Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

40
PLANNING for a post CELTIC TIGER Urban Landscape City Without Public Economic Funds’

description

Presentation of paper for the ECTP Young Planners Workshop 2013. The City without Public Economic Funds by Colin Broderick, Aoife Doyle and Rachel Ivers.

Transcript of Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Page 1: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

PLANNINGfor a post

CELTIC TIGER Urban Landscape

City Without Public Economic Funds’

Page 2: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

IRELANDYoung Planners Workshop 2013

Aoife Doyle, Colin Broderick, Rachel Ivers,Stephen D. Walsh & Philip Kavanagh

19th September, 2013

Page 3: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

PLANNINGfor a post

CELTIC TIGER Urban Landscape

Our paper:

Page 4: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

OVERVIEW.

1

Page 5: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

• Celtic Tiger and Entrepreneurial Planning • The Response to the Crisis – NAMA • Spatial Planning at the Crossroads • Alternative Future’s for Ireland’s Urban Development• The Living Cities Initiatives • Community Responses • The Economic Viability of Temporary Uses• Towards More Adaptive and Resilient Spatial Planning• Conclusion

OVERVIEW

Page 6: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Celtic Tiger and Entrepreneurial Planning.

2

Page 7: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

During the 1990s the so called ‘Celtic Tiger’ Irish economy grew at an average annual rate of 7.5%, more than three times the European average at the time (Murphy, 2000).

Page 8: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Irish Planning became increasingly infused with the ethos of entrepreneurialism ;

Page 9: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

A new focus on Ireland’s cities brought about a wave of market led regeneration efforts, encouraged by an availability of cheap credit, tax incentives and a climate which encouraged the creation of numerous public private partnerships (PPP’s).

Page 10: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

The Irish economic model as ‘predicated on constant growth to function’ and this focus spilled over into planning practice.

While Ireland’s recession mirrors what is going on in most European states and further afield, the particular causes of the Irish economic crisis were decidedly local in origin as the Irish economy had become unsustainably dependent on the construction industry (and house building specifically).

Page 11: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Indeed it has been argued that the goal of Ireland’s loose regulatory system was to ‘encourage the market rather than restrain it’(Kirby, 2009: 9).

Page 12: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Housing unit completions per 1000 population for Europe in 2007

Page 13: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

New postal addresses 2005 - 2007

Page 14: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Urban Planningin theCeltic Tiger Era

Page 15: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

NationalRESPONSE.

3

Page 16: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

NAMA€77 billion

Page 17: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

“obtain so far as possible the best achievable financial return for the State having regard to the amount paid, plus whatever additional working or development capital costs for the acquired bank assets.”

(Section 10 of the NAMA Act 2009)

Page 18: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

local government

reform

Page 19: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

National Spatial Strategy (NSS)

Regional Planning Guidelines (RPG’s)

Development Plans

Local Area Plans (LAP’s)

National

Regional

Local

irish Planning System

Page 20: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"
Page 21: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

NSSAbandoned

Page 22: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

localRESPONSEs.

4

Page 23: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

PROPOSED DEMANDED?

THE RESULT

Page 24: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

local responses / alternative futures

for  Ireland’s urban

development

Page 25: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

LIVING cities

Page 26: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

vulnerable

STRENGTH POWER

Page 27: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

communityresponse

Page 28: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Granby Park

Page 29: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

GranbyPark

Page 30: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Thomas Street

Page 31: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Future Potential?

Prime LocationLarge Developmentinviting foreign investment

Page 32: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Viability?

Page 33: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

New Central BANK HQ.

Page 34: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Towards More Adaptive and Resilient Spatial Planning.

5

Page 35: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Towards more adaptive and resilient spatial planning? The scale of the current global economic crisis has undermined and raised questions about some of the core assumptions that dominated urban policy thinking in many global cities in the 1990s and 2000s (Raco, 2011).

“As well as a catastrophic failure in Ireland’s banking and financial regulatory system, there has been a catastrophic failure of the

planning system” (NIRSA, 2010: 2)

‘Is this the end of spatial planning in Ireland?’ (Kitchin, 2013)

Page 36: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Conclusions

6

Page 37: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

Seeking to Recover rather than Reform?

Thus far, the Irish response to the crisis—like that of many other nations—has been described as reacting rather than acting. It is critical that current circumstances do not combine to promote a tendency to short termism and a predomination of non strategic thinking and action.

Strategic Spatial Planning is crucial in moving forward

Page 39: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"

‘If a city is struck by disaster it follows that the original state was one in which it was vulnerable to disaster in the first place’ (Klein et al, 2003)

Page 40: Ireland Group "Planning for a post Celtic Tiger Urban Landscape"