IRB ~hmedabad Vadodara subsidiary of Super Express...

164
/, IRB ~hmedabad Vadodara A subsidiary of Super Express Tollway Pvt Ltd Mumboi Officu: 8-301, Universal Business Park, kc am an^ Oil Mill Rood, Cbon$$li Edote, Andheri (E), Momboi-400 072 rn Tel: 91 -22-6733 5900 rn Fax: 91 -22-6753 5905 s www.i&.co.in May 07,2014 - - - - The Team Leader Mls. Aarvee Associates Architects, Engineers 8 Consultants Pvt. Lfd. House No. 2, Radha Kutir Bungalows Near Parth Kutir, Beside Shyam Bungalow Near Octroi Naka, Karamsad Dist - Anand, Gujarat - 388325 Tel - 02692-644684 Email- [email protected] Project: - Six Laning of Ahmedabad to Vadodara Section of N H 8 from Krn. 6.400 to Km. 108.700 (Length 102.300 Km.) in the State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from Km. 0.000 to Km. 93.302 in the State of Gujarat (Length 93.302 Km.) under NHDP Phase V on Design Build ~inance Operate Transfer (DBFOT) Toll Basis. c + -8 Subject: Monthly Progress Report - April 2014 Dear Sir, Please find enclosed herewith the Monthly Progress Report for the month of April 2014 in pursuant to Clause 13.1 of Article 13 of the Concession Agreement. Fking you, urs Sincerely, I i andi \ (Bjeputy Head Project Construction) <) Encl: - As above C.C.: The Project Director, National Highways Authority of India, 3A & 36, 2"d Floor, Amul Building near Dena Bank Vejalpur Road, Jivraj Park, Ahmedabad - 380051 Ph: 079 - 26821062 - For Information and Records. Corporate Office: IRB Complex, Chondivli Form, Chandivli Village, Andheri (E), Mumboi-400 072 Tel: 91 -22-66404220 Fox: 91 -22-6675 1024 e-moil: [email protected] I www.irb.co.in

Transcript of IRB ~hmedabad Vadodara subsidiary of Super Express...

/,

IRB ~hmedabad Vadodara A subsidiary of

Super Express Tollway Pvt Ltd Mumboi Officu: 8-301, Universal Business Park, kc am an^ Oil Mill Rood, Cbon$$li Edote, Andheri (E), Momboi-400 072 rn Tel: 91 -22-6733 5900 rn Fax: 91 -22-6753 5905 s www.i&.co.in

May 07,2014 - - - -

The Team Leader Mls. Aarvee Associates Architects, Engineers 8 Consultants Pvt. Lfd. House No. 2, Radha Kutir Bungalows Near Parth Kutir, Beside Shyam Bungalow Near Octroi Naka, Karamsad Dist - Anand, Gujarat - 388325 Tel- 02692-644684 Email- [email protected]

Project: - Six Laning of Ahmedabad to Vadodara Section of NH 8 from Krn. 6.400 to Km. 108.700 (Length 102.300 Km.) in the State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from Km. 0.000 to Km. 93.302 in the State of Gujarat (Length 93.302 Km.) under NHDP Phase V on Design Build ~ inance Operate Transfer (DBFOT) Toll Basis. c

+ -8

Subject: Monthly Progress Report -April 2014

Dear Sir,

Please find enclosed herewith the Monthly Progress Report for the month of April 2014 in pursuant to Clause 13.1 of Article 13 of the Concession Agreement.

F k i n g you, urs Sincerely,

I i andi \ (Bjeputy Head Project Construction) <) Encl: - As above

C.C.: The Project Director, National Highways Authority of India, 3A & 36, 2"d Floor, Amul Building near Dena Bank Vejalpur Road, Jivraj Park, Ahmedabad - 380051 Ph: 079 - 26821062 - For Information and Records.

Corporate Office: IRB Complex, Chondivli Form, Chandivli Village, Andheri (E), Mumboi-400 072 Tel: 91 -22-6640 4220 Fox: 91 -22-6675 1024 e-moil: [email protected] I www.irb.co.in

SIX LAKM 6GUJAEXPREGUJABUILD

NATI(M

ANING O6.400 TORAT ANDESSWAYRAT (LE

D, FINAN

M

ONAL MINISTRY

OF AHMEO KM 10D IMPRO

Y FROM ENGTH 9NCE, OPER

MONT

Aar

AHM

M

HIGHWY OF ROA

(Gove

EDABAD 08.700 (OVEMEN

KM 0.03.302 KMRATE & T

THLY PAP

P

Indep

rvee Assoc

& Co

Co

EDABAD V

TO

EPMODERN R

WAYS AAD TRANernment

TO VAD(LENGTH

NT OF EX000 TO M) UNDTRANSFE

PROGPRIL 2

art-I o

endent

ciates Arc

onsultants

oncessio

VADODAR

LLWAY PV

PC ContrROAD MA

AUTHORNSPORT &t of India

DODARA H 102.30XISTING A

KM 93DER NHDER (DBFO

GRESS2014

of II

Enginee

hitects En

s Pvt. Ltd.

onaire

RA SUPER

VT.LTD.

ractor AKERS PVT

RITY O& HIGHW

a)

SECTION00KM) INAHMEDA3.302 INDP PHASOT) TOLL

S REPO

er

ngineers

R EXPRESS

T. LTD

F INDIAWAYS)

N OF NHN THE SABAD VAN THE SSE V ON

BASIS

ORT

S

A

H 8 FROMSTATE OADODARASTATE O

DESIGN

M F A F

N,

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 2 

TABLE OF CONTENTS 1.0 Location Plan .............................................................................................................................. 4

2.0 Salient Features of Project ........................................................................................................ 10

3.0 Executive Summary .................................................................................................................. 11

3.1 General ................................................................................................................... 11

3.2 Climate and Environment ....................................................................................... 11

3.3 Existing Right of Way .............................................................................................. 11

3.4 Structures ............................................................................................................... 12

3.5 Toll plazas ............................................................................................................... 12

4.0 Scope of Work ................................................................................................................................ 12

4.1 Broad Scope of Work & Current Status ................................................................... 12

5.0 Project Milestones ......................................................................................................................... 14

5.1 Project Completion Milestones: ............................................................................. 14

7.0 Design & Engineering and Mobilization of Independent Engineer ............................................. 18

8.0 Mobilization Status of Plant & Machinery ................................................................................. 18

9.0 Safety Measures ....................................................................................................................... 20

10.0 Weather Report ........................................................................................................................ 21

11.0 Progress Strip Chart – Highway ................................................................................................. 21

12.0 Progress Strip Chart – Structure ................................................................................................ 21

13.0 QC Test Summary/Details of Source of Material ....................................................................... 21

14.0 Project / Site Organization ........................................................................................................ 21

15.0 Drawing & Design Status .......................................................................................................... 22

16.0 Event Diary ............................................................................................................................... 22

17.0 Progress Photographs ................................................................................................... 23

18.0 Correspondence with IE & NHAI .................................................................................... 25

19.0 Road Safety & Maintenance Report .............................................................................. 32

20.0 Environment Mitigation Measures ................................................................................ 32

21.0 Safety Measures ........................................................................................................... 32

22.0 Structure Held-up due to Non-Decision ......................................................................... 32

23.0 ROB Status .................................................................................................................... 32

24.0 Status of NCR ................................................................................................................ 32

25.0 Monthly Accident Report .............................................................................................. 32

26.0 Issues Concerned with NHAI ......................................................................................... 32

Appendices

Appendix ‘A’ ------ Weather Report

Appendix ‘B’ ------ Progress Strip Chart - Highway

Appendix ‘C’ ------ Progress Strip Chart - Structure

Appendix ‘D’ ----- QC Test Summary

Appendix ‘E’ ------Source Approval of Material

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 3 

Appendix ‘F’ ------ Site Organization Chart (Concessionaire & EPC)

Appendix ‘F(a)’----Site Organization Chart (QCE)

Appendix ‘G’ ------Manpower Status

Appendix ‘H’ ------Drawing & Design Status

Appendix ‘I’ -------Correspondance with IE & NHAI

Appendix ‘J’ ------Road Safety and Maintenance Report NE-1

Appendix ‘K’ -----Environmental Mitigation Measures

Appendix ‘L’ -----Safety measures

Appendix ‘M’ -----Structure Held-up due to Non-Decision

Appendix ‘N’ ---- ROB Status

Appendix ‘O’ ---- S-Curve

Appendix ‘P’ ---- Status of NCR

Appendix ‘Q’ ---- Abstract of Accident Data

Appendix ‘R’---- Monthly Accident Report

Appendix ‘S’ --- Issues Concerned with NHAI

Appendix ‘T1’ --- Affected Length Strip Plan due to Land Acquisition and other issues as on 31stMarch 2013 (On 90th Day from Appointed Date)

Appendix ‘T2’ --- Affected Length Strip Plan due to Land Acquisition and other issues as on 30th April 2014

Appendix ‘U’ --- Event Diary

MONTHL

A

Pivota

NH-8 : C

NE-1 : C

Detail A

Detail B

Detail C

LY PROGRE

AHMEDABAD VADO

al Location

Ch-6+400 to

Ch-0+000 to

A. – AUDA R

B. – Nadiad

C. – Anand I

ESS REPOR

ODARA SUPER EXPR

ns of the P

o 108+700

o 93+302

Ring Road In

Interchang

Interchange

Ahmeda

N

RT – APRI

RESS TOLWAY PVT.

Project

nterchange

ge

e

abad

NH-8

IL 2014

.

NE-1

Detaail A

Detail

Vad

B

Detail

Page 

dodara

C

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 7 

AUDA Ring Road Interchange (NE-1)

AUDA Ring Road Interchange Ahmedabad Side

Vadodara Side

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 8 

Nadiad Interchange (NE-1)

Vadodara Side

Ahmedabad Side

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 9 

Anand Interchange (NE-1)

Vadodara Side

Ahmedabad Side

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 10 

2.0 Salient Features of Project

SR. NO. PARTICULARS DERSCRIPTION

1. Name of Project

Six Laning Of Ahmedabad To Vadodara Section of NH 8

from Km 6.400 to Km 108.700 (Length 102.300 km) in the

State of Gujarat and improvement of existing

Ahmedabad Vadodara Expressway from Km 0.000 to Km

93.302 in the State of Gujarat (Length 93.302 Km) Under

NHDP Phase V on Design, Build, Finance, Operate &

Transfer (DBFOT) Toll Basis

2. Total Length of Project NH-8: Km. 102.300

NE-1: Km. 93.302

3. Contract / Phase NHDP phase-V.

4. Client / Authority National Highways Authority of India.

(Ministry of Road Transport & Highways).

5. Concessionaire M/s IRB Ahmedabad Vadodara Super Express Tollway

Pvt. Ltd., Mumbai

6. Independent Engineer M/s. Aarvee Associates Architects Engineers

& Consultants Pvt. Ltd.

7. EPC Contractor M/s Modern Road Makers Pvt. Ltd., Mumbai.

8. Total Project Cost INR 2125.24 Cr.

9. Date of signing of

Concession Agreement 25th July, 2011.

10. Appointed date 01st January, 2013.

11. NE-1 COD 01st January, 2013.

12. Construction

Completion Period 1095 days

13. Construction

Completion date 31st December, 2015

14. Concession Period 25 Years including construction period of 1095days

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 11 

3.0 Executive Summary

3.1 General

The National Highway-8 connects Delhi with Jaipur, Ahmedabad, Vadodara and Surat before

culminating at Mumbai. This is one of the major high traffic density highways in the country.

Some sections of NH-8 are already in the process of being six laned and enhanced capacity

levels are contemplated to meet the existing and projected traffic volumes. The present

project addresses these needs of the National Highway. The project consists of six laning of

existing two/four lane NH 8 between of Ahmedabad to Vadodara and strengthening of the

existing expressway between Ahmedabad and Vadodara.

The project highway is a section of the National Highway-8 from km 6/400 to 108/700

(Approx length–102.300 KM) and Ahmedabad Vadodara Expressway from km 0.000 to

93.302, (Approx length– 93.302 KM) in the state of Gujarat.

This segment of NH 8 was strengthened during last decade. There are a number of major and

minor urban centres located along the project highway. This stretch of the project highway is

joined and or intersected by a number of State Highways, Major District Roads and Ordinary

District roads.

NH-8 section of the Project Highway runs in plain terrain and encounters a number of rivers

on its way to Mumbai. .

The Expressway NE-1 section of the Project Highway was constructed during last decade.

There are 5 entry/exit points (2 at Ahmedabad, 1 at Nadiad, 1 at Anand and 1 at Vadodara).

3.2 Climate and Environment

The climate patterns in Ahmadabad, Kheda, Anand and Baroda districts are fairly uniform.

The summer season extends from March to June, with the maximum temperature reaching

about 45° C. Monsoon startsfrom June and ends around September and winter season

extends from October to February with the minimum temperature being 10°C to 18° C.

3.3 Existing Right of Way

The existing ROW in built up areas is 45 m to 53 mandranges from 60 m to 80 m in rural

areas.

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 12 

3.4 Structures

NH-8

3.4.1 There are existing total of 4 Major Bridges, 3 Rail Over Bridges, 1 Grade

Seperator/Underpasses, 12 Minor Bridges, 1 Foot Over Bridge, 57 Slab /

Box Culverts, 101 Hume pipe Culverts, 3 Slab/Hume pipe Culverts.

NE-1

3.4.2 There are existing total of 10 Major Bridges, 3 Rail Over Bridges, 27

Overpasses, 11 Grade Seperator/Underpasses, 13 Minor Bridges, 16 Slab /

Box Culverts, 171 Hume pipe Culverts, 30 Canal Crossing, 5 Slab Drain.

3.5 Toll plazas

NH-8

There are two existing Toll plazas in NH-8 at the following locations (design chainages).

1) Kheda Bypass Km: 42+000 (Not in operation)

2) Vasad Km: 92+400 (Not in operation)

NE-1

There are two existing Toll plazas in NE-1 at the following locations (design chainages).

1) Mainline toll plaza location Km: 2.600 & Km. 86.600

2) Interchange toll plaza locations Km: 3.80, Km. 43.30 and Km. 58.60

4.0 Scope of Work

The broad scope of project is as below:

i) Construction of the Project Highway as described in Concession Agreement.

ii) Operation and Maintenance of the Project Highway in accordance with the provisions of Agreement; and

iii) Performance and fulfillment of all other obligations of the Concessionaire in accordance with the provisions of this Agreement.

4.1 Broad Scope of Work & Current Status

Sr. No.

Description Unit NH-8 NE-1

Proposed Facilities

Existing Facilities

Proposed Facilities

Existing Facilities

Remarks

1. Six laning on NH-8 and Engineering Improvement on NE-1

Km 102.3 102.3 93.302 93.302

2. Service Road (Km) Km 82.5 0 0 0

3. Slip Road 7.0m wide 5.50m wide

Km Km.

24.740 18.840

0 0

0 0

0 0

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 13 

Sr. No.

Description Unit NH-8 NE-1

Proposed Facilities

Existing Facilities

Proposed Facilities

Existing Facilities

Remarks

4. Major Bridge Nos. 4 4 0 10

5. Grade Seperator (Flyover)/ Underpasses

Nos. 15 1 0 11

6. Flyover/inter section Nos. 1 0 0 0

7. Pedestrian Underpass Nos. 14 0 0 0

8. Vehicular Underpass Nos. 9 0 0 0

9. Overpasses Nos. 0 0 0 27

10. Minor Bridges Nos. 20 12 0 13

11.Rehabilitation/Repair/ Widening of Existing Minor Bridges

Nos. 7 0 0 0

12. RUB Nos. 0 0 0 0

13. ROB Nos. 4 3 0 3 14. FOB Nos. 0 1 0 0 15. Slab/ Box Culverts Nos. 171 57 0 16

16. Slab/Hume pipe Culverts Nos. 0 3 0 0

17. Hume Pipe Culverts Nos. 9 101 0 171

18. Canal Crossing Nos. 0 0 0 30

19. RCC Covered Drain Km. 82.5 0 0 0

20. Slab Drain Nos. 0 0 0 5

21.Toll Plazas Mainline Interchange

Nos. Nos.

2 0

0 0

0 0

2 3

22. Bus Bays Nos. 32x2=64 0 0 0

23. Truck Lay Bays Nos. 3x2=6 0 0 0

A) The following design and provisions are to be carried out on major bridges of NE-1:

1. Remedial measures on River Khari / Dharwa at km 12.4.

2. River training works and protection of embankment at River Sheddhi at km 38.24

3. Design and provisions for additional two spans for Sheddi

4. River training works on Mini Mahi at km 83.7.

B) The following works to be carried out in cross drainages of NE-1

1. Maintenance of Cross-Drianageworks between Km 32 to Km 38

2. Design and Provisions of proper chute drains between Km 57 and Km 58

3. Repair of Box Culvert at Km 58.8 as per requirement

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 14 

4. Design and provision of pond at R.D. 58.8 near Anand Interchange and proper section of

drain to discharge

5. Design and provision of link drain from triple pipe culvert at km 76.5 and Box Culvert to

MahiKotar. Pipe Culvert to MahiKotar.

6. Design and provision of section of Mini Mahi upstream and downstream.

7. Design and provision of draining water from drain SD2

8. Design and provision of draining water from CD 164 so that CD shall not be flooded and

obstruct the passage of pedestrains

9. Cleaning of mouth of pipes, approaches and exit of all water passages.

10. Construction of longitudinal Aggreagte Drain from Km 22.00 to Km 42.00

5.0 Project Milestones

5.1 Project Completion Milestones:

Sr. No.

Milestones Period from

Appointment date

Scheduled date of

Milestone Criteria for achievement of Milestones

1 Milestone– I 220 days Aug. 8 ,

2013

Concessionaire shall have commenced construction of Project Highway and expended not less than 10% of the total capital cost set forth in the Financial Package.

2 Milestone – II 490 days May. 05 ,

2014

Concessionaire shall have commenced construction of all bridges and expended not less than 35 % of the total capital cost set forth in the Financial Package.

3 Milestone – III 780 days Feb. 19 ,

2015

Concessionaire shall have commenced construction of project facilities and expended not less than 70 % of the total capital cost set forth in the Financial Package.

4 Scheduled Six

laning date 1095 days

Dec. 31 , 2015

Concessionaire shall have completed Six laning in accordance with the Concession Agreement.

Pursuant to clause-1 of Schedule-G of CA, this is notified here that the concessionaire has

achived the Project Milestone-I by expending 28.99% of total capital cost upto 30th June 2013,

against the schedule date of 8th August 2013 vide concessionaire letter no.

IRB/AVSETPL/1131/2013, dt. 9th August 2013.

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 15 

6.0 Physical Progress& Financial Progress6.1 Physical Progress OF NH-8 AND NE-1 Based on Weightages

a) Physical Progress for NH-8

(A) + (B) = 100% (NH-8 & NE-1 Combined)

Percentage of

NH-8 (A) = 88.582%

Item No. Item Description Weightagein

%

Cumulative Physical

Progress in %

1 SITE CLEARANCE 0.610% 0.584%

2 EARTH WORK 4.642% 3.669%

3 GRANULAR BASE COURSE & SUB-BASE 8.519% 5.330%

4 BITUMINOUS COURSE 18.731% 8.254%

5 TOLL PLAZA 1.372% 0.183%

6 TRAFFIC SIGNS, MARKINGS & OTHER

ROAD APPURTENANCE 5.658% 0.462%

7 FLYOVERS 15.614% 12.022%

8 ROB'S & RUB'S 5.557% 1.130%

9 MAJOR BRIDGES 9.131% 8.287%

10 MINOR BRIDGES 3.083% 2.947%

11 UNDERPASSES 4.342% 3.886%

12 VEHICULAR UNDERPASSES 3.423% 3.251%

13 CULVERTS 3.962% 3.895%

14 DRAINAGE AND PROTECTIVE WORKS 9.235% 7.613%

15 RETAINING & TOE WALL - 0.000%

16 REPAIR & REHABILITATION 0.132% 0.000%

17 MAINTENANCE OF ROAD 0.046% 0.045%

18 ELECTRICAL & OTHER WORKS 4.498% 0.000%

19 HTMS 0.461% 0.000%

20 OTHER & MISCELLANEOUS WORKS 0.984% 0.000%

PHYSICAL PROGRES OF NH-8 X 61.559%

CUMMULATIVE PROGRESS OF (NH-8) = A x X = 54.530%

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 16 

b) Physical Progress For NE-1

Percentage of

NE-1 (B) = 11.418%

Item No. Item Description Weightage in

%

Cumulative Physical

Progress in %

1 SITE CLEARANCE 2.117% 2.117%

2 EARTH WORK 1.546% 1.546%

3 GRANULAR BASE COURSE & SUB BASE - 0.000%

4 BITUMINOUS COURSE 53.093% 52.846%

5 TOLL PLAZA 3.220% 3.220%

6 TRAFFIC SIGNS, MARKINGS & OTHER

ROAD APPURTENANCE 12.991% 12.991%

7 FLYOVERS - 0.000%

8 ROB'S & RUB'S - 0.000%

9 MAJOR BRIDGES 8.501% 6.500%

10 MINOR BRIDGES - 0.000%

11 UNDERPASSES - 0.000%

12 VEHICULAR UNDERPASSES - 0.000%

13 CULVERTS 2.137% 2.090%

14 DRAINAGE AND PROTECTIVE WORKS 11.351% 11.351%

15 RETAINING & TOE WALL 0.782% 0.782%

16 REPAIR & REHABILITATION - 0.000%

17 MAINTENANCE OF ROAD 0.355% 0.355%

18 ELECTRICAL & OTHER WORKS - 0.000%

19 HTMS 2.633% 1.342%

20 OTHER & MISCELLANEOUS WORKS 1.274% 1.274%

PHYSICAL PROGRES OF NE-1 Y 96.412%

CUMMULATIVE PROGRESS OF (NE-1) = B x Y = 11.008%

COMBINED CUMMULATIVE PHYSICAL PROGRESS (NH-8 + NE-1) = 65.539%

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 17 

6.2 Financial Progress of Work a) Financial Progress in %

Month Achieved Progress

Monthly % of Financial Progress Cumulative % of Financial Progress Jan-13 17.131% 17.131% Feb-13 1.856% 18.987% Mar-13 2.227% 21.214% Apr-13 4.204% 25.418% May-13 5.297% 30.715% Jun-13 3.610% 34.325% Jul-13 4.503% 38.828% Aug-13 3.751% 42.579% Sep-13 1.854% 44.433% Oct-13 2.172% 46.606% Nov-13 2.623% 49.228% Dec-13 5.268% 54.497% Jan-14 2.378% 56.874% Feb-14 2.761% 59.636% Mar-14 5.145% 64.781% Apr-14 4.210% 68.990% May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15

b) S-Curve

See Appendix - O

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 18 

7.0 Design & Engineering and Mobilization of Independent Engineer

7a) Design & Engineering

The EPC Contractors M/S Modern Road Makers Limited, have retained the services of M/s Stup

Consultants Pvt.Ltd. for Design and Engineering of this project.

7b) Mobilization of Independent Engineer (IE)

M/s AARVEE AssociateArchitects Engineers & Consultants Pvt. Ltd has been appointed by NHAI,

ref: NHAI/PIU-Ahmedabad/NH-8/6-laning/16112, dated 04.05.12 as the Independent Engineer

for the project. M/s AARVEE AssociateArchitects Engineers & Consultants Pvt. Ltd has mobilized

their Key Staff (Team Leader, Resident Engineer, Senior Pavement Specialist, and Senior Quality

cum Materials Expert) and Field Engineers, Laboratory Technicians at Site, towards 4th May

2012. They are functioning fromtheir office at Anand&Nadiad.

8.0 Mobilization Status of Plant & Machinery

Sr.No. Plant / Machinery Sec-I Sec-II Sec-III Sec-IV NE-1 Othwad Crusher

Plant TOTAL

1 Stone Crusher plant 8 0 0 0 2 0 10

2 Hot Mix Plant 1 1 1 1 2 0 6

3 Wet Mix Plant (Macons) 1 1 1 1 0 0 4

4 Ready Mix Plant (SchwingStetter) 2 2 4 4 0 0 12

5 DG 750 KVA 0 0 0 0 0 4 4

6 DG 500 KVA 1 1 0 0 0 0 2

7 DG 380 KVA (CUMMINS) 0 0 1 1 2 1 5

8 DG 250 KVA (CUMMINS) 1 0 0 0 0 0 1

9 DG 180 KVA (CUMMINS) 0 1 3 1 0 0 5

10 DG 125 KVA (CUMMINS) 1 1 1 4 0 0 7

11 DG 125 KVA (CUMMINS) 1 0 1 1 0 0 3

12 DG 82.5 KVA (GMMCO) 2 3 1 1 0 0 7

13 DG 62.5 KVA 0 1 0 0 0 1 2

14 DG 40 KVA (CUMMINS) 2 1 1 1 2 1 8

15 DG 25 KVA (CUMMINS) 2 2 4 1 0 1 10

16 DG 30 KVA 2 1 0 2 0 0 5

17 DG 15 KVA 3 1 1 3 0 0 8

18 DG 7.5 KVA 0 1 0 4 0 0 5

19 ROAD MILLING MACHINE 0 0 0 0 3 0 3

20 Loader 3 3 3 5 4 7 25

21 JCB 3DX 5 9 8 11 2 0 35

22 Excavator 6 14 7 12 0 17 56

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 19 

Sr.No. Plant / Machinery Sec-I Sec-II Sec-III Sec-IV NE-1 Othwad Crusher

Plant TOTAL

23 Hydra 1 2 3 1 0 0 7

24 SOIL COMPACTOR ( I.R. ) 6 6 6 4 0 0 22

25 TOWER LIGHT - 2 ( DIPCO ) 3 2 2 5 2 0 14

26 SMALL TIPPER 7 2 21 5 0 0 35

27 HYVA 53 69 92 65 50 55 384

28 Transist Mixer 7 10 15 13 0 0 45

29 Paver 3 4 3 3 2 0 15

30 Tandem Roller 3 3 8 3 7 0 24

31 Pneumatic Tyre Roller 1 1 1 1 2 0 6

32 Baby Roller 2 4 5 2 1 0 14

33 Hydraulic Grader 4 5 4 5 1 0 19

34 Water Tanker 4 8 5 11 2 5 35

35 Dozer 1 1 0 0 0 1 3

36 Water Pump 8 5 4 4 0 0 21

37 Tower Crane 0 1 0 2 0 0 3

38 Hydraulic Mobile Crane 0 0 0 0 0 1 1

39 Piling Rig 0 0 0 2 1 0 3

40 TRAILOR 0 4 2 1 0 0 7

41 Electronic Weigh Bridge 3 3 3 2 0 6 17

42 Utility Vehicle 4 7 7 6 4 3 31

43 Eicher Tempo 2 1 2 1 2 0 8

44 Mobile Despensive Unit. 1 1 1 1 2 0 6

45 SprayorBrowzer tanker 1 2 3 2 2 0 10

46 Mini Sprayer for Crack Sealing 0 0 0 0 1 0 1

47 Bitumen Cutter (Dynapac) 0 1 1 0 0 0 2

48 Mechanical Broomer 1 1 1 1 1 0 5

49 Air Compressor 2 2 1 3 4 9 21

50 Diesel Pump Set. 1 1 1 1 0 0 4

51 Diesel Tanker 0 2 0 0 2 1 5

52 Container (Big) Store 1 1 1 3 0 2 8

53 Container (Big) Plant Admine 0 1 1 0 0 0 2

54 Container (Big) Office 2 3 3 3 0 2 13

55 Container (Small) 2 1 3 2 0 0 8

56 Container (Small) Weigh Bridge 2 0 1 2 0 0 5

57 Kerb Laying Machine 1 1 1 1 0 0 4

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.   Page 20 

9.0 Safety Measures

Safety measures taken during the month that is at all the locations of NH-8 & NE-1, adequate safety measures i.e. barricades, warning signs, cautionary signs etc. at structures locations and barricades, gunny bags, safety ribbons and cautionary boards etc. at excavated locations of NH-8 as per stipulation of IRC as well as additional boards are also provided as desired by NHAI/IE during site visit. Safety measures are taken as below: Sr. No. Particular Safety Measures Photographs NH-8

1 Signages Concessionaire has placed all required signboards i.e. Men at Work, Work in Progress, Go Slow, Speed limit etc. as per IRC-67 on project Highway.

2 Diversion The traffic diversion plan has

submitted by Concessionaire as per IRC-SP-55and reviewed by IE and same constructed at site.

3 Structure Necessary safety measures taken by concessionaire i.e. covered construction zone by barricading boards, put necessary signages as per IRC-67 i.e. mandatory,causonary, informatory sign boards etc.

NE-1

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 21 

Sr. No. Particular Safety Measures Photographs 1 Signages Concessionaire has placed all

required sign boards i.e. Men at Work, Work in Progress, Go Slow, Speed limit etc. as per IRC-67 on NE-1

2 Diversion The traffic diversion plan has submitted by Concessionaire and reviewed by IE and same constructed at site

Also see in Appendix-L

10.0 Weather Report

See in Appendix-A

11.0 Progress Strip Chart – Highway

See in Appendix-B

12.0 Progress Strip Chart – Structure

See in Appendix-C

13.0 QC Test Summary/Details of Source of Material

13.1 QC Test Summary - See in Appendix-D

13.2 Details of Source of Material - See in Appendix-E

14.0 Project / Site Organization

14.1 Site Organization Chart (Concessionaire & EPC) – See in Appendix-F

14.2 Site Organization Chart (QCE) – See in Appendix-F (a)

14.3 Manpower Status – See in Appendix-G

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 22 

15.0 Drawing & Design Status

See in Appendix-H

16.0 Event Diary Sr. No.

Date Officers Visited / Meeting Conducted

Designation Organization Remark

1 12.04.14

Minutes of Meeting held on 12th April'14 chaired by Member,NHAI

Points discussed: See in Appendix-U

2 21.04.14

Mr. H.C.Modi Project Director NHAI Minutes of Meeting -Site Visit of Shri H.C. Modi (PD/CRO) at NH-8 Points discussed: See in Appendix-U

Mr. Manoj Kumar Resident Engineer IE (Aarvee Associates)

Mr. S.K.Singh Resident Engineer IE (Aarvee Associates)

Mr. A.K.Joshi Chief General Manager (SPV)

Concessionaire - IRB

Mr. L.N.Surve Chief General Manager (EPC)

Concessionaire - IRB

Mr. S.N.Kulkarni Chief Liasioning Manager

Concessionaire - IRB

Mr. Mehul Pandya D.G.M Concessionaire - IRB

Mr. Dhanraj Parit D.G.M Concessionaire - IRB

Mr. T.B. Dumal Section Incharge Concessionaire - IRB

Mr. V.B.Bhayde Section Incharge Concessionaire - IRB

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 23 

17.0 Progress Photographs

DBM top Completed of Main Carriageway from Ch. 29.679 Km. to Ch. 29.903 Km. (LHS)

Deck Slab Completed of Minor Bridge @ Ch. 22+700 Km. (RHS)

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 24 

Work in progress of Major Bridge @ Ch. 30.610 Km. (LHS)

Work in progress of Major Bridge @ Ch. 30.610 Km. (RHS)

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 25 

RE wall & Crash Barrier completed at VUP @ Ch. 46.931 Km.

Plate Load Test conducted at PUP @ Ch. 72.080 Km. RE wall location

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 26 

Plate Load Test conducted at PUP @ Ch. 72.080 Km. RE wall location

Deck slab work in progress at Pipalag Flyover @ Ch. 58.710 Km.

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 27 

Crash Barrier work is in progress of Minor Bridge at ch.59.364 Km. (RHS)

Kerb casting is in progress from Ch. 60.700 Km. to Ch. 61.200 Km.

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 28 

DBM Top laying is in progress at PUP approach (RE wall location) @ Ch. 61.940 Km.

DBM Top laying is in progress at PUP approach (RE wall location) @ Ch. 61.940 Km.

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 29 

Deck Slab Reinforcement Binding Work in Progress for Span P-3 to P-4 at Ch. 93.542 Km. (MJBR)

Thermoplastic paint laying @ Ch. 26.000 Km. (LHS) – NE-1

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 30 

Milling work in progress on Vatrak River Bridge @ Ch. 22.250 Km. – NE-1

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 31 

Work in Progress of Sheddhi River Bridge @ Ch. 38.250 Km. – NE-1

MONTHLY PROGRESS REPORT – APRIL 2014

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT.  Page 32 

18.0 Correspondance with IE & NHAI See Appendix –I

19.0 Road Safety and Maintenance Report:

See Appendix –J

20.0 Environmental Mitigation Measures:

See Appendix - K

21.0 Safety Measures:

See Appendix - L

22.0 Structure Held-up due to Non-Decision:

See Appendix - M

23.0 ROB Status:

See Appendix –N

24.0 Status of NCR: See Appendix –P

25.0 Monthly Accident Report: See Appendix –Q&R

26.0 Issues Concernedwith NHAI See Appendix –S

27.0 Affected Length Strip Plan due to Land Acquisition and other

issues as on 31st March 2013 (On 90th Day from Appointed Date)

See Appendix –T1

28.0 Affected Length Strip Plan due to Land Acquisition and other

issues as on 30th April 2014. See Appendix –T2

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-'A'

Min Temp (˚C)

Max Temp (˚C)

Average Rainfall (in mm)

Cummulative Rainfall (in mm)

Weather Condition

Min Temp (˚C)

Max Temp (˚C)

Average Rainfall (in mm)

Cummulative Rainfall (in mm)

Weather Condition

Min Temp (˚C)

Max Temp (˚C)

Average Rainfall (in mm)

Cummulative Rainfall (in mm)

Weather Condition

Min Temp (˚C)

Max Temp (˚C)

Average Rainfall (in mm)

Cummulative Rainfall (in mm)

Weather Condition

1-Apr-2014 22.3 41.8 0.0 0.0 Sunny 26.4 38.8 0.0 0.0 Sunny 21.3 42.3 0.0 0.0 Sunny 20.1 35.5 0.0 0.0 Sunny

2-Apr-2014 21.9 41.2 0.0 0.0 Sunny 26.6 29.2 0.0 0.0 Sunny 23.2 44.1 0.0 0.0 Sunny 21.6 36.8 0.0 0.0 Sunny

3-Apr-2014 22.5 43.9 0.0 0.0 Sunny 26.8 39.6 0.0 0.0 Sunny 21.2 43.4 0.0 0.0 Sunny 23.0 37.1 0.0 0.0 Sunny

4-Apr-2014 22.3 42.8 0.0 0.0 Sunny 26.6 39.9 0.0 0.0 Sunny 22.5 45.4 0.0 0.0 Sunny 22.0 37.5 0.0 0.0 Sunny

5-Apr-2014 21.8 43.0 0.0 0.0 Sunny 26.8 40.2 0.0 0.0 Sunny 22.3 44.3 0.0 0.0 Sunny 21.7 37.9 0.0 0.0 Sunny

6-Apr-2014 22.4 43.2 0.0 0.0 Sunny 26.7 40.0 0.0 0.0 Sunny 23.1 42.9 0.0 0.0 Sunny 20.8 37.8 0.0 0.0 Sunny

7-Apr-2014 22.9 44.0 0.0 0.0 Sunny 26.9 40.6 0.0 0.0 Sunny 22.9 42.8 0.0 0.0 Sunny 22.9 37.4 0.0 0.0 Sunny

8-Apr-2014 21.7 42.9 0.0 0.0 Sunny 27.2 40.9 0.0 0.0 Sunny 21.6 43.3 0.0 0.0 Sunny 22.3 37.5 0.0 0.0 Sunny

9-Apr-2014 22.3 42.8 0.0 0.0 Sunny 27.0 40.7 0.0 0.0 Sunny 20.9 43.3 0.0 0.0 Sunny 22.1 37.8 0.0 0.0 Sunny

10-Apr-2014 20.6 42.1 0.0 0.0 Sunny 26.6 39.8 0.0 0.0 Sunny 21.2 41.8 0.0 0.0 Sunny 21.9 37.6 0.0 0.0 Sunny

11-Apr-2014 21.8 42.9 0.0 0.0 Sunny 26.2 38.7 0.0 0.0 Sunny 21.3 42.1 0.0 0.0 Sunny 22.2 36.9 0.0 0.0 Sunny

12-Apr-2014 20.3 43.1 0.0 0.0 Sunny 26.8 39.9 0.0 0.0 Sunny 21.4 43.1 0.0 0.0 Sunny 22.6 36.7 0.0 0.0 Sunny

13-Apr-2014 21.4 42.9 0.0 0.0 Sunny 26.6 39.4 0.0 0.0 Sunny 21.7 43.3 0.0 0.0 Sunny 22.4 37.1 0.0 0.0 Sunny

14-Apr-2014 20.9 42.8 0.0 0.0 Sunny 26.9 39.8 0.0 0.0 Sunny 23.1 42.4 0.0 0.0 Sunny 23.0 37.0 0.0 0.0 Sunny

15-Apr-2014 21.6 43.7 0.0 0.0 Sunny 27.0 40.8 0.0 0.0 Sunny 24.5 43.4 0.0 0.0 Sunny 22.9 37.8 0.0 0.0 Sunny

16-Apr-2014 22.4 42.9 0.0 0.0 Sunny 29.6 41.3 0.0 0.0 Sunny 25.4 44.9 0.0 0.0 Sunny 24.9 38.9 0.0 0.0 Sunny

17-Apr-2014 20.7 43.1 0.0 0.0 Sunny 29.8 41.8 0.0 0.0 Sunny 25.3 42.8 0.0 0.0 Sunny 25.8 39.0 0.0 0.0 Sunny

18-Apr-2014 21.8 42.5 0.0 0.0 Sunny 29.6 42.0 0.0 0.0 Sunny 25.8 41.5 0.0 0.0 Sunny 25.1 37.2 0.0 0.0 Sunny

19-Apr-2014 20.3 41.2 0.0 0.0 Sunny 28.9 41.6 0.0 0.0 Sunny 26.1 42.2 0.0 0.0 Sunny 26.1 37.3 0.0 0.0 Sunny

20-Apr-2014 21.6 42.3 0.0 0.0 Sunny 28.1 41.9 5.0 5.0 Cloudy 21.8 43.9 0.0 0.0 Sunny 25.9 36.9 0.0 0.0 Sunny

21-Apr-2014 20.8 41.2 2.0 2.0 Cloudy 27.6 41.2 0.0 5.0 Sunny 25.2 43.1 0.0 0.0 Sunny 23.0 37.2 0.0 0.0 Sunny

22-Apr-2014 20.9 42.7 0.0 2.0 Sunny 27.4 41.8 0.0 5.0 Sunny 24.1 44.6 0.0 0.0 Sunny 22.9 38.0 0.0 0.0 Sunny

23-Apr-2014 21.5 42.3 0.0 2.0 Sunny 27.8 42.4 0.0 5.0 Sunny 23.8 45.1 0.0 0.0 Sunny 22.6 39.8 0.0 0.0 Sunny

24-Apr-2014 21.8 42.8 0.0 2.0 Sunny 28.3 42.6 0.0 5.0 Sunny 25.9 45.9 0.0 0.0 Sunny 22.3 39.9 0.0 0.0 Sunny

25-Apr-2014 21.9 43.0 0.0 2.0 Sunny 28.9 42.9 0.0 5.0 Sunny 24.6 44.4 0.0 0.0 Sunny 23.1 39.5 0.0 0.0 Sunny

26-Apr-2014 21.7 42.9 0.0 2.0 Sunny 30.2 43.4 0.0 5.0 Sunny 25.5 45.5 0.0 0.0 Sunny 23.5 40.0 0.0 0.0 Sunny

27-Apr-2014 21.6 43.8 0.0 2.0 Sunny 30.4 43.6 0.0 5.0 Sunny 27.0 45.1 0.0 0.0 Sunny 23.1 40.2 0.0 0.0 Sunny

28-Apr-2014 22.3 44.6 0.0 2.0 Sunny 30.2 43.8 0.0 5.0 Sunny 26.4 44.3 0.0 0.0 Sunny 26.0 41.5 0.0 0.0 Sunny

29-Apr-2014 22.0 44.3 0.0 2.0 Sunny 30.6 43.5 0.0 5.0 Sunny 26.2 44.1 0.0 0.0 Sunny 26.5 41.1 0.0 0.0 Sunny

30-Apr-2014 22.1 43.9 0.0 2.0 Sunny 30.1 43.2 0.0 5.0 Sunny 25.4 46.1 0.0 0.0 Sunny 26.3 41.4 0.0 0.0 Sunny

NATIONAL HIGHWAYS AUTHORITY OF INDIA

Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer Independent Engineer: Aarvee Associates AE & C Pvt. Ltd.

WEATHER REPORT MONTH APRIL 2014

Date

@ Km. 11+000 (LHS), Vinzol @ 52+500 (LHS), Shilod Village 56+000 (RHS), Pij Chaukadi @ 88+000 (LHS), Vasad

Monthly Progress Report April-2014 Appendix-B

From To MCW SR. MCW SR. MCW SR. MCW SR. MCW SR. MCW SR.

1 Excavation 6.400 108.700 102.300 52.354 102.300 52.354 48.100 38.600 65.400 28.100 54.20 13.75 36.90 24.25 58%

2Emb Layer in Progress

6.400 108.700 102.300 52.354 102.300 52.354 52.300 40.100 75.300 32.400 50.00 12.25 27.00 19.95 65%

3 Emb Top 6.400 108.700 102.300 52.354 102.300 52.354 36.500 34.800 61.100 27.900 65.80 17.55 41.20 24.45 52%4 SG-I 6.400 108.700 102.300 52.354 102.300 52.354 32.100 33.400 54.400 26.900 70.20 18.95 47.90 25.45 47%5 SG-II 6.400 108.700 102.300 52.354 102.300 52.354 31.500 33.100 53.500 25.300 70.80 19.25 48.80 27.05 46%6 SG-Top 6.400 108.700 102.300 52.354 102.300 52.354 30.000 32.500 50.500 23.700 72.30 19.85 51.80 28.65 44%7 GSB 6.400 108.700 102.300 52.354 102.300 52.354 27.900 28.300 46.500 21.800 74.40 24.05 55.80 30.55 40%8 WMM-I 6.400 108.700 102.300 52.354 102.300 52.354 22.400 26.200 41.100 20.400 79.90 26.15 61.20 31.95 36%9 WMM-II 6.400 108.700 102.300 52.354 102.300 52.354 21.200 26.000 39.200 19.500 81.10 26.35 63.10 32.85 34%

10 Kerb 6.400 108.700 102.300 52.354 102.300 52.354 9.000 - 16.900 - 93.30 52.35 85.40 52.35 8%11 DBM-I 6.400 108.700 102.300 52.354 102.300 52.354 20.300 24.700 35.500 17.200 82.00 27.65 66.80 35.15 32%12 DBM-II 6.400 108.700 102.300 52.354 102.300 52.354 16.700 24.700 18.900 17.200 85.60 27.65 83.40 35.15 25%13 BC 6.400 108.700 102.300 52.354 102.300 52.354 - - - - 102.30 52.35 102.30 52.35 0%14 Thermoplastic 6.400 108.700 102.300 52.354 102.300 52.354 - - - - 102.30 52.35 102.30 52.35 0%

Note :- The Progress shown is only for the works executed and tests have been completed at site.

Percentage Achieved %

RemarksLHS RHS LHS RHS LHS RHS

Linear Progress of NH-8 as per DPR from Ch-6+400 to 108+700

Sr. No.

Item DescriptionChainage

Total Length Completed Length upto April-2014 Balance Length

Monthly Progress Report -April-2014 Appendix-B

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 0 100 100 0 100 100 100 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

WMM-II 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 0 100 100 0 100 100 100 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

WMM-I 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 0 100 100 0 100 100 100 0 0 100 100 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

GSB 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 0 100 100 0 100 100 100 0 0 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

SG-Top 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 0 100 100 0 100 100 100 0 0 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

SG-II 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 0 100 100 0 100 100 100 0 0 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

SG-I 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 0 100 100 0 100 100 100 0 0 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

Emb Top 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 0 100 100 0 100 100 100 0 0 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 100 100 100 0 0 0 100 0 0 100 100 100 100 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

Emb Layer 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 0 100 100 0 100 100 100 0 0 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 100 100 100 0 0 0 100 0 0 100 100 100 100 0 0 0 0 0 0 0 100 100 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 0 100 100 0 100 100 100 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 100 100 100 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0

DBM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0

GSB 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0

SG-Top 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0

SG-II 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0

SG-I 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0

Emb Top 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0

Emb Layer 0 0 0 0 0 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

Excavation 0 0 0 0 0 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0

Median

6.40

0

6.50

06.

600

6.70

06.

800

6.90

07.

000

7.10

07.

200

7.30

07.

380

7.40

07.

500

7.60

07.

700

7.80

07.

900

8.00

08.

100

8.20

08.

250

8.30

08.

400

8.50

08.

600

8.70

08.

800

8.90

09.

000

9.10

09.

200

9.30

09.

400

9.50

09.

600

9.70

09.

800

9.90

010

.000

10.1

0010

.200

10.3

0010

.400

10.5

0010

.600

10.7

0010

.800

10.9

0011

.000

11.1

0011

.200

11.3

0011

.320

11.4

0011

.500

11.6

0011

.700

11.8

0011

.900

12.0

0012

.100

12.2

0012

.245

12.3

0012

.400

12.5

0012

.600

12.7

0012

.800

12.9

0013

.000

13.1

0013

.200

13.3

0013

.400

13.5

0013

.600

13.7

0013

.800

13.9

0014

.000

14.1

0014

.200

14.3

0014

.400

14.5

0014

.600

14.7

0014

.800

14.9

0015

.000

15.1

0015

.200

15.3

0015

.400

15.5

0015

.600

15.7

0015

.800

15.8

3015

.900

16.0

0016

.100

16.2

0016

.300

16.4

00

Excavation 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Kerb 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

Emb Top 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

SG-I 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

SG-II 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

SG-Top 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

GSB 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0

DBM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 100 100 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 0 0 0 0 100 100 100 100 100 0 100 100 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 0 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Top 0 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-I 0 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-II 0 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 0 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 0 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 0 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 0 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 0 0 0 0 0 0 0 100 100 100 0 100 100 100 100 100 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

PROGRESS STRIP CHART OF AHMEDABAD TO VADODARA OF NH 8 FROM KM. 6.400 TO KM. 108.700 IN THE STATE OF GUJRAT

LHS

SR.

LHS

MC

WR

HS

MC

WR

HS

SR.

Flyo

ver a

t Ch-

6+40

0

Flyo

ver a

t Ch-

7+38

0

PUP

at C

h-8+

250

Flyo

ver a

t Ch-

11+3

20

MN

B a

t Ch-

12+2

45

Flyo

ver a

t Ch-

6+40

0

PUP

at C

h-15

+830

Flyo

ver a

t Ch-

7+38

0

PUP

at C

h-8+

250

Flyo

ver a

t Ch-

11+3

20

MN

B a

t Ch-

12+2

45

PUP

at C

h-15

+830

Note: The progress reported above is only for the works executed and tests completed at site

Monthly Progress Report -April-2014 Appendix-B

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 0 0 0 0 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0

SG-II 0 0 0 0 100 100 100 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0

SG-I 0 0 0 0 100 100 100 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 0

Emb Top 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 0

Emb Layer 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-I 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0

SG-Top 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0

SG-II 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0

SG-I 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0

Emb Top 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 100 100 0

Emb Layer 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 100 100 0

Kerb 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0

Median

16.5

00

16.6

0016

.700

16.8

0016

.900

17.0

0017

.100

17.2

0017

.300

17.4

0017

.500

17.6

0017

.700

17.8

0017

.900

18.0

0018

.100

18.2

0018

.300

18.4

0018

.500

18.6

0018

.700

18.8

0018

.900

19.0

0019

.100

19.2

0019

.300

19.4

0019

.500

19.6

0019

.700

19.8

0019

.900

20.0

0020

.100

20.2

0020

.300

20.4

0020

.500

20.6

0020

.700

20.8

0020

.900

21.0

0021

.100

21.2

0021

.300

21.4

0021

.500

21.6

0021

.700

21.8

0021

.900

22.0

0022

.100

22.2

0022

.300

22.4

0022

.415

22.5

0022

.600

22.7

0022

.760

22.8

0022

.900

23.0

0023

.100

23.2

0023

.300

23.4

0023

.500

23.5

6023

.600

23.7

0023

.800

23.9

0024

.000

24.1

0024

.200

24.3

0024

.400

24.5

0024

.600

24.7

0024

.800

24.9

0025

.000

25.1

0025

.200

25.3

0025

.400

25.5

0025

.600

25.7

0025

.800

25.8

4025

.900

26.0

0026

.100

26.1

8026

.200

26.3

0026

.400

26.5

00

Excavation 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Kerb 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Emb Top 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

SG-I 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

SG-II 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

SG-Top 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

GSB 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

WMM-I 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

WMM-II 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

DBM-I 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 0 0 100 100 100 100 100 100 100

DBM-II 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 0 0 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100

Emb Top 0 0 100 100 100 100 100 100 100 100 100 0 100 100 100 100 0 0 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100

SG-I 0 0 100 100 100 100 100 100 100 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100

SG-II 0 0 100 100 100 100 100 100 100 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0

SG-Top 0 0 100 100 100 100 100 100 100 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0

GSB 0 0 100 100 100 100 100 100 100 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0

WMM-I 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0

WMM-II 0 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0

DBM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

PUP

at C

h-26

+180

PUP

at C

h-26

+180

LHS

SR.

LHS

MC

WR

HS

MC

WR

HS

SR.

VUP

at C

h-19

+600

MN

B a

t Ch-

22+4

15

MN

B a

t Ch-

22+7

60

PUP

at C

h-23

+400

MN

B a

t Ch-

23+5

60

MN

B a

t Ch-

25+8

40

VUP

at C

h-19

+600

MN

B a

t Ch-

22+4

15

MN

B a

t Ch-

22+7

60

PUP

at C

h-23

+400

MN

B a

t Ch-

23+5

60

MN

B a

t Ch-

25+8

40

Note: The progress reported above is only for the works executed and tests completed at site

Monthly Progress Report -April-2014 Appendix-B

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

Emb Layer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

Median

26.6

00

26.7

0026

.800

26.9

0027

.000

27.1

0027

.200

27.3

0027

.400

27.5

0027

.600

27.7

0027

.800

27.9

0028

.000

28.1

0028

.200

28.3

0028

.400

28.5

0028

.600

28.7

0028

.800

28.9

0029

.000

29.1

0029

.200

29.3

0029

.400

29.5

0029

.600

29.7

0029

.800

29.9

0029

.910

30.0

0030

.100

30.2

0030

.300

30.4

0030

.500

30.6

0030

.610

30.7

0030

.800

30.9

0031

.000

31.1

0031

.200

31.3

0031

.400

31.5

0031

.600

31.7

0031

.800

31.9

0032

.000

32.1

0032

.200

32.3

0032

.400

32.5

0032

.600

32.7

0032

.800

32.9

0033

.000

33.1

0033

.200

33.3

0033

.400

33.5

0033

.600

33.7

0033

.800

33.9

0034

.000

34.0

2034

.100

34.2

0034

.300

34.4

0034

.500

34.6

0034

.700

34.8

0034

.900

35.0

0035

.100

35.2

0035

.300

35.4

0035

.500

35.6

0035

.700

35.8

0035

.900

36.0

0036

.100

36.2

0036

.300

36.4

0036

.420

36.5

0036

.600

Excavation 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Emb Top 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 100

SG-I 100 0 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-II 100 0 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 100 0 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 100 0 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 100 0 100 100 100 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 100 0 100 100 100 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-I 0 0 100 100 100 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 100 100

Emb Top 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 100 100

SG-I 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100

SG-II 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100

SG-Top 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100

GSB 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100

DBM 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

MJB

at C

h-35

+000

VUP

at C

h-36

+420

PUP

at C

h-27

+800

PUP

at C

h-29

+910

MJB

at C

h-30

+610

Flyo

ver a

t Ch-

34+0

20

PUP

at C

h-27

+800

PUP

at C

h-29

+910

MJB

at C

h-30

+610

Flyo

ver a

t Ch-

34+0

20

MJB

at C

h-35

+000

RH

S M

CW

LHS

SR.

LHS

MC

WR

HS

SR.

VUP

at C

h-36

+420

Note: The progress reported above is only for the works executed and tests completed at site

Monthly Progress Report -April-2014 Appendix-B

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 100 100 100

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 100 100 100

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 100 100 100

GSB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 100 100 100

SG-Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 100 100 100

SG-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 100 100 100

SG-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 100 100 100

Emb Top 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 100 100 100

Emb Layer 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 100 100 100

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

GSB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

SG-Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

SG-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

SG-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100

Emb Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100

Emb Layer 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Median

36.7

00

36.8

0036

.900

37.0

0037

.100

37.2

0037

.300

37.4

0037

.500

37.6

0037

.700

37.8

0037

.900

38.0

0038

.100

38.2

0038

.300

38.4

0038

.500

38.6

0038

.700

38.8

0038

.900

39.0

0039

.100

39.2

0039

.300

39.4

0039

.500

39.6

0039

.700

39.8

0039

.900

40.0

0040

.100

40.2

0040

.300

40.4

0040

.500

40.6

0040

.700

40.8

0040

.900

41.0

0041

.100

41.2

0041

.300

41.4

0041

.500

41.6

0041

.700

41.8

0041

.900

42.0

0042

.100

42.2

0042

.300

42.4

0042

.500

42.6

0042

.700

42.8

0042

.900

43.0

0043

.100

43.2

0043

.300

43.4

0043

.500

43.6

0043

.700

43.8

0043

.900

44.0

0044

.100

44.2

0044

.300

44.4

0044

.500

44.6

0044

.700

44.8

0044

.900

45.0

0045

.100

45.2

0045

.300

45.3

2045

.400

45.5

0045

.600

45.7

0045

.800

45.9

0046

.000

46.1

0046

.200

46.3

0046

.400

46.5

0046

.600

46.7

00

Excavation 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Kerb 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

Emb Layer 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Emb Top 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

SG-I 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100

SG-II 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100

SG-Top 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100

GSB 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

WMM-I 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

WMM-II 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

DBM-I 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100

Emb Top 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100

SG-I 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100

SG-II 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

SG-Top 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

GSB 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

WMM-I 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

WMM-II 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

DBM 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

LHS

SR.

LHS

MC

WR

HS

MC

WR

HS

SR.

Flyo

ver a

t Ch-

42+6

00

VUP

at C

h-45

+320

Flyo

ver a

t Ch-

42+6

00

VUP

at C

h-45

+320

Note: The progress reported above is only for the works executed and tests completed at site

Monthly Progress Report -April-2014 Appendix-B

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0

WMM-II 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0

WMM-I 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0

GSB 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0

SG-Top 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0

SG-II 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0

SG-I 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0

Emb Top 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 0 100 0 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 0 100 0 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-I 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0

SG-Top 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0

SG-II 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0

SG-I 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0

Emb Top 100 100 100 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0

Emb Layer 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Median

46.8

00

46.9

0046

.960

47.0

0047

.100

47.2

0047

.300

47.4

0047

.500

47.6

0047

.700

47.8

0047

.900

47.9

1048

.000

48.1

0048

.200

48.3

0048

.400

48.5

0048

.600

48.7

0048

.800

48.9

0049

.000

49.0

5049

.100

49.2

0049

.300

49.4

0049

.500

49.6

0049

.700

49.8

0049

.900

50.0

0050

.100

50.2

0050

.300

50.4

0050

.500

50.6

0050

.610

50.7

0050

.800

50.9

0051

.000

51.1

0051

.200

51.3

0051

.400

51.5

0051

.600

51.7

0051

.800

51.9

0052

.000

52.1

0052

.200

52.3

0052

.400

52.5

0052

.600

52.7

0052

.800

52.9

0053

.000

53.1

0053

.200

53.3

0053

.320

53.4

0053

.500

53.6

0053

.700

53.8

0053

.900

53.9

3054

.000

54.1

0054

.200

54.3

0054

.400

54.5

0054

.600

54.7

0054

.800

54.8

6554

.900

55.0

0055

.100

55.2

0055

.300

55.4

0055

.500

55.6

0055

.700

55.8

0055

.900

56.0

0056

.100

56.2

0056

.300

56.4

0056

.500

56.6

0056

.700

56.8

0056

.800

Excavation 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Kerb 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

Emb Layer 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Emb Top 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100

SG-I 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100

SG-II 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100

SG-Top 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100

GSB 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100

WMM-I 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100

WMM-II 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100

DBM-I 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100

DBM-II 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 0 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 0 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 100 100 100 100

Emb Top 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0

SG-I 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0

SG-II 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

VUP

at C

h-55

+600

VUP

at C

h-55

+600

LHS

SR.

LHS

MC

WR

HS

MC

WR

HS

SR.

VUP

at C

h-46

+960

MN

B a

t Ch-

47+9

10

VUP

at C

h-49

+050

MN

B a

t Ch-

50+6

10

Flyo

ver a

t Ch-

52+7

00

MN

B a

t Ch-

53+3

20

MN

B a

t Ch-

53+9

30

MN

B a

t Ch-

54+1

00

RO

B a

t Ch-

54+8

65

VUP

at C

h-46

+960

MN

B a

t Ch-

47+9

10

VUP

at C

h-49

+050

MN

B a

t Ch-

50+6

10

Flyo

ver a

t Ch-

52+7

00

MN

B a

t Ch-

53+3

20

MN

B a

t Ch-

53+9

30

MN

B a

t Ch-

54+1

00

RO

B a

t Ch-

54+8

65

Note: The progress reported above is only for the works executed and tests completed at site

Monthly Progress Report -April-2014 Appendix-B

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 0 100 100 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100

WMM-II 0 100 100 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100

WMM-I 0 100 100 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100

GSB 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100

SG-Top 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100

SG-II 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100

SG-I 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100

Emb Top 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100

Emb Layer 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-I 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Top 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Median

56.9

00

57.0

0057

.100

57.2

0057

.300

57.4

0057

.500

57.6

0057

.700

57.8

0057

.900

58.0

0058

.100

58.2

0058

.300

58.4

0058

.500

58.6

0058

.700

58.7

1058

.800

58.9

0059

.000

59.1

0059

.200

59.3

0059

.364

59.4

0059

.500

59.6

0059

.700

59.8

0059

.900

60.0

0060

.100

60.2

0060

.300

60.4

0060

.500

60.6

0060

.700

60.8

0060

.900

61.0

0061

.100

61.2

0061

.300

61.4

0061

.500

61.6

0061

.700

61.8

0061

.900

61.9

6062

.000

62.1

0062

.200

62.3

0062

.400

62.5

0062

.600

62.7

0062

.800

62.9

0063

.000

63.1

0063

.200

63.3

0063

.400

63.5

0063

.600

63.7

0063

.800

63.9

0064

.000

64.1

0064

.200

64.3

0064

.400

64.5

0064

.600

64.7

0064

.800

64.9

0065

.000

65.1

0065

.200

65.3

0065

.400

65.5

0054

.100

65.6

0065

.700

65.8

0065

.900

66.0

0066

.100

66.2

0066

.300

66.4

0066

.500

66.6

0066

.700

66.8

0066

.900

Excavation 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 0 100 100 100 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Kerb 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100

Emb Top 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-I 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-II 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-I 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100

Emb Top 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100

SG-I 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100

SG-II 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100

SG-Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100

GSB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100

DBM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Flyo

ver a

t Ch-

58+7

10

MN

B a

t Ch-

59+3

64

PUP

at C

h-61

+960

VUP

at C

h-63

+300

RO

B a

t Ch-

65+5

45

Flyo

ver a

t Ch-

58+7

10

MN

B a

t Ch-

59+3

64

PUP

at C

h-61

+960

VUP

at C

h-63

+300

RO

B a

t Ch-

65+5

45

RH

S M

CW

LHS

SR.

LHS

MC

WR

HS

SR.

Note: The progress reported above is only for the works executed and tests completed at site

Monthly Progress Report -April-2014 Appendix-B

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0

WMM-II 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0

WMM-I 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0

GSB 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0

SG-Top 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0

SG-II 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 100 100 100 100 0 0

SG-I 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 100 100 100 100 0 0

Emb Top 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 100 100 100 100 0 0

Emb Layer 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

GSB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

SG-Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

SG-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

SG-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

Emb Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

Emb Layer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100

Excavation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

Median

66.9

40

67.0

0067

.100

67.2

0067

.300

67.4

0067

.500

67.6

0067

.700

67.8

0067

.900

68.0

0068

.100

68.2

0068

.300

68.4

0068

.500

68.5

4268

.600

68.7

0068

.800

68.9

0069

.000

69.1

0069

.140

69.2

0069

.300

69.4

0069

.500

69.6

0069

.700

69.8

0069

.900

70.0

0070

.100

70.2

0070

.300

70.4

0070

.500

70.6

0070

.700

70.8

0070

.900

71.0

0071

.100

71.2

0071

.242

71.3

0071

.400

71.5

0071

.600

71.7

0071

.800

71.9

0072

.000

72.0

8072

.100

72.2

0072

.300

72.4

0072

.500

72.6

0072

.675

72.7

0072

.800

72.9

0073

.000

73.1

0073

.200

73.3

0073

.400

73.5

0073

.600

73.7

0073

.800

73.9

0074

.000

74.1

0074

.200

74.3

0074

.370

74.4

0074

.500

74.6

0074

.700

74.8

0074

.900

75.0

0075

.100

75.2

0075

.300

75.4

0054

.100

75.5

0075

.600

75.7

0075

.800

75.9

0076

.000

76.1

0076

.200

76.3

0076

.400

76.5

0076

.600

76.7

0076

.800

76.9

0077

.000

Excavation 0 0 0 0 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 0 0 0 100 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 0 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100

Emb Top 0 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

SG-I 0 0 100 100 100 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

SG-II 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

SG-Top 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

GSB 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100

WMM-I 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0

WMM-II 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0

DBM-I 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0

Emb Top 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0

SG-I 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0

SG-II 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0

SG-Top 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0

GSB 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0

WMM-I 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0

WMM-II 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0

DBM 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

MN

B a

t Ch-

72+6

75

Flyo

ver a

t Ch-

74+3

70

RO

B a

t Ch-

75+4

25

Flyo

ver a

t Ch-

66+9

40

MN

B a

t Ch-

68+5

42

PUP

at C

h-69

+140

MN

B a

t Ch-

71+2

42

PUP

at C

h-72

+080

Flyo

ver a

t Ch-

66+9

40

MN

B a

t Ch-

68+5

42

PUP

at C

h-69

+140

MN

B a

t Ch-

71+2

42

PUP

at C

h-72

+080

MN

B a

t Ch-

72+6

75

Flyo

ver a

t Ch-

74+3

70

RO

B a

t Ch-

75+4

25

LHS

SR.

LHS

MC

WR

HS

MC

WR

HS

SR.

Note: The progress reported above is only for the works executed and tests completed at site

Monthly Progress Report -April-2014 Appendix-B

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 0 0 0 0 0 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 100

WMM-II 0 0 0 0 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 100

WMM-I 0 0 0 0 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 100

GSB 0 0 0 0 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 100

SG-Top 0 100 0 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 0 100

SG-II 0 100 0 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 0 100

SG-I 0 100 0 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 0 100

Emb Top 0 100 0 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 0 100

Emb Layer 0 100 0 100 100 100 0 100 100 100 100 100 0 100 100 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 0 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 0 0 100 100 100 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 0 100

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0

Emb Layer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100

Median

77.1

00

77.2

0077

.227

77.3

0077

.400

77.5

0077

.540

77.6

0077

.700

77.8

0077

.900

78.0

0078

.100

78.2

0078

.300

78.4

0078

.500

78.6

0078

.700

78.8

0078

.900

79.0

0079

.100

79.2

0079

.300

79.4

0079

.500

79.6

0079

.700

79.8

0079

.900

80.0

0080

.100

80.2

0080

.300

80.4

0080

.500

80.6

0080

.685

80.7

0080

.800

80.9

0081

.000

81.1

0081

.200

81.3

0081

.400

81.5

0081

.600

81.7

0081

.800

81.9

0082

.000

82.1

0082

.200

82.3

0082

.390

82.4

0082

.500

82.6

0082

.700

82.8

0082

.900

83.0

0083

.100

83.2

0083

.300

83.4

0083

.404

83.5

0083

.600

83.7

0083

.800

83.9

0084

.000

84.1

0084

.200

84.3

0084

.400

84.5

0084

.600

84.7

0084

.800

84.9

0085

.000

85.1

0085

.200

85.3

0085

.400

85.5

0085

.600

85.7

0085

.800

85.9

0086

.000

86.1

0086

.200

86.3

0086

.400

86.5

0086

.600

86.7

0086

.800

86.9

0087

.000

87.0

4087

.100

Excavation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 0 0 0 0 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 0 100 0 0 100 100 100 100 0 0 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 0 0 0 100 100 0 100 100 100 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 0 100 0 0 100 100 100 100 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Emb Top 100 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 100 100 100 100 0 100 0 0 100 100 100 100 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0

SG-I 100 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0

SG-II 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0

SG-Top 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0

GSB 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

DBM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 0 0 0 0 100 100 0 100 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Top 0 0 0 0 0 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-I 0 0 0 0 0 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-II 0 0 0 0 0 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 0 0 0 0 0 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 0 0 0 0 0 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 0 0 0 0 0 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 0 0 0 0 0 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 0 0 0 0 0 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

PUP

at C

h-87

+040

MN

B a

t Ch-

77+2

27

Flyo

ver a

t Ch-

77+5

40

MN

B a

t Ch-

80+6

85

MN

B a

t Ch-

83+4

04

PUP

at C

h-87

+040

MN

B a

t Ch-

77+2

27

Flyo

ver a

t Ch-

77+5

40

MN

B a

t Ch-

80+6

85

MN

B a

t Ch-

83+4

04

VUP

at C

h-82

+390

VUP

at C

h-82

+390

LHS

SR.

LHS

MC

WR

HS

MC

WR

HS

SR.

Note: The progress reported above is only for the works executed and tests completed at site

Monthly Progress Report -April-2014 Appendix-B

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0

WMM-II 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0

WMM-I 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0

GSB 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0

SG-Top 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 100

SG-II 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 100

SG-I 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 100

Emb Top 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 100

Emb Layer 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 100 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 100 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 0 0 0 0 0 100

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

DBM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

GSB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

SG-Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

SG-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

SG-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

Emb Top 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

Emb Layer 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100

Median

87.2

00

87.3

0087

.400

87.5

0087

.600

87.7

0087

.800

87.9

0088

.000

88.1

0088

.200

88.3

0088

.400

88.5

0088

.600

88.7

0088

.800

88.9

0089

.000

89.1

0089

.200

89.3

0089

.362

89.4

0089

.500

89.6

0089

.690

89.7

0089

.800

89.9

0090

.000

90.1

0090

.200

90.3

0090

.400

90.5

0090

.600

90.7

0090

.740

90.8

0090

.900

91.0

0091

.100

91.2

0091

.300

91.4

0091

.500

91.6

0091

.700

91.8

0091

.900

92.0

0092

.100

92.2

0092

.300

92.4

0092

.500

92.6

0092

.700

92.8

0092

.900

93.0

0093

.100

93.2

0093

.300

93.4

0093

.500

93.5

4293

.600

93.7

0093

.800

93.9

0094

.000

94.1

0094

.200

94.3

0094

.400

94.5

0094

.600

94.7

0094

.800

94.9

0095

.000

95.1

0095

.200

95.3

0095

.400

95.5

0095

.600

95.7

0095

.800

95.8

3095

.900

96.0

0096

.100

96.2

0096

.300

96.4

0096

.500

96.6

0096

.700

96.8

0096

.900

97.0

0097

.100

97.2

00

Excavation 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100

Emb Top 0 0 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100

SG-I 0 0 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100

SG-II 0 0 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100

SG-Top 0 0 100 100 100 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100

GSB 0 0 100 100 100 0 0 0 0 100 100 100 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100

WMM-I 0 0 100 100 100 0 0 0 0 100 100 100 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100

WMM-II 0 0 100 100 0 0 0 0 0 100 100 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100

DBM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100

DBM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Emb Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

SG-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

SG-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

SG-Top 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

GSB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

DBM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

MN

B a

t Ch-

89+3

62

PUP

at C

h-89

+690

Flyo

ver a

t Ch-

90+7

40

MJB

at C

h-93

+542

VUP

at C

h-95

+830

MN

B a

t Ch-

89+3

62

PUP

at C

h-89

+690

Flyo

ver a

t Ch-

90+7

40

MJB

at C

h-93

+542

VUP

at C

h-95

+830

RH

S M

CW

LHS

SR.

LHS

MC

WR

HS

SR.

Note: The progress reported above is only for the works executed and tests completed at site

Monthly Progress Report -April-2014 Appendix-B

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 100 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 100 100 0 100 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 100 100 0 100 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 0 0 0 0 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 100 100 0 100 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 0 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 100 100 0 100 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

SG-II 0 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 100 100 0 100 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

SG-I 0 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 0 100 100 0 100 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

Emb Top 0 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 0 0 100 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 100 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

Emb Layer 0 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 0 0 100 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 100 0 0 0 100 100 0 0 0 0 0 0 100 0 0 0 0 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 0 100 100 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 100 100 0 100 0 0 100 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 100 0 0 0 100 100 0 0 0 0 0 0 100 0 0 0 0 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-I 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-II 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-I 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Top 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 0 0 100 100 100 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 0 0 100 100 100 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Median

97.3

00

97.4

0097

.500

97.5

8097

.600

35.0

0097

.700

97.8

0097

.900

98.0

0098

.100

98.2

0098

.300

98.4

0098

.500

98.6

0098

.700

98.8

0098

.900

99.0

0099

.100

99.2

0099

.300

99.4

0099

.500

99.5

8099

.600

99.7

0099

.800

99.9

0010

0.00

010

0.10

010

0.20

010

0.30

010

0.40

010

0.50

010

0.60

010

0.70

010

0.80

010

0.90

010

1.00

010

1.10

010

1.20

010

1.30

010

1.40

010

1.50

010

1.60

010

1.70

010

1.80

010

1.90

010

2.00

010

2.10

010

2.20

010

2.30

010

2.40

010

2.50

010

2.54

010

2.60

010

2.70

010

2.80

010

2.90

010

3.00

010

3.10

010

3.20

010

3.30

010

3.40

010

3.50

010

3.58

010

3.60

010

3.70

010

3.80

010

3.90

010

4.00

010

4.10

010

4.20

010

4.30

010

4.40

010

4.50

010

4.60

010

4.70

010

4.80

010

4.90

010

5.00

010

5.10

010

5.20

010

5.30

010

5.40

010

5.49

010

5.50

010

5.60

010

5.70

010

5.80

010

5.90

010

6.00

010

6.05

010

6.10

010

6.20

010

6.30

010

6.40

010

6.47

510

6.50

010

6.60

010

6.70

010

6.80

010

6.90

010

6.98

010

7.00

010

7.10

010

7.20

010

7.30

0

Excavation 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Top 100 100 100 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-I 100 100 100 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-II 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-I 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 100 0 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 0 100 0 0 100 100 100 0 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 100 0 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

Emb Top 100 100 100 0 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

SG-I 100 100 100 0 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

SG-II 100 100 100 0 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

SG-Top 100 100 100 0 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 100 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100

GSB 100 100 100 0 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 0 0 0 0 0 0 100 0 100 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 100 100 100 0 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 100 0 100 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 100 100 100 0 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 100 0 100 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 100 100 100 0 100 0 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Flyo

ver a

t Ch-

105+

490

MN

B a

t Ch-

106+

050

RO

B a

t Ch-

106+

475

MN

B a

t Ch-

106+

980

PUP

at C

h-97

+580

MJB

at C

h-97

+688

PUP

at C

h-99

+580

Flyo

ver a

t Ch-

102+

540

PUP

at C

h-10

3+58

0

PUP

at C

h-97

+580

MJB

at C

h-97

+688

PUP

at C

h-99

+580

Flyo

ver a

t Ch-

102+

540

PUP

at C

h-10

3+58

0

Flyo

ver a

t Ch-

105+

490

MN

B a

t Ch-

106+

050

RO

B a

t Ch-

106+

475

MN

B a

t Ch-

106+

980

LHS

SR.

LHS

MC

WR

HS

MC

WR

HS

SR.

Note: The progress reported above is only for the works executed and tests completed at site

Monthly Progress Report -April-2014 Appendix-B

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 100 100 100 100 100 100 0

WMM-II 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 100 100 100 100 100 100 0

WMM-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 100 100 100 100 100 100 0

GSB 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 100 100 100 100 100 100 0

SG-Top 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 100 100 100 100 100 100 0

SG-II 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 100 100 100 100 100 100 0

SG-I 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 100 100 100 100 100 100 0

Emb Top 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 100 0 100 100 100 100 100 100 0

Emb Layer 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 100 0 100 100 100 100 100 100 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 100 0 100 100 100 100 100 100 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-I 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-II 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-I 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Top 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Median

107.

400

107.

500

107.

600

107.

700

107.

800

107.

900

108.

000

108.

100

108.

200

108.

300

108.

400

108.

500

108.

600

108.

700

108.

800

108.

860

108.

900

109.

000

109.

100

109.

200

109.

300

109.

400

109.

490

109.

500

109.

600

109.

700

109.

800

109.

900

110.

000

110.

100

Excavation 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Top 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-I 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-II 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SG-Top 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

GSB 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-I 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WMM-II 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-I 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DBM-II 100 100 100 100 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavation 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 0

Kerb 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Emb Layer 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 0

Emb Top 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 0

SG-I 100 100 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 0

SG-II 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 0

SG-Top 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 0

GSB 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 0

WMM-I 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 0

WMM-II 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 0

DBM 100 100 100 100 100 100 100 100 0 0 0 0 0 0 0 0 0 100 100 100 100 0 100 100 100 100 100 100 0

BC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Flyo

ver a

t Ch-

108+

860

Flyo

ver a

t Ch-

109+

490

Flyo

ver a

t Ch-

108+

860

Flyo

ver a

t Ch-

109+

490

LHS

MC

WR

HS

MC

WR

HS

SR.

LHS

SR.

Note: The progress reported above is only for the works executed and tests completed at site

Monthly Progress Report -April-2014 Appendix-B

Thermoplastic (Sh.Side) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (Center) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (M.Side) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

BC 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

DBM including PCC 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Kerb 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Median

0.00

0

0.20

0

0.40

0

0.60

0

0.80

0

1.00

0

1.20

0

1.40

0

1.60

0

1.80

0

2.00

0

2.20

0

2.40

0

2.60

0

2.80

0

3.00

0

3.20

0

3.40

0

3.60

0

3.80

0

4.00

0

4.20

0

4.40

0

4.60

0

4.80

0

5.00

0

5.20

0

5.40

0

5.60

0

5.80

0

6.00

0

6.20

0

6.40

0

6.60

0

6.80

0

7.00

0

7.20

0

7.40

0

7.60

0

7.80

0

8.00

0

8.20

0

8.40

0

8.60

0

8.80

0

9.00

0

9.20

0

9.40

0

9.60

0

9.80

0

10.0

00

10.2

00

10.4

00

10.6

00

10.8

00

11.0

00

11.2

00

11.4

00

11.6

00

11.8

00

12.0

00

12.2

00

12.4

00

12.6

00

12.8

00

13.0

00

13.2

00

13.4

00

13.6

00

13.8

00

14.0

00

14.2

00

14.4

00

14.6

00

14.8

00

15.0

00

15.2

00

15.4

00

15.6

00

15.8

00

16.0

00

16.2

00

16.4

00

16.6

00

16.8

00

17.0

00

17.2

00

17.4

00

17.6

00

17.8

00

18.0

00

18.2

00

18.4

00

18.6

00

18.8

00

19.0

00

19.2

00

19.4

00

19.6

00

19.8

00

20.0

00

Kerb 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

DBM including PCC 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

BC 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (M.Side) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (Center) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (Sh.Side) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (Sh.Side) 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic (Center) 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic (M.Side) 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

BC 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0 0 0 0 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0 0 0 0 0 0

DBM including PCC 200 200 200 200 200 200 200 200 200 200 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 200 200 200 200 200 200 200

Kerb 200 200 200 200 200 200 200 200 200 200 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0 0 0 0 0 0

Median

20.2

00

20.4

00

20.6

00

20.8

00

21.0

00

21.2

00

21.4

00

21.6

00

21.8

00

22.0

00

22.2

00

22.4

00

22.6

00

22.8

00

23.0

00

23.2

00

23.4

00

23.6

00

23.8

00

24.0

00

24.2

00

24.4

00

24.6

00

24.8

00

25.0

00

25.2

00

25.4

00

25.6

00

25.8

00

26.0

00

26.2

00

26.4

00

26.6

00

26.8

00

27.0

00

27.2

00

27.4

00

27.6

00

27.8

00

28.0

00

28.2

00

28.4

00

28.6

00

28.8

00

29.0

00

29.2

00

29.4

00

29.6

00

29.8

00

30.0

00

30.2

00

30.4

00

30.6

00

30.8

00

31.0

00

31.2

00

31.4

00

31.6

00

31.8

00

32.0

00

32.2

00

32.4

00

32.6

00

32.8

00

33.0

00

33.2

00

33.4

00

33.6

00

33.8

00

34.0

00

34.2

00

34.4

00

34.6

00

34.8

00

35.0

00

35.2

00

35.4

00

35.6

00

35.8

00

36.0

00

36.2

00

36.4

00

36.6

00

36.8

00

37.0

00

37.2

00

37.4

00

37.6

00

37.8

00

38.0

00

38.2

00

38.4

00

38.6

00

38.8

00

39.0

00

39.2

00

39.4

00

39.6

00

39.8

00

40.0

00

Kerb 200 200 200 200 200 200 200 200 200 200 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0 0 0 0 0 0

DBM including PCC 200 200 200 200 200 200 200 200 200 200 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0 0 0 0 0 0

BC 200 200 200 200 200 200 200 200 200 200 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic (M.Side) 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic (Center) 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic (Sh.Side) 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thermoplastic (Sh.Side) 0 0 0 0 0 0 0 0 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (Center) 0 0 0 0 0 0 0 0 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (M.Side) 0 0 0 0 0 0 0 0 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

BC 0 0 0 0 0 0 0 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

DBM including PCC 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Kerb 0 0 0 0 0 0 0 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Median

40.2

00

40.4

00

40.6

00

40.8

00

41.0

00

41.2

00

41.4

00

41.6

00

41.8

00

42.0

00

42.2

00

42.4

00

42.6

00

42.8

00

43.0

00

43.2

00

43.4

00

43.6

00

43.8

00

44.0

00

44.2

00

44.4

00

44.6

00

44.8

00

45.0

00

45.2

00

45.4

00

45.6

00

45.8

00

46.0

00

46.2

00

46.4

00

46.6

00

46.8

00

47.0

00

47.2

00

47.4

00

47.6

00

47.8

00

48.0

00

48.2

00

48.4

00

48.6

00

48.8

00

49.0

00

49.2

00

49.4

00

49.6

00

49.8

00

50.0

00

50.2

00

50.4

00

50.6

00

50.8

00

51.0

00

51.2

00

51.4

00

51.6

00

51.8

00

52.0

00

52.2

00

52.4

00

52.6

00

52.8

00

53.0

00

53.2

00

53.4

00

53.6

00

53.8

00

54.0

00

54.2

00

54.4

00

54.6

00

54.8

00

55.0

00

55.2

00

55.4

00

55.6

00

55.8

00

56.0

00

56.2

00

56.4

00

56.6

00

56.8

00

57.0

00

57.2

00

57.4

00

57.6

00

57.8

00

58.0

00

58.2

00

58.4

00

58.6

00

58.8

00

59.0

00

59.2

00

59.4

00

59.6

00

59.8

00

60.0

00

Kerb 0 0 0 0 0 0 0 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

DBM including PCC 0 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

BC 0 0 0 0 0 0 0 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (M.Side) 0 0 0 0 0 0 0 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (Center) 0 0 0 0 0 0 0 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (Sh.Side) 0 0 0 0 0 0 0 0 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (Sh.Side) 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (Center) 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (M.Side) 0 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

BC 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

DBM including PCC 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Kerb 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Median

60.2

00

60.4

00

60.6

00

60.8

00

61.0

00

61.2

00

61.4

00

61.6

00

61.8

00

62.0

00

62.2

00

62.4

00

62.6

00

62.8

00

63.0

00

63.2

00

63.4

00

63.6

00

63.8

00

64.0

00

64.2

00

64.4

00

64.6

00

64.8

00

65.0

00

65.2

00

65.4

00

65.6

00

65.8

00

66.0

00

66.2

00

66.4

00

66.6

00

66.8

00

67.0

00

67.2

00

67.4

00

67.6

00

67.8

00

68.0

00

68.2

00

68.4

00

68.6

00

68.8

00

69.0

00

69.2

00

69.4

00

69.6

00

69.8

00

70.0

00

70.2

00

70.4

00

70.6

00

70.8

00

71.0

00

71.2

00

71.4

00

71.6

00

71.8

00

72.0

00

72.2

00

72.4

00

72.6

00

72.8

00

73.0

00

73.2

00

73.4

00

73.6

00

73.8

00

74.0

00

74.2

00

74.4

00

74.6

00

74.8

00

75.0

00

75.2

00

75.4

00

75.6

00

75.8

00

76.0

00

76.2

00

76.4

00

76.6

00

76.8

00

77.0

00

77.2

00

77.4

00

77.6

00

77.8

00

78.0

00

78.2

00

78.4

00

78.6

00

78.8

00

79.0

00

79.2

00

79.4

00

79.6

00

79.8

00

80.0

00

Kerb 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

DBM including PCC 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

BC 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (M.Side) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (Center) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (Sh.Side) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200

Thermoplastic (Sh.Side) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0

Thermoplastic (Center) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0

Thermoplastic (M.Side) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0

BC 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0

DBM including PCC 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0

Kerb 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0

Median

80.2

00

80.4

00

80.6

00

80.8

00

81.0

00

81.2

00

81.4

00

81.6

00

81.8

00

82.0

00

82.2

00

82.4

00

82.6

00

82.8

00

83.0

00

83.2

00

83.4

00

83.6

00

83.8

00

84.0

00

84.2

00

84.4

00

84.6

00

84.8

00

85.0

00

85.2

00

85.4

00

85.6

00

85.8

00

86.0

00

86.2

00

86.4

00

86.6

00

86.8

00

87.0

00

87.2

00

87.4

00

87.6

00

87.8

00

88.0

00

88.2

00

88.4

00

88.6

00

88.8

00

89.0

00

89.2

00

89.4

00

89.6

00

89.8

00

90.0

00

90.2

00

90.4

00

90.6

00

90.8

00

91.0

00

91.2

00

91.4

00

91.6

00

91.8

00

92.0

00

92.2

00

92.4

00

92.6

00

92.8

00

93.0

00

93.2

00

93.4

00

93.6

00

93.8

00

94.0

00

Kerb 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0

DBM including PCC 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0

BC 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0

Thermoplastic (M.Side) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0

Thermoplastic (Center) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0

Thermoplastic (Sh.Side) 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0

RHS

5.0 PROGRESS STRIP CHART OF IMPROVEMENT OF EXISTING AHMEDABAD VADODARA EXPRESSWAY FROM KM. 0.000 TO KM. 93.302 IN THE STATE OF GUJRAT

LHS

RHS

LHS

RHS

LHS

RHS

LHS

RHS

LHS

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Sr. No. Structure Total in NosWork in progress/

CompletedRemarks

1 Major Bridge 4 4

2 Minor Bridge 20 18

1) MNBR @ 106+500: Accommodate in ROB Span - May not to be constructed2) MNBR @ 106+980 : Decision pending due to non approval of GAD of ROB @ 106+475

3 Flyover 15 12

Decision pending from IE/NHAI for 2 Nos. of Flyover i.e.1) Flyover @ 6+4002) Flyover @ 108+860

4 VUP 9 81) VUP @ 95+830 : Converted into Flyover due to existance of water pipe line.

5 PUP 14 10

For 4 nos of PUP's decision pending from IE/NHAI, due to modification in size/location.At 2 Nos. of PUP's works taken up but hold on account of relocation of underpass on local demand which is pending from IE/NHAI

6 CD Structures180 (As per CA)

21 (COS) 168

1) 15 Nos.: To be started at earliest.2) 1 Nos.: Irrigation Canal3) 5 Nos.: Not started due to under COS4) 3 Nos.: Land Acquisition problem5) 2 Nos.: Not tackled due to utility6) 3 Nos.: Hold on account of non finalization of ROB alignment. 7) 4 Nos. : Not found

8 ROB 4 1

1) ROB @ 65+545 & ROB @ 75+454:GAD approval pending with Railway/NHAI.2) ROB @ 106+475 : Approval of revised GAD is awaited.

Six laning of Ahmedabad – Vadodara Section of NH-8 from km. 6.400 to 108.700 (Length 102.300 km.) and Improvement of existing Ahmedabad – Vadodara Expressway from m. 0.000 km. 93.302 in the state of Gujarat ( Length 93.302 km. ) under NHDP Phase – V on Design

Built Finance Operate Transfer (DBFOT)

STATUS OF STRUCTURES FOR NH-8

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Progress Charts – Structures Proposed Flyovers

Existing DesignPlan & Profile

TotalCompleted

TotalCompleted

Total 8 2 2 2 2 8 4 1 2Completed 8 2 2 2

Total 2 2 2 2 2 4 1 2Completed 2 2 1

Total 2 2 2 2 2 8 2 2 2 2 24 12 3 2Completed 2 2 2 2 2 8 2 2 2 2 24 4 1 0

Total 2 2 2 2 2 8 2 2 2 2 24 12 3 2Completed 2 2 2 2 0 8 2 2 2 2 24 0 0 0

Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1Completed 2 2 2 2 0 NA NA NA NA NA 0 0 0 0

Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1Completed 2 2 2 1 0 NA NA NA NA NA 0 0 0 0

Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1Completed 1 1 1 1 0 NA NA NA NA NA 0 0 0 0

Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1Completed 2 2 2 2 0 NA NA NA NA NA 0 0 0 0

Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1Completed 2 2 2 2 0 NA NA NA NA NA 8 4 1 0

Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1Completed 2 2 2 2 0 NA NA NA NA NA 8 4 1 0

Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1Completed 2 2 2 2 2 NA NA NA NA NA 8 4 0 0

Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1Completed 2 2 2 2 0 NA NA NA NA NA 8 4 0 0

Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1Completed 2 2 2 2 2 NA NA NA NA NA 8 4 1 0

Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1Completed 2 2 2 2 0 NA NA NA NA NA 0 0 0 0

Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1Completed 0 0 0 0 0 NA NA NA NA NA 0 0 0 0

Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1Completed 2 2 2 2 2 NA NA NA NA NA 8 4 1 0

Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1

PILE

CA

P

Narol

Narol

Aslali

Hariyala

Radhavanj

Dabhan

RemarksPier

Su

bstr

uctu

re

Top

Slab

of B

ox

Type

Abu

tmen

t

PED

ESTA

L

GIR

DER

DEC

K SL

AB

CRA

SH

BARR

IER

Pier

Cap

1x35m

1x35m

LHS

RHS

LHS

RHS

Span Arrangement

1 x 60m + 4 x3x25m

1x26m

1x46m+ 2x20m

Location

1x35m

1x26m

1x35m

Sl. No

Nadiad

Kanjari

Anand

6+400 6+4001

7+3802

9

3

4

7

8

6

5

11+300 11+320

43+000 42+600

51+400 52+700

Ope

n Fo

unda

tion

for

abut

men

t57+200 58+710

65+950 66+940

73+100 74+370

34+000 34+020

PCC

1x35m

7+450

RHS

LHS

A1 Ahmedabad Side

A2 Vadodara Side

RHS

LHS

RHS

Side

Chainage

Status

PCC

belo

w P

ile

Cap

for

Pier

LHS

RHS

LHS

RHS

LHS

RHS

LHS

RHS

Abu

tmen

t Su

bstr

uctu

re

Dir

t W

all

PILE

Fo

unda

tion

for

Pier

6+400

7+389

11+313

34+002

42+579

52+700

58+686

66+879

74+322

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Existing DesignPlan & Profile PI

LE C

AP

RemarksPier

Su

bstr

uctu

re

Top

Slab

of B

ox

Type

Abu

tmen

t

PED

ESTA

L

GIR

DER

DEC

K SL

AB

CRA

SH

BARR

IER

Pier

CapSpan

ArrangementLocation

Sl. No O

pen

Foun

dati

on fo

r ab

utm

ent

PCC

Side

Chainage

Status

PCC

belo

w P

ile

Cap

for

Pier

Abu

tmen

t Su

bstr

uctu

re

Dir

t W

all

PILE

Fo

unda

tion

for

Pier

Completed 2 2 2 P 0 NA NA NA NA NA 0 0 0 0Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1

Completed 2 2 2 2 2 NA NA NA NA NA 4 0 0 0Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1

Completed 2 2 2 0 0 NA NA NA NA NA 0 0 0 0Total 2 2 2 2 2 NA NA NA NA NA 8 4 1 1

Completed 2 2 2 2 0 NA NA NA NA NA 8 4 1 0Total 2 2 2 2 2 8 2 2 2 2 24 12 3 3

Completed 2 2 2 2 0 4 1 1 1 1 0 0 0 0Total 2 2 2 2 2 8 2 2 2 2 24 12 3 3

Completed 2 2 2 2 0 7 1 1 1 1 0 0 0 0Total 2 2 2 2 2 8 2 2 2 1 24 12 3 3

Completed 2 0 0 0 0 0 0 0 0 0 0 0 0 0Total 2 2 2 2 2 8 2 2 2 2 24 12 3 3

Completed 0 0 0 0 0 0 0 0 0 0 0 0 0 0Total 2 2 2 2 2 4 1 1 1 1 16 8 2 2

Completed 0 0 0 0 0 0 0 0 0 0 0 0 0 0Total 2 2 2 2 2 4 1 1 1 1 16 8 2 2

Completed 0 0 0 0 0 0 0 0 0 0 0 0 0 0Total 2 2 2 2 2 4 1 1 1 1 16 8 2 2

Completed 2 2 2 2 0 4 1 1 1 1 16 8 2 0Total 2 2 2 2 2 4 1 1 1 1 16 8 2 2

Completed 2 2 2 2 0 4 1 1 1 1 8 4 0 0

C COMPLETED P IN PROGRESS NA NOT APPLICABLE

Sama

Dumad

Vasad

Ranoli

Chhani

2x26m

1x26m

1x26m

1x46m+ 2x20m

3x35m

(25.00m) & (27.38m)

Chikodra10 76+500 77+540

108+350 109+49015

89+600 90+740

101+500 102+540

104+500 105+490

11

12

13

14 107+710 108+860

LHS

RHS

LHS

RHS

LHS

RHS

LHS

RHS

LHS

RHS

RHS

LHS77+483

90+700

102+555

105+514

108+800

109+470

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Progress Charts – Structures New Major Bridge

Existing DesignPlan & Profile

Total 18 5 5 5 5 2 32 16 4 2

Completed 18 5 5 3 4 0 32 0 0 0

Total 22 5 5 5 5 2 40 20 4 2

Completed 22 5 5 5 5 0 40 20 1 0

Total 75 10 10 10 10 2 72 36 9 9

Completed 75 10 10 10 10 0 56 28 3 0

Total 87 11 11 11 11 2 100 50 10 10

Completed 87 11 11 11 11 0 90 45 4 0

Total 162 19 19 19 19 2 216 108 18 18

Completed 162 19 19 19 19 2 216 42 4 0

Total NA NA NA NA NA NA NA NA NA NA

Completed NA NA NA NA NA NA NA NA NA NA

Total 20 4 4 4 4 2 24 12 3 3

Completed 20 4 4 4 4 0 16 8 2 0

Total 20 4 4 4 4 2 24 12 3 3

Completed 20 4 4 4 4 0 8 4 0 0

Total 71 4 4 NA NA 2 30 15 3 3 NE-1

Completed 0 0 0 NA NA 0 0 0 0 0 NE-1

Total 71 4 4 NA NA 2 30 15 3 3 NE-1

Completed 44 2 2 NA NA 0 0 0 0 0 NE-1

C COMPLETED P IN PROGRESS NA NOT APPLICABLE

2 LHS

3x20 2 RHS

1 38+230 38+230Shedhi River

3x20

Pile

Cap

30+800 30+610

Span Arrangement (m)

Meshow

Village

2x17.1+2x16.9 2

2x17.1+2x16.9

LHS

RHS

No. of Lanes

Chainage

Remark

Abu

tmen

t/Pi

er

Abu

tmen

t /P

ier

CAP

DIR

T W

ALL

PED

ESTA

L

GIR

DER

DEC

K SL

AB

CRA

SH

BARR

IER

Mahi

Mini Mahi

14.9 +32+14.9

97+7004 97+688

3

14.0+16.0x33.0 +14.0

92+400 93+542

14.0+16.0x33.0 +14.0

14.90+32.0+14.9

93+549

98+723

2

1

2

4

20.0+7 x 42.2+20.0

20.0+8 x 42.2+20.0

35+200 35+000 Vatrak

3

30+592

34+989

NE-1

2

Status

PCC

belo

w

PILE

CA

P

LHS

RHS

Side PILE

2

LHS

RHS

LHS

RHS-

4

Sl. No

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Progress Charts – Structures Widening of Minor Bridge

Existing DesignPlan & Profile PC

C

Foun

dati

on

Bott

om

Hau

nch

Wal

l

Top

Slab

Cras

h Ba

rrie

r

PCC

Foun

dati

on

Bott

om

Hau

nch

Wal

l

Top

Slab

Cras

h Ba

rrie

r

TotalCompleted

Total 2 2Completed 2 2

Total 4 4 8 4 1 2 NA NA NA NA NA NACompleted 4 4 8 4 0 0

Total 4 4 8 4 1 2 NA NA NA NA NA NACompleted 4 4 8 4 1 2

Total 4 4 8 4 1 2 NA NA NA NA NA NACompleted 4 4 8 0 0 0

Total 4 4 8 4 1 2 NA NA NA NA NA NACompleted 4 4 8 0 0 0

Total 4 4 8 4 1 2 NA NA NA NA NA NACompleted 4 2 2 0 0 0

Total 4 4 8 4 1 2 NA NA NA NA NA NACompleted 2 2 2 0 0 0

Total 4 4 8 4 1 2Completed 4

Total 4 4 8 4 1 2Completed 4 4

Total 1 1 6 3 2 2 NA NA NA NA NA NACompleted 0 0 0 0 0 0 NA NA NA NA NA NA

Total 1 1 6 3 2 2 NA NA NA NA NA NACompleted 1 1 6 3 2 2 NA NA NA NA NA NA

Total 1 1 4 2 1 1 NA NA NA NA NA NACompleted 0 0 0 0 0 0 NA NA NA NA NA NA

Total 1 1 4 2 1 1 NA NA NA NA NA NACompleted 1 1 4 2 1 1 NA NA NA NA NA NA

Total 1 1 6 3 2 2 1 1 6 3 2 2Completed 1 1 6 3 2 0 1 1 6 3 2 2

Total 1 1 6 3 2 2 1 1 6 3 2 2Completed 1 1 6 3 2 2 1 1 6 3 2 2

Total 1 1 6 3 2 2 1 1 6 3 2 2Completed 1 1 6 3 2 0 1 1 6 3 2 2

Total 1 1 6 3 2 2 1 1 6 3 2 2Completed 1 1 6 3 2 2 1 1 6 3 2 2

Total NA NA NA NA NA NA 1 1 6 3 2 2Completed NA NA NA NA NA NA 1 1 6 3 2 2

Total 1 1 6 3 2 2 1 1 6 3 2 2Completed 1 1 6 3 2 2 1 1 6 3 2 2

Total 1 1 1 1 6 6 NA NA NA NA NA NACompleted 1 1 1 1 6 0 NA NA NA NA NA NA

Total 1 1 1 1 6 6 1 1 1 1 6 6Completed 1 1 1 1 6 0 1 1 1 1 6 3

Total 1 1 1 3 2 2 NA NA NA NA NA NA

22+760

22+415

59+364

54+100

53+930

53+320

50+610

47+910-

-

-

-

Minor Bridge LHS/ RHS

Drain

Drain

Canal syphon

Canal Bridge LHS/RHS

Canal Bridge LHS/RHS

Canal syphon

53+030

58+500

25+900 25+840

6

7

8

9

10

11

RHS

LHS

RHS53+908

54+074

59+342

MCW SR.

LHS

RHS

LHS

RHS

LHS

RHS

LHS

RHS

LHS

RHS

LHS

Rem

arks

LHS

RHS

LHS

RHS

LHS

RHS

LHS

RHS

LHS5

Khor Canal Bridge LHS/

RHS

12.366 12.245

22+400

22+800

23+700

Status Side

23+560

Sl. No.

Name of Bridge

Minor Bridge LHS/ RHS

1

Minor Bridge LHS/ RHS

2

Minor Bridge LHS/ RHS

3

4

Chainage

Span Arrangement

(m)

1x17.05

1x8.82

1x18.50

2x19.2

12+230

22+399

22+750

23+545

25+823

47+880

50+586

53+311

2x7.054(skew)

(2x4.3)+(2x4.5)+(2x4.4)

(1x13.80)+(2x14.00)

(2x10.23)+(1x 10.32)

(2x10.26)+(1x10.35)

1x17.05

1x11.687 (skew)

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Existing DesignPlan & Profile PC

C

Foun

dati

on

Bott

om

Hau

nch

Wal

l

Top

Slab

Cras

h Ba

rrie

r

PCC

Foun

dati

on

Bott

om

Hau

nch

Wal

l

Top

Slab

Cras

h Ba

rrie

r

Rem

arks

Status SideSl.

No.Name of Bridge

Span Arrangement

(m)

Completed 0 0 0 0 0 0 NA NA NA NA NA NATotal 1 1 1 3 2 2 NA NA NA NA NA NA

Completed 1 1 1 3 2 0 NA NA NA NA NA NATotal 1 1 1 3 2 2 NA NA NA NA NA NA

Completed 1 1 1 3 2 0 NA NA NA NA NA NATotal 1 1 1 3 2 2 NA NA NA NA NA NA

Completed 1 1 1 3 2 2 NA NA NA NA NA NATotal 1 1 1 3 2 2 1 1 1 3 2 2

Completed 0 0 0 0 0 0 1 1 1 3 2 0Total 1 1 1 3 2 2 1 1 1 3 2 2

Completed 1 1 1 3 2 0 1 1 1 3 2 0Total 1 1 1 3 2 2 1 1 1 3 2 2

Completed 0 0 0 0 0 0 1 1 1 3 2 0Total 1 1 1 3 2 2 1 1 1 3 2 2

Completed 1 1 1 3 2 0 1 1 1 3 2 0Total 1 1 1 3 2 2 NA NA NA NA NA NA

Completed 0 0 0 0 0 0 NA NA NA NA NA NATotal 1 1 1 3 2 2 NA NA NA NA NA NA

Completed 1 1 1 3 2 0 NA NA NA NA NA NATotal 1 1 1 5 4 4 NA NA NA NA NA NA

Completed 1 1 1 5 4 0 NA NA NA NA NA NATotal 1 1 1 4 4 2 NA NA NA NA NA NA

Completed 1 1 1 4 4 2 NA NA NA NA NA NATotal 1 1 1 3 2 2 NA NA NA NA NA NA

Completed 1 1 1 3 2 0 NA NA NA NA NA NATotal 1 1 1 3 2 2 NA NA NA NA NA NA

Completed 1 1 1 3 2 2 NA NA NA NA NA NATotal 1 1 1 2 1 1 NA NA NA NA NA NA

Completed 0 0 0 0 0 0 NA NA NA NA NA NATotal 1 1 1 2 1 1 NA NA NA NA NA NA

Completed 0 0 0 0 0 0 NA NA NA NA NA NATotal 1 1 1 3 2 2 NA NA NA NA NA NA

Completed 0 0 0 0 0 0 NA NA NA NA NA NATotal 1 1 1 3 2 2 NA NA NA NA NA NA

Completed 0 0 0 0 0 0 NA NA NA NA NA NA

C COMPLETED P IN PROGRESS NA NOT APPLICABLE

-

105+04

105+90 106+98

106+50

89+362

71+242

68+542

82+200 83+404

80+685

77+22776+200

79+600

72+675

Canal Bridge LHS/RHS

67+45

Drain

Canal Bridge LHS/RHS

70+20

-

13

14

18

19

20

Minor Bridge Cum

Underpass RHS/LHS

Underpass (30 Deg. Skew)

Canal syphon

Canal Bridge LHS/RHS

Canal syphon

Minor Bridge LHS /RHS

17

15

16

LHS

RHS

LHS

RHS

LHS

RHS

RHS

1x8.20(skew)

68+502

71+209

72+638

12

RHS

LHS

RHS

LHS

RHS

LHS

RHS

LHS

RHS

LHS

LHS

1x15

1x17.75

1x15.05

1x17.05

1x14.267(skew)

2x16.477(skew)

1x9.971(skew)

77+181

80+646

83+363

2x7.20

89+318

106+488

107+004

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Progress Charts – Structures Details of ROB

DesignPlan & Profile

Total 42 4 4 4 4 34 17 3 3

Completed 21 2 2 2

Total 42 4 4 4 4 34 17 3 3

Completed 21 2 2 2 1

Total

Completed

Total

Completed

Total

Completed

Total

Completed

Total

Completed

Total

Completed

C COMPLETED P IN PROGRESS NA NOT APPLICABLE

2x37.175+ 37.00

Gamdi

LHS

RHS

LHS

RHS

1x25.35

LHS

RHS

Chhani

ROB at 75/2 LHS/RHS

ROB at 105/2 LHS/RHS

3

4

75.425

106.475

75.387

106.453

2

New ROB at Nadiad

Bhandran Railway line

ROB 267 C/2E 65/1

LHS/RHSBhumel65.545

Tundel54.8651 54.837

65.518

Rem

arks

PILE

PILE

CA

P

FOU

ND

ATI

ON

PIER

/ W

ALL

S

PIER

CA

P

PED

ESTA

L

GIR

DER

DEC

K SL

AB

CRA

SH

BARR

IER

SideVillageSl. No

Span in (m)Location Lanes Status

Chainage

LHS

RHS

4

4

2

3

2

4

2

225.193+ 25.015+

19.193

25.193+ 25.015+ 19.193

1x19.37

1x19.37

1x25.35

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Progress Charts – Structures Details of Vehicular Underpass

Existing DesignPlan & Profile

LHS C C C C C C C C C C C CRHS C C C C C C C C C C C CLHS C C C PRHS C C C C C C CLHS C C C C C C C C C C C CRHS C C C C C C C C C C C CLHS C C C C C C C C C C C CRHS C C C C C C C C C C C CLHS C C C C C C C C C C C CRHS C C C C C C C C C C C CLHS C C C C C C C C C C C CRHS C C C C C C C C C C C CLHSRHS C C C C C C C C C PLHS C C C C C C C C C CRHS C C C C C C C C C CLHSRHS

C COMPLETED P IN PROGRESS NA NOT APPLICABLE

Converted to Flyover

9 94+800 95+830 12x5.595+862

7 62+100 63+300 12x5.5

8 81+500 82+390 12x5.5

63+274

82+354

1 19+700 19+600 12x5.5

2 36+300 36+420 12x5.5

19+603

36+396

6 54+300 55+600 2x12x5.5 Tundel55+564

12x5.5

5 48+000 49+050 12x5.5

45+900 46+960 12x5.5

3 44+200 45+320

4

45+317

46+931

49+021

Mogar

Nandesari

Bareja

Sokhada

Sandhana

Sandhana

Dantali

Narsanda

Chainage

Sl. No.

Proposed Size(m)

Village Side

Exca

vati

on

PCC

Bott

om S

lab

Hau

nch

Wal

l

Wal

l

Cras

h ba

rrie

r

Remarks

Top

Slab

Cras

h ba

rrie

r

Med

ian

Wal

l PCC

Med

ian

Wal

l Fo

unda

tion

Med

ian

Wal

l hau

nch

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Progress Charts – Structures Details of Pedestrain Underpass

Existing DesignPlan & Profile

LHS C C C C C C C C C C C C

RHS C C C C C C C C C C C C

LHSRHSLHSRHSLHSRHS C C C C C C P C C C C PLHSRHS C C C C C CLHSRHS C C C C C C P C C C C PLHS C C C C C C C NA NA NA NA CRHS C C C C C C C C C C C CLHSRHS C C C CLHS C C C C C C C C C CRHS C C C C C C C C C CLHS C C C C C CRHS C C C C C CLHSRHSLHS C C C C C C NA NA NA NARHS C C C C C C NA NA NA NALHSRHSLHS C CRHS C C

C COMPLETED P IN PROGRESS NA NOT APPLICABLE

96+500 97+580 7.0 x 3.50

89+721

97+733

98+500 99+580 7.0 x 3.50

102+500 103+580 7.0 x 3.50

99+617

103+543

71+000 72+080 7.0 x 3.50

85+900 87+040 7.0 x 3.50

72+024

86+992

88+700 89+690 7.0 x 3.50

30+000 29+910 7.0 x 3.50

27+779

29+897

60+900 61+960 7.0 x 3.50

68+100 69+140 7.0 x 3.50

61+935

69+078

26+180

7.0 x 3.50

7.0 x 3.50

7.0 x 3.50

23+390

26+168

27+900 27+800 7.0 x 3.50

14

1

2

3

4

5

6

7

8

9

10

11

12

13 Padamla

Dashrath

Kajipura

Gutal

Boriavi

Lambhvel

Adas

Vasad

Sankarda

Chainage

Sl. No.Proposed Size

(m)Village Side

C C C C

Narol

Jetalpur

Kanera

Malarpura

Gobhalaj

8+200 8+250 7.0 x 3.50

16+000 15+830

8+245

15+822

23+450 23+400

26+100

Wal

l

Cras

h ba

rrie

r

Rem

arks

Top

Slab

Cras

h ba

rrie

r

Med

ian

Wal

l PCC

Med

ian

Wal

l Fo

unda

tion

Med

ian

Wal

l ha

unch

Exca

vati

on

PCC

Bott

om S

lab

bott

om H

aunc

h

Wal

ls

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Progress Charts – Structures

Details of Box Culvert

Existing DesignPlan & Profile V

illag

e

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

Rem

arks

1 07+600 07+595 07+597 BC 2x2x2.0 Narol C C C C C C C C C C C C C C C C C C C C

2 07+800 07+780 07+767 BC 1x2x1.5 Narol C C C C C C C C C C C C C C C C C C C C

3 09+300 09+300 09+184 BC 1x2x1.5 Vatva C C C C C C C C C C C C C C C C C C C C

4 10+800 10+690 10+684 BC 1x2.0x1.5 Vatva C C C C C C C C C C C C C C C C C C C C

5 11+200 11+065 11+055 BC 2x3x3.0 Vatva C C C C C C C C

6 12+700 12+640 12+622 BC 1x2.0x1.5 Aslali C C C C C C C C C C C C C C C C C C C C

7 13+100 13+115 13+107 BC 1x2.0x1.5 Aslali C C C C C C C C C P C C C C C C C C C C

8 13+950 13+710 13+702 BC 1x2.0x1.50 Aslali C C C C C

9 15+950 15+895 15+881 BC 1x3.0x3.0 Jetalpur

10 16+600 16+470 16+455 BC 2x3.0x3.0 Jetalpur C C C C C C C C C C

11 18+400 18+300 18+291 BC 1x2.0x2.0 Jetalpur C C C C C C C C C C C C C C C C C C C C

12 19+120 19+020 19+010 BC 1x2.0x2.0 Bareja C C C C C C C C C C C C C C C C C C C C

13 19+750 19+660 19+650 BC 1x2.0x2.0 Bareja C C C C C

14 20+800 20+680 20+670 BC 2x2.0x2.0 Bareja C C C C C C C C C C C C C C C C C C C C

15 24+500 24+250 24+234 BC 1x2.0x2.0 Kanera C C P C C C C C

16 24+650 24+530 24+517 BC 1x2.0x2.0 Kanera C C C P C C C C C

17 24+850 24+785 24+769 BC 1x2.0x2.0 Kanera

18 24+950 24+870 24+856 BC 1x2.0x2.0 Kanera

19 25+300 25+120 25+108 BC 1x2.0x2.0 Kanera

20 25+750 25+640 25+630 BC 1x2.0x2.0 Malarpura C C C P

21 26+080 26+000 25+990 BC 1x2.0x2.0 Malarpura P C C C P C C C C C

22 26+700 26+700 26+701 BC 1x2.0x2.0 Gobhalaj C C P C C C P

23 27+500 27+570 27+554 BC 1x2.0x2.0 Gobhalaj P C C C C C C C C C C

24 27+950 27+800 27+803 BC 1x2.0x2.0 Gobhalaj C C C C P C C C C C

25 28+600 28+520 28+506 BC 1x2.0x2.0 Gobhalaj C C C C P

26 32+390 32+250 32+249 BC 1x2.0x2.0 Hariyala

27 33+700 33+690 33+672 BC 1x4.0x4.0 Hariyala C C C C C C C C C C C C C

28 34+300 34+330 34+310 BC 1x3.0x3.0 Hariyala C C C C C C C C C C C

29 35+800 35+580 35+546 BC 1x4.0x5.5 Sokhada C C C P

30 35+830 35+530 35+727 BC 1x3x3 Sokhada

31 36+200 36+180 36+147 BC 3 x 3.0 x 3.0 Matar C C C C C C C C C C C C C C C C C C C C C C C C

32 36+400 36+300 36+267 BC 2 x 3.0 x3.0 Matar C C C C C C C C C C C C C C C C C C C C C C C C C C

33 36+450 36+405 36+374 BC 2 x3.0x 3.0 Sokhada C C C C C C C C C C C C C C C C C C C C C C C C

34 36+500 36+450 36+419 BC 2 x 3.0 x3.0 Sokhada C C C C C C C C C C C C C C C C C C C C C C C C

35 36+600 36+535 36+507 BC 3x3x3 Sokhada C C C C C C C C C C C C C C C C C C C C C

36 36+850 36+690 36+657 BC 1x3x3 Sokhada C C C C C C C C C C C C C C C

37 37+020 37+005 36+973 BC 2x3x2.5 Sokhada NA NA NA NA NA C C C C C NA NA NA NA NA

38 37+200 37+240 37+206 BC 1x3x3 Matar NA NA NA NA NA C C C C C C C C C C NA NA NA NA NA

39 37+400 37+350 37+326 BC 1x4.5x2.7 Matar NA NA NA NA NA C C C C C C C C C C NA NA NA NA NA

40 37+500 37+495 37+466 BC 1x4.5x3.0 Matar NA NA NA NA NA C C C C C C C C C C NA NA NA NA NA

41 37+600 37+565 37+534 BC 2x3.0x3.0 Matar NA NA NA NA NA C C C C C C C C C C NA NA NA NA NA

42 37+750 37+735 37+706 BC 1x4.5x3.0 Sokhada NA NA NA NA NA C C C C C C C C C C NA NA NA NA NA

43 37+950 37+920 37+886 BC 1x4.0x3.0 Sokhada NA NA NA NA NA C C C C C C C C C C NA NA NA NA NA

44 38+000 37+970 37+938 BC 2x3.0x2.5 Sokhada NA NA NA NA NA C C C C C C C C C C NA NA NA NA NA

45 38+400 38+250 38+230 BC 1x2.0x2.0 Sokhada NA NA NA NA NA NA NA NA NA NA

46 39+400 39+380 39+424 BC 1x3x3 NA NA NA NA NA NA NA NA NA NA

47 39+850 39+870 39+849 BC 1x2.0x2.0 Vansar NA NA NA NA NA C C C C C C C C C C NA NA NA NA NA

48 40+200 40+220 40+192 BC 1x2.0x2.0 Vansar NA NA NA NA NA C C C C C C C C C C NA NA NA NA NA

49 41+800 41+470 41+438 BC 1x3x3 Vansar NA NA NA NA NA NA NA NA NA NA

50 42+450 43+550 43+524 BC 1x2.0x2.0 C C C C C

51 42+700 43+700 43+673 BC 1x2.0x2.0 C C C C C

52 44+150 45+190 45+180 BC 2x2.0x2.0 Sandhana C C C C C C C C C C NA NA NA C C C C C C C C C C

53 44+700 45+815 45+808 BC 1x2.0x2.0 Sandhana NA NA NA NA NA C C C C C NA NA NA NA NA

RHS MCW RHS SR.

Sl. No

LHS SR. LHS MCW

Type

of S

truc

ture

Span

Arr

ange

men

t (m

)Chainage

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Details of Box Culvert

Existing DesignPlan & Profile V

illag

e

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

Rem

arks

RHS MCW RHS SR.

Sl. No

LHS SR. LHS MCW

Type

of S

truc

ture

Span

Arr

ange

men

t (m

)Chainage

54 45+200 46+270 46+248 BC 1x2.0x2.0 Sandhana NA NA NA NA NA C C C C C NA NA NA NA NA

55 45+900 47+000 46+968 BC 1x3x3 Sandhana C C C C C C C C C C NA NA NA C C C C C C C C C C

56 46+200 47+320 47+293 BC 1x2.0x2.0 Dantali C C C C C C C C C C C C C C C

57 48+100 49+145 49+118 BC 1x3x3 Dantali C C C C C C C C C C C C C C C

58 49+500 50+630 50+602 BC 1x2.0x2.0 Dabhan NA NA NA NA NA C C C C C NA NA NA NA NA

59 50+450 51+460 51+428 BC 1x2.0x2.0 Dabhan NA NA NA NA NA C C C C C C NA NA NA NA NA

60 50+500 51+490 51+466 BC 1x3x3 Dabhan NA NA NA NA NA C C C C C C C C C NA NA NA NA NA

61 51+100 52+130 52+096 BC 1x1.85 Dabhan C C C C C NA NA NA NA NA NA NA NA NA NA C C C C C

62 51+600 52+650 52+626 BC 1x2x2 Dabhan

63 52+450 53+480 53+459 BC 1x2x2 Dabhan C C C C C C C C C C C C C C C C C C C C

64 52+700 53+840 53+817 BC 2x2x2 Dabhan C C C C C C C C C C C C C C C C C C C C C C

65 53+500 54+590 54+564 BC 1x2x2 Tundel C C C C C C C C C C C C C C C

66 54+600 55+575 55+549 BC 1x4.0x4.0 Tundel C C C

67 56+400 57+405 57+378 BC 1x2.0x2.0 Dumral C C C C C C C C C C NA NA NA C C C C C C C C C C

68 57+650 58+625 58+596 BC 1x4.0x4.0 Nadiad C C C C C C C C C C C C C NA NA NA C C C C C NA NA NA C C C C C

69 57+750 58+725 58+724 BC 1x2.0x2.0 Nadiad C C C C C C C C C C C C C NA NA NA C C C C C NA NA NA C C C C C

70 57+950 58+925 58+899 BC 1x3x3 Pipalag C C C C C C C C C C C C C NA NA NA C C C C C NA NA NA C C C C C

71 59+100 60+350 60+323 BC 1x2.0x2.0 Pipalag NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA

72 60+150 61+220 61+193 BC 1x3.0x2.0 Gutal NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA

73 61+350 62+405 62+376 BC 1x3.0x2.0 Uttarsanda NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA

74 62+080 63+113 63+086 BC 1x2.0x2.0 Narsanda C C C C C C C C C C C C C C C C C C

75 62+200 63+330 63+303 BC 1x2.0x2.0 Narsanda C C C C C C C C

76 62+500 63+533 63+506 BC 1x2.0x2.0 Narsanda

77 62+800 63+842 63+815 BC 1x3.0x2.0 Narsanda NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA

78 67+200 68+250 68+225 BC 1x2.0x2.0 Boriavi NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA

79 68+000 69+095 69+070 BC 2x3.0x3.0 Boriavi C C C C C C C C C C C C C

80 68+300 69+330 69+305 BC 2x3.0x3.0 Boriavi C C C C C C C C

81 71+250 72+332 72+290 BC 1x2.0x2.0 Lambhvel C C C C C C C C NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C C C C NA

82 72+370 73+420 73+377 BC 1x2.0x2.0 Anand C C C C C C C C NA NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C C C C NA

83 73+150 74+205 74+161 BC 2x3.0x3.0 Anand C C C C C C C C C C C C P NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C

84 74+200 75+250 75+207 BC 5x3 Gamdi

85 74+800 75+823 75+815 BC 1x2.0x2.0 Gamdi

86 75+600 76+647 76+604 BC 1x2.0x2.0 Gamdi C C C C C C C C NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C C C C NA

87 75+700 76+770 76+799 BC 1x2.0x2.0 Gamdi C C C C C C C C NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C C C C NA

88 76+600 77+654 77+629 BC 1x2.0x2.0 Chikodra C C C C C C C C NA C C C C C NA NA NA NA NA NA NA NA NA NA C C C C C C C C NA

89 77+300 78+462 78+419 BC 1x2.0x2.0 Vaghasi C C C C C NA NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C C C P NA

90 78+300 79+442 79+400 BC 1x2.0x2.0 Vaghasi NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

91 80+600 81+653 81+628 BC 1x2.0x2.0 Mogar NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

92 83+300 84+375 84+333 BC 1x2.0x1.5 Mogar NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA93 85+200 86+319 86+295 BC 1x2.0x2.0 Adas NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA94 86+200 87+212 87+169 BC 2x2.0x2.0 Adas C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA95 87+600 88+672 88+628 BC 1x2.0x2.0 Adas NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA96 88+600 89+875 89+832 BC 1x4.0x4.0 Vasad C C C C97 89+200 90+270 90+226 BC 1x2.0x2.0 Vasad C C C C C C C C NA C98 90+250 91+432 91+410 BC 1x2.0x2.0 Vasad

99 90+650 91+831 91+817 BC 1x2.0x2.0 Vasad

100 96+400 97+525 97+508 BC 1x2.0x2.0 Sankarda C C C C C C C C C C C C C C NA NA C C C C C C C C NA C101 98+600 99+710 99+683 BC 2x3x3 Padamla C C C C C C C C C C C C C NA NA NA NA NA C C C C C C C C102 98+650 99+760 99+735 BC 1x6.0x3.0 Padamla C C C C C C C C C C NA NA NA NA NA C C C C C103 102+700 103+894 103+636 BC 1x2.0x2.0 Dashrath C C C C C P C C C C C C C C NA NA104 103+500 104+560 104+529 BC 1x2.0x2.0 Dashrath C C C C C C C C NA C C C C C C NA NA NA NA NA C C C C C C C C NA C105 106+250 107+377 107+354 BC 1x2.0x2.0 Chhani C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA106 106+300 107+435 107+412 BC 1x2.0x2.0 Chhani C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA107 106+350 107+496 107+475 BC 1x2.0x2.0 Chhani C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Details of Box Culvert

Existing DesignPlan & Profile V

illag

e

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

Rem

arks

RHS MCW RHS SR.

Sl. No

LHS SR. LHS MCW

Type

of S

truc

ture

Span

Arr

ange

men

t (m

)Chainage

108 107+050 108+147 108+126 BC 1x2.0x2.0 Dumad C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA

1 40+960 40+721 40+724 BC 1x2.0x2.0 Vansar

2 43+350 44+420 44+398 BC 1x2.0x2.0 Radhavanj C C

3 47+560 48+600 48+577 BC 1x2.0x2.0 Dantali C C C C C

4 48+360 49+400 49+378 BC 1x2.0x2.0 Dantali C C C C C C C C C C C C C C C

5 48+860 49+940 49+918 BC 1x2.0x2.0 Dantali C C C C C C C C C C

6 49+920 51+000 50+978 BC 1x2.0x2.0 Dabhan C C C C C

7 52+950 54+000 53+973 BC 1x2.0x2.0 Dabhan C C C C C C C C C C C C C C C C C C C

8 55+600 56+640 56+613 BC 1x2.0x2.0 Nadiad C C C C C C C C C C C C C C C C C C C

9 59+760 61+010 60+983 BC 1x2.0x2.0 Pipalag NA C C C C C

10 61+580 62+630 62+603 BC 1x2.0x2.0 Uttarsanda

11 64+470 65+490 65+465 BC 1x2.0x2.0 Bhumel

12 64+950 65+980 65+955 BC 1x2.0x2.0 Bhumel

13 65+430 66+450 66+426 BC 1x2.0x2.0 Kanjari

14 66+370 67+400 67+376 BC 1x2.0x2.0 Kanjari C C C C C C C C C C C C C C C C C C C C C

15 78+900 79+940 79+916 BC 1x2.0x2.0 Mogar NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

16 79+240 80+340 80+316 BC 2x2.0x2.0 Mogar NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

17 80+100 81+190 81+116 BC 2x2.0x2.0 Mogar NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

18 81+500 82+550 82+526 BC 1x2.0x2.0 Mogar C C C C C C C C NA C C C C C C C C C NA C C C C C C C C C NA C C C C C C C C C NA C19 81+830 83+115 82+650 BC 3x2.0x2.0 Mogar NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA20 82+690 83+750 83+726 BC 1x2.0x2.0 Mogar

21 101+580 102+600 102+582 BC 1x2.0x2.0 Dashrath C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C C C C NA C22 104+790 105+820 105+801 BC 1x2.0x2.0 Chhani C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA

Additional Culvert under COS1 30.140 30.127 C C Converted from HPC

2 63+083 63+056 C C C C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C Converted from HPC

3 91+931 C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA4 95+970 C C C C C C C C NA P C C C C C C C C NA P

C COMPLETED P IN PROGRESS NA NOT APPLICABLE

New Additional Culverts

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Progress Charts – Structures

Details of Slab Culvert

Existing DesignPlan & Profile V

illag

e

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

PCC

Foun

dati

on

HA

UN

CH

Wal

l

Slab

PCC

R1/

R2

Foun

dati

on R

1/R2

WA

LL R

1/R2

App

roac

h Sl

abs

Cras

h Ba

rrie

r

Rem

arks

1 09+500 09+400 09+393 SLC 1x1.6 Vatva C C C C C C C C C C C C C C C C C C C C

2 09+700 09+575 09+566 SLC 1x1.6 Vatva C C C C C C C C C C C C C C C C C C C C

3 10+600 10+490 10+479 SLC 1x6.00 Vatva

4 12+800 12+835 12+820 SLC 1x5.90 Aslali C C C C C C C C C C C C C C C C C C C C

5 14+450 14+350 14+335 SLC 1X2.3 Aslali C C C C C C C C C C P C C C C C

6 15+585 15+445 15+434 SLC 1x6.00 Jetalpur

7 17+300 17+180 17+170 SLC 1x1.25 Jetalpur C C C C C C C C C C C C C C C C C C C C

8 17+850 17+790 17+776 SLC 1x6.00 Jetalpur C C C C C C C C C C C C C C C C C C C C

9 18+200 18+100 18+091 SLC 1x1.25 Jetalpur C C C C C C C C P

10 18+950 18+850 18+837 SLC -1x6.0R--1x6.0 Bareja C C C C C P P P P P P P P P P C C C C C

11 20+200 20+185 20+162 SLC 1x6.00 Bareja C C C C P C P

12 21+700 21+670 21+657 SLC 1x6.00 Bareja

13 24+150 24+030 24+018 SLC 1x4.0 Kanera C C C C C

14 26+520 26+520 26+510 SLC 1x6.00 Gobhalaj C C P

15 29+000 29+220 29+208 SLC 1x2.5 Kajipura C C

16 33+100 33+005 32+987 SLC 1x2.5 Hariyala C C

17 40+700 40+835 40+806 SLC 1x4.0 C C C P

18 43+950 45+009 44+976 SLC 1x6.0 Sandhana C C C C C C C C C C C C C C C

19 45+500 46+500 46+507 SLC 1x3.5 Sandhana NA NA NA NA NA C C C C C NA NA NA NA NA

20 52+000 53+140 53+113 SLC 1x4.0 Dabhan C C C C C C C C C C C C C C C C C C C C

21 55+450 56+470 56+443 SLC 1x4.0 Nadiad C C C C C C C C C C C C C C C C C

22 55+800 56+810 56+783 SLC 1x6.0 Nadiad C C C C C C C C C C C C C C C C C C C C

23 56+780 57+810 57+783 SLC 1x6.0 Dumral C C C C C C C C C P NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C

24 68+800 69+853 69+828 SLC 1x6.0 Boriavi NA NA NA NA NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

25 73+960 75+188 75+145 SLC 1x6.0 Gamdi

26 74+400 75+430 75+398 SLC 1x5.0 Gamdi

27 75+200 76+262 76+219 SLC 1x3.0 Gamdi C C C C C C C C NA C C C C C NA NA NA NA NA C P NA NA NA NA NA C C C C C C C P NA

28 84+250 85+282 85+237 SLC 1x3 Adas NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

29 84+970 86+028 85+985 SLC 1x6.0 Adas NA NA NA NA NA NA NA NA NA NA C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

30 96+980 98+038 98+004 SLC 1x3.5 Sankarda C C C C C C C C NA C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA C C C C C C C C NA C

31 99+050 100+028 100+001 SLC 1x3.0 Padamla C C C C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA C C C C C C C C

32 99+350 100+357 100+328 SLC 1x1.2 Padamla C C C C C C C C NA P NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA C C C C C C C C NA C

33 99+500 100+505 100+476 SLC 1x2.2 Padamla C C C C C C C C NA C C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C C C C NA C R1 complete

34 99+950 100+995 100+965 SLC 1x1.2 Padamla C C C C C C C C NA C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA C C C C C P

35 100+300 101+345 101+315 SLC 1x2.0 Padamla C C C C C C C C NA C C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C P

36 100+500 101+597 101+575 SLC 1x2.0 Padamla C C C C C P NA P C C C C C NA NA NA NA NA C C C C C NA NA NA NA NA C C C C C C C C NA C R1 Complete

37 102+100 103+127 103+097 SLC 1x2.0 Dashrath C C C C C P NA P NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA C C C C C C C C NA C

38 102+200 103+245 103+216 SLC 1x3.8 Dashrath NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

39 102+900 104+094 104+076 SLC 2x2.0 Dashrath C C C C C C C C NA C NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA C C C C C C C C NA C

1 36+800 36+840 36+816 SLC 1x3.0 Sokhada C C C C C

2 53+300 54+410 54+384 SLC 1x6.0 Tundel C C C C C C C C C C C C C C C C

Additional Slab over Existing slab of Slab Culvert- RHS 100+357 - 09/04/2013Additional Slab over Existing slab of Slab Culvert- RHS 100+995 - 16/04/2013Additional Slab over Existing slab of Slab Culvert- RHS 100+028 - 18/04/2013

C COMPLETED P IN PROGRESS NA NOT APPLICABLE 0

RHS MCW RHS SR.

New Additional Culverts

Sl. No

Type

of S

truc

ture

Span

Arr

ange

men

t (m

) LHS SR. LHS MCWChainage

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-C

Progress Charts – Structures Details of Hume Pipe Culvert

Des

ign Plan &

Profile

Exca

vati

on fo

r he

ad w

all &

cr

adle

PCC

M15

for

Hea

d w

alls

M15

PCC

M20

hea

d w

all u

pto

sill

leve

l

Gra

nula

r/PC

C M

15 fo

r pi

pe

bedd

ing

port

ion

Pipe

layi

ng &

join

ting

PCC

M20

for

head

wal

l up

to

pipe

top

PCC

M20

for

head

wal

l up

to

top

Exca

vati

on fo

r he

ad w

all &

cr

adle

PCC

M15

for

Hea

d w

alls

M15

PCC

M20

hea

d w

all u

pto

sill

leve

l

Gra

nula

r/PC

C M

15 fo

r pi

pe

bedd

ing

port

ion

Pipe

layi

ng &

join

ting

PCC

M20

for

head

wal

l up

to

pipe

top

PCC

M20

for

head

wal

l up

to

top

Exca

vati

on fo

r he

ad w

all &

cr

adle

PCC

M15

for

Hea

d w

alls

M15

PCC

M20

hea

d w

all u

pto

sill

leve

l

Gra

nula

r/PC

C M

15 fo

r pi

pe

bedd

ing

port

ion

Pipe

layi

ng &

join

ting

PCC

M20

for

head

wal

l up

to

pipe

top

PCC

M20

for

head

wal

l up

to

top

Exca

vati

on fo

r he

ad w

all &

cr

adle

PCC

M15

for

Hea

d w

alls

M15

PCC

M20

hea

d w

all u

pto

sill

leve

l

Gra

nula

r/PC

C M

15 fo

r pi

pe

bedd

ing

port

ion

Pipe

layi

ng &

join

ting

PCC

M20

for

head

wal

l up

to

pipe

top

PCC

M20

for

head

wal

l up

to

top

Rem

arks

1 18.695 18.683 1 x1.2

2 27.145 27.129 1x1.2 C C C C C P C C C C C P

3 27.175 27.160 1x1.2 NA NA NA NA NA NA NA C C C C C P C C C C C P NA NA NA NA NA NA NA

4 29.970 29.960 3x1.2 C C C C P P

5 30.140 30.127 2x1.2 Change of scope converted in to box culvert6 31.050 31.040 2x1.2

7 63.083 63.056 3x1.2 Change of scope converted in to box culvert8 64.600 64.584 3x1.2 NA NA NA NA NA NA NA C C C C C C C NA NA NA NA NA NA NA9 83.672 83.648 2x0.9

Additional Culvert under COS

1 39.380 C C C C C C C

2 40.835 C C C C C C C

3 43.550 C C C C C C C C C C C C C C

4 43.700 C C C C C C C C C C C C C C

54.766

5 59.310 NA NA NA NA NA NA NA C C C C C C C NA NA NA C C NA NA C C C C C C C6 59.380 NA NA NA NA NA NA NA C C C C C C C NA NA NA C C NA NA C C C C C C C7 62.030 NA NA NA C C NA NA NA NA NA C C NA NA C C C C C C C8 63.430 C C C C C C C9 63.635 C C NA NA NA C C NA NA C C

10 63.650

11 63.930

12 64.375

13 64.510

14 82.630 (A) C C C C C C C NA NA NA NA NA NA NA C C C C C C C C C C C C C C15 88.265 C C C C C C C16 90.995 C C C C C C C17 99.153 C C C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA18 102.860 C C C C C C C C C C C C C C C C C C C C C19 104.523 C C C C C C C C C C C C C C C C C C C C C C C C C C C C20 104.884 NA NA NA NA NA NA NA NA NA NA NA NA NA NA C C C C C C C21 107.825 (A) C C C C C C C NA NA NA NA NA NA NA NA NA NA NA NA NA NA C C C C C C C

C COMPLETED P IN PROGRESS NA NOT APPLICABLE

RHS MCW RHS SR.

Sl. No

LHS SR. LHS MCWChainage

Span

Arr

ange

men

t (m

)

MONTHLY PROGRESS REPORT - APRIL 2014QC TEST SUMMARY

Appendix-D

Passed Failed Passed Failed Passed Failed Borrow Area

1 Free Swell Index IS 2720 Part 40 As Required 50 % Max 1355 3 76 0 1431 32 Grain Size Analysis IS 2720 Part 4 As Required 1355 0 76 0 1431 03 Plasticity Index IS 2720 Part 5 As Required L.L.= Not>70 %,PI =Not> 45 % 1355 0 76 0 1431 0

4 Max. Dry Density IS 2720 Part 8 As RequiredUp to 3m 1.55 gm/cc More than 3m 1.63 gm/cc

1355 0 76 0 1431 0

5 CBR IS 2720 Part 16 As Required 494 98 53 8 547 106

OGL1 Free Swell Index IS 2720 Part 40 As Required 50 % Max 1646 100 26 1 1672 1012 Grain Size Analysis IS 2720 Part 4 As Required 1640 5 26 0 1666 53 Plasticity Index IS 2720 Part 5 As Required L.L.= Not>70 %,PI =Not> 45 % 1636 0 26 0 1662 0

4 Max. Dry Density IS 2720 Part 8 As RequiredUp to 3m 1.55 gm/cc More than 3m 1.63 gm/cc

1647 0 26 0 1673 0

5 CBR IS 2720 Part 16 As Required 676 113 8 0 684 1136 Density of Comp.Layer IS 2720 Part 28 As Required 95% of Lab MDD 2063 16 182 0 2245 167 Moisture Cont. IS 2720 Part 2 As Required -2% to +1 % OMC 393 3 28 0 421 3

Existing Shoulder Sample1 Free Swell Index IS 2720 Part 40 As Required 50 % Max 909 16 14 0 923 162 Grain Size Analysis IS 2720 Part 4 2 Test /3000M3 899 0 14 0 913 0

3 Plasticity Index IS 2720 Part 5 2 Test /3000M3 L.L.>70 %,PI => 45 % 896 0 14 0 910 0

4 Max. Dry Density IS 2720 Part 8 2 Test /3000M3 Up to 3m 1.55 gm/cc More than 3m 1.63 gm/cc

894 0 14 0 908 0

5 CBR IS 2720 Part 16 As Required 816 45 9 0 825 45

Monthly Progress Report of QA/QC Department

NATIONAL HIGHWAYS AUTHORITY OF INDIAMinistry of Road Shipping Transport & Highways. (MORST & H)

Six Laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (Length Km. 102.300) in State of Gujarat and improvement of existing Ahmedabad Vadodara Expressway from Km 0.000 Concessionaire : IRB Ahmadabad Vadodra Super Express Tollway Pvt. Ltd.

EPC Contractor : MRM Pvt Ltd Quality Control Engineer Independent Engineer: Aarvee Associates AE & C Pvt. Ltd.

MONTH - APRIL 2014Sr. No. Name of Test Testing Method Frequency of Test Specification Requirements

Number of Tests ConductedPrevious Month This Month Total to Date

1 of 8

MONTHLY PROGRESS REPORT - APRIL 2014QC TEST SUMMARY

Appendix-D

Passed Failed Passed Failed Passed Failed

Monthly Progress Report of QA/QC Department

NATIONAL HIGHWAYS AUTHORITY OF INDIAMinistry of Road Shipping Transport & Highways. (MORST & H)

Six Laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (Length Km. 102.300) in State of Gujarat and improvement of existing Ahmedabad Vadodara Expressway from Km 0.000 Concessionaire : IRB Ahmadabad Vadodra Super Express Tollway Pvt. Ltd.

EPC Contractor : MRM Pvt Ltd Quality Control Engineer Independent Engineer: Aarvee Associates AE & C Pvt. Ltd.

MONTH - APRIL 2014Sr. No. Name of Test Testing Method Frequency of Test Specification Requirements

Number of Tests ConductedPrevious Month This Month Total to Date

Embankment 1 Free Swell Index IS 2720 Part 40 As Required 50 % Max 1020 0 111 0 1131 02 Grain Size Analysis IS 2720 Part 4 2 Test /3000M3 1020 0 111 0 1131 0

3 Plasticity Index IS 2720 Part 5 2 Test /3000M3 L.L.>70 %,PI => 45 % 1020 0 111 0 1131 0

4 Max. Dry Density IS 2720 Part 8 2 Test /3000M3 Up to 3m 1.55 gm/cc More than 3m 1.63 gm/cc

1020 0 111 0 1131 0

5 Density of Comp.Layer IS 2720 Part 281 Test /1000M2

(1 Test =6 No of Pits)95% of Lab MDD 11000 123 1548 12 12548 135

6 Moisture Cont. IS 2720 Part 2 1 Test /250M3 -2% to +1 % OMC 6499 34 701 7 7200 41

Sub Grade/ Shoulder1 Free Swell Index IS 2720 Part 40 As Required 50 % Max 508 0 79 0 587 02 Grain Size Analysis IS 2720 Part 4 2 Test /3000M3 508 0 79 0 587 0

3 Plasticity Index IS 2720 Part 5 2 Test /3000M3 L.L.>70 %,PI => 45 % 508 0 79 0 587 0

4 Max. Dry Density IS 2720 Part 8 2 Test /3000M3 516 0 79 0 595 0

5 CBR IS 2720 Part 16 1 Test /3000M3 8% Min.at 97% Mdd 337 29 56 0 393 29

6 Density of Comp.Layer IS 2720 Part 28 1 Test /500M2

(1 Test =10 No of Pits)97% of Lab MDD 6363 75 1245 10 7608 85

7 Moisture Cont. IS 2720 Part 2 1 Test /250M3 -2% to +1 % OMC 2997 29 643 8 3640 37

Side Shoulder1 Density of Comp.Layer IS 2720 Part 28 1 Test /500M2 97% of Lab MDD 145 4 34 0 179 42 Moisture Cont. IS 2720 Part 2 1 Test /250M3 -2 % to +1 % OMC 69 0 16 0 85 0

2 of 8

MONTHLY PROGRESS REPORT - APRIL 2014QC TEST SUMMARY

Appendix-D

Passed Failed Passed Failed Passed Failed

Monthly Progress Report of QA/QC Department

NATIONAL HIGHWAYS AUTHORITY OF INDIAMinistry of Road Shipping Transport & Highways. (MORST & H)

Six Laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (Length Km. 102.300) in State of Gujarat and improvement of existing Ahmedabad Vadodara Expressway from Km 0.000 Concessionaire : IRB Ahmadabad Vadodra Super Express Tollway Pvt. Ltd.

EPC Contractor : MRM Pvt Ltd Quality Control Engineer Independent Engineer: Aarvee Associates AE & C Pvt. Ltd.

MONTH - APRIL 2014Sr. No. Name of Test Testing Method Frequency of Test Specification Requirements

Number of Tests ConductedPrevious Month This Month Total to Date

GSB1 Max. Dry Density IS 2720 Part 8 1 TEST PER SOURCE 46 0 2 0 48 02 Sieve Analysis 1 Test /200M3 As per MOST T.N.400-2 1188 2 243 0 1431 2

3 Plasticity Index IS 2720 Part 5 1 Test /200M3 LL=Not>25% PI=Not>6% 1148 0 244 0 1392 04 CBR IS 2720 Part 16 As Required 30% 21 0 2 0 23 05 Water Absorption IS 2386 Part 3 As Required IF WA >2% THEN 10 0 1 0 11 06 10% Fines Value BS 812 Part 111 As Required 50 KN min 14 0 1 0 15 07 Moisture Cont. IS 2720 Part 2 1 Test /250M3 -2% to +1 % OMC 2358 3 434 1 2792 48 Density of Comp.Layer IS 2720 Part 28 1 Test /500M2 98% of Lab MDD 2050 17 436 2 2486 19

WMM1 Max. Dry Density IS 2720 Part 8 1 TEST PER SOURCE As per Approved Design Mix 13 0 1 0 14 02 Plasticity Index IS 2720 Part 5 1 Test /100M3 6 % max. 2484 0 514 0 2998 0

3 Aggregate Impact Value IS 2386 PART 4 1 Test /200M3 30% max 1520 0 282 0 1802 0

4 Sieve Analysis IS 2386 PART 1 1 Test /100M3 As per table no 400-2 2486 1 514 0 3000 1

5 Flakiness & Elongation IS 2386 PART 1 1 Test /200M3 30% max 1551 0 282 0 1833 0

6 Density of Comp.Layer IS 2720 Part 28 1 Test /500M2 98% of Lab MDD 3342 1 676 0 4018 17 Moisture Cont. IS 2720 Part 2 As Required -2% to +1 % OMC 1327 1 232 0 1559 1

BM- 11 Aggregate Impact Value IS 2386 PART 4 1Test /50M3 27% max. 0 0 0 0 0 0

2 Flakiness & Elongation IS 2386 PART 1 1Test /50M3 30% max. 0 0 0 0 0 03 Mix Grading IS 2386 PART 1 1 Test/400 MT or 2 test per day As per Approved Design JMF Limit 0 0 0 0 0 04 Individual Grading IS 2386 PART 1 1 Test/400 MT or 2 test per day As per Approved Design Mix 0 0 0 0 0 05 Density of Mix ASTM D 1559 1 Test/400 MT or 2 test per day As per Approved Design Mix 0 0 0 0 0 06 Binder Content & Grading Mix ASTM D 2172 1 Test/400 MT or 2 test per day ± 0.3 % of OBC 0 0 0 0 0 07 Density of Compacted layer IS 2720 Part 28 1 Test /250M2 98% of Lab Marshall Density. 0 0 0 0 0 0

BM- 2

3 of 8

MONTHLY PROGRESS REPORT - APRIL 2014QC TEST SUMMARY

Appendix-D

Passed Failed Passed Failed Passed Failed

Monthly Progress Report of QA/QC Department

NATIONAL HIGHWAYS AUTHORITY OF INDIAMinistry of Road Shipping Transport & Highways. (MORST & H)

Six Laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (Length Km. 102.300) in State of Gujarat and improvement of existing Ahmedabad Vadodara Expressway from Km 0.000 Concessionaire : IRB Ahmadabad Vadodra Super Express Tollway Pvt. Ltd.

EPC Contractor : MRM Pvt Ltd Quality Control Engineer Independent Engineer: Aarvee Associates AE & C Pvt. Ltd.

MONTH - APRIL 2014Sr. No. Name of Test Testing Method Frequency of Test Specification Requirements

Number of Tests ConductedPrevious Month This Month Total to Date

1 Aggregate Impact Value IS 2386 PART 4 1Test /50M3 27% max. 162 0 4 0 166 0

2 Flakiness & Elongation IS 2386 PART 1 1Test /50M3 30% max. 162 0 4 0 166 0

3 Mix Grading IS 2386 PART 1 1 Test/400 MT or 2 test per day As per Approved Design JMF Limit 136 0 4 0 140 0

4 Individual Grading IS 2386 PART 1 1 Test/400 MT or 2 test per day As per Approved Design Mix 136 0 4 0 140 0

5 Density of MixASTM D 1559

1 Test/400 MT or 2 test per day As per Approved Design Mix 118 0 4 0 122 0

6 Binder Content & Grading MixASTM D 2172

1 Test/400 MT or 2 test per day ± 0.3 % of OBC 142 0 4 0 146 0

7 Density of Compacted layer IS 2720 Part 28 1 Test /250M2 98% of Lab Marshall Density. 252 0 0 0 252 0

DBM- 11 Aggregate Impact Value IS 2386 PART 4 1Test /350M3 27% max. 824 0 80 0 904 0

2 Flakiness & Elongation IS 2386 PART 1 1Test /350M3 35% max. 823 0 80 0 903 03 Mix Grading IS 2386 PART 1 1 Test/400 MT or 2 test per day As per Approved Design JMF Limit 621 0 101 0 722 04 Individual Grading IS 2386 PART 1 1 Test/400 MT or 2 test per day As per Approved Design Mix 629 0 101 0 730 05 Stability of Mix ASTM D 1559 1 Test/400 MT or 2 test per day As per Approved Design Mix 642 0 102 0 744 06 Binder Content & Grading Mix ASTM D 2172 1 Test/400 MT or 2 test per day ± 0.3 % of OBC 626 0 102 0 728 07 Density of Compacted layer IS 2720 Part 28 1 Test /700M2 Minimum 92% of Gmm 666 0 180 0 846 08 Gmm Test ASTM D 2041 1 Test per day As per Approved Design Mix 452 0 91 0 543 0

4 of 8

MONTHLY PROGRESS REPORT - APRIL 2014QC TEST SUMMARY

Appendix-D

Passed Failed Passed Failed Passed Failed

Monthly Progress Report of QA/QC Department

NATIONAL HIGHWAYS AUTHORITY OF INDIAMinistry of Road Shipping Transport & Highways. (MORST & H)

Six Laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (Length Km. 102.300) in State of Gujarat and improvement of existing Ahmedabad Vadodara Expressway from Km 0.000 Concessionaire : IRB Ahmadabad Vadodra Super Express Tollway Pvt. Ltd.

EPC Contractor : MRM Pvt Ltd Quality Control Engineer Independent Engineer: Aarvee Associates AE & C Pvt. Ltd.

MONTH - APRIL 2014Sr. No. Name of Test Testing Method Frequency of Test Specification Requirements

Number of Tests ConductedPrevious Month This Month Total to Date

DBM- 21 Aggregate Impact Value IS 2386 PART 4 1Test /350M3 27% max. 2548 0 74 0 2622 0

2 Flakiness & Elongation IS 2386 PART 1 1Test /350M3 35% max. 2547 0 74 0 2621 03 Mix Grading IS 2386 PART 1 1 Test/400 MT or 2 test per day As per Approved Design JMF Limit 1372 0 109 0 1481 04 Individual Grading IS 2386 PART 1 1 Test/400 MT or 2 test per day As per Approved Design Mix 1376 0 109 0 1485 05 Stability of Mix ASTM D 1559 1 Test/400 MT or 2 test per day As per Approved Design Mix 1388 0 107 0 1495 06 Binder Content & Grading Mix ASTM D 2172 1 Test/400 MT or 2 test per day ± 0.3 % of OBC 1374 0 109 0 1483 07 Density of Compacted layer IS 2720 Part 28 1 Test /700M2 Minimum 92% of Gmm 8928 0 416 0 9344 08 Gmm Test ASTM D 2041 1 Test per day As per Approved Design Mix 633 0 84 0 717 0

BC -11 Aggregate Impact Value IS 2386 PART 4 1Test /350M3 24% max. 1742 0 37 0 1779 0

2 Flakiness & Elongation IS 2386 PART 1 1Test /350M3 35% max. 1742 0 37 0 1779 03 Mix Grading IS 2386 PART 1 1 Test/400 MT or 2 test per day As per Approved Design JMF Limit 648 0 69 0 717 04 Individual Grading IS 2386 PART 1 1 Test/400 MT or 2 test per day As per Approved Design Mix 686 0 69 0 755 05 Stability of Mix ASTM D 1559 1 Test/400 MT or 2 test per day As per Approved Design Mix 646 0 76 0 722 06 Binder Content & Grading Mix ASTM D 2172 1 Test/400 MT or 2 test per day ± 0.3 % of OBC 646 0 69 0 715 07 Density of Compacted layer IS 2720 Part 28 1 Test /700M2 Minimum 92% of Gmm 2152 0 538 0 2690 08 Gmm Test ASTM D 2041 1 Test per day As per Approved Design Mix 171 0 12 0 183 0

BC - 21 Aggregate Impact Value IS 2386 PART 4 1Test /350M3 24% max. 0 0 0 0 0 02 Flakiness & Elongation IS 2386 PART 1 1Test /350M3 35% max. 0 0 0 0 0 03 Mix Grading IS 2386 PART 1 1 Test/400 MT or 2 test per day As per Approved Design JMF Limit 0 0 0 0 0 04 Individual Grading IS 2386 PART 1 1 Test/400 MT or 2 test per day As per Approved Design Mix 0 0 0 0 0 05 Stability of Mix ASTM D 1559 1 Test/400 MT or 2 test per day As per Approved Design Mix 0 0 0 0 0 06 Binder Content & Grading Mix ASTM D 2172 1 Test/400 MT or 2 test per day ± 0.3 % of OBC 0 0 0 0 0 07 Density of Compacted layer IS 2720 Part 28 1 Test /700M2 Minimum 92% of Gmm 0 0 0 0 0 08 Gmm Test ASTM D 2041 1 Test per day As per Approved Design Mix 0 0 0 0 0 0

5 of 8

MONTHLY PROGRESS REPORT - APRIL 2014QC TEST SUMMARY

Appendix-D

Passed Failed Passed Failed Passed Failed

Monthly Progress Report of QA/QC Department

NATIONAL HIGHWAYS AUTHORITY OF INDIAMinistry of Road Shipping Transport & Highways. (MORST & H)

Six Laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (Length Km. 102.300) in State of Gujarat and improvement of existing Ahmedabad Vadodara Expressway from Km 0.000 Concessionaire : IRB Ahmadabad Vadodra Super Express Tollway Pvt. Ltd.

EPC Contractor : MRM Pvt Ltd Quality Control Engineer Independent Engineer: Aarvee Associates AE & C Pvt. Ltd.

MONTH - APRIL 2014Sr. No. Name of Test Testing Method Frequency of Test Specification Requirements

Number of Tests ConductedPrevious Month This Month Total to Date

Bitumen VG301 Softening Point IS 1205 1 Test/Lot 47°C Minimum 1110 0 108 0 1218 02 Penetration IS 1203 1 Test/Lot 50-70 mm Minimum 1110 0 108 0 1218 03 Viscosity IS 1206 As Required 2400 Poise Minimum 1109 0 108 0 1217 0

Bitumen VG101 Softening Point IS 1205 1 Test/Lot 40°C Minimum 11 0 3 0 14 02 Penetration IS 1203 1 Test/Lot 80-100 mm Minimum 11 0 3 0 14 03 Viscosity IS 1206 As Required 800 Poise Minimum 11 0 0 0 11 0

PMB 40 1 Softening Point IS 1205 1 Test/Lot 60°C min 550 0 65 0 615 02 Penetration IS 1203 1 Test/Lot 30-50 mm 550 0 65 0 615 03 Viscosity IS 1206 As Required 3-9 Poise 544 0 65 0 609 04 Elastic Recovery IS 1208 & SP 53 1 Test/Lot 50% min 550 0 65 0 615 05 Separation Test IRC SP 53 2010 As Required 3 °C Maximum 3 0 0 0 3 0

Prime Coat1 Quality Of Binder (Viscosity) ASTM D 2390 1 Test/Lot As per MoRT&H Table 500-1 35 0 4 0 39 02 Rate of Spray of Binder MORT& H 502 1 Test/500 M2 As per MoRT&H Table 500-1 1944 0 406 0 2350 0

Tack Coat1 Quality Of Binder IS 8887 1 Test/Lot 51 0 3 0 54 02 Rate of Spray of Binder MORT& H 503 1 Test/500 M2 As per MoRT&H Table 500-2 11559 0 1151 0 12710 0

Concrete1 Sieve Analysis of Coarse Aggregate IS 2386 Part 1 1 Test/Concreting Day As per IS 383 6033 0 667 0 6700 02 Aggregate Impact Value IS 2386 Part 4 1 Test/Concreting Day As per IS 383 2967 0 349 0 3316 03 Flakiness Index IS 2386 Part 1 1 Test/Concreting Day As per IS 383 4033 0 375 0 4408 04 Sieve Analysis of Fine Aggregate IS 2386 Part 1 1 Test/Concreting Day As per IS 383 3477 0 375 0 3852 05 Specific Gravity & Water Absorption IS 2386 PART 3 1 Test/Month 177 0 11 0 188 0

Compressive Strength of Concrete Cube

6 of 8

MONTHLY PROGRESS REPORT - APRIL 2014QC TEST SUMMARY

Appendix-D

Passed Failed Passed Failed Passed Failed

Monthly Progress Report of QA/QC Department

NATIONAL HIGHWAYS AUTHORITY OF INDIAMinistry of Road Shipping Transport & Highways. (MORST & H)

Six Laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (Length Km. 102.300) in State of Gujarat and improvement of existing Ahmedabad Vadodara Expressway from Km 0.000 Concessionaire : IRB Ahmadabad Vadodra Super Express Tollway Pvt. Ltd.

EPC Contractor : MRM Pvt Ltd Quality Control Engineer Independent Engineer: Aarvee Associates AE & C Pvt. Ltd.

MONTH - APRIL 2014Sr. No. Name of Test Testing Method Frequency of Test Specification Requirements

Number of Tests ConductedPrevious Month This Month Total to Date

1 M15 7 Days 2003 0 180 0 2183 028 Days 2967 0 297 0 3264 0

2 M20 7 Days 2588 0 295 0 2883 028 Days 3553 0 520 0 4073 0

3 M20 Kerb 7 Days 517 0 79 0 596 028 Days 1109 0 115 0 1224 0

4 M25 7 Days 2298 0 149 0 2447 028 Days 4135 0 264 0 4399 0

5 M30 7 Days 238 0 17 0 255 028 Days 402 0 42 0 444 0

6 M30 RE Wall 7 Days 868 0 82 0 950 028 Days 2276 0 291 0 2567 0

7 M35 7 Days 706 0 49 0 755 028 Days 1474 0 132 0 1606 0

8 M35 Pile 7 Days 189 0 0 0 189 028 Days 455 0 0 0 455 0

9 M40 7 Days 1691 0 258 0 1949 028 Days 3399 0 483 0 3882 0

10 M40 PQC 7 Days 34 0 13 0 47 028 Days 40 0 1 0 41 0

11 M40 Pile 7 Days 601 0 8 0 609 028 Days 1389 0 49 0 1438 0

12 M45 7 Days 183 0 60 0 243 028 Days 418 0 134 0 552 0

13 M45 Pile 7 Days 65 0 0 0 65 028 Days 133 0 0 0 133 0

14 M50 7 Days 49 0 0 0 49 028 Days 35 0 0 0 35 0

15 DLC 3 Days 10 0 0 0 10 0

7 of 8

MONTHLY PROGRESS REPORT - APRIL 2014QC TEST SUMMARY

Appendix-D

Passed Failed Passed Failed Passed Failed

Monthly Progress Report of QA/QC Department

NATIONAL HIGHWAYS AUTHORITY OF INDIAMinistry of Road Shipping Transport & Highways. (MORST & H)

Six Laning of Ahmedabad to Vadodara section of NH-8 from Km. 6.400 to Km. 108.700 (Length Km. 102.300) in State of Gujarat and improvement of existing Ahmedabad Vadodara Expressway from Km 0.000 Concessionaire : IRB Ahmadabad Vadodra Super Express Tollway Pvt. Ltd.

EPC Contractor : MRM Pvt Ltd Quality Control Engineer Independent Engineer: Aarvee Associates AE & C Pvt. Ltd.

MONTH - APRIL 2014Sr. No. Name of Test Testing Method Frequency of Test Specification Requirements

Number of Tests ConductedPrevious Month This Month Total to Date

7 Days 40 0 47 0 87 0Flexural Strength of Beam

1 M40 PQC 7 Days 22 0 8 0 30 028 Days 20 0 0 0 20 0

Cement1 Consistency IS 4031 1 Test/Week 159 0 8 0 167 02 Setting Time IS 4031 1 Test/Week 159 0 8 0 167 03 Fineness IS 4031 1 Test/Week 159 0 8 0 167 04 Compressive Strength IS 4031 1 Test/Week

a) 3 Days 161 0 9 0 170 0b) 7 Days 155 0 11 0 166 0c) 28 Days 150 0 8 0 158 0

RE Wall Back fill Material1 Sand Cont. 2720 Part 4 As Required As per Design 629 0 162 0 791 02 Plasticity Index 2720 Part 5 As Required 602 0 158 0 760 03 Max. Dry Density 2720 Part 8 As Required As per Design 560 0 158 0 718 04 Density of Comp.Layer 2720 Part 28 As Required 95% of Lab MDD 3688 24 1772 10 5460 345 C & ø Value 2720 Part 13 As Required As per Design 360 0 86 0 446 0

8 of 8

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. COMPANY MATERIAL DESCRIPTION IRB Letter No Date IE LETTER NO DATE REMARKS

1BASF Construction Chemicals (India) Pvt. Ltd

Chemical Admixture IRB/AVSETPL/142/2012 14.08.2012 AA/AMBD-VDDR/Q&M/032 20.09.2012Reviewed by IE and Consent given

2 Gujarat NRE Coke Ltd. Steel

IRB/AVSETPL/143/2012IRB/AVSETPL/148/2012IRB/AVSETPL/168/2012 IRB/AVSETPL/261/2012 IRB/AVSETPL/265/2012

14.08.201220.08.201230.08.2012 29.11.2013 04.12.2013

AA/AMBD-VDDR/Q&M/012AA/AMBD-VDDR/Q&M/014AA/AMBD-VDDR/Q&M/030 NHAI/PIU-Ahmedabad/NH-8/16737

17.08.201222.08.201219.09.2012 08.10.2013

Consent not given

3 Bharat Petroleum Corporation Ltd. Bitumen of Viscosity Grade IRB/AVSETPL/152/2012 22.08.2012 AA/AMBD-VDDR/Q&M/018 27.08.2012Reviewed by IE and Consent given

4 Indian Oil Bitumen of Viscosity Grade IRB/AVSETPL/153/2012 22.08.2012 AA/AMBD-VDDR/Q&M/018 27.08.2012Reviewed by IE and Consent given

5 Hindustan Petroleum Corporation Ltd. Bitumen of Viscosity Grade IRB/AVSETPL/154/2012 22.08.2012 AA/AMBD-VDDR/Q&M/018 27.08.2012Reviewed by IE and Consent given

6 Hindustan Petroleum Corporation Ltd. Prime Coat IRB/AVSETPL/154/2012 22.08.2012 AA/AMBD-VDDR/Q&M/018 27.08.2012Reviewed by IE and Consent given

7 Hindustan Petroleum Corporation Ltd. Tack coat IRB/AVSETPL/154/2012 22.08.2012 AA/AMBD-VDDR/Q&M/018 27.08.2012Reviewed by IE and Consent given

8 Giriraj Hume Pipe Industries, Bodeli Hume PipeIRB/AVSETPL/155/2012 & IRB/AVSETPL/426/2013

22.08.2012 & 08.02.2013

AA/AMBD-VDDR/Q&M/125 13.02.2013Reviewed by IE and Consent given

9 Ultratech Cement Ltd. OPC 43 Grade Cement IRB/AVSETPL/156/2012 22.08.2012AA/AMBD-VDDR/Q&M/017AA/AMBD-VDDR/Q&M/033

27.08.201220.09.2012

No Mix design

10 Ultratech Cement Ltd. OPC 53 Grade Cement IRB/AVSETPL/156/2012 22.08.2012AA/AMBD-VDDR/Q&M/017AA/AMBD-VDDR/Q&M/033

27.08.201220.09.2012

Reviewed by IE and Consent given

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALSEPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

1 of 7

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. COMPANY MATERIAL DESCRIPTION IRB Letter No Date IE LETTER NO DATE REMARKS

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALSEPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

11 Binani Cement Ltd. OPC 43 Grade Cement IRB/AVSETPL/157/2012 22.08.2012AA/AMBD-VDDR/Q&M/017AA/AMBD-VDDR/Q&M/033

27.08.201220.09.2012

Reviewed by IE and Consent given

12 Binani Cement Ltd. OPC 53 Grade Cement IRB/AVSETPL/157/2012 22.08.2012AA/AMBD-VDDR/Q&M/017AA/AMBD-VDDR/Q&M/033

27.08.201220.09.2012

Reviewed by IE and Consent given

13 Jaypee Cement Ltd OPC 43 Grade Cement IRB/AVSETPL/158/2012 22.08.2012AA/AMBD-VDDR/Q&M/017AA/AMBD-VDDR/Q&M/033

27.08.201220.09.2012

Reviewed by IE and Consent given

14 Jaypee Cement Ltd OPC 53 Grade Cement IRB/AVSETPL/158/2012 22.08.2012AA/AMBD-VDDR/Q&M/017AA/AMBD-VDDR/Q&M/033

27.08.201220.09.2012

Reviewed by IE and Consent given

15 Hindustan Colas Ltd. PMB IRB/AVSETPL/159/2012 22.08.2012 AA/AMBD-VDDR/Q&M/018 27.08.2012Reviewed by IE and Consent given

16 Hindustan Colas Ltd. CRMB IRB/AVSETPL/159/2012 22.08.2012 AA/AMBD-VDDR/Q&M/018 27.08.2012Reviewed by IE and Consent given

17 Hindustan Colas Ltd. Emulsion IRB/AVSETPL/159/2012 22.08.2012 AA/AMBD-VDDR/Q&M/018 27.08.2012Reviewed by IE and Consent given

18 Tricon Polymer Pvt. Ltd, Mumbai POT PTFE Bearing IRB/AVSETPL/160/2012 22.08.2012 AA/AMBD-VDDR/Q&M/017 27.08.2012 Factory Visit19 Tricon Polymer Pvt. Ltd, Mumbai Expansion Joint IRB/AVSETPL/160/2012 22.08.2012 AA/AMBD-VDDR/Q&M/017 27.08.2012 Factory Visit

20 Tiki Tar Industries Ltd. PMB, & Emulsion (SS1 & RS1)IRB/AVSETPL/161/2012IRB/AVSETPL/654/2013

24.08.201212.04.2013

AA/AMBD-VDDR/Q&M/017AA/AMBD-VDDR/Q&M/229AA/AMBD-VDDR/Q&M/228

27.08.201212.04.2013

Reviewed by IE and Consent given

21 Sanfield (India) Ltd. POT/ POT-PTFE Bearing

IRB/AVSETPL/174/2012IRB/AVSETPL/189/2012IRB/AVSETPL/944/2013IRB/AVSETPL/992/2013IRB/AVSETPL/1126/2013

05.09.201217.09.201215.06.201301.07.201306.08.2013

AA/AMBD-VDDR/Q&M/024AA/AMBD-VDDR/Q&M/368AA/AMBD-VDDR/Q&M/450AA/AMBD-VDDR/Q&M/541AA/AMBD-VDDR/Q&M/689

12-09-201222.05.201324.06.201327.07.201310.09.2013

Reviewed by IE and Consent given

2 of 7

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. COMPANY MATERIAL DESCRIPTION IRB Letter No Date IE LETTER NO DATE REMARKS

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALSEPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

22 Sanfield (India) Ltd. Expansion JointIRB/AVSETPL/174/2012IRB/AVSETPL/189/2012 IRB/AVSETPL/771/2013

05.09.201217.09.2012 08.05.2013

AA/AMBD-VDDR/Q&M/024 AA/AMBD-VDDR/Q&M/368 AA/AMBD-VDDR/Q&M/541

12-09-2012 22.05.2013 24.07.2013

Reviewed by IE and Consent given

23 Shri Bujrang Power & Ispat Ltd. Steel

IRB/AVSETPL/175/2012IRB/AVSETPL/704/2013IRB/AVSETPL/796/2013 IRB/AVSETPL/1178/2013 IRB/AVSETPL/1299/2013

12.09.201223.04.201315.05.2013 21.08.2013 21.09.2013

AA/AMBD-VDDR/Q&M/026AA/AMBD-VDDR/Q&M/262AA/AMBD-VDDR/Q&M/386 NHAI/PIU-Ahmedabad/11011/3/13/NH-8/6-lanning/18754 AA/AMBD-VDDR/DHR/793

12.09.201226.04.201329.05.2013 11.09.2013 19.10.2013

Consent not given

24 Osnar Chemical Pvt. Ltd, Mumbai Modified Bitumen of required graIRB/AVSETPL/176/2012 05.09.2012 AA/AMBD-VDDR/Q&M/058 14.12.2012Reviewed by IE and Consent given

25 Dynamic Prestress, MumbaiPrestressing Materials, Equipment & Acessiores

IRB/AVSETPL/179/2012IRB/AVSETPL/188/2012

05.09.201217.09.2012

AA/AMBD-VDDR/Q&M/023 12.09.2012Reviewed by IE and Consent given

26 Dynamic Prestress, Mumbai POT-PTFE BearingIRB/AVSETPL/179/2012IRB/AVSETPL/188/2012

05.09.201217.09.2012

AA/AMBD-VDDR/Q&M/023 12.09.2012Reviewed by IE and Consent given

27 Dynamic Prestress, Mumbai Void FormersIRB/AVSETPL/179/2012IRB/AVSETPL/188/2012

05.09.201217.09.2012

AA/AMBD-VDDR/Q&M/023 12.09.2012Reviewed by IE and Consent given

28 Dynamic Prestress, Mumbai Bar SplicingIRB/AVSETPL/179/2012IRB/AVSETPL/188/2012

05.09.201217.09.2012

AA/AMBD-VDDR/Q&M/023 AA/AMBD-VDDR/Q&M/963

12-09-2012 26-12-2013

Reviewed by IE and Consent given

29 Fosroc Chemical (India) Pvt. Ltd Construction Chemicals IRB/AVSETPL/187/2012 17.09.2012 AA/AMBD-VDDR/Q&M/034 26.09.2012

30 Sika India Pvt. Ltd Chemical Admixture IRB/AVSETPL/269/2012 07.12.2012 AA/AMBD-VDDR/Q&M/060 21.12.2012Reviewed by IE and Consent given

31 Ambuja Cement Ltd. OPC 43 Grade Cement IRB/AVSETPL/270/2012 07.12.2012 AA/AMBD-VDDR/Q&M/059 14.12.2012

3 of 7

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. COMPANY MATERIAL DESCRIPTION IRB Letter No Date IE LETTER NO DATE REMARKS

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALSEPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

32 Ambuja Cement Ltd. OPC 53 Grade Cement IRB/AVSETPL/270/2012 07.12.2012 AA/AMBD-VDDR/Q&M/059 14.12.2012Reviewed by IE and Consent given

33Mangalam Cement Ltd.(Birla Uttam)

OPC 43 Grade cement IRB/AVSETPL/273/2012 07.12.2012 AA/AMBD-VDDR/Q&M/059 14.12.2012

34 Wonder Cement OPC 43 Grade Cement IRB/AVSETPL/274/2012 07.12.2012 AA/AMBD-VDDR/Q&M/059 14.12.2012Reviewed by IE and Consent given

35 Wonder Cement OPC 53 Grade Cement IRB/AVSETPL/274/2012 07.12.2012 AA/AMBD-VDDR/Q&M/059 14.12.2012Reviewed by IE and Consent given

36 Steel Authority Of India Ltd. Steel IRB/AVSETPL/285/2012 17.12.2012Reviewed by IE and Consent given

37 Rastriya Ispat Nigam Ltd Steel IRB/AVSETPL/285/2012 17.12.2012Reviewed by IE and Consent given

38 Tata Steel Ltd Steel IRB/AVSETPL/285/2012 17.12.2012Reviewed by IE and Consent given

39 JSW Steel Ltd Steel IRB/AVSETPL/285/2012 17.12.2012Reviewed by IE and Consent given

40 Essar Steel Ltd Steel IRB/AVSETPL/285/2012 17.12.2012Reviewed by IE and Consent given

41 Ispat Industries Ltd Steel IRB/AVSETPL/285/2012 17.12.2012Reviewed by IE and Consent given

42 Jindal Steel & Power Ltd. Steel IRB/AVSETPL/285/2012 17.12.2012Reviewed by IE and Consent given

4 of 7

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. COMPANY MATERIAL DESCRIPTION IRB Letter No Date IE LETTER NO DATE REMARKS

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALSEPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

43 M/S Strata Geosystems (India) Pvt. Ltd.Design and Method statement

for casting RE Wall BlocksIRB/AVSETPL/624/2013IRB/AVSETPL/798/2013

04.04.201316.05.2013

AA/AMBD-VDDR/Q&M/290 06.05.2013

44 M/S. Saivishwa Infra.Design and Method statement

for casting RE Wall Blocks

IRB/AVSETPL/747/2013IRB/AVSETPL/964/2013

IRB/AVSETPL/1146/2013

02.05.201313.06.201313.08.2013

AA/AMBD-VDDR/Q&M/370AA/AMBD-VDDR/Q&M/490

22.05.201308.07.2013

M/S Saivishwa Infra. Fully

capable for doing the work of RE

Wall

45M/S. Soham Foundation Engineering Pvt.Ltd.

Design and Method statement for casting RE Wall Blocks.

IRB/AVSETPL/748/2013IRB/AVSETPL/848/2013IRB/AVSETPL/950/2013

IRB/AVSETPL/1170/2013

02.05.201324.05.201317.06.201319.08.2013

AA/AMBD-VDDR/Q&M/369AA/AMBD-VDDR/Q&M/408AA/AMBD-VDDR/Q&M/464AA/AMBD-VDDR/Q&M/471AA/AMBD-VDDR/Q&M/644

22.05.201311.06.201329.06.201302.07.201324.08.2013

Attached summary of

various correspondence made between

the designs

46 Gujarat Sidhee Cement.Ltd. OPC 53 Grade Cement IRB/AVSETPL/675/2013 17.04.2013 AA/AMBD-VDDR/Q&M/258 25.04.2013Reviewed by IE and Consent given

471. Sunlight Corporation2. Kunal Conchem Pvt. Ltd.

Admixture 30.03.2013

48M/s Mageba for Strip Seal Expension Joint and POT/POT-PTFE Bearings

Strip Seal Expension Joint and POT/POT-PTFE Bearings

IRB/AVSETPL/770/2013IRB/AVSETPL/944/2013IRB/AVSETPL/992/2013

IRB/AVSETPL/1126/2013

08.05.201315.06.201301.07.201306.08.2013

AA/AMBD-VDDR/Q&M/368AA/AMBD-VDDR/Q&M/450AA/AMBD-VDDR/Q&M/541AA/AMBD-VDDR/Q&M/689

22.05.201324.06.201327.07.201310.09.2013

Reviewed by IE and Consent given

49POT/POT-PTFE Bearings-M/s Sanfield (India) Ltd.

Strip Seal Expension Joint and POT/POT-PTFE Bearings

IRB/AVSETPL/771/2013IRB/AVSETPL/992/2013

08-05-201301.07.2013

AA/AMBD-VDDR/Q&M/368AA/AMBD-VDDR/Q&M/541

22.05.201327.07.2013

Testing is required prior to delivery

50 M/S Zenith High Tech Industries for road MarkingIRB/AVSETPL/776/2013IRB/AVSETPL/1041/2013

09.05.201311.07.2013

AA/AMBD-VDDR/Q&M/367AA/AMBD-VDDR/Q&M/543

22.05.201325.05.2013

Reviewed by IE and Consent given

51 Fairmate Chemicals Pvt.Ltd. Construction ChemicalsIRB/AVSETPL/903/2013IRB/AVSETPL/1061/2013

05.06.201313.07.2013

AA/AMBD-VDDR/Q&M/427AA/AMBD-VDDR/Q&M/701

15.06.201318.09.2013

Reviewed by IE and Consent given

5 of 7

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. COMPANY MATERIAL DESCRIPTION IRB Letter No Date IE LETTER NO DATE REMARKS

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALSEPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

52 Maruti Bitumen Pvt. LtdEmulsion SS-1, RS-1 & Bitumen PMB 40.

Submited on date 18.06.2013

53 Katline Infra Product Pvt. Ltd. for road MarkingIRB/AVSETPL/1038/2013IRB/AVSETPL/1260/2013

10.07.201311.09.2013

AA/AMBD-VDDR/Q&M/542AA/AMBD-VDDR/Q&M/702

25.07.201318.09.2013

Reviewed by IE and Consent given

54Epoxy Bonding MasterBrace 1414 BASF India Ltd.

Epoxy bonding agent MasterBrace 1414 Product of BASF India Ltd.

IRB/AVSETPL/1095/2013 30.07.2013 AA/AMBD-VDDR/Q&M/647 27.08.2013Reviewed by IE and Consent given

55M/S Thakkarsons Rolling Forming Pvt. Ltd

Metal Beam Crash BarrierIRB/AVSETPL/1258/2013 IRB/AVSETPL/1513/2013

10-09-2013 16.11.2013

AA/AMBD-VDDR/Q&M/703AA/AMBD-VDDR/Q&M/883

18.09.201326.11.2013

Third Party testing required

56Company Profile of M/s Sovitec as one of the source of Glass beads for Road Marking Material

Glass BeadsIRB/AVSETPL/1275/2013 IRB/AVSETPL/1399/2013

16.09.2013 17.10.2013

AA/AMBD-VDDR/Q&M/724 AA/AMBD-VDDR/Q&M/795

25.09.201321.10.2013

Reviewed by IE and Consent given

57Company Profile of Berger Paints India Ltd

PaintsIRB/AVSETPL/1319/2013 IRB/AVSETPL/1369/2013

27.09.201310.10.2013

AA/AMBD-VDDR/Q&M/755 AA/AMBD-VDDR/Q&M/778

04.10.2013 15.10.2013

Reviewed by IE and Consent given

58Company Profile of DP Wires Pvt.Ltd as one of the source of HT Strand Wires

HTS Wire IRB/AVSETPL/1396/2013 17.10.2013 AA/AMBD-VDDR/Q&M/798 21.10.2013Reviewed by IE and Consent given

59 Company Profile of 3M India Ltd. Retro Reflective SheetingIRB/AVSETPL/1397/2013 IRB/AVSETPL/1507/2013

17.10.2013 15.11.2013

AA/AMBD-VDDR/Q&M/801AA/AMBD-VDDR/Q&M/829AA/AMBD-VDDR/Q&M/829

22.10.201329.10.201327.11.2013

Reviewed by IE and Consent given

60Company Profile of JK Lakshmi as one of the source of cement

Cement IRB/AVSETPL/1426/2013 22.10.2013 AA/AMBD-VDDR/Q&M/820 26.10.2013Reviewed by IE and Consent given

61 STP Limited AdmixtureIRB/AVSETPL/1449/2013IRB/AVSETPL/1632/2013IRB/AVSETPL/1829/2014

25.10.201317.12.201321.01.2014

AA/AMBD-VDDR/Q&M/836 AA/AMBD-VDDR/Q&M/970

AA/AMBD-VDDR/Q&M/1104

31.10.2013 28.12.201304.02.20.14

Reviewed by IE and Consent given

62 The India Cement Ltd Cement IRB/AVSETPL/1516/2013 16.11.2013 AA/AMBD-VDDR/Q&M/882 26.11.2013Reviewed by IE and Consent given

6 of 7

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. COMPANY MATERIAL DESCRIPTION IRB Letter No Date IE LETTER NO DATE REMARKS

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALSEPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

63 Iniz Platomech Pvt. Ltd HDPE Duct IRB/AVSETPL/1651/2013 19.12.2013 AA/AMBD-VDDR/Q&M/957 24.12.2013Document Required

64 Tefcon Bearing Pvt.Ltd POT-PTFE BearingIRB/AVSETPL/1688/2013 IRB/AVSETPL/1742/2014 IRB/AVSETPL/1912/2014

30.12.2013 10.01.201418.01.2014

AA/AMBD-VDDR/Q&M/986AA/AMBD-VDDR/Q&M/1075AA/AMBD-VDDR/Q&M/1162

03.01.201427.01.201422.02.2014

Reviewed by IE and Consent given

65 Usha Martin Ltd HT Strand Wire IRB/AVSETPL/1692/2013 30.12.2013 AA/AMBD-VDDR/Q&M/987 03.01.2014Reviewed by IE and Consent given

66 TikiTar Danosa (India) Pvt.Ltd Water Proofing Membrane (Asphaltoseal)

IRB/AVSETPL/1794/2013 IRB/AVSETPL/2012/2014 IRB/AVSETPL/2038/2014

22.01.2014 19.03.2014 27.03.2014

AA/AMBD-VDDR/Q&M/1181 AA/AMBD-VDDR/Q&M/1225

28.02.2014 21.03.2014

Pending from IE

68Evotherm Warm Mix Asphalt Technology

Warm Mix Asphalt TechnologyIRB/AVSETPL/1895/2014 IRB/AVSETPL/2004/2014 IRB/AVSETPL/2089/2014

15.02.201418.03.201409.04.2014

AA/AMBD-VDDR/Q&M/1164 AA/AMBD-VDDR/Q&M/1233AA/AMBD-VDDR/Q&M/1289

22.02.201424.03.201419.04.2014

Observed the trial strech till six

Months

7 of 7

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Subject IRB Letter No Date IE Letter No Date Status Remark's

1 Aggregate for Concrete and Highway Construction from Othwad Quarry

IRB/AVSETPL/0216/2012 29.10.2012 AA/AMBD-VDDR/Q&M/048 08.11.2012 Reviewed by IE and Consent given

2 Natural Sand for construction and Highway from Mahi River

IRB/AVSETPL/0217/2012 29.10.2012 Reviewed by IE and Consent given

3 Natural Sand for construction and Highway from Orsand River

IRB/AVSETPL/0218/2012 29.10.2012 Reviewed by IE and Consent given

4 Aggregate for Concrete and Highway Construction from Timba Quarry

IRB/AVSETPL/0246/2012 16.11.2012 AA/AMBD-VDDR/Q&M/052 24.11.2012 Reviewed by IE and Consent given

5 Aggregate for Concrete and Highway Construction from Jesapura Quarry

IRB/AVSETPL/0247/2012 16.11.2012 AA/AMBD-VDDR/Q&M/085 11.01.2013 Reviewed by IE and Consent given

6 Natural Sand for construction and Highway from Sabarmati River

IRB/AVSETPL/0304/2012 26.12.2012 AA/AMBD-VDDR/Q&M/072 01.01.2013 Reviewed by IE and Consent given

AA/AMBD-VDDR/Q&M/050 09.11.2012

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

1 of 1

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

1 WMM Mix Design with Othwad Quarry Aggregate AVBOT Project IRB/AVSETPL/0215/2012 19.10.2012 AA/AMBD-VDDR/Q&M/049 08.11.2012Reviewed by IE and Consent given WMM

2Borrow Area for use in Embankment, Sub grade, Shoulders and Median Filling.1) BA. No-2 CH-90+000 LHS, Rajpura Village.

Section IV IRB/AVSETPL/0272/2012 07.12.2012 AA/AMBD-VDDR/Q&M/087 11.01.2013Reviewed by IE and Consent given BA

3Borrow Area for use in Embankment.1) BA. No-1 CH-29+220 LHS, Kajipura Village.

Section I IRB/AVSETPL/0275/2012 10.12.2012 AA/AMBD-VDDR/Q&M/086 11.01.2013Reviewed by IE and Consent given BA

4 Design of Surface Sub Surface for Expressway AVBOT Project IRB/AVSETPL/442/2012 13.02.2013 AA/AMBD-VDDR/Q&M/167 19.03.2013Reviewed by IE and Consent given

5Concrete Mix Design of Grade M15 to M 40 With Ultratech OPC 53 Grade Cement, BASF Admixture, Mahi river Natural Sand & Othwad Quarry Aggregate

AVBOT Project IRB/AVSETPL/0297/2012 24.12.2012 AA/AMBD-VDDR/Q&M/088 11.01.2013Reviewed by IE and Consent given Concrete

6Concrete Mix Design of Grade M15 to M 40 With Ultratech OPC 53 Grade Cement, BASF Admixture, Orsang river Natural Sand & Othwad Quarry Aggregate

AVBOT Project IRB/AVSETPL/0279/2012 12.12.2012 AA/AMBD-VDDR/Q&M/065 28.12.2012Reviewed by IE and Consent given Concrete

7 GSB Mix Design with Othwad Quarry Aggregate AVBOT Project IRB/AVSETPL/0301/2012 26.12.2012 AA/AMBD-VDDR/Q&M/099 23.01.2013Reviewed by IE and Consent given GSB

8DBM Grade-2 Mix Design With Othwad Quarry, Bitumen (VG-30) BPCL,IOCL, HPCL. @Tudel Plant

AVBOT Project IRB/AVSETPL/0302/2012 26.12.2012 AA/AMBD-VDDR/Q&M/073 02.01.2013Reviewed by IE and Consent given DBM-2

9DBM Grade-2 Mix Design With Jeshapura & Timba Quarry, Bitumen (VG-30) BPCL,HPCL & IOCL.@Vasad Plant

AVBOT Project IRB/AVSETPL/311/2012 31.12.2012 AA/AMBD-VDDR/Q&M/082 10.01.2013Reviewed by IE and Consent given DBM-2

10 Mix Design of DBM Grade-2 Using Aggregete Othwad & Timba Quarry, Bitumen (VG-30) IOCL.

AVBOT Project IRB/AVSETPL/323/2013 04.01.2013AA/AMBD-VDDR/Q&M/081AA/AMBD-VDDR/Q&M/127

10.01.2013 18.02.2013

Reviewed by IE and Consent given DBM-2

11Mix Design of BC Grade-1 Using Aggregate Othwad Quarry, Bitumen PMB-40 OSNAR & HINCOL.@Tudel Plant

AVBOT Project IRB/AVSETPL/324/2013 04.01.2013 AA/AMBD-VDDR/Q&M/082 10.01.2013Reviewed by IE and Consent given BC-1

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

1 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

12Concrete Mix Design of Grade M-35, M-40 & M-40 Pile With Jaypee OPC 53 Grade Cement, BASF Admixture, Mahi river Natural Sand & Othwad Quarry

AVBOT Project IRB/AVSETPL/325/2013 04.01.2013 AA/AMBD-VDDR/Q&M/168 20.03.2013Reviewed by IE and Consent given Concrete

13Concrete Mix Design of Grade M15 to M 30 With Jaypee OPC 53 Grade Cement, BASF Admixture, Mahi river Natural Sand & Othwad Quarry Aggregate

AVBOT Project IRB/AVSETPL/325/2013 04.01.2013 AA/AMBD-VDDR/Q&M/168 20.03.2013Reviewed by IE and Consent given Concrete

14Concrete Mix Design of Grade M-35 Pile With Ultratech OPC 53 Grade Cement,BASF Admixture, Mahi river Natural Sand & Othwad Quarry Aggregate

AVBOT Project IRB/AVSETPL/328/2013 05.01.2013 AA/AMBD-VDDR/Q&M/090 12.01.2013Reviewed by IE and Consent given Concrete

15Trial Patch For DBM-2 HMP@ Ch:- 88+000 RHS Using Aggregate 10mm Othwad Quarry & 20mm, 6mm & Down Timba Quarry.@Vasad Plant

AVBOT Project IRB/AVSETPL/413/2013 02.02.2013 OK DBM-2,TP

16Borrow Area for use in Embankment.1) BA. No-7 CH-46+900 RHS, Palana Village.

Section II IRB/AVSETPL/356/2013 16.01.2013 AA/AMBD-VDDR/Q&M/095 22.01.2013Reviewed by IE and Consent given BA

17Borrow Area for use in Embankment.1) BA. No-6 CH- 46+900 RHS, Dantali Village.

Section II IRB/AVSETPL/357/2013 16.01.2013 AA/AMBD-VDDR/Q&M/096 22.01.2013Reviewed by IE and Consent given BA

18Borrow Area for use in Embankment, Subgrade, Shoulders and Median Filling.1) BA. No-5 CH-15+850 LHS, Gamdi Village.

Section I IRB/AVSETPL/358/2013 16.01.2013 AA/AMBD-VDDR/Q&M/097 22.01.2013Reviewed by IE and Consent given BA

19Mix Design of DBM Grade-1 Using Aggregate Othwad Quarry, Bitumen BPCL, HPCL & IOCL. @ Tundel Plant

AVBOT ProjectIRB/AVSETPL/420/2013IRB/AVSETPL/588/2013

06.02.201321.03.2013

AA/AMBD-VDDR/Q&M/145AA/AMBD-VDDR/Q&M/205

26.02.201302.04.2013

Reviewed by IE and Consent given DBM-1

20Borrow Area for use in Embankment, Subgrade, Shoulders and Median Filling.BA No-8 CH-36+410 LHS, (Khedai Village)

Section II IRB/AVSETPL/409/2013 02.02.2013 AA/AMBD-VDDR/Q&M/113 07.02.2013Reviewed by IE and Consent given BA

21Borrow Area for use in Embankment Filling.BA No-10 CH-26+260 LHS, (Samadra Village)

Section I IRB/AVSETPL/411/2013 02.02.2013 AA/AMBD-VDDR/Q&M/114 07.02.2013Reviewed by IE and Consent given BA

22Borrow Area for use in Embankment, Subgrade, Shoulders and Median Filling.BA No-11 CH-98+000 LHS, (Laljipura Village)

Section IV IRB/AVSETPL/407/2013 02.02.2013 AA/AMBD-VDDR/Q&M/115 07.02.2013Reviewed by IE and Consent given BA

2 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

23Borrow Area for use in Embankment, Subgrade, Shoulders and Median Filling.BA No-12 CH-110+000 RHS, (Vemali Village)

Section IV IRB/AVSETPL/406/2013 02.02.2013 AA/AMBD-VDDR/Q&M/117 07.02.2013Reviewed by IE and Consent given BA

24Borrow Area for use in Enbankment Filling.BA No-14 CH-12+300 RHS, (Aslali Village)

Section I IRB/AVSETPL/408/2013 02.02.2013 AA/AMBD-VDDR/Q&M/112 07.02.2013Reviewed by IE and Consent given BA

25Mix Design of BC Grade-1 Using Aggregate Timba & Othwad Quarry, Bitumen PMB-40 OSNAR Chemical.@Vasad Plant

AVBOT ProjectIRB/AVSETPL/412/2013IRB/AVSETPL/587/2013

02.02.201321.03.2013

AA/AMBD-VDDR/Q&M/138AA/AMBD-VDDR/Q&M/245

21.02.201318.04.2013

OK BC-1

26Borrow Area for use in Embankment, Subgrade, Shoulders and Median Filling.BA No-15 CH 11+300 LHS, (Gamdi Village)

Section I IRB/AVSETPL/410/2013 02.02.2013 AA/AMBD-VDDR/Q&M/116 07.02.2013Reviewed by IE and Consent given BA

27Concrete Mix Design of Grade M-15 to M-40 & M-45,M-50 Pile With Ultratech OPC 53 Grade Cement,Sika Admixture, Mahi river Natural Sand &

AVBOT Project IRB/AVSETPL/401/2013 02.02.2013 AA/AMBD-VDDR/Q&M/202 02.04.2013Reviewed by IE and Consent given Concrete

28Borrow Area for use in Embankment, Subgrade, Shoulders and Median Filling.BA No-9 CH-45+540 LHS, (Vansar Village)

Section II IRB/AVSETPL/431/2013 12.02.2013 AA/AMBD-VDDR/Q&M/133 18.02.2013Reviewed by IE and Consent given BA

29Borrow Area for use in Embankment &SubgradeBA No-18 CH-77+200 LHS, (Kherda Village)

Section IIIIRB/AVSETPL/433/2013IRB/AVSETPL/493/2013

12.02.2013 25.02.2013

AA/AMBD-VDDR/Q&M/132AA/AMBD-VDDR/Q&M/162

18.02.201313.03.2013

Reviewed by IE and Consent given BA

30Borrow Area for use in Embankment & SubgradeBA No-20 CH-38+600 RHS, (Matargaon Village)

Section IIIRB/AVSETPL/432/2013IRB/AVSETPL/492/2013

12.02.2013 25.02.2013

AA/AMBD-VDDR/Q&M/131AA/AMBD-VDDR/Q&M/161

18.02.201313.03.2013

Reviewed by IE and Consent given BA

31Concrete Mix Design of Grade M-45 & M-50 With Ultratech OPC 53 Grade Cement,BASF Admixture, Mahi river Natural Sand & Othwad Quarry Aggregate

AVBOT Project IRB/AVSETPL/514/2013 01.03.2013 AA/AMBD-VDDR/Q&M/169 20.03.2013Reviewed by IE and Consent given Concrete

32Concrete Mix Design of Grade M-15 to M-40 (Pile) M-45 & M-50 With Jaypee OPC 53 Grade Cement,Sika Admixture, Mahi river Natural Sand & Othwad Quarry

AVBOT Project IRB/AVSETPL/461/2013 19.02.2013 AA/AMBD-VDDR/Q&M/204 02.04.2013Reviewed by IE and Consent given Concrete

33Borrow Area for use in Embankment & Subgrade. BA No-21 CH-83+400 LHS , Inside lead 4.0 km , (Berda Village)

Section III IRB/AVSETPL/497/2013 25.02.2013 AA/AMBD-VDDR/Q&M/174 20.03.2013Reviewed by IE and Consent given BA

3 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

34Borrow Area for use in Embankment & Subgrade.BA No-26, CH-102+500 RHS , Inside lead 5.0 km ,(Ranli Village)

Section IV IRB/AVSETPL/499/2013 25.02.2013 AA/AMBD-VDDR/Q&M/158 13.03.2013Reviewed by IE and Consent given BA

35Borrow Area for use in Embankment & Subgrade.BA No-17 Ch-42+500 RHS, inside lead 3.0 km, (Undela Village)

Section II IRB/AVSETPL/494/2013 25.02.2013 AA/AMBD-VDDR/Q&M/155 13.03.2013Reviewed by IE and Consent given BA

36Borrow Area for use in Embankment.BA No-19 Ch-86+000 RHS, inside lead 3.5 km, (Adas Village)

Section III & IV IRB/AVSETPL/496/2013 25.02.2013 AA/AMBD-VDDR/Q&M/156 13.03.2013Reviewed by IE and Consent given BA

37Borrow Area for use in Embankment & Subgrade.BA-23 Ch-16+000 RHS, inside lead 5.0 km, (Naaz Village)

Section I IRB/AVSETPL/495/2013 25.02.2013 AA/AMBD-VDDR/Q&M/157 13.03.2013Reviewed by IE and Consent given BA

38Borrow Area for use in Embankment.BA-27 CH-50+000 RHS, inside lead 11.0 km, (Samaspur Village)

Section II IRB/AVSETPL/498/2013 25.02.2013 AA/AMBD-VDDR/Q&M/160 13.03.2013Reviewed by IE and Consent given BA

39Borrow Area for use in Embankment & Subgrade BA-22 CH-11+300 LHS, Inside lead 7.0 Km.(Gamdi Village)

Section I IRB/AVSETPL/513/2013 01.03.2013 AA/AMBD-VDDR/Q&M/159 13.03.2013Reviewed by IE and Consent given BA

40Mix Design of BM Grade-2 Using Aggregate Othwad Quarry, Bitumen BPCL, HPCL & IOCL. @ 55+000 RHS Tundel Plant.

AVBOT Project IRB/AVSETPL/878/2013 30.05.2013 AA/AMBD-VDDR/Q&M/415 11.06.2013Reviewed by IE and Consent given BM-2

41Borrow Area for use in Embankment BA- 29 CH-36+410 LHS, Inside Lead 4.0 km, (Kheda village)

Section II IRB/AVSETPL/593/2013 22.03.2013 AA/AMBD-VDDR/Q&M/196 28.03.2013Reviewed by IE and Consent given BA

42Borrow Area for use in Embankment & SubgradeBA-30 CH-79+620 LHS, Inside Lead 3.0 km, (Vagasi village)

Section III IRB/AVSETPL/592/2013 22.03.2013 AA/AMBD-VDDR/Q&M/194 28.03.2013Reviewed by IE and Consent given BA

43Borrow Area for use in Embankment & SubgradeBA-31 CH-74+300 LHS, Inside Lead 9.0 km, (Thronal village)

Section III IRB/AVSETPL/595/2013 22.03.2013 AA/AMBD-VDDR/Q&M/192 28.03.2013Reviewed by IE and Consent given BA

44Borrow Area for use in Embankment & SubgradeBA-32 CH-74+300 LHS, Inside Lead 15.0 km, (Kambipura village)

Section III IRB/AVSETPL/594/2013 22.03.2013 AA/AMBD-VDDR/Q&M/193 28.03.2013Reviewed by IE and Consent given BA

4 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

45WMM Mix Design Trial Patch with Othwad Quarry AggregateCH-55+000 LHS @ Tundel Plant.

AVBOT Project IRB/AVSETPL/617/2013 29.03.2013 AA/AMBD-VDDR/Q&M/232 13.04.2013Reviewed by IE and Consent given WMM

46Borrow Area for use in Embankment & SubgradeBA- 33 CH- 49+050 LHS, Inside Lead 2.0 km, (Jaroal village)

Section II IRB/AVSETPL/569/2013 16.03.2013 AA/AMBD-VDDR/Q&M/172 20.03.2013Reviewed by IE and Consent given BA

47Borrow Area for use in Embankment & SubgradeBA-34 CH- 67+000 LHS, Inside Lead 10.0 km, (Ajarpura village)

Section III IRB/AVSETPL/570/2013 16.03.2013 AA/AMBD-VDDR/Q&M/171 20.03.2013Reviewed by IE and Consent given BA

48Borrow Area for use in Embankment & SubgradeBA-35 CH-81+680 RHS, Inside Lead 2.5 km, (Vadod village)

Section III IRB/AVSETPL/571/2013 16.03.2013 AA/AMBD-VDDR/Q&M/170 20.03.2013Reviewed by IE and Consent given BA

49Borrow Area for use in Embankment & SubgradeBA-37 CH-46+900 RHS, Inside Lead 2.5 km, (Palana-2 village)

Section II IRB/AVSETPL/568/2013 16.03.2013 AA/AMBD-VDDR/Q&M/173 20.03.2013Reviewed by IE and Consent given BA

50M30grade RE Wall block.50% CA & 50% FAWith Ultra+ Mahi & Othwad.

AVBOT Project IRB/AVSETPL/585/2013 21.03.2013 AA/AMBD-VDDR/Q&M/201 28.03.2013Reviewed by IE and Consent given

ConcreteRE Block

51Concrete Mix Design of Grade (M15,M20,M20kerb,M25,M30,M35,M35Pile,M40,M40Pile,M45, M50.) With Ultra+BASF+ Sabarmati &

AVBOT Project IRB/AVSETPL/586/2013 21.03.2013 AA/AMBD-VDDR/Q&M/203 02.04.2013Reviewed by IE and Consent given Concrete

52Borrow Area for use in EmbankmenBA-38 CH-105+000 LHS, Inside Lead 5.0 km, (Siswa village)

Section IV IRB/AVSETPL/596/2013 22.03.2013 AA/AMBD-VDDR/Q&M/197 28.03.2013Reviewed by IE and Consent given BA

53Borrow Area for use in Embankment & SubgradeBA-39 CH-87+350 LHS, inside lead 1.1 km, (Dehnapura Village)

Section IV IRB/AVSETPL/583/2013 21.03.2013 AA/AMBD-VDDR/Q&M/195 28.03.2013Reviewed by IE and Consent given BA

54Trial patch of DBM 1 Using Aggregate Othwad Quarry, Bitumen BPCL, HPCL & IOCL of HMP@55+000 RHS With Othwad Quarry aggregate.

AVBOT Project IRB/AVSETPL/584/2013 21.03.2013 AA/AMBD-VDDR/Q&M/236 13.04.2013Reviewed by IE and Consent given DBM-1,TP

5 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

55

Mix Design of BC Grade-1 Using Aggregate 20 mm & 6 mm Down from Timba Quarry & 10 mm aggregate from Jeshapura Quarry.Binder PMB 40 of OSNAR & HINCOL. @ CH-88+000 RHS Vasad

AVBOT ProjectIRB/AVSETPL/590/2013IRB/AVSETPL/619/2013IRB/AVSETPL/676/2013

22.03.201329.03.201317.04.2013

AA/AMBD-VDDR/Q&M/190AA/AMBD-VDDR/Q&M/214

25.03.201306.04.2013

OK BC-1

56Borrow Area for use in EmbankmenBA No-4 CH-19+800 LHS , Inside lead 9.0km, (Mahij Village)

Section I IRB/AVSETPL/604/2013 23.03.2013 AA/AMBD-VDDR/Q&M/200 28.03.2013Reviewed by IE and Consent given BA

57Borrow Area for use in EmbankmenBA No-16 CH-12+000 RHS , Inside lead 0.7km, (Aslali Village)

Section I IRB/AVSETPL/603/2013 23.03.2013 AA/AMBD-VDDR/Q&M/199 28.03.2013Reviewed by IE and Consent given BA

58Borrow Area for use in EmbankmenBA No-36 CH-19+600 LHS , Inside lead 2.7km, (Bidaj Village)

Section I IRB/AVSETPL/602/2013 23.03.2013 AA/AMBD-VDDR/Q&M/198 28.03.2013Reviewed by IE and Consent given BA

59Trial Patch of BC 1 Using Aggregate 20 mm & 6 mm Down Timba Quarry, 10 mm aggregate Othwad quarryBinder PMB 40 of OSNAR.HMP @ 72+000 LHS.

AVBOT Project IRB/AVSETPL/605/2013 23.03.2013 OK BC-1,TP

60Trial Patch of DBM-2 Using Aggregate Othwad Quarry, Bitumen IOCL Vg-30. HMP @55+000 RHS.Tundel plant.

AVBOT Project IRB/AVSETPL/689/2013 19.04.2013 AA/AMBD-VDDR/Q&M/259 25.04.2013Reviewed by IE and Consent given DBM-2,TP

61GSB Mix DesignCh-93+000(LHS) Natural material (Mahi River) 50% with 40mm Aggregate 50% of Othwad Crusher.

Section IVIRB/AVSETPL/516/2013IRB/AVSETPL/782/2013

29.03.201314.05.2013

AA/AMBD-VDDR/Q&M/233AA/AMBD-VDDR/Q&M/376

13.04.201324.05.2013

Reviewed by IE and Consent given GSB

62Mix Design of BC Grade-1 Using Aggregate : 20 mm & 6 mm Down of Timba Quarry & 10 mm Of jeshapura Quarry

AVBOT ProjectIRB/AVSETPL/630/2013IRB/AVSETPL/654/2013

03.04.201306.04.2013

AA/AMBD-VDDR/Q&M/213AA/AMBD-VDDR/Q&M/229

04.04.201312.04.2013

OK BC-1

63Borrow area for Use in Embankment & Sub grade.BA No-40 CH-46+900 LHS, inside lead 3.5 km, (Dhegam Village)

Section II IRB/AVSETPL/999/2013 02.07.2013 AA/AMBD-VDDR/Q&M/488 06.07.2013Reviewed by IE and Consent given BA

64Borrow Area for use in Embankment & SubgradeBA No-41 CH-55+600 RHS (11.0 km from NH-8) Shinoladi Village

Section II IRB/AVSETPL/635/2013 04.04.2013 AA/AMBD-VDDR/Q&M/235 13.04.2013Reviewed by IE and Consent given BA

6 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

65Borrow Area for use in Embankment & SubgradeBA No- 42 CH- 77+200 LHS (4.0 km from NH-8) Chikodara Village

Section III IRB/AVSETPL/634/2013 04.04.2013 AA/AMBD-VDDR/Q&M/234 13.04.2013Reviewed by IE and Consent given BA

66Concrete Mix Design of PQC (M 40)Cement : Ultratech Cement OPC 53 GradeCoarse Aggregate : Othwad Quarry

AVBOT Project IRB/AVSETPL/632/2013 03.04.2013 AA/AMBD-VDDR/Q&M/231 12.04.2013Reviewed by IE and Consent given Concrete

67

Concrete Mix Design of DLCCement : Ultratech Cement OPC 53 GradeCoarse Aggregate : Othwad QuarryFine Aggregate : Mahi River.

AVBOT Project IRB/AVSETPL/631/2013 03.04.2013 AA/AMBD-VDDR/Q&M/230 12.04.2013

Reviewed by IE and Consent given

Concrete

68Mix Design of Filter Media Using material crushed GSB othwad quarry & natural sand

AVBOT ProjectIRB/AVSETPL/658/2013IRB/AVSETPL/692/2013IRB/AVSETPL/872/2013

10.04.201319.04.201330.05.2013

AA/AMBD-VDDR/Q&M/241AA/AMBD-VDDR/Q&M/261

17.04.201325.04.2013

Reviewed by IE and Consent given Filter Media

69Concrete Mix Design of Grade M-30 for RE wall block.Grade of concrete : M30 With Ultratech OPC 53 (75 %) 310Kg

AVBOT ProjectIRB/AVSETPL/722/2013IRB/AVSETPL/795/2013

25.04.201315.05.2013

AA/AMBD-VDDR/Q&M/295AA/AMBD-VDDR/Q&M/363

07.05.201322.05.2013

Source VisitConcreteRE Block

70Borrow Area for use in Embankmen.BA No-43 CH-36+300 RHS, (Matart 2 Village) Section II IRB/AVSETPL/688/2013 19.04.2013 AA/AMBD-VDDR/Q&M/260 25.04.2013

Reviewed by IE and Consent given BA

71Concrete Mix Design of M45 (for pile) with Ult OPC 53+ Mahi River+BASF Chemical

AVBOT Project IRB/AVSETPL/721/2013 25.04.2013 Concrete

72Borrow Area for use in Embankmen & Sub grade.BA No-44 CH-39+800 RHS inside lead 1.80 km, (Undela Village)

Section II IRB/AVSETPL/709/2013 24.04.2013 AA/AMBD-VDDR/Q&M/263 26.04.2013Reviewed by IE and Consent given BA

73Borrow Area for use in Embankmen & Sub grade. BA No-45 CH-55+600 RHS inside lead 11.00 km, (Allindra Village)

Section II IRB/AVSETPL/708/2013 24.04.2013 AA/AMBD-VDDR/Q&M/264 26.04.2013Reviewed by IE and Consent given BA

74Borrow Area for use in Embankmen & Sub grade.BA No-46 CH-89+900 LHS inside lead 3.50 km, (Anklawadi Village)

Section IV IRB/AVSETPL/719/2013 25.04.2013 AA/AMBD-VDDR/Q&M/268 29.04.2013Reviewed by IE and Consent given BA

75Borrow Area for use in Embankmen. BA No-47 CH-50+000 RHS inside lead 11.00 km, (Samaspur Village)

Section II IRB/AVSETPL/720/2013 25.04.2013 AA/AMBD-VDDR/Q&M/267 29.04.2013Reviewed by IE and Consent given BA

7 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

76Borrow Area for use in Embankmen & Sub grade. BA No-48 CH-67+000 LHS , Inside lead 22.00 Km, (Fhatepur Village)

Section III IRB/AVSETPL/746/2013 02.05.2013 AA/AMBD-VDDR/Q&M/296 07.05.2013Reviewed by IE and Consent given BA

77Borrow Area for use in Embankmen & Sub grade.BA No-49 CH-42+500 RHS , Inside lead 3.00 Km, (Undela Village)

Section II IRB/AVSETPL/745/2013 02.05.2013 AA/AMBD-VDDR/Q&M/294 07.05.2013Reviewed by IE and Consent given BA

78Borrow Area for use in Embankmen & Sub grade.BA No-50 CH-67+000 LHS, Inside Lead 20.0 km,(Kunjrav Village)

Section III IRB/AVSETPL/767/2013 08.05.2013 AA/AMBD-VDDR/Q&M/366 22.05.2013Reviewed by IE and Consent given BA

79Concrete Mix Design of Grade M-15 to M-50 With Ultratech Cement, SIKA India Pvt. Ltd. Admixture and Fine aggregate of Sabarmati River.

AVBOT Project IRB/AVSETPL/766/2013 08.05.2013 AA/AMBD-VDDR/Q&M/365 22.05.2013Reviewed by IE and Consent given Concrete

80Borrow Area for use in Embankmen & Sub grade.BA No-9A CH-41+540 LHS, 0.5 km inside lead (Vansar Village)

Section II IRB/AVSETPL/1000/2013 02.07.2013 AA/AMBD-VDDR/Q&M/489 06.07.2013Reviewed by IE and Consent given BA

81Borrow Area for use in Embankmen & Sub grade.BA No-52 CH-16+000 RHS, Inside Lead 4.0Km, (Naaz-2 Village)

Section I IRB/AVSETPL/822/2013 18.05.2013 AA/AMBD-VDDR/Q&M/375 24.05.2013Reviewed by IE and Consent given BA

82Concrete Mix Design of Grade M-30 for RE wall block.Cement : Ultratech OPC 53 grade 310 KgFly ash : Vanakbori power Plant. 65 Kg

AVBOT ProjectIRB/AVSETPL/794/2013IRB/AVSETPL/970/2013

15.05.201325.06.2013

AA/AMBD-VDDR/Q&M/364AA/AMBD-VDDR/Q&M/491

22.05.201308.07.2013

Reviewed by IE and Consent given

ConcreteRE Block

83Borrow Area for use in Embankmen & Sub grade.BA No- 53 CH-89+330 RHS , Inside lead 1.5Km,(Vadatalav Village)

Section IV IRB/AVSETPL/836/2013 23.05.2013 AA/AMBD-VDDR/Q&M/383 28.05.2013Reviewed by IE and Consent given BA

84Borrow Area for use in Embankmen & Sub grade.BA No-55 CH-95+850 LHS , Inside lead 3.00 Km, (Dodka Village)

Section IV IRB/AVSETPL/837/2013 23.05.2013 AA/AMBD-VDDR/Q&M/384 28.05.2013Reviewed by IE and Consent given BA

85Borrow Area for use in Embankmen & Sub grade. BA No-54 CH-25+850 LHS , Inside lead 4.4Km, (Pinglaj Village)

Section I IRB/AVSETPL/865/2013 28.05.2013 AA/AMBD-VDDR/Q&M/392 06.06.2013Reviewed by IE and Consent given BA

86Concrete Mix Design of Grade M-30 for RE wall block.Grade of concrete : M30Cement : Jaypee OPC 53 310 Kg

AVBOT ProjectIRB/AVSETPL/827/2013IRB/AVSETPL/970/2013

20.05.201325.06.2013

AA/AMBD-VDDR/Q&M/364AA/AMBD-VDDR/Q&M/491

22.05.201308.07.2013

Reviewed by IE and Consent given

ConcreteRE Block

8 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

Borrow Area for use RE Wall Backfill & Retaind FillCH 11+300 LHS Inside lead 6.0 km (Gamdi-2 Village)

Section I IRB/AVSETPL/864/2013 28.05.2013 AA/AMBD-VDDR/Q&M/406 10.06.2013Reviewed by IE and Consent given

Backfill Material

Borrow Area for use RE Wall Backfill & Retaind FillCH 29+200 LHS Inside lead 4.50 km (Meshwo River)

Section I IRB/AVSETPL/864/2013 28.05.2013 AA/AMBD-VDDR/Q&M/406 10.06.2013Reviewed by IE and Consent given

Backfill Material

Borrow Area for use RE Wall Backfill & Retaind FillCH 36+300 LHS Inside lead 11.0 km (Vatrak River)

Section II IRB/AVSETPL/864/2013 28.05.2013 AA/AMBD-VDDR/Q&M/406 10.06.2013Reviewed by IE and Consent given

Backfill Material

Borrow Area for use RE Wall Backfill & Retaind FillCH 41+500 LHS Inside lead 0.5 km (Vansar Village)

Section II IRB/AVSETPL/864/2013 28.05.2013 AA/AMBD-VDDR/Q&M/406 10.06.2013Reviewed by IE and Consent given

Backfill Material

Borrow Area for use RE Wall Backfill & Retaind FillCH 46+900 LHS Inside lead 3.5 km (Degam Village)

Section II IRB/AVSETPL/864/2013 28.05.2013 AA/AMBD-VDDR/Q&M/406 10.06.2013Reviewed by IE and Consent given

Backfill Material

Borrow Area for use RE Wall Backfill & Retaind FillCH 55+600 LHS Inside lead 11.0 km (Shinoladi Village)

Section II IRB/AVSETPL/864/2013 28.05.2013 AA/AMBD-VDDR/Q&M/406 10.06.2013Reviewed by IE and Consent given

Backfill Material

Borrow Area for use RE Wall Backfill & Retaind FillCH 56+000 LHS Inside lead 48.0 km (Jesapura Village)

Section Iii IRB/AVSETPL/864/2013 28.05.2013 AA/AMBD-VDDR/Q&M/406 10.06.2013Reviewed by IE and Consent given

Backfill Material

Borrow Area for use RE Wall Backfill & Retaind FillCH-92+200 RHS, Inside Lead 2.0Km (Vasad Village)

Section VI IRB/AVSETPL/889/2013 03.06.2013 AA/AMBD-VDDR/Q&M/405 10.06.2013Reviewed by IE and Consent given

Backfill Material

Borrow Area for use RE Wall Backfill & Retaind FillCH-98+000 LHS Inside Lead 13.0 Km (Mahisagar River)

Section VI IRB/AVSETPL/889/2013 03.06.2013 AA/AMBD-VDDR/Q&M/405 10.06.2013Reviewed by IE and Consent given

Backfill Material

89Borrow Area for use in Embankmen & Sub grade.BA No-56 CH-110+000 LHS (1.5 km from NH-8) Vemali Village

Section IV IRB/AVSETPL/893/2013 03.06.2013 AA/AMBD-VDDR/Q&M/398 06.06.2013Reviewed by IE and Consent given BA

90Borrow Area for use in Embankmen.No-57 CH-25+580 RHS, Inside Lead 0.0Km.(Pinglej-2 Village) Suitable for Embankment (Section 1)

Section I IRB/AVSETPL/890/2013 03.06.2013 AA/AMBD-VDDR/Q&M/400 06.06.2013Reviewed by IE and Consent given BA

87

88

9 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

91Borrow Area for use in Embankmen & Sub grade.BA No29 A CH-36+410 LHS, Inside Lead 4.0 Km (Kheda Village

Section I IRB/AVSETPL/892/2013 03.06.2013 AA/AMBD-VDDR/Q&M/397 06.06.2013Reviewed by IE and Consent given BA

92Borrow Area for use in Embankmen.BA No-1-A CH-29+220 LHS, Inside Lead 2.5 km,(Kajipura Village)

Section I IRB/AVSETPL/891/2013 03.06.2013 AA/AMBD-VDDR/Q&M/399 06.06.2013Reviewed by IE and Consent given BA

93Borrow Area for use in Embankmen & Sub grade.BA No-59 CH-74+000 LHS, Inside Lead 12Km, (Kasor Village)

Section III IRB/AVSETPL/939/2013 15.06.2013 AA/AMBD-VDDR/Q&M/444 21.06.2013Reviewed by IE and Consent given BA

94Concrete Mix Design of Grade M-15 to M-50Cement : Jaypee OPC 53Coarse Aggregate : Othwad Quarry.

AVBOT Project IRB/AVSETPL/940/2013 15.06.2013 AA/AMBD-VDDR/Q&M/443 20.06.2013Reviewed by IE and Consent given Concrete

95Concrete Mix Design of Grade M-15 to M-50Cement : Ambuja OPC 53Coarse Aggregate : Othwad Quarry.

AVBOT Project IRB/AVSETPL/955/2013 18.06.2013 AA/AMBD-VDDR/Q&M/442 21.06.2013Reviewed by IE and Consent given Concrete

96Grade of Concrete : M15 to M 50Cement : Jaypee OPC 53 GradeCoarse Aggregate : Othwad Quarry

AVBOT Project IRB/AVSETPL/968/2013 24.06.2013 AA/AMBD-VDDR/Q&M/458 27.06.2013Reviewed by IE and Consent given Concrete

97Borrow Area for use in Embankmen & Sub grade.BA No-1B CH-29+220 LHS, 2.5 km inside lead, Kajipura Village.

Section I IRB/AVSETPL/998/2013 02.07.2013 AA/AMBD-VDDR/Q&M/487 06.07.2013Reviewed by IE and Consent given BA

98Borrow Area for use in Embankmen & Sub grade.BA No-35A CH-81+680 RHS, Inside Lead 2.5Km.(Vadod Village)

Section IV IRB/AVSETPL/1022/2013 09.07.2013 AA/AMBD-VDDR/Q&M/513 16.07.2013Reviewed by IE and Consent given BA

99

Grade of concrete : M15 to M50.Cement : Ultratech OPC 53 gradeAdmixture : Kunacon 37 SRFine Aggregate : Mahi RiverCoarse aggregate : Othwad Quarry

AVBOT Project Concrete

10 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

100

Grade of concrete : M15 to M 40.Cement : Ultratech OPC 53 GradeCoarse Aggregate : Othwad Quarry.Fine Aggregate : Mahi River.Admixture : Sunplast Super QC-2610. Mfg

AVBOT Project Concrete

101

Grade of concrete : M 15 to M 45Cement : Ultratech OPC 53 GradeAdmixture : Masterpolyheed 8980 A product of BSAF India Ltd.Coarse Aggregate : Othwad QuarryFine Aggregate : Mahi river

AVBOT Project IRB/AVSETPL/1076/2013 20.07.2013 AA/AMBD-VDDR/Q&M/546 25.07.2013

Reviewed by IE and Consent given

Concrete

102Grade of concrete : M 15 to M 50Cement : Sidhee OPC 53 GradeAdmixture : Sikament 581 LT20/1 A product of SIKA

AVBOT Project IRB/AVSETPL/1101/2013 31.07.2013 AA/AMBD-VDDR/Q&M/586 08.08.2013Reviewed by IE and Consent given Concrete

103Grade of concrete : M 15 to M 50Cement : Sidhee OPC 53 GradeAdmixture : Sikament 581 LT20/1 A product of SIKA

AVBOT Project IRB/AVSETPL/1191/2013 26.08.2013 AA/AMBD-VDDR/Q&M/660 30.08.2013Reviewed by IE and Consent given Concrete

104Borrow Area use for RE Wall Backfill materialCh. 78+500 RHs inside lead 17 km. Verakhadi Village

Section III IRB/AVSETPL/1208/2013 28.08.2013 AA/AMBD-VDDR/Q&M/676 05.09.2013Reviewed by IE and Consent given

Backfill Material

105Borrow Area for use in Embankmen & Sub grade.BA No-43 A CH-36+300 RHS, Inside lead 2.0 Km. Matar Villgae

Section II IRB/AVSETPL/1201/2013 27.08.2013 AA/AMBD-VDDR/Q&M/661 30.08.2013Reviewed by IE and Consent given BA

106Borrow Area for use in RE Wall Backfill & Retained Fill.BA No-60 CH-78+500 RHS, Inside lead 17.0 Km. Verakhadi Villgae

Section III IRB/AVSETPL/1208/2013 28.08.2013 AA/AMBD-VDDR/Q&M/676 05.09.2013

Reviewed by IE and Consent given

BA

107

Grade of concrete : M-30 (RE Wall Block) Cement : Ultratech/Jaypee OPC 53 gradeFine Aggregate : Mahi RiverCoarse aggregate : Othwad Quarry

AVBOT Project IRB/AVSETPL/1325/2013 01.10.2013 AA/AMBD-VDDR/Q&M/761 08.10.2013

Reviewed by IE and Consent given

Concrete

11 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

108 Sumbmission of Mix Design of Grout Master Roc FLC AVBOT ProjectIRB/AVSETPL/1326/2013IRB/AVSETPL/1533/2013

01.10.201305.11.2013

AA/AMBD-VDDR/Q&M/764AA/AMBD-VDDR/Q&M/891

10.10.201328.11.2013

Reviewed by IE and Consent given

Grout

109Borrow Area for use in Embankmen & Sub grade.BA No-63 CH-89+700 LHS, Inside lead 10.5 Km. Sarsa Villgae

Section IV IRB/AVSETPL/1330/2013 02.10.2013 AA/AMBD-VDDR/Q&M/760 08.10.2013

Reviewed by IE and Consent given

BA

110Borrow Area use for RE Wall Backfill materialCh. 16+000 RHS inside lead 5.0 km. Naaz Village

Section I IRB/AVSETPL/1360/2013 07.10.2013 AA/AMBD-VDDR/Q&M/789 19.10.2013

Reviewed by IE and Consent given Backfill

Material

111Borrow Area use for RE Wall Backfill materialCh-102+500 RHS, Inside lead 5.0 km Ranoli Village & Ch-98+000 LHS Inside lead 13 km Mahi River

Section IV IRB/AVSETPL/1364/2013 08.10.2013 AA/AMBD-VDDR/Q&M/772 11.10.2013

Reviewed by IE and Consent given Backfill

Material

112Borrow Area use for RE Wall Backfill materialCh. 110+000 RHS Inside lead 1.5 km. Vemali Village & Ch-98+000 LHS, Inside lead 13 km Mahi River.

Section IV IRB/AVSETPL/1364/2013 08.10.2013 AA/AMBD-VDDR/Q&M/772 11.10.2013

Reviewed by IE and Consent given Backfill

Material

113Borrow Area use for RE Wall Backfill materialCh. 77+500 LHS inside lead 20.0 km. Kherda Village

Section III IRB/AVSETPL/1401/2013 17.10.2013 AA/AMBD-VDDR/Q&M/794 21.10.2013

Reviewed by IE and Consent given Backfill

Material

114

( ),Cement : Ultratech OPC 53 gradeAdmixture : Masterpolyhead 8980 (BASF India Ltd).Fine Aggregate : Mahi RiverCoarse aggregate : Othwad Quarry

AVBOT Project IRB/AVSETPL/1418/2013 19.10.2013 AA/AMBD-VDDR/Q&M/822 26.10.2013

Reviewed by IE and Consent given

Concrete

12 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

115Borrow Area use for RE Wall Backfill materialCh. 36+400 RHS inside lead 5.5 km. Kheda Village & Ch-35+000 RHS Vatrak River

Section II IRB/AVSETPL/1419/2013 19.10.2013 AA/AMBD-VDDR/Q&M/821 26.10.2013

Reviewed by IE and Consent given Backfill

Material

116

Cement : Wonder OPC 53 gradeAdmixture : Masterpolyhead 8980 (BASF Lndia Ltd)Fine Aggregate : Mahi RiverCoarse aggregate : Othwad Quarry

AVBOT Project IRB/AVSETPL/1420/2013 19.10.2013 AA/AMBD-VDDR/Q&M/824 26.10.2013

Reviewed by IE and Consent given

Concrete

117Grade of concrete : M15 to M50.Cement : Jaypee OPC 53 gradeAdmixture : Masterpolyhead 8980 (BASF Lndia Ltd)

AVBOT Project IRB/AVSETPL/1421/2013 19.10.2013 AA/AMBD-VDDR/Q&M/823 26.10.2013Reviewed by IE and Consent given Concrete

118Mix Design of DBM Grade-1 Using Aggregate Timba & Jeshapura Quarry, Bitumen BPCL, HPCL & IOCL. @ Samarkha (72+000 LHS) Plant

AVBOT Project IRB/AVSETPL/1453/2013 28.10.2013 AA/AMBD-VDDR/Q&M/870 14.11.2013Reviewed by IE and Consent given DBM-1

119Borrow Area for use in Embankmen & Sub grade.BA No-62 CH-86+000 RHS, Inside lead 3.5 Km. Adas Villgae

Section IV IRB/AVSETPL/1525/2013 21.11.2013 AA/AMBD-VDDR/Q&M/884 26.11.2013Reviewed by IE and Consent given BA

120Borrow Area for use in Embankmen & Sub grade.BA No-61 CH-36+400 LHS, Inside lead 5.5 Km. Kheda Villgae

Section II IRB/AVSETPL/1524/2013 21.11.2013 AA/AMBD-VDDR/Q&M/887 26.11.2013Reviewed by IE and Consent given BA

121Borrow Area for use in Embankmen & Sub grade.BA No-65 CH-98+000 RHS, Inside lead 4.0 Km. Sakariyapura Villgae

Section IV IRB/AVSETPL/1498/2013 13.11.2013 AA/AMBD-VDDR/Q&M/885 26.11.2013Reviewed by IE and Consent given BA

122Borrow Area for use in Embankmen & Sub grade.BA No-66 CH-42+600 RHS, Inside lead 5.0 Km. Antroli Villgae

Section II IRB/AVSETPL/1515/2013 16.11.2013 AA/AMBD-VDDR/Q&M/886 26.11.2013Reviewed by IE and Consent given BA

123Borrow Area for use in Embankmen & Sub grade.BA No-64 CH-47+000 RHS, Inside lead 17.0 Km. Bhadkad Villgae

Section II IRB/AVSETPL/1539/2013 27.11.2013 AA/AMBD-VDDR/Q&M/894 30.11.2013Reviewed by IE and Consent given BA

124Grade of concrete : M15 to M50.Cement : Wonder OPC 53 gradeAdmixture : Sikament 581 LT20/1 (SIKA India Pvt.Ltd)

AVBOT Project IRB/AVSETPL/1540/2013 27.11.2013 AA/AMBD-VDDR/Q&M/893 30.11.2013Reviewed by IE and Consent given Concrete

13 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

125GSB Mix DesignExisting GSB material 70% with Crushed GSB 30% of Othwad Crusher.

Section IV IRB/AVSETPL/1541/2013 27.11.2013 AA/AMBD-VDDR/Q&M/895 30.11.2013Reviewed by IE and Consent given GSB

126Borrow Area for use in Embankmen & Sub grade.BA No-67 CH-42+500 RHS, Inside lead 17.0 Km. Utal Villgae

Section II IRB/AVSETPL/1565/2013 02.12.2013 AA/AMBD-VDDR/Q&M/910 07.12.2013Reviewed by IE and Consent given BA

127Borrow Area for use in Embankmen & Sub grade.BA No-68 CH-45+080 LHS, Inside lead 2.8 Km. Haijerabad Villgae

Section II IRB/AVSETPL/1575/2013 04.12.2013 AA/AMBD-VDDR/Q&M/912 07.12.2013Reviewed by IE and Consent given BA

128Borrow Area for use in Embankmen & Sub grade.BA No-62A CH-86+000 RHS, Inside lead 3.5 Km. Adas Villgae

Section IV IRB/AVSETPL/1574/2013 04.12.2013 AA/AMBD-VDDR/Q&M/911 07.12.2013Reviewed by IE and Consent given BA

129Borrow Area for use in Embankmen & Sub grade.BA No-69 CH-52+700 LHS, Inside lead 9.0 Km. Bhilodara Villgae

Section II IRB/AVSETPL/1589/2013 07.12.2013 AA/AMBD-VDDR/Q&M/926 12.12.2013Reviewed by IE and Consent given BA

130 Sumbmission of Mix Design of Grout Cebex 100 AVBOT Project IRB/AVSETPL/1590/2013 07.12.2013 AA/AMBD-VDDR/Q&M/932 16.12.2013Reviewed by IE and Consent given Grout

131Borrow Area for use in Embankment.BA No-72 CH-77+500 LHS, Inside lead 7.5 Km. Bedva Villgae

Section IIIIRB/AVSETPL/1585/2013IRB/AVSETPL/1634/2013

06.12.201317.12.2013

AA/AMBD-VDDR/Q&M/911 12.12.2013Resubmite with

correct RFIBA

132Borrow Area use for RE Wall Backfill materialCh. 55+600 RHS inside lead 13.5 km. Allindra Village

Section II IRB/AVSETPL/1607/2013 10.12.2013 AA/AMD-VDDR/Q&M/929 16.12.2013Reviewed by IE and Consent given

Backfill Material

133Borrow Area use for RE Wall Backfill materialCh. 36+000 LHS inside lead 5.5 km. Kheda Village

Section II IRB/AVSETPL/1625/2013 13.12.2013 AA/AMD-VDDR/Q&M/945 20.12.2013Reviewed by IE and Consent given

Backfill Material

134Borrow Area for use in Embankment/Sub Grade/Median FillingBA No-70 CH-83+100 LHS, Inside lead 1.5 Km. Bedva

Section IV IRB/AVSETPL/1624/2013 13.12.2013 AA/AMD-VDDR/Q&M/946 20.12.2013Reviewed by IE and Consent given BA

135Borrow Area for use in Embankment/Sub Grade/Median FillingBA No-71 CH-29+200 RHS, Inside lead 1.5 Km. Vadala

Section I IRB/AVSETPL/1623/2013 13.12.2013 AA/AMD-VDDR/Q&M/947 20.12.2013Reviewed by IE and Consent given BA

14 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

136Borrow Area use for RE Wall Backfill materialCh. 16+000 RHS inside lead 6.0 km. Giramtha Village

Section I IRB/AVSETPL/1650/2013 19.12.2013 AA/AMD-VDDR/Q&M/956 24.12.2013Reviewed by IE and Consent given

Backfill Material

137Borrow Area N-74 use for EMB/SUB materialCh. 16+000 RHS inside lead 6.0 km. Giramtha Village

Section I IRB/AVSETPL/1669/2013 23.12.2013 AA/AMD-VDDR/Q&M/965 27.12.2013Reviewed by IE and Consent given BA

138Borrow Area No-75 use for EMB/SUB materialCh. 55+600 RHS inside lead 13.5 km. Shinoladi (Dulsurpura) Village

Section II IRB/AVSETPL/1693/2013 30.12.2013 AA/AMD-VDDR/Q&M/980 02.01.2014Reviewed by IE and Consent given BA

139Borrow Area No-76 use for EMB/SUB materialCh. 55+600 RHS inside lead 13.5 km. Shinoladi Village

Section II IRB/AVSETPL/1693/2013 30.12.2013 AA/AMD-VDDR/Q&M/980 02.01.2014Reviewed by IE and Consent given BA

140Borrow Area No-73 use for EMB/SUB materialCh. 52+700 LHS inside lead 13.0 km. Devkivansol Village

Section II IRB/AVSETPL/1697/2013 01.01.2014 AA/AMD-VDDR/Q&M/989 03.01.2014Reviewed by IE and Consent given BA

141Borrow Area No-62B use for EMB/SUB materialCh. 86+000 RHS inside lead 3.5 km. Adas Village

Section IV IRB/AVSETPL/1700/2013 01.01.2014 AA/AMD-VDDR/Q&M/990 03.01.2014Reviewed by IE and Consent given BA

142Borrow Area No-78 use for EMB/SUB materialCh. 86+980 RHS inside lead 8.0 km. Napad Village

Section IV IRB/AVSETPL/1700/2013 01.01.2014 AA/AMD-VDDR/Q&M/990 03.01.2014Reviewed by IE and Consent given BA

143Borrow Area use for RE Wall Backfill materialCh. 98+000 RHS , Inside Lead 4.0 Km Sakariyapura Village

Section IV IRB/AVSETPL/1707/2014 02.01.2014 AA/AMD-VDDR/Q&M/999 08.01.2014Reviewed by IE and Consent given BA

144Borrow Area use for RE Wall Backfill material Ch. 89+700, 10.5 km Lead, Sarsa Village (80%) & Ch 98+000 LHS Inside Lead 13.0 Km Mahisagar River

Section IV IRB/AVSETPL/1708/2014 02.01.2014 AA/AMD-VDDR/Q&M/1000 08.01.2014Reviewed by IE and Consent given BA

145Borrow Area No-80 use for EMB/SUB materialCh. 88+500 LHS inside lead 2.0 km. Rajupura Village

Section IV IRB/AVSETPL/1720/2014 04.01.2014 AA/AMD-VDDR/Q&M/1001 08.01.2014Reviewed by IE and Consent given BA

146Borrow Area use for RE Wall Backfill materialCh. 19+500 RHS , Inside Lead 8.0 Km Vasai Village

Section I IRB/AVSETPL/1729/2014 07.01.2014 AA/AMD-VDDR/Q&M/1020 10.01.2014Reviewed by IE and Consent given BA

15 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

147Borrow Area use for RE Wall Backfill materialCh. 19+500 RHS , Inside Lead 7.0 Km Vasai Village-2

Section I IRB/AVSETPL/1729/2014 07.01.2014 AA/AMD-VDDR/Q&M/1020 10.01.2014Reviewed by IE and Consent given BA

148Borrow Area No-1C use for EMB materialCh. 29+220 LHS inside lead 2.5 km. kajipura Village

Section I IRB/AVSETPL/1732/2014 07.01.2014 AA/AMD-VDDR/Q&M/1019 10.01.2014Reviewed by IE and Consent given BA

149Borrow Area No-82 use for EMB/SUB materialCh. 19+500 LHS inside lead 8.0 km. Vasai Village

Section I IRB/AVSETPL/1732/2014 07.01.2014 AA/AMD-VDDR/Q&M/1019 10.01.2014Reviewed by IE and Consent given BA

150Borrow Area No-79 use for EmbankmentCh. 42+500 LHS inside lead 3.5 km. Anthroli Village

Section II IRB/AVSETPL/1745/2014 13.01.2014 AA/AMD-VDDR/Q&M/1068 25.01.2014Reviewed by IE and Consent given BA

151Borrow Area No-83 use for EMB/SUB materialCh. 19+500 RHS inside lead 7.0 km. Vasai Village-2

Section I IRB/AVSETPL/1746/2014 13.01.2014 AA/AMD-VDDR/Q&M/1069 25.01.2014Reviewed by IE and Consent given BA

152Grade of concrete : M15 to M50.Cement : Jaypee OPC 53 gradeAdmixture : Masterpolyheed 8980 (BASF India Pvt.Ltd)

AVBOT Project IRB/AVSETPL/1747/2014 13.01.2014 AA/AMD-VDDR/Q&M/1073 27.01.2014Reviewed by IE and Consent given Concrete

153Borrow Area No-84 use for EMB materialCh. 36+400 LHS inside lead 7.0 km. Kheda Village

Section II IRB/AVSETPL/1748/2014 13.01.2014 AA/AMD-VDDR/Q&M/1067 25.01.2014Reviewed by IE and Consent given BA

154Borrow Area No-86 use for EMB/SUB materialCh. 82+500 RHS inside lead 0.5 km. Vadod Village

Section IV IRB/AVSETPL/1763/2014 17.01.2014 AA/AMD-VDDR/Q&M/1070 25.01.2014Reviewed by IE and Consent given BA

155Borrow Area No-77 use for EMB/SUB materialCh. 63+250 LHS inside lead 24.0 km. Fhatepura Village

Section III IRB/AVSETPL/1762/2014 17.01.2014 AA/AMD-VDDR/Q&M/1072 27.01.2014Reviewed by IE and Consent given BA

156Borrow Area No-81 use for EMB/SUB materialCh. 67+000 LHS inside lead 24.0 km. Uthakhari Village

Section III IRB/AVSETPL/1772/2014 17.01.2014 AA/AMD-VDDR/Q&M/1071 25.01.2014Reviewed by IE and Consent given BA

157Borrow Area No-85 use for EMB/SUB materialCh. 77+500 LHS inside lead 20.5 km. Devrangpura Village

Section III IRB/AVSETPL/1793/2014 24.01.2014 AA/AMD-VDDR/Q&M/1074 27.01.2014Reviewed by IE and Consent given BA

16 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

158Submission of natural GSB: i) CH-77+500 LHS,Inside lead 21.0 km Khanpura Village, Mahi River & ii) CH-77+500 LHS, Inside lead 23.0 km Pratpura Village, Mahi

Section IIIIRB/AVSETPL/1802/2014IRB/AVSETPL/2003/2014IRB/AVSETPL/2166/2014

24.01.201418.03.201428.04.2014

AA/AMD-VDDR/Q&M/1169AA/AMD-VDDR/Q&M/1238

24.02.201425.03.2014

required Documents Submitted

GSB

159Submission of documents of Review of Bituminous Concrete Grade-1 Mix Design

AVBOT Project IRB/AVSETPL/1807/2014 27.01.2014 AA/AMD-VDDR/Q&M/1112 06.02.2014Reviewed by IE and Consent given BC

160Borrow Area No-62C use for EMB/SUB materialCh. 86+000 RHS inside lead 3.5 km. Adas Village

Section IV IRB/AVSETPL/1830/2014 31.01.2014 AA/AMD-VDDR/Q&M/1103 04.02.2014Reviewed by IE and Consent given BA

161Submission of Concrete Mix DesignGrade of concrete : M15 to M50.Cement : Ultratech OPC 53 grade

AVBOT Project IRB/AVSETPL/1831/2014 31.01.2014 AA/AMD-VDDR/Q&M/1105 04.02.2014Reviewed by IE and Consent given Concrete

162Borrow Area No-1D use for EMB/SUB materialCh. 29+220 LHS inside lead 2.5 km. Kajipura Village

Section I IRB/AVSETPL/1865/2014 10.02.2014 AA/AMD-VDDR/Q&M/1146 19.02.2014Reviewed by IE and Consent given BA

163Borrow Area No-87 use for EMB/SUB materialCh. 49+050 LHS inside lead 4.0 km. Degam Village-2

Section II IRB/AVSETPL/1867/2014 10.02.2014 AA/AMD-VDDR/Q&M/1145 19.02.2014Reviewed by IE and Consent given BA

164Borrow Area use for RE Wall Backfill materialCh. 42+500 RHS , Inside Lead 0.5 Km Radhvanaj Village

Section II IRB/AVSETPL/1866/2014 10.02.2014 AA/AMD-VDDR/Q&M/1144 19.02.2014Reviewed by IE and Consent given

Backfill Material

165Borrow Area use for RE Wall Backfill materialCh. 16+000 RHS , Inside Lead 5.5 Km Naaz-3 Village

Section I IRB/AVSETPL/1884/2014 14.02.2014 AA/AMD-VDDR/Q&M/1156 21.02.2014Reviewed by IE and Consent given

Backfill Material

166Borrow Area No-88 use for EMB/SUB materialCh. 67+000 LHS inside lead 25.0 km.Heranj Village

Section III IRB/AVSETPL/1885/2014 14.02.2014 AA/AMD-VDDR/Q&M/1154 21.02.2014Reviewed by IE and Consent given BA

167Submission of Concrete Mix DesignGrade of concrete : M15 to M50.Cement : Sidhee OPC 53 grade

AVBOT ProjectIRB/AVSETPL/1888/2014IRB/AVSETPL/1985/2014

14.02.201410.03.2014

AA/AMD-VDDR/Q&M/1160AA/AMD-VDDR/Q&M/1216

22.02.201414.03.2014

Reviewed by IE and Consent given Concrete

168Borrow Area use for RE Wall Backfill materialCH-16+000 RHS, Inside Lead 8.0 Km, Giramtha Village

Section I IRB/AVSETPL/1886/2014 14.02.2014 AA/AMD-VDDR/Q&M/1157 21.02.2014Reviewed by IE and Consent given

Backfill Material

17 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

169Borrow area no 89, Ch 52+700 LHS Inside lead 16.5 Km. Vansol (Sanda) Village.Suitable for Embankment.

Section II IRB/AVSETPL/1914/2014 19.02.2014 AA/AMD-VDDR/Q&M/1155 21.02.2014Reviewed by IE and Consent given BA

170Submission of Concrete Mix DesignGrade of concrete : M15 to M50Cement : JK Lakshmi OPC 53 Grade.

AVBOT Project IRB/AVSETPL/1917/2014 20.02.2014 AA/AMD-VDDR/Q&M/1161 22.02.2014Reviewed by IE and Consent given Concrete

171Submission of orrow area no 90, CH-16+000 RHS, Inside Lead 8.0 Km, Giramtha Village. Suitable for Embankment/Subgrade & Median filling

Section I IRB/AVSETPL/1926/2014 21.02.2014 AA/AMD-VDDR/Q&M/1186 01.03.2014Reviewed by IE and Consent given BA

172Borrow Area use for RE Wall Backfill materialCh. 77+500 LHS, Inside lead 21.0 km Kherda Village-2

Section II IRB/AVSETPL/1938/2014 24.02.2014 AA/AMD-VDDR/Q&M/1185 01.03.2014Reviewed by IE and Consent given

Backfill Material

173Submission of Concrete Mix DesignGrade of concrete : M15 to M50Cement : JK Lakshmi OPC 53 Grade.

AVBOT Project IRB/AVSETPL/1937/2014 24.02.2014 AA/AMD-VDDR/Q&M/1184 01.03.2014Reviewed by IE and Consent given Concrete

174Borrow area no 73A, CH-52+700 LHS, Inside Lead 13.9 Km, Devkivansol Village. Suitable for Embankment/Subgrade & Median filling

Section II IRB/AVSETPL/1942/2014 25.02.2014 AA/AMD-VDDR/Q&M/1187 01.03.2014Reviewed by IE and Consent given BA

175Submission of GSB Mix Design with Natural GSB from Mahi River 60% & Crushed GSB from Othwad Quarry 40%.

Section IVIRB/AVSETPL/1944/2014IRB/AVSETPL/2165/2014

25.02.201428.04.2014

AA/AMD-VDDR/Q&M/1183 01.03.2014required

Documents Submitted

GSB

176Submission of Borrow Area no 91, Ch 16+000 RHS, Inside Lead 5.5 Km, Naaz 3 Village Suitable for Embankment Subgrade & median filling

Section I IRB/AVSETPL/1996/2014 18.03.2014 AA/AMD-VDDR/Q&M/1227 24.03.2014Reviewed by IE and Consent given BA

177Submission of Borrow Area no 92, Ch 77+500 LHS, Inside Lead 21.0 Km, Kherda Village Village Suitable for Embankment Subgrade & median filling

Section III IRB/AVSETPL/1984/2014 10.03.2014 AA/AMBD-VDDR/Q&M/1215 14.03.2014Reviewed by IE and Consent given BA

178Borrow Area use for RE Wall Backfill materialCh. 36+300 RHS inside lead 1.0 km. Vatrak River

Section I IRB/AVSETPL/1983/2014 10.03.2014 AA/AMBD-VDDR/Q&M/1214 14.03.2014Reviewed by IE and Consent given

Backfill Material

179Borrow Area use for RE Wall Backfill materialCh. 52+700 LHS inside lead 13.9 km. Devki Vansol Village

Section II IRB/AVSETPL/1983/2014 10.03.2014 AA/AMBD-VDDR/Q&M/1214 14.03.2014Reviewed by IE and Consent given

Backfill Material

18 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

180Borrow Area use for RE Wall Backfill materialCh. 27+600 LHS inside lead 1.5 km. Goblej Village

Section I IRB/AVSETPL/1991/2014 12.03.2014 AA/AMBD-VDDR/Q&M/1218 15.03.2014Reviewed by IE and Consent given

Backfill Material

181Submission of Concrete Mix DesignGrade of concrete : M15 to M50Cement : JK Lakshmi OPC 53 Grade.

AVBOT Project IRB/AVSETPL/1997/2014 18.03.2014 AA/AMBD-VDDR/Q&M/1230 24.03.2014Reviewed by IE and Consent given Concrete

182Submission of Borrow Area no 29B, Ch 36+410 LHS, Inside Lead 4.0 Km ,Kheda Village Suitable for Embankment Subgrade & median filling

Section II IRB/AVSETPL/2006/2014 18.03.2014 AA/AMD-VDDR/Q&M/1228 24.03.2014Reviewed by IE and Consent given BA

183Submission of Borrow Area no 93,Ch 13+500 RHS Inside Lead 0.5 Km from NE-1 Harniyav Village. Suitable for Embankment Subgrade & median filling

NE 1 IRB/AVSETPL/2007/2014 18.03.2014 AA/AMBD-VDDR/Q&M/1234 24.03.2014Reviewed by IE and Consent given BA

184Submission of Concrete Mix DesignGrade of concrete : M15 to M50Cement : JK Lakshmi OPC 53 Grade.

AVBOT Project IRB/AVSETPL/2005/2014 18.03.2014 AA/AMBD-VDDR/Q&M/1229 24.03.2014Reviewed by IE and Consent given Concrete

185Submission of Borrow Area no 96, Ch 03+600 LHS, Inside Lead 6.0 Km from NE-1, Mehamdapura Village. Suitable for Embankment Subgrade & median filling

NE 1 IRB/AVSETPL/2031/2014 26.03.2014 AA/AMBD-VDDR/Q&M/1264 07.04.2014Reviewed by IE and Consent given BA

186Submission of Borrow Area no 95, Ch-27+600 LHS, Inside Lead 1.5 Km ,Goblej Village. Suitable for Embankment, Subgrade & Median Filling.

Section I IRB/AVSETPL/2033/2014 26.03.2014 AA/AMBD-VDDR/Q&M/1266 07.04.2014Reviewed by IE and Consent given BA

187Submission of Borrow Area no 94, Ch-77+500 LHS, Inside Lead 22.0 Km ,Kherda Village BA.2. Suitable for Embankment.

Section III IRB/AVSETPL/2032/2014 26.03.2014 AA/AMBD-VDDR/Q&M/1265 07.04.2014Reviewed by IE and Consent given BA

188DBM Grade-2 Mix Design With Othwad Quarry, Bitumen (VG-30) BPCL,IOCL, HPCL. @Vasad Plant

AVBOT Project IRB/AVSETPL/2048/2014 29.03.2014 AA/AMBD-VDDR/Q&M/1275 09.04.2014Reviewed by IE and Consent given DBM-2

189Mix Design of BC Grade-1 Using Aggregate Othwad Quarry, Bitumen PMB-40 OSNAR & HINCOL.@Vasad Plant

AVBOT Project IRB/AVSETPL/2047/2014 29.03.2014 AA/AMBD-VDDR/Q&M/1276 09.04.2014Reviewed by IE and Consent given BC-1

190Submission of Concrete Mix DesignGrade of concrete : M15 to M50Cement : Sidhee OPC 53 Grade.

AVBOT Project IRB/AVSETPL/2061/2014 04.04.2014 AA/AMBD-VDDR/Q&M/1268 09.04.2014Reviewed by IE and Consent given Concrete

19 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'E'Source Approval of Material

Sr. No. Design Description Intended to Used IRB Letter No Date IE Letter No Date Status Remark's

NATIONAL HIGHWAYS AUTHORITY OF INDIA Ministry of Road Transport & Highways (MoRT&H)

Six Laning of Ahmedabad to Vadodara Section of NH-8 from Km. 6.400 to km 108.700 (Length Km. 102.300km) in State of Gujarat and Improvement of Existing Ahmedabad Vadodara Expressway from 0.000 to km 93.302 in the state of Gujarat (Length 93.302 km) under NHDP Phase-V Design Built Finance Operate Transfer (DBFOT) Toll basis

EPC Contractor : MRM Pvt Ltd Quality Control Engineer IE: Aarvee Associates Architects Engineers & Consultants Pvt. Ltd.

STATUS OF REVIEWED/CONSENT BY IE FOR CONSTRUCTION MATERIALS

191 WMM Mix Design with Jeshapura Quarry Aggregate AVBOT Project IRB/AVSETPL/2098/2014 15.04.2014 AA/AMBD-VDDR/Q&M/1290 19.04.2014Reviewed by IE and Consent given WMM

192WMM Mix Design Trial Patch with Othwad Quarry AggregateCH-55+000 LHS @ Tundel Plant.

AVBOT Project IRB/AVSETPL/2122/2014 15.04.2014 WMM

193DBM Grade-1 Mix Design With Othwad Quarry, Bitumen (VG-30) BPCL,IOCL, HPCL. @Vasad Plant

AVBOT Project IRB/AVSETPL/2121/2014 15-04-2014 AA/AMBD-VDDR/Q&M/1292 21.04.2014Reviewed by IE and Consent given DBM-1

194Submission of Borrow are no -97, Ch-42+500 RHS,Inside lead 0.5 km, Radhavanaj Village. Suitable for Embankment/Subgrade & Median Filing

Section II IRB/AVSETPL/2128/2014 17.04.2014 AA/AMBD-VDDR/Q&M/1298 23.04.2014Reviewed by IE and Consent given BA

195Submission of Borrow are no -98, Ch-9+220 LHS,Inside lead 1.0 km, Vatva Village. Suitable for Embankment/Subgrade & Median Filing

Section I IRB/AVSETPL/2159/2014 25.04.2014 BA

196Submission of Borrow are no -99, Ch-16+000 RHS,Inside lead 8.0 km, Oad Village. Suitable for Embankment/Subgrade & Median Filing

Section I IRB/AVSETPL/2167/2014 28.04.2014 BA

197Submission of Concrete Mix DesignGrade of concrete : M15 to M50Cement : Ultratech OPC 53 Grade.

AVBOT Project IRB/AVSETPL/2168/2014 28.04.2014 Concrete

20 of 20

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX - F

ORGANIZATION CHART (EPC)

PROJECT HEAD

(EPC)

(Mr. L.N.Surve)

Material Manager

(Mr. Bharat Marvaniya)

Asst. Material Manager

Material

Engineer (10 Nos.)

Asst. Material Engineer (8 Nos.)

Supervisor

(48 Nos.)

DGM/GMSECTION I & II(Mr. D.K.Parit)

Section

Incharge - I

(Mr. T.B.Dhumal)

Senior Engr. Highway (1 No)

Laying Engr.

(1 No)

Sr./Jr. Supervisor

Laying (8 Nos.)

Asst. Engineer

(3 Nos.)

Junior Engr.

(7Nos)

Sr./Jr. Supervisor

(14 Nos.)

Surveyor

(7Nos.)

Surveyor

Laying (2 No)

Surveyor (TS)

(1 No)

Senior Engr. Structure (2 Nos.)

Asst. Engineer

(4 Nos.)

Junior Engr.

(8Nos)

Sr./Jr. Supervisor

(16 Nos.)

Senoir Engr. EDP

(1 No)

Junior Eng. EDP

(1 No.)

Computer

Operator (2No.)

Asst.

Accountant

Admin

Officer

Store

Officer

Store

Assistant (1 No)

Section

Inharge - II

(Mr. Chinnapa Sankdal)

Senior Engr. Highway (2 No)

Laying Engr.

(2 No)

Sr./Jr. Supervisor

Laying (8 Nos.)

Asst. Engineer

(4 Nos.)

Junior Engr.

(7Nos)

Sr./Jr. Supervisor

(14 Nos.)

Surveyor

(7Nos.)

Surveyor

Laying (2 No)

Surveyor (TS)

(1 No)

Senior Engr. Structure (2 Nos.)

Asst. Engineer

(4 Nos.)

Junior Engr.

(8Nos)

Sr./Jr. Supervisor

(16 Nos.)

Senoir Engr. EDP

(1 No)

Junior Eng. EDP

(1 No.)

Computer

Operator (2 No.)

Asst.

Accountant

Admin

Officer

Store

Officer

Store

Assistant (1 No)

Safety

Officer

Safety

Supervisor(2 Nos.)

DGM/GM

SECTION III & IV

(Mr. M.S.Pandya)

Section

Incharge - III

(Mr. Vijay Bhayde)

Senior Engr. Highway (2 No)

Laying Engr.

(2 No)

Sr./Jr. Supervisor

Laying (8 Nos.)

Asst. Engineer

(4 Nos.)

Junior Engr.

(8 Nos)

Sr./Jr. Supervisor

(14 Nos.)

Surveyor

(7Nos.)

Surveyor

Laying (2No)

Surveyor (TS)

(1 No)

Senior Engr. Structure (2 Nos.)

Asst. Engineer

(4 Nos.)

Junior Engr.

(8Nos)

Sr./Jr. Supervisor

(16 Nos.)

Senoir Engr. EDP

(1 No)

Junior Eng. EDP

(1 No.)

Computer

Operator (2 No.)

Asst.

Accountant

Admin

Officer

Store

Officer

Store

Assistant (1 No)

Section

Inharge - IV

(Mr. Pramod Dhavan)

Senior Engr. Highway (2 No)

Laying Engr.

(2 No)

Sr./Jr. Supervisor

Laying (8 Nos.)

Asst. Engineer

(4 Nos.)

Junior Engr.

(7Nos)

Sr./Jr. Supervisor

(15 Nos.)

Surveyor

(8os.)

Surveyor

Laying (2 No)

Surveyor (TS)

(1 No)

Senior Engr. Structure (2 Nos.)

Asst. Engineer

(4 Nos.)

Junior Engr.

(8Nos)

Sr./Jr. Supervisor

(16 Nos.)

Senoir Engr. EDP

(1 No)

Junior Engr.

(1 Nos.)

Computer Operator

(2 Nos.)

Asst.

Accountant

Admin

Officer

Store

Officer

Store

Assistant (1 No)

Safety

Officer

Safety

Supervisor (2 Nos.)

EDP

PROJECT OFFICE

EDP

Incharge

Senior EDP

Engr. (3 Nos)

Junior EDP

Engr. (6 Nos.)

Computer

Operator (3 Nos.)

Store

Project Office

Store

Manager (2 Nos.)

Store Officer

Store

Asst. (2Nos.)

Mining

Department

Mining

Manager

Mining

Engr.

Mining

Officer (3 Nos.)

Computer

Operator (7 Nos.)

Supervisor

(47 Nos.)

Accountant

Accounts

Project Office

Account

Manager (2 Nos.)

Asst. Account

Manager

Accountant

(2 Nos.)

Account

Asst. (8 Nos.)

Expressway

NE-1

Senior

Engr. (2 Nos.)

Junior

Engr. (4 Nos.)

Sr./Jr. Supervisor

(16 Nos)

Safety

Supervisor (2 Nos.)

Surveyor

(2 nos.)

Surveyor (TS)

(1 Nos.)

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX - F

ORGANIZATION CHART (CONCESSIONAIRE)

PROJECT HEAD (SPV)

(Concessionaire)

(Mr. A.K.Joshi)

Liasoning Department

(Concessionaire)

(Mr. S.N.Kulkarni)

Liasoning Department

Chief Liasoning Manager

Liasoning

Manager (1Nos.)

Liasoning

Officer (2 Nos.)

Supervisor

(4 Nos.)

Liasoning

Manager (1 Nos.)

Liasoning

Officer (3 Nos.)

Supervisor

(6 Nos.)

PROJECT HEAD

(EPC)

(Mr. L.N.Surve)

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX - F(a)

Organisation Chart of Concessionaire's Quality Control Engineers

Project Manager

NH - 8 NE - 1

Bridge Engineer - 2 Nos

Highway Engineer - 2 Nos

Material Engineer - 2 Nos

Highway Engineer

- 1 no.

Material Engineer

- 1 no.

Lab Technician- 2 Nos.

Field Engineer (High) - 2 Nos.

Surveyor- 2 Nos.

Field Engineer (Str) - 1 No

Field Engineer- 5 Nos

Surveyor - 2 Nos

Field Engineer- 8 Nos

Surveyor- 2 Nos

Lab Technician - 4 Nos

Quantity Surveyor

Jr. Quantity Surveyor

- 2 Nos (NH - 8)

Jr. Quantity Surveyor

- 1 No (NE-1)

Office Clerk - 2 Nos

ADMIN

Peon - 2 Nos

1 of 1

MONTHLY PROGRESS REPORT - APRIL 2014

Manpower StatusAppendix-'G'

1 Chief General Manager (SPV) 1

2 Chief General Manager (EPC) 1

3 General Manager (EPC) 2

4 DGM or General Manager ( Section I) 1

5 DGM or General Manager ( Section II) 1

6 Safety Officer 0

6

1 Section In Charge (M3/M4) 4

2 DPM (Highway) (M3/M4) 2

3 DPM (Structure) (M3/M4) 2

4 Senior Engineer ( Highway) (E1) 7

5 Senior Engineer (Structure) (M4/E1) 8

6 Laying Engineer (E1/E2/E3) 9

7 EDP Engineer (E1/E2) 5

8 Assistant Engineer (Highway) (E2) 5

9 Assistant Engineer (Structure) (E2) 4

10 Junior Engineer (Highway) (E3/E4/GET/DET) 29

11 Junior Engineer (Structure) (E3/E4/GET/DET) 18

12 Junior Enginner (EDP) (E3/E4/GET/DET) 6

13 Surveyor ( TS) 5

14 Surveyor 22

15 Surveyor (Laying) 1

16 Senior/Junior Supervisor (Highway) (S1/S2) 57

17 Senior/Junior Supervisor (Structure) (S1/S2) 39

18 Senior/Junior Supervisor ( Laying) (S1/S2) 11

19 Safety Supervisor (S1/S2) 3

20 Asst .Accountant (O2/O3) 5

21 Admin Officer (O1/O2) 4

22 Computer Operator (O2/O3) 7

23 Store Officer (O1) 4

24 Store Assistant (O2/O3) 8

265

MANPOWER STATUS

Sr.No. Designation Availablity

Total

Total Staff Required For NH 8

Total

1 of 3

MONTHLY PROGRESS REPORT - APRIL 2014

Manpower StatusAppendix-'G'

Sr.No. Designation Availablity

1 Senior Engineer (M4/E2) 3

2 Junior Engineer (E3/E4/GET/DET) 4

3 Surveyor 3

4 Senior/Junior Supervisor (S1/S2) 8

5 Safety Supervisor 0

18

1 EDP Incharge (M3/M4) 0

2 Senior EDP Engineer (E1/E2) 2

3 Junior EDP Engineer (E3/E4/GET/DET) 3

4 Computer Operator 2

7

1 Store Manager 2

2 Store Officer 0

3 Store Assistant 2

4

1 Material Manager 3

2 Material Engineer 4

3 Asst. Material Engineer 5

4 Supervisor / Technician 47

59

1 Mining Manager 1

2 Mining Engineer 0

3 Officer 4

4 Computer Operator 31

5 Supervisor 4

6 Accountant 0

40

1 Account Manager 3

2 Accountant 2

3 Account Assistant 5

Total Staff Required For Project Office EDP

Total Staff Required For EXP. WAY

Total

Total

Total Staff Required For Project Office Store

Total

Total Staff Required For QA/QC

Total

Total Staff Required For Mining

Total

Total Staff Required For Project Office Account

2 of 3

MONTHLY PROGRESS REPORT - APRIL 2014

Manpower StatusAppendix-'G'

Sr.No. Designation Availablity

10

1 Chief Liasioning Manager 1

2 Liasioning Manager 1

3 Liasioning Officer 5

4 Supervisor/Assistant 9

16

425Total

Total

Total Staff Required For Liasioning

Total

3 of 3

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'H'

From To

1 04.04.2014 2058 5910/E/DD-13106 R2 98.600Analysis and Design of Two Cell BoxCulvert at 98+600 as per CA

CD Works

2 04.04.2014 2058 5910/E/DD-13107 R2 98.600Analysis and Design of Single Cell BoxCulvert at 98+650 as per CA

CD Works

3 04.04.2014 2058 5910/E/DD-14105 R4 98.600GAD for reconstruction of Pipelslab toBox Culvert at Ch. 98+600 (Sheet 1 of 2)

CD Works

4 04.04.2014 2058 5910/E/DD-14105A R3 98.600GAD for reconstruction of Pipelslab toBox Culvert at Ch. 98+600 (Sheet 2 of 2)

CD Works

5 04.04.2014 2058 5910/E/DD-14106 R4 98.600Reinforcement details for reconstruction of Slab/Pipe to Double Cell Box Culvert at Ch-98+600

CD Works

6 04.04.2014 2058 5910/E/DD-14113 R4 98.650GAD for reconstruction of Slab to BoxCulvert at Ch. 98+650 (Sheet 1 of 2)

CD Works

7 04.04.2014 2058 5910/E/DD-14113A R3 98.650GAD for reconstruction of Slab to BoxCulvert at Ch. 98+650 (Sheet 2 of 2)

CD Works

8 04.04.2014 2058 5910/E/DD-14114 R4 98.650Reinforcement details for reconstructionof Slab/Pipe to Single Cell Box Culvert atCh. 98+650

CD Works

9 11.04.2014 2097 5910/E/DD-11862 R0 108.860Details of Pile for Initial Load Test near Pier P1

Flyover

10 11.04.2014 2098 5910/E/DD-11276 R5 42.600 General Arrangement Drawing Flyover11 11.04.2014 2098 5910/E/DD-11326 R4 52.700 General Arrangement Drawing Flyover

12 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-LP-001

R0 36.396 Matar Junction Ch-Km.-36+396-Layout Plan RE Wall

13 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-IN-002

R0 36.396 Matar Junction Ch-Km.-36+396-Index RE Wall

14 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-DS-003

R0 36.396Matar Junction Ch-Km.-36+396-Design Section

RE Wall

15 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-DS-004

R0 36.396Matar Junction Ch-Km.-36+396-Design Section

RE Wall

16 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-005

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

17 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-006

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

18 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-007

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

19 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-008

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

20 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-009

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

21 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-010

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

22 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-011

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

23 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-012

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

24 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-013

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

25 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-014

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

26 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-015

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

27 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-016

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

28 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-017

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

29 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-018

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

30 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-019

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

31 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W1-020

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side RHS (W1)

RE Wall

32 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-021

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

33 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-022

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

34 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-023

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

35 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-024

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

36 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-025

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

37 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-026

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

Rev. No.

Chainage Drawing Title Type of Structure Remarks

Six laning of Ahmedabad – Vadodara Section of NH-8 from km. 6.400 to 108.700 (Length 102.300 km.) and Improvement of existing Ahmedabad – Vadodara Expressway from km. 93.302 in the state of Gujarat ( Length 93.302 km. ) under NHDP

Phase – V on Design Built Finance Operate Transfer (DBFOT)

DRAWING STATUSSr. No.

Letter Dated

Letter No.

Drawing No.

Drawing & Design Status Page 1 of 6

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'H'

From ToRev. No.

Chainage Drawing Title Type of Structure RemarksSr. No.

Letter Dated

Letter No.

Drawing No.

38 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-027

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

39 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-028

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

40 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-029

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

41 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-030

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

42 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-031

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

43 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-032

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

44 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-033

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

45 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-034

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

46 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-035

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

47 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W2-036

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Ahmedabad Side LHS (W2)

RE Wall

48 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-037

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

49 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-038

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

50 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-039

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

51 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-040

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

52 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-041

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

53 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-042

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

54 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-043

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

55 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-044

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

56 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-045

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

57 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-046

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

58 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-047

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

59 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-048

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

60 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-049

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

61 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-050

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

62 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-051

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

63 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-052

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

64 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W3-053

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side RHS (W3)

RE Wall

65 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-054

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

66 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-055

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

67 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-056

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

68 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-057

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

69 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-058

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

70 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-059

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

71 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-060

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

72 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-061

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

73 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-062

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

74 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-063

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

75 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-064

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

76 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-065

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

77 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-066

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

Drawing & Design Status Page 2 of 6

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'H'

From ToRev. No.

Chainage Drawing Title Type of Structure RemarksSr. No.

Letter Dated

Letter No.

Drawing No.

78 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-067

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

79 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-068

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

80 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-069

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

81 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-W4-070

R0 36.396Matar Junction Ch-Km.-36+396-Elevation Drawing Vadodara Side LHS (W4)

RE Wall

82 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-EP-071

R0 36.396Matar Junction Ch-Km.-36+396-Excavation Plan

RE Wall

83 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-EP-072

R0 36.396Matar Junction Ch-Km.-36+396-Excavation Plan

RE Wall

84 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-EP-073

R0 36.396Matar Junction Ch-Km.-36+396-Excavation Plan

RE Wall

85 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-EP-074

R0 36.396Matar Junction Ch-Km.-36+396-Excavation Plan

RE Wall

86 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-EP-075

R0 36.396Matar Junction Ch-Km.-36+396-Excavation Plan

RE Wall

87 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-EP-076

R0 36.396Matar Junction Ch-Km.-36+396-Excavation Plan

RE Wall

88 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-EP-077

R0 36.396Matar Junction Ch-Km.-36+396-Excavation Plan

RE Wall

89 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-EP-078

R0 36.396Matar Junction Ch-Km.-36+396-Excavation Plan

RE Wall

90 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-EP-079

R0 36.396Matar Junction Ch-Km.-36+396-Excavation Plan

RE Wall

91 11.04.2014 2099SGI-031-SB-AVBOT-CH-36+396-R0-SR-080

R0 36.396Matar Junction Ch-Km.-36+396-Soil Replacement

RE Wall

92 11.04.2014 2100 5910/E/DN-12010 R0 7.800Design of 7.0m X 3.5m Box Pedestrian Underpass with 2.0m Cushion

Additional Underpass

93 11.04.2014 2100 5910/E/DD-12005 R5 7.800General Notes for CD Structures, Underpass, Retaining Walls & Road Side Drain

PUP

94 11.04.2014 2100 5910/E/DD-12182 R0 7.800General Arrangement of Pedestrian Underpass at Ch.7+580 (Sheet 1 of 2)

PUP

95 11.04.2014 2100 5910/E/DD-12183 R0 7.800General Arrangement of Pedestrian Underpass at Ch.7+580 (Sheet 2 of 2)

PUP

96 11.04.2014 2100 5910/E/DD-12184 R0 7.800Reinforcement Details of Pedestrian Underpass at Ch.7+580

PUP

97 15.04.2014 2125 5910/E/DD-3543 R3 43.000 44.000 Plan & Profile NH-8 PPD (NH-8)

98 19.04.2014 2139 5910/E/DN-012 R1 6.400 108.700 Rigid Pavement Design for Toll Plaza Location Toll Plaza

99 19.04.2014 2139 5910/E/DD-5022 R1 6.400 108.700 Details of Joint for Pavement Toll Plaza

100 18.04.2014 2135 5910/E/DN-11751 R0 108.860Longitudinal analysis and design of 10.02m RCC Span P2-A2

Flyover

101 18.04.2014 2135 5910/E/DN-11752 R0 108.860Transverse Analysis and Design of Deck Slab and Diaphragms of 10.02m Span P2-A2

Flyover

102 18.04.2014 2135 5910/E/DN-11753 R0 108.860Analysis and design of single cell box structure for abutment at A2

Flyover

103 18.04.2014 2135 5910/E/DN-11755 R0 108.860Longitudinal analysis and design of PSC Girder G1, G2, G3 & G4 of Span A1-P1 & P1-P2

Flyover

104 18.04.2014 2135 5910/E/DD-11858 R0 108.860Concrete Dimension of Hollow Box Type Abutment at A2

Flyover

105 18.04.2014 2135 5910/E/DD-11859 R0 108.860Reinforcement details of Hollow Box Type Abutment at A2

Flyover

106 18.04.2014 2135 5910/E/DD-11860 R0 108.860Concrete Dimension of 10.02m Span RCC Superstructure (Span P2-A2)

Flyover

107 18.04.2014 2135 5910/E/DD-11861 R0 108.860Reinforcement details of 10.02m Span RCC Superstructure (Span P2-A2)

Flyover

108 18.04.2014 2135 5910/E/DD-11863 R0 108.860Concrete Dimension of PSC Superstructure for Span A1-P1

Flyover

109 18.04.2014 2135 5910/E/DD-11864 R0 108.860Concrete Dimension of PSC Superstructure for Span P1-P2

Flyover

110 18.04.2014 2135 5910/E/DD-11865 R0 108.860Cable Layout for Girder G1, G2, G3 & G4 for Span A1-P1 & P1-P2

Flyover

111 18.04.2014 2135 5910/E/DD-11866 R0 108.860Reinforcement Details of Girder G1, G2, G3 & G4 for Span A1-P1 & P1-P2

Flyover

112 18.04.2014 2136 5910/E/DN-14006 R0 6.400 108.700RCC design of 2m wide strom water open drains

RCC Drain

113 18.04.2014 2136 5910/E/DD-13113 R0 6.400 108.700 Details of RCC Open Drains (Sheet 1 of 2) RCC Drain114 18.04.2014 2136 5910/E/DD-13114 R0 6.400 108.700 Details of RCC Open Drains (Sheet 2 of 2) RCC Drain

115 21.04.2014 2146 5910/E/DN-11756 R0 108.860Transverse Analysis and Design of Deck Slab and Diaphragms of Span A1-P1 and P1-P2

Flyover

116 21.04.2014 2146 5910/E/DD-11867 R0 108.860Details of Deck Slab & Diaphragms for Span A1-P1 & P1-P2

Flyover

117 21.04.2014 2143 5910/E/DD-5501 R4 44.000 Details of Toll Plaza Toll Plaza118 21.04.2014 2143 5910/E/DD-5502 R13 91.786 Details of Toll Plaza Toll Plaza119 21.04.2014 2143 5910/E/DD-5514 R1 44.000 Land Acquisition Plan of Toll Plaza Toll Plaza

Drawing & Design Status Page 3 of 6

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'H'

From ToRev. No.

Chainage Drawing Title Type of Structure RemarksSr. No.

Letter Dated

Letter No.

Drawing No.

120 21.04.2014 2143 5910/E/DD-5515 R1 91.786 Land Acquisition Plan of Toll Plaza Toll Plaza

121 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-1 R1 109.533 Key Plan Flyover

122 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-1 R1 109.533 Design Section Flyover

123 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-1 R1 109.533 Design Section Flyover

124 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-1 R1 109.533 Design Section Flyover

125 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-1 R1 109.533 Design Section Flyover

126 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-1

Flyover

127 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-2

Flyover

128 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-3

Flyover

129 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-4

Flyover

130 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-5

Flyover

131 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-6

Flyover

132 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-7

Flyover

133 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-8

Flyover

134 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-9

Flyover

135 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-10

Flyover

136 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-11

Flyover

137 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-12

Flyover

138 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-13

Flyover

139 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-14

Flyover

140 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-15

Flyover

141 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-16

Flyover

142 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-17

Flyover

143 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-18

Flyover

144 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-19

Flyover

145 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-20

Flyover

146 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W1) Page-21

Flyover

147 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-22

Flyover

148 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-23

Flyover

149 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-24

Flyover

150 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-25

Flyover

151 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-26

Flyover

152 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-27

Flyover

153 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-28

Flyover

154 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-29

Flyover

155 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-30

Flyover

156 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-31

Flyover

157 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-32

Flyover

158 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-33

Flyover

159 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-34

Flyover

160 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-35

Flyover

Drawing & Design Status Page 4 of 6

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'H'

From ToRev. No.

Chainage Drawing Title Type of Structure RemarksSr. No.

Letter Dated

Letter No.

Drawing No.

161 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-36

Flyover

162 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-37

Flyover

163 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-2 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W2) Page-38

Flyover

164 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-01

Flyover

165 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-02

Flyover

166 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-03

Flyover

167 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-04

Flyover

168 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-05

Flyover

169 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-06

Flyover

170 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-07

Flyover

171 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-08

Flyover

172 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-09

Flyover

173 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-10

Flyover

174 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-11

Flyover

175 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-12

Flyover

176 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-13

Flyover

177 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-14

Flyover

178 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-15

Flyover

179 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-16

Flyover

180 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-17

Flyover

181 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side RHS (W3) Page-18

Flyover

182 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-19

Flyover

183 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-20

Flyover

184 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-21

Flyover

185 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-22

Flyover

186 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-23

Flyover

187 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-24

Flyover

188 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-25

Flyover

189 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-26

Flyover

190 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-27

Flyover

191 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-28

Flyover

192 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-29

Flyover

193 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-30

Flyover

194 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-31

Flyover

195 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-32

Flyover

196 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-33

Flyover

197 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-34

Flyover

198 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-3 R1 109.533Vadodara Fly at Ch-109+533.086 Ahmedabad Side LHS (W4) Page-35

Flyover

199 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-4 R1 109.533 Excavation & Offset Plan Page-01 Flyover

200 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-4 R1 109.533 Excavation & Offset Plan Page-02 Flyover

Drawing & Design Status Page 5 of 6

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'H'

From ToRev. No.

Chainage Drawing Title Type of Structure RemarksSr. No.

Letter Dated

Letter No.

Drawing No.

201 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-4 R1 109.533 Excavation & Offset Plan Page-03 Flyover

202 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-4 R1 109.533 Excavation & Offset Plan Page-04 Flyover

203 22.04.2014 2148 2014/MH/39/FLY/GB/DWG-4 R1 109.533 Excavation & Offset Plan Page-05 Flyover

204 22.04.2014 2149 5910/E/DN-12008 R0 6.400 108.700Design of 10.0m x 3.5m - Box Pedestrian Underpass

CD Works

205 22.04.2014 2149 5910/E/DD-12179 R0 6.400 108.700Typical General arrangement of Box Unbderpass (10.0m x 3.5m) - Sheet 1 of 2

CD Works

206 22.04.2014 2149 5910/E/DD-12180 R0 6.400 108.700Typical General arrangement of Box Unbderpass (10.0m x 3.5m) - Sheet 2 of 2

CD Works

207 22.04.2014 2149 5910/E/DD-12181 R0 6.400 108.700Reinforcement Details of Box Underpass (10.0m x 3.5m)

CD Works

208 23.04.2014 2155 5910/E/DN-11754 R0 108.860Analysis and design of single cell box structure for abutment at A1 location

Flyover

209 23.04.2014 2155 5910/E/DD-11871 R0 108.860Concrete Dimensions of hollow box type abutment at A1 Location

Flyover

210 23.04.2014 2155 5910/E/DD-11872 R0 108.860Reinforcement details of hollow box type abutment at A1 Location

Flyover

Drawing & Design Status Page 6 of 6

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

1 Inward 28.03.2014 01.04.2014 AA/AMBD-VDDR/DRH/1240 1240Aarvee

AssociatesNHAI 1788

Representation of Boriavi Nagar Palika received from NHAl for the construction of PUP of size 7.0 m x 4.50 m at Km 69+290 instead of PUP at Krn 69+111

COS-II

2 Inward 29.03.2014 01.04.2014 AA/AMBD-VDDR/Q&M/1241 1241Aarvee

AssociatesIRB 1789

TIKITAR DONOSA (INDIA) Pvt. Ltd. as one of the source of water proofing membrane (Asphaltoseal).

LAB

3 Inward 29.03.2014 01.04.2014 AA/AMBD-VDDR/DRH/1242 1242Aarvee

AssociatesIRB 1790

Revised Proposal for CD Structure at Km 99+710 and Km 99+760.

CD WORK

4 Inward 29.03.2014 01.04.2014 AA/AMBD-VDDR/DRH/1243 1243Aarvee

AssociatesIRB 1792

River Training work Dharwa - Khari River at 12.4 km. on Expressway-NE.1

Expressway

5 Inward 29.03.2014 01.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20454

20454 NHAI IRB 1794

Various letter no.1140 to 1151 dated 28.03.2014 forwarded from competenet Authority for Land Acquisition, kheda as received in this office on 22.03.2014

LA

6 Inward 29.03.2014 01.04.2014 AA/AMBD-VDDR/MIR/1244 1244Aarvee

AssociatesIRB 1795 Review of Monthly status report of the Concessionaire MSR

7 Inward 29.03.2014 01.04.2014 AA/AMBD-VDDR/MPR/1245 1245Aarvee

AssociatesIRB 1796 Review of Monthly Progress Report of the Concessionaire MPR

8 Inward 31.03.2014 01.04.2014 AA/AMBD-VDDR/DRH/1246 1246Aarvee

AssociatesIRB 1797 Details of L-Type Kerb ON NH-8 KERB

9 Inward 31.03.2014 01.04.2014 AA/AMBD-VDDR/HTMS/1247 1247Aarvee

AssociatesIRB 1798

Validation of Toll Rates on Ahmedabad Vadodara Expressway w.e.f 01.04.2014

Toll Rate

10 Outward 01.04.2014 IRB/AVSETPL/2056/2014 2056 IRBCGM (CMS), NHAI,

New Delhi

Land Acquisition in Kheda District for missing/Major are difference of Survey/Block No. through mutual-consent-private negotiation- reg

LA

11 Inward 01.04.2014 01.04.2014 AA/AMBD-VDDR/DRH/1249 1249Aarvee

AssociatesIRB 1799

Land Acquisition Plan for Toll Plaza at Km 44+000 and Km 91+770 on NH-8 Section of the Project Highway.

Toll Plaza

12 Inward 26.03.2014 01.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2040720407 NHAI

Mr. Mahesh Kore, Hindustan Coca Cola

Pvt. Ltd.1800

Permission for laying 250mm dia Ductile iron raw water supply pipe line from Foiwala Tank to Goblej Tank for Hindustan Coca-Cola Plant, Goblej

Access Permission

13 Inward 27.03.2014 01.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2040920409 NHAI IRB 1801 ROB at Km. 65.545, 75.425 & 106.475 ROB

14 Inward 27.03.2014 01.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20410

20410 NHAI Aarvee Associates 1802 Design Review

15 Inward 27.03.2014 01.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20415

20415 NHAI Aarvee Associates 1803 Application for deferment of premium

16 Inward 27.03.2014 01.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20416

20416 NHAI Aarvee Associates 1804 Representation received from villagers of Kanera COS-III

Six laning of Ahmedabad – Vadodara Section of NH-8 from km. 6.400 to 108.700 (Length 102.300 km.) and Improvement of existing Ahmedabad – Vadodara Expressway from km. 0.000 km. 93.302 in the state of Gujarat

( Length 93.302 km. ) under NHDP Phase – V on Design Built Finance Operate Transfer (DBFOT)

CORRESPONDANCE WITH IE & NHAI

Correspondance with IE & NHAI Page 1 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

17 Inward 27.03.2014 01.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20417

20417 NHAI Aarvee Associates 1805 Expenditure on civil works Civil Work

18 Inward 27.03.2014 01.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20420

20420 NHAI Aarvee Associates 1806Request to release of Bank Guarantee towards performance security in pursuant to Clause no. 9.3 of Article 9 of CA

BG

19 Inward 26.03.2014 01.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20424

20424 NHAI Aarvee Associates 1807Authorization letter for conducting proof of concept for the logistics data bank project at the Toll Collection Booth

Toll Plaza

20 Inward 27.03.2014 01.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20426

20426 NHAI Aarvee Associates 1808Delay in construction of project highway due to non availability of land, hindrances on account of encroachment.

Encroachment

21 Inward 27.03.2014 02.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20425

20425 NHAI IRB 1810Secretary ministry of road transport and highway, GOI Shri Vijay Chhibber's DO letter 23.05.13

22 Inward 01.04.2014 02.04.2014 AA/AMBD-VDDR/DRH/1251 1251Aarvee

AssociatesIRB 1811

Tentative cost estimates and COS proposal modification for Design for Flyover at Km 7+380.

COS-III

23 Inward 01.04.2014 02.04.2014 AA/AMBD-VDDR/DRH/1252 1252Aarvee

AssociatesIRB 1812

Plan and Profile drawings from Km 6.400 to Km 108.500 for NH-8.

PLAN & PROFILE NH-8

24 Inward 01.04.2014 02.04.2014 AA/AMBD-VDDR/DRH/1253 1253Aarvee

AssociatesIRB 1813

Cost estimate for shifting of 450mm dia cast iron water pipe line from Sakharha village at Km 96.200 to Village Dashrath village at Km 105.600.

COS-III

25 Inward 01.04.2014 02.04.2014 AA/AMBD-VDDR/DRH/1254 1254Aarvee

AssociatesNHAI 1814 Concessions to Local and Frequent Users.

26 Inward 02.04.2014 02.04.2014 NHAI/13013/CO/2014-15 13013 NHAI All RO & PDs, NHAI 1815Approval for rivision of rates w.e.f. 01.04.2013 conevyed by CO division

27 Inward 28.03.2014 02.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2042920429 NHAI Aarvee Associates 1817 Representation received from villagers of Narol COS-III

28 Inward 29.03.2014 02.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20437

20437 NHAI Aarvee Associates 1818Estimate for providing fixing reparing of damaged ROW chain link fencing at NE-1

Expressway

29 Inward 29.03.2014 02.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2043920439 NHAI CGM RO, Gandhinagar 1819

Representation of Boriavi Nagar Palika for construction of PUP of size 7.0m X 4.5m at Ch. 69+290 Km. instead of PUP at Ch. 69+111 Km.

COS-II

30 Inward 29.03.2014 02.04.2014NHAI/PIU-

Ahmedabad/11012/2/14/NH-8/6-laning/20440

20440 NHAIShri S.Jaswant Kumar,

IE1820 Complaint of Shri Ashok Surve Complaint

31 Inward 29.03.2014 02.04.2014NHAI/PIU-

Ahmedabad/11012/2/14/NH-8/6-laning/20444

20444 NHAI IRB 1821Not providing revised estimate as per joint survey by IRB and MGVCL

Utility Shifting

32 Inward 02.04.2014 02.04.2014 AA/AMBD-VDDR/DRH/1255 1255Aarvee

AssociatesNHAI 1822

Representation received from the Mogar Gram panchayat and VIP reference of Hon’ble MLA, Anklav, Shri Amit Chavda.

COS-III

33 Inward 02.04.2014 03.04.2014 AA/AMBD-VDDR/DRH/1256 1256Aarvee

AssociatesNHAI 1823 Representation received from the Villagers of Kanera COS-III

34 Inward 03.04.2014 03.04.2014 AA/HW/NHAI/1308/14-15/10 10Aarvee

AssociatesNHAI 1824 Release of performance Security

Correspondance with IE & NHAI Page 2 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

35 Inward 20.03.2014 03.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20384

20384 NHAIDeputy Head Project Construction, Aarvee

Associates1824 A

Grievance of Shri Manish Shah regarding diversion of Expressway

Expressway

36 Inward 24.03.2014 03.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2039120391 NHAI IRB 1825 Accident Report Accident Report

37 Inward 03.04.2014 03.04.2014 AA/AMBD-VDDR/DRH/1257 1257Aarvee

AssociatesNHAI 1826

Representation received from Bhumel Gram Panchayat, Bhumel

COS-III

38 Inward 29.03.2014 03.04.2014NHAI/PIU-Ahmedabad/IE-

Aarvee/2043020430 NHAI IRB 1827

Reimbursement of 50% of passed payment against Invoice no. 21 for the month of February 2014 (Indian Currency)

CA

39 Inward 29.03.2014 03.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

Laning/2044920449 NHAI

Executive Engineer, Petlad Irrigation Division, Petlad

1828Relocation of existing Piplag Sub Minor due to widening of Minor Bridge on Cambay Branch Canal at Ch. 59+364 (RHS)

CANAL SYPHONS

40 Inward 29.03.2014 03.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

Laning/2045120451 NHAI

Sr. Manager Ops. I/c, Bharat Petroleum Cor.

Ltd. Kheda1829

Land Acquisition of Portion of Land bearing Survey nos. 284 to 304 for widening

LA

41 Inward 29.03.2014 03.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-Laning/20456

20456 NHAI Aarvee Associates 1830Opinion for NA permission for survey - block no. 873 Paiki, 874+868+869 (Total 11841 sq. mt.) of Village Kanjari, Taluka Nadiad, District Kheda

Access Permission

42 Inward 01.04.2014 03.04.2014NHAI/PIU-

Ahmedabad/Railway/2047020470 NHAI IRB 1831

Payment for Maintenance charges for level crossing no. 10B on NH-8

ROB

43 Inward 28.03.2014 03.04.2014NHAI/12011/1/2010-RO-

GNR/Tech./AHD/Vol.15/45194519 NHAI

A.K. Sharma, GM (T) NHAI, HQ New Delhi

1832Approval of shifting-raising of HT lines on Ahmedabad Vadodara section of NH-8

Utility Shifting

44 Inward 03.04.2014 04.04.2014 AA/AMBD-VDDR/DRH/1258 1258Aarvee

AssociatesNHAI 1833

Representation received from the Kanjari Nagar Seva Sadan & Patel Babubhai Ambalal,Kanjari village, Nadiad, Dist. Kheda

COS-III

45 Inward 03.04.2014 04.04.2014 AA/AMBD-VDDR/DRH/1259 1259Aarvee

AssociatesNHAI 1834

Incorporate the planning of Grade Separator appropriate structure to cater the future growth of traffic at Vasad Junction.

46 Inward 31.03.2014 04.04.2014NHAI/12011/1/2010-RO-

GNR/Tech./AHD/Vol.13/45394539 NHAI

A.K. Sharma, GM (T) NHAI, HQ New Delhi

1835Approval of shifting-raising of HT lines on Ahmedabad Vadodara section of NH-8

Utility Shifting

47 Inward 01.04.2014 04.04.2014NHAI/PIU-

Ahmedabad/11011/3/13/NH-8/6-Laning/20480

20480 NHAI IRB 1836Construction of ROB in lieu of LC 10 C between Nadiad-Pij Station.

ROB

48 Outward 04.04.2014 IRB/AVSETPL/2058/2014 2058 IRB Aarvee AssociatesRevised Proposal for CD Structure at Km. 99+710 and Km. 99+760

CD WORK

49 Outward 04.04.2014 IRB/AVSETPL/2059/2014 2059 IRBCGM (CMS), NHAI,

New DelhiSecretary Ministry of Road Transport and Highways, GOI, Shri Vijay Chhibber’s DO Letter, dated 23.05.2013 - reg

50 Outward 04.04.2014 IRB/AVSETPL/2060/2014 2060 IRB Aarvee AssociatesTraffic Diversion Plan for Construction of Minor Bridge at Ch.89+362 (LHS) on NH-8

Traffic Management

Plan NH-8

51 Outward 04.04.2014 IRB/AVSETPL/2061/2014 2061 IRB Aarvee AssociatesSubmission of Mix Design for concrete using Sidhee Cement, Admixture of BASF India Ltd. and Fine aggregate of Sabarmati River

LAB

Correspondance with IE & NHAI Page 3 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

52 Outward 04.04.2014 IRB/AVSETPL/2062/2014 2062 IRBCGM (CMS), NHAI,

New DelhiConcessionaire shall make reasonable effort to facilitate the Acquisition of Land -reg

LA

53 Outward 04.04.2014 IRB/AVSETPL/2063/2014 2063 IRB Aarvee AssociatesTesting of POT-PTFE Bearing at Dynamic Prestress (I) Pvt. Ltd. Nasik

LAB

54 Inward 05.04.2014 05.04.2014 AA/AMBD-VDDR/Q&M/1260 1260Aarvee

AssociatesIRB 1837

Testing of POT-PTFE Bearing at Dynamic Prestress (I) Pvt. Ltd, Nasik

LAB

55 Inward 05.04.2014 05.04.2014 AA/AMBD-VDDR/DRH/1261 1261Aarvee

AssociatesNHAI 1838

R.A.Bill No. 1 for Electrical Pole Shifting –Anand (South), Kheda ( R ) and Nadiad( R) Sub Divisions of MGVCL

Utility Shifting

56 Inward 05.04.2014 05.04.2014 AA/AMBD-VDDR/DRH/1262 1262Aarvee

AssociatesIRB 1839

Pavement Design Report – Requirement of traffic surveys on project highway and Revised Pavement Design Report

LAB

57 Inward 03.04.2014 05.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-Laning/20523

20523 NHAI Aarvee Associates 1840Revision of User Fee Rates w.e.f. 01.04.2014 (04.04.2014)

Toll Rate

58 Outward 05.04.2014 IRB/AVSETPL/2065/2014 2065 IRBCGM (CMS), NHAI,

New DelhiShifting of existing Temple within ROW along NH-8 of Project Highway

Temple

59 Outward 05.04.2014 IRB/AVSETPL/2066/2014 2066 IRBCGM (CMS), NHAI,

New DelhiSubmission of photocopy of Complaint Register Complaint

60 Outward 05.04.2014 IRB/AVSETPL/2067/2014 2067 IRBCGM (CMS), NHAI,

New DelhiDetails of Land Acquisition for Survey No.347-1 LA

61 Outward 05.04.2014 IRB/AVSETPL/2068/2014 2068 IRB Aarvee Associates Review of Monthly Progress Report of the Concessionaire MPR

62 Outward 05.04.2014 IRB/AVSETPL/2069/2014 2069 IRB Aarvee AssociatesComplaint regarding Underpass Bridge on NH-8 village -Gutal (Uttarsanda), Taluka Nadiad and District Kheda

Complaint

63 Outward 05.04.2014 IRB/AVSETPL/2070/2014 2070 IRB Aarvee Associates Representation received from Nirant Vividh Seva Trust COS-III

64 Outward 05.04.2014 IRB/AVSETPL/2071/2014 2071 IRB Aarvee AssociatesTruck Lay Bays and Bus Bays location identification along NH-8 of Project Highway

Truck lay

65 Outward 05.04.2014 IRB/AVSETPL/2072/2014 2072 IRB Aarvee Associates Black Spot on Ahmedabad Vadodara section of NH-8 Black Spot

66 Outward 05.04.2014 IRB/AVSETPL/2073/2014 2073 IRBCGM (CMS), NHAI,

New Delhi

Land Acquisition in Vadodara District for missing Survey Block No. Major area differences on mutual - consent-private negotiation -reg

LA

67 Inward 01.04.2014 07.04.2014NHAI/PIU-

Ahmedabad/Permission/ 20473

20473 NHAIDivisional Engineer, Telecom Project-IV

1841Permission for laying Optical Fibre Cable along NE1 from Vadodara (Express Highway limit to Nadiad (Express Highway Limit)

Access Permission

68 Inward 01.04.2014 07.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-Laning/20479

20479 NHAI Aarvee Associates 1842Representation received from Sarpanch, Jetalpur Grampanchayat

COS-III

69 Inward 01.04.2014 07.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-Laning/20482

20482 NHAIShri S.Jaswant Kumar,

IE1843 Complaint of Shri. Vijay Joshi Complaint

70 Inward 01.04.2014 07.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-Laning/20483

20483 NHAI Aarvee Associates 1844 Represntation received from villagers of Aslali COS-III

71 Inward 01.04.2014 07.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

Laning/2048420484 NHAI IRB 1845

Payment for maintenance charges for level crossing no. 10-B on NH-8

ROB

Correspondance with IE & NHAI Page 4 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

72 Inward 01.04.2014 07.04.2014NHAI/PIU-Ahmedabad/Land

acquisition/Anand/2049520495 NHAI Collector office Anand 1846

Objection letter for land acquisition at village Gamdi District -Anand-

LA

73 Inward 01.04.2014 07.04.2014NHAI/PIU-Ahmedabad/Land

acquisition/Kheda/2049620496 NHAI Collector office Kheda 1847

Objection letter received for Land Acquisition in Kheda District

LA

74 Inward 03.04.2014 07.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-Laning/20507

20507 NHAI Aarvee Associates 1848Removal of illegal parking at relaince petrol pump at ch. 23.200 LHS

Expressway

75 Inward 03.04.2014 07.04.2014NHAI/PIU-

Ahmedabad/11011/3/14/NH-8/6-Laning/20508

20508 NHAI IRB 1849Regarding plantation and its maintenance alongside NH free of cost

Maintenance

76 Inward 03.04.2014 07.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-Laning/20509

20509 NHAI Aarvee Associates 1850Construction of proposed flyover at Narol Junction at Ch. 6+400 of NH-8

Flyover

77 Inward 03.04.2014 07.04.2014NHAI/PIU-Ahmedabad/NH-

8/2051520515 NHAI

CGM (T) & RO, Gandhinagar

1851Representation of Boriavi Nagar Palika for construction of PUP of size 7.0m X 4.5m at Ch. 69+290 Km. instead of PUP at Ch. 69+111 Km.

COS-II

78 Outward 07.04.2014 IRB/AVSETPL/2075/2014 2075 IRB Aarvee AssociatesPermission for laying Optical Fibre Cable (4G Project) along Ahmedabad Vadodara Section of NH-8.

Access Permission

79 Outward 07.04.2014 IRB/AVSETPL/2076/2014 2076 IRBCGM (CMS), NHAI,

New DelhiRepresentation received from Sarpanch, Vansar Village. COS-III

80 Outward 07.04.2014 IRB/AVSETPL/2077/2014 2077 IRBCGM (CMS), NHAI,

New Delhi

Proposal for Modification in Design - Cross section between Km. 95+000 to 109+000 in view of a number of pipeline laying within the ROW of the project

COS-I

81 Outward 07.04.2014 IRB/AVSETPL/2078/2014 2078 IRBCGM (CMS), NHAI,

New Delhi

Damage to ROW fencing of NHAI property at Ch-0+000 Km. to Ch 0.400 km on Ahmedabad-Vadodara Expressway (NE-1) section of project Highway-reg..

Expressway

82 Outward 07.04.2014 IRB/AVSETPL/2079/2014 2079 IRBCGM (CMS), NHAI,

New DelhiGrievance of Shri Manish Shah regarding diversion of Expressway.

Expressway

83 Outward 07.04.2014 IRB/AVSETPL/2080/2014 2080 IRBCGM (CMS), NHAI,

New Delhi

Authorization letter for conducting proof of concept for the logistics data bank project at the Toll Collection Booth-reg..

Toll Rate

84 Outward 07.04.2014 IRB/AVSETPL/2081/2014 2081 IRB Aarvee Associates Monthly Inspection Report February 2014. MIR

85 Outward 07.04.2014 IRB/AVSETPL/2082/2014 2082 IRBCGM (CMS), NHAI,

New DelhiMogar Gram Panchayat regarding disposal of rain water from the village.

COS-III

86 Outward 07.04.2014 IRB/AVSETPL/2083/2014 2083 IRBCGM (CMS), NHAI,

New DelhiSubmission of Quarterly Summary of FIR recorded and Accident Report.

FIR

87 Outward 07.04.2014 IRB/AVSETPL/2084/2014 2084 IRBCGM (CMS), NHAI,

New DelhiVideo recording of 5th Quarter (January - 2014 to March -2014).

Video recording

88 Outward 07.04.2014 IRB/AVSETPL/2085/2014 2085 IRBCGM (CMS), NHAI,

New DelhiRepresentation received from Sarpanch Dabhan Gram Panchayat, Nadiad.

COS-III

89 Outward 07.04.2014 IRB/AVSETPL/2086/2014 2086 IRB Aarvee Associates Monthly Progress Report March- 2014. MPR

90 Inward 03.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-Laning/20512

20512 NHAI Aarvee Associates 1852Proposal for Grant of permission for laying Optical Fibre Cable (4G Project) along AV Expressway

Access Permission

Correspondance with IE & NHAI Page 5 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

91 Inward 03.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-Laning/20513

20513 NHAI Aarvee Associates 1853Proposal for Grant of permission for laying Optical Fibre Cable (4G Project) along AV section of NH-8

Access Permission

92 Inward 03.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-Laning/20518

20518 NHAI Aarvee Associates 1854Permission for laying 250mm dia. Ductile Iron Raw Water Supply Pipeline from Foiwala Tank to Goblej Tank for Hindustan Coca-Cola Plant, Goblej..........

Access Permission

93 Inward 04.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-Laning/20529

20529 NHAI Aarvee Associates 1855Tentative cost implication for addition-modification of various structures, service roads as per site requriement -public demand - VIP references

COS-III

94 Inward 04.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-Laning/20530

20530 NHAI Aarvee Associates 1856 Accident report on AV Expressway (NE1) Accident Report

95 Inward 04.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-Laning/20531

20531 NHAI Aarvee Associates 1857Request to Archeological department for issuing NOC for removal of fort wall located at village Jetalpur Dascroi Ahmedabad on Ch 15+800 to 16+000

NOC

96 Inward 04.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-Laning/20532

20532 NHAI Aarvee Associates 1858 Representation received from Kanjari Nagar Seva Sadan COS-III

97 Inward 04.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-Laning/20535

20535 NHAI Aarvee Associates 1859Location survey within Ahmedabad City for CSITMS project

98 Inward 04.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/11020/2/13/NH-8/6-Laning/20536

20536 NHAI

Dy.Eng.(Const), Construction Sub

division office Narol, GETCO

1860permission for laying unerground 66 KV XLPE cable along NH-8 between Narol Circle to Aslali Circle

Utility Shifting

99 Inward 04.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/11011/3/14/NH-8/6-Laning/20538

20538 NHAI IRB 18613(D) Gazzette notification no. 907 (E) of Villages Padmala, Sankarda and Ranoli of District Vadodara

LA

100 Inward 04.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/11011/3/14/NH-8/6-Laning/20539

20539 NHAI IRB 1862Land acquisition in kheda for missing major area differnace of survey through mutual consent private negotiation

LA

101 Inward 03.04.2014 08.04.2014NHAI/PIU-Ahmedabad/6-

Laning/ROB/2054620546 NHAI

CGM (T) & RO, Gandhinagar

1863 Construction of ROBs at km. 65.54, 75.425, 106.475 ROB

102 Inward 04.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-/6-Laning/20552

20552 NHAI Aarvee Associates 1864Representation received from sarpanch sankarda Grampanchyat

COS-III

103 Inward 05.04.2014 08.04.2014NHAI/Labour/PIU-Ahmedabad/20553

20553 NHAI IRB 1865Letter of Deputy Chief Labour Commissioner (C) Ahmedabad

Liasoning

104 Inward 05.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/Labour/2055420554 NHAI

Shri P.K.Nayak, Dy.Chief Labour

Commissioner (C ), Dy. Chief Labour

Commissioner(Central

1866Cancellation of registration certificate-withdrawal of Form-V issued to Concessaionaire

Liasoning

105 Inward 05.04.2014 08.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-Laning/20561

20561 NHAI Aarvee Associates 1867Compensation for land acqusition in survey no. 11-2 paiki, 1+36 Paiki-1, Applicant Shri Ranvirsinh Sursinh Solanki

LA

Correspondance with IE & NHAI Page 6 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

106 Outward 09.04.2014 IRB/AVSETPL/2087/2014 2087 IRBCGM (CMS), NHAI,

New Delhi

Land Acquisition in Anand District for missing Survey Block No. Major area differences on mutual - consent-private negotiation

LA

107 Outward 09.04.2014 IRB/AVSETPL/2088/2014 2088 IRB Aarvee Associates

Diversion of 329.46 Ha protected forest land for widening of NH-8 from Ahmedabad to vadodara from Km. 6+400 to 108+700 in Ahmedabad (Kheda, Anand & Vadodara) district of Gujarat, Permission for cutting of Trees directly by user Department estimated cost for tree cutting-reg

LA (Forest)

108 Outward 09.04.2014 IRB/AVSETPL/2089/2014 2089 IRB Aarvee AssociatesProposal of use of Evotherm, Warm Mix Asphalt Technology for project.

LAB

109 Inward 07.04.2014 09.04.2014 AA/AMBD-VDDR/Q&M/1264 1264Aarvee

AssociatesIRB 1868

Source of Earth to be obtained from Borrow Areas for use in Embankment-Sub grade-Median Filling.

LAB

110 Inward 07.04.2014 09.04.2014 AA/AMBD-VDDR/Q&M/1265 1265Aarvee

AssociatesIRB 1869

Source of Earth to be obtained from Borrow Areas for use in Embankment.

LAB

111 Inward 07.04.2014 09.04.2014 AA/AMBD-VDDR/Q&M/1266 1266Aarvee

AssociatesIRB 1870

Source of Earth to be obtained from Borrow Areas for use in Embankment-Subgrade-Median filling.

LAB

112 Inward 07.04.2014 09.04.2014 AA/AMBD-VDDR/Q&M/1267 1267Aarvee

AssociatesIRB 1871

Testing of POT-PTFE Bearing at Tefcon Bearings Pvt. Ltd. Pune.

LAB

113 Inward 09.04.2014 09.04.2014 AA/AMBD-VDDR/Q&M/1268 1268Aarvee

AssociatesIRB 1872

Submission of Mix Design for Concrete using Sidhee Cement, Admixture of BASF India Pvt. Ltd. and Fine aggregate of Sabarmati River.

LAB

114 Inward 09.04.2014 09.04.2014 AA/AMBD-VDDR/Q&M/1269 1269Aarvee

AssociatesIRB 1873

Manufacturer Test Certificate of Expansion Joint manufactured by Ms. Sanfield (India) limited Bhopal.

LAB

115 Inward 09.04.2014 09.04.2014 AA/AMBD-VDDR/DRH/1270 1270Aarvee

AssociatesIRB 1874

Submission of Design and Drawings for Reinforced Soil approach ramps for ROB at Pij Junction at Ch. 54+839

STRATA

116 Inward 09.04.2014 09.04.2014 AA/AMBD-VDDR/DRH/1271 1271Aarvee

AssociatesIRB 1875

Submission of Design and Drawings for Reinforced soil approach & ramps for VUP at PIJ Junction at Ch. 55+578.

STRATA

117 Inward 09.04.2014 09.04.2014 AA/AMBD-VDDR/DRH/1272 1272Aarvee

AssociatesIRB 1876

Submission of Design and Drawings for reinforced soil approach ramps for Flyover at Chikhodara Junction at Ch. 77+491.

STRATA

118 Inward 09.04.2014 09.04.2014 AA/AMBD-VDDR/DRH/1273 1273Aarvee

AssociatesIRB 1877

Submission of design and drawings for reinforced soil approach & ramps - Good for Construction Drawings

STRATA

119 Inward 09.04.2014 09.04.2014 AA/AMBD-VDDR/DRH/1274 1274Aarvee

AssociatesIRB 1878

Submission of Design and Drawings for reinforced soil approach & ramps for VUP at Sandhana Junction at Ch. 45+320

STRATA

120 Inward 01.04.2014 09.04.2014NHAI/PIU-Ahmedabad/Land

acquisition/Anand/2054320543 NHAI Collector Anand 1879 Regarding Survey no.181 at Vasad village District Anand - LA

121 Inward 03.04.2014 09.04.2014NHAI/PIU-Ahmedabad/Land

acquisition/Anand/2054420544 NHAI Collector Anand 1880

To separate the acquiared area after taking measurement as per land acquisition-

LA

122 Inward 01.04.2014 09.04.2014NHAI/PIU-Ahmedabad/Land

acquisition/Anand/2054520545 NHAI Collector Anand 1881

To separate the acquiared area after taking measurement as per land acquisition

LA

123 Inward 05.04.2014 09.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2056320563 NHAI

A.K. Sharma, GM (Gujarat) NHAI, HQ

New Delhi1882

Construction of six laning Ahmedabad Vadodara section of NH-8

Correspondance with IE & NHAI Page 7 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

124 Inward 05.04.2014 09.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20568

20568 NHAI Aarvee Associates 1883

Additional 3(A) under NH Act 1956 of village Hariyala, Kajipura, gobhalaj, Malarpura, Kanera of Taluka Kheda, Radhvanaj, Vansar, Sokhada, Antroli, Matar and Sandhana of Taluka, Matar, Tundel, Dumral, Dantali, Dabhan, Piplag, Guntal Nadiad Bhumel, Kanjari, Narsanda....

LA

125 Inward 05.04.2014 09.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20571

20571 NHAI Aarvee Associates 1884Representation received from chairmen agriculture produce market committee, reg. requirement of Underpass at Jetalpur

COS-III

126 Inward 20.03.2014 10.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20357

20357 NHAI Aarvee Associates 1885Investigation works for the condition of existing pavement for Km. 22.000 to Km. 42.000 ono NE-1

Expressway

127 Inward 20.03.2014 10.04.2014NHAI/NH-8/Railway/PIU-

Ahmedabad/2036420364 NHAI

Chief Cashier, Western Railway,

Mumbai1886

Proposed construction of 6 lane ROB in lieu of LC No 10 at Rly km 419-510 between Nadiad

ROB

128 Inward 20.03.2014 10.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20383

20383 NHAI Aarvee Associates 1887R. A. Bill no. 1 for Electric Pole Shifting (Anand (South), Kheda (R) & Nadiad (R) sub divisions of MGVCL)

Utility Shifting

129 Inward 20.03.2014 10.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20384

20384 NHAIDeputy Head Project Construction, Aarvee

Associates1888

Grievance of Shri Manish Shah regarding diversion of Expressway

Expressway

130 Inward 24.03.2014 10.04.2014NHAI/PIU-Ahmedabad/IE-

Aarvee/2038520385 NHAI IRB 1889

Reimbursement of 50% passed payment against service tax - Sept Nov – 2013

CA

131 Inward 25.03.2014 10.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20389

20389 NHAIDeputy Head Project Construction, Aarvee

Associates1890

Complaint regarding underpass bridge - village Gutal (Uttarsanda), Taluka Nadiad and District Kheda

Complaint

132 Inward 25.03.2014 10.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20390

20390 NHAIDeputy Head Project Construction, Aarvee

Associates1891 Representation received from Nirant Vividh seva trust COS-III

133 Inward 11.03.2014 10.04.2014NHAI/13013/156/05-06/CMD-

CP/AV-Expressway/4989349893 NHAI

Shri Jaswant kumar, IE

1892 Concessions to local and frequent users

134 Inward 09.04.2014 10.04.2014 AA/AMBD-VDDR/Q&M/1275 1275Aarvee

AssociatesIRB 1893

Submission of Mix Design for DBM Grade 2 using Aggregate from Source Othwad Quarry and Bitumen from IOCLBPCL & HPCL

LAB

135 Inward 09.04.2014 10.04.2014 AA/AMBD-VDDR/Q&M/1276 1276Aarvee

AssociatesIRB 1894

Submission of Mix Design for BC Grade 1 using Aggregate from Source Othwad Quarry and PMB 40 from OSNAR & HINCOL.

LAB

136 Inward 10.04.2014 10.04.2014 AA/AMBD-VDDR/DRH/1277 1277Aarvee

AssociatesNHAI 1895

Representation received from Tirupathi Foundation , Visnagar

COS-III

137 Outward 10.04.2014 IRB/AVSETPL/2092/2014 2092 IRB Aarvee AssociatesDelay in approval of GAD at Km. 65+545, Km. 75+425 and Km. 106+475 - reg

ROB

138 Outward 10.04.2014 IRB/AVSETPL/2093/2014 2093 IRBCGM (CMS), NHAI,

New DelhiPermission for road crossing of Optical Fibre Cable at NH-8 Km. 8+200 to Km. 9+400 total length 1.300 Km.

Access Permission

139 Outward 10.04.2014 IRB/AVSETPL/2094/2014 2094 IRB Aarvee Associates Black-Spot on Ahmedabad Vadodara section of NH-8 Black Spot

140 Outward 10.04.2014 IRB/AVSETPL/2095/2014 2095 IRBCGM (CMS), NHAI,

New Delhi

VIP Reference received from Shri Dinsha Patel, Hon'ble Minister of Mines, Govt. of India regarding construction of under bridge at NH-8.....

COS-III

Correspondance with IE & NHAI Page 8 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

141 Inward 10.04.2014 11.04.2014 AA/AMBD-VDDR/DRH/1278 1278Aarvee

AssociatesNHAI 1896

Tentative cost implication for additions modifications of various structures , Service Roads as per Site Requirement Public Demand VIP Reference etc

PUP

142 Outward 11.04.2014 IRB/AVSETPL/2097/2014 2097 IRB Aarvee AssociatesSubmission of design & drawings for Flyover at Ch. 108+860 Km.

Flyover

143 Outward 11.04.2014 IRB/AVSETPL/2098/2014 2098 IRB Aarvee AssociatesSubmission of Job Mix formula for Wet Mix Macadam using aggregate obtained from Jeshapura Quarry

LAB

144 Outward 11.04.2014 IRB/AVSETPL/2099/2014 2099 IRB Aarvee AssociatesSubmission of Design and Drawings for Reinforced Soil approach ramps for VUP at Matar Junction at ch. 36+396 Km

STRATA

145 Outward 11.04.2014 IRB/AVSETPL/2100/2014 2100 IRB Aarvee AssociatesSubmission of Design & Drawings for additional Underpass at ch. 7+800

CD WORK

146 Outward 11.04.2014 IRB/AVSETPL/2101/2014 2101 IRB Aarvee AssociatesSubmission of General Arrangement Drawings for Flyover at ch. 52+700 & 42+600 Km.

Flyover

147 Outward 11.04.2014 IRB/AVSETPL/2102/2014 2102 IRB Aarvee Associates Reiew of Monthly Status Report of the Concessionaire MSR

148 Outward 11.04.2014 IRB/AVSETPL/2103/2014 2103 IRBCGM (CMS), NHAI,

New DelhiRequest from Police Authority for CCTV footage and recoding

149 Outward 11.04.2014 IRB/AVSETPL/2104/2014 2104 IRBCGM (CMS), NHAI,

New Delhi

Land Acquisition in Anand District for missing Survey Block No. Major area differences on mutual - consent-private negotiation

LA

150 Outward 11.04.2014 IRB/AVSETPL/2105/2014 2105 IRBCGM (CMS), NHAI,

New DelhiSubmission of Cost Estimate of PUP at ch. 7+600 Km., village-Narol under "Change of Scope"

COS-III

151 Outward 11.04.2014 IRBAV/OUT/129 129 IRBCGM (CMS), NHAI,

New DelhiSubmission of Schedule N for Week No 12 & 13

152 Outward 11.04.2014 IRBAV/OUT/129 129 IRBCGM (CMS), NHAI,

New DelhiRegarding Schedule M & N for December 2013 to March 2014

153 Outward 11.04.2014 IRBAV/OUT/129 129 IRBCGM (CMS), NHAI,

New DelhiSubmission of Schedule M for the month of March 2014

154 Inward 07.04.2014 14.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20578

20578 NHAI Aarvee Associates 1897Shifting of existing temple within the ROW along NH-8 of Project Highway

Temple

155 Outward 14.04.2014 IRB/AVSETPL/2106/2014 2106 IRB Aarvee AssociatesTraffic diversion plans for construction of Flyover at Ch.66+940 (LHS) & Ch. 77+540 (RHS) and its approaches on NH-8.

Traffic Management

Plan NH-8156 Outward 14.04.2014 IRB/AVSETPL/2107/2014 2107 IRB Aarvee Associates Review of Monthly O & M Inspection Report MIR

157 Outward 14.04.2014 IRB/AVSETPL/2108/2014 2108 IRB Aarvee AssociatesAccess permission and approval of Logistic Park of Ms R. P. Chemical abutting on NH-8 at Km. 29+791.

Access Permission

158 Outward 14.04.2014 IRB/AVSETPL/2109/2014 2109 IRB Aarvee AssociatesRepresentation received from Malarpura Gram Panchayat, Taluka and district Kheda.

COS-III

159 Outward 14.04.2014 IRB/AVSETPL/2110/2014 2110 IRB Aarvee AssociatesRepresentation Received from Shri Vikrambhai Ravjibhai Parmar.

COS-III

160 Outward 14.04.2014 IRB/AVSETPL/2111/2014 2111 IRB Aarvee AssociatesTraffic Diversion Plan for Construction of Major Bridge across Mahi River at Ch.93+542 (LHS

Traffic Management

Plan NH-8

Correspondance with IE & NHAI Page 9 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

161 Outward 14.04.2014 IRB/AVSETPL/2112/2014 2112 IRB Aarvee AssociatesTraffic Diversion Plan for Construction of PUP at Ch. 97+750, 99+650 & 109+528 and it is approaches on NH-8

Traffic Management

Plan NH-8

162 Outward 14.04.2014 IRB/AVSETPL/2113/2014 2113 IRB Aarvee AssociatesTraffic Management Plan for Construction of additional Span on Shedhi River Bridge at Ch. 38.230 Km.

Traffic Management

Plan NE-1

163 Outward 14.04.2014 IRB/AVSETPL/2114/2014 2114 IRB Aarvee AssociatesTesting of POT-PTFE Bearing Dynamic Prestress (I) Pvt. Ltd, Nasik

LAB

164 Outward 14.04.2014 IRB/AVSETPL/2115/2014 2115 IRBCGM (CMS), NHAI,

New DelhiComplaint of Shri Ashok Surve Complaint

165 Outward 14.04.2014 IRB/AVSETPL/2116/2014 2116 IRB

Executive Engineer, Public Health work Division, GWS&SB,

Vadodara

Shifting of water pipeline-(450 mm dia.-LHS and 350 mm dia.-RHS, MS Pipeline)- Specification and Standard in Fazalpur, Dist. Vadodara-.reg..

Utility Shifting

166 Outward 14.04.2014 IRB/AVSETPL/2117/2014 2117 IRB Aarvee AssociatesM/s Ambica Petrolium, Bareja, Taluka Daskroi, Ahmedabad

Access Permission

167 Outward 14.04.2014 IRB/AVSETPL/2118/2014 2118 IRBCGM (CMS), NHAI,

New DelhiIssue the notice for payment of structure which included in award of Anand District

168 Outward 14.04.2014 IRB/AVSETPL/2119/2014 2119 IRBCGM (CMS), NHAI,

New DelhiVarious issue of GSFC in proposed six laning

Access Permission

169 Outward 15.04.2014 IRB/AVSETPL/2121/2014 2121 IRB Aarvee AssociatesSubmission of Mix Design for DBM Grade 1 Using Aggregate from Source Othwad Quarry and Bitumen from IOCL, BPCL & HPCL

LAB

170 Outward 15.04.2014 IRB/AVSETPL/2122/2014 2122 IRB Aarvee AssociatesSubmission of Trial stretch of Wet Mix Macadam with Jeshapura Quarry aggregate

LAB

171 Outward 15.04.2014 IRB/AVSETPL/2123/2014 2123 IRB Aarvee AssociatesInvestigation works for the condition of existing Pavement from Km. 22.000 to Km. 42.000 on NE-1

PLAN & PROFILE NE-1

172 Outward 15.04.2014 IRB/AVSETPL/2124/2014 2124 IRB Aarvee AssociatesMethod Statement for Repair of Cracks in bituminous course over Deck Slab of Major Bridge over Vatrak River on NE-1

Expressway

173 Outward 15.04.2014 IRB/AVSETPL/2125/2014 2125 IRB Aarvee AssociatesSubmission of Plan and Profile Drawing for Toll Plaza at Km. 44.000

Toll Plaza

174 Inward 10.04.2014 15.04.2014NHAI/PIU-Ahmedabad/IE-

Aarvee/2059620596 NHAI IRB 1898

Reimbursement of 50% passed payment against Service Tax

CA

175 Inward 10.04.2014 15.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20597

20597 NHAIShri S.Jaswant Kumar,

IE1899 Complaint of Shri Vijay Joshi Complaint

176 Inward 09.04.2014 15.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20610

20610 NHAI Aarvee Associates 1900First appeal application under Right to Information Act, 2005 from Shri Nishith Joshi

RTI

177 Inward 10.04.2014 15.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20611

20611 NHAI Aarvee Associates 1901 Representation received from Villagers of Aslali COS-III

178 Inward 10.04.2014 15.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20612

20612 NHAI Aarvee Associates 1902 Acquisition of Center's land - reg. LA

179 Inward 10.04.2014 15.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20613

20613 NHAI Aarvee Associates 1903Application of Shri Nirav J. Hiryara, Block No. 575, Villager Mogar, Taluka & District Anand, Chainage 80+370 to 80+600

LA

Correspondance with IE & NHAI Page 10 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

180 Inward 10.04.2014 15.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2061820618 NHAI

Special Land Acquisition officer

Vadodara1904

3(D) Gazatte Notification dated 27.03.14 of Villages Dashrath and Fajalpur

LA

181 Inward 10.04.2014 15.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20619

20619 NHAI Aarvee Associates 1905Grivance of Sh. Manish Shah reg. diversion of expressway

Expressway

182 Inward 10.04.2014 15.04.2014NHAI/PIU-

Ahmedabad/11011/3/14/NH-8/6-laning/20620

20620 NHAI IRB 1906 Photography and video of AV Expressway Video recording

183 Inward 10.04.2014 15.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20622

20622 NHAI Aarvee Associates 1907Vehicle Tracking System using global positioning system to tack ambulances route patrol vehicles and tow away cranes

Vehicle Tracking

184 Inward 10.04.2014 15.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20623

20623 NHAI Aarvee Associates 1908Complaint regarding Underpass Bridge on NH-8 Village Gutal (Uttarsanda), Taluka Nadiad and District Kheda

Complaint

185 Inward 09.04.2014 15.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20624

20624 NHAI Aarvee Associates 1909Representation received from President Ahmedabad Motor Transport Association

Toll Rate

186 Inward 10.04.2014 15.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20627

20627 NHAI Aarvee Associates 1910 Representation received from Sarpanch Vansar Village COS-III

187 Inward 10.04.2014 15.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20628

20628 NHAI Aarvee Associates 1911Permission for laying Optical Fibre Cable along NE1 from Vadodara (Express Highway limit) to Nadiad (Express Highway Limit)

Access Permission

188 Inward 14.04.2014 15.04.2014 AA/AMBD-VDDR/DRH/1279 1279Aarvee

AssociatesIRB 1912

Location Survey within Ahmedabad City for CSITMS project.

189 Inward 14.04.2014 15.04.2014 AA/AMBD-VDDR/DRH/1280 1280Aarvee

AssociatesIRB 1913

Traffic Diversion Plan for Construction of Minor Bridge at Ch. 89+362 (LHS) on NH-8

Traffic Management

Plan NH-8

190 Inward 15.04.2014 16.04.2014 AA/AMBD-VDDR/DRH/1281 1281Aarvee

AssociatesNHAI 1914

First Appeal Application under Right to Information Act,2005 from Shri Nishith Joshi

RTI

191 Inward 12.04.2014 16.04.2014NHAI/PIU-

Ahmedabad/Permission/ 20639

20639 NHAIThe Divisional

Engineer OFC (Mtce), I, BSNL

1915Uninterrupted BSNL telecom service during Loksabha Election 2014

Access Permission

192 Inward 14.04.2014 16.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20640

20640 NHAI Aarvee Associates 1916 Detail report of Accident Tanker no. MH 04 DD 645 Accident Report

193 Inward 14.04.2014 16.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20641

20641 NHAI Aarvee Associates 1917Application of Bhupendrakumar Diabhai Patel of Bareja dated 09.04.2014

Application

194 Inward 14.04.2014 16.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2064220642 NHAI

The Collector District Kheda Nadiad

1918Uninterrupted BSNL telecom service during Loksabha Election 2014

Access Permission

195 Inward 17.04.2014 17.04.2014 NHAI/PIU-Ahmedabad/20677 20677 NHAI

GM, Essel Ahmedabad-Godhara Toll Roads, PD BSCPL Godhra Tollways Ltd., IRB

1919Vehicle Tracking System using Global Positioning System (GPS) to track Ambulance, Route Patrol Vehicles and Tow Away Cranes

Vehicle Tracking

Correspondance with IE & NHAI Page 11 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

196 Inward 16.04.2014 17.04.2014 AA/AMBD-VDDR/DRH/1283 1283Aarvee

AssociatesIRB 1920

Submission of Design & Drawings for Flyover at Ch. 108+860

Flyover

197 Inward 16.04.2014 17.04.2014 AA/AMBD-VDDR/DRH/1284 1284Aarvee

AssociatesIRB 1921

Tentative cost implication for additions-modifications of various structures, Service Roads as per Site Requirement-Public Demand-VIP References etc.

COS-III

198 Inward 17.04.2014 17.04.2014 AA/HW/NHAI/1308/14-15/040 40Aarvee

AssociatesNHAI 1922 Achievement of Project Milestone-1-Reg. Milestone

199 Outward 17.04.2014 IRB/AVSETPL/2127/2014 2127 IRB Aarvee Associates

RA Bill no. 1 for Shifting of HT-LT Lines and Transformers center on for widening of Road NH-8 from Ahmadabad to Vadodara Section under Anand (South) subdivision of Anand division, Kheda ® subdivision of Mahemdavad division and Nadiad (R ) subdivision of Nadiad division within ROW along NH-8 - Reg

Utility Shifting

200 Outward 17.04.2014 IRB/AVSETPL/2128/2014 2128 IRB Aarvee AssociatesSource of Earth to be obtained from Borrow Areas for use in Embankment - Sub grade - Median Filling.

LAB

201 Outward 17.04.2014 IRB/AVSETPL/2129/2014 2129 IRB Aarvee AssociatesRepresentation received from Sarpanch Dumral Gram Panchayat, Taluka Nadiad, District Kheda

COS-III

202 Outward 17.04.2014 IRB/AVSETPL/2130/2014 2130 IRB Aarvee Associates Expenditure on Civil Works Civil Work

203 Outward 17.04.2014 IRB/AVSETPL/2131/2014 2131 IRB Aarvee AssociatesPermission for laying Optical Fibre Cable from Km. 98.998 to Km. 104.700 (Total Length - 5.702 Km.) NH-8.

Access Permission

204 Outward 17.04.2014 IRB/AVSETPL/2132/2014 2132 IRBCGM (CMS), NHAI,

New DelhiVIP reference received from Shri Manoj Thakore. COS-III

205 Outward 17.04.2014 IRB/AVSETPL/2133/2014 2133 IRB Aarvee Associates Representation of Villagers of Bhumel COS-III

206 Inward 10.04.2014 18.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2060120601 NHAI

District Collector, Anand

1923Regarding split the land acquisition area after measurement as per possession at village Anand for 6 laning work of NH-8

LA

207 Inward 31.03.2014 18.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2064320643 NHAI

District Collector, Anand

1924Resurvey as per objection applications for compensation received during land acquisition at village Mogar District Anand

LA

208 Inward 31.03.2014 18.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2064420644 NHAI

District Collector, Anand

1925Resurvey as per objection applications for compensation received during land acquisition for 6 laning work of NH-8

LA

209 Inward 14.04.2014 18.04.2014NHAI/PIU-Ahmedabad/NH-

8/2064920649 NHAI Aarvee Associates 1926

Representation of Sh. Vasantbhai Chaturbhai Patel regarding survey no. 186+192-1 of Village Vasad, Taluka Anand, District Anand

LA

210 Inward 14.04.2014 18.04.2014NHAI/PIU-Ahmedabad/NH-

8/2065020650 NHAI Aarvee Associates 1927

Representation of divisional director state transport nadiad regarding LA of survey no. 182-B of Village Vasad, Taluka Anand, District Anand

LA

211 Inward 14.04.2014 18.04.2014NHAI/PIU-

Ahmedabad/11011/3/14NH-8/6-laning/20652

20652 NHAI IRB 1928 Concessions to local and frequent users

212 Inward 11.04.2014 18.04.2014NHAI/PIU-Ahmedabad/NE-

1/2065520655 NHAI

City Engineer (Drainage) AMC

1929Damage to ROW fencing of NHAI property at Ch-0+000 Km to Ch 0 400 km on Ahmedabad-Vadodara Expressway (NE-1) section of project Highway

Expressway

Correspondance with IE & NHAI Page 12 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

213 Inward 10.04.2014 18.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2066120661 NHAI

District Collector, Anand

1930Regarding split the land acquisition area after measurement as per possession at village Boriavi District Anand for 6 laning work of NH-8

LA

214 Inward 15.04.2014 18.04.2014NHAI/PIU-Ahmedabad/NH-

8/2066320663 NHAI Aarvee Associates 1931

NA-NOC for Survey-block nos. 76 paiki 1 Village Dumral, Taluka Nadiad, District Kheda

LA

215 Inward 14.04.2014 18.04.2014 NHAI/PIU-Ahmedabad/20664 20664 NHAI Aarvee Associates 1932Information providing of Road Users and Uploaded on NHAI Website

216 Inward 31.03.2014 18.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2066920669 NHAI

District Collector, Anand

1933Objection applications received for compensation paid during land acquisition at village chikhodara District Anand for 6 laning work of NH-8

LA

217 Inward 31.03.2014 18.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2067020670 NHAI

District Collector, Anand

1934Resurvey as per objection applications for compensation received during land acquisition at village Boriavi District Anand

LA

218 Inward 11.04.2014 18.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2067120671 NHAI

District Collector, Anand

1935Resurvey of structures and land exists at survey no.181 at village Vasad District Anand for payment of compensation

LA

219 Inward 31.03.2014 18.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2067220672 NHAI

District Collector, Anand

1936Objection letters for compensation received during land acquisition for 6 laning work of NH-8

LA

220 Inward 18.04.2014 18.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2074320743 NHAI

CGM (Tech) & RO (Gujarat) NHAI,

Gandhinagar1936 A

Construction of Roadway in restricted width due to existing facilities on ONGC and IOCL from Km. 31.500 to 33.500

Access Permission

221 Outward 18.04.2014IAVSET/BD/Toll rates/14/13025

13025 IRBCGM (Tech) Gujarat &

(CO), NHAI, New Delhi

Concession to local and frequent users. Toll Rate

222 Outward 18.04.2014 IRB/AVSETPL/2135/2014 2135 IRB Aarvee AssociatesSubmission of Design & Drawings for Flyover at Ch. 108+860 Km

Flyover

223 Outward 18.04.2014 IRB/AVSETPL/2136/2014 2136 IRB Aarvee AssociatesSubmission of Design & Drawings for Storm Water Open Drains.

SWD

224 Inward 19.04.2014 19.04.2014 AA/AMBD-VDDR/DRH/1285 1285Aarvee

AssociatesNHAI 1937

RA Bill no. 1 for Shifting of HTLT Lines and Transformers center on for widening of Road NH-8 from Ahmadabad to Vadodara Section

Utility Shifting

225 Inward 14.04.2014 19.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2065420654 NHAI

Shri Gopalbhai Laxmanbhai Purohit,

Nadiad1938

Access permission for entry at Rajasthan Garden Hotel situated on NH-8

Access Permission

226 Inward 17.04.2014 19.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20679

20679 NHAI Aarvee Associates 1939Representation received from Sarpanch Dabhan Gram Panchayat, Nadiad

COS-III

227 Inward 17.04.2014 19.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20680

20680 NHAI Aarvee Associates 1940Grievance received in Jilla Swagat Lok Fariyadd Nivaran programme from Sh. Kiritbhai Vittalbhai Nadiad

228 Inward 17.04.2014 19.04.2014NHAI/PIU-

Ahmedabad/11011/3/14/NH-8/6-laning/20710

20710 NHAI IRB 1950Representation received from Kanjari Nagar Seva Sadan & Patel Babubhai Ambalal, Kanjari, Nadiad

COS-III

229 Inward 24.07.2013 19.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/18444

18444 NHAIShri Jaswant kumar,

IE1951

Validition of Toll Rate on Ahmedabad Vadodara Expressway (NE-1) w.e.f. 01.07.2013

Toll Rate

230 Inward 17.01.2014 19.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/19933

19933 NHAIShri Jaswant kumar,

IE1952 Concession to local and frequent users. Toll Rate

Correspondance with IE & NHAI Page 13 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

231 Inward 22.02.2014 19.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20181

20181 NHAI Aarvee Associates 1953 Concession Agreement dated 25.07.2011 Toll Rate

232 Inward 19.04.2014 19.04.2014 AA/AMBD-VDDR/DRH/1286 1286Aarvee

AssociatesNHAI 1954

Delay in approval of GAD at Km 65.545, Km 75.425 and Km 106.475.

ROB

233 Inward 19.04.2014 19.04.2014 AA/AMBD-VDDR/MIR/1287 1287Aarvee

AssociatesNHAI 1955 Monthly O & M Inspection Report MIR

234 Inward 19.04.2014 19.04.2014 AA/AMBD-VDDR/Q&M/1288 1288Aarvee

AssociatesIRB 1956

Testing of POT-PTFE Bearing Dynamic Prestress (I) Pvt. Ltd, Nasik

LAB

235 Inward 19.04.2014 19.04.2014 AA/AMBD-VDDR/Q&M/1289 1289Aarvee

AssociatesIRB 1957

Proposal of use of Evotherm, Warm Mix Asphalt Technology for project

LAB

236 Inward 19.04.2014 19.04.2014 AA/AMBD-VDDR/Q&M/1290 1290Aarvee

AssociatesIRB 1958

Submission of Job Mix Formula for Wet Mix Macadam using aggregate Obtained from Jeshapura Quarry

LAB

237 Inward 19.04.2014 19.04.2014 AA/HW/NHAI/1308/14-15/047 47Aarvee

AssociatesIRB 1959

Review of Plan & profile drawings for Service Road and Slip Road for Flyover/underpass from Km. 6+400 to Km. 108+500 of NH-8- reg

PLAN & PROFILE NH-8

238 Outward 19.04.2014 IRB/AVSETPL/2138/2014 2138 IRBCGM (CMS), NHAI,

New DelhiVarious issue of GSFC in proposed Six Laning.

239 Outward 19.04.2014 IRB/AVSETPL/2139/2014 2139 IRB Aarvee AssociatesSubmission of Rigid Pavement Design & Drawing for Toll Plaza Location

Toll Plaza

240 Inward 15.04.2014 21.04.2014 AA/AMBD-VDDR/MIR/1282 1282Aarvee

AssociatesNHAI 1960 Monthly Inspection Report -Reg. MIR

241 Outward 21.04.2014 IRB/AVSETPL/2141/2014 2141 IRBCGM (CMS), NHAI,

New Delhi

Additional structures modification in sizechange in location of structures construction of additional service roads under Change of Scope

COS-III

242 Outward 21.04.2014 IRB/AVSETPL/2142/2014 2142 IRB Aarvee AssociatesSubmission of Designs and method statement for casting of RE wall blocks and company profile of Service provider M/s Sohams Foundation Engineering Pvt. Ltd.

LAB

243 Outward 21.04.2014 IRB/AVSETPL/2143/2014 2143 IRB Aarvee AssociatesSubmission of Designs Drawings for Underpass Tunnel for Toll Plaza at Ch 44+000 Km Ch 91+786 Km

Toll Plaza

244 Outward 21.04.2014 IRB/AVSETPL/2144/2014 2144 IRB Aarvee AssociatesCompany profile of MEREX E.A. Co. Ltd. as one of the source of Geo Grid for the Project

LAB

245 Outward 21.04.2014 IRB/AVSETPL/2145/2014 2145 IRB Aarvee AssociatesTentative cost implication for addition modification of various structures, service road as per site requirement public demand VIP reference.

COS-III

246 Outward 21.04.2014 IRB/AVSETPL/2146/2014 2146 IRB Aarvee AssociatesSubmission of Design & Drawings for Flyover at Ch. 108+860 Km

Flyover

247 Inward 21.04.2014 21.04.2014 AA/AMBD-VDDR/Q&M/1292 1292Aarvee

AssociatesIRB 1961

Submission of Mix Design for DBM Grade 1 Using Aggregate from Source Othwad Quarry and Bitumen from IOCL, BPCL & HPCL

LAB

248 Inward 21.04.2014 21.04.2014 AA/AMBD-VDDR/Q&M/1293 1293Aarvee

AssociatesIRB 1962

Method Statement for Repair of Cracks in bituminous course over Deck Slab of Major Bridge over Vatrak River on NE-1

LAB

249 Inward 21.04.2014 21.04.2014 AA/AMBD-VDDR/Q&M/1294 1294Aarvee

AssociatesIRB 1963

Submission of Trial stretch of Wet Mix Macadam with Jeshapura Quarry Aggregate.

LAB

Correspondance with IE & NHAI Page 14 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

250 Inward 17.04.2014 21.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20681

20681 NHAI Aarvee Associates 1964Proposal for modification in Design Cross Section between Km. 95+000 to Km. 109+000 in view of number of pipelines laying within th ROW of the Project

COS-I

251 Inward 16.04.2014 21.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2068220682 NHAI

Executive Engineer, Petlad Irrigation Division, Petlad

1965Relocation of existing Piplag Sub Minor due to widening of Minor Bridge on Cambay Branch Canal at Km. 59+364 (RHS)

CANAL SYPHONS

252 Inward 17.04.2014 21.04.2014NHAI/PIU-Ahmedabad/Policy

Matter/2070020700 NHAI

Deputy Head Project Construction, Aarvee

Associates1966

Partial Modification to the existing guidelines for processing Extension of Time Cases related to Supervision Consultancy and IE services

MOM

253 Inward 17.04.2014 21.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20706

20706 NHAI Aarvee Associates 1967Request from Police Authority for CCTV Footage and Recording

254 Inward 17.04.2014 21.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2071120711 NHAI IRB 1968

Concessionaire shall make reasonable effort to facilitate the acqusition of land

LA

255 Inward 17.04.2014 21.04.2014NHAI/PIU-Ahmedabad/IE-

Aarvee/2071420714 NHAI IRB 1969

Reimbursement of 50% of passed payment against invoice no. 21 for the month of March 2014 (Indian Currency)

CA

256 Inward 17.04.2014 21.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20718

20718 NHAI Aarvee Associates 1970Submission of cost estimate of PUP at 7+600 Km. Village Narol under COS

COS-III

257 Inward 17.04.2014 21.04.2014NHAI/PIU-Ahmedabad/NH-

8/Permission/2071920719 NHAI

M/s Idea Cellular Limited Gandhinagar

1971Permission for road crossing of optical fibre cable at NH-8 from MS 73+300 to MS 74+200 near Anand City Length 0.900 Mtr.

Access Permission

258 Inward 16.04.2014 21.04.2014NHAI/PIU-

Ahmedabad/11015/2/13/NH-8/6-laning/20720

20720 NHAIThe Superintending

Archeologist , Vadodara

1972Request for issue NOC for removal of wall located at Jetalpur, Taluka - Dascroi, Ahmedabad, on Ch. 15+800 to 16+000

NOC

259 Inward 17.04.2014 21.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2072120721 NHAI

CGM (T) & RO, Gandhinagar

1973Request for issue NOC for removal of wall located at Jetalpur, Taluka - Dascroi, Ahmedabad, on Ch. 15+800 to 16+000

NOC

260 Inward 17.04.2014 21.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2072520725 NHAI

The Sarpanch, Bhumal Gram panchyat

1974 Request for Underpass at Km. 64+584 COS-III

261 Inward 17.04.2014 21.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20726

20726 NHAI Aarvee Associates 1975Land Acquistion in Vadodara for missing Survey-Block No.-Major Area differences on mutual consent private negotiation - reg

LA

262 Inward 17.04.2014 21.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20739

20739 NHAI Aarvee Associates 1976Additional 3(A) under NH Act 1956 of Village Narol, Isanpur of Taluka Ahmedabad City East, Aslali, Bareja, Jetalpur, Vatwa and Laxmipura.

LA

263 Outward 22.04.2014 IRB/AVSETPL/2148/2014 2148 IRB Aarvee AssociatesSubmission of Design and Drawings for Flyover at Ch.109+533

Flyover

264 Outward 22.04.2014 IRB/AVSETPL/2149/2014 2149 IRB Aarvee AssociatesSubmission of Typical Design Drawings for Box Underpass of Size 10 0m x 3 5m.

CD WORK

265 Outward 22.04.2014 IRB/AVSETPL/2150/2014 2150 IRB Aarvee Associates Submission of drawings for Flyover at Ch. 95+830 Km. Flyover

266 Inward 17.04.2014 22.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2071220712 NHAI

The President Kanjari Nagar Seve Sadan

1977 Request of drainage system near kanjari access road COS-III

Correspondance with IE & NHAI Page 15 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

267 Inward 17.04.2014 22.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2072220722 NHAI

Shri Laljibhai Dholabhai Desai

Kenera1978

Request for drainage arrangement and construction of damaged culvert near BPCL depot at km. 23.520

COS-III

268 Inward 18.04.2014 22.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20741

20741 NHAI Aarvee Associates 1979Representation received from president Ahmedabad motor transport association

COS-III

269 Inward 18.04.2014 22.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2074420744 NHAI IRB 1980

Possession receipt (Kabja Pavti) for acquired land for village adas of taluka and district anand

LA

270 Inward 18.04.2014 22.04.2014NHAI/PIU-

Ahmedabad/11011/3/14/NH-8/6-laning/20747

20747 NHAI IRB 1981 Revision of user fee rates w.e.f. 01.04.2014 Toll Rate

271 Inward 17.04.2014 22.04.2014NHAI/PIU-

Ahmedabad/11012/13/NH-8/6-laning/20748

20748 NHAI Aarvee Associates 1982Additional 3(A) under NH Act 1956 of village chhani, dashrath, padamala, Sankarda, Fajalpur, Ranoli, Dumad and Rayka of Taluka Vadodara district

LA

272 Inward 18.04.2014 22.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20749

20749 NHAI Aarvee Associates 1983

Additional 3(A) under NH Act 1956 of village boriavi, lambhvel, anand, samarkha Chikhodara Vaghasi, Gamdi, Mogar, Vadod, Gopalpura, Adas and Vasad of Taluka Anand district anand

LA

273 Outward 23.04.2014 IRB/AVSETPL/2152/2014 2152 IRB Aarvee Associates Submission of Monthly Status Report MSR

274 Outward 23.04.2014 IRB/AVSETPL/2153/2014 2153 IRB Aarvee AssociatesDelay in approval of GAD at Km. 65+545, Km. 75+425 and Km. 106+475 - Reg

ROB

275 Outward 23.04.2014 IRB/AVSETPL/2154/2014 2154 IRBCGM (CMS), NHAI,

New Delhi

Vehicle Tracking System using Global Positioning System (GPS) to track Ambulance, Route Patrol Vehicles and Toe away Cranes

Vehicle Tracking

276 Outward 23.04.2014 IRB/AVSETPL/2155/2014 2155 IRB Aarvee AssociatesSubmission of Design & Drawings for Flyover at Ch. 108+860 Km.

Flyover

277 Inward 17.04.2014 24.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2075920759 NHAI

District Collector, Kheda

1984Regarding Objection letter for Ahmedabad - Vadodara Six lane Project

LA

278 Inward 18.04.2014 24.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2076020760 NHAI

District Collector, Anand

1985Regarding difference in land acqisition area for survey no.27-3 at Vasad village District Anand for six laning of Ahmedabad - Vadodara Project -

LA

279 Inward 18.04.2014 24.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2076220762 NHAI

District Collector, Anand

1986Regarding land acquistion for survey no.2619-6 at village Anand District Anand

LA

280 Inward 18.04.2014 24.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2076320763 NHAI

District Collector, Anand

1987Regarding land acquistion for survey no.2619-7 at village Anand District Anand

LA

281 Inward 10.04.2014 24.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2076520765 NHAI

District Collector, Anand

1988To seprate the area of land acquistion for survey no.2605 village- Anand District- Anand

LA

282 Inward 18.04.2014 24.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2076620766 NHAI

District Collector, Anand

1989Regarding resurvey of land for survey no.164 at village -Chikhodara District - Anand

LA

283 Inward 18.04.2014 24.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2076720767 NHAI

District Collector, Anand

1990Regarding resurvey of land for survey no.105-2 and 101-1 at Village -Gamdi District - Anand

LA

284 Inward 18.04.2014 24.04.2014NHAI/PIU-Ahmedabad/NH-

8/LA/2076820768 NHAI

District Collector, Anand

1991Regarding mistake during land acquisition for survey no.910 at village- Vasad District - Anand

LA

285 Inward 23.04.2014 24.04.2014NHAI/12011/1/2010-RO-

GNR/Tech./AHD/Vol.13/243243 NHAI

Sh. A.K. Sharma GM (Tech) NHAI HQ

1992

Approval of shifting-raising of 400/220/132/66 KV EHT Line on Ahmedabad-Vadodara section of NH-8(Ahmedabad section)-under Deposit work Revision of approved estimate considering current SOR & material rates

Utility Shifting

Correspondance with IE & NHAI Page 16 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

286 Inward 19.04.2014 24.04.2014 AA/AMBD-VDDR/MPR/1291 1291Aarvee

AssociatesIRB 1993

Review of Monthly Progress Report of the Concessionaire.

MPR

287 Inward 23.04.2014 24.04.2014 AA/AMBD-VDDR/QIR/1295 1295Aarvee

AssociatesNHAI 1994 Quarterly Inspection Report no. - 05 QIR

288 Inward 23.04.2014 24.04.2014 AA/AMBD-VDDR/DRH/1296 1296Aarvee

AssociatesIRB 1995 Plan and Profile drawings for Toll Plaza at Km 44.000 Toll Plaza

289 Inward 23.04.2014 24.04.2014 AA/AMBD-VDDR/DRH/1297 1297Aarvee

AssociatesIRB 1996

Submission of Plan and Profile Drawings for ROB at 54+865.

ROB

290 Inward 23.04.2014 24.04.2014 AA/AMBD-VDDR/Q&M/1298 1298Aarvee

AssociatesIRB 1997

Source of Earth to be obtained from Borrow Areas for use in Embankment-Sub grade-Median Filling

LAB

291 Inward 23.04.2014 24.04.2014 AA/AMBD-VDDR/DRH/1299 1299Aarvee

AssociatesIRB 1998

Design and drawings for Underpass Tunnel, Layout and Land Acquisition Plan for Toll Plaza at Km 44+000 and Km 91+786 on NH-8 Section of the Project Highway.

Toll Plaza

292 Inward 23.04.2014 24.04.2014 AA/AMBD-VDDR/DRH/1300 1300Aarvee

AssociatesNHAI 1999 Leave of absence of Team Leader.

293 Inward 24.04.2014 24.04.2014 AA/AMBD-VDDR/DRH/1301 1301Aarvee

AssociatesNHAI 2000

Access Permission for factory of Marck Biosciences Ltd. abutting on NH-8 (New NH-48) at Km. 31.712 (between Km. 31.600 to 31.738) left side at survey no.-669-1 at village-Hariyala, Tal-Kheda.

Access Permission

294 Inward 24.04.2014 24.04.2014 AA/AMBD-VDDR/DRH/1302 1302Aarvee

AssociatesNHAI 2001

Access Permission and approval of Logistic Park of M/s R.P. Chemicals abutting on NH-8 (New NH-40) at Km 29.791 ( between Km 29.715 to Km 29.868) ,Right Side at Survey No. 114,115 &116 at Village Kajipura, Taluka Kheda, Dist Kheda, State-Gujarat.

Access Permission

295 Inward 24.04.2014 25.04.2014 AA/AMBD-VDDR/DRH/1303 1303Aarvee

AssociatesIRB 2002

Proposals for modifications in design – cross section between Km 95.000 to Km 109.000 in view of a number of pipelines laying within the ROW of the Project.

COS-I

296 Inward 24.04.2014 25.04.2014 AA/AMBD-VDDR/DRH/1304 1304Aarvee

AssociatesIRB 2003

Investigation works for the condition of existing pavement from Km 22.000 to Km 42.000 on NE -1

PLAN & PROFILE NE-1

297 Inward 23.04.2014 25.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2083420834 NHAI IRB 2004

Delay in approval of GAD at Km. 65+545, 75+425 and Km. 106+475

ROB

298 Inward 16.04.2014 25.04.2014NHAI/12011/1/2010-RO-

GNR/Tech./AHD/Vol-14/185185 NHAI

Sh. A.K. Sharma GM (Tech) NHAI HQ

2005

Representation of Borriavi Nagar Palika received from Dr Tushar A Chaudhary, MOS (RT&H) regarding construction of small PUP at km. 69+300 instead of Box culvert structure

COS-II

299 Inward 25.04.2014 25.04.2014 NHAI/PIU-Ahmedabad/20865 20865 NHAI Aarvee Associates 2006Meeting taken by secretary (RTH) on 22.04.2014 on traffic survey locations for the reaches entrusted to NAHI

MOM

300 Inward 25.04.2014 25.04.2014 AA/AMBD-VDDR/DRH/1305 1305Aarvee

AssociatesNHAI 2007

Construction of Proposed Flyover at Narol Junction at Ch. 6.400 on NH-8

COS-III

301 Inward 25.04.2014 25.04.2014 AA/AMBD-VDDR/DRH/1306 1306Aarvee

AssociatesNHAI 2008

Legal Notice received from Shri Thamim Ansari ,Advocate, High Court, Ahmedabad

Legal Notice

302 Outward 25.04.2014 IRB/AVSETPL/2156/2014 2156 IRBCGM (CMS), NHAI,

New DelhiWork not allowed by Ms Piyush Hotel from Ch-27+520 Km to Ch-27+780 Km Village-Goblej Dist-Kheda.

COS-III

303 Outward 25.04.2014 IRB/AVSETPL/2157/2014 2157 IRBCGM (CMS), NHAI,

New DelhiExecutive Engineer, Mahi Irrigation Division, Nadiad's

CANAL SYPHONS

Correspondance with IE & NHAI Page 17 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

304 Outward 25.04.2014 IRB/AVSETPL/2158/2014 2158 IRBCGM (CMS), NHAI,

New DelhiSuggestions received from User Sri Jitendra B Patel. Complaint

305 Outward 25.04.2014 IRB/AVSETPL/2159/2014 2159 IRB Aarvee AssociatesSource of Earth to be obtained from Borrow Areas for use in Embankment Sub gradeMedian Filling

LAB

306 Inward 23.04.2014 26.04.2014NHAI/12011/1/2010-RO-

GNR/Tech./AHD/Vol-13/255255 NHAI

Sh. A.K. Sharma GM (Tech) NHAI HQ

2009Approval of shifting -raising HT lines on Ahmedabad Vadodara section section of NH-8 under Jambuva Circle

Utility Shifting

307 Inward 28.04.2014 28.04.2014 AA/AMBD-VDDR/DRH/1307 1307Aarvee

AssociatesIRB 2010

Traffic Diversion Plan for construction of Major Bridge across Mahi River at Ch. 93+542 (LHS)

Traffic Management

Plan NH-8

308 Inward 28.04.2014 28.04.2014 AA/AMBD-VDDR/DRH/1308 1308Aarvee

AssociatesIRB 2011

Traffic Diversion Plan for construction of PUP at Ch. 97+750, 99+650 & 109+528

Traffic Management

Plan NH-8

309 Inward 28.04.2014 28.04.2014 AA/AMBD-VDDR/DRH/1309 1309Aarvee

AssociatesNHAI 2012

Meeting taken by Secretary (RTH) on 22.04.2014 on Traffic Survey Locations for the reaches entrusted to NHAI

MOM

310 Inward 28.04.2014 28.04.2014 AA/AMBD-VDDR/DRH/1310 1310Aarvee

AssociatesIRB 2013

Traffic diversion plans for construction of Flyover at Ch.66+940 (LHS) & Ch. 77+540 (RHS) and its approaches on NH-8.

Traffic Management

Plan NH-8

311 Inward 28.04.2014 28.04.2014 AA/AMBD-VDDR/DRH/1311 1311Aarvee

AssociatesIRB 2014

Traffic Management Plan for Construction of additional Span on Shedhi River Bridge at Ch. 38.230 Km.

Traffic Management

Plan NE-1

312 Inward 22.04.2014 28.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20783

20783 NHAI Aarvee Associates 2015 Various issues of GSFC in proposed six laning

313 Inward 22.04.2014 28.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20784

20784 NHAI Aarvee Associates 2016 Revision of User Fee Rates w.e.f. 01.04.2014 Toll Rate

314 Inward 22.04.2014 28.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2079820798 NHAI

Shri Amit Chavda, Hon'ble MLA

2017Request for making arrangement for water disposal near Mogar Village

COS-III

315 Inward 22.04.2014 28.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20802

20802 NHAIManaging Director,

GSRDCL, Gandhinagar2018

Incorporate the planning of grade seperator - appropriate structure to cater the future growth of traffic at Vasad Junction

316 Inward 22.04.2014 28.04.2014NHAI/PIU-Ahmedabad/NH-

8/2080520805 NHAI Aarvee Associates 2019

Representation of Shri Jitendrabhai Manibhai Patel regarding survey no. 449 of Village Vaghasi, Taluka Anand, District Anand

COS-III

317 Inward 22.04.2014 28.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20806

20806 NHAI Aarvee Associates 2020

Delay in construction of Project Highway due to non availablity of land, hindrances on account of encroachment, delay in approval of estimates for shifting of various utlities under change of scope proposals, stoppage of works at various locations by local villagers/politicians/village panchyat and delay in approval of GAD for ROB's

ROB

318 Outward 28.04.2014 IRB/AVSETPL/2161/2014 2161 IRBCGM (CMS), NHAI,

New DelhiLocation Survey within Ahmedabad City for CSITMS project

319 Outward 28.04.2014 IRB/AVSETPL/2162/2014 2162 IRBCGM (CMS), NHAI,

New DelhiPayment for Maintenance Charges for level crossing no. 10-B on NH-8

ROB

Correspondance with IE & NHAI Page 18 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

320 Outward 28.04.2014 IRB/AVSETPL/2163/2014 2163 IRB Aarvee Associates

Sleeves at deck continuity location for Major Bridge across river (i) Kalia Bhera (Meshow) at ch. 30+610 Km. (ii) Vatrak at Ch. 35+000 Km, (iii) Mahi at ch. 93+542 Km. & (iv) Mini at Ch. 97+688 Km.

Major Bridge

321 Outward 28.04.2014 IRB/AVSETPL/2164/2014 2164 IRBCGM (CMS), NHAI,

New DelhiDelay in approval of GAD at Km. 65+545, Km. 75+425 and Km. 106+475 - Reg.

ROB

322 Outward 28.04.2014 IRB/AVSETPL/2165/2014 2165 IRB Aarvee AssociatesSubmission of Mix Designfor GSB using Natural GSB (Mahi River) &Othwad crushed GSB

LAB

323 Outward 28.04.2014 IRB/AVSETPL/2166/2014 2166 IRB Aarvee Associates Submission of Mix Design of natural GSB of Mahi - Reg. LAB

324 Outward 28.04.2014 IRB/AVSETPL/2167/2014 2167 IRB Aarvee AssociatesSource of Earth to be obtained from Borrow Areas for use in Embankment Sub grade Median Filling

LAB

325 Outward 28.04.2014 IRB/AVSETPL/2168/2014 2168 IRB Aarvee AssociatesSubmission of Mix Design for concrete using Ultratech Cement, Admixture of STP Ltd. and Fine aggregate of Mahi River

LAB

326 Inward 17.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20717

20717 NHAI Aarvee Associates 2021Video recording of 5th Quarter (January 2014 to March 2014)

Video recording

327 Inward 17.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20718

20718 NHAI Aarvee Associates 2022Submission of cost estimate of PUP at 7+600 Km. Village Narol under COS

COS-III

328 Inward 22.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20773

20773 NHAI Aarvee Associates 2023 Release of Performance Security

329 Inward 22.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20774

20774 NHAI Aarvee Associates 2024 Submission of Schedule M for the month of March 2014

330 Inward 22.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20776

20776 NHAI Aarvee Associates 2025 Submission of Schedule N for week no. 12 & 13

331 Inward 23.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20825

20825 NHAI Aarvee Associates 2026 Expenditure on Civil Works Civil Work

332 Inward 24.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20826

20826 NHAI Aarvee Associates 2027 Complaint of Shri Ashok Surve Complaint

333 Inward 24.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20827

20827 NHAI Aarvee Associates 2028Tentative cost implications for additions - modifictions of various structures, service roads as per Site Requirement.... etc.

COS-III

334 Inward 23.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20828

20828 NHAI Aarvee Associates 2029Representation received from Sarpanch, Dumral Gram Panchayat, Taluka Nadiad

COS-III

335 Inward 23.04.2014 29.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2082920829 NHAI IRB 2030

Payment for Maintenance Charges for level crossing no. 10-B on NH-8

ROB

336 Inward 23.04.2014 29.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2083020830 NHAI

CGM (T) & RO, Gandhinagar

2031 Various issues of GSFC in proposed six laning

337 Inward 23.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20831

20831 NHAI Aarvee Associates 2032Additional structures - modifications in size - change in location of structures and construction of additional service roads under Change of Scope

COS-III

Correspondance with IE & NHAI Page 19 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

338 Inward 23.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20832

20832 NHAI Aarvee Associates 2033Representation received from Sarpanch Vasad Gram Panchayat

COS-III

339 Inward 23.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20833

20833 NHAI Aarvee Associates 2034 Representation of Villagers of Bhumel COS-III

340 Inward 24.04.2014 29.04.2014NHAI/PIU-Ahmedabad/NH-

8/2083520835 NHAI Shri S.K.Pandey, CPC 2035 Escalation of Premium Amount - Concession Fee Fee

341 Inward 23.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20837

20837 NHAI Aarvee Associates 2036Representation recevied from Sarpanch Sankarda Gram Panchayat

COS-III

342 Inward 23.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20838

20838 NHAI Aarvee Associates 2037Representation received from Villagers of Dabhan through Additional District Magistrate, Kheda

COS-III

343 Inward 22.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20840

20840 NHAI Aarvee Associates 2038 Change of Scope Proposals COS-I

344 Inward 24.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11011/3/14/NH-8/6-laning/20841

20841 NHAI IRB 2039Photography and Video of Ahmedabad Vadodara Expressway

345 Inward 23.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/14/NH-8/6-laning/20850

20850 NHAI Aarvee Associates 2040VIP reference received from Shri Manoj Thakore, Addl. Secretary to Minister State for RT&H, GOI enclosing representation of Ratanpur…..

COS-III

346 Inward 24.04.2014 29.04.2014NHAI/PIU-Ahmedabad/NH-

8/2085220852 NHAI

Competent Authority (LA officer)

2041Approval of order for village Isanpur Taluka Ahmedabad City (East) District Ahmedabad under Clause 3 (G) 1 of NH Act 1956

LA

347 Inward 24.04.2014 29.04.2014NHAI/PIU-Ahmedabad/NH-

8/2085320853 NHAI Aarvee Associates 2042

Representation of Shri Chimanbhai Parshottambhai, Arvindbhai Parshottambhai Patel regarding survey no. 329 of Village Vasad..

COS-III

348 Inward 22.04.2014 29.04.2014NHAI/PIU-Ahmedabad/NH-8/6-

laning/2085520855 NHAI

M/s Tirupathi Foundation, Mehasana

2043 Request for various facilities on National Highway

349 Inward 24.04.2014 29.04.2014NHAI/PIU-

Ahmedabad/11012/2/13/NH-8/6-laning/20866

20866 NHAI Aarvee Associates 2044Delay in approval of GAD at Km. 65+545, Km. 75+425 and Km. & 106+475

ROB

350 Inward 25.04.2014 29.04.2014NHAI/PIU-Ahmedabad/IE-

Aarvee/2086720867 NHAI IRB 2045 Compliance of the observtion Complaint

351 Inward 29.04.2014 29.04.2014 AA/AMBD-VDDR/DRH/1312 1312Aarvee

AssociatesIRB 2046

Submission of Design and Drawings for Storm Water Open Drain

SWD

352 Outward 30.04.2014 IRB/AVSETPL/2170/2014 2170 IRB Aarvee AssociatesSource of Earth to be obtained from Borrow Areas for use in Embankment Sub grade Median Filling

LAB

353 Outward 30.04.2014 IRB/AVSETPL/2171/2014 2171 IRB Aarvee AssociatesTraffic diversion plans for construction of Flyover at Ch.66+940 (LHS) & Ch. 77+540 (RHS) and its approaches on NH-8

Traffic Management

Plan NH-8

354 Inward 26.04.2014 30.04.2014NHAI/PIU-Ahmedabad/NH-

8/2089120891 NHAI

Deputy C.E.O, Home department, Sachivalaya Gandhinagar

2047 Location Survey within Ahmedabad City for CSITMS Project - reg.

Correspondance with IE & NHAI Page 20 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'I'

Sr. No.

Inward/ Outward

Date on Letter

Inward Date Ref. No. Letter No.

Issued By Issued To Inward No.

Description Remarks

355 Inward 26.04.2014 30.04.2014NHAI/PIU-Ahmedabad/NH-

8/2089220892 NHAI IRB 2048

Review of Plan & Profile Drawings for Service Road and Slip Road for Flyover - Underpass from Km. 6+400 to Km. 108+500 of NH-8

Traffic Management

Plan NH-8

356 Inward 26.04.2014 30.04.2014NHAI/PIU-Ahmedabad/NH-

8/2089320893 NHAI Aarvee Associates 2049

Comments on Complaint Register for the Month of February 2014

Complaint

357 Inward 26.04.2014 30.04.2014NHAI/PIU-Ahmedabad/NH-

8/2090120901 NHAI Aarvee Associates 2050

Representation of Shri Chatrasinh Somsinh Chasatiya regarding Survey no. 749 of Village Mogar, Taluka Anand, District Anand

COS-III

Correspondance with IE & NHAI Page 21 of 21

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'J'

From To From To From To From To From To From To From To From To From To From To From To

Apr-14 0.000 44.000 0.000 45.000 0.000 92.600 50.935 50.943 39.440 39.480 47.525 47.530 40.110 40.170

75.000 92.500 60.000 92.500 52.657 52.672 39.760 39.810 47.530 47.535

56.095 56.100 39.850 39.880 47.535 47.548

56.824 56.832 39.130 39.230 47.555 47.570

56.839 56.849 47.580 47.595

56.862 56.867 47.595 47.605

57.022 57.030 47.610 47.615

57.052 57.055 47.625 47.635

72.084 72.089 47.645 47.655

72.097 72.102 47.865 47.868

72.102 72.109 47.883 47.885

72.890 72.965 47.885 47.910

74.733 74.741 47.927 47.947

74.741 74.743 47.980 47.982

74.783 74.791 47.982 47.985

75.190 75.280 47.987 47.990

75.340 75.365 47.990 47.992

75.365 75.375 47.992 47.995

76.140 76.145 48.363 48.366

76.145 76.153 48.368 48.373

76.153 76.170 48.833 48.841

76.280 76.323 48.851 48.853

76.639 76.664 48.853 48.858

76.727 76.757 48.956 48.961

77.347 77.357 48.961 48.966

77.380 77.445 49.110 49.120

77.453 77.460 49.120 49.128

77.460 77.468 49.200 49.215

77.529 77.534 49.230 49.240

77.534 77.539 50.920 50.930

77.634 77.641 50.972 50.977

77.646 77.651 50.977 51.015

77.693 77.958 51.032 51.037

77.958 77.963 51.042 51.060

77.968 77.971 51.075 51.085

79.445 79.465 51.087 51.100

79.750 79.753 51.100 51.105

79.753 79.763 51.407 51.410

80.060 80.083 51.410 51.425

80.088 80.093 52.395 52.430

LHSFencing, Side Drain

MedianMedian Cleaning Water Spreading to Median Sr. No. Date Median Tree's Milling & Paving on MCW

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT. LTD.

UCR wall side Milling & Paving on UCR wall side Replacement of Fencing RHS

Fencing, Side Drain Replacement of Fencing Remarks

1 of 2

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'J'

From To From To From To From To From To From To From To From To From To From To From To

LHSFencing, Side Drain

MedianMedian Cleaning Water Spreading to Median Sr. No. Date Median Tree's Milling & Paving on MCW

AHMEDABAD VADODARA SUPER EXPRESS TOLWAY PVT. LTD.

UCR wall side Milling & Paving on UCR wall side Replacement of Fencing RHS

Fencing, Side Drain Replacement of Fencing Remarks

80.836 80.849 52.632 52.642

81.200 81.205 52.652 52.657

81.372 81.395 52.672 52.677

81.400 81.412 52.876 52.879

81.460 81.475 52.884 52.891

81.860 81.870 52.891 52.896

81.873 81.878 52.896 52.899

82.575 82.585 52.899 52.910

82.590 82.600 52.910 52.920

83.818 83.848 53.615 53.630

84.141 84.144 53.630 53.635

84.166 84.174 53.635 53.648

84.810 84.818 53.648 53.658

84.818 84.825 53.658 53.660

85.070 85.078 53.900 53.905

85.078 85.083 53.905 53.908

85.083 85.093 53.917 53.922

85.096 85.101 54.268 54.273

85.101 85.103 54.273 54.278

88.045 88.055 54.286 54.298

88.055 88.060 54.736 54.741

88.060 88.063 54.741 54.749

88.063 88.085 54.754 54.756

88.085 88.095 55.314 55.322

88.095 88.100 56.515 56.518

90.300 90.303 56.518 56.525

90.303 90.310 56.525 56.530

90.310 90.315 56.530 56.533

90.336 90.341 56.533 56.538

90.341 90.346 56.538 56.540

90.346 90.351 56.857 56.862

90.351 90.356 57.030 57.037

90.356 90.361 57.037 57.045

91.290 91.298 57.045 57.052

91.298 91.318

91.318 91.323

91.323 91.338

92.343 92.350

92.350 92.365

92.692 92.697

92.702 92.705

92.722 92.732

2 of 2

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX - 'K'

Implementation Supervision

1 Utility RelocationEstimate received from concern authorities and it is under verification with concessionaire

M/ORT&H 110Concessionaire /

Utility ownerUtility Owner

2Impact on land use outside ROW

Construction related activities restricted within project ROW.

M/ORT&H 201.2 Concessionaire IE Being Followed

3Ecological impact due to tree cutting

Permission for tree cutting is awarded vide letter no.A/SVY/15/2699-2705/2012-13, dt. 24/01/2013 of Chief Conzervator of Forest (CCF).Trees has been cut 13102 Nos. out of 13492 Nos. of Trees upto April 2013

Authority. If authority requires, the Concessionaire

may execute the work on behalf of

Authority limited to felling of trees and

its disposal

Forest / Authority Cutting of Trees Completed

4 Local Traffic Arrangement

Temporary traffic arrangement during construction within ROW is reviewed by IE as per guidelines of Concession Agreement. During site clearance activity, the demolition debris removed as quickly as possible and with deployment of more vehicles for the purpose.

M/ORT&H 112 Concessionaire IE Being Followed

M/ORT&H: 112.4M/ORTH&H: 112

7Plying vehicles on unpaved roads

Unpaved roads is sprinkled with water periodically to control the fugitive dust emissions.

M/ORT&H: 111.10 Concessionaire IE Under Control

M/ORT&H: 111.9M/ORT&H: 111.11M/ORT&H: 111.12

9Using Hot Mix/Concrete/Asphalt Plants

All Crushing plants, Batching Plants and Hot Mix plants which are installed, are licensed and authorized for operation by concerned authorities.

M/ORT&H: 111.5 Concessionaire IE Conformed

10Watering to control dust at site

Construction site is watered periodically to minimize fugitive dust generation.

M/ORT&H: 111.8 Concessionaire IE Being done

11 Roads used for transportThe transport vehicles used to ferry materials and dispose debris at dispose area.

M/ORT&H: 111.9 Concessionaire IE Being done

12 Barricading site

The construction zone is covered with barricading at all times with adequate marking, flags, reflectors etc., for the safety of general traffic and movement and pedestrians

M/ORT&H: 112 Concessionaire IE Being done

13 EarthworkAll earthwork and construction material is dumped in such a manner to minimize generation of dust and spillage on roads.

M/ORT&H: 201.4 Concessionaire IE Being done

14 Idling of vehiclesIdling vehicles is parked at workshops or plant locations so, running traffic will not be disturb.

M/ORT&H: 201.2 Concessionaire IE As per norms

15 Drilling OperationsAll possible and practical measures to control noise emission during drilling operations is employed.

M/ORT&H: 111 Concessionaire IE NA

16Construction equipment emissions

Exhaust emissions of construction equipment is adhere to pollution control emission norms of the Govt.

Legal requirement Concessionaire IE Limit ensured

17Noise from construction related plants & equipments

All construction equipment is fitted with exhaust silencers. Damaged silencers to be promptly replaced by Concessionaire

M/ORT&H: 111 Concessionaire IE Under Control

18Noise impact due to operation of DG sets

DG sets, if used, is adhere to noise standards. M/ORT&H: 111 Concessionaire IE Under Control

M/ORT&H: 111.6M/ORT&H: 105.2

20Storage of construction material

Construction material containing fine particles is stored in such a manner, so that sediment laden water does not drain into nearby storm water drains and underground sewage pipes.

M/ORT&H: 306 Concessionaire IE Proper storage ensured

21 Silting of water bodies

Silting of soil into water bodies viz., River, Nallah/Drain, is prevented as per as possible by adopting soil erosion control measures as per M/ORT&H guidelines.

M/ORT&H: Guidelines 305 through 309

Concessionaire IE

Details of Environmental Mitigation Measures

Exposure to Loud NoiseWorkers exposed to loud noise (As per Factory Act requirements) are wear earplugs/earmuffs

Concessionaire IE

Material SpillAll vehicles delivering construction material to the site is covered to avoid material spillage

Concessionaire IE

Safety of PedestriansSpecial consideration is given to local traffic management for safety of pedestrians

M/ORT&H: 112.2

Mitigation Measures Cross Reference to Documents

Responsibility

Traffic Control and Safety

Action Taken during Month

Being Maintained

Being Maintained

Noise within limit19

8

All necessary measures is taken for the safety of traffic during demolition and site clearing

Concessionaire IE

Environmental Issue

IE

SlNo.

5

6 Concessionaire

1 of 2

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX - 'K'

Implementation Supervision

Details of Environmental Mitigation MeasuresMitigation Measures Cross Reference to

DocumentsResponsibility Action Taken during MonthEnvironmental IssueSlNo.

22Foundation excavation debris

Bentonite slurry or similar debris generated from pile driving or other construction activities is disposed such that it does not flow into surface water bodies.

Project requirement Concessionaire IE

23 Inspection of siteDaily inspection at construction site is carried out to ensure removal of construction debris.

M/ORT&H: 301.3 Concessionaire IE Being carriedout

24 Earthwork debris disposal

As soon as construction is over the surplus earth is utilized to fill up low-lying areas or from the dumping area. In no case, loose earth is allowed to pile up along alignment.

M/ORT&H: 301.3 Concessionaire IE Debris being disposaed regularly

25 Debris Disposal

Debris generated due to dismantling of existing pavement/structures is suitably disposed off to avoid inconvenience to General Public. Good disposal practices.

M/ORT&H: 301.3 Concessionaire IE Debris being disposaed regularly

26Soil contamination by construction wastes, fuel etc.

Oil and fuel spills from construction equipment is minimized. Site/sediment is collected and stockpiled for possible reuse as surfacing of slopes. All the diversion and bunds is removed such that there is minimum amount of sediment generation. At the construction camps, the sewage system is properly designed and built so that no water pollution takes place to any water body or watercourse.

Project requirement Concessionaire IE Under Control

27 Sourcing Quarry materials Sand, aggregates and other quarry material is sourced from licensed quarries of the Concessionaire.

M/ORT&H: 111.3 Concessionaire IE Quarry from licensed quarry

28 Aesthetics and LandscapeAdequate landscaping of the median, embankment slopes, is carried out as provided in the Concession Agreement.

Project requirement Concessionaire IE Being done on NE- 1

29Providing Labor camps and facilities

Providing facilities with respect to location of labor camps, providing sanitation facilities and labor welfare issues etc.

M/ORT&H: 105.2 Concessionaire IE Provided

30Occupational Health and safety

Supplying all necessary safety appliances such as safety goggles, helmets, safety belts, ear plugs, masks etc. to the worker and staff.

M/ORT&H: 105.2 Concessionaire IE Provided

31 Safety Precautions

Adequate precautions is taken to prevent danger from electrical equipment. All machines / equipment are used conform to the relevant Indian standards (IS) codes.

- Concessionaire IE Adequate safety measures provided

32Availability of first aid kit at construction site

A readily available first aid unit including an adequate supply of sterilized dressing material and appliances is provided as per the requirement under the Factory Act. At the following locations:

M/ORT&H: 105.2 Concessionaire IE Available at prime location

33Workers health and hygiene

All anti-material measures shall be complied with, including filling up of burrow pits.

M/ORT&H: 105.2 Concessionaire IE Being ensured

2 of 2

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'L'

From To

1 06+400 32+000 632 No over taking-4 nos,Men at work-25 nos,Speed limit-16 nos,Median opening-8 nos,In convenience regreted-2 nos,Diversion at 120 mtr-3 nos,Diversion at 500 mtr-2 nos,Caution 6 lanning work in progress Go Slow -3 nos,Left Arrow- 2nos,Right Arrow - 3 nos,Blincker - 2 Nos,Diversion - 442 Nos.

2 32+000 57+000 221 No over taking-21 nos,Men at work-38 nos,Go slow-19 nos,Work in progress-28 nos,Inconvenience regreted-7 nos,Pedestrian crossing-1 nos,Diversion at 500mtr-13 nos,Caution 6 lanning work in progress Go slow-2 nos,Direction/Diversion Board - 49 nos,Diversion at 120mtr - 4 Nos,Speed Breaker - 3 Nos,Speed limit - 18 Nos,Left Turn - 5 Nos,Two lane Ahead - 13 Nos.

3 33+690 6 Diversion Board4 34+030 34+080 10 Diversion Board RE Wall5 34+350 4 Diversion Board

36+100 12 Diversion Board37+000 8 Diversion Board

6 38+600 15 Diversion Board7 39+200 22 Diversion Board8 39+730 16 Diversion Board9 40+650 29 Diversion Board

10 40+750 13 Diversion Board

11 40+800 12 Diversion Board12 41+400 12 Diversion Board13 42+100 29 Diversion Board14 42+195 42+400 55 Diversion Board RE Wall15 42+540 7 Diversion Board16 42+594 43+008 61 Diversion Board RE Wall (L/S)17 42+954 42+690 13 Diversion Board RE Wall (R/S)18 43+850 3 Diversion Board19 45+050 8 Diversion Board20 45+084 45+540 104 Diversion Board RE Wall21 45+540 9 Diversion Board

45+750 32 Diversion Board22 46+640 47+230 21 Diversion Board RE Wall23 47+250 18 Diversion Board

48+600 26 Diversion Board24 48+768 49+014 15 Diversion Board RE Wall25 48+900 49+100 52 Diversion Board26 51+200 9 Diversion Board27 51+680 3 Diversion Board Electric Pole Safe28 52+080 16 Diversion Board29 52+500 52+700 55 Diversion Board RE Wall30 52+700 3 Direction Board31 52+724 53+010 38 Diversion Board32 53+010 53+200 83 Diversion Board33 54+060 17 Diversion Board34 54+800 47 Diversion Board35 55+500 40 Diversion Board36 55+610 55+827 82 Diversion Board RE Wall

Safety Measures on NH - 8

Highway

LocationSl No. No. of Sign Boards

Type of Sign Boards Remarks

1 of 3

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'L'

From To

Safety Measures on NH - 8

LocationSl No. No. of Sign Boards

Type of Sign Boards Remarks

37 55+900 17 Diversion Board38 55+150 17 Diversion Board39 56+600 8 Diversion Board40 57+000 82+000 236 Diversion Board - 224 Nos,GO Slow Board - 2

Nos,Work in Progress Board - 3 Nos,Diversion (120 m)ahead Board - 2 Nos,Diversion (500 m) ahead Board - 5 Nos.

41 97+000 98+000 130 Diversion Board RE Wall42 102+000 103+070 200 Diversion Board RE Wall43 82+000 109+200 539 Work in Progress - 21 Nos, Diversion Ahead - 122

Nos, No Over taking - 13Nos, Speed Limit - 15 Nos, GO Slow - 12 Nos, TwoWay Traffic - 8 Nos, Speed Breaker Board - 2 Nos, Men at Work - 57 Nos, Village Road Board - 1 No, In convenience regretted Board - 3 Nos, T- Junction Board - 1 No, Four Lane Board - 2 Nos,Keep Left Board - 7 Nos, Six lane in Progress Board - 5 Nos,One Way Traffic Board - 5 Nos,Bump Ahead - 2 Nos, Keep Right - 4Nos,Blinker Board - 3 No,Diversion Board - 250 Nos, L cone board - 6 Nos

108+390 108+750 54 L Cone - 45 Nos,Diversion Board - 6 Nos,Go Slow Board - 1 No, Men at Work - 1 No, Speed Limit (20 Km) Board - 1 No

109+100 109+300 82 Diversion Board - 30 Nos, L Cone - 50 Nos, Go Slow Board - 1 No, Men at Work - 1 No

44 109+563 109+750 82 Diversion Board - 75 Nos,Keep Right -1 No,Work in Progress - 1 No,Speed limit (30 km) - 1 Nos, Diversion (500m) a head - 1 No,Diversion (120m) ahead - 1 No, No over taking - 1 No,Men at Work - 1 No

Sl No. Location Type of Structure

No. of Sign Board

Type of Sign Board Remarks

1 07+245 Flyover 31 Diversion Board2 11+313 Flyover 10 Diversion Board3 34+020 Flyover 14 Diversion Board 4 42+600 Flyover 24 Diversion Board 5 58+710 Flyover 175 Diversion Board 171 Nos,BlinkerBoard - 4 Nos6 66+940 Flyover 180 Diversion Board - 179 Nos, Blinker Board - 1 No.7 74+370 Flyover 83 Diversion Board - 81 Nos, Blinker Board - 2 Nos.8 77+540 Flyover 213 Diversion Board - 205 Nos, Blinker Board - 2 Nos,

Speed Breaker Board - 2 Nos, Two Lane Traffic Board - 2 Nos, Keep left Board - 1 No, 30KM Board - 1 No

9 90+740 Flyover 74 IRB Board - 70 Nos,Diversion Board - 2 Nos, Blinker Board - 2 Nos

10 102+540 Flyover 52 Diversion Board - 52 Nos, Blinker Board - 2 Nos

11 109+490 Flyover 37 Blinker Board - 2 Nos,IRB Board - 10 Nos, L - Cone Board - 25 Nos

12 72+675 MJBR 2 Diversion Board 13 83+115 MJBR 2 Diversion Board 14 93+542 MJBR 7 Chevron sign Board15 22+760 MNBR 1 Diversion Board16 23+560 MNBR 8 Diversion Board

Structure

2 of 3

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'L'

From To

Safety Measures on NH - 8

LocationSl No. No. of Sign Boards

Type of Sign Boards Remarks

17 50+610 MNBR 2 Diversion Board21 47+910 MNBR 10 Diversion Board25 59+365 MNBR 11 Diversion Board26 68+542 MNBR 2 Diversion Board27 71+242 MNBR 1 Diversion Board28 72+675 MNBR 2 Diversion Board 29 77+227 MNBR 7 Diversion Board 30 80+685 MNBR 2 Diversion Board 31 83+404 MNBR 2 Diversion Board 32 83+404 MNBR 2 Men at work-1 no, Work in progress-1 no33 89+362 MNBR 1 Work in progress35 27+790 PUP 4 Diversion Board36 61+960 PUP 35 Diversion Board - 34 Nos, Blinker Board - 1 No.37 72+080 PUP 150 Diversion Board 38 87+040 PUP 10 Diversion Board - 120 Nos,Go Slow Board - 2

Nos,Men at Work - 2 Nos, Two Lane Board - 2 Nos,Bump - 2 Nos,Light Indicator - 2Nos

39 103+580 PUP 4 Diversion Board 40 54+824 ROB 16 Diversion Board 41 19+609 VUP 145 Diversion Board 46 63+330 VUP 18 Diversion Board 47 82+390 VUP 258 Go slow-2 no, Two way-2 no, Bump-2 no, Diversion

Board-250 nos,Light Indicator - 2Nos

48 Culverts 949 Diversion Board - 1014 Nos, Blinker board - 1 No,Chevron Sign Board - 32 Nos

3 of 3

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'M'

Structure Heldup due to Non-decision from NHAI/IESr. No. Structure Location Village Reason Remarks

1 Flyover 6.400 Narol Decion Pending for Utility Shifting 2 PUP 23.400 Kanera Desion Pending from NHAI; PUP size tobe modified

12.0mx4.5m (PUP) instead of 7.0mx3.5m (PUP)Pending with HQ, Delhi

3 PUP 89.690 Vasad Decision pending from NHAI end to change proposal at Vasad Junction – Construction of Flyover at Ch. 89+700 in lieu of PUP

Pending with HQ, Delhi

4 VUP 95.882 Nandesari Decision pending under COS for provision of Flyover of 35m span at Km. 95+882 (design chainage Km 95+530) in place of VUP of size 12mx5.5m to accommodate 3 pipe line crossings due to accommodate 3 pipe line crossing i.e. VMC, GSFC & GWSSB

Pending with HQ, Delhi

5 PUP 99.580 Padamala Decision pending under COS to construct VUP size 12.0m x 5.5m in place of PUP size 7.0m x 3.5m (PUP)

Pending with HQ, Delhi

6 PUP 103.580 Dasarath PUP size tobe modified 10.0mx4.5m (PUP) instead of 7.0mx3.5m (PUP) - Villagers Demand

IE HAS NOT RECOMMENDED FOR CHANGE OF SIZE VIDE LETTER NO. 501, DT. 28.10.2013 ALSO VILLAGERS DEMAND FOR CHANGE IN LOCATION, CONCESSIONAIRE LETTER NO. 1841, DT. 03.02.2014

Six laning of Ahmedabad – Vadodara Section of NH-8 from km. 6.400 to 108.700 (Length 102.300 km.) and Improvement of existing Ahmedabad – Vadodara Expressway from km. 93.302 in the state of Gujarat ( Length 93.302 km. ) under NHDP Phase – V on Design Built Finance Operate Transfer

(DBFOT)

1) Works under Change of Scope: - There are various proposals, which are to be executed under Change of Scope. The Change of Scopeproposals mainly contains (1) to avoid the shifting of utilities exist on the Project Highway, (2) change in location / modification in size /demand of additional structure by the local villagers / politicians / Sarpanch of Village Panchayat etc. and (3) the additional structure /modification in size / change in location as per the joint inspection made by the Concessionaire, Independent Engineer and Authority. TheConcessionaire has already submitted all the details along with tentative estimated cost in pursuant to clause 16.2.2 of Article 16 of theConcession Agreement as desired by Authority / Independent Engineer. However, till date neither a single “Change of Scope Notice” isreceived by the Concessionaire from the Authority, which is under the obligation of the Authority in pursuant to Clause 16.2.1 of Article16 of the Concession Agreement nor the communication for acceptance / rejection of the proposal is received in pursuant to Clause16.1.1 of Article 16 of the Concession Agreement. The details of Change of Scope is attached herewith as Annexure 5, due to which theconsiderable length i.e. about 20 Km. is held up as of now as per the instructions of Authority / Independent Engineer.

2) Stoppage of Works at Various Locations by Local Villagers / Local Politicians / Village Panchayat:- The works at various locationshave been forcefully stopped by the local villagers / local politicians / Sarpanch of Village Panchayat demanding the additional structure /modification in size of structures proposed in Concession Agreement, to facilitate the villagers. This has already been intimated to theAuthority / Independent Engineer through the Concessionaire’s letter no. IRB/AVSETPL/694/2013, dt. 20/04/2013,IRB/AVSETPL/691/2013, dt. 19/04/2013, IRB/AVSETPL/1096/2013, dated 30/07/2013, IRB/AVSETPL/1689/2013, dt. 30.12.2013,IRB/AVSETPL/1546/2013, dt. 28/11/13. The same are being intimated in the several meetings held with Authority / Independent Engineerfrom time to time. The construction of various structures / six laning and service road is held up at various locations on account of thissince April’2013.

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-N

Concessionaire IE NHAI SDE1 ROB At Nadiad-

Bhadran Railway line

54.865 Tundel 2x37.175m+37m Approved Work in progress - - - - We have followed up the matter with collector office. Application moved to DSP's office for verifying diversion from traffic management view point. DSP's opinion expected by 07.04.2013

2 ROB 65/1 65.545 Bhumel 1x25.350m Under approval with concern authority

Untackled - - - Pending with Railway Authority

NA

3 ROB 75/2 75.425 Gamdi 1x19.370m (skew) Under approval with concern authority

Untackled - - - Pending with Railway Authority

NA

4 ROB 105/2 106.475 Chhani 25.193m+25.015m+19.193m (skew)

Under approval with concern authority

Untackled - - - Pending with Railway Authority

NA

In view of above, the GAD’s for ROB at Km. 65+545 & Km. 75+425 are still pending for approval from the Authority / Railway. Please note that the GAD approval is under the obligations of Authority

NOTE :- The attention of the Authority / Independent Engineer is invited towards the Railway letter no. W.420/5/189,190,191, dated 29/05/2012 and W.420/4/190, dated 15/06/2012 vide which the comments on the GAD’s submitted by theAuthority in pursuant to Authority’s obligation stipulated under clause 4.1.2 (d) of Article 4 of the Concession Agreement. The revised GAD’s of these two ROB’s were submitted by the Concessionaire duly complying the observations of Railways to theAuthority vide letter no. IRB/AVSETPL/185/2012, dated 13/09/2012, for further submission to Railway for approval. Further, the comments on these submitted GAD’s were received from Railway vide letter no. W 420/9/125,124, dated 17/01/2013demanding the dismantling of existing ROB. In view of observation / insistence of Railway, the revised GAD’s were again submitted by the Concessionaire to the Authority vide letter no. IRB/AVSETPL/618/2013, dated 29/03/2013 for further submissionto Railway Authority for Approval.

The revised GAD’s were again submitted vide Concessionaire letter no. IRB/AVSETPL/1177/2013, dated 21/08/2013 with New RDSO design as insisted upon by the Western Railway vide letter no. W420/9/94(D) (W3), dated 02/07/2013 addressed toyour office on earlier submitted General Arrangement Drawings, Also Revised GAD for ROB @ Ch. 106+475 is submitted vide IRB/AVSETPL/1703/2014, dated 02/01/2014 in compliance to comments of Railway Authority.

Status of Work Pending with

Six laning of Ahmedabad – Vadodara Section of NH-8 from km. 6.400 to 108.700 (Length 102.300 km.) and Improvement of existing Ahmedabad – Vadodara Expressway from km. 93.302 in the state of Gujarat ( Length 93.302 km. ) under NHDP Phase – V on Design Built Finance Operate Transfer (DBFOT)

RAIL OVER BRIDGE (ROB) STATUSSr. No. ROB Design

ChainageVillage Proposed Span

ArrangementGAD Status L.C. closing NOC from

Collector/Mamlatdar upto date statusRemarks

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-O

MONTH Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15

MONTHLY TARGETED 15.627% 1.091% 1.916% 2.088% 2.206% 1.637% 0.046% 0.046% 1.746% 3.796% 4.195% 4.243% 4.239% 4.282% 4.154% 4.095% 4.071% 1.940% 0.598% 0.598% 2.153% 4.229% 4.419% 4.610% 4.342% 3.855% 3.428% 2.803% 2.303% 1.461% 0.321% 0.321% 1.354% 1.460% 0.325% 0.000%

MONTHLY FINANCIAL PROGRESS 17.131% 1.856% 2.227% 4.204% 5.297% 3.610% 4.503% 3.751% 1.854% 2.172% 2.623% 5.268% 2.378% 2.761% 5.145% 4.210%

MONTH Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15

CUMULATIVE TARGETED 15.627% 16.717% 18.633% 20.721% 22.927% 24.565% 24.611% 24.657% 26.404% 30.199% 34.395% 38.638% 42.877% 47.159% 51.313% 55.408% 59.480% 61.420% 62.017% 62.615% 64.768% 68.997% 73.415% 78.025% 82.367% 86.222% 89.650% 92.454% 94.757% 96.218% 96.539% 96.861% 98.215% 99.675% 100.000% 100.000%

CUMULATIVE FINANCIAL PROGRESS

17.131% 18.987% 21.213% 25.418% 30.715% 34.325% 38.828% 42.579% 44.433% 46.606% 49.228% 54.496% 56.874% 59.636% 64.781% 68.990%

Note :- This Month % is provisional and final % will be updated in next MPR as per CA Ceritficate

Six laning of NH-8 and improvement of NE-1 of Ahmedabad – Vadodara Section in the state of Gujrat under NHDP Phase-V on DBFOT Toll Basis.

15.6

27%

16.7

17%

18.6

33%

20.7

21%

22.9

27%

24.5

65%

24.6

11%

24.6

57%

26.4

04% 30

.199

% 34.3

95% 38

.638

% 42.8

77% 47

.159

% 51.3

13% 55

.408

% 59.4

80%

61.4

20%

62.0

17%

62.6

15%

64.7

68% 68

.997

% 73.4

15% 78

.025

% 82.3

67% 86

.222

%

89.6

50%

92.4

54%

94.7

57%

96.2

18%

96.5

39%

96.8

61%

98.2

15%

99.6

75%

17.1

31%

18.9

87%

21.2

13% 25

.418

% 30.7

15%

34.3

25% 38

.828

% 42.5

79%

44.4

33%

46.6

06%

49.2

28% 54

.496

%

56.8

74%

59.6

36% 64

.781

% 68.9

90%

0.000%

10.000%

20.000%

30.000%

40.000%

50.000%

60.000%

70.000%

80.000%

90.000%

100.000%

Jan-

13

Feb-

13

Mar

-13

Apr

-13

May

-13

Jun-

13

Jul-1

3

Aug

-13

Sep-

13

Oct

-13

Nov

-13

Dec

-13

Jan-

14

Feb-

14

Mar

-14

Apr

-14

May

-14

Jun-

14

Jul-1

4

Aug

-14

Sep-

14

Oct

-14

Nov

-14

Dec

-14

Jan-

15

Feb-

15

Mar

-15

Apr

-15

May

-15

Jun-

15

Jul-1

5

Aug

-15

Sep-

15

Oct

-15

Nov

-15

Dec

-15

Fina

ncia

l Pro

gres

s in

%

Month

"S" CURVE PLANNED Vs ACHIVED

Month

"S" CURVE PLANNED Vs ACHIVED FINANCIAL PROGRESS

LEGEND :BASE LINE TARGET

ACHIVED TARGET

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix -'P'

Month No.of NCR Issued No. of NCR Closed No. of NCR Pending Remarks

January'13 1 0 1February'13 1 1 0March'13 0 0 0April'13 0 0 0May'13 0 0 0June'13 0 0 0July'13 0 0 0August'13 0 0 0September'13 0 0 0October'13 0 0 0November'13 0 0 0December'13 0 0 0January'14 0 0 0February'14 0 0 0March'14 0 0 0April'14 0 0 0

Total 2 1 1

Activity Details No. of NCR Issued No. of NCR Closed No. of NCR Pending RemarksHighways 0 0 0Structures 0 0 0Materials 0 0 0

Environmental 0 0 0Total 0 0 0

NON CONFORMANCE REPORTSNon Conformance Report Upto APRIL - 2014

Six laning of Ahmedabad – Vadodara Section of NH-8 from km. 6.400 to 108.700 (Length 102.300 km.) and Improvement of existing Ahmedabad – Vadodara Expressway from km. 93.302 in the state of Gujarat ( Length 93.302 km. ) under NHDP Phase – V on Design Built Finance Operate

Transfer (DBFOT)

Non Conformance Report during the Month of APRIL 2014

MONTHLY PROGRESS REPORT - APRIL 2014 Appendix-'Q'

From (KM) To (KM)Fatal/ Very

SeriousGrievous Minor

Total accident

Ahmedabad Vadodara Expressway(NE 1)

0.000 93.302 93.302 2 3 66 71 0 -

Total 93.302 2 3 66 71 0

Gujarat1

NHAI Abstract of accident data for the month of April- 2014

Sr.No State PIU/CMU NH No.

StretchLength (KM)

Details of Accident No of Animals Killed,if

any

Remarks

Regional Office -Gandhi Nagar Gujarat

Ahmedabad

1 of 1

MONTLY PROGRESS REPORT - APRIL 2014 Appendix-'R'

National Highway No. : Ahmedabad - Vadodara Expressway NE-1 Month : April -2014B C D E F G H

Accident Location Side Area Nature of

AccidentClassification of accident Causes Road

Feature Road

Condition

Intersection Type And Control

Weather Condition

Fatal / Very

Serious Grievous Minor Non

Injured

1 2.4.14 12:16 AM 9+850 RHS Rural 3 2+3 4 4 1 - 1 GJ-6-AA-2435 & GJ-15-XX-5436 0 1 3 0 - PAT+CRN -

2 2.4.14 8:50 PM 8+300 RHS Rural 1 3 5 4 1 - 1 GJ-6-ED-1659 0 0 2 0 - PAT+ AMB -

3 2.4.14 9:54 PM 21+700 RHS Rural 4 4 4 4 1 - 1 GJ-1-CT-7673 & MH-01-BB-2485 0 0 0 0 - PAT -

4 3.4.14 2:30 AM 38+600 RHS Rural 8 4 4 4 1 - 1 GJ-5-JF-0523 0 0 0 0 - PAT+CRN -5 3.4.14 6:00 AM 80+500 RHS Rural 8 4 5 4 1 - 1 RJ-07-GA-3680 0 0 0 0 - PAT -6 3.4.14 10:41 AM 36+050 RHS Rural 4 3 4 4 1 - 1 GJ-4-BE-4391 0 0 1 0 - PAT+CRN -

7 3.4.14 11:20 AM 19+100 RHS Rural 3 4 4 4 1 - 1 GJ-18-G-6600 & GJ-06-HD-0843 0 0 0 0 - PAT -

8 3.4.14 11:55 AM 72+450 LHS Rural 3 4 4 4 1 - 1 GJ-1-CY-3010 & unknown vehicle 0 0 0 0 - PAT -

9 4.4.14 1:50 AM 57+480 LHS Rural 3 3 4 4 1 - 1 GJ-24-U-1733 & GJ-1-BX-9032 0 0 1 0 - PAT+ AMB+ CRN -

10 4.4.14 2:00 AM 49+050 LHS Rural 1 4 4 4 1 - 1 GJ-05-BU-0883 0 0 0 0 - PAT -11 4.4.14 5:13 PM 53+650 LHS Rural 8 4 5 4 1 - 1 RJ-19-GD-4518 0 0 0 0 - PAT -

12 4.4.14 9:15 PM 22+000 RHS Rural 3 4 4 4 1 - 1 GJ-27-C-9290 & GJ-1-HZ-6082 0 0 0 0 - PAT -

13 5.4.14 5:55 AM 72+750 LHS Rural 8 1 4 4 1 - 1 (Male) Dead body found . 1 0 0 0 - PAT -

14 5.4.14 7:00 AM 49+750 RHS Rural 4 4 4 4 1 - 1 RJ-19-GD-5439 0 0 0 0 - PAT -

15 5.4.14 4:40 PM 22+000 RHS Rural 3 4 4 4 1 - 1 GJ-1-HQ-8485 & GJ-1-G-4993 & GJ-24-A-497 0 0 0 0 - PAT -

16 5.4.14 5:55 PM 15+480 LHS Rural 8 4 5 4 1 - 1 GJ-5-C-8219 0 0 0 0 - PAT+ CRN -17 5.4.14 10:21 PM 15+500 LHS Rural 1 4 5 4 1 - 1 GJ-9-Z-9114 0 0 0 0 - PAT+ CRN -

18 6.4.14 4:12 AM 3+700 RHS Rural 3 4 4 4 1 - 1 GJ-1-AY-8758 & unknown vehicle 0 0 0 0 - PAT+ CRN -

19 6.4.14 8:00 AM 44+930 RHS Rural 1 4 4 4 1 - 1 GJ-12-AU-5109 0 0 0 0 - PAT -

20 6.4.14 9:30 PM 44+850 RHS Rural 3 4 4 4 1 - 1 GJ-27-T-1975 & GJ-1-KM-2010 0 0 1 0 - PAT -

21 7.4.14 5:15 AM 06+450 RHS Rural 8 4 5 4 1 - 1 RJ-19-GC-4857 0 0 0 0 - PAT -22 7.4.14 5:30 AM 17+600 RHS Rural 1 3 5 4 1 - 1 GJ-1-KM-9310 0 0 1 0 - PAT+CRN+108 AMB -23 7.4.14 7:00 AM 71+700 LHS Rural 4 4 4 4 1 - 1 RJ-19-GA-7540 0 0 0 0 - PAT -24 7.4.14 11:53 PM 88+750 RHS Rural 4 4 4 4 1 - 1 GJ-23-V-2340 0 0 0 0 - V PAT -25 8.4.14 3:10 AM 7+000 RHS Rural 8 4 4 4 1 - 1 GJ-5-CS-9838 0 0 0 0 - PAT+ CRN -26 8.4.14 3:30 PM 17+000 LHS Rural 8 4 4 4 1 - 1 GJ 6 AT 4371 0 0 0 0 - PAT -27 9.4.14 12:10 AM 24+340 LHS Rural 8 4 4 4 1 - 1 JK-02-AQ-2735 0 0 0 0 - PAT -28 9.4.14 2:12 AM 61+140 LHS Rural 1 4 4 4 1 - 1 GJ-6TT-6183 0 0 0 0 - PAT+ CRN -29 9.4.14 5:30 AM 32+230 RHS Rural 8 4 4 4 1 - 1 MH-04-DD-645 0 0 0 0 - PAT -30 9.4.14 12:45 PM 9+450 RHS Rural 8 4 5 4 1 - 1 GJ-18-AA-20 0 0 0 0 - PAT+ CRN -

(2) Stretch Chainage : Km (0/00 to 93/302)(3) State : Gujarat(4) District : Ahmedabad, Kheda, Anand, Vadodara

National Highways Authority of India Name of PIU : Ahmedabad

(1) Stretch : Ahmedabad - Vadodara Expressway NE-1

(5) Police Station : Ramol,Kanbha,Mahemdabad,Nadiad Rural,Chaklasi,Anand Rural.Vasad,Khambholaj,Bhadrva,Chhani,Vadodara Accident Data

Sr. No. Date

Time of acc.

(am/pm)

A

Vehicle Responsible

No. of Affected Persons No of Animals Killed if

any

Help Provided by Ambulance /Crane/ Petrol

Vehicle

Remarks

1 of 3

MONTLY PROGRESS REPORT - APRIL 2014 Appendix-'R'

National Highway No. : Ahmedabad - Vadodara Expressway NE-1 Month : April -2014B C D E F G H

Accident Location Side Area Nature of

AccidentClassification of accident Causes Road

Feature Road

Condition

Intersection Type And Control

Weather Condition

Fatal / Very

Serious Grievous Minor Non

Injured

Accident Data

Sr. No. Date

Time of acc.

(am/pm)

A

Vehicle Responsible

No. of Affected Persons No of Animals Killed if

any

Help Provided by Ambulance /Crane/ Petrol

Vehicle

Remarks

31 9.4.14 4:00 PM 26+870 LHS Rural 8 4 4 4 1 - 1 GJ-1-KB - 1236 & animal 0 0 0 0 - PAT -

32 9.4.14 9:00 PM 82+618 RHS Rural 8 1 4 4 1 - 1 Male dead body found 1 0 0 0 - PAT -

33 10.4.14 9:45 PM 29+480 LHS Rural 3 4 4 4 1 - 1 GJ-18-BB-4585 & GJ-23-AF-4046 0 0 0 0 - PAT -

34 11.4.14 12:17 AM 25+730 RHS Rural 4 4 4 4 1 - 1 GJ-1-IC-305 0 0 0 0 - PAT -

35 13.4.14 9:19 AM 36+500 LHS Rural 3 4 4 4 1 - 1

Unknokn vehicle & GJ-1-RD-4127 & GJ-1-KR-7463 & GJ-18-BB-0544

& GJ-1-KB-9301

0 0 0 0 - PAT -

36 13.4.14 10:45 AM 74+700 LHS Rural 3 3 5 4 1 - 1 GJ-9-Y-2689 & unknown vehicle 0 0 3 0 - PAT+AMB-108 -

37 15.4.14 3:17 AM 72+436 LHS Rural 3 3 4 4 1 - 1 GJ-2-AN-485 & RJ-07-GB-7659 0 0 3 0 - PAT+AMB+CRN+ -

38 15.4.14 2:48 PM 39+750 RHS Rural 1 2+3 4 4 1 - 1 GJ-01-KP-4827 0 1 5 0 - PAT+ CRN+ AMB -

39 15.4.14 5:40 PM 72+750 LHS Rural 3 4 4 4 1 - 1 GJ-01-ZM-4339 & GJ-01-RB-4594 0 0 0 0 - PAT -

40 16.4.14 6:20 AM 45+900 LHS Rural 4 4 4 4 1 - 1 GJ-12-AY-6000 0 0 0 0 - PAT -41 16.4.14 1:49 PM 33+300 LHS Rural 4 4 4 4 1 - 1 GJ-6-FQ-3511 0 0 0 0 - PAT -42 16.4.14 5:55 PM 34+100 LHS Rural 1 3 5 4 1 - 1 GJ-18-AH-1822 0 0 4 0 - PAT+ CRN -43 17.4.14 2:38 AM 21+650 LHS Rural 4 4 4 4 1 - 1 GJ-6-VV-8500 0 0 0 0 - PAT -44 17.4.14 4:00 AM 34+200 LHS Rural 4 4 4 4 1 - 1 GJ-8-U-3390 0 0 0 0 - PAT -

45 17.4.14 11:30 AM 39+800 LHS Rural 3 4 4 4 1 - 1 GJ-01-KR-3477 & unknown vehicle 0 0 0 0 - PAT -

46 17.4.14 11:35 AM 42+050 RHS Rural 3 4 4 4 1 - 1 GJ-01-BA-8405 & GJ-05-CN-8693 & GJ-05-

CM-129 0 0 0 0 - PAT -

47 18.4.14 4:25 AM 09+000 RHS Rural 1 4 5 4 1 - 1 MH-18-AA-8535 0 0 0 0 - PAT+ CRN -

48 18.4.14 8:30 PM 42+050 RHS Rural 3 4 4 4 1 - 1 MH-04-AC-5000 & MH-04-EX-8981 0 0 0 0 - N PAT -

49 19.4.14 3:20 AM 23+500 RHS Rural 3 3 4 4 1 - 1 GJ-5-UU-7258 & unknown vehicle 0 0 2 0 - PAT+AMB+ CRN -

50 19.4.14 9:40 PM 7+100 RHS Rural 1 4 4 4 1 - 1 GJ-1-DT-4656 0 0 0 0 - PAT +CRN -51 19.4.14 10:16 PM 42+000 RHS Rural 8 3 4 4 1 - 1 GJ-01-KE-400 0 0 2 0 - PAT + AMB -52 20.4.14 6:00 AM 72+240 RHS Rural 8 4 4 4 1 - 1 MH-18-M-9511 0 0 0 0 - PAT -53 20.4.14 8:30 AM 85+000 LHS Rural 4 4 4 4 1 - 1 GJ-16-AJ-8836 0 0 0 0 - PAT -54 21.4.14 7:30 AM 65+580 RHS Rural 4 4 4 4 1 - 1 MH-19-Z-3570 0 0 0 0 - PAT -55 22.4.14 7:03 AM 79+320 LHS Rural 8 4 4 4 1 - 1 RJ-19-CB-3391 0 0 0 0 - PAT+ CRN -56 23.4.14 5:10 PM 71+350 LHS Rural 4 4 5 4 1 - 1 GJ-7-AG-9092 0 0 0 0 - PAT -

57 23.4.14 11:35 PM 23+200 LHS Rural 3 3 4 4 1 - 1 MH-04-FU-21 & unknown vehicle 0 0 1 0 - PAT+ CRN -

58 24.4.14 10:10 AM 38+000 RHS Rural 3 4 4 4 1 - 1 GJ-1 HC-7884 & KA-16-A-6023 0 0 0 0 - PAT -

59 24.4.14 9:10 PM 71+850 RHS Rural 4 4 4 4 1 - 1 GJ-1-KR-1217 & RJ-19-GB-0772 0 0 0 0 - PAT -

60 26.4.14 1:33 AM 09+850 LHS Rural 4 3 4 4 1 - 1 GJ-05-AT1780 0 0 1 0 - PAT -

2 of 3

MONTLY PROGRESS REPORT - APRIL 2014 Appendix-'R'

National Highway No. : Ahmedabad - Vadodara Expressway NE-1 Month : April -2014B C D E F G H

Accident Location Side Area Nature of

AccidentClassification of accident Causes Road

Feature Road

Condition

Intersection Type And Control

Weather Condition

Fatal / Very

Serious Grievous Minor Non

Injured

Accident Data

Sr. No. Date

Time of acc.

(am/pm)

A

Vehicle Responsible

No. of Affected Persons No of Animals Killed if

any

Help Provided by Ambulance /Crane/ Petrol

Vehicle

Remarks

61 26.4.14 2:23 AM 17+300 LHS Rural 3 4 4 4 1 - 1 MH-12-GV-7719 & unknown vehicle 0 0 0 0 - PAT -

62 26.4.14 10:01 AM 56+940 LHS Rural 1 4 4 4 1 - 1 GJ-2-AP-4111 0 0 0 0 - PAT+ CRN -

63 26.4.14 2:05 PM 80+050 LHS Rural 3 2+3 4 4 1 - 1 UP-32-CJ-2090 & unknown vehicle 0 1 2 0 - PAT+ AMB -

64 27.4.14 7:35 AM 15+670 RHS Rural 1 3 4 4 1 - 1 MH-18-AA-9989 0 0 1 0 - PAT+ AMB -

65 27.4.14 7:40 AM 15+680 RHS Rural 3 3 4 4 1 - 1 GJ-27-C-9642 & GJ-06-HQ-2765 0 0 1 0 - PAT + AMB -

66 28.4.14 4:30 AM 10+000 RHS Rural 8 4 4 4 1 - 1 GJ-18-AV-6233 0 0 0 0 - PAT+ CRN -67 28.4.14 5:25 AM 42+000 RHS Rural 1 4 4 4 1 - 1 MP-09-GF-1406 0 0 0 0 - PAT -

68 30.4.14 2:30 AM 65+000 LHS Rural 3 4 4 4 1 - 1 GJ-12-Z-1451 & RJ-19-GA-5154 0 0 0 0 - PAT -

69 30.4.14 5:33 AM 22+728 LHS Rural 1 4 4 4 1 - 1 GJ-1-CZ-2601 0 0 0 0 - PAT -70 30.4.14 2:06 PM 66+720 RHS Rural 8 3 5 4 1 - 1 GJ-5-CH-5293 0 0 7 0 - PAT+ AMB+ CRN -71 30.4.14 5:48 PM 32+855 RHS Rural 4 4 4 4 1 - 1 GJ-1-KE-314 0 0 0 0 - PAT -

ABCDEFGH

PAT Patrolling VehicleAMBCRN

AmbulanceCrane

Name & Sign. Of Project Director

1 T-junction, 2 Y-junction, 3 Four arm junction, 4 Staggered junction, 5 Junction with more than four arms, 6 Roundabout junction, 7 Manned rail crossing, 8 Unmanned rail crossing 1 Fine, 2 Mist / fog, 3 Cloudy, 4 Light rain, 5 Heavy rain, 6 Hail / sleet, 7 Snow, 8 Strong wind, 9 Dust strom, 10 Very hot, 11 Very cold, 12 Other extraordinary weather condition

Note :-

1 Fatal / Very serious 2 Grievous injury, 3 Minor injury, 4 Non injury 1 Drunken, 2 Overspeeding, 3 Vehicle out of control, 4 Fault of driver of motor vehicle / driver of other vehicle / cyclist / Pedestrian/Animal / passenger, 5 Defect in mechanical condition of motor vehicle / 6 Stray Animal

1 single lane, 2 two lane, 3 three lanes or more without central divider (median), 4 Four lanes or more with central divider 1 straight road, 2 Slight curve, 3 Sharp curve, 4 Flat Road, 5 Gentle incline, 6 Steep incline, 7 Hump, 8 Dip

Urban / Rural and details of surrounding landuse 1 Overturning, 2 Head on colision, 3 Rear end collision, 4 Collision brush / side swipe, 5 Right angled collision, 6 Skidding /Jumping 7 Right turn collision, 8 Other ( Pl. specific)

3 of 3

Issues Concerned with NHAI

Appendix ‘S’

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

I-Status of Unencumbered LandI.a Land Acquisition / Procurement of Site

Balance Land Proposal Status:

Sr. No. Remarks

NE-1

11a

1b

1c

1d

NH-82

3A Prepared and with Competent Authority for Sign.

c) Soil conservative of forest – Vasad, Ch.91+000 km. – LA Proposal to be Prepare & submit to Authority.

d) Savali Carriageway to FO @ Ch. 109.490 – (At Dumad Chowkadi) – LA proposal to be prepared and submit to Authority

e) Vatrak - LA Proposal Submitted, JMS completed - follow up for 3A.

f) Additional Land proposal submitted for Bus lay bay / missing / truck lay bay, entry / exit ramp – follow up – 55.00 Hact. + 20.00

Prepared and submitted to Concern Authority.Land transfer proposal under process and pending with Agricultural Department.

Concessionaire Proposal prepared and submitted to NHAI.

3A Prepared and with Competent Authority for Sign.

As per the "Memorandum on Procurement of the Site", Dated: 28/12/2012,only 86.31 % of the total area of the 'Site' necessary for Six Lane ProjectHighway has been granted by National Highways Authority of India to theConcessionaire as -Vacant Access and Right of Way.

1) Tollplaza LA tobe finalized.2) Additional 3A prepared and with Competent Authority for Sign.Kheda Tollplaza: Additional 3A prepared and with Competent Authority for Sign

Submitted by Concessionaire to PD, NHAI, same forwarded to IE by PD, NHAI for review & comments - Pending with IE, Vadodara district 3(A) Land Schedule submitted by letter

Ahmedabad - JMS completed (Weigh Bridge/additional ETC lane) - Submitted

1) Ahmedabad – Vadodara Toll Plaza

AUDA Ring Road - For Weigh Bridge - Submitted

Completed on 10/07/2013

Land not required for weigh bridge

b) Mini Mahi River – LA Proposal to be prepared & submit to Authority

Pending from NHAI

3(a) draft notification sent to New Delhi for Gazette notification for Ahmedabad & Vadodara district)

2) Anand & Nadiad InterchangeLand Acquisition for Weigh Bridge

a) Vasad toll plaza Ch.-91+785 km.- LA Proposal to additional land for weigh bridge & Tollplaza

b) Kheda BypassTollplaza @ Ch. 42+000 (as per CA)

Status

Pending from NHAI

3(A) Published in Gazette No. 3754 (A), dt. 20/12/13 and Local Sandesh Gujarati News Paper on dt. 20/01/14 also and with Competent Authority for sign

Vadodara - JMS completed (Weigh Bridge/ additional ETC lane) - Submitted

Description

Balance Land Proposal Status 1 OF 1

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

I-b Status of Land Acquisition

a) NH-8 (Ahmedabad-Vadodara Section)

From To 3(a) 3 (A) 3 (D) 3 (G) 3 (H)

1 Ahmedabad NH-8 6.400 21.800 8 6 4 34.8383 34.8383 25.5661 25.0629 20.2525 3.9036 10.49 3.9036

2 Kheda NH-8 21.800 68.200 24 24 24 95.6475 95.6475 68.5572 64.5446 63.0324 20.7075 16.44 20.7075

3 Anand NH-8 68.200 94.000 12 12 12 63.9011 63.9011 34.9961 34.8999 33.9544 13.0608 20.86 13.0608

4 Vadodara NH-8 94.000 110.000 62 (Cancel)

6 6 36.8995 36.8995 11.2076 5.7436 5.4180 4.0522 6.29 4.0522 CALA has canceled 2 villagesdue to LA is not required.

50 231.286 231.286 140.327 130.251 122.657 41.7241 54.08 41.7241

Percentage (%) 100.00% 60.67% 56.32% 53.03%

b) NE-1 (Ahmedabad-Vadodara Expressway)

3(a) 3 (A) 3 (D) 3 (G) 3 (H)

1 Ahmedabad NE-1 1 9.0262 9.0262 0.0000 0.0000 0.0000 0.0000

2 Vadodara NE-1 2 9.0260 9.0260 2.3700 0.0000 0.0000 0.0000

3 18.0522 18.0522 2.3700 0.0000 0.0000 0.0000

100.00% 13.13% 0.00% 0.00%

249.3386 142.6970 130.2510 122.6573 41.7241

Amount Disbursed

(in Cr.)

Total Village(Nos.)

Awarded Village(Nos.)

Approved Village(Nos.)

Total Area tobe

Acquired (Ha)

Status(Ha)

Summary of Land Acquisition

Total…..(B)

Percentage (%)

Grand Total (NH-8+NE-1)…(A+B)

Area Disbursed

(in Ha.)

Remarks

Total…..(A)

Sr. No. District Village(Nos.)

Total Area tobe Acquired

(Ha)

Status(Ha)

Remarks

Sr. No. District Location(Ch. / Km.)

LA Summary 1 OF 1

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

3 (A) 3 (D) 3 (G) 3 (H)

Narol 4.3770 4.1643

Isanpur 2.0449 0.0000

Lambha 0.9915 0.9915

Vatva 3.0247 0.0000

Laxmipura 0.6349 0.6349

Asalali 7.1159 7.0846

Bareja 5.0116 5.0116

Jetalpur 2.3656 2.3656

Ramol (NE1) 9.0262 0.0000

Total 34.5923 20.2525

2 Kheda Bidaj 0.8744 26.5748 95.6475 68.5572 64.5446 0.7046 0.0000Hariyala 7.4285 6.6676Kajipura 1.8193 1.8913

Malarpura 0.4650 0.4350Gobhalaj 2.5849 2.3129Kanera 3.8926 3.8332

Radhvanaj 4.3892 4.3892Vansar 3.8412 3.6526

Sokhada 4.5119 4.0513Sandhana 3.5306 3.4953

Antroli 0.0931 0.0931Ratanpur 0.2263 0.2263

Matar 1.5228 1.5113Tundel 2.8617 2.8133Dantali 4.8907 4.8867Dabhan 7.5319 7.4827Dumral 0.8819 0.8819Piplag 2.4575 2.4122Guntal 1.7263 1.6486Nadiad 3.2909 3.1579

Uttarsanda 0.1269 0.1269Bhumel 3.5276 1.8671Kanjari 3.5343 3.3420

Narsanda 3.0632 1.1494Total 69.0727 63.0324

3 Anand Boriyavi 3.4593 28.9050 63.9011 34.9961 34.8999 3.4593 0.0000Lambhvel 0.7608 0.7608

Anand 2.6859 2.5897Samarkha 1.0871 1.0871Chikodara 1.9848 1.9848

Vaghasi 2.3182 2.3182Gamdi 4.0261 3.8489Mogar 3.9599 3.9599

Gopalpura 0.0120 0.0120Vadod 1.8678 1.8678Adas 4.5179 4.5179

Vasad 8.3163 7.5480Total 34.9961 33.9544

Dashrath 3.0771 0.9591

Padamla 1.7881 0.2067

Fajalpur 3.6279 2.1857

Sakarda 0.0651 0.0000

Chhani 0.4684 0.4684

Ranoli 0.4501 0.0749

Dumad 1.5232 1.5232

Rayaka 0.2077 0.0000

Ajod 2.7078 0.0000

Sokhada 6.3182 0.0000

Total 20.2336 5.4180

158.8947 90.444 249.339 142.697 130.251 122.657

LAND ACQUISITION STATUSSr. No. District Village Area

(Ha)Additional land required which

was not included in

earlier proposal (Submitted by

Concessionaire on 02/06/12)

(Ha)

Total Area to be Acquired

(Ha)

Status(Ha)

Remarks

1 Ahmedabad 9.2722 43.8645 25.5661 25.0629 0.0000 NH-8: Balance 2 villages for 3(G) as below: 1) Isanpur2) VatvaNE-1: Balance 1 village for 3(G) as below:1) Ramol (NE-1)

0.0000 NH-8: Cancel 2 Nos. villages as below:1) Sakarda2) RayakaNE-1: Balance 2 villages for 3(G) as below: 1) Ajod - NE-12) Sokhada - NE-1

NOTE: Delay in procurement of land: - In pursuant clause 4.2.1 of Article 4 of the Concession Agreement to be read in conjunction with clause 10.3 of Article 10 ofthe Concession Agreement it is under the obligation of the Authority to provide all the land included in the Appendix attached to the Memorandum signed jointly inpursuant to clause 10.3.1 of Article 10 of the Concession Agreement within 90 days from the Appointed Date to the Concessionaire. The status of land made availableby the Authority as on 24/04/2013 has been intimated to the Authority / Independent Engineer vide Concessionaire’s letter no. IRB/AVSETPL/735/2013, dated29/04/2013, which is a evident that only 86.67 % land was made available to the Concessionaire for the development of the Project Highway, which includes 107.34hectare i.e. 14.69% of total land under 3D stage only. Even as on today the payment to the land owners for these lands is not disbursed by the Authority in-spite oflapse of more than 8 months from the Appointed Date, due to which the land owners are not allowing to work in their lands as already intimated to Authority /Independent Engineer during several meetings held from time to time as well as through letters. The details of the length of six laning of Project Highway, Service Road& structures affected due to non availability of land is enclosed herewith as Annexure 1 & 2 in the form of strip plan as well as tabular form. It is also to be brought intonotice of Authority / Independent Engineer that unless the work of six laning by constructing new 3 lane on RHS is completed and traffic is diverted into it, the work ofwidening from existing 2 lane to 3 lane in LHS cannot be taken up. Similarly the work in the sections, which are under Tree saving, cannot be executed as the entirewidening is to be done on RHS only and hence these lengths / sections are entirely held up because of non-availability of land.

4 Vadodara 25.6919 45.9255 13.5776 5.7436

Villagewise LA details 1 OF 1

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

II - Utility Shifting & Tree CuttingII-a Utility Shifting:

Utility shifting estimates and approval status as below:II-a-1-Electric Pole Shifting:Total 9 nos. estimates have been submitted to Authority and all are approved. Also works have been started II-a-2 High Tension Line Raising / Shifting – GETCO:

II-a-3 Water Supply & Sewer Line Shifting:

II-1-4-STATUS OF UTILITY SHIFTING

(A) Electric Pole Shifting

From To

1 UGVCL, Ahmedaba Ahmedaba Barejadi 11+400 21+100 12,110,043 1,816,506

2 UGVCL, Ahmedaba Ahmedaba Bareja 21+100 29+450 19,185,385 2,877,808

3 MGVCL, Mhemedavad Mehemdavad Kheda 1 29+450 45+400 18,097,098 2,714,565 1 1 1 1

45+400 58+700

58+700 66+000

5 MGVCL, Anand Anand Anand North 66+000 74+350 15,104,204 2,265,631

6 MGVCL, Anand Anand Saraddar Shastri

74+350 77+550 8,891,738 1,333,761

7 MGVCL, Anand Anand South 77+550 93+350 41,196,067 6,179,410

8 Vadodara, MGVCL Vadodara Chahani 97+800 108+700 23,996,923 3,599,539

9 Vadodara, MGVCL Vadodara Koyali 95+850 97+800 15,134,795 2,270,219

9 188,394,373 28,259,157 9 9 9 9

ChainageSr. No. Company Name Division Sub-Division No. of Estimate

2 2 2 Approved on 09/12/13 by CGM,RO, Gandhinagar

Estimated Amount Supervision Charges

No. of Estimate Received by

NHAI

No. of Estimate Reviewed by IE

No. of Estimate Sent to

RO/CGM by PD

No. of Estimate Approved by Competent Authority.

Total

Approved on 29/08/13 vide CGM,NHAI, Gandhinagar letter nos.NHAI/12011/1/2010-RO-GNR/Tech./AHD/Vol.13/1798 Supervision Charges were

1 1

2

4 MGVCL, Nadiad Nadiad Nadiad ®Chaklasi

3 3 3 3 3 Approved on 26/08/13Supervision Charges weredeposited in 2nd week of Sep'13.

Approved on 29/08/13 vide CGM,NHAI, Gandhinagar letter nos.NHAI/12011/1/2010-RO-GNR/Tech./AHD/Vol.13/1799 &NHAI/12011/1/2010-RO-GNR/Tech./AHD/Vol.13/1800. Supervision Charges were

1

Total 17 nos. revised cost estimates have been submitted to Authority, all 10 nos. estimates are yet to be approved by Authority due to change in schedule of Rates but now As per new SOR revised estimates are finalized.

Total 4 nos. estimates have been submitted to Authority and all are approved. Additional Vadodara Municiple Corporation pipe line for the same estimate to be prepared, site inspection completed.

2 2 2 2

34,678,121 5,201,718 1 1

Work has been started

Status Remarks

2 2

II-Utility Shifting-Ele.pole 1 of 1

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

(B) High Tension Line Raising / Shifting - GETCOCompany Name: GETCO

Existing Design

1 5.-6 8+640 8+530 3,572,200.00 522,954.00 1 1 1 0 Pending with HQ, Delhi

2 5.-6 8+960 8+840 - - - - - - Raising Said by Not require shiffting D.E

3 2.-3 9+310 9+200 - - - - - - Raising Said by Not require shiffting D.E

4 261-262 9+340 9+230 7,498,138.00 1,094,163.00 1 1 1 05 25-26 21+380 21+250 14,017,084.00 2,025,544.00 1 1 1 06 203-204 27+230 27+110 7,436,924.00 1,085,424.00 1 1 1 0

7 19-20 29+650 29+590 273,772.00 45,315.00 1 1 1 08 35-36 33+150 33+130 3,286,818.00 479,593.00 1 1 1 09 79-80 47+560 48+620 7,910,840.00 1,158,832.00 1 1 1 0

10 65-66 60+150 61+200 6,182,328.00 909,527.00 1 1 1 011 59-60 62+190 63+223 4,347,486.00 635,964.00 1 1 1 012 93-94 85+510 86+570 7,370,203.00 1,080,856.00 1 1 1 013 114-115 102+500 102+550 44,498,180.00 6,420,842.00 1 1 1 0

14 17-18 101+570 102+590 47,631,748.00 6,872,800.00 1 1 1 0

15 5.-6 104+890 105+920 903,616.00 133,706.00 1 1 1 0

16 29-30 106+110 107+250 904,346.00 134,374.00 1 1 1 0

17 28-29 96+650 97+700 2,130,660.00 310,121.00 1 1 1 0

18 51-52 98+110 99+234 1,310,075.00 192,611.00 1 1 1 0

19 16-17 108+190 109+260 28,931,884.00 4,172,882.00 1 1 1 0

188,206,302.00 27,275,508.00 17 17 17 0

RemarksNo. of Estimate Approved by Competent Authority.

Status

Pending with HQ, Delhi

Total

Option -2 Estimated Cost

No. of Estimate Received by NHAI

No. of Estimate Reviewed by IE

No. of Estimate Sent to

RO/CGM by PD

Sr. No.

Division Name Location Chainage Option -1 Estimated Cost

Nadiad Division Km 11/300 To 93/00 In Ahmedabad, Kheda And Anand District.

Jambuva Division Km 93/00 To 108/300 In Vadodara District.

II-Utility Shifting-GETCO 1 of 1

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

(C) WATER SUPPLY & SEWER LINE SHIFTING.

Sr. No. Company Name Division Sub-Division No. of Estimate

Estimated Amount No. of Estimate Received by NHAI

No. of Estimate Reviewed by IE

No. of Estimate Sent to RO/CGM

by PD

No. of Estimate Approved by Competent Authority.

Approval Status

1 Gujrat Water Supply and Seawage Board

Vadodara Vadodara 1 26,705,050.00 1 1 1 1 Approved vide NHAI letter no. NHAI/GWSSB/PIU-Ahmedabad/19268, dt. 29/11/2013

2 Gujrat Water Supply and Seawage Board

Kheda Matar 1 5,755,376.00 1 1 1 1 Approved

3 Gujrat Water Supply and Seawage Board

Kheda Matar 1 857,736.00 1 1 1 1 Approved

4 Vadodara Mahanagar Seva Sadan

Vadodara Vadodara 1 5,827,500.00 1 1 1 1 Approved

5 Vadodara Municiple Corporation

Vadodara Vadodara 1 - 0 0 0 0 Estimate tobe prepared, Site Inspection Completed

5 39,145,662.00 4 4 4 4

Remarks

1) 450mm dia in between Km. 96.300 to Km. 97.800 in LHS (Total length Km. 2.50). 2) 350mm dia from Km. 99.900 to Km. 102.550 in LHS (Total length in Km. 3.76)

NOTE: Delay in approval of estimates for shifting of various utilities: - There are various existing utilities in the form of electrical poles / lines, High Tension Towers, Water & drainage pipe lines and Gas pipe lines etc., which are adversely affectingthe construction of said Project Highway. In pursuant to clause 11.2 of Article 11 of the Concession Agreement the utilities, which cause adverse affect on the Project Highway needs to be shifted to appropriate locations. The cost of such shifting isrequired to borne by the Authority. The estimates for the various utilities have already been submitted to the Authority by the respective departments by making rigorous efforts of the Concessionaire, but the approval of estimates is not yetconveyed by the Authority to the Concessionaire. The detail of lengths of six laning as well as Service Road affected on this account is attached herewith as Annexure 3 and 4.

1) 90mm dia PVC pipe in between Ch. 38.600 to 39.000 Total Length 930 Rmt.2) 160mm dia PVC pipe in between Ch. 39.000 to 41.460 Total Length 2440 Rmt.3) 200mm dia A.C. pipe & PVC pipe in between Ch. 41.460 to 45.300 Total Length 5000 Rmt. Affecting to Six laning

1) 90mm dia HDPE pipes Total Length 205 Rmt.2) 350mm dia C.I. pipes Total Length 75 Rmt.3) 450mm dia C.I. pipes Total Length 25 Rmt.4) 90mm dia PVC pipe Total Length 120 Rmt. Affecting to Six laning

1500mm dia water supply line of VMC near GSFC junction, Vadodara at Km. 105.490 Length 200m from proposed Flyover

450mm dia CI pipe line of VMC on LHS at below locations:Km. 96.260 to Km. 97.750Km. 98.550 to Km. 98.700Km. 98.950 to Km. 99.200Km. 99.650 to Km. 99.850Km. 99.950 to Km. 102.000Km. 102.550 to Km. 102.850Km. 103.175 to Km. 103.350Km. 103.700 to Km. 105.300Total length is 6.215 Km.

Total

II-Utility Shifting-Pipe line 1 of 1

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

II-b Tree Cutting:

From To1 Ahmedabad 6.4 22 1306 1306 02 Kheda-Nadiad 22 65.9 7091 7091 03 Anand 65.9 93.8 3737 3737 04 Vadodara 93.8 110 1358 1358 0

13492 13492 0

Balance Nos of Tree to be cut as

Total

Tree Cutting: Permission for tree cutting is awarded vide letter no.A/SVY/15/2699-2705/2012-13, dt.24/01/2013 of Chief Conzervator of Forest (CCF).

Trees cutting have been competed in May 2013.The summary of Tree cutting is as below:

Summary of Tree CuttingSr.No. District Chainage Total Nos of

Tree to be cut Total Nos of Tree

cut upto

II-Utility Shifting-Tree Cuttin 1 of 1

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

Status RemarksLetter No. COS Amount

(Cr.)Letter No. COS Amount

(Cr.)Letter No. COS Amount

(Cr.)Letter No. COS Amount

(Cr.)Letter No. COS Amount

(Cr.)1 Proposal of modification in

design/Cross section between Km.95.000 to Km. Km. 109.000 in view of anumber of pipe lines within ROW

IRB/AVSETPL/78/2012, dt. 15/03/2012IRB/AVSETPL/2077/2014, dt. 07/04/2014

86.66 AA/NHAI/1308/12-13/1715, dt. 12.09.2012

42.01 1) NHAI/PIU-Ahmedabad/NH-8/6-laning/19350, dt. 9/12/20132) NHAI/PIU-Ahmedabad/NH-8/6-laning/20055, dt. 6/02/2014

30.21 NHAI/12011/1/2010-RO-GNR/Tech./AHD./Vol.15/4095, dt. 21/02/2014

30.21 Pending with HQ, Delhi

2 Representation of Boriavi Nagar Palikareceived from NHAI for construction ofPUP of size 7.0m x 4.5m at Km. 69.290instead of PUP at Km. 69.111

IRB/AVSETPL/1823/2014, dt. 30/01/2014

1.89 AA/AMBD/-VDDR/DRH/1124, dt. 10/02/2014

1.11 1) NHAI/PIU-Ahmedabad/NH-8/6-laning/20164, dt. 18/02/2014

1.11 1) NHAI/12011/1/2010-RO-GNR/Tech./AHD./Vol.14/4388, dt. 14/03/2014 2) NHAI/12011/1/2010-RO-GNR/Tech./AHD./Vol.14/185, dt. 16/04/2014

1.11 Pending with HQ, Delhi

3 Tentative cost implication foradditions/modifications of variousstructures, service roads as per siterequirement / public demand / VIPreferences etc

IRB/AVSETPL/1109/2013, dt. 05/08/2013

120.96 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

77.48 NHAI/PIU-Ahmedabad/19870, dt. 07/01/2014

41.26 NHAI/12011/1/2010-RO-GNR/Tech./AHD./Vol.11/3543, dt. 17/01/2014

41.26 Pending with HQ, Delhi

Authority has not recommended to HQ, Delhi as below:1) PUP @ Ch. 23.400 Km. (Change of Size)2) PUP @ Ch. 24.840 Km. (Additional)3) Service Road 9.12 Km.

4 VIP reference received from Shri.Bharatsingh Solanki , Hon’ble Ministerof State for Drinking Water andSanitation ( Independent Charge)regarding ongoing construction for sixlaning of Ahmedabad Vadodara Sectionof NH-8 and construction of foot overbridge on the 6 - Lane NH - 8 of Vasad,Gujarat and various representationsreceived from Villagers and Principalsof Schools of Kachalapura / VasadGram Panchayat , Taluka and DistrictAnand.

IRB/AVSETPL/1828/2014, dt. 31/01/2014

8.69 AA/AMBD-VDDR/DRH/1117, dt. 07/02/2014

7.99 NHAI/PIU-Ahmedabad/20099, dt.10/02/2014

7.99 NHAI/19011/1/2010-RO-GNR/Rep./VIP/Vol.14/4370, dt. 10/03/2014

7.99 Pending with HQ, Delhi

5 Construction of roadway in restrictedwidth due to existing facilities onONGC and IOCL from Km.31.500 to33.500

IRB/AVSETPL/1203/2013, dt. 28/08/2013

6.39 AA/HW/NHAI/1308/13-14/519, dt. 04.11.13

3.69 NHAI/PIU-Ahmedabad/20743, dt. 18/04/2014

3.69 NHAI/12011/2/2010-RO-GNR/Tech/AHD-AV-Excel/3/283 , dt. 25/04/2014

3.69 Pending with HQ, Delhi

224.58 132.28 84.26 84.26 - Total

Six laning of Ahmedabad – Vadodara Section of NH-8 from km. 6.400 to 108.700 (Length 102.300 km.) and Improvement of existing Ahmedabad – Vadodara Expressway from km. 93.302 in the state of Gujarat ( Length 93.302 km. ) under NHDP Phase – V on Design Build Finance Operate Transfer (DBFOT)

SUMMARY OF CHANGE OF SCOPECOS No. Brief Description Concessionaire Proposal Recommendation of Independent Recommendation by Authority Approval by Authority Approval by Authority

III-COS Summary 1 OF 1

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

From To Village Modified Proposal Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

1 1 Flyover 105.53 (GSFC

junction)

- Chhani Provision of 90m long Flyover at Km. 105+530 in place of a single span 35.0 m Flyover / Underpass to accommdate the skew crossing of various pipe lines

IRB/AVSETPL/78/2012, dt. 15/03/2012

8.55 NHAI/12011/2010-RO-GNR/Tech/AHD/Vol-15/4095, dt. 21/02/2014

Due to accommdate the skew crossing of various pipe lines- VMC pipe line passing below the RE wall approach.- Maintenance problem in future.- Initial proposal of 150m (5 x 30m span) modified to 90m (3 x 30m) subject to decision of shifting VMC pipe line 1500mm dia

2 1 Vehicular Underpass to

Flyover

95.882 (Nandesari)

- Nandesari Provision of Flyover of 35m span at Km. 95+882 (design chainage Km 95+530)in place of VUP of size 12mx5.5m toaccommodate 3 pipe line crossings

IRB/AVSETPL/78/2012, dt. 15/03/2012

1.42 NHAI/12011/2010-RO-GNR/Tech/AHD/Vol-15/4095, dt. 21/02/2014

Due to accommodate 3 pipe line crossings- VMC- GSFC- GWSSB- Initialy proposal 20m as decided in NHAI, HQ, New Delhi on 21/02/2012

3 1 Major Bridge 93.542 (Mahi

Bridge)

- Vasad Provision of Single four lane bridge on upstream of existing bridge instead of two lane bridges on either side of the existing bridge across river Mahi due to the existence of the ONGC and IOC pipelines on downstream of existing bridge at Km. 93+500

IRB/AVSETPL/78/2012, dt. 15/03/2012

(7.68) NHAI/12011/2010-RO-GNR/Tech/AHD/Vol-15/4095, dt. 21/02/2014

Existence of the ONGC and IOC pipelines on downstream of existing bridge at Km. 93+500

4 1 Toe wall & Slip Road

93.542 (Mahi

Bridge)

- Vasad 1) Construction of toe wall to protect the earth in embankment and minimize land acquisition.2) Construction of 300m slip road to access the resort.

IRB/AVSETPL/78/2012, dt. 15/03/2012

3.51 ROW constraint and habitation adjacent to ROW

5 1 MCW & Service Road

Length of MCW=12850m

Length of Service

Road=11800m

95.000 107.200 - Modification in Typical Cross Section given in the CA from Km. 95+000 to Km. 107+200 of the Project Highway

IRB/AVSETPL/78/2012, dt. 15/03/2012

(16.09) NHAI/12011/2010-RO-GNR/Tech/AHD/Vol-15/4095, dt. 21/02/2014

VMC, GSFC & GWSSB pipe line along the Project Highway.- Avoid to shifting

6 1 Toe Wall/ Retaining wall

95.000 107.200 - Provision of retaining wall at the end of Service Road/Main Carriageway due to pipe lines and restricted ROW

IRB/AVSETPL/78/2012, dt. 15/03/2012

30.90 NHAI/12011/2010-RO-GNR/Tech/AHD/Vol-15/4095, dt. 21/02/2014

Along the Project Highway heavy habitation, urban area.- VMC, GSFC & GWSSB pipe line along the Project Highway- Restricted ROW

7 1 Pipe Encasing 95.000 107.200 - Encasing of utility pipes of different sizes those are either under service road or crossing the completed carriagewaya) 955 mm diab) 1354 diac) 1000 mm dia

IRB/AVSETPL/78/2012, dt. 15/03/2012IRB/AVSETPL/2077/2014, dt. 07/04/2014

33.96 NHAI/12011/2010-RO-GNR/Tech/AHD/Vol-15/4095, dt. 21/02/2014

Modification in Typical Cross Section.- Restricted ROW- VMC, GSFC & GWSSB pipe line along the Project Highway

8 1 New Jersey Crash Barrier

95.000 107.200 - Provision of New Jersey Type Crash Barrier in 0.6m wide median

IRB/AVSETPL/78/2012, dt. 15/03/2012

22.17 NHAI/12011/2010-RO-GNR/Tech/AHD/Vol-15/4095, dt. 21/02/2014

VMC, GSFC & GWSSB pipe line along the Project Highway.- Modification in Typical Cross Section - To accommodate pipe line, redused the median width.

9 1 Entry/ Exit ramp 95.000 107.200 - Deletion of entry/exit ramps due to non availability of land

NHAI/12011/2010-RO-GNR/Tech/AHD/Vol-15/4095, dt. 21/02/2014

LA problem

COS-1HQ, Delhi

Six laning of Ahmedabad – Vadodara Section of NH-8 from km. 6.400 to 108.700 (Length 102.300 km.) and Improvement of existing Ahmedabad – Vadodara Expressway from km. 93.302 in the state of Gujarat ( Length 93.302 km. ) under NHDP Phase – V on Design Built Finance Operate Transfer (DBFOT)

III-Change of ScopeSr. No. COS NO. Structure/ Road Location Reason for Modification Proposal by Concessionaire Recommendation by IE Recommendation/Approval by Authority Pending with Remarks

30.21 AA/NHAI/1308/13-14/224, dt. 24/07/2013 [LETTER NOT AVAILABLE WITH CONCESSIONAIRE, ref. shown in NHAI letter no. NHAI/PI-Ahmedabad/NH-8/6-Laning/19350, dt. 09/12/2013]

30.21

III-COS 1 of 8

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

From To Village Modified Proposal Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Sr. No. COS NO. Structure/ Road Location Reason for Modification Proposal by Concessionaire Recommendation by IE Recommendation/Approval by Authority Pending with Remarks

10 1 Major Bridge 35.000 (Vatrak Bridge)

- Sokhada Provision of one additional span of 42m due to the crossing of existing ONGC crude pipe line near the Ahmedabad side abutment of the proposed new bridge across River Vatrak at Km 35+000

IRB/AVSETPL/78/2012, dt. 15/03/2012

6.46 NHAI/12011/2010-RO-GNR/Tech/AHD/Vol-15/4095, dt. 21/02/2014

Crossing of existing ONGC crude pipe line near the Ahmedabad side abutment of the proposed new bridge across River Vatrak at Km 35+000

11 1 Providing additional light poles on Service Road

IRB/AVSETPL/78/2012, dt. 15/03/2012

3.46

86.66 30.21 30.21

1 2 Pedestrian Underpass(Change in Location)

69.290 - Boriavi Construction of PUP (7.0 x 4.5) at Ch. 69.290 km at Village – Boriavi Junction.

IRB/AVSETPL/1823/2014, dt. 30/01/2014

1.89 AA/AMBD-VDDR/DRH/1124, dt. 10/02/2014

1.11 NHAI/12011/1/2010-RO-GNR/Tech/AHD/Vol-14/4388, dt. 14/03/2014

1.11 Public demand / VIP representation HQ, Delhi

1.89 1.11 1.11

VUP1 3 Vehicular

Underpass(Additional)

13.940 Aslali 12.0 m * 5.5 m (VUP) IRB/AVSETPL/1109/2013, dt. 05/08/2013

10.34 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

8.49 NHAI/12011/1/2010-RO-GNR/Tech./AHD/Vol.11/3543, dt. 17/01/2014

8.49 At Junction of NH 228 & NH 8. Observed cross movement of Bus, Truck,Trailer, etc. There is a Flyover at Ch.11.320 for cross movement as per CA provision .

2 3 Vehicular Underpass

(Additional)

38.260 Sokhada & Hatkeshwar

A VUP of Size 12mx5.5m can be provided.

IRB/AVSETPL/1109/2013, dt. 05/08/2013

16.48 Not recommended by IE vide letter no. AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

3 3 Vehicular Underpass

(Additional)Pedestrian Underpass(Deletion)

89.690 - Vasad 12.0 m * 5.5 m (VUP) IRB/AVSETPL/1109/2013, dt. 05/08/2013

3.36 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

2.81 NHAI/12011/1/2010-RO-GNR/Tech./AHD/Vol.11/3543, dt. 17/01/2014

2.81

4 3 Vehicular Underpass

(Additional)Pedestrian Underpass(Deletion)

99.650 Padamala 12.0 m x 5.5 m (VUP) (Below MCW)

VUP of size 12.0m x 5.50 m can be provided at Km. 99.650 at Padamala village in place of PUP of size 7.0m x 3.5m.

IRB/AVSETPL/1109/2013, dt. 05/08/2013

4.92 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

3.87 NHAI/12011/1/2010-RO-GNR/Tech./AHD/Vol.11/3543, dt. 17/01/2014

3.87 Representation from the Sarapanch, Padamala Gram Panchayat.During the traffic survey observed considerable cross movement of Bus, Truck,Trailer etc. on account of near by Ranoli GIDC area. The vehicles need to travel up to Flyover at Ch.95.830 or at Ch.102.540 for the cross movement as per CA provision. Also, public representation has been receivde for provision of Flyover

PUP1 3 Pedestrian

Underpass(Change Size)

23.400 Kanera 12.0m x 4.5m (PUP) IRB/AVSETPL/1109/2013, dt. 05/08/2013

3.06 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

5.02 NHAI/12011/1/2010-RO-GNR/Tech./AHD/Vol.11/3543, dt. 17/01/2014

Due to cross movement of over sized oil/Gas carriage vehicles like truck,bulker etc. The vehicles need to travel up to Ch.19.600 ( Provision of VUP of size 12.0 m * 5.5 m ) or Flyover at Ch.34.020 for the cross movement as per CA provision.

2 3 Pedestrian Underpass

(Change Size)

29.910 Logistic Park(Kajipura)

12.0 m x 4.5 m (PUP) IRB/AVSETPL/1109/2013, dt. 05/08/2013

3.06 Not recommended by IE vide letter no. AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

HQ, Delhi

COS-2

COS-3Total Cost (in Crore)

Total Cost (in Crore)

III-COS 2 of 8

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

From To Village Modified Proposal Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Sr. No. COS NO. Structure/ Road Location Reason for Modification Proposal by Concessionaire Recommendation by IE Recommendation/Approval by Authority Pending with Remarks

3 3 Pedestrian Underpass

(Additional)

24.840 - Kanera 7.0m x 4.5m (PUP) IRB/AVSETPL/1109/2013, dt. 05/08/2013

11.52 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

9.38 NHAI/12011/1/2010-RO-GNR/Tech./AHD/Vol.11/3543, dt. 17/01/2014

To avoid the direct access to MCW, provision of service road is required because we observed cross movement of vehicles Bus, Truck, etc. on account of Education Centre & Kanera Village. Also, public presentation has been received from the villagers & education institute for provision of Underpass.- Additional Service Road / Slip Road required due to additional PUP.

4 3 Pedestrian Underpass

(Additional)

32.450 Nayka 12.0 m x 4.5 m (PUP) IRB/AVSETPL/1109/2013, dt. 05/08/2013

12.55 Not recommended by IE vide letter no. AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

5 3 Pedestrian Underpass

(Additional)

Service Road(Additional)

75.860 Gamdi PUP size 7.0mx3.0m and additional service roads of 5.50m width can be provided from Km. 75.860 to Km. 76.060 for a length of 200m beyond the end of approach ramps as recommended by IE vide letter no. AA/AMBD-VDDR/DRH/495, dt. 12.07.2013.

IRB/AVSETPL/1109/2013, dt. 05/08/2013

2.12 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

2.37 NHAI/12011/1/2010-RO-GNR/Tech./AHD/Vol.11/3543, dt. 17/01/2014

2.37 The public representation has been received for provision of Underpass for cross movement of farmers/vendors whose farms/shops situated on both side of highway.

6 3 Pedestrian Underpass

(Additional)

78.790 Wagashi 7.0 m x 4.5 m (PUP) IRB/AVSETPL/1109/2013, dt. 05/08/2013

7.54 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

6.24 NHAI/12011/1/2010-RO-GNR/Tech./AHD/Vol.11/3543, dt. 17/01/2014

6.24 The public representation has been received for provision of Underpass for cross movement of farmers/vendors whose farms/shops situated on both side of highway.

7 3 Pedestrian Underpass

(Additional)

80.650 - Mogar 7.0 m x 4.5 m (PUP) IRB/AVSETPL/1109/2013, dt. 05/08/2013

8.98 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

7.56 NHAI/12011/1/2010-RO-GNR/Tech./AHD/Vol.11/3543, dt. 17/01/2014

7.56 Due to increase in the FRL of about 3.5 m atsaid location on account of Minor Bridge atCh.80.685 which is constructed on Irrigationcanal, the vehicular movement of the schoolmay be obstructed. Hence, provision ofunderpass is required for the crossmovement of the school vehicles . - Additional Service Road / Slip Roadrequired due to additional PUP

8 3 Pedestrian Underpass

(Additional)

84.105 - Ramnagar 7.0 m x 4.5 m (PUP) IRB/AVSETPL/1109/2013, dt. 05/08/2013

10.62 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

9.92 NHAI/12011/1/2010-RO-GNR/Tech./AHD/Vol.11/3543, dt. 17/01/2014

9.92 To avoid the direct access to MCW , provision of service road is required because we observed cross movement of vehicles Bus, Truck, etc. on account of Education Centre ,Ramnagar Village & Vadod Ruparel Village. The vehicles need to travel to VUP at Ch.82.390 & Flyover at Ch.90.740 for cross movement as per CA provision.- Additional Service Road / Slip Road required due to additional PUP

9 3 Pedestrian Underpass

(Change Size)

97.780 - Sakharda 12.0 m x 4.5 m (PUP) IRB/AVSETPL/1109/2013, dt. 05/08/2013

3.06 Not recommended by IE vide letter no. AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

10 3 Pedestrian Underpass

(Change Size)

103.580 Dasrath 10.0 m x 4.5 m (PUP) IRB/AVSETPL/1109/2013, dt. 05/08/2013

2.89 Not recommended by IE vide letter no. AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

SERVICE ROAD1 3 Service Road

(Extension)Length=880m

(LHS Side)

20.920 (LHS) 21.800 (LHS) Bareja / Bidaj Extension of proposed service road atLHS (Length= 880 m)AndSlab Culvert 1 x 6 @ 21.668

IRB/AVSETPL/1109/2013, dt. 05/08/2013

2.40 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

2.20 (1) Representation of Vraj Integrated Textile Park(2) To avoid inconvenience to the occupants/ Entry & Exit of MCW as per CA

2 3 Service Road(Additional)

Length=450m (Both Side)

25.200 (Both sides)

25.650 (Both sides)

Malarpura & Kashipura

Service Road can be provided from Km. 25.200 to Km. 25.700 for a lengthof 500 m

IRB/AVSETPL/1109/2013, dt. 05/08/2013

1.02 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

2.22 -

3 3 Service Road(Additional)

Length=410m(LHS Side)

26.440 (LHS) 26.850 (LHS) Vaikunthpura Construction of additional Service Road(Length =410 m)andSC-1 x 6m @ 26.520 & BC-2m x 2m @26.700

IRB/AVSETPL/1109/2013, dt. 05/08/2013

0.83 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

1.11 To avoid direct access to MCW

III-COS 3 of 8

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

From To Village Modified Proposal Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Sr. No. COS NO. Structure/ Road Location Reason for Modification Proposal by Concessionaire Recommendation by IE Recommendation/Approval by Authority Pending with Remarks

4 3 Service Road(Additional)

Length=610m(LHS Side)

29.050 (LHS) 29.660 (LHS) Kajipura Service road can be provided up to theaccess road to Kajipura village byextending the proposed Slip road atLHS from Km. 29.050 to km. 29.660(Length 610m)andSC-1 x 2.5m @ 29.218

IRB/AVSETPL/1109/2013, dt. 05/08/2013

1.23 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

1.49 Representation received from Kajipura Vaikundpura Group Gram Panchayat

5 3 Service Road(Additional)

Length=1700m(LHS Side)

39.400 (LHS) 42.020 (LHS) Ratanpur village Construction of additional Service Road (Length= 1700 m)andBC-3m x 3m @ 39.445BC-2m x 2m @ 39.870BC-2m x 2m @ 40.213BC-2m x 2m @ 40.745SC-1 x 4m @ 40.828

IRB/AVSETPL/1109/2013, dt. 05/08/2013

3.55 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

6.48 The public representation has been received for provision of Service Road to avoid direct access to MCW.Extension Of Service Road of proposed Under Pass at Ch.41.430 up to Ch.39.400 on LHS only .

6 3 Service Road(Additional)

Length=900m(RHS Side)

59.100 (RHS) 60.000 (RHS) Piplag Construction of additional Service Road (Length = 900 m)

IRB/AVSETPL/1109/2013, dt. 05/08/2013

2.43 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

1.95 Minor Bridge at Ch.Km.59.364 is widened for service road on RHS side. Hence, extension of service road is required up to APMC market piplag which is situated on RHS side to avoid the direct access to MCW.

7 3 Service Road(Additional)

Length=400m(LHS Side)

66.100 (LHS) 66.500 (LHS) Nadiad/Uttarsanda

Construction of additional Service Roadat LHS upto Chaklashi Flyover Junctionon NH-228 to NH-8 (Length = 500 m)andBC- 2m x 2m @ 66.450

IRB/AVSETPL/1109/2013, dt. 05/08/2013

1.39 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

0.90 To avoid direct access to MCW (NH-8 & NH-228 Junction)

8 3 Service Road(Additional)

Length=1400m(Both Side)

72.400 73.100 Rawadapura Construction of additional Service Road both side (Length = 1400 m )

IRB/AVSETPL/1109/2013, dt. 05/08/2013

3.78 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

3.04 Minor Bridge at Ch.72.675 is widened for service road on RHS/LHS side.Hence, extension of service road is required from Ch.72.400 to Ch.73.100.

9 3 Service Road(Additional)

Length=800m(Both Side)

81.600 82.000 Bedava / Vadod Construction of aditional Service Roadon both side (Length = 800 m)andBC - 2m x 2m @ 81.653

IRB/AVSETPL/1109/2013, dt. 05/08/2013

1.12 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

1.98 To avoid direct access to MCW

10 3 Service Road(Additional)

(Length=200m(LHS Side)

82.700 (LHS) 82.900 (LHS) Bedava / Vadod Construction of aditional Service Road(Length = 300 m)

IRB/AVSETPL/1109/2013, dt. 05/08/2013

0.81 AA/HW/NHAI/1308/13-14/501, dt. 28/10/2013

0.48 To facilitate the movement of the vehicles coming to Hospital, the extension of service road up to Ch.83.00 is required on LHS in lieu of 82.700 as mentioned in CA.

11 3 Service Road(Additional)

Length=670m(Both Side)

91.720 92.055 Rajupura / Vasad Construction of additional Service Roadon both side (Length = 335 m)

IRB/AVSETPL/1109/2013, dt. 05/08/2013

1.88 Not recommended by IE vide letter no. AA/HW/NHAI/1308/13-14/501, dt. 28 To avoid direct access to MCW

120.96 77.51 41.26 Total Cost (in Crore)

III-COS 4 of 8

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

From To Village Modified Proposal Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Sr. No. COS NO. Structure/ Road Location Reason for Modification Proposal by Concessionaire Recommendation by IE Recommendation/Approval by Authority Pending with Remarks

PUP1 4 Pedestrian

Underpass(Additional)

Additional Service Road /

Slip Road

92.05

92.050 (LHS)

92.050 (RHS)

-

92.840

92.800

Kachalapura VIP reference received from Shri.Bharatsingh Solanki , Hon’ble Ministerof State for Drinking Water andSanitation ( Independent Charge)regarding ongoing construction for sixlaning of Ahmedabad VadodaraSection of NH-8 and construction offoot over bridge on the 6 - Lane NH - 8of Vasad ,Gujarat and variousrepresentations received from Villagersand Principals of Schools ofKachalapura / Vasad Gram Panchayat ,Taluka and District Anand.

IRB/AVSETPL/1828/2014, dt. 31/01/2014

8.69 AA/AMBD-VDDR/DRH/1117, dt. 07/02/2014

7.99 NHAI/PIU-Ahmedabad/20099, dt.10/02/2014

NHAI/19011/1/2010-RO-GNR/Rep./VIP/Vol.14/4370, dt. 10/03/2014

7.99 Representation received from villagers of Kachalapura / Vasad Gram Panchayat Taluka and District Anand

Pending with HQ, Delhi

8.69 7.99 7.99

TOE WALL1 4 Toe Wall 31.500 33.500 - Regarding restricted ROW width in RHS

due to utility pipe lines of ONGC andIOCL from 31.500 to 33.500, (ONGCROU, as per PMP act 1962, ONGC willnot permit any construction)considering existing center line asproposed center line, keeping 4.5mMedian width and Toe wall / Retainingwall, wherever required toaccomodate the carriageway withinthe available of existing ROW.

IRB/AVSETPL/1203/2013, dt. 28/08/2013

6.40 AA/HW/NHAI/1308/13-14/519, dt. 04.11.13

3.69 NHAI/12011/2/2010-RO-GNR/Tech/AHD-AV-Excel/3/283 , dt. 25/04/2014

3.69 Due to existing utilities of ONGC and IOCL on RHS

Pending with HQ, Delhi

6.40 3.69 3.69

FLYOVER1 4 Flyover 6.400

(Narol junction)

- Narol For Fly-Over at Ch. 6+400 is adopted by span arrangement of the Fly-Over and length of structure, thereby minimizing the effect of existing utilities on construction of the Fly-Over- Final decision by PD, NHAI to propose as per CA by demolish BRTS Bus Stop

IRB/AVSETPL/427/2013, dt. 08/02/2013

10.52 AA/AMBD-VDDR/DRH/478, dt. 03/07/2013AA/AMBD-VDDR/DRH/1305, dt. 25/04/2013

- To minimize the effect of existing utilities- To avoid the shifting, existing under ground utility water/sewage pipe line.

Decision pending at PD, NHAI

2 4 Flyover 7.380 (Vatwa)

- Vatva Fly-Over at Ch. 7+380 -Restructuring tominimize the effect of existing utilitieson the construction of proposedstructure and its approaches.Restructuring proposal consideringwidth of carriageway as 11m andmedian width of 1.2m was discussed

IRB/AVSETPL/2037/2014, dt. 27/03/2014

0.22 AA/AMBD-VDDR/DRH/1047, dt. 18/01/2014AA/AMBD-VDDR/DRH/1251, dt. 01/04/2014

To minimize the effect of existing utilities on the construction of proposed structure and its approaches

IE/Concessionaire

PUP1 4 Pedestrian

Underpass(Additional)

7.600 - Narol Tentative cost estimate of PUP (7.0m x3.0m) at 7+600 Km. Village Narol underCOS”

IRB/AVSETPL/2105/2014, dt. 11/04/2014

0.29 AA/AMBD-VDDR/DRH/1378, dt. 21/05/2014

0.29

Total Cost (in Crore)

FUTURE COS

Total Cost (in Crore)

COS-5

COS-4

III-COS 5 of 8

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

From To Village Modified Proposal Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Sr. No. COS NO. Structure/ Road Location Reason for Modification Proposal by Concessionaire Recommendation by IE Recommendation/Approval by Authority Pending with Remarks

2 4 Pedestrian Underpass

(Change Size)

87.025 - Adas 7.0m x 4.5m (PUP) IRB/AVSETPL/1920/2014, dt. 20.02.2014

1.52 AA/AMBD-VDDR/DRH/1203, dt. 08/03/2014

1.56 Representation received from the Sarpanch, Adas Gram Panchayat, Taluka and District Anand requesting for increasing the height of underpass which is being constructed to cross the project highway by trucks, tractors and buses at Km. 87+025

PD, NHAI

SERVICE ROAD1 4 Service Road

(Additional)Length=903m

(Both Side)

6.400 (Narol

junction)

- Narol Option-IAdditional 5.5 m wide Service Roadadjacent to FO 6+400 (Ground level)

IRB/AVSETPL/427/2013, dt. 08/02/2013

1.67 IE/NHAI

2 4 Slip Road(Reduction)

45.317 Sandhana Reduction of Slip Road nearby the Edgah Ground at Km. 45.317 in Sandhana Village in view of modification of verticle profile of the project highway in the approach road at VUP towards Vadodara Side

IRB/AVSETPL/1307/2013, dt. 23/09/2013

(1.96) AA/AMBD-VDDR/DRH/1149, dt. 19.02.2014

- Reduction of Slip Road due to Edgah Ground IE/Concessionaire

PIPE ENCASING 1 4 Pipe Encasing 39.690 39.720 Vansar Encashing of ONGC cross pipe line

(Length = 132 m)IRB/AVSETPL/1140/2013, dt. 12/08/2013

- ROU required by ONGC before construction of NH-8 bypass

IE

DRAIN1 4 Drain 16.400 - Jetalpur Underpass at Ch. 16+400 – Shifting of

existing open drain / Channelobstructing the construction ofproposed structure and its approaches -

IRB/AVSETPL/427/2013, dt. 08/02/2013

5.99 AA/AMBD-VDDR/COS/511, dt. 13.07.13

- RCC open drain of village Panchayat obstructing the construction of proposed structure and its approaches -

IE/Concessionaire

CULVERT1 4 Culvert Additional Pipe, Box and Slab Culvert

under Change of Scope as below:IRB/AVSETPL/1232/2013, dt. 04/09/2013

IE/PD, NHAI

1) CD Structures as per CA but notfound at site (Total 6 Nos.)

HPC @ Ch. 26.520

Box Culvert @ Ch. 39.38HPC @ Ch. 39.870HPC @ Ch. 52.650HPC @ Ch. 83.672HPC @ Ch. 91.831

2) CD Structures Not in CA but foundat site (Under COS) (Total 54 Nos.)

HPC @ Ch. 18.695

HPC @ Ch. 25.26HPC @ Ch. 26.283HPC @ Ch. 27.38HPC @ Ch. 28.39HPC @ Ch. 28.6HPC @ Ch. 28.82HPC @ Ch. 28.97HPC @ Ch. 33.55HPC @ Ch. 34.015HPC @ Ch. 34.1Box Culvert @ Ch. 35.73Box Culvert @ Ch. 35.75Box Culvert @ Ch. 35.987

HPC @ Ch. 38.6HPC @ Ch. 38.94HPC @ Ch. 39.445HPC @ Ch. 39.595HPC @ Ch. 40.35HPC @ Ch. 40.75HPC @ Ch. 40.83HPC @ Ch. 41.09HPC @ Ch. 42.9HPC @ Ch. 46.98

III-COS 6 of 8

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

From To Village Modified Proposal Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Sr. No. COS NO. Structure/ Road Location Reason for Modification Proposal by Concessionaire Recommendation by IE Recommendation/Approval by Authority Pending with Remarks

HPC @ Ch. 52.73HPC @ Ch. 54.46Slab Culvert @ Ch. 55.555

HPC @ Ch. 55.95HPC @ Ch. 59.325HPC @ Ch. 59.4HPC @ Ch. 61.958HPC @ Ch. 62.05HPC @ Ch. 62.96HPC @ Ch. 63.63HPC @ Ch. 63.68HPC @ Ch. 63.96HPC @ Ch. 64.385HPC @ Ch. 64.517HPC @ Ch. 75.399HPC @ Ch. 75.436HPC @ Ch. 78.92HPC @ Ch. 82.63HPC @ Ch. 88.265HPC @ Ch. 90.995Slab Culvert @ Ch. 91.931

HPC @ Ch. 94.155Slab Culvert @ Ch. 95.97HPC @ Ch. 99.172HPC @ Ch. 102.86HPC @ Ch. 104.33HPC @ Ch. 104.909HPC @ Ch. 107.837HPC @ Ch. 108.613HPC @ Ch. 109.037

3) CD Structures as per local demandor existing site condition (Under COS)(Total 1 No.)

Box Culvert @ Ch. 26.350

4) CD Structures where the size at siteis different from CA (Under COS)(Total 13 Nos.)

HPC @ Ch. 29.685

HPC @ Ch. 31.165Box Culvert @ Ch. 37.227

Box Culvert @ Ch. 37.347

Box Culvert @ Ch. 37.487

Box Culvert @ Ch. 37.555

Box Culvert @ Ch. 37.727

Box Culvert @ Ch. 37.907

Box Culvert @ Ch. 37.959

HPC @ Ch. 38.28HPC @ Ch. 41.46HPC @ Ch. 43.57HPC @ Ch. 43.73

5) CD Structures where the size at siteis different from CA but for executionsize is modified at site (Under COS)(Total 11 Nos.)

HPC @ Ch. 27.14

HPC @ Ch. 27.17HPC @ Ch. 30.14Slab Culvert @ Ch. 46.529

Slab Culvert @ Ch. 51.485

HPC @ Ch. 55.575

III-COS 7 of 8

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

From To Village Modified Proposal Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Correspondance Cost (in Crore)

Sr. No. COS NO. Structure/ Road Location Reason for Modification Proposal by Concessionaire Recommendation by IE Recommendation/Approval by Authority Pending with Remarks

HPC @ Ch. 56.81HPC @ Ch. 63.107HPC @ Ch. 64.61HPC @ Ch. 99.69Slab Culvert @ Ch. 99.719

6) As per CA proposed for wideningbut as per site conditionrecommended for reconstruction(Under COS) (Total 3 Nos.)

Slab Culvert @ Ch. 100.494

Slab Culvert @ Ch. 101.333

Slab Culvert @ Ch. 101.587

III-COS 8 of 8

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

From To1 38.000 42.000 Vansar,

Ratanpur & Sokhada

Construction works have been stopped from Km. 38+000 to Km. 42+000 by Vansar, Ratanpur & Solhada villagers . The Work is held up in this section since 20.12.2013.

1) Villagers have demanded additonal structure at ch.41.+440 km to facilitate the cross movement of villagers . 2) Some villagers are not satisfied with disbursement amount for land acquisition given by NHAI .

i) IRB/AVSETPL/1689/2013, dt. 30.12.2013 ii) IRB/AVSETPL/1664/2013, dt. 23.12.2013 iii) NHAI/PIU-Ahmedabad/11012/2/13/NH-8/6 laning/19381 dt.13.12.2013 iv) NHAI/PIU-Ahmedabad/11012/2/13/NH-8/6 laning/19471 dt.27.12.2013iv) NHAI/PIU-Ahmedabad/11012/2/13/NH-8/6 laning/19941 dt.20.01.2014

Mamlatdar-Matar , Manager (Tech) NHAI, and representative of concessionaire vidited the site on 21st December 2013 and discussed all the issue with Sarpanch and villagers at Vansar village. During the site visit Sarpanch & villagers are convinced and agreed to withdraw hunger strike / protest subject to that district administration's confirms in writing for fulfilling their demands. As discussed in meeting they postponed scheduled hunger strike from 22nd December-2013 , but still the y have not allowed highway construction and structure work incl. flyover at 42.600, and hence works in this section are still stands held up under force majeure.

2 39.680 39.720 Vansar Construction works have been stopped due to presence of ONGC ROU and other pipelines within the project road corridor

ONGC have been stopped the work on RHS due to ROU.

Site inspection done on dt. 11.12.2013 to confirm thickness of coating.

3 69.111 - Boriyavi The work of PUP at boriyavi village Ch.Km.69.111 was stopped since 14/05/2013 by the villagers & NHAI.

The villagers are demanding additional underpass at Ch.Km.69.290.

i) IRB/AVSETPL/1096/2013, dt. 30/07/13.ii) AA/AMBD-VDDR/DRH/568, dt. 02.08.13

4 91.300 91.600 Vasad

5 91.670 92.100 Vasad

6 97.400 97.600 Sankarda Encroachment in existing ROW at Km. 97+400 to Km. 97+600 LHS.

Landowner has refuced to remove of compound wall at a distance 20m from the center line from km. 97+400 to 97+600, mentioning that compensation has not been paid to him during old acquisition.

i) IRB/AVSETPL/691/2013, dt. 19/04/2013ii) IRB/AVSETPL/759/2013, dt. 06/05/2013iii) AA/AMBD-VDDR/DRH/299, dt. 08/05/2013

Concessionaire has approached to the landowner for removal of compound wall, but he has refused to remove the same mentioning that compensation has not been paid to him during old acquisition.

IV- Details of Stoppage of work

Sr. No.Location

Village Particulars Reason Correspondence Status Action Taken

IRB/AVSETPL/694/2013, dt. 20/04/2013

The Concessionaire has discussed the matter with the Head of the Department of CSCR. He informed that the Central Soil Conservation Research Department required following data from NHAI through office letter: 1) The area of land proposed for acquisition, as per gazette notification, is less than the actual. It should be verified by joint measurement.2) The amount of compensation to be paid by NHAI for the Land.3) Compensation for the trees to be cut from the area.

Remarks

Stoppage of works by central Conservation Research Department (LHS) since 04/04/2013

Central Consevation Research Department have stopped the construction work with effect from 04/04/2013 because the land belongs to them. CSCR required the following details from NHAI through official letter to enable them to forward the same to its Head of Circle located at Dehradun:1) The area of land proposed for acquisition, as per gazette notification, is less than the actual. it should be verified by joint measurement.2) The amount of compensation to be paid by NHAI for land.3) Compensation for the trees to be cut from the area.

IV-Stoppage of work 1 of 2

MONTHLY PROGRESS REPORT - APRIL 2014 APPENDIX-S

From ToSr. No.

LocationVillage Particulars Reason Correspondence Status Action Taken Remarks

7 102.540(Ranoli Flyover)

- Ranoli Immediate stoppage of construction work of Flyover bridge at Ch. 102.540 Km., Village: Ranoli

The construction activity of flyove at Ch. 102.540 Km., Village: Ranoli had been stopped with immediate effect due to which the work of pilling of pier (P2) on both sides and construction of Superstructure work is held up due to non shifting of 132 KV Jawahar nagar - Fertilizer nagar (GETCO) line.

IRB/AVSETPL/1546/2013, dt. 28/11/13 Concessionaire has written letter to NHAI, toresolve the issue.

NOTE: Stoppage of Works at Various Locations by Local Villagers / Local Politicians / Village Panchayat:- The works at various locations have been forcefully stopped by the local villagers / local politicians / Sarpanch of VillagePanchayat demanding the additional structure / modification in size of structures proposed in Concession Agreement, to facilitate the villagers. This has already been intimated to the Authority / Independent Engineer through theConcessionaire’s letter no. IRB/AVSETPL/1096/2013, dt. 30/07/13, IRB/AVSETPL/694/2013, dt. 20/04/2013, IRB/AVSETPL/691/2013, dt. 19/04/2013, IRB/AVSETPL/759/2013, dt. 06/05/2013, IRB/AVSETPL/1546/2013, dt. 28/11/13,IRB/AVSETPL/1689/2013, dt. 30.12.2013 and IRB/AVSETPL/1664/2013, dt. 23.12.2013. The same are being intimated in the several meetings held with Authority / Independent Engineer from time to time. The construction of variousstructures / six laning and service road is held up at various locations on account of this since April’2013.