IRAHDALI, CV (2)
-
Upload
irshad-ali -
Category
Documents
-
view
58 -
download
1
Transcript of IRAHDALI, CV (2)
Irshad ali s/o Mureed AhmedCell: 0092-3361173720-3023307247-459-8082052
Email: [email protected]@yahoomail.comObjectives:skills Challenging position with a dynamic group where I could apply my all and abilities obtained through, work experience and educational background for the success professional field of my.
Descon Engineering Limited Karachi. Korangi Gas Turbine Hydro Power Station ,K-Electric Project.test and Radiography. Punch list preparation and punch item clearance.Till The Job Supervisor
Piping of Fabrication, Welding and erection for process piping, structure and pipe supports etc. Arrangement of
11-11-2014
JOB RESPONSIBILITIES ; Arrangement of resources such as material, manpower, consumable,
and machinery. Co-ordination project team members and site, clients, venders,
engineering section. Conduct periodic progress review meeting, preparation of meetings and
fallow up of routine shutdown matters. Supervision of Fabrication, Welding and erection for process
piping, structure and pipe supports etc. Arrangement of Hydro test and Radiography.
Punch list preparation and punch item clearance. Commissioning and testing of erected lines. Compliance to safety standard. Underground piping 20 inch coating raping and tandem lifting.
QCON QATAR ENGINEERING & CONSTRUCTIONSupervisor Piping ,Methanol Plant Qafac Qatar fuel Additiues Company L,td
JOB RESPONSIBILITIES;
Conduct periodic progress review meeting, preparation of meetings and fallow up of routine shutdown matters.Qatar T/A Shutdown 2014 Work activities on the site Reformer area Transtion Tubes Removed and new Install and Haerd, Mainway Radint transation section
Entry for catalyst,Tubes Replacement.Works and Furnace Haerder & Tubes Changes. 20-03-2014 to 07-05-02014
MCSC Mechanical contracting & Services companyW.L.L
Employed with M/s Mechanical Contracting & Services Co WLL . Bahrain since
23-01- 2010 to 23-01-2014, working as Site Supervisor for EPC Tank Battery
JOB RESPONSIBILITIES
Facilities project. M/s Tatweer Petroleum Company (Tatweer), EPC for New Tank Batteries
facilities (TB7 and TB08). M/s Tatweer Petroleum Company (Tatweer), for the installation of
compressor Station CS M/s Tatweer Petroleum Company (Tatweer), for construction of pipelines
for AGEP Phase‐ M/s Tatweer Petroleum Company (Tatweer), for Bahrain, Well Development Program(2010 2011)Installation of flow lines surface facilities for wells‐
( 936,937,and 938) and Fabrication and installation of fencing for surface facilities 35 Sets‐ Bahrain National Gas Co (Banagas), T&I shutdown on CG Plant and tanks,
Expansion Project LBOP (LUBE BASE OIL PLANT) Client: Samsung Engineering company.
Position : Mechanical Supervisor .
OL2K ETHYLENE PROJECT KUWAIT (C.C.C)
FORMAN PIPEING ; in OL2K ETHYLENE PROJECT KUWAIT (C.C.C) o Fabrication & Erection of Piping and all other related
matter.o Maintaining of material control for piping activities on the site.
12-07-2007 TO 20-01-2008
Descon Engineering Limited FORMAN PIPING in Descon Engineering Bab Field Expansion
Project# 1101
Habshan Abu-Dhabi, U.A.E. 04-04-2004 to 12-04-2007
GASCO HABSHAN SHUT DOWN 1111 ABU DHABI Fabricator in Gasco Habshan Shut Dow 1111 Abu Dhabi Worked as a Pipe Fabricator in Fertilizer Industries Ruwais
Shutdown ABU DHABI U.A.E Worked as a Pipe Fabricator in Bouroge Shut Down T/A UAE.
National Petroleum Construction Company Abu Dhabi. Position: Fabricator Fabrication & Erection of Piping and all other related matter.Maintaining of material control for piping activities on the site. 27-03-1997 to 01-06-2001
Olympia Chemical Limited (Khushab Pakistan)Position: Fabricator
Fabricator in Olympia Chemical Limited (Khushab) as a work of Piping & Structure. 7-2-2003 to 24-1-2004
Pakistan Atomic Energy Commission ChashmaPosition: TECH-I Tech-I in Pakistan Atomic Energy Commission Chashma Nuclear Power Plant KundianDistrict Mianwali (PAKISTAN)
05-09-2002 to 15-01-20031.
Descon Engineering LIMITED.
Position: Fabricator 28-07- 1996 to 15-03- 1997Fabrication&Erection of Piping and all other related matter , Maintaining of material control for piping activities on the site.
Fabricator with Fuji Cement Plant Project # 1040 (Jhang Bhatar)
Descon Engineering LIMITED
Position: Fabricator 08 Oct. 1995 to 07 May 1996 Fabricator with Lucky Cement Plant Project#1044 Pezu Pakistan Fabrication & Erection of Piping and all other related matter.
HMC HEAVY MECHANICAL COMPLEX TAXILA
Position: Fabricator 08 March 1995 to July 1995
Fabrication & Erection of Piping and Structure.
AcademicQualifications: Diploma; Punjab, Labour and Manpower Government of The Department Directorate of Manpower and Training Trade Testing Board . 2 Years.
Computer Course: Auto Cade , MS. Excel , MS. Word , Inpage , Power Point
Personal Profile:
Date of Birth : 01-11-1974Nationality : PakistaniReligion : Islam Marital Status : Married I.D. No. : 38303-6290188-9 Passport No : GM1801881 Place of Issue : Bahrain Date of Issue : 01-12-2011Expiry : 29-11-2016
Address: MOHALLAH DIRKHANAWALA TEHSIL PIPLAN DISTT. MIANWALIPH: 0092-0459808205 -03361173720