology & Investigation Division No.2 (Godavari Basin)
Metpally of Hydrology & Investigation Circle (Godavari Basin) Karimnagar is
converted as Kaleshwaram Project Construction Division No-8 duly shifting
the headquarters from Metpally to Siddipet and ordered to work under the
control of Kaleshwaram Project Construction Circle No.1, Siddipet with the
following three Sub Divisions.
Sri B.Gopala Krishna Rao, Executive Engineer, KP Construction Division
No.1, Siddipet, who is placed on Full Additional Charge to the post of
erstwhile Executive Engineer, Hydrology & Investigation Division No.2
(Godavari Basin) Metpally vide reference 2nd
cited is directed to form now
3
converted Kaleshwaram Project Construction Division No-8, Siddipet and
hold full additional charge to the post until further orders.
The works and records of H&I Division No.2(GB), Metpally are attached to
H&I Division No.4(GB), Karimnagar.
Sub Division No.1, Siddipet: The existing H & I Sub Division No.3, Armoor.
of Hydrology & Investigation Division No.2 (Godavari Basin) Metpally is now
converted as Sub Division No.1, Siddipet duly shifting the headquarters from
Armoor to Siddpet and ordered to work under the control of Kaleshwaram
Project Construction Division No-8, Siddipet of Kaleshwaram Project
Construction Circle No.1, Siddipet.
Sri N.Devender, Deputy Executive Engineer.Sub Division No.1,
Ellathakunta of Kaleshwaram Project Construction Division No.1 Siddipet is
directed to form Sub Division No.1, Siddipet and hold full additional charge to
the post until further orders.
Smt P.Shailaja, Deputy Executive Engineer, H & I Sub Division No.3,
Armoor is hereby transferred and posted to O/o Chief Engineer, Hydrology &
Investigation, Hyderabad.
The existing H & I Sub Division No.2, Nizambad of Hydrology &
Investigation Division No.2 (Godavari Basin) Metpally is now detached and
converted as H & I Sub Division No.1, Nizambad with same headquarters
and ordered to work under the control of Hydrology & Investigation Division
No.4 (Godavari Basin), LMD Colony, Karimnagar of Hydrology & Investigation
Circle (GB), LMD Colony, Karimnagar.
Sri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub
Division No.2, Nizambad now converted as H & I Sub Division No.1 ,
Nizambad is directed to work under the control of Hydrology & Investigation
Division No.4 (Godavari Basin), LMD Colony, Karimnagar of Hydrology &
Investigation Division No.4 (Godavari Basin), LMD Colony, Karimnagar of
Hydrology & Investigation Circle (GB), LMD Colony, Karimnagar.
4
The works and records of H & I Sub Division No.3, Armoor are attached to now converted H & I Sub Division No.1, Nizambad of Hydrology &
Investigation Division No.4 (Godavari Basin) , LMD Colony, Karimnagar.
Sub Division No.2, Siddipet : The existing H & I Sub Division No.1, Metpally of Hydrology & Investigation Division No.4 (Godavari Basin) LMD Colony, Karimnagar is converted as Sub Division No.2, Siddipet duly shifting the headquarters from Metpally to Siddipet and ordered to work under the control of Kaleshwaram Project Construction Division No-8, Siddipet.
Sri D.Ravinder, Deputy Executive Engineer, Sub Division No.4, Siddipet of Kaleshwaram Project Construction Division No.1 Siddipet is directed to form Sub Division No.2, Siddipet and hold full additional charge to
the post until further orders.
The Circle scale establishment working in the H & I Sub Division No.1,
Metpally are attached to Hydrology & Investigation Division No.4 (Godavari
Basin) LMD Colony, Karimnagar.
The works and records of H & I Sub Division No.1, Metpally are
attached to H & I Sub Division No.2, LMD Colony, Karimnagar of Hydrology &
Investigation Division No.4 (Godavari Basin) LMD Colony, Karimnagar.
Sub Division No.3, Siddipet: The existing H & I Sub Division No.2, Asifabad
of Hydrology & Investigation Division No.3 (Godavari Basin) Adilabad is
converted as Sub Division No.3, Siddipet duly shifting the headquarters from
Asifabad to Siddipet.
Sri V.Ch.Srinivas Rao, Deputy Executive Engineer, Sub Division No.3,
Siddipet of Kaleshwaram Project Construction Division No.1 Siddipet
is directed to form Sub Division No.3, Siddipet and hold full additional charge
to the post until further orders.
Sri M.Venkat Ratnam, Deputy Executive Engineer, H & I Sub Division
No.2, Asifabad, of Hydrology & Investigation Division No.3 (Godavari Basin)
5
Adilabad is transferred and posted to H&I Sub Division No 2, Khammam of
Hydrology & Investigation Division No.S(Godavari Basin), Bhadrachalam.
The Circle scale establishment working in the H & I Sub Division No.2,
Asifabad are attached to Hydrology & Investigation Division No.3 (Godavari
Basin) Adilabad.
The works and records of H & I Sub Division No.2, Asifabad are
attached to H & I Sub Division No.3, Bellampally.
The Circle scale staff working in Hydrology & Investigation Division
No.2 (Godavari Basin) Metpally are transferred and posted to the offices
shown against their names as Annexure appended to this proceedings.
The lien and Seniority of Circle scale establishment of Kaleshwaram
Project Construction Division No.8, Siddipet will be continued to be
maintained in their parent circle only i.e H&I Circle (GB), LMD Colony,
Karimnagar.
The Statement showing the details of Modified reorganization structure
of Kaleshwaram Project Circle No.1, Siddipet is appended as Annexure-I to
the G.O 1st cited and H&I Circle (GB), LMD Colony, Karimnagar is appended
as Statement to this proceeding.
The staffing pattern of Kaleshwaram Project Circle No.1, Siddipet after
modified reorganization is shown as Annexure-11 and staffing pattern of
H&I Circle (GB), LMD Colony, Karimnagar is shown as Annexure-11I
respectively to the G.O 1st cited .
These orders are placed in the department official Web Site
www.irrigation.telangana.qov.in . All the Unit /Circle officers in the address
entry are r~quested to download the orders from the Website and take
necessary action accordingly.
These orders shall come into force with immediate effect from
30.06.2020 AN.
To
6
The Engineer-in-Chief, Kaleshwaram Project, Hyderabad and the Chief
Engineer, Hydrology & Investigation, Hyderabad are requested to take
necessary action accordingly.
Encl: 1. G.O Ms No.15 Irrigation & CAD (Ser-II) Dept Dated: 22.05.2020 along with Annexure-I ,II and Ill
2. Statement, 3. Annexure.
Sd/- B.Nagendra Rao, Dt.23.06.2020 Eng ineer-in-Chief(AW)
The Engineer-in-Chief, Kaleshwaram Project, Hyderabad The Chief Engineer, Hydrology & Investigation, Hyderabad The individuals through concerned Circle/ unit officers
1. Copy submitted to the Principal Secretary to Government, Irrigation &CAD Department, Telangana Secretariat, Hyderabad for favour of information.
2. Copy to the Engineer-in-Chief (Irrigation) for information and necessary action. 3. Copy to the Superintending Engineer, Hydrology & Investigation Circle
(Godavari Basin), Karimnagar for information and necessary action. 4. Copy to the Superintending Engineer, Kaleshwaram Project Circle No.1,
Siddipet for information and necessary action. 5. Copy to the Director of Works Accounts, Manoranjan Buildings, M.J.Road,
Hyderabad. 6. Copy to the PAO Concerned. 7. Copy to the Deputy Executive Engineer (Computers) to place in irrigation
website. 8. Copy to 'B'Section, 'D' Section, 'E' Section of this office for information.
Leµ) . .
for Engineer-in-Chief (AW)
STA
TEM
EN
T R
E-O
RG
AN
ISA
TION
STR
UC
TUR
E O
F HY
DR
OLO
GY
& INV
ES
TIGA
TION
CIR
CLE (G
OD
AVA
RI B
ASIN
), KA
RIM
NA
GA
R
Division
Sub-Division
S.N
o Existing
Now
converted after Existing
Now
converted after reorganisation reorganisation
Hydrology &
H & I S
ub Division N
o.1, Kadam
H
& I Sub D
ivision No.1, K
adam
Investigation Division
Hydrology & Investigation
1 N
o.3 (Godavari B
asin) D
ivision No.3 (G
odavari H
& I Sub D
ivision No.3, B
ellampally
H & I S
ub Division N
o.3, Bellam
pally A
dilabad B
asin) Adilabad
H & I S
ub Division N
o.2, Nizam
abad of H
ydrology & Investigation Division N
o.2 (GB
) H
& I Sub D
ivision No.1, N
izamabad
Hydrology &
Hydrology & Investigation
Metpally
Investigation Division
H & I S
ub Division N
o.2, LMD
Colony,
H & I S
ub Division N
o.2, LMD
Colony,
2 N
o.4 (Godavari B
asin) D
ivision No.4 (G
odavari K
arimnagar
Karim
nagar LM
D C
olony, B
asin) LMD
Colony,
Karim
nagar K
arimnagar
H & I S
ub Division N
o.3, Manthani
H & I S
ub Division N
o.3, Manthani
H & I S
ub Division N
o.4, Medak
H & I S
ub Division N
o.4, Medak
H & I S
ub Division N
o. 1, Warangal
H & I S
ub Division N
o.1, Warangal
Hydrology &
Hydrology & Investigation
3 Investigation D
ivision D
ivision No.5 (G
odavari H
& I Sub D
ivision No.2, B
hadrachalam
H & I S
ub Division N
o.2, Bhadrachalam
N
o.5 (Godavari B
asin) B
asin) Bhadrachalam
B
hadrachalam
H & I S
ub Division N
o.2, Kham
mam
H
& I Sub D
ivision No.3, K
hamm
am
Sd/-
B.N
agendra Rao, D
t.23.06.2020 E
ngineer-in-Chief(A
W)
_\o: '\Engineer-in-C
hief(AW
)
~~bfv,
Annexure
S.No Name of the officer holding the post Employee Designation
1 Azeem Khan Assistant Technical Officer
2 Shailaja Palle Junior Technical Officer
3 Venkateshwar Rao Damera Technical Assistant
4 Venkata Swamy Kothakonda Superintendent
5 Padmakar Gajanaveni Senior Assistant
6 M.Rajeshwar Rao Marepally Senior Assistant
7 Satya Narayana Goud Bollapally Senior Assistant
8 Santhosh Kumar Santapuri Senior Assistant
9 Saleem Pasha - Junior Assistant
10 Srinivas Raju Namarapu Raju Junior Assistant
11 Ramesh Dasari Record Assistant
12 Anwer Baig Md. Driver(Regular)
13 Satyanarayana Sunkari Driver(Regular)
14 Ramakrishna Sonnaila Office Subordinate
15 Kiran Kumar Nakka Office Subordinate
16 Prasad Bingi Office Subordinate
1/I C F S+ei a ¥ WW:c-=-
, __
Now Transferred to
KP Construction Division No.8 , Siddipet
KP Construction Division No.1, Siddipet
KP Construction Division No.8, Siddipet
KP Construction Division No.8, Siddipet
KP Construction Division No.1, Siddipet
KP Construction Division No.1, Siddipet
KP Construction Division No.8, Siddipet
KP Construction Division No.8, Siddipet
KP Construction Division No.8, Siddipet
KP Construction Division No.8, Siddipet
KP Construction Division No.8, Siddipet
KP Construction Division No.4, Kama reddy
KP Construction Division No.8, Siddipet
KP Construction Division No.1 , Siddipet
KP Construction Division No.1, Siddipet
KP Construction Division No.8, · Siddipet
Sd/- B.Nagendra Rao, Dt.23.06 .2020 Engineer-in-Chief(AW)
for Engineer-in-Chief(AW)
~-r--
Y-(A)
J/,_?)r
q GOVERNMENT OF TELANGANA
ABSTRACT
Es1ablishf!1ent . - l&CAD Department - Reorganization of Kaleshwaram Project Construction ~1rcle No.1 Siddipet of the Engineer-in-Chief, Kaleshwaram Project, Hyoerabad unit - Orders - Issued. ----------------=============--==============
IRRIGATION & CAD (Ser.II} DEPARTMENT
G.O.Ms.No.15 Dated:22.05.2020.
ORDER:
Read:
From the Engineer-in-Chief (AW), I &CAD Department, Hyderabad Lr. No. RC/ ENC(AW)/ADA/AEE2/ Keleshwaram (Hyd) / Reorg, Dated: 04.05.2020
-x-x-x-x-x-x-
After careful examination of the proposal of the Engineer-in-Chief (Admn.Wing), I & CAD Department, Hyderabad in the reference read above, Government hereby reorganize the Kaleshwaram Project Construction circle No.1 Siddipet of the Engineer-in-Chief, Kaleshwaram Project, Hyderabad unit as per Annexure-1 and staffing pattern as per Annexure-11 & Ill appended to this order, subject to re-deployment of staff within the sanctioned strength and effect transfers as per his competency strictly in conformity
· t< with the Presidential Order, in terms of G.O.Ms.No.12, l&CAD (P&B) Department, dated
20.02.2016.
~__;:: 2. The Engineer-in-Chief (AW), l&CAD Department, Hyderabad/ Engineer-in-Chief ~cl iP.s ·•waram Project) Hyderabad shall take further necessary action in the matter
~0
{ -~ i-oaccordingly. ?--1·
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TELANGANA)
Dr. RAJAT KUMAR PRINCIPAL SECRETARY TO GOVERNMENT
To The Engineer-in-Chief (AW), l&CAD Department, Hyderabad.
Copy to: . The Engineer-in-Chief (Kaleshwaram ProJect) , Hyderabad
I &CAD Department, Hyderabad. The Engineer-in-Chief (Irrigation) l&CAD Department, Hyderabad. The Accountant General, Hyderabad through the E-n-C (AW). The Pay & Accounts Officer, Hyderabad through the E-n-C (AW) The PS to Principal Secretary to Govt., l&CAD Department. The I ti. CAD(Proj.lV} Dept. Sf/ Sc.
// FORWARDED :: BY ORDER II fl · {,,,Ji.A Iii~ SECTION OFFICER
... --.
... --
ANNEXURE-1 -
-1 G
.O.M
s.No.15, I &
CAD(SER.11) DEPARTMENT, DT: 22.05.2020
RE-ORG
ANISATION STRUCTURE O
F KALESHWARAM
PROJECT coN
STRU
CTIO
N C
IRC
LE N0.1 SIDDIPET
Division sub-D
ivision
Existing I
Now converted after
Existing
' Now
converted after reorganisation reorganisation
Proposed work load
KALESHWARAM
PROJECT CO
NSTRUCTION CIRCLE NO
.1 KALESHW
ARAM PRO
JECT CO
NSTR
UC
TION
CIR
CLE NO.1 SIDDIPET
SIDD
IPET
Sub Division No.1, Ellanthakunta
Sub Division No.1, Ellanthakunta
Kaleshwaram Project
Kaleshwaram Project
Sub Division No.2,C
hinna Kodur, Sub D
ivision No.2,Chinna Kodur C
onstruction Division No-1, C
onstruction Division No-1,
Sub Division No.3, Siddipet,
Package-10, 11 and 12 Siddipet,
Siddipet, Sub Division No.3, Siddipet,
Sub Division No.4, Siddipet, Sub D
ivision No.4, Siddipet,
Kaleshwaram Project
Kaleshwaram Project
Sub-Divisin No.1 Kam
areddy Sub-D
ivisin No.1 Kamareddy
Construction Division No-4,
Construction D
ivision No-4, Sub-Division No.2, G
handhari Sub-D
ivision No.2, Ghandhari
Package-22 Kam
a reddy Kam
a reddy Sub-D
ivision No.3, Bikanoor Sub-D
ivision No.3, Bikanoor
H & I Sub Division No.3, Arm
oor of Sub D
ivision No.1, Siddipet, H
ydrology & Investigation Division No.2
Hydrology & Investigation
(GB) M
etpally W
orks of additional One
Division No.2 (G
odavari Basin) Kaleshwaram
Project H
& I Sub Division No.1, M
etpally of Sub D
ivision No.2, Siddipet, TM
C parallel conveyor M
etpally of Hydrology & C
onstruction Division No-8,
Hydrology & Investigation Division No.4
system from
MM
R to Sri Investigation C
ircle (Godavari
Siddipet (G
B) LMD Colony, Karim
nagar Kom
aravelli Mallanasagar
Basin) Karimnagar
Reservoir.
H & I Sub D
ivision No.2, Asifabad of Sub D
ivision No.3, Siddipet, H
ydrology & Investigation Division No.3 (G
B) Adilabad DR. RAJAT KUM
AR PRINCIPAL SECRETARY TO
GO
VERNMENT
//FOR
WAR
DED
: BY ORDER//
til_-~Olt}i~~
SECTION O
FFICER
--------
------
--.. ,.,,,a.1re.11 I
G.O
.Ms.N
o.15, I &
CA
D~
o2
0
' '
r. I) brePt., ot: 22.0 . S
tatemen
t sho
win
g th
e S
anctio
ned
po
sts of K
aleshw
aran, P
. -
ct·on Circle N
o.1, S
idd
ipet A
fter Reorganisation
ro1rett constru •
0/o
SE, Kaleshw
aram P
roject K
aleshwaram
Project C
onstn. aram
Project
Kaleshw
aram P
roject Constn. D
ivn. D
ivn. No.1, S
iddipet C
l<aleshW
o•vision N
o-4, N
o.8, Siddipet
Kaleshw
aram P
roject C
onstruction Circle N
o.1, Siddipet
0nstruction I ddY
Construction C
ircle No.1 Sid,
Ka
m!r!.-
No of No of
SS including No of
No of
55 including N
o of
S.N
o N
ame of the Post
SS including R
edeployment
Redeploym
ent ss includin9
Redeploym
ent R
edeployment
Redeploym
ent SS including
Redeployn
Redeploym
ent Posts
Redeploym
ent Posts
Redeploym
ent P
osts Posts
Redeploym
ent Posts
-A
B C
D
F
E F
G=A
+C+E
H=B+D-1
E
-0
0 0
0 0
0 1
0 1
0 1
5uperintendinq Engineer
I 0
1 0
0 1
0 4
0 1
1 I
2 E
xecutive Engineer /D5E
I 4
0 0
3 0
12 0
2 0
3 3
Dy. E
xecutive Engineer
17 0
0 13
0 47
0 A
ssistant Executive
4 0
13 4
Engineer/ Assistant Enqineer
0 1
0 3
0 1
0 0
0 1
5 Technical O
ffice(DM G
r.I)
0 0
0 0
1 0
1 0
2 0
6 A
.T.O. (D
M G
r.II) 1
0 6
0 1
0 1
0 3
0 7
J.T.O. (DM
Gr.III)
8 Tech
. Asst. (Tracers)
0 0
0 0
0 0
2 0
2 0
0 0
0 0
0 0
1 0
1 0
9 P
rintinq Technician (BPO)
1 3
1 0
1 0
1 0
1 0
10 D
.A.O
. 0
1 0
0 0
0 0
0 0
1 1
1
N.T.P.A.
0 4
1 1
0 1
1 0
1 1
12 S
uoerintendent
4 0
6 3
3 0
4 0
17 3
13 S
enior Asst.
19 4
0 8
4 5
0 4
2 0
14
Junior A
sst. 1
0 0
0 0
0 0
0 1
0 15
Senior S
teno 6
2 2
0 0
0 2
0 2
2 Tvoist
-...... -
16
-
. . --
, . u ... ·-
-'I,
.. , II,
. -
-
· ned P s s of I< ' . the sanct10 aleshwaram . Statement showing - hwara111 Pro1ect Construction Circle No.1, Siddipet After Reorganisation
. Kales Proj ect Co Kaleshwaram Project Kaleshwararh Projet;f:' 0/o SE, Kaleshwaram otvn. No.1, Siddipe;stn. Kaleshwaram Project Constn . Divn. ,.
Construction Circle No.l, _ ,-----~ Construction Division No-4, No.8, Siddipet Construction Circle No.i Side Kama reddy y ./
No of ss including No of No of Noof SS including Redeployment Redeployment Redeployment SS including No of SS including SS including S.No Name of the Post Redeployment Redeployment Redeploym Redeployment Posts - Posts Redeployment Redeployment Redeployment Posts i-- -i--- Posts Posts -
C A B D E F E F G=A+C+E H=B+D+ - r---.
1 0 17 Driver 0 0 r-- 1 0 1 0 3 0
0 0 0 0 1 0 1 0 2 0 18 Record Asst - -
0 10 6 0 28 8 5 7 2 6 19 O.S. l AttendersJ -0 0 0 0 1 0 20 Night Watchman 0 0 0 1
Total 26 0 52 16 43 2 42 1 163 19 I
Dr.RAJAT KUMAR PRINCIPAL SECRETARY TO GOVERNMENT
/ /FORWARDED: : BY ORDER// t91 . IJ [JP)~~~ SEC~ N OFFICER
-[ G.O.Ms.No.15, I&c:~nexure.!ti
os.2020 -
. , Before Reorganisation Ser.11 De After Reorganisation --. 1)1::2:Z• I
0/o Hydrol og Hydrolo g Hydrolo gy Hydrolog y ---
Hydrology& Hydrology& .!! ti y y& & Investigatio Investigatio tl2.k: .. 0
SE,Hydrolog y& & 0.
Investi ga Investig a Investig at Investiga o/o Hydrolo9Y~ n Division n Division
0 l,J Ill .. & ti SE,1iydrolo9Y In"estigatiO
0. l a .e- C Ill
Inve~gation tion tion ion on Divisiq No.4 No.s GB Total 8~t:g l S.No Cadre Circle Divisio n Divisio n Division No.S
n GB Tota 1 s, n pilfision (Godavari (Godavari ; i 'iii In.,l!stigation No,3 .2
(Godavari No.2 No.3 No.4 (Godavar Basin) Basin) iii:it; 0. i arcJe . Adilabad
Ill .-t C Ill
Basin) (Godava r Adilaba d (Godavari Basin) LMDColony, Bhadrachala a "ti (GOda~11 Ill
- -- K=G+H+ A B C D E f=A+B + H I J L=F-K
C+D+E G l+l
Superintending 1 0 0 0 1 - ,__ - 0 0 0 1 0 1 0 - 0
Engineer 1
1 1 Executive 1 1 5 -- 1 1 1 4 1 0 2 Engineer/DSE 1 1
Dy. Executive 1 3 4 3 13 2 4 3 10 3 0 3 2 1
Engineer
3 10 7 15 44 6 12 10 31 13 0 4 AEEs/AEs 9 3
Technical Officer 1 1 0 1 4 1 0 1 3 1 0 5 (DM Gr.I) 1 1
2 1 1 1 6 1 1 1 5 1 0 6 A.T.O. (DM Gr.II) 1
2
2 4 2 1 12 2 4 2 1 9 3 0 7 J.T.O. (DM Gr.III) 3
Tech. Asst. 2 1 2 1 8 2 1 2 1 6 2 0 8 (Tracers) 2
Printing Technician 1 1 1 1 5 1 1 1 1 4 1 0
9 (BPO) 1
0 1 0 0 1 0 1 0 0 1 0 0
10 D.A.O. 0 I I
E======:- ;;;;,,; .... -~ .__ - ''H;;ie ----- ··- ------...... - . -... -. - ., r-----___r-- G.O.Ms.No,1s Annexure-uz
=--===== Before Reorganisation I&.CAD(Ser,IIJ DeDt. Dt:22.os.2020 I -e I Hydrology liYdrology f O/o Hydrolo g Hydrolog After Reorganisation .S! 0
& u • g. SE,Hydrology y& y& &. O/o Hydrology& Hydrology & ti.so~ S.No & Investig a Investiga Investigat Investigati SE,Hydrology Hydrology& Investigatio Investigatio &.-o sf Investigation tion tion ion on Division & Investigatio n Division n Division cu cu ·- "O Cadre Division GB Total u t: tl ·-Circle Division Division No.s Investigation n Division No.4 No.S GB Total cCU:,11> _
(Godavari No.2 No,3 No,4 (Godavari Circle No.3 (Godavari (Godavari ~:au~ t (Godavari (Godavari ID C "O Basin) (Godavar Adilabad Basin) Adilabad Basin) Basin) 8 Basin) LMDColony, Bhadrachala
--
A B C D E f=A+B+ K=G+H+ r---
C+D+E G H I J L-F-K 11 1 0 0 I+l
N.T.P.A. 0 0 0 1 1 0 0 0 1 0 r---12
Superintendent ' 1 1 1 1 5 0 1 1 1 1 1 4 1
13 Senior Asst.
4 8 2 5 25 4 0 6 8 2 5 19 6
14 Junior Asst. 4 8 4 6 27 4 8 0 5 4 6 22 5
15 0 1 2 1 4 0 1 2 0 Typist 0 1 4 0
16 0 0 0 3 0 0 0 0 0 3 0 Driver 3 0
1 0 1 0 3 1 0 1 0 2 1 0 17 Record Asst 1
7 21 7 19 63 7 21 7 19 54 9 0 18 o.s. (Attenders) 9
1 1 0 0 3 1 1 0 0 2 1 0 19 Night Watchman 1
Total 33 46 63 35 56 233 33 58 40 51 182 51 0
Dr. RAlAT KUMAR
// FORWARDED:: BY ORDER// PRINCIPAL SECRETARY TO GOVERNMENT
/Y}.ila,P,~~ SE~~N OFFICER