Ir. Sukardjo M - ESDMpsdg.bgl.esdm.go.id/makalah/sukardjo_pmg.pdf · Ir. Sukardjo M.Sc. MAIN COAL...
-
Upload
phunghuong -
Category
Documents
-
view
218 -
download
0
Transcript of Ir. Sukardjo M - ESDMpsdg.bgl.esdm.go.id/makalah/sukardjo_pmg.pdf · Ir. Sukardjo M.Sc. MAIN COAL...
-
1
Ir. Sukardjo M.Sc
-
MAIN COAL BASINS OF INDONESIA
2
-
Indonesian Coal Bearing FormationsIndonesian Coal Bearing Formations
3
-
INDONESIAN COAL RESOURCES AND RESERVESINDONESIAN COAL RESOURCES AND RESERVES (2005)(2005)(Continue)(Continue)
QUALITYQUALITYNoNo ISLANDISLAND
CALORYCALORY CRITERIACRITERIA
1.1. JAWAJAWA Low Low -- MediumMedium < 5100 < 5100 -- 61006100 19,2419,24 0,000,00
High High -- Very HighVery High 6100 6100 -- >7100>7100 2,972,97 0,000,00
2.2. SUMATERASUMATERA Low Low -- MediumMedium < 5100 < 5100 -- 61006100 26.872,526.872,5 2.636,622.636,62
High High -- Very HighVery High 6100 6100 -- 71007100 1.780,661.780,66 134,11134,11
3.3. KALIMANTANKALIMANTAN Low Low -- MediumMedium < 5100 < 5100 -- 61006100 25.375,6925.375,69 2.769,012.769,01
High High -- Very HighVery High 6100 6100 -- 71007100 6.844,446.844,44 1.219,11.219,1
4.4. SULAWESISULAWESI Low Low -- MediumMedium < 5100 < 5100 -- 61006100 218,42218,42 0,060,06
5.5. MALUKUMALUKU LowLow < 5100< 5100 2,132,13 0,000,00
6.6. PAPUAPAPUA Low Low -- MediumMedium < 5100 < 5100 -- 61006100 120,35120,35 0,000,00
High High -- Very HighVery High 6100 6100 -- 71007100 30,9130,91 0,000,00
TOTALTOTAL 61.273,9961.273,99 6.758,906.758,90
High High -- Very HighVery High 6100 6100 -- 71007100 14,6814,68 0,000,00
RESOURCES RESOURCES
( M Ton)( M Ton)RESERVESRESERVES
4
-
INDONESIAN COAL RESOURCES INDONESIAN COAL RESOURCES ( Based on calorific value )( Based on calorific value )
1% 24%13%
62%
Low CaloryMedium CaloryHigh CaloryVery High Calory
5
-
KALIMANTAN COAL RESOURCESKALIMANTAN COAL RESOURCES( Based on Calorific Value )( Based on Calorific Value )
1,761.30
23,614.40
6,213.60
630.90
0
5,000
10,000
15,000
20,000
25,000
LowCalory
MediumCalory
HighCalory
VeryHigh
Calory
LowCalory
MediumCalory
HighCalory
VeryHighCalory
M
Tonn
es
6
-
Coal Basin in KALIMANTANCoal Basin in KALIMANTAN
WAHAU COAL FIELD
7
-
Kutai Basin is the biggest and deepest basin in Indonesia, very economic, oil gas and coal producing sequences.
Coal Bearing Formation : Ayau, Wahau and Balikpapan Formation.
KUTAI BASINKUTAI BASIN
8
-
GEOLOGYGEOLOGYBasin Setting : back arch basinBasin Setting : back arch basin
Influenced by sea floor spreading at Influenced by sea floor spreading at Makassar strait Makassar strait
Stratigraphy of Kutai Basin mostly Stratigraphy of Kutai Basin mostly define from oil exploration datadefine from oil exploration data
9
-
STRUCTURE GEOLOGY STRUCTURE GEOLOGY KUTAIKUTAI--BARITOBARITO--ASAMASAM--ASAM BASINASAM BASIN
10
-
STRATIGRAPHY OF EAST KALIMANTAN BASINSSTRATIGRAPHY OF EAST KALIMANTAN BASINS
11
-
12
THE MORFOLOGY OF WAHAU COALFIELD
N
-
STRATIGRAPHY OF WAHAU COALFIELDSTRATIGRAPHY OF WAHAU COALFIELD
13
FORMATION DESCRIPTION
BATUAYAU( Tea )
HOLOCENE
PLIOCENEM
IOC
EN
EO
LIG
OC
EN
E
QU
AR
TE
RN
AR
YT
ER
TIA
RY
EO
CE
NE
AGE
LATE
MIDDLE
EARLY
LATE
MIDDLE
EARLY
LATE
ALLUVIAL( Qa )
BALIKPAPAN( Tmbp )
WAHAU( Tomw )
Consists of the older rock reworks and mudstone.
Consists of quartz sandstone interbedded of claystone, siltstone, shale, limestone and coal
Consists of interbedded of of claystone, quartz sandstone, clayey sandstone and coal intercalations limestone at the bottom of formation.
Consists of sandstone mudstone, and small amount of limestone. Coal and carbonaceous clay found in some arean.
-
S .Ngen
S. J ok
S.
Jo
kn
g
a n
S .S o
n gl e
n g
S . G e n g
S . Bu sa ng
S .T e ng e u
S .Ge b l eo
S.D
a n K
anan
S. D
a n
Ki r i
S.N
ge l
im
S.
Lu
nu
k
S.
Lu
nd
uk
S.B
ek
ua
k
S. A
s ak
S . M a r a h
S .P a k
S . Pa s i rp u t i hS . S a k a Hu l u
S . Lo a H u l u
S . L o ba
ng
S. S
aw
ah
S . B
an
g
S. A
pa
k
S.
Go
da
ng
S . M a r a h
S .
T ug ang
S .Ma ha i
S . Ma
ra
h
S. K
a pu r
B e s a r
S . M e n y i u
S . P i ng
S. D
ur
i a n
S.
La
u
S. G
o n g s o n g
S.
Le
es
S.
Li
m
S.
Ba
ya
k S . K e l i nj
au
Gema Baru
Muara Dun
Long Nah
Teluk Baru
Temaning Baru
Toma
Tmbp
S.
Ke
li
nj
au
S.
Ke
li
nj
a u
S . T e m a n i n g
S.
T em a
n in g
S . T i nj a u
S . J o r
Long Tesak
A
L T 3438NH - 03
NH - 05
NH - 10
NH - 02
NH - 06
NH - 08
NH - 09
NH - 07
NH - 01
Toma
S . T i nj a u
S.
Lo
ng
Jo
B
C
D
C DD
C
D
C
G E
J
BA
F
BLOK 2
BLOK 1
NH - 04
Gema Baru
Muara Dun
Long Nah
Teluk Baru
Temaning Baru
Tea
Tea
Tmbp
Toma
Tmbp
Qa
Qa
Tea
Tmbp
Tmbp
Tmbp
Tmbp
Tmbp
Tea
S.
Ke
li
nj
au
S.
Ke
li
nj
a u
S . T e m a n i n g
S.
T em a
n in g
S . T i nj a u
S . J o r
Long Tesak
A
L T 3438NH - 03
NH - 05
NH - 10
NH - 02
NH - 06
NH - 08
NH - 09
NH - 07
NH - 01
Toma
S . T i nj a u
S.
Lo
ng
Jo
B
C
D
C DD
C
D
C
G E
J
BA
F
BLOK 2
BLOK 1
NH - 04
BW-04
BW-06
B
A
B
A
S.
T a n a h me
r
ah
S.
K
al
se
t
S.
Te
l en
S.
Be
ki k
in
g
Marahaloq
Marahkenyah
Muaramarah
S.
N
an
ga
B
es
ar
S.
N
an
ga
K
ec
il
S.
L
iu
k
S.
K
at
ak
Lo
a B
et
un
g
S.
So k
a K
i ri
S.
So
ka
Ka
na
n
S . P o r e
S . P a si
r
Pu
ti
h
S . L o n g H u l u
S . N or a
n
Long Noran
Bat uredi
Jukayak
KUTAIMuarawahau
Muarapantun
S . L o n g k o l
Rantaupan jang
Long Segar
BMH-1 BMH-2
BMH-3
BMH-4
BMH-5
BMH-6
BMH-7
BMH-8
BMH-9
S . M a r a
h
S. G
ep
uk
S.
Na
ng
a
S
.I
m am
S.
Be
nt
ia
n
LE-03
LE-02
LE-04
LE-01
LE-05
LE-06
LE-09
LE-08
LE-07
LE-10
Tea
Tea
Tmbp
TmbpQa
Qa
Tea
TmbpTmbp
Tmbp
Tmbp
Tea
Qal
Tomw
Tomw
Qal
QalQal
Qal
Tomw
BLOCK MUARA WAHAU
BLOCK LONG LEES
BLOCK MARAH HALOQ
BLOCK LONG NAH
14
-
COAL SEAM DATACOAL SEAM DATA
BLOCKBLOCK FORMATIONNUMBER OF SEAM
THICKNESSTHICKNESS
( m )( m )DIP ( O )
MUARA WAHAUMUARA WAHAU WAHAUWAHAU 66 1.5 1.5 45.0045.00 44OO -- 1515OO
44OO -- 6565OO
1010OO -- 2020OO
77OO -- 2020OO
55OO -- 2020OO
55OO -- 2121OO
3030OO -- 4545OO
MARAH HALOQMARAH HALOQ WAHAUWAHAU 44 1.70 1.70 26.8026.80
LONG LELONG LEESESBALIK PAPANBALIK PAPAN
WAHAUWAHAU
BATU AYAUBATU AYAU
44
33
33
2.50 2.50 -- 22.6022.60
1.00 1.00 -- 18.8018.80
1.00 1.00 -- 14.7014.70
LONG NAHLONG NAHBALIKPAPANBALIKPAPAN
BATU AYAUBATU AYAU22
2214.80 14.80 -- 18.2018.20
1.20 1.20 -- 8.108.10
15
-
16
BORE HOLE CORRELATION OF BLOCK LONG LEES
-
17
BORE HOLE CORRELATION OF BLOCK MARAH HALOQ
-
COAL RESOURCES OF WAHAU COALFIELDCOAL RESOURCES OF WAHAU COALFIELD
BLOCKBLOCKNUMBER NUMBER
OF SEAMOF SEAM
COAL RESOURCES / COAL RESOURCES / TONNESTONNES
( 100 m below from surface)( 100 m below from surface)
WAHAUWAHAU 66 4,385,000,0004,385,000,000
MARAH HALOQMARAH HALOQ 44 543,900,000543,900,000
LONG LELONG LEESES 1010 1,403,000,0001,403,000,000
LONG NAHLONG NAH 44 424,400,000424,400,000
TOTALTOTAL 6,756,300,0006,756,300,000
18
-
COAL QUALITY BY FORMATION (COAL QUALITY BY FORMATION (ar/adbar/adb))
FORMATION FM%TM%
IM%
VM%
FC%
ASH%
St%
SG CVCal/gr
HGI
34,8561,69
44,5065,38
9,64 14,79
37,6344,18
35,0240,00
2,269,39
0,150,35
1,381,409
51005620 60
49,35 55,64 11,94 40,61 37,55 6,06 0,30 1,30 5440 60
36,73 45,16 11,46 44,89 36,97 5,33 0,17 1,42 5380 53
45,64 51,31 11,84 47,28 37,49 4,19 0,14 1,40 5540 61
19,1251,87
26,4056,67
9,0012,50
33,6450,76
30,2940,25
2,2812,40
0,110,45
1,381,55
48705635 41-76
39,9049,39
47,4953,35
10,0615,04
46,2048,16
36,9037,72
3,435,21
0,130,15
1,361,43
52455665 47-67
BALIKPAPAN
WAHAU
BATUAYAU
19
-
FORMATIONFORMATION
ELEMENELEMENBT. AYAUBT. AYAU WAHAUWAHAU B. PAPANB. PAPAN
C (%)C (%) 70.1070.10 69,9069,90 70,7070,70
H (%)H (%) 4,904,90 5,005,00 5,205,20
N (%)N (%) 0,770,77 0,950,95 0,910,91
S (%)S (%) 0,430,43 0,220,22 0,120,12
O (%)O (%) 23,9023,90 23,9023,90 23,7023,70
COAL ULTIMATE ANALYSIS
20
-
21
POSSIBLE TRANSPORTATION AND PORT
-
Positive side / StrengthPositive side / Strength
Clean CoalClean Coal
Huge ResourcesHuge Resources
No need to carry out preliminary surveyNo need to carry out preliminary survey
22
-
Possible Constrain / WeaknessPossible Constrain / Weakness
Transportation and logisticTransportation and logisticRoad Road : distance, capital cost for road : distance, capital cost for road development, trucks, number of vehicles, development, trucks, number of vehicles, operation cost, safety. operation cost, safety. RiverRiver : distance, capital cost for barge, size and : distance, capital cost for barge, size and barge needed, operational cost, possibility to barge needed, operational cost, possibility to built stockpilesbuilt stockpilesTrainTrain : cost, long waiting time: cost, long waiting timeOtherOther : possibility of : possibility of unofficialyunofficialy taxtax
Surety of landSurety of land--rightright
23
-
24
-
25
-
26
-
27
-
www.esdm.go.id www.mesdm.net
Please visit our website
28
Indonesian Coal Bearing FormationsINDONESIAN COAL RESOURCES AND RESERVES (2005)(Continue)INDONESIAN COAL RESOURCES ( Based on calorific value )KALIMANTAN COAL RESOURCES( Based on Calorific Value )Coal Basin in KALIMANTANGEOLOGYSTRUCTURE GEOLOGY KUTAI-BARITO-ASAM-ASAM BASINSTRATIGRAPHY OF EAST KALIMANTAN BASINSCOAL SEAM DATA COAL RESOURCES OF WAHAU COALFIELDCOAL QUALITY BY FORMATION (ar/adb)Positive side / StrengthPossible Constrain / Weakness