IR for Grouting
Transcript of IR for Grouting
-
7/27/2019 IR for Grouting
1/2
NO:
Unless otherwise approved,this inspection request form shall be submitted during
the daily morning meeting among LTA,Contractor and QP(S)
Contractor: Project:
To: Date:
LTA Time:
The work described below has been inspected by our Site Engineer and is complete
and ready for your inspection. A checklist is attached overleaf.
Location
Checked and Requested By:
Chainage
Activity
Drawings Used for Construction
Other Description
The meeting noted that the information provided by the Contractor is adequate/not adequate*.
QP(S) may proceed Request Rejected
* delete where appropriate
INITIAL INSPECTION DECISION BY QP(S)
We have inspected the above referenced works and found them acceptable. You may proceed.
However, please return the completed checklist upon completion of the remaining work.
You cannot proceed. Please carry out corrective works as noted on the checklist and
submit a fresh request for inspection.
Other comments:
RE/RTO Name & Signature/ Date
FINAL INSPECTION BY QP(S)
Work approved to Start:_________________________ Work Completed on:____________________
LTA
The above process for request for inspection of work by Contractor and approval by QP(S) in noted.
LTA's representative/Date/Time
INSPECTION REQUEST FORM FOR GROUTING WORKS
SAMWOH CORPORATION PTE LTD SK E&C
ER296-CONSTRUCTION AND COMPLECTION OF SENTOSA
GATEWAY TUNNEL FROM TELOK BLANGAH ROAD TO KEPPEL
ROAD / KAMPONG BAHRU ROAD/ LOWER DELTA ROAD AND
ASSOCIATED ROAD WIDENING WORKS INTERCHANGE
Contractor's PM Name & Signature
_____________________________________
QP(S) Name & Signature/Date
-
7/27/2019 IR for Grouting
2/2