IPP Sep10 Progress
-
Upload
shubha-dutta -
Category
Documents
-
view
87 -
download
1
Transcript of IPP Sep10 Progress
Sl. No Land Water Coal
MoU Signed with Govt. of Orissa on 09.06.2006 (Total Capacity-3130 MW, State Share-782.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable cost
1 4.85
2 6.3
3 4.701
MoU Signed with Govt. of Orissa on 26.09.2006 (Total Capacity-12970 MW, State Share-2850.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable cost
4 5.76
5 15
Information regarding MoU signed IPPs as on May.2010
Company Name
Proposed
Capacity of
plant (MW) / Project
Location of the
Plant, District
Total Requirement
Already
acquired
Total quantit
y Require
Quantity
already allotted
Coal req.
(MTPA)
GMR Kamalanga Energy Ltd.
1050
(3x350)
(Rs.4540
Cr.) HLCA
cleared
Kamalanga, Meramundali, Dhenkanal
1175.76 Ac GL-145.1 Ac
PL-
1030.66 Ac (For. L-78.5
1011.025Ac For Govt.
land of 69 Ac
42 cusecs from
Brahmani River
Approval of WRD obtained for 30 Cusecs (Ph-1). 2.06 cusecs water drawl
Mahanadi Aban Power Co Ltd.
1030
(2x515) (Rs.4257
Cr.)
Tehranpur, Talcher, Angul
1035.98 Ac.
GL-57Ac PL-
978.98Ac
Nil Alienatio
40 cusecs Brahman
i River
Final Clearance letter for 35.81 cusec of water issued by WRD on
Nava Bharat Power (P) Ltd.
1050
(Rs.4700 Cr.)
MoU
Meramundali & Khadagprasad, Dhenkanal
1093.3Ac GL-
88.47Ac PL-1002.59
Ac
Nil
42 cusecs
Brahmant River
WRD has issued clearance for drawl of 42 Cusecs.Central Ground water authority
K.V.K Nilachal Power (P) Ltd,
1050
(3x350)
(Revised)
(Rs.
5000
Kandarei, Athgarh Cuttack (New location)
945.1Ac GL-238.29
Ac For. L-
165.85Ac PL-540.96A
260.26 Ac
6 (I)
48cusecs from
Mahanadi River
Water allocation for 48 cusecs issued by WRD on 15.04.08.Central Ground
Bhushan Energy Ltd
2000 (in
one go)
Ghantigadia, Talbahal, Nuahata, Angul
1793 Ac GL-622
Ac PL-1171
Ac
Nil
70 cusecs from
Brahmani River
WAC sanctioned 40 cusecs of water on
6 4.53
7 5.4
8 5.76
9 6.5
10 5.45
11 13.25
CESC Ltd.
1000
(2x500)
(Rs.4042
Neulapoi , Dhenkanal
1094.13 Ac GL-
190.39Ac
Forest L-20.76
678 Ac
40 cusecs from
Brahmani River
Permission accorded for 40 cusecs on 5.4.08
Essar Power Ltd.
1000 (Rs.
4860 Cr.)
Paranga Talcher, Angul
1070 Ac GL-300 Ac PL-770
Ac
Nil 4(1)
40 cusecs from
Brahmani River
Water drawal reccommendation obtained for 40 cusec
Jindal India Thermal Power Ltd
1200
(Revised
) (2x600)
Deranga, Talcher Angul (New location)
1100Ac
GL-262 Ac
Forest L - Nil PL-838 Ac
1063 Ac Lease Deeds
executed for 254
40 cusecs from
Brahmani River
(upstream of
Samal Barrage)
Received commitment for 40 cusecs of water from WRD on 2.6.08. Central
Lanco Babandh Power Private Ltd.
1320 (2X660 MW)
(Rs.7158 Cr.) SWCA
cleared enhance
Kurunti, Khadag Prasad, Dhenkanal (New location)
1400 Ac
GL-109.87 Ac ,
Forest L-18.7 Ac PL-929.77
Ac
549.06 Ac
6(1)
issued for
40 cusecs from
Brahmani River
Allocation received for 40 cusecs from WRD on 07.02.09. construction
Monnet Power Company Ltd.
1000 (2x500 MW)
(Revised)
(Rs.4107
.25)
Malibrahmani & Nisha, Chendipada Angul
993.42Ac
GL-498.04 Ac For. L- 45.18 Ac
PL-495.38
Ac
635.725 Ac
Govt land 296.73 Ac & private
land 338.995
Ac in
40 cusecs from
Brahmani River
Allocation received for 27 cusecs from WRD. Water pipe line survey completed.
Sterlite Energy Ltd
2400 (4x600 MW)
(Rs.7481
Burkhamunda, Jharsuguda
3000 Ac
GL-478.13Ac
PL-2536.47
Ac
705 Ac 576 Ac
73 cusecs
Hirakud Reservoir (7.7 km)
WMP submitte. Laying of water pipe line is under progress. Final allocatio
12 6
13 6.2
MoU Signed with Govt. of Orissa on 07.02.2009(Total capacity-9850 MW , State share-1182-1379 MW), State share = 12-14% of power generated from the plant at variable cost depending on the availability of coal block
14 755 Ac. 2.844
15 2500 Ac 6.5
16 1300 Ac 6.6
17 3.4
18 1545 Ac 7.67
Tata Power Company Ltd.
1000
(HLCA
cleared for 2000 MW)
Naraj Marthapur, Cuttack
985.304Ac
GL-
158.82 Ac
Forest L-46.12Ac
Nil Govt.
40 cusecs from
Mahanadi River
Allocation for 40 cusecs of water received from WRD on 24.09.20
Visa Power Ltd.
1000
(4x250)
(Rs.4498
Cr.)
Brahamanabasta Athagarh, Cuttack
1089 Ac GL-309 Ac PL-780 Ac
160 Ac.
160 Ac Govt.
land allotted. •133 Ac
40 cusecs
from
Mahanadi River
20 cusecs water approved by WRD for ph-I. Balance 20 cusec cleared
Aarti Steel Ltd.
500
(4x125)
(Rs.2065 Cr.) 50
MW already
Ghantikhal,
Athagarh
Cuttack
80 Ac. 80 Ac.
Of
20 cusec from
Mahanadi river
IPICOL recemmended for allocation. GMS Power Pack
Astaranga Power Co. Ltd.
2640
(4x660)
(Rs.11200 Cr.)
Astaranga, Nuagarh
Puri
Applied to IDCO
20,000 cum/hr
from Devi river
WAC recommended for 50 cusec for Ph-1 Undertaking for installation of
Chambal Infrastructure & Ventures Ltd.
1320
(2x660)
(Rs.7550
Cr.)
Siaria,
Dhenkanal
Land Survey, plot plan completed, land application, DPR,
41 cusec from
Mahanadi river
WAC recommened 41 Cusec water
Ind Barath Energy (Utkal) Ltd.
700 (2x350)
(Rs.3150
Cr)
Sahajbahal,
Lakhanpur,
Jharsuguda
725 Ac.
GL-179.43 Ac
PL-545.57
545 Ac.
545 Ac Pvt.
28 cusec from Ib /
Mahanadi river
Assurance obtained for 28 cusec of water from
Jindal Steel & Power Ltd.
1320
(2x660)
(Rs.5940
Cr)
Boinda, Angul
Appllied to
IPICOL. Request
for relocatin
g the site for the IPP
5000 cum/hr from
Mahanadi river
system
As per MoU JSPL participate in construction of barrage near Badama
19 1000 Ac
20 6.3
21 1200 Ac 6.2
Information IPPs who have signed MoU during 2010
Sl. No
1
1320 158.4
2
1980 237.6
3
1320 158.4
4
60 7.2
5
120 14.4
Kalinga Energy & Power Ltd.
1000
(4x250 MW)
Babuchakuli,
Sambalpur
location will be
changed as 600 Ac of forest
40 cusec from
Bheden/ Mahanadi
river system
IPICOL recommened 40 Cusec water to WRD
Sahara India Power Corpn Ltd.
1320
(2x660)
(Rs.6911
Titlagarh, Bolangir
(New location)
950 Ac
PL-808.45
Ac
LA proposal filed with
IDCO, Survey
works are
53 cusec from Tel / Mahanadi
river system
WAC cleared for 50 cusec of water. Applied
Visaka Thermal Power Pvt. Ltd.
1050 (2x525)
Deopara,
Bhandari Pokhari, Bhadrak
Recommendation sent by
IPICOL to IDCO, IDCO
44 cusec from
Baitarani river
system
Applied to WRD, IPICOL recommended water to
Company
Name
MoU on
Date
Location
Capaci
ty (MW)
State Share(MW)
Likely Commissioning
BGR Energy System Ltd
09.04.2010
Bhapur, Nayagarh
12 Plan Period
JR Powergen Private Ltd
09.04.2011
Redhakhol, SBP & KishoreNagar,
12 Plan Period
Adhunic Power & Natural Resources Ltd
09.04.2012
Birmaharajpur, Sonepur
12 Plan Period
Maadurga Thermal Power Company Ltd
09.04.2013 Tangi,
Cuttack
12 Plan Period
Vijaya Ferro & Power Private Ltd
09.04.2014
Turlakhamar,Kesinga,Kalahandi
12 Plan Period
6
1320 158.4
Total 6120 734.4
Jindal Stainless Ltd
06.05.2010
Luni, Dhenkanal
12 Plan Period
Coal
MoU Signed with Govt. of Orissa on 09.06.2006 (Total Capacity-3130 MW, State Share-782.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable cost
Rs. 20.00 Cr.
MoU Signed with Govt. of Orissa on 26.09.2006 (Total Capacity-12970 MW, State Share-2850.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable cost
August/2012
as on May.2010
Status of Environment clearance
Financial Closure
LOA/EPC Placement, Ordering of
BTG Equipment
Likely Commissioning Schedule
Expenditure till date/
Signing of BPTA/Other clearances
Coal Block
Allotted
Coal Linkage Obtaine
d
Rampia, Dip Side Rampia (112.22 MT Coal)
for 1050 MW
Environmental clearance received from MoEF 5.02.08. Consent for establishment issued by
FC achieved on 27.05.09 IDFC is principal lender ,
Lahmeyer Internl. appointed as owners consultant, EPC ordered to SEPCO, China. NTP for BTG package
Sep-2011, Nov-2012, Dec-2012,
Rs. 850 Cr. BPTA signed.
RTC from Min. of
Railway, GoI. NoC for
Chimney from Airport AI
Concent for establishemnt issued by OPCB . Presentation made before MoEF for final clearance
SBI caps appointed fin. Consult. FC 6 months from allocation of coal linkage
Mantech Synergies Pvt Ltd appointed as Owner's Consultant. Selection of EPC contractor in progress
June -2013/ within 36 months of the financial closure
Rampia Dip Side Rampia (112.22 MT Coal)
for 1050 MW
Environmental Clearance received from MoEF. Consent for establishment of OPCB received on 07.08.08.
Project appraisal by PFC. FC achieved on 09.12.09
Lahmeyer Int'nal appointed as Owner's consultant, LOI issued to INDURE Ltd for EPC. BTG to Harbin, China
Mar-2012 (balance in interval of 4 months)
Rs. 78.02 Cr. BPTA
signed. RTC from Min. of Railway,
Chimney Height from Airport AI
for 1000 MW
Environmental Clearance received from MoEF. Concent for Project issued by OPCB on 19.12.08.
FC achieved, PFC appointed as Financial Advisor.
Desien appointed as Owner's consultant. EPC awared to Nagarjun Construction. BTG package finalised with Harbin,
Rs.261.63 Cr. BPTA signed. RTC from
Min. of Railway, Chimney
Height from Airport AI
ToR received. EIA submitted
after Dec-2013
Rs. 49 Cr.
Rs. 4823 Cr.
ToR cleared. EIA/EMP submitted & Public Hearing
Development Consultant Ltd appointed as Owner's consultant. LOI issued for BTG Package
Dec-2012, Jun-2013
Public hearing completed. EIA / EMP completed & submitted to OPCB &
Oct-2012 , Dec-2012 / (4 years after availability of land)
Mandakini
(96.84
MT Coal)
for 600 MW
Obtained Concent for Project from OPCB on 18.11.08 & Environment Clearance from MoEF on 29.09.08
FC achieved for Unit-1 on 08.10.08 & Unit-2 on 22.12.09 through SBI Cap
TCE appointed as Owner's consultant, BTG package ordered on BHEL with advance payment of Rs.135.36 Cr.
Unit-1: Dec-2012 Unit-2: Mar-2013
Rs. 320 Cr. BPTA initiated. RTC from Min.
of Railway, NoC for
Chimney from Airport AI,
Constn. Power from CESU
Rampia Dip Side Rampia (112.22 MT Coal)
for 660 MW
Concent for Project issued by OPCB on 16.03.09. Environment Clearance from MoEF on 13.09.09 MoEF clearance for
PFC appointed as Financial Consultant. FC achieved on Dec-09.
Lahmeyer International appointed as Owner's consultant, EPC ordered to LITL, BTG package placed with Dongfang, China. BoP
Unit-1, Dec-2013 Unit-2,Mar-2014
Rs.192 Cr. BPTA signed.
RTC from Min. of
Railway, Chimney
Height from Airport AI
Mandakini
(96.84
MT Coal)
Concent for Project issued by OPCB . Presentation before MoEF held on 12-03-08 for Final Environmental Clearance•
IDFC appointed as Financial Consultant. FC achieved.
DCPL appointed as Owner's consultant EPC order issued on 04.03.10. BTG ordered on BHEL. ESP/Boiler material received at site. BOP
Jul-2012, Oct-2012
Rs.410 Cr. BPTA
signed. RTC from Min.
of Railway, NoC for
Chimney from Airport AI, BTG & BOP ordered
Rampia, Dip Side Rampia (112.22 MT Coal)
for 600 MW
Consent of OPCB received on 21.09.06. MoEF clearance obtained on Dec’07
SBI Caps appointed as Financial Advosor. Expenses met from own funding
DCPL appointed as Owner's consultant. EPC awared to SEPCO, China, Construction activities
U#1: Jul-10 U#2: Sep-10 U#3: Dec-10 U#4: Mar-11
Rs.55.19 Cr.
Rs. 6.75 Cr.
MoU Signed with Govt. of Orissa on 07.02.2009(Total capacity-9850 MW , State share-1182-1379 MW), State share = 12-14% of power generated from the plant at variable cost depending on the availability of coal block
12 Plan Period
12 Plan Period
Mandakini
(96.84
Consent for project issued by OPCB. Presentation made before MoEF for final EC.
EPC/ BTG package finalised & will be issued after physical possession of land
Oct- 2013 (36 months after land acquired)
ToR approved by MoEF. EIA/EMP submitted to OPCB. Public hearing conducted on Feb'09
SBI Caps appointed as Financial Advisor. FC pending due to non all'tion of land & coal linkage.
DCPL appointed as Owner's consultant. EPC consultant is being finalised
Mar-2012 (42 months from coal linkage allottment)
applied to GoI with
recommendation of GoO
ToR obtained. EIA submitted. For 50 MW MoEF clearance obtained,
Agreement with SBI patiala for term loan
Commissioned 50 MW in Mar-2010, balance in 12th Plan Period
applied to GoI with
recommendation of GoO
Energy Infratech Pvt Ltd appointed as consultant
applied to GoI with
recommendation of GoO
TCE appointed as Owner's consultant,
12 Plan Period (48 months from FC)
for 700 MW
MoEF clearance obtained on 30.11.09
FC achieved with Axis bank for 1st Unit
EPC placed with Cethar Vessels Ltd. BOP order placed with Punj Lloid
Unit -1: Dec, 2011, Unit-2: Mar,2012
BPTA signed. Chimney
Height from Airport AI
applied to GoI with
recommendation of GoO
Applied for TOR to MoEF, EMRTC appointed as consultant
12 Plan PeriodApplied for TOR to MoEF,
applied to GoI with
recommendation of GoO
TOR obtained from MoEF, EIA under process
e-Gateway Pvt Ltd appointed as Owner's Consultant
U# 1-June -2014 U# 2-Dec-2014
applied to GoI with
recommendation of GoO
TOR obtained from MoEF, EIA under process
U# 1-Mar -2014 U# 2-Sep-2014
MoU Signed with Govt. of Orissa on 09.06.2006 (Total Capacity-3130 MW, State Share-782.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable cost
MoU Signed with Govt. of Orissa on 26.09.2006 (Total Capacity-12970 MW, State Share-2850.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable cost
as on May.2010
MoU Signed with Govt. of Orissa on 07.02.2009(Total capacity-9850 MW , State share-1182-1379 MW), State share = 12-14% of power generated from the plant at variable cost depending on the availability of coal block
as on May.2010
as on May.2010
Company Name MoU on Location
1 Bhushan Energy Ltd 2000 500 Dec-14 250 500 500 500 500
2 CESC Ltd. Neulapoi, Dhenkanal 1320 330 Mar-2014, Sep-2014 165 330 330 330 330 330
3 Essar Power Ltd. 1000 250
4 1400 350 350 350 350 350 350 350 350 350
5 1800 450 Dec-2012, Mar-2013 150 300 450 450 450 450 450
6 1050 262.5 March/2012 131 262 262 262 262 262 262 262
7 1320 330 Dec-2013, Mar-2014 165 330 330 330 330 330
8 1320 330 Jun-2014, Dec -2014 165 330 330 330 330
9 1050 262.5 Jul-2012 , Oct-2012 262 262 262 262 262 262 262
10 1050 262.5 262 262 262 262 262 262
11 Sterlite Energy Ltd 2400 600 300 600 600 600 600 600 600 600 600
12 Tata Power Company Ltd. 1000 250 125 250 250 250 250 250
13 Visa Power Ltd. 1320 330 165 330 330 330 330
Sub Total 17030 4257.5 300 1081 1624 2491 3676 4256 4256 4256 4256
14 Aarti Steel Ltd. Ghantikhal, Cuttack 500 60 6 6 60 60 60 60 60 60 60
15 Astaranga Power Co. Ltd. Astaranga, Puri 2640 316.8 2015-2016 158 316 316 316
16 Siaria, Dhenkanal 1320 158.4 2016-2017 79 158 158
17 1360 163.2 Dec-2011, Mar-2012 84 163 163 163 163 163 163
18 Jindal Steel & Power Ltd. Boinda, Angul 1320 158.4 2015-2016 158 158 158 158
19 1320 158.4 2015-2016 158 158 158 158
20 Titlagarh, Bolangir 1320 158.4 June -2014, Dec-2014 158 158 158 158 158
21 Deopara, Bhadrak 1050 126 2015-2016 126 126 126 126
Sub Total 10830 1299.6 90 60 223 381 981 1218 1297 1297
Information regarding MoU signed IPPs proposed to be set up in Orissa.
Sl. No
Capacity (MW)
State Share (MW)
Likely Commissioning Schedule
2010-2011
2011-2012
2012-2013
2013-2014
2014-2015
2015-2016
2016-2017
2017-2018
2018-2019
26.09.2006
Ghantigadia, Angul
26.09.2006
26.09.2006
Paranga, Talcher, Angul
MoU period not extended, IPP file closedGMR Kamalaga Energy
Ltd.09.06.2006
Kamalanga, Dhenkanal
Sep-2011, Nov-2011, Feb-2012
Jindal India Thermal Power Ltd
26.09.2006
Deranga,Talcher, Angul
K.V.K Nilachal Power (P) Ltd,
26.09.2006
Kandarei,Athgarh, Cuttack
Lanco Babandh Power Projects Ltd.
26.09.2006
Kurunti, Dhenkanal
Mahanadi Aban Power Co Ltd.
09.06.2006
Tehranpur,Talcher, Angul
Monnet Power Company Ltd.
26.09.2006
Malibrahmani,Nisha, Angul
Nava Bharat Power (P) Ltd.
09.06.2006
Khadagprasad, Dhenkanal
Mar-2012 ( balance in interval of 3 months)
26.09.2006
Burkhamunda, Jharsuguda
600 MW in Aug-2010 (balance in interval of 3 months)26.09.200
6Naraj Marthapur, Cuttack
Oct- 2013 (36 months after land acquired)
26.09.2006
Brahamanabasta, Cuttack
Jun-2014 (42 months from coal linkage allottment)
07.02.2009
50MW commissioned in Mar-2010, balance in 12th Plan Period07.02.200
9
Chambal Infrastructure & Ventures Ltd.
07.02.2009
Ind Barath Energy (Utkal) Ltd.
07.02.2009
Sahajbahal, Jharsuguda
07.02.2009
Kalinga Energy & Power Ltd.
07.02.2009
Sodamal, Kuchinda, Jharsuguda
Sahara India Power Corporation Ltd.
07.02.2009
Visaka Thermal Power Pvt. Ltd.
07.02.2009
22 BGR Energy System Ltd Bhapur, Nayagarh 1320 158.42015-2016 158 158 158 158
23 JR Powergen Private Ltd 1980 237.62015-2016 237 237 237 237
24 1320 158.42016-2017 158 158 158
25 Tangi, Cuttack 60 7.2 June/20117 7 7 7 7 7 7 7
26 120 14.42016-2017 14 14 14
27 Jindal Stainless Ltd 06.05.2010 Luni, Dhenkanal1320 158.4
2016-2017 158 158 158
Sub Total 6120 734.4 7 7 7 7 7 402 732 732 732
Total 33980 6291.5 307 1178 1691 2721 4064 5639 6206 6285 6285
85% PLF 260.95 1001 1437 2313 3454 4793 5275 5342 5342
OTHER COMPANIES PROGRESSED TO SET UP THERMAL POWER PROJECTS IN ORISSA
Company Name Location State Share
1 Ultra Mega Power Plant MoP/PFC 4000 1300 2014-15 650 1300 1300 1300 1300
2 MoP/ PFC not Finalised 8000 4000 2016-17
3 NTPC CPSU Dalipali, Sundergarh 3200 1600 2015-16 800 1600 1600 1600
4 NTPC CPSU 3200 1600 2015-16 800 1600 1600 1600
5 TTPS-NTPC -Expansion CPSU TTPS, Talcher 1320 660 2014-15 660 660 660 660 660
6 State PSU 1320 660 2014-15 660 660 660 660 660
7 State PSU 2000 2000 2015-161000 2000 2000 2000
15040 7820 0 0 0 0 1970 5220 7820 7820 7820
85% PLF 0 0 0 0 1674.5 4437 6647 6647 6647
Total Power(100% availability from IPPs) 260.95 1001.3 1437.4 2312.9 5128.9 9230.2 11922 11989 11989
Present availability(80% of installed capacity 4100 MW) 3280 3280 3280 3280 3280 3280 3280 3280 3280
Total Available Power(100% availability from IPPs) 3540.95 4281.3 4717.4 5592.9 8408.9 12510 15202 15269 15269
CEA 17th EPS 4020 4459 4958 5417 5812
OPTCL Proposed forecast(2009-10 to 2018-19) 3706 4300 5270 5694 5927 6135 6362 6614 7196
Suplus/Deficit of Power(100% availability from IPPs) as per CEA -479.05 -177.7 -240.65 175.85 2596.9
09.04.2010
09.04.2010
Baija, KishoreNagar, Angul
Adhunic Power & Natural Resources Ltd
09.04.2010
Birmaharajpur, Sonepur
Maadurga Thermal Power Company Ltd
09.04.2010
Vijaya Ferro & Power Private Ltd
09.04.2010
Turlakhamar,Kesinga,Kalahandi
Developers
Capacity (MW)
Likely Commissioning
ScheduleBedabahal, Sundergarh
02 nos. Shell Company (UMPP Pattern)
Gajamara, Dhenkanal
OPGC Unit-3 & 4- Expansion
IB Thermal, Jharsuguda
OTPCL (Joint Venture of OHPC & OMC)
Kamakyanagar, Dhenkanal
Suplus/Deficit of Power(100% availability from IPPs) as per OPTCL -165.05 -18.7 -552.65 -101.15 2481.9 6375.2 8840.1 8655.25 8073.25
Peak Demand (MW) Forecast by CEA & OPTCL & AvailabilityPower Demand 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17CEA(17th EPS) 4020 4459 4958 5417 5812
OPTCL Forecast 3706 4300 5270 5694 5927 6135 6362
Peak Power Available 3941 4281 4717 5593 8409 12510 15202
2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-190
2000
4000
6000
8000
10000
12000
14000
16000
18000
Peak Demand (MW) Forecast by CEA & OPTCL & Availability
Axis
Title
2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-190
2000
4000
6000
8000
10000
12000
14000
16000
18000
Peak Demand (MW) Forecast by CEA & OPTCL & Availability
Peak
Pow
er in
MW
2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-190
2000
4000
6000
8000
10000
12000
14000
16000
18000
Peak Demand (MW) Forecast by CEA & OPTCL & Availability
Peak
Pow
er in
MW
Peak Demand (MW) Forecast by CEA & OPTCL & Availability
2017-18 2018-19
6614 7196
15269 15269
2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-190
2000
4000
6000
8000
10000
12000
14000
16000
18000
Peak Demand (MW) Forecast by CEA & OPTCL & Availability
Axis
Title
2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-190
2000
4000
6000
8000
10000
12000
14000
16000
18000
Peak Demand (MW) Forecast by CEA & OPTCL & Availability
Peak
Pow
er in
MW
2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-190
2000
4000
6000
8000
10000
12000
14000
16000
18000
Peak Demand (MW) Forecast by CEA & OPTCL & Availability
Peak
Pow
er in
MW