IPP Sep10 Progress

38
Sl. No Land Water MoU Signed with Govt. of Orissa on 09.06.2006 (Total Capacity-3130 MW, State Share 1 4.85 2 6.3 3 4.701 MoU Signed with Govt. of Orissa on 26.09.2006 (Total Capacity-12970 MW, State Shar 4 5.76 Information regarding MoU signed IPPs as on May.20 Company Name Proposed Capacity of plant (MW) / Project Cost Location of the Plant, District Total Requirem ent Already acquired Total quantity Requirem Quantity already allotted Coal req. (MTPA) GMR Kamalang a Energy Ltd. 1050 (3x350) Kamalang a, Meramund ali, Dhenkana l 1175.76 Ac GL- 145.1 Ac PL- 1011.025 Ac 42 cusecs from Brahmani River Approval of WRD obtained for 30 Cusecs (Ph-1). 2.06 cusecs Mahanadi Aban Power Co Ltd. 1030 (2x515) Tehranpu r, Talcher, 1035.98 Ac. GL-57Ac PL- 978.98Ac Nil 40 cusecs Brahmani River Final Clearanc e letter for 35.81 cusec of water issued Nava Bharat Power (P) Ltd. 1050 (Rs.4700 Cr.) Meramund ali & Khadagpr asad, Dhenkana l 1093.3Ac GL- 88.47Ac PL- 1002.59 Ac Nil 42 cusecs Brahmant River WRD has issued clearanc e for drawl of 42 Cusecs.C entral Ground water K.V.K Nilachal Power (P) Ltd, 1050 (3x350) (Revised ) Kandarei , Athgarh Cuttack 945.1Ac GL- 238.29 Ac For. L- 165.85Ac 260.26 Ac 48cusecs from Mahanadi River Water allocati on for 48 cusecs issued by WRD on 15.04.08

Transcript of IPP Sep10 Progress

Page 1: IPP Sep10 Progress

Sl. No Land Water Coal

MoU Signed with Govt. of Orissa on 09.06.2006 (Total Capacity-3130 MW, State Share-782.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable cost

1 4.85

2 6.3

3 4.701

MoU Signed with Govt. of Orissa on 26.09.2006 (Total Capacity-12970 MW, State Share-2850.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable cost

4 5.76

5 15

Information regarding MoU signed IPPs as on May.2010

Company Name

Proposed

Capacity of

plant (MW) / Project

Location of the

Plant, District

Total Requirement

Already

acquired

Total quantit

y Require

Quantity

already allotted

Coal req.

(MTPA)

GMR Kamalanga Energy Ltd.

1050

(3x350)

(Rs.4540

Cr.) HLCA

cleared

Kamalanga, Meramundali, Dhenkanal

1175.76 Ac GL-145.1 Ac

PL-

1030.66 Ac (For. L-78.5

1011.025Ac For Govt.

land of 69 Ac

42 cusecs from

Brahmani River

Approval of WRD obtained for 30 Cusecs (Ph-1). 2.06 cusecs water drawl

Mahanadi Aban Power Co Ltd.

1030

(2x515) (Rs.4257

Cr.)

Tehranpur, Talcher, Angul

1035.98 Ac.

GL-57Ac PL-

978.98Ac

Nil Alienatio

40 cusecs Brahman

i River

Final Clearance letter for 35.81 cusec of water issued by WRD on

Nava Bharat Power (P) Ltd.

1050

(Rs.4700 Cr.)

MoU

Meramundali & Khadagprasad, Dhenkanal

1093.3Ac GL-

88.47Ac PL-1002.59

Ac

Nil

42 cusecs

Brahmant River

WRD has issued clearance for drawl of 42 Cusecs.Central Ground water authority

K.V.K Nilachal Power (P) Ltd,

1050

(3x350)

(Revised)

(Rs.

5000

Kandarei, Athgarh Cuttack (New location)

945.1Ac GL-238.29

Ac For. L-

165.85Ac PL-540.96A

260.26 Ac

6 (I)

48cusecs from

Mahanadi River

Water allocation for 48 cusecs issued by WRD on 15.04.08.Central Ground

Bhushan Energy Ltd

2000 (in

one go)

Ghantigadia, Talbahal, Nuahata, Angul

1793 Ac GL-622

Ac PL-1171

Ac

Nil

70 cusecs from

Brahmani River

WAC sanctioned 40 cusecs of water on

Page 2: IPP Sep10 Progress

6 4.53

7 5.4

8 5.76

9 6.5

10 5.45

11 13.25

CESC Ltd.

1000

(2x500)

(Rs.4042

Neulapoi , Dhenkanal

1094.13 Ac GL-

190.39Ac

Forest L-20.76

678 Ac

40 cusecs from

Brahmani River

Permission accorded for 40 cusecs on 5.4.08

Essar Power Ltd.

1000 (Rs.

4860 Cr.)

Paranga Talcher, Angul

1070 Ac GL-300 Ac PL-770

Ac

Nil 4(1)

40 cusecs from

Brahmani River

Water drawal reccommendation obtained for 40 cusec

Jindal India Thermal Power Ltd

1200

(Revised

) (2x600)

Deranga, Talcher Angul (New location)

1100Ac

GL-262 Ac

Forest L - Nil PL-838 Ac

1063 Ac Lease Deeds

executed for 254

40 cusecs from

Brahmani River

(upstream of

Samal Barrage)

Received commitment for 40 cusecs of water from WRD on 2.6.08. Central

Lanco Babandh Power Private Ltd.

1320 (2X660 MW)

(Rs.7158 Cr.) SWCA

cleared enhance

Kurunti, Khadag Prasad, Dhenkanal (New location)

1400 Ac

GL-109.87 Ac ,

Forest L-18.7 Ac PL-929.77

Ac

549.06 Ac

6(1)

issued for

40 cusecs from

Brahmani River

Allocation received for 40 cusecs from WRD on 07.02.09. construction

Monnet Power Company Ltd.

1000 (2x500 MW)

(Revised)

(Rs.4107

.25)

Malibrahmani & Nisha, Chendipada Angul

993.42Ac

GL-498.04 Ac For. L- 45.18 Ac

PL-495.38

Ac

635.725 Ac

Govt land 296.73 Ac & private

land 338.995

Ac in

40 cusecs from

Brahmani River

Allocation received for 27 cusecs from WRD. Water pipe line survey completed.

Sterlite Energy Ltd

2400 (4x600 MW)

(Rs.7481

Burkhamunda, Jharsuguda

3000 Ac

GL-478.13Ac

PL-2536.47

Ac

705 Ac 576 Ac

73 cusecs

Hirakud Reservoir (7.7 km)

WMP submitte. Laying of water pipe line is under progress. Final allocatio

Page 3: IPP Sep10 Progress

12 6

13 6.2

MoU Signed with Govt. of Orissa on 07.02.2009(Total capacity-9850 MW , State share-1182-1379 MW), State share = 12-14% of power generated from the plant at variable cost depending on the availability of coal block

14 755 Ac. 2.844

15 2500 Ac 6.5

16 1300 Ac 6.6

17 3.4

18 1545 Ac 7.67

Tata Power Company Ltd.

1000

(HLCA

cleared for 2000 MW)

Naraj Marthapur, Cuttack

985.304Ac

GL-

158.82 Ac

Forest L-46.12Ac

Nil Govt.

40 cusecs from

Mahanadi River

Allocation for 40 cusecs of water received from WRD on 24.09.20

Visa Power Ltd.

1000

(4x250)

(Rs.4498

Cr.)

Brahamanabasta Athagarh, Cuttack

1089 Ac GL-309 Ac PL-780 Ac

160 Ac.

160 Ac Govt.

land allotted. •133 Ac

40 cusecs

from

Mahanadi River

20 cusecs water approved by WRD for ph-I. Balance 20 cusec cleared

Aarti Steel Ltd.

500

(4x125)

(Rs.2065 Cr.) 50

MW already

Ghantikhal,

Athagarh

Cuttack

80 Ac. 80 Ac.

Of

20 cusec from

Mahanadi river

IPICOL recemmended for allocation. GMS Power Pack

Astaranga Power Co. Ltd.

2640

(4x660)

(Rs.11200 Cr.)

Astaranga, Nuagarh

Puri

Applied to IDCO

20,000 cum/hr

from Devi river

WAC recommended for 50 cusec for Ph-1 Undertaking for installation of

Chambal Infrastructure & Ventures Ltd.

1320

(2x660)

(Rs.7550

Cr.)

Siaria,

Dhenkanal

Land Survey, plot plan completed, land application, DPR,

41 cusec from

Mahanadi river

WAC recommened 41 Cusec water

Ind Barath Energy (Utkal) Ltd.

700 (2x350)

(Rs.3150

Cr)

Sahajbahal,

Lakhanpur,

Jharsuguda

725 Ac.

GL-179.43 Ac

PL-545.57

545 Ac.

545 Ac Pvt.

28 cusec from Ib /

Mahanadi river

Assurance obtained for 28 cusec of water from

Jindal Steel & Power Ltd.

1320

(2x660)

(Rs.5940

Cr)

Boinda, Angul

Appllied to

IPICOL. Request

for relocatin

g the site for the IPP

5000 cum/hr from

Mahanadi river

system

As per MoU JSPL participate in construction of barrage near Badama

Page 4: IPP Sep10 Progress

19 1000 Ac

20 6.3

21 1200 Ac 6.2

Information IPPs who have signed MoU during 2010

Sl. No

1

1320 158.4

2

1980 237.6

3

1320 158.4

4

60 7.2

5

120 14.4

Kalinga Energy & Power Ltd.

1000

(4x250 MW)

Babuchakuli,

Sambalpur

location will be

changed as 600 Ac of forest

40 cusec from

Bheden/ Mahanadi

river system

IPICOL recommened 40 Cusec water to WRD

Sahara India Power Corpn Ltd.

1320

(2x660)

(Rs.6911

Titlagarh, Bolangir

(New location)

950 Ac

PL-808.45

Ac

LA proposal filed with

IDCO, Survey

works are

53 cusec from Tel / Mahanadi

river system

WAC cleared for 50 cusec of water. Applied

Visaka Thermal Power Pvt. Ltd.

1050 (2x525)

Deopara,

Bhandari Pokhari, Bhadrak

Recommendation sent by

IPICOL to IDCO, IDCO

44 cusec from

Baitarani river

system

Applied to WRD, IPICOL recommended water to

Company

Name

MoU on

Date

Location

Capaci

ty (MW)

State Share(MW)

Likely Commissioning

BGR Energy System Ltd

09.04.2010

Bhapur, Nayagarh

12 Plan Period

JR Powergen Private Ltd

09.04.2011

Redhakhol, SBP & KishoreNagar,

12 Plan Period

Adhunic Power & Natural Resources Ltd

09.04.2012

Birmaharajpur, Sonepur

12 Plan Period

Maadurga Thermal Power Company Ltd

09.04.2013 Tangi,

Cuttack

12 Plan Period

Vijaya Ferro & Power Private Ltd

09.04.2014

Turlakhamar,Kesinga,Kalahandi

12 Plan Period

Page 5: IPP Sep10 Progress

6

1320 158.4

Total 6120 734.4

Jindal Stainless Ltd

06.05.2010

Luni, Dhenkanal

12 Plan Period

Page 6: IPP Sep10 Progress

Coal

MoU Signed with Govt. of Orissa on 09.06.2006 (Total Capacity-3130 MW, State Share-782.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable cost

Rs. 20.00 Cr.

MoU Signed with Govt. of Orissa on 26.09.2006 (Total Capacity-12970 MW, State Share-2850.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable cost

August/2012

as on May.2010

Status of Environment clearance

Financial Closure

LOA/EPC Placement, Ordering of

BTG Equipment

Likely Commissioning Schedule

Expenditure till date/

Signing of BPTA/Other clearances

Coal Block

Allotted

Coal Linkage Obtaine

d

Rampia, Dip Side Rampia (112.22 MT Coal)

for 1050 MW

Environmental clearance received from MoEF 5.02.08. Consent for establishment issued by

FC achieved on 27.05.09 IDFC is principal lender ,

Lahmeyer Internl. appointed as owners consultant, EPC ordered to SEPCO, China. NTP for BTG package

Sep-2011, Nov-2012, Dec-2012,

Rs. 850 Cr. BPTA signed.

RTC from Min. of

Railway, GoI. NoC for

Chimney from Airport AI

Concent for establishemnt issued by OPCB . Presentation made before MoEF for final clearance

SBI caps appointed fin. Consult. FC 6 months from allocation of coal linkage

Mantech Synergies Pvt Ltd appointed as Owner's Consultant. Selection of EPC contractor in progress

June -2013/ within 36 months of the financial closure

Rampia Dip Side Rampia (112.22 MT Coal)

for 1050 MW

Environmental Clearance received from MoEF. Consent for establishment of OPCB received on 07.08.08.

Project appraisal by PFC. FC achieved on 09.12.09

Lahmeyer Int'nal appointed as Owner's consultant, LOI issued to INDURE Ltd for EPC. BTG to Harbin, China

Mar-2012 (balance in interval of 4 months)

Rs. 78.02 Cr. BPTA

signed. RTC from Min. of Railway,

Chimney Height from Airport AI

for 1000 MW

Environmental Clearance received from MoEF. Concent for Project issued by OPCB on 19.12.08.

FC achieved, PFC appointed as Financial Advisor.

Desien appointed as Owner's consultant. EPC awared to Nagarjun Construction. BTG package finalised with Harbin,

Rs.261.63 Cr. BPTA signed. RTC from

Min. of Railway, Chimney

Height from Airport AI

ToR received. EIA submitted

after Dec-2013

Page 7: IPP Sep10 Progress

Rs. 49 Cr.

Rs. 4823 Cr.

ToR cleared. EIA/EMP submitted & Public Hearing

Development Consultant Ltd appointed as Owner's consultant. LOI issued for BTG Package

Dec-2012, Jun-2013

Public hearing completed. EIA / EMP completed & submitted to OPCB &

Oct-2012 , Dec-2012 / (4 years after availability of land)

Mandakini

(96.84

MT Coal)

for 600 MW

Obtained Concent for Project from OPCB on 18.11.08 & Environment Clearance from MoEF on 29.09.08

FC achieved for Unit-1 on 08.10.08 & Unit-2 on 22.12.09 through SBI Cap

TCE appointed as Owner's consultant, BTG package ordered on BHEL with advance payment of Rs.135.36 Cr.

Unit-1: Dec-2012 Unit-2: Mar-2013

Rs. 320 Cr. BPTA initiated. RTC from Min.

of Railway, NoC for

Chimney from Airport AI,

Constn. Power from CESU

Rampia Dip Side Rampia (112.22 MT Coal)

for 660 MW

Concent for Project issued by OPCB on 16.03.09. Environment Clearance from MoEF on 13.09.09 MoEF clearance for

PFC appointed as Financial Consultant. FC achieved on Dec-09.

Lahmeyer International appointed as Owner's consultant, EPC ordered to LITL, BTG package placed with Dongfang, China. BoP

Unit-1, Dec-2013 Unit-2,Mar-2014

Rs.192 Cr. BPTA signed.

RTC from Min. of

Railway, Chimney

Height from Airport AI

Mandakini

(96.84

MT Coal)

Concent for Project issued by OPCB . Presentation before MoEF held on 12-03-08 for Final Environmental Clearance•

IDFC appointed as Financial Consultant. FC achieved.

DCPL appointed as Owner's consultant EPC order issued on 04.03.10. BTG ordered on BHEL. ESP/Boiler material received at site. BOP

Jul-2012, Oct-2012

Rs.410 Cr. BPTA

signed. RTC from Min.

of Railway, NoC for

Chimney from Airport AI, BTG & BOP ordered

Rampia, Dip Side Rampia (112.22 MT Coal)

for 600 MW

Consent of OPCB received on 21.09.06. MoEF clearance obtained on Dec’07

SBI Caps appointed as Financial Advosor. Expenses met from own funding

DCPL appointed as Owner's consultant. EPC awared to SEPCO, China, Construction activities

U#1: Jul-10 U#2: Sep-10 U#3: Dec-10 U#4: Mar-11

Page 8: IPP Sep10 Progress

Rs.55.19 Cr.

Rs. 6.75 Cr.

MoU Signed with Govt. of Orissa on 07.02.2009(Total capacity-9850 MW , State share-1182-1379 MW), State share = 12-14% of power generated from the plant at variable cost depending on the availability of coal block

12 Plan Period

12 Plan Period

Mandakini

(96.84

Consent for project issued by OPCB. Presentation made before MoEF for final EC.

EPC/ BTG package finalised & will be issued after physical possession of land

Oct- 2013 (36 months after land acquired)

ToR approved by MoEF. EIA/EMP submitted to OPCB. Public hearing conducted on Feb'09

SBI Caps appointed as Financial Advisor. FC pending due to non all'tion of land & coal linkage.

DCPL appointed as Owner's consultant. EPC consultant is being finalised

Mar-2012 (42 months from coal linkage allottment)

applied to GoI with

recommendation of GoO

ToR obtained. EIA submitted. For 50 MW MoEF clearance obtained,

Agreement with SBI patiala for term loan

Commissioned 50 MW in Mar-2010, balance in 12th Plan Period

applied to GoI with

recommendation of GoO

Energy Infratech Pvt Ltd appointed as consultant

applied to GoI with

recommendation of GoO

TCE appointed as Owner's consultant,

12 Plan Period (48 months from FC)

for 700 MW

MoEF clearance obtained on 30.11.09

FC achieved with Axis bank for 1st Unit

EPC placed with Cethar Vessels Ltd. BOP order placed with Punj Lloid

Unit -1: Dec, 2011, Unit-2: Mar,2012

BPTA signed. Chimney

Height from Airport AI

applied to GoI with

recommendation of GoO

Applied for TOR to MoEF, EMRTC appointed as consultant

Page 9: IPP Sep10 Progress

12 Plan PeriodApplied for TOR to MoEF,

applied to GoI with

recommendation of GoO

TOR obtained from MoEF, EIA under process

e-Gateway Pvt Ltd appointed as Owner's Consultant

U# 1-June -2014 U# 2-Dec-2014

applied to GoI with

recommendation of GoO

TOR obtained from MoEF, EIA under process

U# 1-Mar -2014 U# 2-Sep-2014

Page 10: IPP Sep10 Progress

MoU Signed with Govt. of Orissa on 09.06.2006 (Total Capacity-3130 MW, State Share-782.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable cost

MoU Signed with Govt. of Orissa on 26.09.2006 (Total Capacity-12970 MW, State Share-2850.5 MW), State share = 25% of power generated from the plant at regulated price + all power above 80% PLF at variable cost

as on May.2010

Page 11: IPP Sep10 Progress
Page 12: IPP Sep10 Progress

MoU Signed with Govt. of Orissa on 07.02.2009(Total capacity-9850 MW , State share-1182-1379 MW), State share = 12-14% of power generated from the plant at variable cost depending on the availability of coal block

Page 13: IPP Sep10 Progress

as on May.2010

Page 14: IPP Sep10 Progress
Page 15: IPP Sep10 Progress
Page 16: IPP Sep10 Progress

as on May.2010

Page 17: IPP Sep10 Progress
Page 18: IPP Sep10 Progress
Page 19: IPP Sep10 Progress

Company Name MoU on Location

1 Bhushan Energy Ltd 2000 500 Dec-14 250 500 500 500 500

2 CESC Ltd. Neulapoi, Dhenkanal 1320 330 Mar-2014, Sep-2014 165 330 330 330 330 330

3 Essar Power Ltd. 1000 250

4 1400 350 350 350 350 350 350 350 350 350

5 1800 450 Dec-2012, Mar-2013 150 300 450 450 450 450 450

6 1050 262.5 March/2012 131 262 262 262 262 262 262 262

7 1320 330 Dec-2013, Mar-2014 165 330 330 330 330 330

8 1320 330 Jun-2014, Dec -2014 165 330 330 330 330

9 1050 262.5 Jul-2012 , Oct-2012 262 262 262 262 262 262 262

10 1050 262.5 262 262 262 262 262 262

11 Sterlite Energy Ltd 2400 600 300 600 600 600 600 600 600 600 600

12 Tata Power Company Ltd. 1000 250 125 250 250 250 250 250

13 Visa Power Ltd. 1320 330 165 330 330 330 330

Sub Total 17030 4257.5 300 1081 1624 2491 3676 4256 4256 4256 4256

14 Aarti Steel Ltd. Ghantikhal, Cuttack 500 60 6 6 60 60 60 60 60 60 60

15 Astaranga Power Co. Ltd. Astaranga, Puri 2640 316.8 2015-2016 158 316 316 316

16 Siaria, Dhenkanal 1320 158.4 2016-2017 79 158 158

17 1360 163.2 Dec-2011, Mar-2012 84 163 163 163 163 163 163

18 Jindal Steel & Power Ltd. Boinda, Angul 1320 158.4 2015-2016 158 158 158 158

19 1320 158.4 2015-2016 158 158 158 158

20 Titlagarh, Bolangir 1320 158.4 June -2014, Dec-2014 158 158 158 158 158

21 Deopara, Bhadrak 1050 126 2015-2016 126 126 126 126

Sub Total 10830 1299.6 90 60 223 381 981 1218 1297 1297

Information regarding MoU signed IPPs proposed to be set up in Orissa.

Sl. No

Capacity (MW)

State Share (MW)

Likely Commissioning Schedule

2010-2011

2011-2012

2012-2013

2013-2014

2014-2015

2015-2016

2016-2017

2017-2018

2018-2019

26.09.2006

Ghantigadia, Angul

26.09.2006

26.09.2006

Paranga, Talcher, Angul

MoU period not extended, IPP file closedGMR Kamalaga Energy

Ltd.09.06.2006

Kamalanga, Dhenkanal

Sep-2011, Nov-2011, Feb-2012

Jindal India Thermal Power Ltd

26.09.2006

Deranga,Talcher, Angul

K.V.K Nilachal Power (P) Ltd,

26.09.2006

Kandarei,Athgarh, Cuttack

Lanco Babandh Power Projects Ltd.

26.09.2006

Kurunti, Dhenkanal

Mahanadi Aban Power Co Ltd.

09.06.2006

Tehranpur,Talcher, Angul

Monnet Power Company Ltd.

26.09.2006

Malibrahmani,Nisha, Angul

Nava Bharat Power (P) Ltd.

09.06.2006

Khadagprasad, Dhenkanal

Mar-2012 ( balance in interval of 3 months)

26.09.2006

Burkhamunda, Jharsuguda

600 MW in Aug-2010 (balance in interval of 3 months)26.09.200

6Naraj Marthapur, Cuttack

Oct- 2013 (36 months after land acquired)

26.09.2006

Brahamanabasta, Cuttack

Jun-2014 (42 months from coal linkage allottment)

07.02.2009

50MW commissioned in Mar-2010, balance in 12th Plan Period07.02.200

9

Chambal Infrastructure & Ventures Ltd.

07.02.2009

Ind Barath Energy (Utkal) Ltd.

07.02.2009

Sahajbahal, Jharsuguda

07.02.2009

Kalinga Energy & Power Ltd.

07.02.2009

Sodamal, Kuchinda, Jharsuguda

Sahara India Power Corporation Ltd.

07.02.2009

Visaka Thermal Power Pvt. Ltd.

07.02.2009

Page 20: IPP Sep10 Progress

22 BGR Energy System Ltd Bhapur, Nayagarh 1320 158.42015-2016 158 158 158 158

23 JR Powergen Private Ltd 1980 237.62015-2016 237 237 237 237

24 1320 158.42016-2017 158 158 158

25 Tangi, Cuttack 60 7.2 June/20117 7 7 7 7 7 7 7

26 120 14.42016-2017 14 14 14

27 Jindal Stainless Ltd 06.05.2010 Luni, Dhenkanal1320 158.4

2016-2017 158 158 158

Sub Total 6120 734.4 7 7 7 7 7 402 732 732 732

Total 33980 6291.5 307 1178 1691 2721 4064 5639 6206 6285 6285

85% PLF 260.95 1001 1437 2313 3454 4793 5275 5342 5342

OTHER COMPANIES PROGRESSED TO SET UP THERMAL POWER PROJECTS IN ORISSA

Company Name Location State Share

1 Ultra Mega Power Plant MoP/PFC 4000 1300 2014-15 650 1300 1300 1300 1300

2 MoP/ PFC not Finalised 8000 4000 2016-17

3 NTPC CPSU Dalipali, Sundergarh 3200 1600 2015-16 800 1600 1600 1600

4 NTPC CPSU 3200 1600 2015-16 800 1600 1600 1600

5 TTPS-NTPC -Expansion CPSU TTPS, Talcher 1320 660 2014-15 660 660 660 660 660

6 State PSU 1320 660 2014-15 660 660 660 660 660

7 State PSU 2000 2000 2015-161000 2000 2000 2000

15040 7820 0 0 0 0 1970 5220 7820 7820 7820

85% PLF 0 0 0 0 1674.5 4437 6647 6647 6647

Total Power(100% availability from IPPs) 260.95 1001.3 1437.4 2312.9 5128.9 9230.2 11922 11989 11989

Present availability(80% of installed capacity 4100 MW) 3280 3280 3280 3280 3280 3280 3280 3280 3280

Total Available Power(100% availability from IPPs) 3540.95 4281.3 4717.4 5592.9 8408.9 12510 15202 15269 15269

CEA 17th EPS 4020 4459 4958 5417 5812

OPTCL Proposed forecast(2009-10 to 2018-19) 3706 4300 5270 5694 5927 6135 6362 6614 7196

Suplus/Deficit of Power(100% availability from IPPs) as per CEA -479.05 -177.7 -240.65 175.85 2596.9

09.04.2010

09.04.2010

Baija, KishoreNagar, Angul

Adhunic Power & Natural Resources Ltd

09.04.2010

Birmaharajpur, Sonepur

Maadurga Thermal Power Company Ltd

09.04.2010

Vijaya Ferro & Power Private Ltd

09.04.2010

Turlakhamar,Kesinga,Kalahandi

Developers

Capacity (MW)

Likely Commissioning

ScheduleBedabahal, Sundergarh

02 nos. Shell Company (UMPP Pattern)

Gajamara, Dhenkanal

OPGC Unit-3 & 4- Expansion

IB Thermal, Jharsuguda

OTPCL (Joint Venture of OHPC & OMC)

Kamakyanagar, Dhenkanal

Page 21: IPP Sep10 Progress

Suplus/Deficit of Power(100% availability from IPPs) as per OPTCL -165.05 -18.7 -552.65 -101.15 2481.9 6375.2 8840.1 8655.25 8073.25

Page 22: IPP Sep10 Progress

Peak Demand (MW) Forecast by CEA & OPTCL & AvailabilityPower Demand 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17CEA(17th EPS) 4020 4459 4958 5417 5812

OPTCL Forecast 3706 4300 5270 5694 5927 6135 6362

Peak Power Available 3941 4281 4717 5593 8409 12510 15202

2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-190

2000

4000

6000

8000

10000

12000

14000

16000

18000

Peak Demand (MW) Forecast by CEA & OPTCL & Availability

Axis

Title

2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-190

2000

4000

6000

8000

10000

12000

14000

16000

18000

Peak Demand (MW) Forecast by CEA & OPTCL & Availability

Peak

Pow

er in

MW

Page 23: IPP Sep10 Progress

2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-190

2000

4000

6000

8000

10000

12000

14000

16000

18000

Peak Demand (MW) Forecast by CEA & OPTCL & Availability

Peak

Pow

er in

MW

Page 24: IPP Sep10 Progress

Peak Demand (MW) Forecast by CEA & OPTCL & Availability

2017-18 2018-19

6614 7196

15269 15269

2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-190

2000

4000

6000

8000

10000

12000

14000

16000

18000

Peak Demand (MW) Forecast by CEA & OPTCL & Availability

Axis

Title

2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-190

2000

4000

6000

8000

10000

12000

14000

16000

18000

Peak Demand (MW) Forecast by CEA & OPTCL & Availability

Peak

Pow

er in

MW

Page 25: IPP Sep10 Progress

2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-190

2000

4000

6000

8000

10000

12000

14000

16000

18000

Peak Demand (MW) Forecast by CEA & OPTCL & Availability

Peak

Pow

er in

MW