Confidentiality & Copyright This Manual contains CrimsonLogic proprietary material. While CrimsonLogic customers are given reasonable opportunity to view the Manual for the purpose of exemplifying CrimsonLogic’s commitment to quality, any form of reproduction, transmission or use of this Manual or its contents is not permitted without prior written approval from CrimsonLogic. All rights are reserved. CrimsonLogic Pte Ltd 31 Science Park Road, The Crimson, Singapore 117611, Main: (65) 6887 7888, Fax: (65) 6778 5277, www.crimsonlogic.com.sg SYSTEM REQUIREMENTS SPECIFICATION FOR PORT COMMUNITY SYSTEM (PCS) Release No 3.0 – June, 2007

Transcript of IPA PCS Software Requirements Specification V3

Page 1: IPA PCS Software Requirements Specification V3

Confidentiality & Copyright

This Manual contains CrimsonLogic proprietary material. While CrimsonLogic customers are given reasonable opportunity to view the Manual for the purpose of exemplifying CrimsonLogic’s commitment to quality, any form of reproduction, transmission or use of this Manual or its contents is not permitted without prior written approval from CrimsonLogic. All rights are reserved.

CrimsonLogic Pte Ltd 31 Science Park Road, The Crimson, Singapore 117611, Main: (65) 6887 7888, Fax: (65) 6778 5277, www.crimsonlogic.com.sg

SYSTEM REQUIREMENTS SPECIFICATION

FOR

PORT COMMUNITY SYSTEM (PCS) Release No 3.0 – June, 2007

Page 2: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 2 of 291

PREPARED BY ROLE NAME SIGNATURE DATE

(DD.MM.YYYY) Project Leads GOURAV ARORA,

PANG TECK CHUN, ASHOK KUMAR, VENKATESAM, RAMESH KUMAR

09.02.2007

Project Manager SURESH KUMAR KANTHOLY 09.02.2007 REVIEWED BY

ROLE NAME SIGNATURE DATE (DD.MM.YYYY)

Project Manager SURESH KUMAR KANTHOLY 10.02.2007 APPROVALS BY DESIGNATION NAME SIGNATURE DATE

(DD.MM.YYYY) PROJECT MANAGER SURESH KUMAR KANTHOLY 13.02.2007 BUSINESS MANAGER NAVNEET CHAUHAN 13.02.2007 PROJECT DIRECTOR THIAGU ETTI GOUNDAN 13.02.2007 IPA PROJECT MANAGER RAJEEV PURI

DISTRIBUTION LIST (Applicable only if hardcopies are distributed)

DOCUMENT CONTROL NUMBER

VERSION NUMBER RECIPIENT NAME DATE (DD.MM.YYYY)

1 1.0 RAJEEV PURI 08.12.2006 2 2.0 3 2.2 4 2.3

RELEASE HISTORY RELEASE NUMBER ASSOCIATED

CHANGE REQUEST NUMBER

DATE (MM,YYYY) BRIEF SUMMARY OF CHANGES

1.0 NA December, 2006 First release to IPA 2.0 NA January, 2007 Incorporated the

recommendations after the IPA review.

2.2 NA February, 2007 Amended after second round of review by Ports, IPA and TWG

2.3 NA March, 2007 Amended after third round of review by Ports, IPA, NIC and TWG

3.0 NA June, 2007 Base line

Page 3: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 3 of 291

Page 4: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 4 of 291

CONTENTS 1. INTRODUCTION ....................................................................................................................6 1.1 ABOUT THE PROJECT ..................................................................................................................6 1.2 PURPOSE AND SCOPE OF THIS DOCUMENT....................................................................................6 1.3 REFERENCES ..............................................................................................................................6 1.4 DEFINITIONS AND ABBREVIATIONS ................................................................................................7 2. REQUIREMENTS STUDY........................................................................................................11 2.1 SCOPE OF THE STUDY................................................................................................................11 2.2 OBJECTIVE OF THE STUDY ..........................................................................................................11 2.3 APPROACH TO THE REQUIREMENT STUDY .....................................................................................11

2.3.1 meeting with stakeholders ......................................................................................12 2.3.2 Points of discussion ...................................................................................................12 2.3.3 Collection of Sample Documents .........................................................................12

2.4 PERIOD OF STUDY AND PORTS VISITED........................................................................................13 2.5 EXISTING SYSTEM......................................................................................................................14

2.5.1 Overview of Existing System....................................................................................14 2.5.2 Business Documents Exchanged ...........................................................................15 2.5.3 Information Flow Diagram.......................................................................................16 2.5.4 Differences in Business Processes between Ports ................................................26 2.5.5 Problems and Shortcomings with Current System(s)...........................................34 2.5.6 General Problems or Issues .....................................................................................34 2.5.7 Specific Problems/Issues with Some Port ..............................................................36 2.5.8 Suggestions From Stakeholders ..............................................................................37

3. PROPOSED BUSINESS SOLUTION........................................................................................40 3.1 PORT COMMUNITY SYSTEM (PCS).............................................................................................40 3.2 PRODUCT OVERVIEW...............................................................................................................41 3.3 PCS ARCHITECTURE.................................................................................................................41 3.4 USER CHARACTERISTICS............................................................................................................42

3.4.1 User Groups................................................................................................................42 3.4.2 User Roles ...................................................................................................................45 3.4.3 User Roles and Responsibilities................................................................................47

3.5 OPERATIONAL CONCEPT AND SCENARIOS ................................................................................55 3.5.1 Import Workflow........................................................................................................55 3.5.2 Export Workflow.........................................................................................................60 3.5.3 User Interaction with PCS ........................................................................................64 3.5.4 List of Messages or Documents ..............................................................................67

3.6 ISSUES ADDRESSED IN PCS........................................................................................................76 4. INTERFACES REQUIREMENTS ..............................................................................................85 4.1 SYSTEM INTERFACES..................................................................................................................85

4.1.1 FTP (File Transfer Protocol) .......................................................................................85 4.1.2 MHX (Message Hub Access)...................................................................................85 4.1.3 Web Upload ..............................................................................................................85 4.1.4 Other clients ..............................................................................................................85

4.2 USER INTERFACES .....................................................................................................................86 5. SPECIFIC REQUIREMENTS ...................................................................................................87 5.1 INTELLIGENT MESSAGE SYSTEM...................................................................................................87

Page 5: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 5 of 291

5.1.1 PCS Message Hub ....................................................................................................87 5.1.2 Modes of Message Exchange................................................................................87 5.1.3 Components of Message Exchange ....................................................................89 5.1.4 Message Exchange Use Cases ..............................................................................92

5.2 CENTRALIZED DATABASE AND DOCUMENT REPOSITORY ..............................................................93 5.2.1 Central Database ....................................................................................................93 5.2.2 Central Document Repository................................................................................94 5.2.3 MIS Reports ................................................................................................................95

5.3 WEB SERVICES.........................................................................................................................96 5.3.1 Web Services Use Cases..........................................................................................96 5.3.2 Web Services Provided............................................................................................97

5.4 PORTAL SERVICES ....................................................................................................................98 5.4.1 Portal Services Provided ..........................................................................................99

5.5 PAYMENT SERVICES................................................................................................................100 5.5.1 Payment Service Workflow .................................................................................. 103

5.6 ADMINISTRATION SERVICES .....................................................................................................105 5.6.1 Components Administration................................................................................ 105 5.6.2 Company and User Account Administration.................................................... 107

5.7 REGISTRATION AND AUTHORIZATION SERVICES..........................................................................109 5.7.1 User Registration Use Cases ................................................................................. 111

5.8 SINGLE WINDOW WEB APPLICATION.......................................................................................112 5.8.1 Import Process........................................................................................................ 113 5.8.2 Export Process ........................................................................................................ 133 5.8.3 Functions for Stakeholders ................................................................................... 150

6. OTHER NONFUNCTIONAL REQUIREMENTS ......................................................................156 6.1 SECURITY REQUIREMENTS ........................................................................................................156 6.2 APPLICATION MANUALS REQUIREMENTS ....................................................................................157 6.3 PERFORMANCE REQUIREMENTS ...............................................................................................158 6.4 END USER TRAINING REQUIREMENTS..........................................................................................158 6.5 INFRASTRUCTURE REQUIREMENTS ..............................................................................................159 7. ANNEXURE........................................................................................................................161 7.1 ANNEXURE I – POINTS OF DISCUSSION .....................................................................................161 7.2 ANNEXURE II – USE CASE DESCRIPTIONS ..................................................................................166

7.2.1 Message Exchange Use Cases descriptions ..................................................... 166 7.2.2 Web Service Use Cases descriptions .................................................................. 172 7.2.3 Payment Services Use Cases descriptions......................................................... 181 7.2.4 Registration Service Use Cases descriptions ..................................................... 187 7.2.5 Import & Export Use Cases descriptions............................................................. 191

7.3 ANNEXURE III - REQUIREMENT COMPLIANCE WITH TENDER .........................................................273

Page 6: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 6 of 291

1. INTRODUCTION

1.1 ABOUT THE PROJECT Centralized Port Community System (PCS) is an initiative by Indian Ports Association (IPA) intended to provide a single window system for the Port communities in India to securely exchange the documents and information electronically with their stakeholders involved in the maritime transport and logistics chain including the trading partners and government agencies. It also expected to provide global visibility and access to the central database to all its stakeholders through internet based interfaces.

1.2 PURPOSE AND SCOPE OF THIS DOCUMENT This document specifies the requirements for the Port Community System (PCS) for Indian Ports in detail. The scope of this document includes the description of the current and proposed system, the functional and interface requirements and the other nonfunctional requirements like security, performance, infrastructure and training requirements. The target audience for this document is project team members, technical working group, end users, steering committee and IPA or any other government officials involved in the project.

1.3 REFERENCES The following documents have been referred during the preparation of SRS: • RFP No. IPA/ EDP/EDI/WBPCS/2005 for Centralized web-based Port Community

System dated December 2005 • CrimsonLogic Proposal for IPA/ EDP/EDI/WBPCS/2005 dated March 6, 2006 • Work Order No IPA/EDP/EDI/WBPCS/2005/WO dated 12th Oct 2006 • PCS System Study Report by NIC NIC-PCS-SSR Version 2.0 dated 17/03/2005 • Port Customs message format Version 1.6 • PCS Message Format Version 1.1 (PCS_MessageFormat_Ver1.1)

Page 7: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 7 of 291

1.4 DEFINITIONS AND ABBREVIATIONS

Abbreviation Description

API Application Programming Interface BAPLIE Bay Plan – UN EDIFACT Standard Message BBN Blue Boat Note BE Bill of Entry BERMAN Berth Management Message - UNEDIFACT Standard Message BG Bank Guarantee BL Bill of Lading BOM Bill Of Material CA Container Agent CE Central Excise CT Container Terminal

CALINF Vessel Intimation – UNEDIFACT Standard Message CFS Container Freight Station CHA Custom House Agent CL CrimsonLogic Pte Ltd CLP Container Loading Plan

COARRI Container Loading/Discharge Report - UNEDIFACT Standard Message

CODECO Container Gate-in Gate-Out – UNEDIFACT Standard Message COEDOR Equipment Stock Report – UNEDIFACT Standard Message COHAOR Container Special Handling Order – UNEDIFACT Standard Message CONCOR Container Corporation COPARN Container Announcement – UNEDIFACT Standard Message COPINO Container Pre –notification – UNEDIFACT Standard Message COPRAR Container Loading Order – UNEDIFACT Standard Message COREOR Container Release Order – UNEDIFACT Standard Message COSTOR Stuffing or stripping Order – UNEDIFACT Standard Message COSTCO Stuffing or stripping Report – UNEDIFACT Standard Message CR Change Request

CREADV Credit Advice – UNEDIFACT Standard Message CSLA Container Shipping Line Association CSV Comma Separated Value file CWG Container Working Group DC Data Centre

DEBADV Debit Advice – UNEDIFACT Standard Message DO Delivery Order DR Disaster Recovery EAI Enterprise Application Integration

Page 8: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 8 of 291

ebMS EbXML Message Service EC Electronic Commerce EDI Electronic Data Interchange EGM Export General Manifest EIR Equipment Interchange Report EO Entry Outward ETA Expected Time of Arrival FCL Full Container Load FOB Free On Board FTP File Transfer Protocol GBN Green Boat Note GCC General Conditions of Contract GUI Graphical User Interface HTML Hyper Text Mark Up Language HTTP Hyper Text Transfer Protocol HTTPS Secure HTTP ICD Inland Container Depot ICEGATE Indian Customs and Excise Gateway ICT Information and Communication Technologies IFTDGN Dangerous Goods – UNEDIFACT Standard Message IGM Import General Manifest INVOIC Invoice – UNEDIFACT Standard Message IPA Indian Ports Association

ISO International Organization for Standardization IST Indian Standard Time Java Popular Computer Language JDBC Java Database Connectivity JNPT Jawaharlal Nehru Port Trust LAN Local Area Network LCL Less Container Load LEO Let Export Order MBPT Mumbai Port Trust MIME Multipurpose Internet Mail Extensions MLO Main Line Operators MMD Mercantile Marine Department. NIC National Informatics Centre NSICT Nhava Sheva International Container Terminal OAT Operational Acceptance Test

ODBC Open Database Connectivity OS Operating System PAN Permanent Account Number (given by Income Tax Dept.) PAYORD Pay Order – UNEDIFACT Standard Message

Page 9: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 9 of 291

PAXLST Passenger and Crew list Message – UNEDIFACT Standard Message PQO Plant Quarantine Organization

Page 10: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 10 of 291

PC Port Clearance PCS Port Community System PD Personal Deposit PD Project Director PHO Port Health Organization PL Project Leader PM Project Manager

PMP Project Management Plan PO Preventive Officer QA Quality Assurance RDBMS Relational Database Management System RR Rail Receipt RWG Regulatory Working Group SA Shipping Agents SB Shipping Bill SC Steering Committee SCL Software Configuration Lead

SEI CMM Software Engineering Institute – Capability Maturity Model SL Shipping Lines SLA Service Level Agreement SMS Short Message Service SMTP Sub Manifest Transshipment Permit SMTP Simple Mail Transfer Protocol SQA Software Quality Auditor

SRS Software Requirement Specifications TCS Trade Community System TEU Twenty Equivalent Unit TFO Tank Farm Operator TP Transshipment Permit TR Technical Requirements TWG Technical Working Group UI User Interface

UNEDIFACT United Nations Electronic Data Interchange For Administration, Commerce and Trade

VAN Value Added Network VCN Vessel Call Number VESDEP Vessel Departure - UNEDIFACT Standard Message VIA Vessel Identification Advice VPN Virtual Private Network WML Wireless Markup Language XML Extensible Markup Language

Page 11: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 11 of 291

2. REQUIREMENTS STUDY

2.1 SCOPE OF THE STUDY National Informatics Center (NIC) of India had already done the preliminary study in 2004 and outlined the functionality and requirements of Port Community System (PCS). The requirements study conducted by CrimsonLogic, as part of this project, was a supplementary study to firm up and fine tune the requirements and prepare a detailed specification for designing and developing the PCS.

2.2 OBJECTIVE OF THE STUDY The main objectives of the requirement study were:

• Understand the business processes of the stakeholders and to see any changes to the process or information flow given in the study report by NIC.

• Identify the document/information exchange requirements between the

stakeholders

• Find out the current IT infrastructure capabilities of port and other stakeholders and the extent of system automation accomplished so for.

• Identify the problems and shortcomings of the current system.

2.3 APPROACH TO THE REQUIREMENT STUDY The Requirements Study Team worked with the Technical Working Group (TWG) in the major Ports with the help of IPA to identify the coordinators in each port. The coordinators arranged and coordinated the meetings and discussions with various stakeholders connected to that Port. The System Study Report on PCS by NIC based on the study they had done in 2004, was taken as the base document and references are made to that report.

The main activities involved as part of the study are:

• Face-to-face meeting with the stakeholders to understand the business process pertaining to PCS and validate the information flow against the flow in the study report to see any major deviations.

• Classify/categorize the document and the information exchanged between

other stakeholders part of the business cycle

• Collect samples of documents involved business transactions regards to PCS

Page 12: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 12 of 291

• Find out the current IT infrastructure capabilities and the extent of system automation accomplished so for.

2.3.1 MEETING WITH STAKEHOLDERS The team met representatives of the following stakeholder identified by the port coordinator for all the major ports in India:

Port Authority Shipping Line/Agent Terminal Operator Importer/Exporter/Custom House Agent Stevedores Container Freight Station Operator Rail Transport Operator (CONCOR) Surveyor Transporter Bank Customs PHO Immigration

2.3.2 POINTS OF DISCUSSION Refer Annexure -I for the key points discussed with stakeholders during the requirements collection. 2.3.3 COLLECTION OF SAMPLE DOCUMENTS

The following are some of the document samples collected from each stakeholder:

• Paper or EDI documents (application forms, requests, memos, intimations etc) the

stakeholder exchange with other business partners in the maritime transport or logistics chain.

• Permits, Licenses, notices, tickets etc issued by government/controlling agencies.

• Supporting documents submitted along with any of the documents mentioned

above.

• Reports, lists, bills etc prepared or received by the stake holder that help in the decision making or information exchange

• The manual or electronic registers kept by the stakeholder, related to port related

operations.

• Formal notifications (letter, fax, email, SMS etc) issued to or received from any other stakeholder

Page 13: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 13 of 291

• Any other document found useful during the study

2.4 PERIOD OF STUDY AND PORTS VISITED The study was conducted in the all the major ports from 1st November 2006 till 2nd December 2006. The list of ports and the period of the study is given in the table below:

Port Days From To Study Team Size Mumbai 5 01/11/06 06/11/06 5 JNPT 4 07/11/06 10/11/06 4 Goa 2 13/11/06 14/11/06 2 Kandla 2 16/11/06 17/11/06 2 Haldia 1 23/11/06 23/11/06 2 3 15/02/07 17/02/07 2 Kolkatta 2 24/11/06 25/11/06 2 Cochin 2 20/11/06 21/11/06 2 Mangalore 2 23/11/06 24/11/06 2 Chennai/Ennore 2 27/11/06 28/11/06 2 Vishakhapatnam 2 27/11/06 28/11/06 2 Tuticorin 2 30/11/06 01/12/06 2 Paradip 2 30/11/06 01/12/06 2

Page 14: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 14 of 291

2.5 EXISTING SYSTEM 2.5.1 OVERVIEW OF EXISTING SYSTEM All the major ports in India handle bulk break bulk, containerized and liquid cargo. The port operations in various ports are not same, though similar, due to the different kind of cargo they handle, different players manage the cargo related activities and different pace and levels of automation of operations. In some of the ports like Mumbai, Kolkata the stevedoring activities and CFS operations are handled by the port itself while in others, they are privatized. In JN Port the stevedoring activities are partly handled by port i.e. loading, discharge and transportation of containers inside the port area is handled by port and lashing is handled by SA, whereas CFS operations are privatized. At Mumbai Port lashing / unlashing is carried by SA and transportation of containers from Port to CFS and vice versa (Except Import Hazardous (B Catetgory) and Import Reefer containers) is done by transporters appointed by SA. Many of the major Ports use Terminal Operating systems like Navis, IPOS and CETOS for managing their terminal operations. They exchange EDI messages with Customs. Some of them even exchange few electronic messages with some of the big Shipping Agents and more advanced private Terminal operators. Though there exist different IT systems deployed by Ports and other different Port Community players but these IT systems only provide limited interfaces to others. The community at large has no single point of information consolidation and retrieval. Shipping goods from one port to another port in India makes it even more difficult for the stakeholders since they will have to liaise with multiple systems to do transactions over different ports. In general, documentation and processing is still manual for most of the stakeholders in the ports community, except few international players. Therefore, exchanging data or information, getting status updates from trading partners or business transaction with other members of the community take place manually resulting in re-entry of data into their internal systems and the increase in the dwell time for the vessels visiting the ports. The interaction between port community players in the current system is depicted in the diagram below:

Page 15: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 15 of 291

2.5.2 BUSINESS DOCUMENTS EXCHANGED Refer the Study Report from NIC for the list of Business Documents exchanged between the stakeholders in the current system.

Page 16: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 16 of 291

2.5.3 INFORMATION FLOW DIAGRAM The consolidated information flow diagrams are given below for both import and export process cycles: 1. Import Cycle

IGM filing (SA-Customs-Port)- Vessel Profile

- Cargo/container details

Cancel IGM (Customs-SA,Port)

Vessel Profile (SA-Port)

Voyage Registration (SA-Port)

Allotment of VCN (Port-SA)

Self Assessment of Charges (SA-Port)

Payment in the Bank/Port and Endorsement(Bank-Port)

Allocation of IGM No. (Custom-SA,Port)

Final IGM Particulars (SA-Customs)Request for Entry Inward (SA-Customs)

End

Start

VoyageRegistration

RegulatoryClearance Request for IGM

Cancellation/ Amendment (SA-Customs-Port)

Amendment

Cancel

A

Call Sign ?No

Yes

Page 17: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 17 of 291

• Berthing/Pilot Application (SA-Port) - Dimensions of Vessel - Cargo Details• Hazardous Cargo Declaration (SA-Port)• Instructions for handling Hazardous Cargo (SA-Port)• Resource Request (SA-Port)• Stowage Plan (SA-Port)

• PHO Certificate (SA-PHO)• Plant quarantine Certificate• MMD Certificate• Immigration Certificate (SA-Immigration)

• Allotment of Berth (Port-SA)• Allotment of Resources (Port-SA)

BerthingRequest

A

Intimation of Cargo Arrival (SA-CHA)Intimation of Cargo Location (Port-SA,Customs) / (SA-CHA)

Cargo Excess Landed ?

Excess Landed Cargo (Port-Customs)

File Supplement IGM (SA-Customs-Port

Vessel/Tanks Survey Report(Port-SA, Customs) / (Surveyor-SA)

Break Bulk, Dry Bulk/Liquidor Container ?

OTR / COARRI / Tally Report for Cargo/Container Unloaded

(Port-SA,Customs) / (Surveyor-SA)

Liquid / Dry BulkBreak bulk/Container

Yes

No

Cargo/ContainerDischarge

B

P

Page 18: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 18 of 291

Request for moving the Container to CFS(SA/Transporter-Port, Customs)

Permission for Moving the Container to CFS( Customs - Port,SA/Transporter) (Port / CFS - SA)

• Advance Container List (SA-Transporter)• Instructions to move Container to CFS

(SA- Transporter)

Gate Pass for Moving Container to CFS(Port-SA,Transporter)

Gate- In Permission at the CFS (Port / CFS / CT-SA,Transporter)

FCL and Delivery in Container?

No

FCL: Request for de-stuffing containers (SA/CHA-CFS/Port)LCL:Request for resources in CFS (SA-CFS)Intimation of De-stuffing (SA-Surveyor)Container Load Plan (SA-CFS/Port,Surveyor)IGM / Advance List (Customs / SA - Port)

Allocation of resources for de-stuffing (CFS / Port -SA)

Container De-Stuffing Report (CFS / Port-SA) /(Surveyor-SA)

Tally Sheet (CFS / Port-SA,Customs)

ContainerShifting

Destuffing ofContainers

B

Containerized Cargo ?

Container Shifting to CFS ?

No

Yes

Yes

No

C

( FCL / LCL De-stuffing )

Yes

Page 19: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 19 of 291

Delivery Order(SA-CHA - Port)

Bill of Entry filing(CHA-Customs - Port)

Out of Charge (Customs-CHA-Port)

Assessment of Wharfage,demurrage, octroi & stamp dutycharges (Port-CHA)

Payment through Bank/PD Account(CHA-Port)

Gate Pass(Port-CHA) (Port-Customs)

Gate Pass (Port-SA)

Railway Receipt(Port-RT) (RT - SA/CHA)

Railway-Out Report (Port-SA/RT)

SMTP Request(SA-Customs)

SMTP Permit(Customs-SA,Port)

End

Obt

ain

Cus

tom

s C

lear

ance

Rel

ease

Car

go

C

Cargo/Container Delivery ?

Cargo orContainer?

Rail

Indent for Wagon(Port-Railways)

Indent for Wagon(Port-CONCOR)

Container

Road

Transit

Cargo

BargeD

Road / Rail /Barge ?

Direct

Road & Rail

BargeD

Movementby Road / Rail /

Barge ?

Rail orRoad?

Road & Rail

Page 20: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 20 of 291

D

Request for Ingress Permission(SA- Port)

Assessment of Barge related chargesPayment of barge related Ad-hoc chargesVerfication of certificates by Port

Issue Ingress Permission ( Port - SA)

End

Request for Egress Permission ( SA- Port )

Issuer Egress Permission ( Port - SA )

Removal /Delivery ?

Request for Ingress Permission(CHA- Port)

Removal Delivery

Loading of cargo onto Barge

Appraise and Issue Green Boat Note (GBN)(Customs - SA - Port)

Adjustment of Barge related charges

Assessment of Barge related chargesPayment of barge related Ad-hoc chargesVerfication of certificates by Port

Issue Ingress Permission ( Port - CHA)

Request for Egress Permission ( CHA- Port )

Issuer Egress Permission ( Port - CHA )

Loading of cargo onto Barge

Appraise and Issue Green Boat Note (GBN)(Customs - CHA - Port)

Adjustment of Barge related charges

Page 21: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 21 of 291

2. Export Cycle

Request for Rotation No. (SA-Customs)

Cancel Rotation No. (Customs-SA,Port)

Vessel Profile(SA-Port)

Voyage Registration (SA-Port)

Allotment of VCN (Port-SA)

Self Assessment of Charges (SA-Port)

Payment in the Bank and Endorsement(Bank-Port)

Allocation of Rotation No.(Custom-SA,Port)

Amended Rotation No. (Customs-SA, Port)

End

Start

VoyageRegistration

RegulatoryClearance Request for

Rotation No. cancellation/ Amendment(SA-Customs)

Amendment

Cancel

A

Call sign ? No

Yes

Page 22: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 22 of 291

A

Break/Dry BulkCargo or Container ? ContainerBreak/Dry Bulk

CartingCargo

B

Request for Space Allocation & Carting(SA/CHA-Port/CFS)

Space allocation & Permission for Carting(Port/CFS - SA/CHA)

Intimation of the location & Vessel(SA - CHA)

Intimation for Moving Empty Containersto CFS (SA-Transporter)

Gate IN Permission for Empty Container(CFS - Transporter, SA)

Customs Examination & LEO(Customs-CHA,Port)

Filing Shipping Bill (CHA-Customs, Port)Note: Witout filing SB also, Cargo can be

moved

Gate IN Pass for Cargo(CFS-CHA,Transporter)

• Gate In Permission (Port-CHA)• Entry of goods in Port (Port-CHA,Customs) (CHA - SA)

• Request for Movement from Pre-Shipmentto Dock (CHA-Port)• Shed to shed Movement Order (Port-CHA)

Cargo or Container ?Cargo Container

Request for moving the Container to Port(SA/CHA-Port/CFS)

Permission for Moving the Container to Port(Port/CFS-SA/CHA)

• Advance Container List (SA/CHA-Transporter/Port)• Instructions to move Container to Port (SA/CHA- Transporter)

Gate Pass for Moving Container out ofCFS (Port-SA,Transporter)

Gate- In Permission at the Port (Port-SA,Transporter)

Con

tain

erSh

iftin

g

Request for Stuffing Containers(SA-CFS / Port)

Allocation of Resources(CFS / Port -SA)

Container Load Plan(CFS/ Port/ Stevedore-SA,Surveyor)

Stuffing Report (CFS / Port-SA) /(Surveyor-SA)

Con

tain

erSt

uffin

g

Customs Examination & LEO(Customs-CHA,Port)

No

Train Summary(CONCOR - Port )

Off-loading of containerfrom wagon( Port - SA )

Train Arrival( Railways - Port )

ICD ContainersPort Stuffed

Preparation of Invoice &Certification by CE

(Shipper -C.E-Customs,Port)

Receipt of Container atPort / CFS ( Port -

Shipper / CHA / SA /Customs)

Generation of ShippingBill (CHA / Shipper -

Customs, Port)

LEO( Customs - CHA /

Shipper, Port)

Factory stuffed container

Gate-In Permission at the Port(Port - SA, Transporter)

Page 23: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 23 of 291

B

• Berthing/Pilot Application (SA-Port) - Dimensions of Vessel - Cargo Details• Hazardous Cargo Declaration (SA-Port)• Instructions for handling Hazardous Cargo (SA-Port)• Resource Request (SA-Port)• Stowage Plan (SA-Port)

• PHO Certificate (SA-PHO)• Plant quarantine Certificate• MMD Certificate• Immigration Certificate (SA-Immigration)

• Allotment of Berth (Port-SA)• Allotment of Resources (Port-SA)

BerthingRequest

Break Bulk Cargo/Container

Break Bulk Cargo/Containeror Bulk/liquid Cargo ?

Tally Report for Containers/ Cargo Loaded(Port-SA, Customers) / (Surveyor-SA)

• Application for Port Clearance (SA-Customs)• Intimation of Cargo Loaded (SA-CHA)

EGM Filing (SA-Customs)

Port Clearance Permission(NOC) (Port - SA,Customs)

Port Clearance Permission (Customs-SA-Port)

• Vessel Sailing Report (Port-Customs)• Stowage Plan (Port / Stevedore-SA) (Surveyor-SA)

Vessel/Tanks Survey Report(Port-SA, Customs) / (Surveyor-SA)

Bulk/Liquid Cargo

PortClearance

P

C

Request for Entry Outward (SA-Cutoms)

Entry Outward Permission (Cutoms-SA,Port)

Mate Receipt (Vessel Master-Port)NOTE: Some of the Ports don't take Mate

Receipt

Assessment of Wharfage, demurrage charges(Port-CHA)

Payment through Bank/PD Account (CHA-Port)

Page 24: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 24 of 291

Short Shipment ?

Yes

Amendment of Shipping Bill (CHA-Customs)

Shut Out Permission (Customs-Port-CHA)

Back to Town ?

Filing of Shipping Bill(CHA-Customs)

Request for Back to Town (CHA-Customs)

Permission for Back to Town(Customs-CHA,Port)

Assessment of Wharfage, demurragecharges (Port-CHA)

Payment through Bank/PD Account(CHA-Port)

Gate Pass for Taking the Consignment Out(Port-CHA)

End

C

Yes

No

No

Page 25: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 25 of 291

Rendering of Invoice for Port charges(Port-SA)

Pay Order (Port-Bank) /(SA-Bank)

Daily Summary (Bank-Port)

P

Advance Payments?RefundShortfall

Credit Advice (Bank-Port)

Debit Advice (Bank-SA)

Pay Order (Port-Bank) /(SA-Bank)

Credit Advice (Bank-SA)

Debit Advice (Bank-Port)

End

Payment

Page 26: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 26 of 291

2.5.4 DIFFERENCES IN BUSINESS PROCESSES BETWEEN PORTS The major differences in the business processes between the Ports compiled after the requirements study is given in the tabular form below: Business Processes Difference Between the Ports

Voyage Registration

Different VCN (Vessel Call Numbers) are allotted for the same Vessel, one for the Import and one for the Export in Marmugao port.

Only one VCN is allocated for a Vessel visiting the Port for

both import and export in all other ports.

If the Shipping Agent is replaced for a vessel, voyage registration will be cancelled. New Agent will apply for the voyage registration and new VCN is issued.

If the Shipping Agent is different for Import and Export,

two voyage registrations are done in Chennai.

In Chennai port, Vessel serial number (VSN) is generated by the system during the voyage registration.

In Chennai Port there were instances of vessel coming

with a call sign and vessel name and sailing with a change of call sign and/or vessel name. The Port Clearance Certificate should be issued with the changed call sign and/or vessel name. There are also cases of an Agent in charge of Import / Incoming of vessel and another Agent in charge of Export / sailing of the vessel.

There are instances in Chennai Port that Vessel

Registration is being done by MLO but billing should be done on another Steamer Agent and vice versa.

In JNPT, only after payments the VIA Number (VCN) is

allocated

The anchorage is 120 kms away from the port in Haldia. So Shipping Agent must submit the Voyage details well in advance.

In Tuticorin Port, if the Shipping Agent is changed for a

vessel, agent conversion is done for changing the Shipping Agent and hence voyage registration will not be cancelled.

Page 27: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 27 of 291

Filing of IGM

In Kolkata, Single IGM is filed where destination (Like Nepal, Bhutan, India etc) is mentioned against each line no.

Shipping Agent files IGM in EDI format to the Mangalore

port

Shipping Agent submits IGM hard copies to other ports

As the Steamer/ Shipping Agent is not required to file an IGM for coastal vessels/cargo with customs, Cochin Port is getting the same by floppy from the SA.

In JNPT, Chennai ports IGM message is received from

Customs

In NMPT, IGM for coastal vessels are received from Customs through EDI

Advance Charges

Bill of Lading is used for calculating the advance charges

in Vizag port.

Berthing Application Berthing application is not there in Mangalore port.

No Operation Group or Berthing Meeting is conducted in Ennore Port.

Customs EDI messages

Paradip port is not having any EDI Message exchange with customs.

The Customs send the EDI message to KoPT MES which is

located at Kolkata Head Office. The messages are redirected to HDC and that related to OCTS application are captured at KDS.

Shipping Agent files the IGM details in hardcopy at

Customs service centre to register IGM with customs in EDI format.

Terminal Operations

JNPT, Vizag, Kandla, Chennai, Cochin and Tuticorin are having private container terminals.

Customs EDI message exchange with Container Terminal

System is in place in JNPT, Chennai, Tuticorin and Cochin.

Advance container list and job order are proprietary message in IGTPL (Cochin) &in JNPT CT, GTI & NSICT

In Cochin, the container terminal acting as a stevedores.

Page 28: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 28 of 291

CFS Operations In Mumbai, and Cochin, CFS operations are handled by Port.

In Kolkata, CFS operations are carried out by Port as well

as other external CFS operators such as CWC, Balmar Lawries etc.

No CFS in GOA and Paradip port.

In all other ports, CFS activities are handled by private parties.

IN Mumbai, port CFS prepares various hard copy reports.

Stevedoring

In Mumbai port and Haldia stevedoring activities are carried by port itself.

In Kolkata, the stevedoring activities are carried by port

and other Stevedores, CDLB and equipments are managed by Shipping Agent.

In other ports stevedoring activities are carried by private

party.

In JNPT stevedoring is carried out by Port partly i.e. lashing operations carried out by vessel agent's contractor and rest all operations like loading, discharge, transportation of containers etc. are carried out by JNPT.

Paradip Port

Vessel Owner arranges the Stevedores for the Liner Vessel.

Importer/Exporter arranges the Stevedores for the Chartered Vessels

Stevedores use the Port Website to send the request for

arranging the man power

Port assigns the man power as requested by the Stevedores

Surveyors

Surveyors are not registered with Mangalore, Vizag, Mumbai and Chennai Port.

In Paradip, Haldia and Tuticorin ports, for liquid cargo,

they will conduct Ullage survey. In this survey, surveyors measure the length from the top of the vessel depth to the top layer of the liquid.

Page 29: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 29 of 291

Rail Transport Operator No CONCOR in Paradip, Goa and Mangalore.

CONCOR will accept any type of cargo based on the

Transshipment Permit in Vizag and Cochin

Page 30: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 30 of 291

Stowage Planning In Vizag and Haldia ports, Stowage plan is given by

surveyors to Shipping Agent. Port is not issuing to Shipping Agent.

In JNPT vessel planning is carried out by JNPT for all vessels fed from JNPT yard whereas loading plan is carried out by shipping Line / agent for vessels fed from private yard.

Stowage planning / Bay Plan : Is furnished by the vessel agent to MbPT for Import for cargo

Container Loading/ Unloading

In Kandla port Stevedores issuing the CLP to Shipping Agent.

In Cochin port, allow Load order is issued to Shipping

Agent by the Customs for loading the container in to the Vessel

In JNPCT, NSICT & GTI containers are discharged against

the Import Advance List and loaded as per the Export Advance List submitted by the SA.

In Mumbai Port, Port prepares CLP and gives to SA for

Export. For import Port accepts CLP from SA

Filing the Shipping Bill

Shipping Agent can move the cargo to the shed before filing the shipping bill in Vizag, Haldia and Mumbai ports as part of pre-shipment facility.

In other ports, the cargo can be moved after filing the

Shipping Bill only.

In Tuticorin Port, Cargo can be moved only after filing of Shipping Bill. For certain cargo, the cargo can be moved to the shed before filing the Shipping Bill on Permission basis.

JNPT accepts Form – 13 instead of Shipping Bills

Delivery Order Process In JNPT, Shipping Agent issues examination letter to CHA, CHA in turn submits this letter to customs to do the examination of the cargo. Examination letter is called an Initial Delivery Order. Once the Examination is done, SA issues the final delivery order to the CHA.

In MBPT, Importer /CHA submits B/L / Agents delivery order to establish title of goods. ADO can be issued in two phases i.e. one for custom examination and second for effecting delivery. The vessel agent may also straight

Page 31: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 31 of 291

away give the delivery order for clearance

In all other ports, single delivery order is issued by Shipping Agent to CHA.

Internal System

Except Ennore other ports are having internal system.

In Mumbai, JNPT, Chennai, Tuticorin, Goa, Vizag and Paradip internal system is used by stake holders

Internal Systems in use

Mumbai – IPOS JNPT – Navis Goa – POPS Kandla – Vessel Berthing Management System, Cargo Management System. Kochi – Vessel & Cargo Information and Billing System (VCIBS) Mangalore – Traffic and Cargo Handling System (TCHS) Vizag – Port Operations Management System (POMS) Paradip – Port Operating System (POS) Haldia – Cargo and Container Handling System Kolkata – Online Container Tracking System (OCTS) Chennai – ORION, Navis Tuticorin – POPS, CTOS

Billing and payment Octroi charges are collected only in Mumbai.

Kandla Port

Shipping agent are not down loading pay-in-slip. If SA has requested for any advance charges to port and in response to the request Kandla Port sends an advance marine voucher to the agents by e-mail and parties can make the e-payment based on the marine voucher received by them.

At Kandla, HDFC, PNB, IndusInd and other banks has

provided facility to make the payment from bank website.

Chennai Port

Port has direct link with Indian Bank Server. Port internal

system assesses the charges automatically for debit/credit and sends the charges and account details as EDI message automatically to the bank.

Bank debits/credits automatically according to the

Page 32: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 32 of 291

message and sends the debit/credit note to the port which is automatically loaded in the port internal system.

There is no manual intervention from the time of

assessment till loading the data received from bank in port system.

Tuticorin Port

Port has EDI with banks for collecting Vessel and Cargo related charges from the Agents. The Debit/Credit notes are automatically created by the application whenever assessments/refunds are processed in the Port and stored in the database. They are exchanged with banks which are connected to TPT server through dialup.

The formats exchanged are mutually agreed by Port and

Bank. Messages like CREADV and DEBADV adopted from EDIFACT standards are exchanged.

The bank clerk reads the EDI message and does the debit

or credit.

Paradip Port

Port has EDI with banks for collecting vessel and cargo related charges from agents/ Importer / Exporter. The Debit/Credit notes are automatically created by the application whenever assessments are processed in the Port and stored in the database. They are exchanged with the banks which are connected to PPT server through dedicated / lease line from BSNL.

Application software of the Bank takes care of the Debit and Credit operation and sends the EDI message to the Port periodically.

Mangalore Port

The Revenue Sections collects the Vessel & Cargo related charges from Shipping Agent in the form of cheque and submits to the bank periodically.

Vizag and Cochin Port

Presently no interaction between Port and Bank. Stake holders have PD Account with port.

Marmugao Port

Pay order can be generated using the POPS by Shipping Agent.

Page 33: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 33 of 291

Shipping Agent issues pay order and calls the bank and approves the transaction, then only, the bank will execute the pay order.

Mumbai Port

The Shipping Agents hold the account with the local

bank in the Port. The shipping agent calculates the advance charges and pays using their PD account. The CHA holds the PD account with the port and all the payments are made using cheque/cash/draft.

The Port Cash Office consolidates the

cheques/drafts/cash collected and send it to the SBI for depositing in MbPT Dock Account.

For the payment of different charges SA maintains account with Bank Some of the charges are made directly to port by CHA/Self/SA.

The Port Cash Office consolidates the cheques/drafts/cash collected and send it to the SBI for depositing in MbPT Dock Account.

JNPT

The bank has provided facility for internet banking. A web site has been created through which the agents can make the payment online by using internet banking.

Other Differences Haldia:

a. At HDC Traffic does not send vessel sailing report to Customs

b. On-board cargo operation and documentation is carried out by Traffic

c. Container Terminal is directly operated by Traffic d. HDC does not grant any separate carting

Permission once Export is opened account the vessel

e. Cargo can be moved in account STOCK without filing SB

Mumbai a. SA shifts containers through its transporter to

nominated CFS except for B category hazardous containers and reefer containers and same is done by port’s appointed transporter.

Page 34: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 34 of 291

2.5.5 PROBLEMS AND SHORTCOMINGS WITH CURRENT SYSTEM(S) Though the automation of the terminal operations and other functional areas are done or being done to a good extent in many of the Ports, the port and the stakeholders are unable to get the expected benefits due to the lack of holistic approach towards the automation and the disconnects resulted from the lack of common platform for document exchange. Following are the problems or Issues gathered or interpreted after the requirement study discussions with the Port officials and the other stakeholders. These problems are grouped to three sections called General, specific to some Port and suggestions from the stakeholders. 2.5.6 GENERAL PROBLEMS OR ISSUES 1. The differences of standards/format used during the document exchange between

some of the stakeholders make the electronic document exchange of little use to the partner.

2. There is no centralized system that can do the conversion from one standard format to another and make the information available to all the players involved.

3. Since Vessel schedules, ETA and Berth allocation details are not published on real time basis, daily berthing meeting between Port officials and Shipping Agents becomes necessary for confirming the berth allocation to give transparency.

4. It is quite difficult to locate a container in many Ports’ CFS since no yard plan is followed currently and if there is any, it’s not updated and conveyed to Agent/CHA when the containers are shifted from the original location to another.

5. Stakeholders still need to submit paper documents in many counters, though the functions of the counter is automated, as there is no link between various existing systems implemented in the Ports.

6. The IGM hard copies are still submitted by SA in almost all the ports since the IGM (EDI

message) from SA or Customs is not used by the port. Port Systems either don’t have an option to do import the IGM message or it can’t interpret the messages.

7. IGM is currently sent to all the terminals by the port if the port has more than one. This should be segregated by terminal and only the data pertaining to the vessels that are arriving at the particular terminal to be sent to that particular Terminal.

8. IGM is submitted to all the CFS even if only few containers are moved to one CFS and rest to another CFS. Only the list of those container moved to a CFS should be send to that particular CFS.

9. Coastal Vessels need to submit Bill of Entry through hard copy to Customs though they don’t have any imported cargo and it is not required for any duty assessment.

Page 35: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 35 of 291

10. Up to seven copies of DO to be given at various counters for filing since the

document exchange and book keeping is still manual.

11. Reports from the Labs the samples sent for testing, taking long time. This leads to the delay in issuing PHO certificate.

12. To issue the LEO, Custom officer checks all the applications, then goes back to office

and enters the details onto the system. Instead, he can use any mobile device to issue LEO while checking each vessel. The dwell time can be reduced by at least Around 4 hours by this.

13. Once LEO is issued for break-bulk cargo and if part of the break-bulk is changed to container since all the cargo is not able to be loaded in the vessel, the CHA needs to cancel the S/B and LEO and need to get another S/B and LEO. It takes 3 days for the customs to approve the S/B and LEO even if the cargo is still the same mentioned in the previous S/B and LEO.

14. Collection of DO is totally manual. CHA has to go to different Shipping Agents for

getting DOs for different importers the CHA represents. 15. No option to track bonded containers (containers of foreign origin. The bonded

containers have to be sent back to their origin within 6 months from the arrival day in India)

16. Many SL/SA doesn’t have message translators to translate the messages to the format acceptable to customs.

17. The Port systems cannot provide information about the cargo once it leaves its

boundaries. i. e. when the cargo is transported out by rails and trucks. 18. CFS is not linked to Customs and therefore physical examination orders need to be

submitted to CFS. It would be good to connect CFS to the Customs for getting the most updated B/L details.

19. CHA is required to escort each truck inside the CFS and outside the CFS with the

documents because the gate-officer does not have access to the necessary information (like Bill of Entry).

20. Import and Export Document goes through lot of small changes / amendments.

Currently it is not easy for the stakeholders to carry out the amendments.

21. Shipping Agent and other stakeholders need to directly enquire with the Port regarding Vessel Arrival/ Departure information and other vessel, cargo and container movement status as there is no real time status update or checking option available in the current system

22. Currently, there is no reminder or notification mechanism in place if there is a delay in

processing or approval.

Page 36: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 36 of 291

23. Gate in and gate out in the port is quite difficult and time consuming due to the manual verification of the document in the gate. Good amount of the time will be saved by streamlining the gate in/out passes issuance and verification of the passes at the gate.

2.5.7 SPECIFIC PROBLEMS/ISSUES WITH SOME PORT 1. Whenever a new Vessel Arrives along with a Barge? How it is handled? 2. IGM hardcopies are submitted still to Port and Customs in some of the ports as the

EDI submission to Customs and port is not totally streamlined.

3. GRT is asked 3 or 4 times in different applications during one import / export cycle. GRT will change if the vessel profile is changed during the process leading to confusion which one is the correct one.

4. Port users are not getting the details about the yard planning and container

movement.

5. Data is submitted twice, first to the customs and then to the ports by CHA as some of the EDI messages that are currently being sent from Customs to Ports (CFS) cannot be interpreted by the Port systems.

6. Vessel Call sign is not unique and some ports it is used to uniquely identify the vessel.

7. For some of the CFS, the operations are totally manual and the Information about the containers shifted to CFS is not available through the system.

8. Shipping bill (EDI based) is not received in Port even after hard copy of LEO is received

9. Cargo Release Order (EDI-based) is often received after the Cargo has been released

10. Yard report/register is still paper based in some ports and the messages sent from the container management to move the empty containers are not made electronic yet.

11. If a Vessel is used for both Import and Export, Different VCN numbers are used for Import and Export separately in some ports.

12. SA maintaining separate accounts wit Port for different kind of charges (Like Vessel Related Charges, Cargo related Charges)

13. Immigration passes (Dock entry permits and NOC) are not uniform in formats in

different ports.

14. All documents are manual and hardcopy forms for immigration; no IT systems are in place to help the work

Page 37: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 37 of 291

15. Different SAs submitting Voyage registrations for Import and Export separately for the same vessel.

2.5.8 SUGGESTIONS FROM STAKEHOLDERS 1. Defaulters (SA) of charges should be blacklisted and prevented from using the port

services that he hasn’t made the payment for and alert other ports.

2. SA can apply for Line clearance from the Tank Operator and Tank Operators can submit tank readiness form to Port through PCS

3. To use a Pre-gate application that will take in information from the Import Advance List and IGM. It will allow the SA to fill in additional information for example seal no., origin, destination, etc. It will then automatically populate Pre-Advice Inbound Rail Container Application that is filled-in by the Port operator while issuing the Gate Pass.

4. Bills / Invoices should be standardized into a common international format across the ports although the tariffs by different ports may be different.

5. Port can push bills files to banks and banks send EDI response back. But Port must send payment details, for example, for which items are these bills for. PCS should reconcile the details.

6. Vessel movement should be transparent and notified to each SA every time whenever there is Vessel Shifting/Vessel Berth/Vessel Un-Berth

7. IMO number or MMSI number can be used to uniquely identify the Ship.

8. Cancellation and amendment in the shipping bill should be made electronic.

9. Not all SL/SA are able to provide this COPRA EDI to Port. These messages can then be translated by PCS and sent to the Terminal Operators or the Terminal Operators will need to change their system to translate these messages.

10. Bay plan/yard plan report should be graphical and published on-line.

11. Even though Free Pratique is issued, if the crew members are sick, while Immigration gives the permit, they need to notify PHO about this.

12. E-mail ID of the Vessel should be included in the Vessel Profile

13. In the Vessel Profile, Include call sign change date and last call sign. Date of previous Vessel name change should be included in Vessel Profile

14. There should some provision to change type of the Vessel between Foreign and

Coastal during the voyage.

15. Amendment of IGM should be on-line. 16. The list of all banned cargo should be published through PCS.

Page 38: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 38 of 291

17. Port Immigration Systems should be linked with the all the AIR PORTS

18. After paying the duty, if CHA gets clearance from customs at 3 or 4 pm, CHA goes to

the CFS next day. Where they have to enter the details again to the system. But takes long time. Instead, if CHA enters the details and CFS verifies the details next morning, can reduce delay

19. PCS should provide online immigration application that checks for blacklisted crew.

20. Sea Port immigration under state government’s purview but airports under Central immigration.

21. Sometimes, SA comes to apply for NOC after ships sails, but Customs would have given clearance for vessel sailing.

22. Port can push bills files to banks and banks send EDI response back. But Port must

send payment details, for example, for which items are these bills for. PCS should reconcile the details.

23. CFS is not linked to Customs and therefore physical examination orders need to be

submitted to CFS. It would be good to connect CFS to the Customs for getting the most updated B/L details.

24. CHA supposed to pay Stamp Duty to Shipping Companies and Shipping Company in-turn pays to the govt. Only after the customs signed bill of entry is shown to the shipping line, does the shipping line accepts the stamp duty. If the payment can be made to CFS directly and CFS can send to Shipping Line, it will be of great help. Also, electronic payment of stamp duty will help expedite this process.

25. Hiring of transporters (private) is currently done by phone or fax.

26. CONCOR is using their own train codes while JNPT is using their own train codes and

messages exchange between them cannot be achieved. 27. Bills / Invoices should be standardized into a common international format across the

ports although the tariffs by different ports may be different.

28. Import and Export Document goes through lot of small changes / amendments. Currently it is not easy for the stakeholders to carry out the amendments.

29. Pre-Advise list should be sent electronically to Port and made available to the people at the gate.

30. In JNPT EIR (Eqpt. Interchange Report) i.e. gate pass is issued only at the time of

departure at the outgate for both receipt of export containers as well as delivery of imports.

31. Documents exchanged are in manual format and at most email attachments

32. Forwarding Note can be made electronic so that it will be easier.

Page 39: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 39 of 291

33. Hazardous cargo codes, agent codes between S/L, Ports, Customs and CONCOR

are different. 34. Some cargo is considered normal to ports while in CONCOR, the same cargo is

classified as hazardous.

35. Cancellation and amendment in the shipping bill should be allowed.

36. History of the ship need to be kept. Need to track the ports or the restricted countries the ship has visited before reaching the Indian port.

37. Provision to search vessels by Vessel name should also be provided. (Vessel ID, Call sign are auto generated number so no body remembers them so if the details of the ships should come by choosing the ships name once the ship enters to port till it sails out.)

38. International code has to be provided to all ports and stakeholders.

Page 40: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 40 of 291

3. PROPOSED BUSINESS SOLUTION

3.1 PORT COMMUNITY SYSTEM (PCS)

Centralized Port Community System (PCS) will provide a single window for the port community in India to securely exchange the documents and information electronically across its stakeholders involved in the maritime transport and logistics chain including the trading partners and government agencies. It also will provide global visibility and access to the central database to all its stakeholders through internet based interfaces. The following are the key components of PCS:

• A centralized intelligent messaging system for the stakeholders to exchange messages in XML, UN/EDIFACT and proprietary standards in multiple protocols.

• A centralized database to provide effective track and trace facility to all

stakeholders and also acts as data repository for research, analysis and reports. • A web based application that acts as a single electronic window for ports and

stakeholders to access and maintaining the central database. • An e-commerce portal for the port community that facilitates electronic

payment options for the stakeholders.

Page 41: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 41 of 291

3.2 PRODUCT OVERVIEW PCS Message Hub, the centralized intelligent messaging component in PCS, will streamline the exchange of business documents and information between port community stakeholders and the government agencies involved. PCS Web, the single window internet application, will provide global visibility and access to the central database populated from the messages exchanged between the stakeholders. PCS Portal, the e-commerce portal for the port community, will provide the interface for the stakeholders to interact with PCS and also provide a platform for publishing general information to public and the stakeholders.

3.3 PCS ARCHITECTURE The following is the PCS architecture diagram:

Page 42: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 42 of 291

3.4 USER CHARACTERISTICS

3.4.1 USER GROUPS The user Groups identified after the requirements study are: 1. Port Authority Port Authority is a state establishment in charge of development and promotion of port equipment and ensuring the compliance of regulations. Port takes care of Allotment of berth, piloting vessels in and out of the port and also provides other vessel related and cargo related services. 2. Shipping Agent/ Shipping Line Shipping Line operates a fleet of ships and other carriers and the Shipping Agent provides the services on behalf of Shipping Lines. Shipping Agent coordinates the arrangements for ship arrival, berthing, discharge/loading and departure of the vessel with port, customs and other regulatory bodies. 3. Terminal Operator The terminal operator manages the terminal operations on behalf of Port and receives, stores, loads/discharges and delivers the containers/cargo within the terminal. They collect the terminal handling charges and storage charges while port collect the vessel related charges. 4. Customs House Agent (CHA) / Importer / Exporter Importers / exporters are the owners of the goods being imported/ exported. And they are mainly responsible for completion of customs and Port formalities either themselves or through a Customs House Agent (CHA). CHA helps the importer/Exporter in getting the customs clearance for his consignments. CHA declares the goods with Customs, and gets goods examined by Customs, pays the duty in the Customs designated bank and takes the physical possession of the cargo from the Custodian after paying all Port dues/charges. 5. Stevedore Stevedores arrange for the labor gangs to handle containers, trailers, pallets, boxes, etc., maintain the tally sheets, and report the container/cargo loading and discharging details to the port and shipping agent. They also ensure the transport of handling units though the port area.

Page 43: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 43 of 291

6. Container Freight Station (CFS) / Inland Container Depot (ICD) The CFS is the custodian of containers and the cargo till the cargo is released to the importers after de-stuffing in case of imports and for exports till the cargo is shifted to port after stuffing. In the case of exports, the cargo is brought to the CFS for examination by Customs, stuffed in the containers and shifted to the port for loading on to the vessel. ICD (Inland Container Depot) is temporary storage for import/export laden and empty containers. According to the guidelines of Indian Government, functionally there is no difference between CFS and ICD. While CFS is an off dock facility located near the servicing port, ICD is generally located outside the port towns. In PCS also ICD is mentioned as CFS for simplicity. 7. Rail Transport Operator The Rail Transport Operator acts both as a custodian of cargo and also as an agency for transporting the containers to/from the port from/to the Inland Container Depots (ICDs). They move the containers by rail / road (in case of shortage of rakes to move container)s directly from the port to ICDs and back. CONCOR is used as synonym for Rail Transport Operator in Port Community as there are not many rail transporters on board. 8. Surveyor The Surveyor is hired by port/ Importer/Exporter as well as of the shipping agent to survey the vessel, container and cargo. The survey reports are used for ascertaining the damages if any. The surveyors also monitor the stevedoring activities and co-ordinate stuffing/de-stuffing, movement of containers/cargo and loading/discharging. 9. Road Transport Operator The transporter shifts the containers or cargo from the port area to the designated CFS in case of imports. The transporters are also involved in shifting the empty containers from CFS to empty container storage yard. In case of export, Transporter moves the containers to the Port yard. The transporter engaged by the Port moves the containers from yard to the vessel in the case of exports and vice versa in the case of imports. 10. Bank Bank facilitates the payment of service charges by the stakeholders to the port and other statutory charges like excise/stamp duties and taxes to Customs and other government agencies. 11. Customs Customs is the government department in charge of collecting duty and taxes and of the border control. Customs also enforces the provisions of the Customs Act governing imports and exports of cargo, arrival and departure of vessels and prevention of smuggling including interdiction of narcotics drug trafficking. Customs grants entry

Page 44: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 44 of 291

inward / entry outwards permission for the vessel and clear goods for both import and export. 12. Port Health Organization (PHO) The agency that is responsible for the inspection of hygiene in the ship and amongst the crew, so as to control the spread of infectious diseases from incoming vessels and aircraft, inspecting food/agricultural products entering the Port, for wholesomeness, fitness and compliance with Indian legislation. Some of the cargo samples like edible oil is inspected by PHO and permitted for domestic use based on lab certification. On arrival, the PHO also issues de-ratting exemption certificate to the vessel. 13. Immigration The agency that is responsible for applying the immigration laws of the country and providing the needed documents for foreign crew and passengers to disembark and embark. 14. Tank Farm Operator Tank Farm Operators provide storage for the bulk liquid cargo and pipeline facilities to transport the liquid cargo to/from the vessel.

15. Container Agent They represent the container Lines and provide the steamer agent with details of the containers belonging to them in the vessel. They also give the delivery order to the Clearing Agent/Importer for clearing the container. Similarly, the liner gives the authorization for loading containers to a vessel to the clearing agent. They recover terminal handling charges and container detention charges as also issue Bill of lading and agent’s delivery order to the consignees. 16. Barge Owner / Operator The Barge Owner / Operator transports Iron Ore from mine to Port and also transports the consignment to the importers location. 17. Plant Quarantine Organization (PQO): PQO examines the consignments (identity and physical checks) and accompanying documentation by administrative enforcement. He inspects plants and plant products for any suspicious containment of harmful organisms. "Phytosanitary certificate" is issued in the model format prescribed under the International Plant Protection Convention of the Food & Agricultural Organization and issued by an authorized officer at the country of origin of consignment or re-export.

Page 45: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 45 of 291

18. Mercantile Marine Department (MMD): The main functions of the Mercantile Marine Departments include Administration of the various Merchant Shipping Laws and Rules relating to the Registration, tonnage measurement and crew accommodation of ships, surveys for Safety of Ships, Load line inspection, enquiries into shipping casualties and wrecks, holding of examinations for Certificates of Competency, survey of passenger ships, inspection and approval of statutory equipments vis-à-vis Life Saving and Fire Fighting, Appliances, communication equipment and other Navigational Aids, detention of overloaded and or unsafe ships, supervision of ship repairs and construction of new vessels at request of State and Central Government Agencies 19. Navy/Coast Guard Port daily sends arrival and departure report of the vessel at mutually agreed time, normally early morning for intelligence purpose. Same reports are also communicated to Coast Guard.

3.4.2 USER ROLES

The user roles identified for each user groups are given in table below:

User Group User Roles Remark

Port Authority Port Operations (PO) Port Marine (PM) Port Traffic (PT) Port Finance (PF) Port Gate (PG)

Port operations and documentation Monitor and control Arrival, Departure, Pilotage and Anchorage Berth Allocation, Cargo Management, Loading/Unloading of Cargo, etc. Billing and Payment Verify the entry of containers, cargo and trucks at port gate Note: Role of Traffic & Marine may be

Page 46: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 46 of 291

interchangeable Shipping line/ Shipping Agent

Shipping line (SA)

Terminal Operator Terminal Operator (TO)

CHA/Importer/ Exporter

CHA (CH)

CFS /ICD CFS Operation (CF) CFS Gate(CG) ICD Operation (CD)

CFS operations and documentation Verify the entry of containers, cargo and trucks at CFS gate ICD operations and documentation

Customs Customs Officer (CO) Road Transport Operator

Transporter (TR)

Rail Transport Operator

Rail Transporter (RT)

Barge Operator Barge Operator Surveyor Surveyor (SR) Stevedore Stevedore (SD)

Bank Bank (BO)

PHO PHO (HO)

Immigration Immigration (IM)

Container Agent Container Agent(CA)

Tank Farm Operator Tank Farm Operator(TFO)

System Administrator PCS Admin (PS) PCS System administration

Plant Quarantine Organization

Plant Quarantine Organization(PQO)

Mercantile Marine Department

Mercantile Marine Department (MMD)

Navy / Coast Guard Navy and Coast Guard (NCG)

Page 47: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 47 of 291

3.4.3 USER ROLES AND RESPONSIBILITIES

User Responsibilities

Shipping Agent • Register the Vessel.

• Register the voyage.

• Pay advance Charges.

• Apply for Berth.

• Submit Import General Manifest.

• Amend/Cancel Import General Manifest

• Submit Crew/Passenger List

• Prepare and Submit Bay Plan / Stowage Plan.

• Apply Port Resources.

• Apply for regulatory certificates.

• Check Short Landed/Excess Landed Cargo report.

• Submit SMTP request.

• Prepare and issue Delivery Order (DO) / Submit Bill of

Lading.

• Request Port for Movement of containers in and out

from CFS to Container Terminal.

• Check and Review Pendancy Report.

• Send Advance container List.

• Intimate Cargo location to CHA

• Check the stuffing and de-stuffing report.

• Request space and carting permission.

• Apply Port Clearance.

• File Export General Manifest.

• View Stowage Plan.

• Check Final Invoice.

• Pay the Shortfall amount to port.

• Ship owner’s lien for freight and other charges

• Abandonment notice

• Submit hazardous goods deceleration

• Submit shredded scrap list

• Issue Empty Container Release order

Page 48: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 48 of 291

• SA submits initial/ final Draft/ Ullage survey reports

duly endorsed by vessel.

• Container stuffing order

• Container Load Plan

• Submit Mate receipt

Container Agent • Submit SMTP request.

• Prepare and issue Delivery Order (DO) / Submit Bill of

Lading.

• Request Port for Movement of containers in and out

from CFS to Container Terminal.

• Check and Review Pendency Report.

• Send Advance container List.

• Issue Empty Container Release order

• Container stuffing order

• Container Load Plan

• issue Carting Permission for moving in container to

pre-shipment area

• They pay certain box-related charges to Port/

Container Terminal

Port Authority

Port Authority – Traffic

• Vessel Registration Processing.

• Voyage Registration.

• Allocation of VCN.

• Allot Berth to the vessel.

• Verify the custom port clearance certificate.

• Vessel Movement report (Vessel list/Waiting list).

• Issue Port Clearance Certificate.

• Send vessel sailing report to customs, Navy

Port Authority – Marine

• Pilot Allocation.

• Movement of vessel from Anchorage to Berth.

Page 49: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 49 of 291

• Movement of vessel from Berth to Anchorage.

• Berth to Berth Movement

Port Authority - Finance

• Collection of Advance amount.

• Collect Charges from

SA/CHA/Stevedores/Transporter.

Port Authority - Operations

• Issue Permission for the movement of Containers from

Port to CFS and CFS to Port.

• Intimate Cargo location to SA

• Issue Delivery Order to CHA

• Allocate Resources.

• View Import General Manifest.

• Prepare and Send Tally Sheet and Yard plan to

Shipping Agent.

• View Out-Of-Charge order issued by Customs

• View Advance container list.

• Prepare and Submit the Cargo out-turn Report.

• Issue Equipment Interchange Report to Transporter.

• Gate in/out permission

• View Sub Manifest Transshipment Permit.

• Forward Railway-out Report to SA.

• Issue Removal Memo to CONCOR/ RAIL OPERATORS.

• Prepare and Issue Pendency Report.

• Allocate the Space for the Shipping Agent.

• Give permission for carting the cargo.

• View the Copy of the Shipping Bill.

• Issues Movement order.

• Issue Gate Pass for the FCL containers to move the

Port.

• View Let Export Order (LEO) issued by Customs.

• Prepare and Send the Export Cargo Register to SA.

Page 50: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 50 of 291

• View Entry outward from customs.

• Grant of Log Entry/Short landed/Landing remark

certificate

• Export Cargo arrival Details

• Disposal of unclaimed cargo.

• Filing BE for unclaimed disposed goods.

• Send arrival /departure report to Navy

Port Authority – Gate

• Verify Gate in/out permission.

• Verify EIR (Equipment Interchange Report.

• Allowing consignments to pass out from the Port

Premises is also the responsibility of PG

Note : The role of operations , Traffic & Marine may be

interchangeable

Container Terminal • View the copy of IGM, SB, Out-of-Charge.

• Issue Permission for the movement of Containers from

Container Terminal to/From CFS.

• View Advance container list.

• Issue Equipment Interchange Report to Transporter.

• Collect all the charges from the SA/CHA/Importer.

• Issue Gate-Pass.

• Issue Railway-out Report to SA.

• Receive Rake Placement Memo from CONCOR.

• Issue Rake Removal Memo to CONCOR.

• View the List of ICD Containers coming by rail.

• Issues Gate Pass for the FCL containers to move the

Container Terminal.

• Prepare Yard plan.

• View Advance container list.

• Prepare and Submit the Cargo out-turn Report.

• Issue Equipment Interchange Report to Transporter.

• Collect Charges from CHA/Stevedores/Transporter /

Page 51: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 51 of 291

SA

• Issue Gate Pass. EIR is Gate Pass for containers in

JNPT.

• View Sub Manifest Transshipment Permit.

• Forward Railway-out Report to SA.

• Issue Removal Memo to CONCOR/Railway.

• Prepare and Issue Pendency Report.

• View Entry outward from customs

• View LEO

• Collect charges from CA

CHA / Importer /

Exporter

• Collect Delivery Order from the SA

• Prepare and submit the Bill of Entry to Customs.

• Collect Out-of-charge order from the Customs

• Pay charges for Wharfage, demurrage, stamp duty,

octroi

• Issue Job Order to transporter

• View Gate-Pass from the CFS / Port

• Apply Carting permission to the Port.

• File the Shipping Bill.

• File the Amendment, Supplement to the Shipping Bill

to the Customs.

• Collect Let Export Order (LEO) from the Customs.

• Collect Movement Order.

• Submit Request for shut out permission to port and

customs.

• Pay final charges.

• Application for Log Entry/Short landed/Landing

remark certificate

Customs • Assign Rotation Number

• Approve IGM.

• Allocate IGM No.

• Board vessel after berthing, check ship’s stores and

crew residences for contraband etc. and grant entry

inward.

Page 52: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 52 of 291

• Approve Bill of Entry.

• Examine the import cargo

• Issue Out-Of-Charge

• Examine and approve the stuffing and de-stuffing

process.

• Verify Supplementary IGM for excess landed Cargo.

• Issue SMTP to CHA

• View the list of the Empty containers moved to the

CFS.

• View and Approve Shipping Bill.

• Examine the export cargo and issues Let Export Order

(LEO)

• Verify the amendment of shipping bill

• Examine export/ import containers at the gate and

endorse Form 13.

• Grant entry outward

• Verify and Approve EGM.

• Issue Port clearance.

• Grant Back to town Permission.

• Clearance for disposal of unclaimed cargo

• Issue of detention order.

• Period of detention (The cargo) for analytical test.

• Confiscation (of goods) notice.

Stevedore • View IGM/Advance Container List.

• View Bay plan of the vessel.

• Arrange for the labor gangs, Equipments.

• Maintain the tally sheets.

• Submit the container/cargo loading report to Port,

SA.

• Submit the Container/Cargo Discharging report to

Port, SA.

CFS / ICD • Intimate Cargo location to SA.

• View Out-of-charge order from the Customs.

• Forward the Pre-Advice (List of containers moved

Page 53: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 53 of 291

from CFS to Port) to Port.

• View IGM details online.

• View Advance Container List online.

• Issue Job Order to Transporter.

• Allocates Resources.

• Receive the container load plan for de-stuffing.

• Do de-stuffing in presence of customs, SA and

surveyors.

• Send the de-stuffing report to SA.

• View Delivery Order.

• Issue Carting Permission to the CHA to bring the

Cargo inside the CFS.

• Do stuffing in presence of customs, SA and surveyors.

• Prepare and Send the stuffing report to SA.

• Collect the charges from the CHA

• View the List of the Empty containers moved to the

CFS.

• Issue Gate pass for

o Empty Containers.

o Cargo.

o Containers moved from Port to CFS.

o Containers Moved from CFS to Port.

o For Factory stuffed Containers.

Road Transport

Operator

• View Advance Container List.

• View Job Order.

• Collect Gate Passes.

• Collect the Equipment Interchange Report (EIR).

• Move the consignment to the Importer specified

location.

• Move the Cargo/Container to/from Port, CFS.

Rail Transport

operator

• View Railway Receipt.

• Move the Containers to the consignee’s

location/ICD.

• Issue Placement Memo.

Page 54: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 54 of 291

• Collect Removal memo.

• Forward Train summary to Port, Shipping Agent.

PHO • View IGM Details.

• Verify the advance crew list and the documents

submitted for free pratique.

• Issue free pratique (Health Clearance Certificate).

• Issue other Certificates Like de-ratting certificate.

• Issue Certificate of Inspection of Medicine, Medical,

Stores and Appliances

Immigration • View Crew List and the passenger List.

• Issue Landing Permit to the crew members.

• Issue No Objection certificate for Sailing and Berthing.

Bank • Collect Port related charges.

• Send Debit advice And Credit advice.

• Send Daily Summary Report to Port.

Surveyor • Prepare tally sheet for export and import cargo.

• Do Survey on Behalf of SA/CHA/Importer/Exporter.

MMD • Issue of sea worthiness certificate / detention of

vessel

Regulatory Bodies • Provide approval prior to Customs Clearance.

Tank Farm Operator • Send Readiness Notice

Barge Owner /

Operator

• Transports Iron Ore from mine to Port

• Transports consignments to the Importers location

Plant Quarantine

Organization (PQO)

• Issue Phytosanitary certificates

• Verify Phytosanitary certificates

Navy / Coast Guard • Receives Vessel arrival details • Receives Vessel departure details

Page 55: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 55 of 291

3.5 OPERATIONAL CONCEPT AND SCENARIOS 3.5.1 IMPORT WORKFLOW The following is the generic overall work flow in a typical import process from the voyage intimation till the vessel sails out of the port. In PCS, all the communication and document exchange described below take place electronically.

Voyage Registration* Assign VCN

* Advance Payment

SA

Berth Allocation* Vessel Details

* Cargo/ Dangerous cargo List* Handling Instructions

Regulatory Clearance* IGM

* PHO, PQ & MMD Certificates* Immigration Clearance

CA

Unload Cargo/Container* Tally report

* Vessel/Tank survey report

Shifting/De-stuffing Container* Job Order

* Container movement* Transhipment

Releasing Cargo* Agents DO

* Out-of-Charge* Port/CFS Payments

Trasporter

Port/TO

Port

CHA /Importer

CFS

Surveyor

Bank

Page 56: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 56 of 291

Vessel Intimation and Berthing 1. The Shipping Line/Shipping agent registers his vessel by submitting the Vessel Profile

along with necessary certificates – Certificate of registry to the Port which in turn verifies and approves the Vessel Profile. The profile needs to be re-submitted every six months or whenever there is change in the profile of the vessel.

2. Once the expected time of arrival (ETA) is known, the shipping agent submits Voyage

details including ETA to port by providing the vessel details along with the expected time of arrival.

3. The port registers the voyage and generates a unique Vessel Call Number (VCN).

VCN is used as a reference number for any transaction related to the particular voyage.

4. After the registration of the voyage, the Shipping Agent files the Import General

Manifest (IGM) to customs containing the Cargo Manifest, Container Details along with the Vessel Details.

5. Customs allocates the IGM Number for the IGM filed and the same is forwarded to

the ports and the shipping agent. 6. The Shipping Agent sends the Berthing Application with expected arrival schedule

(confirming the ETA details and cargo details provided earlier with the changes if any, including hazardous cargo details along with the special instructions for handling it) and Bay Plan after the date of arrival is confirmed.

7. The Shipping Agent co-ordinates with the Port Health Organization (PHO) to obtain

free Pratique certificate and liaisons with MMD for any other vessel certificates, Plant Quarantine (PQ) from the concerned controlling agents. (He can upload the above mentioned documents as attachments)

8. The Shipping Agent submits the certificates mentioned above and applies for the

Entry Inward to Customs. The Entry Inward is forwarded to the shipping agent and the port by the customs.

9. The Port allots the berth and publishes the details of allocation of all the berths in the

port to all Shipping Agents. (The changes to the berth application can be sent to the port and the port needs to confirm the changes to take effect to the published allocation if necessary)

10. The Shipping Agent does the self-assessment of the charges (vessel related and

miscellaneous) as per the applicable port tariff and makes the advance payment at the bank. Bank sends payment details to the port. Cargo related assessment is done by Importer/Exporter.

11. Port allots specific location in the yard for discharging the cargo/containers and

sends the yard plan to the Shipping Agent.

Page 57: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 57 of 291

Cargo/Container Discharge 1. Private Stevedores request for resources to port and pays advance charges for the

resources. In case of Port being the Stevedore, Port and SA together assesses the resource requirement or sometimes Port assesses the requirements pays the advance Stevedore charges

2. SA sends the Arrival Notice of the vessel, IGM, and Stowage plan to Stevedores. 3. The Stevedores/Port unloads the cargo/Containers as per the cargo/Container list,

Stowage (Bay Plan), Yard plan and special instructions for handling hazardous cargo provided by Shipping agent and Port /surveyor also prepares the tally which is then sent as Tally Report (also called Container Arrival Report in case of containers) of the cargo discharged from the vessel along with the details of resources used and any damages if any to the Shipping Agent and the port.

4. The Surveyor prepares the initial Vessel/Tank Survey Report and submits to the

stakeholder whoever hires Surveyor in case of liquid cargo. (After the complete discharge of the cargo, the Surveyor submits the final vessel/tanks survey reports)

5. Port prepares the short landed, landed but missing and excess landed cargo report

and sends it along with the Tally Report (also called cargo out-turn report) to Shipping Agent and Customs.

6. The Shipping Agent files a supplementary IGM in case of excess landed cargo with

the customs and the delivery is allowed accordingly. Cargo/Container Delivery Direct Delivery 1. The Shipping Agent issues Delivery Order (DO) to the Customs House Agent (CHA)/

Importer. However the ADO can be issued in two phases – one for custom examination only followed by the final DO or is issued directly final DO. The gang letter is also issued with validity period for delivery.

2. The CHA/Importer files Bill of Entry (for out-of-charge permission) to Customs 3. CHA presents Bill of Entry along with the Bill of Lading duly discharged by Vessel

Agents or Agent’s Delivery order at CFS/ Port. 4. After appraisal, and Customs issues out-of-charge to the CHA.CHA pays the duties,

wharfage, demurrage charges, Cargo related charges and other statutory charges. 5. Port issues the Gate Pass for taking the consignment out after verifying the DO, out-

of-charge and payment receipts. If the cargo is moved through Barge no Gate pass is required. But need to get the Ingress Permission and Egress Permission.

Page 58: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 58 of 291

Transit 1. The Shipping Agent sends the request for SMTP (Sub Manifest Transit Permit) to the

customs and customs issues the SMTP. 2. Containers can be moved out by road to locations, other than ICD also, like

Importer’s premises 3. Any consignment may move out of the port by modes other than Rail/ Road/Barge

also (e.g.Bargei, Pipeline and Conveyor Belt etc.) 4. If the containers are to be sent by road, the Shipping Agent sends a forwarding note

(List of containers to be transported) to its Transporter to move the container to the ICD location and the Port issues the Gate Pass to SA/CHA which in turn forwards the gate passes to the Transporter.

5. For containers to be moved by road, SA submits duly passed SMTP to port and

approaches CONCOR for trailer for movement of container by road to ICD. Port gives permission to SA for movement of container to ICD.

6. For containers to be moved to ICD by train, SA submits duly passed SMTP to port and

request for indent for wagon on payment of advance charges. After placement of indent, a copy of indent forwarded to port’s railway. SA submits forwarding note directly to CONCOR.

7. If the cargo is to be sent by Barge, CHA applies for Ingress permission and after

loading the cargo into the barge, Port issues Egress Permission. 8. If the containers are to be sent by Rail, Shipping Agent Forwards forwarding note to

Rail Transport Operator. 9. Rail Transport Operator issues a Placement Memo to the Port and the Shipping Agent

after placing the containers on the RAKE. 10. Port issues a removal memo to the Rail Transporter and the Rail Transport Operator

issues Rail Receipt (RR) to the Shipping Agent. 11. Port issues Pendency Report for containers to Rail transporter and Shipping Agent for

removal of pending containers from the yard. 12. Rail Transport Operator also sends Train Summary Report to Shipping Agent. Container Shifting to CFS 1. The Shipping Agent/CA sends list of containers to be shifted to the CFS and sends the

same to the Port and Customs. CFS sends a request for container movement from the port yard.

2. The CFS/Shipping Agent sends the Job Order (container list) and the yard location to

Page 59: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 59 of 291

the Transporter and directs Transporter to move the containers to the designated CFS.

3. Gate pass is issued after realization of relevant Port Charges 4. Port issues the Gate Pass to the CHA which intern forwards to Transporter (Truck

driver) after the Customs gives permission for the movement. 5. At the Port gate, Gate Keeper checks the Gate Pass and allows the truck to pass

out.

6. At the CFS gate, Gate Keeper checks the Gate Pass issued by the Port, the time taken to reach CFS and allows the container/truck in.

Cargo Clearance and Release from CFS 1. The Shipping Agent issues Delivery Order (DO) to the CHA. 2. The CHA requests CFS for de-stuffing after the containers are moved to the CFS and

the CFS sends the container de-stuffing report to the Shipping Agent. (Note: In MbPT, In case of LCL containers SA requests port for de-stuffing and similarly for longstanding un cleared FCL containers.)

3. The CHA/Importer requests for out-of-charge from Customs and Customs issues out-

of-charge (Bill of Entry) to the CHA after appraisal and CHA pays the duties. CHA also pays the stamp duty to the SA/Port.

4. The CHA pays the CFS charges and The CFS issues the Gate Pass. CFS may /may not

send the Gate Passes to Customs. 5. CFS sends the List of empty containers to Shipping Agent. (Empty containers are then

used for stuffing during export or exported as empty container or taken by the shipping agent to his private yard after taking the permission from the customs).

Page 60: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 60 of 291

3.5.2 EXPORT WORKFLOW The overall work flow in an export process is given below. Carting General Cargo

1. Shipping Agent requests Port for space allocation in the Shed for carting in the cargo and Port allocates space and informs Shipping Agent.

2. Shipping Agent sends the vessel details and the location in the shed allotted for

the Shipping Agent to CHA.

3. CHA submits the Carting Application to the port to bring the consignment and The Port grants the carting permission.

4. The CHA files the Shipping Bill with the customs. Port Issues the Gate-in Pass.

5. CHA informs and forward the Gate-in Pass to the Transporter. Gate keeper

verifies the Gate-in Pass against the Shipping Bill and allows the cargo in to the pre-shipment area.

6. The Customs issues Let Export Order (LEO) after the cargo examination.

7. CHA / Exporter sends request to move the cargo from the pre-shipment area to

the dock.

8. Stevedores move the cargo from shed to dock based on the Dock Plan.

9. The Port/Stevedores send the Total Cargo Received Information to the Shipping Agent / CHA / Exporter containing the exporter wise cargo received for the Shipping Agent / CHA / Exporter.

Container Stuffing

1. Shipping Agent/CA sends the list of empty containers to CFS for stuffing the cargo and CFS provides the list of empty container in the CFS yard.

2. If required, Shipping Agent/CA sends the request to Customs to bring the empty

containers to the CFS and the Customs gives the permission.

3. Shipping Agent sends the Job Order (container list) and directs the Transporter to move the empty containers from its private yard to the specified CFS location.

4. The Transporter prepares the Cart Chit/Ticket (CFS Gate Pass) and moves the

container to the CFS. The CFS Gate Keeper verifies the Challan and allows the empty container in.

5. CHA / Exporter files the Shipping Bill to Customs in order to get LEO

Page 61: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 61 of 291

6. Customs forwards the Shipping Bill details to CFS

7. The CHA / Exporter applies for carting permission which is verified and approved by CFS

8. The CHA / Exporter instructs the Transporter to move the cargo inside the CFS, after getting the Carting Permission (Gate Pass) from CFS.

9. The Transporter takes the cargo to the nominated location. The CFS Gate-keeper

checks the Gate Pass against the Carting Permission and allows the cargo into the CFS.

10. Customs issues the LEO after examination.

11. After receiving LEO from customs, the CHA notifies the Shipping Agent and the

Shipping Agent request the CFS for stuffing the cargo into the containers.

12. The CFS prepares the Container Load Plan (CLP) for stuffing and sends it to the Surveyor appointed by the Shipping Agent.

13. The CFS prepares the stuffing report and sends it to Shipping Agent, after the

containers are stuffed and sealed in the presence of the Customs Officer and the Shipping Agent or his representative (surveyor) as per the CLP.

14. CHA / Exporter sends the container List and notifies the Transporter to move the

factory stuffed containers from the private yard to Port, if the stuffing is done at factory. Factory stuffing is done in the private yard in the presence of central excise officer.

15. The Excise Officer gives the clearance order to the CHA / Exporter and seals the

container.

16. CHA / Exporter requests permission to move the containers to Port/CFS and Ports/CFS issues the Gate Pass to the Transporter.

17. In some cases, Stuffing may be done inside Port also

Shifting the Container to Port

1. The Shipping Agent submits an Advance Container List indicating the vessel details onto which the containers to be loaded to the Terminal Operator.

2. Terminal Operate prepares the Yard Plan based on the Advance Container List

submitted by the Shipping Agent.

3. Terminal Operator sends the container-wise Yard Location details as per the Yard Plan to the Transporter to shift the container from CFS to Terminal.

4. Transporter prepares the Drop-off Tickets for the container and moves the

Page 62: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 62 of 291

container to the Terminal.

5. Gate Keeper verifies the Drop-off ticket against the Yard Plan at the gate and permits containers inside the Terminal.

6. If the containers are coming from ICD, Terminal Operator issues Gate In/Rail In to

the Shipping Agent.

7. Containers may come from locations, other than ICD/ CFS, like private warehouses and exporters factory also

Port Clearance

1. The Shipping Agent applies to the customs for Entry Outward prior to the loading the containers/cargo on to the vessel and Customs issues the Entry Outward.

2. After the Shipping Bill with LEO is produced, the Stevedores load the cargo on the

vessel and send the Hatch wise tally sheet and Stevedoring report to the Shipping Agent.

3. For Containers, the loading is done as per the Bay Plan and the Port/Terminal

Operator sends the Tally Sheet to the Shipping Agent. 4. The Vessel Master issues the Mate Receipt to the Port which is a confirmation of

what is loaded on the vessel.

5. The Shipping Agent submits the MMD Certificate along with the requests the port for port clearance and Port issues the Port Clearance.

6. The Shipping Agent requests Customs for Port Clearance and submits his income

tax details, the Port Clearance issued by Port and NOC from Immigration. 7. Customs issues Port Clearance to Shipping Agent and the Port and Vessel sails

out of the Port. 8. If there is any cargo/container that could not be loaded to the vessel, the port

issues a Shut out Report to Shipping Agent. 9. The Shipping Agent sends the Shut-out Report details to CHA and The CHA either

takes the cargo back to town or sends it by another vessel. 10. CHA / Exporter submit the amended Shipping Bill to Customs and Customs give

the Shut-out permission to CHA and the Port. 11. To take the cargo back to town, the CHA files Back-to-Town application to the

customs. The Customs issues the permission to CHA and sends a copy to the Port. 12. After the Port charges are paid, Port issues Gate Pass to the CHA to take the

consignment back to town.

Page 63: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 63 of 291

13. To ship the cargo by another vessel, the CHA / Exporter files a fresh Shipping Bill to Customs.

14. After sailing of the vessel, the Shipping Agent files the Export General Manifest

(EGM) to the Customs. 15. Port sends the final bill to the shipping agent and Shipping Agent pays the

shortfall if any or Port refunds in case of excess payments made by the Shipping Agent.

16. Port hands over the mate receipt to the CHA / Exporter after all the port charges

are paid. CHA returns the mate receipt to SA.

17. COARRI and BAPLIE (outbound) messages are sent after sailing of the vessel to SA Note: In JNPT where after receipt of Export Advance List from the Shipping Agent / Line the Port / TO loads the containers on the vessel and COARRI and BAPLIE (outbound) messages are sent after sailing of the vessel to the Shipping Agent.

Page 64: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 64 of 291

3.5.3 USER INTERACTION WITH PCS The Users from different stakeholders interact with Port Community System either using PCS Message Hub or through the PCS single window web application (called PCS Web) via PCS Portal directly. PCS will also provide host-to-host interface for high volume users to exchange documents respective with their business partners through PCS.

Mes

sagi

ng S

yste

m

Tran

slatio

n Hu

b

User

PCS

User System

BroadBand/LeasedLine

PCS Web

DataRepository

Fire

wal

l

PCS Messaging Hub PCS will provide all the stakeholders, including the business players and the government agencies, the facility to securely exchange the electronic documents/information in real time through the centralized intelligent electronic exchange components called Messaging Hub for messaging. The stakeholders will be able to transact and send information securely and reliably to each other in structured EDI message formats. The request for submission and retrieval of messages can come from a portal or non-portal application via Message Hub Access (MHX). Message Hub authenticates the user information before granting a connection to process the request (see Figure1). All transactions are kept in an audit log and users can also check their inbox and outbox. An online administration system is available for administrators to access or reconfigure their message settings such as mailbox, message routing and filtering.

Page 65: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 65 of 291

Host-to-Host link for High Volume Users Many of the major Ports use various systems like Navis or IPOS for managing their port operations. Most of the ports exchange EDI messages with Customs and some of them even exchange few electronic messages with some of the big Shipping Agents and more advanced private Terminal operators. PCS, a centralized messaging hub for the stakeholders, will also have a host-to-host interface for bulk or high volume users, a direct link with the existing Port systems to the PCS server so that their messages are routed to all the intended parties faster. These messages will be digitally signed using server certificates. PCS server will check the authenticity of the Certificate before receiving the messages.

FILE SERVER secureFTP

SERVER secureFTP

SERVER MHX MHX

1 1 1 1

ClLIENT APPLICATION ClLIENT APPLICATION

CLIENT PC CLIENT PC MESSAGE HUB

Page 66: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 66 of 291

PCS Single Window Web Application

Using PCS Web, the single window Web application, users will access PCS over Internet through the PCS portal. Users require just an Internet connection and a browser to access PCS Web. All the authorized users can access the PCS web from the PCS Portal.

The users need to register with PCS, through PCS portal, in order to access PCS web application. PCS issues user ID and password for the users approved by the Port that the user (stakeholder) wish to do business with.

Page 67: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 67 of 291

3.5.4 LIST OF MESSAGES OR DOCUMENTS The following table lists the business documents or messages the stakeholders exchange with their business partners or government controlling agencies through PCS. 1. Messages Suggested

S. No Messages From To

Covered

In PCS? Remarks

Vessel Related Messages

1. Vessel Profile SA Port Yes

2. CALINF: VIA/VCN Registration/ Vessel Scheduling

SA Port Yes

3. Allotment of VIA/VCN Registration/ ACK of CALINF Port SA Yes

4.

BERMAN : Berth Management Message(BERMAN) / Berthing Application/ Un-Berthing Application/ Resource Request/Movement of Vessel from one Berth to other

SA Port Yes

5. PAXLST : Passenger/Crew List Message SA

PHO, Immigration, Port

Yes

6. BAPLIE: Bay Plan/ Stowage Plan

SA Port/ Surveyor

Port(Import) SA(Export)

Yes

7. MOVINS: Stowage Instruction SA Port Yes

8. IFTDGN: Dangerous Goods Notification SA

Port, CHA, Importer, Barge Contractor

Yes

9. Requisition for Resources SA/ Stevedores

Port Yes

10. Allotment of resources Port SA / Stevedores Yes

11. Un-Berthing/Sailing/Shifting/Re-Berthing Application

SA Port Yes

12. VESDEP : Vessel Movement /Vessel Departure Message Port SA Yes

Berth Allocation can also be sent using this message

Page 68: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 68 of 291

13. TPFREP : Terminal Performance Report Port SA Yes

Container Related Messages

14

COPRAR : Container Loading and Discharge Order/ Advance Container List (Imports and Exports)

SA

Port CONCOR/ RAIL OPERATORS CHA CFS Surveyor Transporter

Yes

15 COARRI : Container Loading/Discharge Report Port SA Yes

16 COSTOR: Container Stuffing/De-Stuffing Order SA Port, CFS Yes

17 Container Load Plan ( CLP ) SA Port, CFS, Surveyor Yes

18 Container special handling order SA Port Yes

19 COSTCO: Container Stuffing / De-stuffing report Port, CFS SA Yes

20 Gate Open Report / Cut Off Report Port Stakeholders No

This can be a web report where the stakeholder can login and check the gate open date & time

21 CODECO : Container/Cargo Gate-in Gate-Out Report Port SA,CHA Yes

22 EIR : Equipment Interchange Report Port SA,

Transporter Yes

23 COPARN : Empty Container Release Order SA Port Yes

24 COEDOR: Container Stock Report Port

SA/CHA,CFS

Yes

25 Request for Carting Permission SA,CHA Port Yes

26 Confirmation of Carting Port SA,CHA Yes

27 Job Order CFS Port, Transporter Yes

28 Stoppage or Release of Containers

Customs SA

CFS/Port

Port Yes

Page 69: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 69 of 291

Finance Related Messages

29 Request for Assessment of Charges SA Port Yes

30 Confirmation of Advance Assessment Charges Port SA Yes

31 PD Account Balance Details/Shortfall Intimation Notice

Port SA,CHA Yes

32 INVOIC : Invoice for Vessel / Container/ Stevedoring / Cargo

Port SA,CHA Yes

33 PAYORD : Pay Order/Refund Order

Port SA,CHA

SA,CHA Port

Yes

34 CREADV : Credit Advice Bank SA, CHA, Port Yes

35 DEBADV : Debit Advice Bank SA, CHA, Port Yes

36 Daily Transaction Summary Report

Bank Port Yes

Cargo Related Messages

37 Bill of Lading/ Agent Delivery Order SA

CHA/ Importer

Port Yes

38 Mate Receipt Return of Mate Receipt

SA Port

Port CHA/ Exporter

Yes

39 Application for Log Entry/Short landed/Landing remark certificate

CHA Port/CFS Yes

40

Grant of Log Entry/Short landed/Landing remark certificate

Port/CFS CHA Yes

Transport related Messages

41

COPINO : In-land Way Bill /Container Pre-notification message arriving by Rail/ Placement Memo / In-Land way bill/ Rail Receipt /Export Advance list for Containers arriving by rail

Rail Operator

Port/CHA/ Stevedore Yes

42 Rail Receipt Rail Operator

Port/CHA/ Stevedores Yes

43 Removal Memo from Rack Port Rail Yes

Page 70: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 70 of 291

CHA/ Stevedore

Operator Rail Operator/ Port

44 Pendency of Containers with Respect to Destination

Port Rail Operator

SA, Rail Operator CHA / Stevedore

Yes

45 Train Schedule/Summary Certificate

Port Rail Operator

Stakeholders Yes

Regulatory Authority Messages

46 Application for Tonnage Certificate SA DG Shipping

No

Not a message or document exchanged regularly

47 Tonnage Certificate DG Shipping

SA/Port No As above

48 License for Vessel Application Ship Owner

DG Shipping

No As above

49 Acknowledgment for License for Vessel Application

DG Shipping

Ship Owner No As above

50 Coastal Voyage Registration Ship Owner

DG Shipping

No As above

51 Acknowledgement for Coastal Voyage Registration

DG Shipping

Ship Owner No As above

52 Multimodal Transport Registration

Transporter

DG Shipping

No As above

53 Acknowledgement for Transport Registration

DG Shipping

Transporter No As above

54 Cargo Manifest SA Customs

Customs Port

Yes

55 Container Details SA Customs

Customs Port

Yes

56 Allocation of IGM No Customs SA,Port Yes

57 Grant of Entry Inward Customs SA, Port Yes

Page 71: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 71 of 291

58 Request for Cancellation of Entry IGM SA Customs Yes

59 Confirmation of Vessel Arrival by Port Port Customs Yes

60 Cancellation of IGM No Customs SA, Port Yes

61 Landing/Tally Report Port/ Stevedores

SA, Customs Yes

62 Details of the Containers Landed and Damaged Packages

Port Customs Yes

63 Excess Landed Cargo Port Customs Yes

64 Location of Cargo Port Customs Yes

65 Bill of Entry on Submission Customs

Port , Terminal Operator, CFS

Yes

65 Out of Charge Customs CHA, Port Yes

66 Containers out of Charge Customs CHA, Port Yes

67 Out of Charge-Item Details Customs CHA, Port Yes

68 Request for Transshipment SA Customs Yes

69 Transshipment Permit Customs SA, Port Yes

70 Detention/Confiscation Release Order Customs Port Yes

71 Detention/Confiscation Release of Containers Customs Port Yes

72 Gate Pass Port/CFS CHA, Customs Yes

73 Disposal Request

Port/ Terminal Operator/ CFS

Customs/ SA/Importer/Exporter

Yes

74 Item Disposal Request

Port/ Terminal Operator/ CFS

Customs/ SA/Importer/Exporter

Yes

75 Disposal Order Customs Port Yes

76 Item Disposal Order Customs Port Yes

77 Cargo Disposal Particulars Port Customs Yes

78 Request for Cargo Movement SA Customs Yes

79 Cargo Movement Approval Customs SA, Port, CFS Yes

Page 72: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 72 of 291

80 Arrival of Cargo at CFS CFS Customs Yes

81 Transshipment Approval Customs SA, Port Yes

82 Acknowledgement Message to Transshipment Request Customs SA Yes

83 Application for Rotation No. SA Customs Yes

84 Allotment of Rotation Number Customs SA, Port/ TO Yes

85 Application for Cancellation of Rotation Number SA Customs Yes

86 Cancellation of Rotation number Customs SA, Port/

CFS/ TO Yes

87 Shipping Bill Details Customs Port/ CFS/ TO Yes

88 Shipping Bill - Item Details Customs Port/ CFS/ TO Yes

89 Entry of Goods into Port Port, CFS, TO Customs Yes

90 Entry of Goods into Port-Container

Port, CFS, TO Customs Yes

91 LEO/Stuffing Report Customs SA/CHA, Port/ CFS/ TO

Yes

92 Stuffing Report - Container Information

Customs or Port

SA/CHA, Port/ TO/ CFS SA / Customs

Yes

93 Details of Shutout Cargo Customs Port/ CFS/ TO Yes

94 Container/Package Shutout Cargo Details Customs Port/ TO /

CFS Yes

95 Application for Entry Outward prior to Loading U/s 39 SA Customs Yes

96 Grant of Entry Outwards Customs SA, Port Yes

97 Application for Port Clearance U/s 42 (Prior to Sailing) SA Customs Yes

98 Grant of Port Clearance Port, Customs SA Yes

99 Vessel Sailing Report Port Customs, SA Yes

100 Export General Manifest SA Customs, Port Yes Some ports are

receiving EGM

101 EGM - Container Particulars SA Customs, Port Yes

102 Requisition of Stevedoring activities

All Stakeholders

Stevedores/ Port Yes

Page 73: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 73 of 291

2. New messages Identified S. No Messages From To Remarks

1. Bill of Entry CHA/Importer

Customs

To submit B/E to customs. Not in the current customs message list.

2. Shipping Bill CHA/Exporter

Customs

To submit S/B to Customs. Not in the current customs message list.

3. Request Back to town CHA Customs

Customs Regulatory Message. Not in the current customs message list.

4. Permission Back to town Customs CHA

Customs Regulatory Message. Not in the current customs message list.

5. Boat Note Customs CHA/Importer/ Exporter/Barge Operator

Boat Note includes the empty boat note also. Not in the current customs message list.

6. ETA SA

Port To submit ETA

7. Movement Permission from Pre-Shipment to Dock

CHA Port To request for movement permission.

8. Movement Order Port CHA To issue the movement order.

9. Export Cargo Register Port SA To send the Export Cargo Register.

10. Form 13 SA/CHA Port To submit the Form 13

11. Entry Permit for export consignment CHA Port

12. Forwarding note SA Rail Transporter

Containers numbers to be transported through rail to the respective ICDs

13. Work Order SA Rail Transporter/ CFS

To move loaded container to factory for de-stuffing or to other ICD's

14.

Notice of Tank Readiness (Tank/Bulk carrier/Vessel)

Tank Farm operator SA

SA Port

Page 74: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 74 of 291

15. Ullage Report/Tank Survey Report Surveyor Port

16. Out-turn Report Port Importer/CHA/ SA, Customs

17. Over side delivery Order SA Port If the delivery is by Barges

18. Cancellation of VCN SA Port

19. Confirmation of VCN Cancellation Port SA

20. Shipping Order SA Port

Shipping order is the one issued to the port by SA. It is the confirmation from the SA that all the formalities are over. SA asks port to accept and load the cargo into the vessel.

21. Packing List CHA/Exporter Port Not possible

22. Pre-Inspection for Scrap

23. Plant Quarantine Certificate PQ SA

24. Phytosanitary certificate PHO SA

25. Pumping Guarantee CHA / Importer Customs, TFO

26. Request for temporary Pipe-line connection TFO Port

27. Request for disconnection and removal of pipe-line

TFO Port

28. Abandonment notice SA Port , Customs

29. lien notice on cargo SA Port

30. Gang Letter

31. Split item

32. Joint Bill of Entry CHA/Importer

Customs

33. Request for en-block movement SA/Lines Port, Customs

34. Permission for en-block movement Customs Port

35. Form 11

Page 75: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 75 of 291

36. Berthing Slip

This is use to communicate SA about the allocation of Berth

37. Request for Ingress Permission CHA / SA Port

38. Ingress Permission Port CHA / SA

39. Request for Egress Permission CHA / SA Port

40. Egress Permission Port CHA / SA

41. Undertaking letter

42. Export Application CHA / Exporter Port

43. Ship Stores

44. Bunkers (Export)

45. Vessel arrival / Departure intimation Port Navy

46. Special Service Request SA TO

47. Container Reconciliation lists TO SA

48. Scanning List Customs SA

49. PC Bond Cancellation Customs SA

50. Customs overtime SA Customs

51. Container Reconcilliation lists Post Vessel Departure

TO SA

52. Acknowledgement Port Other stake holder

This a acknowledgement for any message which sends the Port to other stakeholder. Format: 1. Remarks 2. comment 3. Status (Rejected /

Accepted)

Page 76: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 76 of 291

3.6 ISSUES ADDRESSED IN PCS The following table lists General problems, Issues and suggestions from the various stakeholders, compiled during the requirements study, and how the proposed system is addressing these issues.

S.No General Problems/ Issues Addressed in PCS? 1. The differences of standards/format used

during the document exchange between some of the stakeholders make the electronic document exchange of little use to the partner.

Message formats are standardized in PCS

2. There is no centralized system that can do the conversion from one standard format to another and make the information available to all the players involved.

T-Hub component of the PCS will take care of the conversion of the message formats

3. Since Vessel schedules, ETA and Berth allocation details are not published on real time basis, daily berthing meeting between Port officials and Shipping Agents becomes necessary for confirming the berth allocation to give transparency.

PCS can allot the berth automatically with the details furnished by the SA, but Ports want to continue the Berthing meeting for transparency.

4. It is quite difficult to locate a container in many Ports’ CFS since no yard plan is followed currently and if there is any, it’s not updated and conveyed to Agent/CHA when the containers are shifted from the original location to another.

Ports have to maintain the Yard Plan and should be updated in real time

5. Stakeholders still need to submit paper documents in many counters, though the functions of the counter is automated, as there is no link between various existing systems implemented in the Ports.

Ports internal systems should be connected with all the other departments of the Port.

6. The IGM hard copies are still submitted by SA in almost all the ports since the IGM (EDI message) from SA or Customs is not used by the port. Port Systems either don’t have an option to do import the IGM message or it can’t interpret the messages.

Once PCS is in place, IGM can be received by the Port from PCS or Port can directly receive the IGM from the Customs (In case if there is no integration between customs and Port Community System)

Page 77: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 77 of 291

7. IGM is currently sent to all the terminals by the port if the port has more than one. This should be segregated by terminal and only the data pertaining to the vessels that are arriving at the particular terminal to be sent to that particular Terminal.

Once IGM is received thru EDI, this problem will be resolved.

8. IGM is submitted to all the CFS even if only few containers are moved to one CFS and rest to another CFS. Only the list of those container moved to a CFS should be send to that particular CFS.

Once IGM is received through EDI, this problem will be resolved.

9. Coastal Vessels need to submit Bill of Entry through hard copy to Customs though they don’t have any imported cargo and it is not required for any duty assessment.

Customs issue

10. Up to seven copies of DO to be given at various counters for filing since the document exchange and book keeping is still manual.

Once DO is exchanged electronically this can be resolved

11. Reports from the Labs the samples sent for testing, taking long time. This leads to the delay in issuing PHO certificate.

Without receiving the Lab reports, PQ or PHO can’t issue certificates.

12. To issue the LEO, Custom officer checks all the applications, then goes back to office and enters the details onto the system. Instead, he can use any mobile device to issue LEO while checking each vessel. The dwell time can be reduced by at least Around 4 hours by this.

Customs has to look into this. IPA can take a call on it.

13. Once LEO is issued for break-bulk cargo and if part of the break-bulk is changed to container since all the cargo is not able to be loaded in the vessel, the CHA needs to cancel the S/B and LEO and need to get another S/B and LEO. It takes 3 days for the customs to approve the S/B and LEO even if the cargo is still the same mentioned in the previous S/B and LEO.

Customs issue

14. Collection of DO is totally manual. CHA has to go to different Shipping Agents for getting DOs for different importers the CHA represents.

DO can be received on-line.

15. No option to track bonded containers (containers of foreign origin. The bonded containers have to be sent back to their origin within 6 months from the arrival day in India)

Customs tracks the bonded containers

16. Many SL/SA doesn’t have message translators to translate the messages to the format acceptable to customs.

Port Community System has the message translator (T-Hub).

Page 78: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 78 of 291

17. The Port systems cannot provide information about the cargo once it leaves its boundaries. i. e. when the cargo is transported out by rails and trucks.

Railway and ICD also included in PCS

18. CFS is not linked to Customs and therefore physical examination orders need to be submitted to CFS. It would be good to connect CFS to the Customs for getting the most updated B/L details.

Once Port Community System is implemented, all stakeholders have to be integrated with each other through PCS

19. CHA is required to escort each truck inside the CFS and outside the CFS with the documents because the gate-officer does not have access to the necessary information (like Bill of Entry).

All gates of the Ports should be well connected with the Ports internal system

20. Import and Export Document goes through lot of small changes / amendments. Currently it is not easy for the stakeholders to carry out the amendments.

Amendments can be done through On-line if customs accepts

21. Shipping Agent and other stakeholders need to directly enquire with the Port regarding Vessel Arrival/ Departure information and other vessel, cargo and container movement status as there is no real time status update or checking option available in the current system

Web services can be used to find out Vessel Arrival / Departure details

22. Currently, there is no reminder or notification mechanism in place if there is a delay in processing or approval.

Port Community System can send a reminder to the recipient who is not approving for long time.

23. Gate in and gate out in the port is quite difficult and time consuming due to the manual verification of the document in the gate. Good amount of the time will be saved by streamlining the gate in/out passes issuance and verification of the passes at the gate.

Port’s Gate should have the PC and is connected with the Port’s Internal System.

Page 79: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 79 of 291

S.No Specific Problems/Issues with Some Port Addressed in PCS? 1. Whenever a new Vessel Arrives along with a

Barge? How it is handled? Separate VCN numbers are issued to both Vessel and Barge

2. IGM hardcopies are submitted still to Port and Customs in some of the ports as the EDI submission to Customs and port is not totally streamlined.

Customs and respective Ports have to take a call on it.

3. GRT is asked 3 or 4 times in different applications during one import / export cycle. GRT will change if the vessel profile is changed during the process leading to confusion which one is the correct one.

Pilot verifies all certificates after boards into the Vessel and confirms GRT

4. Port users are not getting the details about the yard planning and container movement.

Container movement information can be obtained web services

5. Data is submitted twice, first to the customs and then to the ports by CHA as some of the EDI messages that are currently being sent from Customs to Ports (CFS) cannot be interpreted by the Port systems.

PCS maintains well defined message formats

6. Vessel Call sign is not unique and some ports it is used to uniquely identify the vessel.

IMO will be used to uniquely identify the Vessel and PCS will assign a unique number for the Barges as IMO number is not assigned to the Barges.

7. For some of the CFS, the operations are totally manual and the Information about the containers shifted to CFS is not available through the system.

CFS should be computerized and is integrated with PCS.

8. Shipping bill (EDI based) is not received in Port even after hard copy of LEO is received

Discuss with Customs

9. Cargo Release Order (EDI-based) is often received after the Cargo has been released

Discuss with Customs

10. Yard report/register is still paper based in some ports and the messages sent from the container management to move the empty containers are not made electronic yet.

PCS provides various web forms and reports

11. If a Vessel is used for both Import and Export, Different VCN numbers are used for Import and Export separately in some ports.

PCS considers as “one Voyage means one VCN i.e for both import and export”

Page 80: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 80 of 291

12. SA maintaining separate accounts wit Port for different kind of charges (Like Vessel Related Charges, Cargo related Charges)

Port’s internal process

13. Immigration passes (Dock entry permits and NOC) are not uniform in formats in different ports.

Dock Permits are Port’s internal issue

14. All documents are manual and hardcopy forms for immigration; no IT systems are in place to help the work

Not in PCS scope

15. Different SAs submitting Voyage registrations for Import and Export separately for the same vessel.

Same Voyage Number can be used for the Import and Export though SAs are different

Page 81: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 81 of 291

S.No Suggestions From Stakeholders Addressed in PCS ? 1. Defaulters (SA) of charges should be blacklisted

and prevented from using the port services that he hasn’t made the payment for and alert other ports.

Ports enter the defaulter’s details to the Port Community System through a web form.

2. SA can apply for Line clearance from the Tank Operator and Tank Operators can submit tank readiness form to Port through PCS

Message is introduced in PCS

3. To use a Pre-gate application that will take in information from the Import Advance List and IGM. It will allow the SA to fill in additional information for example seal no., origin, destination, etc. It will then automatically populate Pre-Advice Inbound Rail Container Application that is filled-in by the Port operator while issuing the Gate Pass.

Gate Pass is covered in Port Community System

4. Bills / Invoices should be standardized into a common international format across the ports although the tariffs by different ports may be different.

PCS Finance related messages are standardized

5. Port can push bills files to banks and banks send EDI response back. But Port must send payment details, for example, for which items are these bills for. PCS should reconcile the details.

Not in PCS scope

6. Vessel movement should be transparent and notified to each SA every time whenever there is Vessel Shifting/Vessel Berth/Vessel Un-Berth

Vessel shifting message is meant for this only.

7. IMO number or MMSI number can be used to uniquely identify the Ship.

IMO number is used to uniquely identify a Vessel.

8. Cancellation and amendment in the shipping bill should be made electronic.

Yes, All Customs messages will be incorporated in Port Community System

9. Not all SL/SA are able to provide this COPRA EDI to Port. These messages can then be translated by PCS and sent to the Terminal Operators or the Terminal Operators will need to change their system to translate these messages.

PCS provides the message translator (T-Hub)

10. Bay plan/yard plan report should be graphical and published on-line.

Graphical presentation of the Yard plan / Bay plan will not be covered in the PCS. But it can be done if required

Page 82: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 82 of 291

11. Even though Free Pratique is issued, if the crew members are sick, while Immigration gives the permit, they need to notify PHO about this.

Its ports internal process.

12. E-mail ID of the Vessel should be included in the Vessel Profile

Included in the VESPRO Message

13. In the Vessel Profile, Include call sign change date and last call sign. Date of previous Vessel name change should be included in Vessel Profile

Included in the VESPRO Message

14. There should some provision to change type of the Vessel between Foreign and Coastal during the voyage.

Will be taken care in the PCS messages

15. Amendment of IGM should be on-line. Amendment of IGM can be done on-line if Customs accepts.

16. The list of all banned cargo should be published through PCS.

It’s a one of the directories. A link should be provided to the DFG.

17. Port Immigration Systems should be linked with the all the AIR PORTS

Not in the scope of PCS

18. After paying the duty, if CHA gets clearance from customs at 3 or 4 pm, CHA goes to the CFS next day. Where they have to enter the details again to the system. But takes long time. Instead, if CHA enters the details and CFS verifies the details next morning, can reduce delay

When all identified stakeholders are connected through Port Community System, this problem will be resolved

19. PCS should provide online immigration application that checks for blacklisted crew.

Not in the PCS scope

20. Sea Port immigration under state government’s purview but airports under Central immigration.

Ok

21. Sometimes, SA comes to apply for NOC after ships sails, but Customs would have given clearance for vessel sailing.

This is process related issue.

22. Port can push bills files to banks and banks send EDI response back. But Port must send payment details, for example, for which items are these bills for. PCS should reconcile the details.

Not in PCS scope

23. CFS is not linked to Customs and therefore physical examination orders need to be submitted to CFS. It would be good to connect CFS to the Customs for getting the most updated B/L details.

When all stakeholders are connected through Port Community System. This will be resolved

Page 83: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 83 of 291

24. CHA supposed to pay Stamp Duty to Shipping Companies and Shipping Company in-turn pays to the govt. Only after the customs signed bill of entry is shown to the shipping line, does the shipping line accepts the stamp duty. If the payment can be made to CFS directly and CFS can send to Shipping Line, it will be of great help. Also, electronic payment of stamp duty will help expedite this process.

Not in PCS scope

25. Hiring of transporters (private) is currently done by phone or fax.

Not in the present scope of PCS, may include in future if required

26. CONCOR is using their own train codes while JNPT is using their own train codes and messages exchange between them cannot be achieved.

its part of directories

27. Bills / Invoices should be standardized into a common international format across the ports although the tariffs by different ports may be different.

PCS finance messages are finalized

28. Import and Export Document goes through lot of small changes / amendments. Currently it is not easy for the stakeholders to carry out the amendments.

Customs has to accept through EDI

29. Pre-Advise list should be sent electronically to Port and made available to the people at the gate.

This can be done electronically as PCS will have the Pre-Advice list

30. In JNPT EIR (Eqpt. Interchange Report) i.e. gate pass is issued only at the time of departure at the outgate for both receipt of export containers as well as delivery of imports.

Port’s internal process

31. Documents exchanged are in manual format and at most email attachments

All documents are exchanged electronically in PCS except legal documents and certificates

32. Forwarding Note can be made electronic so that it will be easier.

Yes, it’s a Message in Port Community System.

33. Hazardous cargo codes, agent codes between S/L, Ports, Customs and CONCOR are different.

PCS directories will be integrated with all the other ports.

34. Some cargo is considered normal to ports while in CONCOR, the same cargo is classified as hazardous.

Need to be made common directory

35. Cancellation and amendment in the shipping bill should be allowed.

Yes.

Page 84: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 84 of 291

36. History of the ship need to be kept. Need to track the ports or the restricted countries the ship has visited before reaching the Indian port.

It will be taken care in Port Community System

37. Provision to search vessels by Vessel name should also be provided. (Vessel ID, Call sign are auto generated number so no body remembers them so if the details of the ships should come by choosing the ships name once the ship enters to port till it sails out.)

Yes, Vessels can be searched with Vessel names

38. International code has to be provided to all ports and stakeholders.

All directories will be provided.

Page 85: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 85 of 291

4. INTERFACES REQUIREMENTS

4.1 SYSTEM INTERFACES The following are the system interfaces through which the PCS users interact with PCS. The registered users can use any of the interfaces mentioned below as the client to send and receive messages from their business partners through PCS. 4.1.1 FTP (FILE TRANSFER PROTOCOL) PCS will be using CrimsonLogic Secure FPT (RTFTP) for uploading and downloading messages. RTFTP Server provides Web based User Management module. User ID's can be created and deleted using this module. While creating the user ID's, RTFTP server generates the private/public key pair. RTFTP server can be used to create users to perform the RTFTP File transfer. The server would create the User ID's on the remote machine where RTFTP Server is installed. The private key file of the user can be extracted using the User Management module to be used by RTFTP client during the file transfer. Each user will be given a FTP login ID using which they can login and upload the messages to be submitted to PCS using Secured FTP. 4.1.2 MHX (MESSAGE HUB ACCESS) Message Hub Access (MHX) is a communication program that allows messages to be transferred between a user’s system and Message Hub, an Internet-based messaging platform for business partners to request for the submission and retrieval of information from both portal and non-portal applications. Users, who required submitting their messages to the message hub, will make use of this option. 4.1.3 WEB UPLOAD User can login to PCS using the user ID provided and key in the information. The messages can be uploaded to/downloaded from the server using the HTTP protocol. The contents of the message (EDI/XML/CSV) will be extracted and stored in the database. 4.1.4 OTHER CLIENTS The users also can use their own HTTP clients that can send messages using HTTP or HTTPS to PCS. PCS users with Web Services capabilities also can use web services based on SOAP, ebXML or RosettaNet to send the messages to PCS.

Page 86: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 86 of 291

4.2 USER INTERFACES The Users from different stakeholders also can access the Port Community System through the single window web application (called PCS Web) .The stakeholders will have to register through PCS Portal to get user ID to logon to PCS Web.

Page 87: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 87 of 291

5. SPECIFIC REQUIREMENTS

5.1 INTELLIGENT MESSAGE SYSTEM 5.1.1 PCS MESSAGE HUB PCS Message Hub (M-Hub) is an Internet-based messaging platform, which allows stakeholders to carry out B2B transactions in a highly secure manner. M-Hub supports protocols like HTTP, HTTPS, FTP and SMTP. Messaging protocols like Web Services based on SOAP, XML, ebXML and RosettaNet are integrated into M-Hub. In PCS, Transwork accepts incoming standard formats, like UN/EDIFACT, ANSI X12, Flat files etc and translates into other formats such as ANSI X12, UN/EDIFACT, ROSSETANET, XML, ebXML etc. It supports FTP, SECURE FTP, SMTP, S/MIME, HTTP, HTTPS, and MHAccess (MHX) protocols. It has the capability of translating one file to many outputs, and many files to one output. It allows the maintenance of messages in a relational database allowing quick and easy reporting functionalities. It also provides audit log and trace facilities, which facilitates easy debugging.

5.1.2 MODES OF MESSAGE EXCHANGE The PCS users will be able to send and receive messages using three modes: 1. FTP (File Transfer Protocol) PCS will be using CrimsonLogic Secure FPT (RTFTP) for uploading and downloading messages. RTFTP Server provides Web based User Management module. User ID's can be created and deleted using this module. While creating the user ID's, RTFTP server generates the private/public key pair. RTFTP server can be used to create users to perform the RTFTP File transfer. The server would create the User ID's on the remote machine where RTFTP Server is installed. The private key file of the user can be extracted using the User Management module to be used by RTFTP client during the file transfer. Each user will be given a FTP login ID using which they can login and upload the messages to be submitted to PCS using Secured FTP. 2. Web Form upload User can login to PCS using the user ID provided and key in the information. The messages can be uploaded to the server using the HTTP protocol. The contents of the message (EDI/XML/CSV) will be extracted and stored in the database.

Page 88: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 88 of 291

3. MHX (Message Hub Access) Message Hub Access (MHX) is a communication program that allows messages to be transferred between a user’s system and Message Hub, an Internet-based messaging platform for business partners to request for the submission and retrieval of information from both portal and non-portal applications. Users, who required submitting their messages to the message hub, will make use of this option. MHX works in two ways both of which use the secure HTTP and FTP protocols to interact with M-Hub: • Script processing

As a stand-alone program, MHX handles the message transfer via scripting. MHX reads the input script file created by the user, processes it and writes the response into the output script file. The script file contains instructions to perform submissions, retrievals, listing or deleting functions with M-Hub.

• Java API

For Java applications that require communication with M-Hub, MHX Java API can be embedded into the application to perform similar functions such as submissions, retrievals, listing or deleting messages in M-Hub.

Features of MHX:

• Transmission and retrieval of messages to and from M-hub. • Supports EDI, X12, Binary and Text files. • Provides distribution list feature to send messages to multiple recipients. • Provides nickname feature to map mailbox ids to user names. • Retrieval from Short term Archive. • List and delete from inbox. • List short-term archives. • Changing of user password. • Supports the legacy EDIAccess scripts. • Works with internet, leased line and dial-up connections. • Can be configured to establish the dial-up connection automatically or to an

internet service provider if required. • Use M-hub mailbox id and password to establish dial-up connection with

CrimsonLogic’s Remote Access server. • Uses secure hypertext transmission protocol to interact with M-Hub. • Uses secure file transfer client to upload or download files to and from the file

server. • Provides script level recovery for failed sessions with communication error. • Automatically checks for software updates and prompts if any update is

available. • Provides a graphical user interface to create and manage user profiles. • Provides a scripting option that creates the scripts automatically based on user

selections.

Page 89: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 89 of 291

5.1.3 COMPONENTS OF MESSAGE EXCHANGE PCS will provide all the stakeholders, including the business players and the government agencies, the facility to securely exchange the electronic documents/information with respect to maritime transport chain in real time through the centralized intelligent electronic exchange components namely Messaging Hub (for messaging), Transwork (for translation) and Maestro (for Business Process Routing). The stakeholders will be able to transact and send information securely and reliably to each other in structured EDI message formats. PCS will use the Enterprise-Application Integration message brokering services to facilitate information exchange with the external business stakeholders, port authorities and the government/regulatory agencies. 1. Message Hub

Message Hub is a server-based application that provides the infrastructure for exchanging messages in the Java 2 Enterprise Edition (J2EE) environment. It enables pre-defined trading partners to request for the submission and retrieval of document-based messages.

The request for submission and retrieval of messages can come from a portal or non-portal application via Message Hub Access (MHX). Message Hub authenticates the user information before granting a connection to process the request (see Figure1).

The main features of Message Hub are:

• Lists messages from the inbox, outbox and archives. • Enquiries on in, out and archive boxes to view the message information. • Messages can be deleted from the user’s inbox. • Restoration of messages from short-term archive to inbox. • Distributes messages to a specific list of recipients. • Allows acknowledgement options e.g. Delivery Notification (DN), and Receipt

Notification (RN). • Automatic notifications of errors e.g. Non-Delivery Notification (NDN) and Non-

Receipt Notification (NRN). • Generates NRN if unread messages are deleted from inbox. • Allows filtering of incoming messages. • Performs basic Electronic Data Interchange (EDI) validation. • Equipped with VADS service for paging and message alerts. • Secures documents and data with digital signatures and message encryption. • Allows the submission and retrieval of messages via SMPT, FTP, Secure FTP, HTTP,

HTTPS and Message Queue. • Outfitted with message routing capability. • Integrates easily with third party billing system.

Page 90: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 90 of 291

2. Transwork Transwork is a flexible data translation software that enables the translation of data from one format to another. Message in UN/EDIFACT format can be easily translated to another format, like XML or user-defined file format. Data translation from one format to another normally requires an input source data and an output destination data. Using the Transwork Designer, a highly intuitive tool, the user first design both the input source and output destination type file. This involves defining the structure of the message, like grouping, segment, composite data element and basic data elements. Properties like the number of occurrences, mandatory or optional, data type, initiator, terminator and others are also defined at this stage. After the input source and output destination type file are designed, the user will proceed to define the data mapping from the input source to the output destination. Mapping is done by simple clicks and drags from the source element to the destination element. A set of function rules that can be applied on the destination element is also available. When the mapping is completed, the map compiler is executed to generate a compiled map file. By supplying the input source file, the translation can be optimally executed with the generated compiled map file. Transwork Designer: Transwork Designer allows for quick designing of type file and map file.

• Support for UN/EDIFACT, ANSI X.12, XML and other user-defined file format • Element properties like number of occurrences, mandatory or optional, data

type, initiator, terminator and others can be easily edited using the Property Viewer

• Backup of the type and map file is done prior to saving the updated file

• A set of function rules is provided. This includes ABS(), COUNT(), MIN(), MAX() and

many others • For optimal run-time performance, the compiler compiles the map and produces

a compact binary map file

• Completed type files can be stored in a library in a hierarchical manner

Page 91: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 91 of 291

Translation Engine Transwork Engine performs the actual translation from one message format to another.

• This allows for the run-time configurations, like the location of the input and output file, verbose, log level, etc

• The translation engine can be invoked via a command-line by passing the

relevant parameters like input and output file location, map location

• A Java-based API is provided to allow integration with other applications

• Audit log and trace file provides information on the status and detailed activities of the translation

• Supports multiple input source files and multiple output destination files

• Support for data encoded in UTF-8

• Translation can continue even when bad data is encountered. The message

which contains the bad data is extracted out and saved into a separate file The Transwork process flow is given in the following diagram.

Page 92: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 92 of 291

5.1.4 MESSAGE EXCHANGE USE CASES

Send / Receive Messages(M-HUB SERVER)

Port Internal SystemMHub Client

Mail Management(M-HUB SERVER)

PCS Port Administrator

Web Portal

Customs System

MHub ClientWeb Portal /MHub Client

All AuthorisedPCS Stakeholders

Web Portal

1. Send / Receive Messages PCS user will be able to send or receive messages via Mhub Clients like MHAccess (MHX) or via Web Portal. MHX can be setup at the client side or the server side and the profile can be configured to send / receive messages from/ to a particular folder periodically. The MHX will automatically connect to the Messaging Server in PCS and pick / deposit the message. The messages will be tracked by the Messaging server so that any failover will be detected and appropriate action can be taken. In case of X12 and EDIFACT messages, MHX will validate, split and extract certain information from the message body content. Distribution list and nickname files are supported in submitting messages. Restart and Recovery feature allows partial send / receive of messages in the event of disconnection. MHX supports data encryption to store the password. It also supports changing of user password. 2. Mail Management Mail management helps the user to view the message header information and delete the messages in the inbox through PCS Portal. It also allows the user to view header information and restore messages in the STA. The message header stores the message records. The search criteria of Mail management enable the user to search and view the message header information available in the inbox, archive, outbox, and the long-term archive. The system retrieves a list of message header information based on the search criteria entered, and displays the information. The user can click on the message ID to view message details listed in the message header list.

Refer the Annexure – II, Section 7.2.1 for the Use Case descriptions.

Page 93: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 93 of 291

5.2 CENTRALIZED DATABASE AND DOCUMENT REPOSITORY PCS will maintain a central repository to store, archive and retrieve the messages and the information exchanged between the different stakeholders. The Central Repository consists of PCS Central Database and PCS Central Document Repository. The profiles of all vessels registered with Indian ports, voyage history, details of cargo and container movements through the major ports, crew and passenger details, the information of the main stakeholders and their business transactions with ports will be kept in the Central Database. All the electronic business documents exchanged (messages) between the registered stakeholders like General Manifests, Berthing Applications, Agent Delivery orders, Stowage Plans, Bill of Entries, import and export permits etc will be stored in the original forms in the Document Repository for archival in the future. The supporting electronic documents in the form of scanned hardcopy documents, emails from the server, the invoices, billing receipts and payment acknowledgements will also be organized and stored using DMS in the Central Document Repository. The PCS will use Relational Database Management System (RDBMS) and Document Management System (DMS) for Maintaining data and document respectively in the Central Repository. 5.2.1 CENTRAL DATABASE

1. The PCS will use Relational Database Management System (RDBMS) for Maintaining

the Central Database. 2. The Central Database is populated by:

• The relevant data extracted by the PCS parser from the messages exchanged between stakeholders

• Data entered by the stakeholders through the web forms provided in PCS web application.

3. The Central Database facilitates track and trace for cargo and containers to the

stakeholders based on their access rights. 4. Central Database provides real time Vessel, Cargo and Container status to the

authorized stakeholders. 5. PCS, through PCS Web, provides functions to search and view the data in the Central

Database for authorized users based on the access rights and also provide MIS reports based on the Central Database.

Page 94: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 94 of 291

5.2.2 CENTRAL DOCUMENT REPOSITORY

1. The PCS will use Document Management System (DMS) to maintain the documents

in the Central Repository. 2. The messages exchanged between stakeholders are deposited in the Document

Repository by the messaging system in the folders designated for the user. 3. PCS will provide option for the stakeholders to upload the electronic messages and

other supporting documents and store the uploaded documents into designated folders in Document Repository.

4. The Document Repository supports built-in search function for searches based on

Meta information, full text, phonic and stemming. 5. The following are some of the Document Repository features:

• The documents for each stakeholder are maintained in separate cabinets.

• Hardcopy document can be scanned using Twain-compatible scanner prior to

filing

• Documents can be encrypted for additional security

• Supports PDF, XML, HTML, Microsoft Office documents (Word, Excel and

PowerPoint) and the image formats including JPEG, GIF, BMP, PNG and TIFF.

6. Administrator will perform the document management via a web front-end in PCS. 7. The Administrator will perform all the below document management functions

through PCS Web:

• Manage the storage of documents and images

• Create folders for each stakeholder for them to upload documents to.

• Create, copy, delete, move and undelete documents and folders

• Create and maintain User groups

• Specify multi-level access rights for each folder, document or function.

• Index uploaded text-based documents.

Page 95: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 95 of 291

5.2.3 MIS REPORTS

PCS will provide the following MIS reports generated from the Central Database:

• Vessel, Cargo and Container Traffic handled by the Port (Daily, Monthly and

Annually, port-wise)

• Transactions processed, Port-wise (Daily, Monthly and Annually)

• Transactions processed, Stakeholder-wise.

• Annual performance of the ports and other stakeholders.

• Port Performance Indicators like turn around time, average Pre-Berthing Time,

Average Stay at Berth etc

• Dwell time at the ports

• Messages processed and pending at various stage, Port-wise

• Average time taken in processing the messages at each stage

• Import and Exports, Port-wise (Daily, Monthly and Annually)

Page 96: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 96 of 291

5.3 WEB SERVICES

5.3.1 WEB SERVICES USE CASES

PCS Stakeholder

Publish Web Services

Consume Web Services

Service Registration / De-registration

Service Status QueryPort Administrator

Access Audit Trail

PCS Business Module

1. Publish Web Services Any PCS Stakeholder who is Web Service-enabled or selected internal PCS business modules will be able to publish their services as a Web Services in the WSG, for other parties’ service consumption. This is done with the help from the Port Administrator. 2. Consume Web Services Any PCS Stakeholder who is Web Service-enabled or selected internal PCS business modules will be able to consume published Web Services via the WSG. 3. Service Registration/ De-registration The Port Administrator will be able to register and de-register a Web Service via the WSG Portal. 4. Service Status Query The Port Administrator will be able to query the status of any Web Service registered in the WSG Portal.

Page 97: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 97 of 291

The following status can be known: • Service activation status (Disabled / Enabled) • End service URL availability (Online / Offline) 5. Access Audit Trail The Port Administrator will be able to view the audit trail of Web Service invocation details via the WSG Portal. The following information can be known: • Name of service • Owner of service • Date/time service was invoked • Date/time of response

Refer the Annexure – II, Section 7.2.2 for the Use Case descriptions. 5.3.2 WEB SERVICES PROVIDED

PCS will provide the following Web services for the stakeholders:

• Resource/Equipment Availability with Port

• Message submission to Port Community System

• Train Schedule (from CONCOR)

• Weather Conditions updated by the port

• Search Container Location (Track n Trace – from PCS, Port / Terminal Operators

and CONCOR)

• Reefer Container Status (from Ports)

• Online payment using Internet Banking

• Global visibility to in-transit ocean cargo from origin to destination (Information

can be retrieved from a centralized agency, if available)

• Yard Inventory

Page 98: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 98 of 291

5.4 PORTAL SERVICES PCS will provide the portal services, Web Content management and Web Services facilities to the stakeholders through CPS, WCM and WSG. CrimsonLogic Portal Server (CPS) provides an application framework that enables integration of information from various systems into one solution through single sign-on and enterprise application integration capabilities. It will provide a generic technical framework that integrates web services within a business portal, creating a standard look and feel for all services offered by the company. PCS Portal will provide built-in Portlets with access control features to publish the information to only the party who has subscribed to it. The contact information, the forms for registration and deregistration, the frequently asked questions, access to procedures and manuals will be available through PCS portal. All the detailed information on PCS covering its activities, benefits of registering and methods of registering will also be published through CPS. The functional view of the CPS is shown in the diagram below:

Web Content Manager (WCM) will allow the content manager or author, to manage the creation, modification, and removal of content from the web site without the expertise of a webmaster. Ports will be able to develop, customize and manage their own content.

CrimsonLogicPortal Server

(CPS)Liferay

PFK / Standard Header & Footer Provider

ANA / Any

Authorization & Authentication

Component

Membership / Any

Customer Info Component

SSO / Any

Single Sign On Component

Portlets / Applications

Portlets / Applications

Portlets / Applications

Page 99: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 99 of 291

The WCM also allows the publishing of the content provided by the other systems in the PCS community. The content will be extracted and published from the XML/HTML source sent to the PCS system through the messaging services provided by the PCS system. PCS will provide the stakeholders the provision to advertise their services and products on the PCS. WCM will provide a workflow for web content publishing to co-ordinate the approval of the content. The access to the content will be maintained based on the subscription and access control settings. In summary, the features of the portal services are as follows:

• Single-Sign On (SSO) facility • Ability to change the content and functionality of the portal. • Allows applications, information and messages to be published as portlets and

be personalized by authorized users. • Allows administrators to easily manage users and groups through a GUI interface. • Provides personalization tools so that users can modify their portal layout as per

their preference. Administrators can also specify community pages so that all users who belong to a certain group see a specific community page.

• Supports internationalization. • Provides comprehensive Audit trail information for using the portal services.

5.4.1 PORTAL SERVICES PROVIDED

PCS portal will provide the following services and information to the visitors like:

• Registration and login facility for non stakeholders of the PCS, for getting

the newsletters, white papers and articles etc.

• PCS activities and registration documents are all provided for PCS Users.

• Application form for registration for stakeholders.

• Contact/Tender details of the ports.

• Links to other related sites like port web sites, ICEGATE etc.

• Frequently asked questions

• Option for managing own user profiles

• Procedures and Manuals based on stake holder’s role.

• Single sign on facility (SSO).

• Access to PCS web application to registered.

• Provision for stakeholders to advertise their services and products on the PCS.

Page 100: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 100 of 291

5.5 PAYMENT SERVICES PCS will provide payment facilities to the stakeholders for various services offered on the PCS through NBS and E-Payment components respectively. Network Billing System (NBS) will allow the customers and the port finance users to do the billing transactions like setting up the account plan and account deal, making the invoice adjustments and Credit card authorization online. NBS will capture the customer’s necessary information from the registration system and maintains the list of all products and services supplied or delivered.

Rating Processing Transaction amounts / usages from PCS will be passed to the billing system either through event publishing or as flat file. The computing of the various charges will be done at the port level. The final computed charges for the various vessel, container and cargo relates services will be fed to the PCS system. The detailed payment summary and breakdown will be kept in PCS.

Bank Agencies

BBiilllliinngg

GL

Financial Analysis

External User

Internal User

Authentication & Authorisation

Enquiries & Reports Administration

Pre-Processor

Communication Gateway

Payment Gateway Event Handler

Registration

Rating

Receivables

Notification

Payable

e-payment

Reconciliation

Business Applications

Page 101: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 101 of 291

Collection and Payment The system provides various modes to collect the outstanding bills from the customer:

1. Inter Bank Direct Debit –The outstanding amount will be automatically sent to a processing bank. The operator will have to setup the accounts with their preferred bank. The Billing System can be customized easily to interface with the preferred bank of the operator in the major ports.

2. Manual – The subscribers uses cash or cheque or E-payment to settle the

outstanding bill. They are given a grace period, after which they are liable to pay surcharges.

3. Deposit – The outstanding amount will be deducted against the deposit. The user

may pay the deposit through cash or cheque over the counter.

E-Payment will provide various payment options to the customer that he can chose from based on his preference and convenience. The E-Payment will facilitate the payment by the stakeholders for the services using the Internet Banking option. The main payment mechanism will be for the following type of customers for the services rendered by the Port and CFS: 1. Shipping Agents / Lines 2. Custom House Agents/Importers/Exporters The E-Payment module will interface through the secure payment gateway established with the major banking corporations or provided. It will also provide an efficient and cost effective method of collecting payment online using credit cards such as AMEX, MasterCard and VISA. The E-Payment module will also interface with the customers deposit (PD) account in the Port’s Internal Financial System, if it exists, to debit/credit the payment amount. PCS will also allow other stakeholders to receive electronic payments from the customers by making use of the interface setup by PCS with the banks and the ports. The following e-Payment options will be available in the PCS system: 3. Direct payment of an amount specified by the stakeholder. 4. Direct payment of a bill selected by the stakeholder. 5. Approaching the specified bank branch and give cash/cheque for payment of a bill

produced by the PCS application. In the first option the user has to input the amount, the port, the PD account and his bank to the payment system to perform the transaction. The details entered by the user will be sent over to his bank via a secured payment gateway. The bank application will carryout the transaction and also will send the messages after successful authentication and confirmation from the stakeholder.

Page 102: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 102 of 291

The flow of the payment system for the above case is shown below.

In the second option the user has to select the bill and his bank from the PCS application. The details of the selected inputs will be sent over to his bank via a secured payment gateway. The bank application will carryout the transaction and also will send the messages after successful authentication and confirmation from the stakeholder.

For implementing these two payment options a payment system will be provided which will send the required details to a secured payment gateway for performing the transactions.

The payment system would be integrated with the existing credit card payment system to provide the option for the stakeholder to do the payment using credit card.

Page 103: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 103 of 291

5.5.1 PAYMENT SERVICE WORKFLOW

Credit Card Pay ment

Internet Banking Pay ment

Pay ment throughPort Deposit Account

Port Financial System

Bank

credit-cardpay ment gateway

bankingpay ment gateway

MHX Client

Any Stakeholder

Web Portal

Web Portal

Web Portal

• Credit Card Payment Shipping Agents and Customs House Agents (CHA) will be able to make payment via their credit cards through PCS. Payment via credit card can be made for vessel, cargo and port related charges. • Internet Banking Payment Shipping Agents (SA) & Customs House Agents (CHA) can also make payment via the internet banking option through PCS. Payment via internet banking can be made for vessel, cargo and port related charges. During payment, Shipping Agents and Custom House Agents will be able to select either to pay by credit card or internet banking option. • Payment through Port Deposit Account Shipping Agents and Customs House Agents (CHA) can make a deposit into their respective bank accounts they have with the ports. NBS will be used to help all the ports keep track of various accounts for the agents. During the debit transactions, PCS uses NBS to debit the amount of charges from the agent’s account maintained in NBS. After the successful debit, a message will be sent from NBS (via M-Hub) to the Port’s Financial Systems for updating the balance amount.

Page 104: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 104 of 291

When the agents top up their balance at the port premises, the Port’s Financial Systems shall send a message (also via M-Hub) to NBS, which will update the correct account balance for the affected agent.

Refer the Annexure – II, Section 7.2.3 for the Use Case descriptions.

Page 105: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 105 of 291

5.6 ADMINISTRATION SERVICES PCS will provide web based administrative facilities to manage the PCS components, the component configuration, Company and user accounts, user roles and user access rights administration. 5.6.1 COMPONENTS ADMINISTRATION

a. M-Hub Administration

M-HUB Service Management

M-HUB Service Management module allows the System Administrator to manage and configure the M-hub service. It allows the Administrator to configure the settings on Messaging Hub server with regards to connection, message types, and libraries.

Adaptor Management Adapters are meant to perform additional processing on the submitted messages. For example, a user ‘A’ submits messages to M-Hub in the plain text format. This message needs to be translated to the EDIFACT format before depositing into the recipient ‘B’s mail box. This value-added service is done by the adapter. Adapter configuration allows users to set up a value-added service code (java class), along with the required parameters. Codes Management Codes Management enables setting up M-Hub system parameters. It helps the PCS administrator to modify the system parameters.

b. Transwork Administration

Transwork Maps Management This feature allows the Port Administrator to organize the translation maps to be used for message translations by various stakeholders of PCS.

Transwork Lib Management

This feature allows the Port Administrator create/update/delete the EDIFACT libraries for reuse in other translation maps. It allows the Port Administrator to keep the libraries updated while the UN/EDIFACT standards are evolving so that PCS will be able to adapt to the latest information interchange standards.

Page 106: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 106 of 291

c. WSG Administration

Service Registration / De-registration The Port Administrator will be able to register and de-register a Web Service via the WSG Portal. Service Status Query The Port Administrator will be able to query the status of any Web Service registered in the WSG Portal. The following status can be known:

• Service activation status (Disabled / Enabled) • End service URL availability (Online / Offline)

Access WSG Audit Trail The Port Administrator will be able to view the audit trail of Web Service invocation details via the WSG Portal.

The following information can be known:

• Name of service • Owner of service • Date/time service was invoked • Date/time of response

d. Business Process Administration

Process Deployment

This feature allows the Port Administrator to deploy new Process templates and process adapters easily for changed business flows or change in business handling logic. Process Management

This feature allows the Port Administrator to enquire the status of business processes that have been started, allowing the administrator to abort the process or to resume processes that were inactive due to some error conditions.

Page 107: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 107 of 291

5.6.2 COMPANY AND USER ACCOUNT ADMINISTRATION

a. Account Management

The Port Administrator will be able to setup company accounts for the different stakeholders of PCS. It also allows the administrator to enquire the list of registered users, total number of users, total active and total inactive users under a particular account.

b. User Management

The Port Administrator will be able to perform user registration / de-registration / re-registration, user details update and user details enquiry for any userID of the PCS.

c. Password Management

The Administrator will be able to reset the password of a selected UserID and the web admin will send a notification (email / fax) to the user concerned, informing him / her of the temporary password to use and change.

d. Role Management

The Administrator will be able to create/update/delete different roles and role rights matrix required for the PCS application. The role access rights will include Add / Update / Delete for different modules that have been pre-configured for each of the above roles.

e. Code /Directory Management

The Administrator will be able to create / update / delete the reference codes and values used in the PCS. Some of these directories include:

• Vessel Types • Engine Types • Hatch Cover Types • Society Classification Types • Agent Codes • MLO Codes • Terminal Operator Codes • Port Codes • Dock Codes • Purpose of visit / docking Codes • Cargo Types • Payment Modes • Re-enter Reasons Codes • ISPS Levels • Country Codes • Trade Types • Container Types

Page 108: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 108 of 291

• Container Action Indicator Types • Dispatch Modes • ISO Container Codes • Dangerous Cargo Types • Nature of Gas Codes • IMO Class / Division Codes • MLO Class Codes • Customs Site Codes • Container Status Codes • Container Size Codes • IMDG Codes • UNNO Codes • Gang Types • Gang Purpose Codes • Equipment Codes • Berth Codes • Disposal / Arrival Codes • Seal Status Codes • Package Types • Certificate Types • Wagon Types • UNO Codes • HS Class Codes • Local agent of P&I Club • Hull Insurance Company • Propulsion Type • Vessel Owner code • Vessel Chartered code • Vessel arrival code (Ballast, Cargo, Passenger, etc.) • UNECE LOCODE for locations / towns • UNECE LOCODE for subdivisions / states / districts • ICD code • CFS code • Unit of Quantity Code / Unit of measurement code • Equipment type • Berth Location code • Group Code • Commodity code (8 digit HS code) • Commodity code (10 digit HS code) • Nature of Cargo code • Importer/Exporter code • Currency code • Railway station code • Container wagon owning railway code

Page 109: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 109 of 291

5.7 REGISTRATION AND AUTHORIZATION SERVICES In PCS, User Registration done through (NCMS) allows the Stakeholders to perform their customer registration, mailing, reporting and other supporting functions quickly and efficiently. PCS Web Administration is a portal that houses various components for the purpose of performing administrative tasks by the appointed Administrator(s). It has got the following components:

• Customer Management System (CMS) • Authentication & Authorization (ANA)

PCS Customer Management System (CMS) will allow the administrators to carry out the Account/Company, User registration, System Administration & Report and other supporting functions such as Update, Suspense, Re-Instate, De-Registration and Re-Registration. In PCS, Customer Management System (CMS) will reside in an administrative portal together with the other components such as Messaging Hub to support the Customer Management System Administration, Report Generation and Mailing. NCMS will also be integrated with the Network Billing System (NBS) and Authentication and Authorization (ANA) to capture and maintain a repository of information on all registered users. PCS will allow the users from all the ports to submit their registration application online securely. The information will be sent to the designate ports for verification of the details. The officials will be able to login and submit the verification report online. After verification, the user will be registered with PCS and a user ID and password will be sent to the user via email. The following are PCS Customer Management System features:

• Enables creation, updates and enquiries on corporate accounts. • Enables account registration, update, browsing, suspension, reinstatement,

deregistration and re-registration. • Allows user to register and de-register their user IDs, update and browse their

respective data. • Provides authorized staff with basic maintenance facilities such as create,

update, delete, enquiry for the code databases. • Access to functions/features is controlled using ANA where the user access rights

list is maintained. • System Administrators can track all transactions with the system’s audit log. • Automatic housekeeping function that archives expired or obsolete records in

the database. • Generation of operation reports for relevant staff based on pre-specifications

from the database. • Generation of notifications to customers informing them of their user IDs and

passwords. • Provides the option to print selected or all mailing records onto the

correspondent documents, envelopes or labels.

Page 110: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 110 of 291

User Authorization and Authentication (ANA) /SSO In PCS, the ANA User ID Registration Module provides administrative functions for authorized personnel to manage user registration, passwords, roles and access rights for the user id.

User Registration

• Provide functions to register user ID. • Provide functions to enquire password related information, reset password and

reactivate frozen password for a user ID. • Provide functions to enquire about applications/roles entitlement, assign or

change applications and roles entitlement and add new application ID and new role ID for a user ID.

• Provide functions to enquire about roles entitlement assign or change roles assigned to the application ID and add new role to an application ID assigned for a user ID.

• Provide function to create resource and delete resource for the application ID. • Provide the function to add new role rights and remove existing role rights. • Provide the function to enquire about reports on login success, login failure,

active roles, inactive roles, active users, inactive users, reactivate password and reset password.

User Administration In PCS, administrator of specified group has the privileges to control the user access by various methods. The following actions can be done by the Administrator.

1. Password:

• Password validity • Force password change • Modify commencement date • Enquire password • Reactivate the frozen password • Reset Password

2. Applications:

• Enquire Applications/Role Entitlement • Change Application Entitlement • Create New Application and Role • Change Roles Entitlement • Create New Role • Create and delete Resource • Create and delete Role Right

Page 111: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 111 of 291

5.7.1 USER REGISTRATION USE CASES

PCS Stakeholder

User Registration

Web Portal

Account Registration

Corporate Registration

PCS Port Administrator

Web Portal

Web Portal

Web Portal

Web Portal

Web Portal

Port

Web Portal

Web Portal

• Corporate Registration A corporate refers to the stakeholder who can be registered with PCS which will have some accounts and some users that can perform certain functions. The corporate can be registered and deregistered here. Stakeholders can either download the registration form from PCS portal or register online. The filled forms that are downloaded will have to be submitted to the Port that the stakeholder would like to register with the supporting documents. The stakeholders who register online would have to take printout of the filled form and approach the port for registration. The port authority will verify the registration form and approves the registration. The PCS Port Administrator will create accounts for the stakeholder once the port approves the registration. • Account Registration An account refers to an account registered under a corporate. For example, in the Port A’s Finance Department, there can be an account (AccZ) for a customer (CustC) for payment services which in turn may have multiple users. The account registration and de-registration can be done in NCMS by the PCS Port Administrator. The account modification, enquiry and deletion feature is also available. • User Registration A user can be registered to a customer’s account. For example user (userid: usr001) may be registered under the customer account (AccZ). The user will be given certain roles

Page 112: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 112 of 291

and each role will have some functional rights. The user details along with the user’s notification preference will be stored here. This would be done by the administrator based on the user registration forms from the account holder submits to the Port. Refer the Annexure – II, Section 7.2.4 for the Use Case descriptions. 5.8 SINGLE WINDOW WEB APPLICATION PCS Single window web application (PCS Web) will allow the stakeholders to access the centralized repository to view all their transactions with other stakeholders. The users also can track and trace his cargo or container using this application. Through this application PCS provides real time vessel, cargo and container status to the authorized users. PCS web will provide many MIS reports to the Port, stakeholders and the Government. PCS Web also provide the stakeholder web forms to enter and submit the messages or business documents that need to be sent to the other counter parts in the Port Community.

Page 113: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 113 of 291

5.8.1 IMPORT PROCESS The following Use Case diagram depicts the main use cases in the import process:

Register Voyage

Shift Container to CFS

Import Cargo clearance

Discharge Cargo/Container

Request Berth

ShippingAgent

CHA

Bank

Customs/ ControllingAgencies

Port/Terminal

De-stuff Container

Release Cargo

Surveyor

Transporter/CONCOR/Railway

Operator

Stevedore/Tank FarmOperator

The each use case in the import process is further explained in the following sections in detail. The use case descriptions are given as annexure – II, 7.2.5 at the end.

Page 114: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 114 of 291

1. Voyage Registration (UC: Register Voyage)

Shipping Lines or Agent will register the vessels they operate to the port through PCS by submitting the vessel profile. The registration need to be renewed in every six months or if there is any change to the profile. Shipping Agents submits the Expected Time of Arrival (ETA, also called the voyage details) with the port before it arrive the Port. A unique Voyage number (VCN) is given to the vessel for each voyage by the Port. Voyage registration is mandatory for all Vessels to enter the Port.

Before assigning a VCN, Vessel profile should be registered by any of the Indian Ports and Vessel profile should be updated whenever there is a change in the profile or in every 6 months. Vessels are identified with unique IMO code.

Features for Stakeholders

1) SA

Enter the details of the Vessel/Voyage

Request for advance charges bill

Pay the advance charges in the Bank

Send request for IGM Number (For Import)

Send request for Rotation Number (For Export)

Receive the Debit advice from the Bank

2) Port

Verify the Vessel Details submitted by the SA

Register the Vessel details

Update the Vessel details

Assign VCN number to uniquely identify the voyage

Send the advance charges bill to SA, Bank

Receive the Credit advice from the Bank

Receives IGM number

Receives Rotation Number

3) Bank

Send Debit advice to SA/CHA/Importer/Exporter

Send the Credit advice to Port

4) Customs

Receive request for Rotation Number

Page 115: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 115 of 291

Assign Rotation Number

Receive Manifest details

Allocates IGM number

Page 116: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 116 of 291

5) CHA / Importer / Exporter

Request for advance charges bill

Pay the advance charges for cargo related charges in the Bank/Port

Receive the Debit advice from the Bank

Use Case Diagram

Following is the Use Case diagram for Voyage Registration:

Shipping Agent

Bank

Port/ Terminal

Register Vessel

Allot VCN

Assessment of Charges

Pay Advance Charges

Customs

Apply for Rotation Number/ IGM No

Assign Rotation Number / IGM No

CHA / Importer/ Exporter

Refer the Annexure – II, Section 7.2.5: 5.1 for the Use Case details.

Page 117: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 117 of 291

2. Vessel Berthing (UC: Request Berth)

The Shipping Agent files the Import General Manifest (IGM) containing the Cargo Manifest, Container Details along with the Vessel Details. Customs allocates the IGM Number and the same is forwarded to the ports and the Shipping Agent as a message. After the availability of the expected arrival information, the Shipping Agent provides the Berthing Application containing arrival schedule, cargo details and the dimensions of the vessel. The Shipping Agent also obtains the PHO certificate, PQ (Plant Quarantine Certificate), MMD (Mercantile Marine Department) and immigration clearance for the crew and the vessel from the agencies concerned. (Note: All certificates are not mandatory and it will vary from port to port) The Shipping Agent also submits the hazardous cargo declaration along with the special instructions for handling the hazardous cargo. Shipping Agent submits the certificates mentioned above and applies for the entry inward permission to Customs. The permission is forwarded to the Shipping Agent and the Port as an electronic message by the Customs. The allotment of berth is carried out by the Port by viewing all the berthing application. Following are the features covered in Berthing Application Module:

1. Shipping Agent

File the IGM to Customs.

Amend/Cancel IGM to Customs.

Supplement the IGM to Customs.

Submit Berthing Application along with the required documents such as

i. Cargo/Container details

ii. List of hazardous cargo and any other as declared as statute

iii. Hazardous cargo details

iv. Instructions to handle hazardous Cargo

v. Stowage Plan

Inform the vessel arrival details with ETA.

Request for Entry Inward.

Request for PHO, PQ, MMD Certificates.

Request for resources to do the stevedoring activities.

Send Advance Passenger/Crew List.

Request for immigration Permit, NOC.

Page 118: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 118 of 291

2. Customs Authority

Get the IGM particulars.

Allocate IGM No (Rotation Number).

Give permission for entry inward.

3. Port

View Berthing application, Supporting Documents.

View Resource requests.

Allocate berth for the vessel.

Allocate resources to do the stevedoring activities.

4. PHO can

Verify the advance crew list and the documents submitted for free pratique.

Issue free pratique (Health Clearance Certificate).

5. MMD, PQ department

Issue MMD, PQ certificates online.

6. Immigration

View Crew List and the passenger List.

Issue Landing Permit to the crew members.

Issue No Objection certificate.

7. Stevedore

Send request for resources to port.

Receive debit advice from bank

Page 119: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 119 of 291

Use Case Diagram

Following is the Use Case diagram for Vessel Berthing:

Shipping Agent

Port/ Terminal

File/Amend/Supplement IGM

Apply Berth

Grant Entry Inward

Request Regulatory Certificates

Customs

Issue Regulatory Certificates

PHO/Immigration/MMD/PQ

Allot Berth

Allocate Resources

Stevedores

Refer the Annexure – II, Section 7.2.5: 5.2 for the Use Case details.

Page 120: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 120 of 291

3. Cargo/Container Unloading (UC: Discharge Cargo/Container)

The unloading of the cargo takes place as per the IGM. The port may provide the tally sheet of the cargo discharged from the vessel to the shipping agent. The Stevedoring Report is also given to the shipping agent related to the cargo. Features for Stakeholders: 1. SA

Send Bay Plan/Stowage Plan to Port. Apply for entry outward to customs. File supplementary IGM to customs

2. Customs

Customs approve entry outward. Supplementary IGM for excess landed is verified by customs

3. Port / Terminal

Based on bay plan the unloading is done from the vessel. View Entry outward issued by Customs. Prepare Tally Sheet and send the same to SA. Send tally sheet to SA

4. Stevedores

Based on bay plan the unloading is done from the vessel. Receives the bay plan from SA. Sends Tally sheet and stevedoring report to SA.

5. Surveyors

Surveyors prepare the tally sheet and loaded cargo reports, sends to the SA.

Page 121: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 121 of 291

Use Case Diagram

Following is the Use Case diagram for Cargo/Container unloading:

Shipping Agent

Port / Terminal

Send Bay Plan/Stowage Plan

Unload Cargo/Container

Customs

Stevedores

SurveyorsExcess/Short Landed

File Supplement IGM

Refer the Annexure – II, Section 7.2.5: 5.3 for the Use Case details.

Page 122: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 122 of 291

4. Import Cargo Clearance (UC: Import Cargo Clearance)

Imported Cargo will have to be cleared by Customs and other government controlling agencies before released from the port and CFS. Cargo clearance is given by the Customs after verifying the cargo, relevant documents and collecting the duties from the CHA Customs examines the cargo in CFS if it is containerized cargo, examines the cargo in the private location in case of factory stuffed cargo. Customs issues Out-of-charge order for Import cargo.

Features for Stakeholders

1) SA

Intimation of Cargo location to CHA / Importer

Preparing the Delivery Order/BL

Sending the Delivery Order to CHA/Importer

2) CHA / Importer / Exporter

Receive Delivery Order from the SA

Create the Bill of Entry/BL/DO

Send the Bill of Entry to Customs

Receive Out-of-charge order from the Customs

Payment of Port Charges.

3) CFS

Intimation of Cargo location to SA, Customs

Receive Delivery Order / BL from the CHA / Importer

Receive Out-of-charge order from the Customs

4) Customs

Receive Bill of Entry from the CHA

Receive Cargo Location message from the Port / CFS

Examine the import cargo and issues Out-Of-Charge

5) Port

Intimation of Cargo location to SA, Customs

Receive Delivery Order / BL from CHA

View Out-Of-Charge order issued by Customs

Issue Gate Pass report for Delivery of Cargo based on OOC

Page 123: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 123 of 291

Page 124: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 124 of 291

Use Case Diagram

Following is the Use Case diagram for Cargo Clearance:

ShippingAgent

Port /Terminal

Customs

Intimation of Cargo Location

Issue Delivery Order / BL

File Bill of Entry

Customs Out-of-charge

CHA / Importer

CFS

Refer the Annexure – II, Section 7.2.5: 5.4 for the Use Case details.

Page 125: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 125 of 291

5. Container Movements to CFS (UC: Shift Container to CFS)

The CFS operates as the custodian of the cargo and containers while the cargo/ containers are inside the CFS. In case of imports, the containers are moved from the Port area to CFS for de-stuffing and discharge to the Importer. CFS also arranges transportation services for shifting containers from Port area to CFS.

Features for Stakeholders:

1. Container Agent

Request for permission for the movement of containers from Container

Terminal to CFS for import.

Forward advance container list and handling instructions to Container

Terminal, CFS and Transporter.

Receive Gate-out Pass in Container Terminal.

Receive Gate-In Pass in CFS.

2. Port / Terminal Operator

Issue Permission for the movement of Containers from Container Terminal to

CFS.

View Advance container list.

Issue Gate out Permission for the containers moved from container Terminal

to CFS.

Issue Equipment Interchange Report to Transporter.

3. CFS

Forward the Pre-Advice (List of containers moved from Port to CFS).

Issue Gate in Permission for the containers moved From container Terminal to

CFS

View Manifest details online.

View Advance Container List online.

Issue Job Order to Transporter for the containers which should be moved from

Container Terminal.

4. Transporter

Page 126: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 126 of 291

Receive Advance Container List from Shipping Agent/CFS.

Receive Job Order from Container Freight Station.

Receive Gate In Passes from CFS online.

Receive Gate-Out Passes from Container Terminal online.

Receive the Equipment Interchange Report (EIR) from Gate Keeper in

Container Terminal.

5. CHA / Importer

Receive Gate In Passes from CFS.

Receive Gate-Out Passes from Container Terminal

6. Customs

Receive Gate In Passes from CFS.

Receive Gate-Out Passes from Container Terminal

Page 127: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 127 of 291

Use Case Diagram

Following is the use case diagram for Container Movements:

ContainerAgent

Port /Terminal

Transporter

CFS

Gateout port

Request for Containermovement to CFS

Grant Container Movement to CFS

Gate-in CFS

Job Order

CHA / Importer

Customs

Refer the Annexure – II, Section 7.2.5: 5.5 for the Use Case details.

Page 128: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 128 of 291

6. De-Stuffing (UC: De-Stuff Container)

In case of imports, the containers are moved from the Port area to CFS for de-stuffing and discharge to the Importer. The CFS operates as custodian of cargo. The de-stuffing of the containers takes place in the presence of custom officers. The surveyors also monitor de-stuffing. Features for Stakeholder: 1. SA / CA

Request for Resources. Send container load plan for de-stuffing. Request for de-stuffing container Receive the de-stuffing report.

2. CFS/ Port/Terminal Operator

Allocate Resources. Receive the container load plan for de-stuffing. Do de-stuffing in presence of CHA/surveyors. Send the de-stuffing report to SA. Prepare tally sheet with surveyors.

3. Customs

Examine and approves the de-stuffing process.

4. Surveyors

Prepare tally sheet for import cargo.

5. CHA / Importer Request for Resources. Send container load plan for de-stuffing. Request for de-stuffing container Receive the de-stuffing report.

Page 129: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 129 of 291

Use case diagram: Following is the use case diagram for De-stuffing:

ContainerAgent

CFS/Port/ContainerTerminal

Customs

Allocate Resources

Request for Resources

Send De-Stuffing ReportSurveyor

s

De-Stuff Containers

Send Container Load Plan

Request for De-StuffingContainers

CHA / Importer

Refer the Annexure – II, Section 7.2.5: 5.6 for the Use Case details.

Page 130: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 130 of 291

7. Cargo and Container Release (UC: Release Cargo)

After Customs examine the cargo, Importer/CHA can take the cargo/container to their location from the CFS or Port in case of delivery or he can apply for SMTP for taking the cargo/container through Railway. For moving the cargo/container through road, Importer/CHA uses the services of transporter. CFS / Port issues the Gate-Passes for moving/delivery of the Container/Cargo. For SMTP, SA uses the CONCOR/ RAIL OPERATORS to move the consignment from the Port to Importer’s location.

Features for Stakeholders

1. CHA / Importer / SA

Payment of charges for Wharfage, demurrage, stamp duty, octroi etc

Request for Gate-Pass to take the consignment

Issue Job Order to transporter

Receive Gate-Pass from the CFS / Port

Submission of BL/Agent DO/Examination DO

File Import Application with Port

Request for Ingress Permission

2. SA / CA

Send SMTP request to Customs

Receive SMTP from Customs

Approach CONCOR/ RAIL OPERATORS for movement of the Containers

through Rail

File forwarding note with port

Receive Railway out report from Port

Submit BL/Agent DO/Examination DO to CHA

3. CFS

Collect the charges from the CHA

Issue Gate-Pass

4. Port / Terminal Operator

Collect all the charges from the CHA/Importer

Issue Gate-Pass

Issue Railway-out Report to SA

Page 131: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 131 of 291

Issue Egress Permission

5. Transporter

Receive Job Order from the CHA/Importer

Receive forwarding note

Receive the Gate-Passes from the CHA/Importer

Move the consignment to the Importer specified location

6. Customs

Receives SMTP request

Issue SMTP to CHA

Forward SMTP copy to Port

Sends BE on Submission

Sends OOC to Port.

Issues Removal Order

7. CONCOR/ RAIL OPERATORS

Receive Railway Receipt from the Port

Move the Containers to the consignee’s location

Use Cases

Use Case Diagram for Cargo and Container Release is given below:

Page 132: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 132 of 291

Importer/

CHA

Permission for taking thecontainers

CFS

Port /Terminal

Pay charges

Issue Job Order

Transporter

Issue Gate Pass

Permission for Direct Delivery

Customs

SMTP Permit

SA

Issue Railway Receipt

CONCOR /RAILWAY

SIssue Railway-out Receipt

Ingress Permission

Egress Permission

Refer the Annexure – II, Section 7.2.5: 5.7 for the Use Case details.

Page 133: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 133 of 291

5.8.2 EXPORT PROCESS The following Use Case diagram gives the main use cases in the export process:

Register Voyage

Shift Container to Port

Obtain Cargo clearance

Carting Cargo

Request Berth

ShippingAgent

CHA / Exporter

Bank

Port/Terminal

Customs/ ControllingAgencies

stuff Container

Obtain Port Clearance

Trasporter/CONCOR/

Railway Operator

Surveyor

Stevedores

Load Cargo/Container

The each use case in the export process is further explained in detail in the following sections. The use cases common to import and processes like Register Voyage or Request berth are included in the import process use cases section and referenced from this section.

1. Voyage Registration (UC: Register Voyage)

Please refer ‘Import Process Use Cases/Voyage Registration’

Page 134: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 134 of 291

2. Vessel Berthing (UC: Request Berth)

Please refer ‘Import Process Use Cases/Vessel Berthing’

3. Carting Cargo (UC: Carting Cargo)

The cargo is carted to the shed (Port) for consolidation, customs examination and then to load on to the vessel. Shipping Agent requests for the space allocation in the shed for allowing the carting of the cargo. CHA gives the Carting Application. The permission is granted by the Port and the CHA/Exporter is allowed to bring the consignment. The CHA files the Shipping Bill with the Customs and brings the cargo against the individual Shipping bill. The CHA is allowed to bring the cargo in advance for consolidation in the pre-shipment area. The carting application is given by the CHA and the permission is obtained from the Port. On the basis of the permission, the cargo is allowed to enter inside the pre-shipment area. Before the berthing of the vessel, the cargo is allowed to be moved from pre-shipment area to shed. After getting the carting permission, the CHA instructs the Transporter to move the cargo inside the Port. The cargo is taken to the nominated shed as informed to the CHA by the Shipping Agent.

Features for Stakeholders:

1. Shipping Agent

Request the Port to Allocate Space and Carting permission.

Can view the location allocated to Shipping Agent.

Intimate the location allocated to him by Port and the vessel details to CHA.

Intimates the Empty Containers moved to CFS to CFS and Customs.

File the List of ICD Containers moved by CONCOR/ RAIL OPERATORS to the

Terminal Operator.

2. CHA / Exporter

Apply for Carting permission to the Port.

Get the Gate Pass issued by the Port.

Files the Shipping Bill.

Files the Amendment, Supplement to the Shipping Bill to the Customs.

Submit the request to move the Cargo from pre-Shipment area to the Dock.

Gets the movement order issued by the Port to move the Cargo from pre-

Shipment area to the Dock.

Page 135: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 135 of 291

Request the CFS to move the Empty containers to CFS.

Request to bring the Cargo inside the CFS.

View the Gate pass generated by the CFS.

Request to Bring the Factory Stuffed to containers to Port/CFS.

Gets Permission from Port/CFS to bring the FCL containers to the Port/CFS.

Intimates Transporter to move Empty/FCL containers to the CFS.

File Export Application with Port

Payment of Charges for Wharfage, Demurrage, etc.

3. Customs

Gets the Intimation of the Empty containers moved to the CFS.

Gets the Amendment/Supplement Shipping Bill Particulars.

4. Port

View the request for space and carting.

Allocates the Space for the Shipping Agent/CHA/Exporter.

Gives permission for carting the cargo.

View the List of ICD Containers coming by rail.

Gets the Copy of the Shipping Bill.

View the request for the Shed to Shed Movement.

Issues Movement order to move the cargo from Pre-Shipment Area to the

Dock.

Gets the request to bring the Factory stuffed container directly to the

Container Terminal.

Accept LEO, Allowed for Shipment.

Receive Payment of Charges by CHA from Bank.

Accept Mate Receipt

Issue tally sheet to SA

5. CFS

Gets the request for Carting.

Issues Carting Permission to the CHA to bring the Cargo inside the CFS.

Gets Intimation about the Empty containers moved to the CFS.

Issues Gate pass for the Empty Containers to be moved to CFS.

View the request for the Factory stuffed containers to be moved from private

yard to the CFS.

Page 136: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 136 of 291

Grants Gate-In permission for Factory Stuffed Containers.

6. Transporter

Get the Gate Pass from the CHA / Exporter which is issued by the Port

Gets the movement order from the CHA / Exporter issued by the Port to move

the Cargo from pre-Shipment area to the Dock.

Gets intimation from the CHA / Exporter to move Empty/FCL containers to the

CFS.

Use Cases

Following is the Use Case diagram for Carting Cargo:

SA

CFS

Cart General Cargo

CHA /Exporter

Port

Cart Containerized Cargo Customs

Transporter

Carting General Cargo:

Page 137: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 137 of 291

File Shipping Bill

ShippingAgent

Port/Terminal

Request for Space Allocation & Carting

CHA /Exporter

Customs

Issue Permission for Carting

Gate-In Permission for the Port

Request to move Cargo to Dock

Issue movement Order

Transporter

Page 138: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 138 of 291

Carting Containerized Cargo:

ShippingAgent

Port/Termina

l

CHA /Exporter

Customs

CFS

Intimate Moving Empty Containers to CFS

Gate In Permission For Empty Containers

Request for Bringing the cargo to CFS

CFS Gate In Permission

Request to Bring Factory-stuffed Container

File Pre-Advice of ICD Containers

Transporter

Refer the Annexure – II, Section 7.2.5: 5.8 for the Use Case details.

Page 139: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 139 of 291

4. Export Cargo Clearance (UC: Export Cargo Clearance)

Cargo clearance is given by the Customs after verifying the cargo, relevant documents and collecting the duties from the CHA. Customs examines the cargo in CFS if it is containerized cargo, examines the cargo in the private location in case of factory stuffed cargo. Customs issues Let Export Order (LEO) for export cargo after examining the cargo.

Features for Stakeholders

1. SA

Intimation of Cargo location to CHA

2. CHA / Exporter

Send the Shipping Bill to Customs

Receive Let Export Order(LEO) from the Customs

3. CFS

Intimation of Cargo location to SA, Customs

Receive Let Export Order(LEO) from the Customs

4. Customs

Receive Cargo Location message from the Port / CFS

Receive the Shipping Bill from the CHA

Examine the export cargo and issues Let Export Order (LEO)

5. Port / Terminal

Intimation of Cargo location to SA, Customs

View Let Export Order (LEO) issued by Customs

Page 140: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 140 of 291

Use Case Diagram

Following is the Use Case diagram for Cargo Clearance:

ShippingAgent

Port /Terminal

Customs

Intimation of Cargo Location

File SB

CHA / Exporter

Let Export Order (LEO)

CFS

Refer the Annexure – II, Section 7.2.5: 5.4 for the Use Case details.

Page 141: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 141 of 291

5. Stuffing (UC: Stuff Container)

Cargo is brought to the CFS for Customs examination and it is stuffed to the Containers.

The stuffed containers are moved to Port for loading on to the vessel. The CFS operates

as custodian of cargo. The stuffing of the containers takes place in the presence of

custom officers. The surveyors also monitor stuffing.

Features for Stakeholder:

1. SA / CA

Request for Resources. Request for stuffing container. Receive the container load plan after stuffing. Receive the stuffing report.

2. CFS / Port/ Terminal Operator

Allocate Resources. Do stuffing in presence of customs, SA and surveyors. Send the stuffing report to SA. Send container load plan for stuffing. Prepare tally sheet with surveyors.

3. Customs

Examine and approves the stuffing process. 4. Surveyors

Prepare tally sheet for export cargo.

5. CHA / Exporter

Request for Resources. Request for stuffing container. Receive the container load plan after stuffing. Receive the stuffing report

Page 142: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 142 of 291

Use case diagram: Following is the use case diagram for Stuffing:

ContainerAgent

CFS/Port/TerminalOperator

Customs

Stuff Containers

Send Stuffing Report

Allocate Resources

Request for Resources

Surveyors

Request for Stuffing Containers

CHA / Exporter

Refer the Annexure – II, Section 7.2.5: 5.6 for the Use Case details.

Page 143: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 143 of 291

6. Container Movements to Port (UC: Shift Container to Port)

The CFS operates as the custodian of the cargo and containers while the cargo/ containers are inside the CFS. For exports, the cargo is brought to the CFS for examination by Customs and it is stuffed onto the Containers. The stuffed containers are moved to Port for loading on to the vessel. CFS also arranges transportation services for shifting containers from CFS to Port area.

Features for Stakeholders:

1. Container Agent

Request for permission for the movement of containers from CFS to Container

Terminal.

Forward advance container list and handling instructions to Terminal

Operator, CFS and Transporter.

Receive Gate-out Pass in CFS.

Receive Gate-In Pass in Container Terminal.

2. Port / Terminal Operator

Issue Permission from the movement of containers from CFS to container

Terminal.

View Advance container list.

Issue Gate in Permission for the containers moved from CFS to Container

Terminal.

Issue Equipment Interchange Report to Transporter.

3. CFS

Forward the Pre-Advice (List of containers moved from CFS to Port).

Issue Gate out permission for the containers moved from CFS to Container

Terminal.

View Manifest details online.

View Advance Container List online.

Issue Job Order to Transporter for the containers which should be moved to

Container Terminal.

Page 144: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 144 of 291

4. Transporter

Receive Advance Container List from Shipping Agent/CFS.

Receive Job Order from Container Freight Station.

Receive Gate-out Passes from CFS online.

Receive Gate-In Passes from Terminal Operator online.

Receive the Equipment Interchange Report (EIR) from Gate Keeper in

Container Terminal.

5. CHA / Exporter

Receive Gate-out Pass in CFS.

Receive Gate-In Pass in Container Terminal.

6. Customs

Receive Gate-out Pass in CFS.

Receive Gate-In Pass in Container Terminal.

Page 145: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 145 of 291

Use Case Diagram

Following is the use case diagram for Container Movements:

ContainerAgent

Port /Terminal

Transporter

CFS

Gate-out CFS

Request for Containermovement From CFS

Grant Container Movement From CFS

Send Advance Container List

Gate-in Port

Job OrderCHA /Exporter

Customs

Refer the Annexure – II, Section 7.2.5: 5.5 for the Use Case details.

Page 146: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 146 of 291

7. Loading Cargo/Container (UC: Load Cargo/Container)

The loading takes place as per the Loading Sequence and a tally sheet containing loading information is sent to the shipping agent by the port. The surveyor also sends the details. Features for Stakeholders: 1. SA/CA

Send bill of lading to the CHA. Apply for entry outward to customs. Receive bay plan from port. File supplementary EGM to customs

2. Customs

Customs approve entry outward. Supplementary EGM for short shipment is verified by customs.

3. Port / Terminal Operator

Send the bay plan to SA/CA. Verify for port clearance in case of short shipment.

4. Stevedores

Sends the bay plan to SA/CA. Tally sheet and stevedoring report send to SA/CA.

5. Surveyors

Surveyors prepare the tally sheet and loaded cargo reports, sends to the SA.

Page 147: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 147 of 291

Use Cases

Following is the Use Case diagram for Loading Cargo/Container:

Shipping Agent

Port / Terminal

Customs

Stevedores

Surveyors

Apply Entry Outward

Load Cargo/Container

Short Shipment

File Supplement EGM

Refer the Annexure – II, Section 7.2.5: 5.3 for the Use Case details.

Page 148: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 148 of 291

8. Port Clearance (UC: Obtain Port Clearance)

The shipping agent files an application with the customs for port clearance prior to the sailing of the vessel. Port Issues NOC to the Shipping Agent. After the customs clearance, the shipping agent files the EGM. Features: 1. SA

Requests for Port Clearance to customs. Files EGM . Receives the Bay Plan/Stowage plan from port. Pay Final Charges. Issue Mate Receipt

2. Customs Port clearance issued by customs based on Clearance Certificate (NOC)

from Port and other documents submitted by SA.

3. Port Port issues clearance certificate after receiving advance payment towards

services required (NOC). Sends vessel sailing report to customs as soon as the vessel sails. Port verifies the custom port clearance certificate.

4. Banks

Collects the final charges paid by SA.

Page 149: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 149 of 291

Use case diagram:

Shipping Agent

Port / Terminal

Request for Port Clearance

Send Vessel Sailing Report

Request for Shut-out

Send Stowage Plan / Bay Plan

Amendment of Shipping Bill,

Request for Back-to-town

Customs

Filing EGM

Pay Final Bill Charges

Banks

Refer the Annexure – II, Section 7.2.5: 5.9 for the Use Case details.

Page 150: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 150 of 291

5.8.3 FUNCTIONS FOR STAKEHOLDERS

The following are the range of functions available in PCS Web for various stakeholders. The PCS users will log on to PCS web and according to user role and access rights, the use will be able to use various functions listed below:

1. Shipping Agent/Shipping Line • Prepare and submit Vessel profile/Voyage • Submit vessel Expected Time of Arrival/ Vessel’s voyage details • Request for advance charges bill • Pay the advance charges in the Bank/Port • Send request for Rotation Number • Receive the Debit advice from the Bank • File the IGM to Customs. • Amend/Cancel IGM to Customs. • Prepare/ Submit Berthing Application along with Cargo details • Enter Hazardous cargo details • Submit Instructions to handle hazardous Cargo • Inform the vessel arrival details with ETA. • Request for Entry Inward. • Request for PHO, PQ, MMD Certificates. • Request for resources to do the stevedoring activities. • Send Advance Passenger/Crew List. • Request for immigration Permit, NOC. • Send Bay Plan/Stowage Plan to Port • Sends bill of lading to the port. • Apply for entry outward to customs. • Receive bay plan/Stowage Plan from port. • File supplementary IGM to customs • File supplementary EGM to customs • Intimation of Cargo location to CHA • Prepare the Delivery Order • Send the Delivery Order to CHA • Request container movement from Container Terminal to CFS. • Request container movement from CFS to Container Terminal. • Forward advance container list and handling instructions to Terminal Operator,

CFS and Transporter. • Receive Gate-In and Gate-out Pass in CFS. • Receive Gate-In and Gate-out Pass in Container Terminal. • Send container load plan for de-stuffing. • Request for de-stuffing container • Receive the de-stuffing report. • Request for stuffing container. • Receive the container load plan after stuffing. • Receive the stuffing report. • Send SMTP request to Customs • Receive SMTP from Customs • Intimate CONCOR/ RAIL OPERATORS for movement of the Containers through

Rail

Page 151: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 151 of 291

• Receive Railway out report from Port • Request the Port to Allocate Space and Carting permission. • View the location allocated to Shipping Agent. • Intimate the location allocated to him by Port and the vessel details to CHA. • Intimate the Empty Containers moved to CFS to CFS and Customs. • File the List of ICD Containers moved by CONCOR/Rail to the Terminal Operator. • Request for Port Clearance to customs. • File EGM for the new Amended Shipping Bill. • Receive the Stowage plan from port. • View Stuffing and De-stuffing Report. • Issue lien on Cargo. • Request for detention of cargo

2. Port Authority/ Terminal Operator • Verify the Vessel Details submitted by the SA. • Register the Vessel details(In case of Naval Ship) • Update the Vessel details. • Assign VCN number to uniquely identify the voyage. • Confirmation of Vessel Arrival • Send the advance charges bill to SA. • Receive the Credit advice from the Bank. • View Berthing application. • View Resource requests. • Allocate berth for the vessel. • Allocate resources to do the stevedoring activities. • Sends the bay plan to SA. • Intimate Cargo location to SA • Issue Delivery Order to CHA • View Out-Of-Charge order issued by Customs. • Prepare and Send Out-turn Report. • View Let Export Order (LEO) issued by Customs • Issue Permission for the movement of Containers from Port to CFS. • Issue Permission fro the movement of containers from CFS to Port. • View Advance container list. • Issue Gate out Permission for the containers moved From Port to CFS. • Issue Gate in Permission for the containers moved from CFS to Port. • Issue Equipment Interchange Report to Transporter. • Collect all the charges from the CHA/Importer • Excess cargo landing • Issue Gate-Pass. • Prepare and Send the Pendancy report. • Issue Removal Memo to CONCOR/ RAIL OPERATORS. • Issue Railway-out Report to SA • Prepare and send the Export Cargo register to SA • View the request for space and carting. • Allocate the Space for the Shipping Agent. • Give permission for carting the cargo. • Request for Disposal of Cargo • View the List of ICD Containers coming by rail. • Get the Copy of the Shipping Bill. • View the request for the Shed to Shed Movement.

Page 152: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 152 of 291

• Issue Movement order to move the cargo from Pre-Shipment Area to the Dock. • Get the request to bring the Factory stuffed container directly to the Port. • Issue Gate Pass for the FCL containers to move the Port. • Tally/Landing Report • View the custom port clearance certificate. • View Entry Outward • Issue Port Clearance Certificates • Send vessel sailing report to customs.

3. CHA • Receive Delivery Order from the SA • Create the Bill of Entry • Send the Bill of Entry to Customs • Receive Out-of-charge order from the Customs • Receive Let Export Order(LEO) from the Customs for exporting cargo • Payment of charges for Wharfage, demurrage, stamp duty, octroi • Send Request for Gate-Pass to take the consignment • Issue Job Order to transporter • Receive Gate-Pass from the CFS / Port • Apply for Carting permission to the Port. • Get the Gate Pass issued by the Port. • File the Shipping Bill. • File the Amendment, Supplement to the Shipping Bill to the Customs. • Submit the request to move the Cargo from pre-Shipment area to the Dock. • Get the movement order issued by the Port to move the Cargo from pre-

Shipment area to the Dock. • Request the CFS to move the Empty containers to CFS. • Request to bring the Cargo inside the CFS. • View the Gate pass generated by the CFS. • Request to Bring the Factory Stuffed to containers to Port/CFS. • Get Permission from Port/CFS to bring the FCL containers to the Port/CFS. • Intimate Transporter to move Empty/FCL containers to the CFS. • Request for shut out permission to port and customs. • Send Amendment of shipping bill with customs. • Pay final charges.

4. Customs • Receive request for Rotation Number • Assign Rotation Number • Get the IGM particulars. • Allocate IGM No. • Send Bill of Entry details • Get the request for Entry Inward • Give permission for entry inward. • Receive Bill of Entry from the CHA • Receive the Shipping Bill from the CHA • issue Out-Of-Charge • issue Let Export Order (LEO)

Page 153: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 153 of 291

• Approve the stuffing and de-stuffing process. • Issue entry outward. • Detention / Release order • Verify Supplementary EGM for short shipment. • Verify Supplementary IGM for excess landed. • Receive SMTP request • Issues SMTP to CHA • Transshipment of Cargo • Disposal of Cargo • Shut out of Cargo • Get the Intimation of the Empty containers moved to the CFS. • Get the Shipping Bill details. • Get the Amendment/Supplement Shipping Bill Particulars. • Issue Port clearance. • Verify the amendment of shipping bill. • Verify and Approve EGM.

5. Stevedore • View IGM/Advance Container List. • View Bay plan/Stowage Plan of the vessel. • Arrange for the labor gangs, Equipments. • Maintain the tally sheets. • Submit the container/cargo loading report to SA/Port / Importer / Exporter • Submit the Container/Cargo Discharging report to SA/Port / Importer / Exporter.

6. CFS Operator

• Intimate of Cargo location to SA • Receive Out-of-charge order from the Customs • Receive Let Export Order(LEO) from the Customs for exporting cargo • Forward the Pre-Advice (List of containers moved from CFS to Port). • Issue Gate in Permission for the containers moved From container Terminal to CFS • Issue Gate out permission for the containers moved from CFS to Container

Terminal. • View Manifest details online. • View Advance Container List online. • Issue Job Order to Transporter for the containers which should be moved from

Container Terminal. • Allocate Resources. • Receive the container load plan for de-stuffing. • Send the de-stuffing report to SA. • Send the stuffing report to SA. • Send container load plan for stuffing. • Prepare tally sheet with surveyors. • Collect the charges from the CHA • Get the request for Carting. • Issue Carting Permission to the CHA to bring the Cargo inside the CFS.

Page 154: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 154 of 291

• Get Intimation about the Empty containers moved to the CFS. • Issue Gate pass for the Empty Containers to be moved to CFS. • View the request for the Factory stuffed containers to be moved from private

yard to the CFS. • Grant Gate-In permission for Factory Stuffed Containers.

7. Road Transport Operator

• Get Advance Container List from Shipping Agent/CFS. • Get Job Order from Container Freight Station. • Get Gate In and Gate-out Passes from CFS online. • Get Gate-In and Gate-Out Passes from Container Terminal online. • Get the Equipment Interchange Report (EIR) from Gate Keeper in Container

Terminal. • Receive Job Order from the CHA/Importer • Receive the Gate-Passes from the CHA/Importer • Move the consignment to the Importer specified location

8. Rail Transport Operator • Receive Railway Receipt from the Port • Move the Containers to the consignee’s location • Issue Placement Memo. • Get Removal memo. • Forward Train summary to Port, Shipping Agent.

9. PHO • Verify the advance crew list and the documents submitted for free pratique. • Issue free pratique (Health Clearance Certificate). • Issues other Certificates Like de-ratting certificate. • Issues Certificate of Inspection of Medicine, Medical, Stores and Appliances

10. Immigration • View Crew List and the passenger List. • Issue Landing Permit to the crew members. • Issue NOC for Sailing and Berthing of the Vessel.

11. Bank • Collect Port related charges. • Send Debit and Credit advice. • Send the Daily Summary Report.

12. Surveyor

Page 155: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 155 of 291

• Submit/upload the Survey report. • Prepare tally sheet for export and import cargo.

13. Container Agent • Submit SMTP request. • Prepare and issue Delivery Order (DO) / Submit Bill of Lading. • Request Port for Movement of containers in and out from CFS to Container

Terminal. • Check and Review Pendancy Report. • Send Advance container List. • Issue Empty Container Release order • Receive Container stuffing order • Receive Container de-stuffing Order • Container Load Plan

14. Plant Quarantine • Issues Plant quarantine certificate

Page 156: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 156 of 291

6. OTHER NONFUNCTIONAL REQUIREMENTS

6.1 SECURITY REQUIREMENTS In order to maintain the highest levels of security and privacy of the data, the following requirements to be considered:

• Access to the data would be suitably protected through access control

mechanisms providing user-based, group-based and role-based security

• Sensitive data would be stored encrypted

• Communication between data sources and PCS Central database would take

place through secure, encrypted communication channels

• Audit trails would be maintained for any and all changes made to the data in

the central database

• Backup operation on encrypted data, so that there is no pilferage of data

To achieve the above described features, access to the Software and Database has to be strictly controlled and monitored. At a broad level, the security will consist of the following:

• Definition of users / user departments / user levels

• Password security at operating System level and application level

• Policy based security management that provides single sign-on

• The login mechanism based on Directory or Naming services.

• Access control and rights and authorization levels

• Data Encryption at storage level and communication level using PKI techniques

• Provision to digitally sign the documents to ensure secure exchange of

transactions/messages

• Audit trail to store all access to all parts of the data and message transactions

and for reporting security breach

• Protection against virus threats, Intruders, Trojans and other security threats.

Page 157: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 157 of 291

6.2 APPLICATION MANUALS REQUIREMENTS Following User Manuals and Guides for system personnel and end users would be provided in both hard copies and electronic form: For System Administrators and system Personnel:

• Users/ Administration guides for all components and software.

• Administration guide for PCS web application.

For end users:

• PCS User Guide for Port users

• PCS user Guide for Shipping Agent/Lines.

• PCS user Guide for Customs Agents/Importers/Exporters.

• PCS user Guide for General (Other) Users.

Other Documentation:

• PCS Messaging and Interfacing guide The following points would be taken care:

• The manuals would be made available prior to the operational acceptance

testing.

• The documentation would be revised as and when changes take place.

• Two sets of hard copies of manuals would be given to the IPA Project Team

• The electronic copies would be indexed and searchable and will be hosted in

the PCS portal.

• The manuals would be strictly version controlled.

Page 158: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 158 of 291

6.3 PERFORMANCE REQUIREMENTS PCS is the central hub for all the major ports in India and its stakeholders involved in millions of transactions. The performance requirements in order to achieve high performance are: • Data model should be prepared in such a fashion so as to uncover the linkages and

retrieve corresponding data faster. Queries should be processed in fraction of seconds.

• Message exchanges would not take more than few minutes even for the network

bandwidth is as low as 256 kbps or dialup. • Average time for a message (average file size of 32 KB) to reach from sender to

recipient’s mailbox should be 5 to 8 seconds • Bulk import of data from disparate systems should be completed in few minutes. • Data synchronization should be completed in few seconds. • Clustering should be done so as to do a proper load balancing. Load balancing

algorithm should be chosen that can give highest performance. • The system should be scalable so that there should not be a performance issues due

to increase in the transaction volume.

6.4 END USER TRAINING REQUIREMENTS Functional and system administration trainings would be given to system staff, Port IT personnel and trainers to help them to gain a good understanding of the web-centric application development architecture, its implementation and interfaces with the port systems. For end users of the system, orientation programs covering management, message integration, digital certificates, digitally signing of the documents. Following functional training will be imparted to the various user groups:

• Technical training for IPA IT personals drawn from different Ports on PCS

architecture, functionality and administration.

• OAT training for the users involved in the user acceptance tests in all the phases.

• System administration training for IPA DC staff on PCS architecture and system

administration.

Page 159: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 159 of 291

• End user workshop/training for stakeholder users covering message

exchange/integration with PCS, using PCS web application for sending and

tracking the messages, accessing the information in the repository etc at all

major ports.

• Training for the IPA trainers (train the trainer program).

• Knowledge sharing session for IPA system staff at the end of the project

• Refresh sessions for the users for the upgrade/new versions of the application

during warranty period and post warranty support.

6.5 INFRASTRUCTURE REQUIREMENTS The Infrastructure requirements and the DR management Plan will be submitted separately as mentioned in the project deliverables in the contract.

Page 160: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 160 of 291

Page 161: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 161 of 291

7. ANNEXURE 7.1 ANNEXURE I – POINTS OF DISCUSSION The Points discussed with the Port officials and other stakeholder representatives during the requirement study:

S No Stakeholder Points Discussed 1 Shipping line/

Shipping Agent

Vessel profile submission Voyage registration Self-assessment of charges Berthing Application Hazardous cargo declaration & handling

instructions Request for Resources to port Registration with CFS Request for space allocation in CFS Stowage Plan/Bay Plan Advance Container List Import/Export Advance List Import/Export Confirmation List General Manifest CFS Nomination Request Container/Empty Container movement

Request Container Stuffing/ De-stuffing Request Container Load Plan Delivery Order Excess/short landed cargo/container

handling Container location log Mate Receipt Empty/stuffed Container Gate-In Request Application for Carting (Break bulk)

Page 162: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 162 of 291

2 Port Operational/ System

staff Vessel profile registration Allotment of VCN/VIA Berthing Confirmation Allocation of resources Confirmation of Advance Charges Vessel Movement Report Short fall of resources Intimation Permission for bringing resources Billing for Vessel/Port/Container charges Tally Sheet for Cargo/Container

discharged Excess/short landed cargo/containers

handling Tally Report for the Vessel Container gate-in/out Permission Container Stuffing/de-stuffing Permission for container movements Container Challans Cargo/Container Release Order Allocation of Resources in CFS Containers send by rail Yard Plan approval Appointment of Surveyors Permission to surveyors for taking

photographs Payment for Surveyors Reports sent to other stakeholders Notifications and intimations

3 CHA/Importer/Exporter

Receiving DO from SA Intimation of location for bringing

Cargo/Container from SA Filing Import/export declaration with

Customs Payment of Customs duty Arranging for the Customs examination Getting clearance from Customs Paying Octroi, stamp duty, wharfage &

demurrage charges Arranging for transport Filing carting application for break bulk

cargo Taking physical possession of the cargo Getting goods registration done Filing Import/Export application with port

Page 163: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 163 of 291

4 Terminal Operator

Managing the receipt, storage, loading,

discharge and delivery of containers/cargo within the terminal.

Collection of Terminal Handling charges Collection of Dwell time/Storage charges Collection of Vessel Services and related

charges

5 Stevedores

Maintaining the tally sheets Reporting the container/cargo loading

details to Port, SA Reporting the container/cargo

discharging Request to Port for supply of labor and

equipment.

6 CFS operator

Stuffing and de-stuffing activity management

Issuance of Job order to transporter Moving containers from port to CFS Receiving movement/ Stuffing plan from

SA Preparation and submission of Container

Loading Plan Container availability status Billing & receiving handling charges from

CHA/Importer Pre-advice list of exporters Issuance of gate-pass Handling damaged/Reefer containers Reports sent to other stakeholders Notifications and intimations

7 CONCOR/ RAIL

OPERATORS Endorsing Transshipment permit Moving containers from one location to

another Placement memo to the Port Container movement list to the Railways. Issuing Railway Receipt (RR) to Shipping

Agent. Submission of container condition report Train summary to the Shipping agent Train-tracking facility Billing the trading partners

Page 164: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 164 of 291

8 Surveyor

Sending Cargo/ Container/ Equipment

Damage Survey Reports Sending Refrigerated container report Invoicing for the charges to port Monitoring the stevedoring activities Coordinating stuffing/de-stuffing Tally report on loading/discharging. Request for Identity card and permission

to take photos Reports sent to other stakeholders

9 Transporter

Receiving Container Challans Moving container from private Yard to

CFS Sending Cargo/container movement

information to SA Receiving Vessel Intimation, advance

Container List, Yard Plan & D.O Billing for the services Payment for the services Moves Non-container cargo

10 Bank

Confirmation of the self assessment

charges Collecting service charges on behalf of

Port, Shipping Agent, CFS, CHA etc. and credits their accounts.

Credit Advice/Debit Advice Daily DD Summary from Port to Bank Debit Advice to the Shipping

Agent/stakeholder Internet banking facility provided to ports ePayment gateway support

Page 165: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 165 of 291

11 Customs

Send Details with respect to the Vessel to port

Sends Cargo manifest and container details to port

Allotment/Cancellation of IGM Number for the Vessel

Acknowledgement for IGM / SMTP. Granting Inward/Outward entry for Vessel Rotation number allotment & Cancellation Amendment of Entry Out ward report on

request Granting Port Clearance Cargo Movement Approval Transshipment Approval Acknowledgement for Transshipment

request De-stuffing order of the Containers Stoppage of the Containers Container Stuffing reports to port Issuance of import/ Export Permits Collection of duties Enforcement of provisions of the Customs

12 Immigration Application for the immigration certificate

for the Crewmembers/ Vessel operators Issuance of certificates

13 PHO Issuance of Heath Inspection Certificate

Issuance of Certificate of Inspection for Medicine, Medical, Stores and Appliances.

Issuance of PARTIQUE Certificate. Issuance of De-ratting Exemption

Certificate.

14 Container Agent Sends SMTP request. Prepare and issue Delivery Order (DO) /

Submit Bill of Lading. Request Port for Movement of containers in

and out from CFS to Container Terminal. Check and Review Pendency Report. Send Advance container List. Issue Empty Container Release order Container stuffing order Prepares Container Load Plan issue Carting Permission for moving in

container to pre-shipment area

15 Plant Quarantine Issue Plant Quarantine certificates

Page 166: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 166 of 291

7.2 ANNEXURE II – USE CASE DESCRIPTIONS The detailed description of the use cases mentioned in the Section 5, Specific Requirements are given in the following sub-sections.

7.2.1 MESSAGE EXCHANGE USE CASES DESCRIPTIONS 1.1 Send / Receive Message

Use Case Send / Receive Message

Actors • All PCS stakeholders will send / receive messages

Description This use case describes the flow of sending / receiving

messages from M-HUB Server using MHX.

Trigger Nil

Pre-Condition Messaging Profile must be setup in MHX

Post-Condition Nil

Normal Flow

Generate the script

1. Load the MHX Client

2. Go to Request -> New -> Send Request option

3. Enter the File Name [Mandatory]

4. Enter the Content Type [Mandatory]

5. Enter the Notification [Choice]

6. Enter the Content ID [Optional]

7. Enter the Recipient ID [Mandatory]

8. Enter the Recipient Type [Choice]

9. Enter the distribution list / Nickname file [Choice]

Sending Message via MHX

1. View script before sending to verify

2. Submit OK button

3. Go to Run -> Run Script file to send the messages

4. Task Completed Message is shown

Page 167: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 167 of 291

Receiving message via MHX

1. Load the MHX Client

2. Generate the script to receive the message

3. View script before retrieving to verify

4. Submit OK button

5. Go to Run -> Run Script file to retrieve the messages

6. Task Completed Message is shown

Alternate Flow 1. Deploy a scheduler to call the MHX client periodically

Exceptions Exceptional flow #1 – Validation Errors

1. The validation errors are thrown by the system if there is

incomplete or inappropriate information entered.

2. The validation errors are rectified by the user and the

application is submitted again.

Exceptional flow #1 – Exception encountered during

runtime

1. The exception is thrown while running the script, if there

are errors encountered.

2. Rectify the error and re-execute the script for sending /

receiving messages

Page 168: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 168 of 291

1.2 Mail Management

Use Case Mail Management

Actors • The authorized PCS stakeholders will be able to view the

message header information and delete the messages

in the inbox.

Description This use case describes the mail management functions (e.g

viewing inbox, viewing message details, deleting message,

archiving message, etc.) that can be performed by the

authorized users on the M-Hub Server.

Trigger Nil

Pre-Condition The PCS Stakeholder should be authorized to use M-Hub

server.

Post-Condition Nil

Normal Flow

Viewing the Inbox

1. Login to the M-Hub Portal

2. From the Menu -> Select Mail Management -> Inbox

3. Enter the Search criteria information and click ok

4. The table displays the Search Results Page

5. This use case ends.

Viewing the Message Details

1. Login to the M-Hub Portal

2. From the Menu -> Select Mail Management -> Inbox

3. Enter the Search criteria information and click ok

4. The table displays the Search Results Page

5. Click the message Id of the message to view the

message details

6. The message details including the senderId, MessageId,

ContentID, subject, submission date, etc will be

Page 169: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 169 of 291

displayed

7. This use case ends.

Deleting the Inbox Messages

1. Login to the M-Hub Portal

2. From the Menu -> Select Mail Management -> Inbox

3. Enter the Search criteria information and click ok

4. The table displays the Search Results Page

5. Click the checkbox corresponding to the S.No of the

message to be deleted and click Delete.

6. The selected message is deleted.

7. This use case ends.

Viewing the Archive

1. Login to the M-Hub Portal

2. From the Menu -> Select Mail Management -> Archive

3. M-Hub displays the search criteria page

4. Enter the Search criteria information and click ok

5. The table displays the Search Results Page

6. This use case ends.

Restore the Archive Messages

1. Login to the M-Hub Portal

2. From the Menu -> Select Mail Management -> Archive

3. M-Hub displays the search criteria page

4. Enter the Search criteria information and click ok

5. The table displays the Search Results Page

6. Click the checkbox corresponding to the S.No of the

message to be restored and click Ok.

7. The selected message is restored.

8. This use case ends.

Page 170: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 170 of 291

Viewing the Outbound

1. Login to the M-Hub Portal

2. From the Menu -> Select Mail Management ->

Outbound

3. M-Hub displays the search criteria page

4. Enter the Search criteria information and click ok

5. The table displays the Search Results Page

6. This use case ends.

View the Long-term Archive Messages

1. Login to the M-Hub Portal

2. From the Menu -> Select Mail Management -> Long

Term Archive

3. M-Hub displays the search criteria page

4. Enter the Search criteria information and click ok

5. The table displays the Search Results Page

6. This use case ends.

Restore the Archive Messages

1. Login to the M-Hub Portal

2. From the Menu -> Select Mail Management -> Long

Term Archive

3. M-Hub displays the search criteria page

4. Enter the Search criteria information and click ok

5. The table displays the Search Results Page

6. Click the checkbox corresponding to the S.No of the

message to be restored and click Ok.

7. The selected message is restored.

8. This use case ends.

Page 171: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 171 of 291

Alternate Flow Nil

Exceptions Exceptional flow #1 – Validation Errors

1. The validation errors are thrown by the system if there is

incomplete or inappropriate information entered.

2. The validation errors are rectified by the user and the

request is sent again by the user.

Page 172: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 172 of 291

7.2.2 WEB SERVICE USE CASES DESCRIPTIONS 2.1 Publish Web Services

Use Case Publish Web Services

Actors • All PCS stakeholders technically capable of publishing

Web Services.

• PCS Business modules who wish to expose the services as

a Web Service.

Description This use case describes the publishing of web services with

PCS via the WSG.

Trigger -

Pre-Condition • Stakeholder or PCS business module has WSDL file for

each Web Service it wishes to publish.

• Each Web Service to be publish is compliant with WS-I

Basic Profile 1.0

Post-Condition -

Normal Flow 1. Stakeholder provides or PCS business module develops

a WSDL file and passes it to the Port Administrator, for

each Web Service he wishes to publish for external

parties’ consumption.

2. Port Administrator logs in to WSG Portal and registers

stakeholder’s Web Service as a producer service.

3. If there is error in the WSDL file given, exception flow #1 is

executed.

4. The expected functionalities are now registered with the

gateway as a Web Service each for external systems

consumption.

5. This use case ends.

Alternate Flow -

Exceptions Exception flow #1 – Error in WDSL file

1. An error will be reported to the Port Administrator on the

screen.

Page 173: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 173 of 291

2. Port Administrator reverts to the stakeholder or PCS

development team concerned via offline means to

obtain the correct WSDL file.

Assumptions -

Notes and Issues -

Page 174: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 174 of 291

2.2 Consume Web Services

Use Case Consume Web Services

Actors • PCS stakeholders with systems ready to consume Web

Services exposed by other stakeholders or PCS-specific

Web Services.

• PCS business modules which need to consume external

Web Services as part of business processing.

Description This use case describes the consuming of published web

services by PCS stakeholders’ systems or internal business

modules.

Trigger -

Pre-Condition • Web Service to be consumed already successfully

registered as a service and published in WSG.

• Published Web Service is not disabled for invocation.

Post-Condition -

Normal Flow Actor: PCS Stakeholder

1. Stakeholder downloads WSDL from WSG Portal and

performs integration with their internal systems.

2. The stakeholder system creates the appropriate SOAP

request, invokes the Web Service and obtains the

expected SOAP response.

3. If there is an exception in invoking the Web Service,

exception flow #1 is executed.

4. The stakeholder system proceeds to process the SOAP

response for its own internal usage.

5. This use case for PCS Stakeholder ends.

Actor: PCS Business Modules

1. PCS development team creates a client jar file based

on the registered Web Service to invoke using the WSG

Portal.

2. Development team downloads jar and integrates

business module to invoke client jar API for calling the

Page 175: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 175 of 291

Web Service published. The invocation uses the T3

protocol for calling the web service.

3. The WSG performs a protocol transformation from T3 to

HTTP(S) when the invocation reaches it.

4. The WSG also generates a SOAP request, adds the

appropriate parameters to the request and sends the

SOAP request over HTTP(S) to the target system.

5. If there is an exception in invoking the Web Service,

exception flow #1 is executed.

6. A SOAP response is sent back to WSG by the external

system; the WSG extracts the contents of the response

for returning the results. A protocol transformation is also

carried out from HTTP(S) to T3.

7. If there is an exception in processing the SOAP

Response, exception flow #1 is executed.

8. The extracted results are sent to the business module by

the WSG, where the module takes the values for further

processing.

This use case for PCS Business Module ends

Alternate Flow -

Exceptions Exception flow #1 – Error in invoking Web Service

1. A notification email will be sent to the configured

account of the stakeholder’s or the development team.

2. The stakeholder or PCS development team examines

the error that was reported, correct errors (if any) and

calls the Web Service again.

Assumptions Actor: PCS Stakeholder

• PCS stakeholder is capable of performing their own

integration with the WSDL downloaded; they should be

capable of changing their systems to create the

appropriate SOAP requests as per the WSDL contents.

• PCS stakeholder is also capable of handling the SOAP

response that are sent back after invoking the Web

Service.

Page 176: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 176 of 291

Notes and Issues -

Page 177: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 177 of 291

2.3 Service Registration / De-Registration

Use Case Service Registration / De-Registration

Actors • PCS Port Administrator with administrator rights to WSG.

Description This use case describes the registration and de-registration

of Web Services by the Port Administrator over the WSG

portal.

Trigger -

Pre-Condition • Port Administrator has been assigned the access rights

of a WSG Portal Administrator via NCMS.

Post-Condition -

Normal Flow

Service Registration

1. Port Administrator logs in to WSG Portal and is granted

access to manage the Service Registration / De-

registration.

2. Port Administrator proceeds to register the service of a

PCS stakeholder published Web Service by assigning a

producer account to it.

3. Port Administrator uploads the WSDL file of the

stakeholder, sets up security policy and completes the

registration process.

Note: Security policy covers basic configurable options

of whether HTTPs and/or Digital Signature are required.

4. This use case ends for Service Registration.

Service De-registration

1. Port Administrator logs in to WSG Portal and is granted

access to manage the Service Registration / De-

registration.

2. Port Administrator proceeds to search for the service of

the stakeholder to de-register.

3. WSG Portal responds by displaying the list of services

that matches the name searched.

Page 178: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 178 of 291

4. Port Administrator proceeds to select the Web Service

and clicks the de-register button.

5. The service is no longer appears in the list registered

service after it is successfully de-registered.

6. This use case ends.

Alternate Flow -

Exceptions -

Assumptions -

Notes and Issues -

Page 179: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 179 of 291

2.4 Service Status Query

Use Case Service Status Query

Actors • PCS Port Administrator with administrator rights to WSG.

Description This use case describes the feature for the Port Administrator

to query the status of registered Web Services.

Trigger -

Pre-Condition • Port Administrator has been assigned the access rights

of a WSG Portal Administrator via NCMS.

Post-Condition -

Normal Flow 1. Port Administrator logs in to WSG Portal and is granted

access to query the service status of registered Web

Services.

2. Port Administrator proceeds to search for the service he

/ she is interested to know.

3. WSG Portal responds by displaying the list of services

that matches the name searched.

4. The page will display whether the service is Disabled /

Enabled and also if the end service URL is online or

offline (i.e. service host not available).

5. This use case ends for Service Status Query.

Alternate Flow -

Exceptions -

Assumptions -

Notes and Issues This service status query facility in the WSG Portal will not be

able to test whether a Web Service is up and running or if it

is producing the correct response expected.

The End Service URL status is simply an indication of whether

the host pointed to by the target URL is online or offline.

Page 180: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 180 of 291

2.5 Access Audit Trial

Use Case Access Audit Trial

Actors • PCS Port Administrator with administrator rights to WSG.

Description This use case describes the feature for the Port Administrator

to view the audit trial of web services that were handled by

the WSG.

Trigger -

Pre-Condition • Port Administrator has been assigned the access rights

of a WSG Portal Administrator via NCMS.

Post-Condition -

Normal Flow 1. Port Administrator logs in to WSG Portal and is granted

access to view the audit trial of registered Web Services.

2. WSG Portal responds by displaying the list of details of

services that were handled by the WSG.

3. Details of web services in the audit trial include

information on name of service, owner of service,

date/time service was invoked and date/time response

was obtained.

4. This use case ends for Access Audit Trial.

Alternate Flow -

Exceptions -

Assumptions -

Notes and Issues -

Page 181: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 181 of 291

7.2.3 PAYMENT SERVICES USE CASES DESCRIPTIONS 3.1 Credit Card Payment

Use Case Credit Card Payment

Actors All stakeholders having financial transactions with port.

Description This use case describes the payment of charges by

stakeholders via credit card payment.

Trigger Payment of Advance Charges and Dues Payment for Port

and related services.

Pre-Condition • The interface from PCS to the Credit Card Payment

Gateway vendor is already established.

• Port specific list of banks of stakeholders are supported

by PCS payment services.

Post-Condition -

Normal Flow 1. Stakeholder opts to make payment for their charges

via Credit Card payment when prompted by the

PCS.

2. Stakeholder fills in their credit card details (name,

card number, expiry date, MCC) on the payment

web page and clicks Submit button.

3. PCS establishes a link to the Credit Card Payment

Gateway to verify the details of the agent.

4. If there the verification of credit card details fail,

exception flow #1 is executed.

5. Once the details are verified correct, the debit will

be transacted successfully and PCS will display a

payment successful page to the stakeholder.

6. This use case ends.

Alternate Flow -

Exceptions Exception flow #1 – Credit Card Details not valid

1. An error will be reported to the agent on the PCS

screen telling him the credit card details entered

Page 182: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 182 of 291

cannot be validated.

2. PCS stops the transaction from progressing further by

redirecting the agent to the initial payment page.

Assumptions -

Notes and Issues -

Page 183: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 183 of 291

3.2 Internet Banking Payment

Use Case Internet Banking Payment

Actors All stakeholders having financial transactions with port

Description This use case describes the payment of charges by

stakeholders via internet banking.

Trigger • Payment of Advance Charges

• Dues Payment for Port and related services.

Pre-Condition • The interface from PCS to the e-Banking Payment

Gateway vendor is already established.

• Port specific list of banks of stakeholders are supported

by PCS payment services.

Post-Condition -

Normal Flow 1. Stakeholder opts to make payment for their charges via

Internet Banking when prompted by the PCS.

2. Stakeholder selects in their choice of bank, enters the

bank account number, account type on the payment

web page and clicks Submit button.

3. PCS establishes a link to the e-Banking Payment

Gateway to verify the details of the agent.

4. If the verification of bank details fails, exception flow #1

is executed.

5. Once the details are verified correct, the debit will be

transacted successfully and PCS will display a payment

successful page to the stakeholder.

6. This use case ends.

Alternate Flow -

Exceptions Exception flow #1 – Bank Details not valid

1. An error will be reported to the stakeholder on the PCS

screen telling him the bank details entered cannot be

validated. (Failed transaction).

2. PCS stops the transaction from progressing further by

redirecting the agent to the initial payment page.

3. Stakeholder may process the payment against the

Page 184: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 184 of 291

failed transaction; normal flow #3 is executed.

Assumptions -

Notes and Issues Port specific list of banks should be prepared and annexed.

Page 185: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 185 of 291

3.3 Payment through Port Deposit Account Use Case Payment through Port Deposit Account

Actors All stakeholders having financial transactions with port.

Description This use case describes the payment of charges by Shipping

Agents and Customs House Agents through their deposit

accounts established with the ports.

Trigger • Payment of Advance Charges

• Dues Payment for Port and related services

Pre-Condition • The interface from PCS to the respective Port Financial

System is already established.

• Port Financial System are able to formulate and send

update messages to PCS for balance replenishment

update.

Post-Condition -

Normal Flow

Credit transaction

1. Stakeholder deposits money into their respective ports

account.

2. Bank sends credit advice message to Port

3. Port Financial System is updated with the new balance

amount, formulates and sends a message to

stakeholder through PCS about the updated account.

4. This use case ends.

Debit transaction

1. Stakeholder opts to make payment for their charges via

their port deposit account when prompted by the PCS.

2. PCS displays the account details (balance) to the

stakeholder and stakeholder clicks the Submit button to

initiate the debit transaction.

3. If there the account does not enough funds, exception

flow #1 is executed.

Page 186: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 186 of 291

4. Else, the amount will be debited from the stakeholder’s

account maintained in PCS and PCS will display a

payment successful page to the stakeholder.

5. At the end of each day, PCS establishes a link to the Port

Financial System to update balances of affected agent

accounts with the latest sum.

6. If the link to update the Port Financial System fails,

exception flow #2 is executed.

7. This use case ends.

Alternate Flow -

Exceptions Exception flow #1 – Account balance insufficient

1. An error will be reported to the stakeholder on the PCS

screen telling him the balance is not enough for debit.

2. PCS stops the transaction from progressing further by

redirecting the stakeholder to the initial payment page.

Exception flow #2 – Update to Port Financial System fail

1. An email notification will be sent to the Port

Administrator.

2. PCS will retry the sending of updates to the Port

Financial System again.

Assumptions -

Notes and Issues -

Page 187: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 187 of 291

7.2.4 REGISTRATION SERVICE USE CASES DESCRIPTIONS 4.1 Corporate Registration

Use Case Corporate Registration

Actors • PCS stakeholder

• Port

• PCS Port Administrator

Description This use case describes the Corporate registration process

for the stakeholders.

Trigger Nil

Pre-Condition Nil

Post-Condition Nil

Normal Flow 1. The stakeholder representative submits the Corporate

registration form to the Port

2. The Port will verify the details and give approval or

rejection based on the evaluation.

3. PCS Port Administrator creates the corporate ID for the

stakeholder

4. The notification is sent to the Corporate representative

of the application status

Alternate Flow Alternate flow #1 – Validation Errors

1. The validation errors are thrown by the system if there is

incomplete or inappropriate information entered.

2. The validation errors are rectified by the user and the

application is submitted again.

Alternate flow #1 – Application is rejected

1. A notification is sent to the user if his application is

rejected by the Port.

2. The user can retrieve his application and make the

necessary amendments to submit the application

again.

3. The application will be re-submitted and sent for

Page 188: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 188 of 291

evaluation.

Page 189: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 189 of 291

4.2 Account Registration

Use Case Account Registration

Actors • PCS stakeholders

• Port

• PCS Port Administrator

Description This use case describes the Account registration process for

stakeholders after/along with the corporate registration.

Trigger Nil

Pre-Condition Nil

Post-Condition Nil

Normal Flow 1. The corporate representative opens an account under

the corporate registered in PCS. The account can be

used to later register users who can transact business /

services using the account.

2. The application is sent to Port for verification.

3. The Port will verify the details and give approval or

rejection based on the evaluation.

4. PCS Administrator will create the account ID for the

corporate and notifies the stakeholder of the

application status

Alternate Flow Alternate flow #1 – Validation Errors

3. The validation errors are thrown by the system if there is

incomplete or inappropriate information entered.

4. The validation errors are rectified by the user and the

application is submitted again.

Alternate flow #1 – Application is rejected

4. A notification is sent to the user if his application is

rejected.

5. The user can retrieve his application and make the

necessary amendments to submit the application

again.

6. The application will be re-submitted and sent for

evaluation.

Page 190: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 190 of 291

4.3 User Registration

Use Case User Registration

Actors • PCS stakeholder

• PCS Port Administrator

Description This use case describes the user registration process.

Trigger Nil

Pre-Condition Nil

Post-Condition Nil

Normal Flow 1. The User either under the Corporate Account or as an

individual registers himself in PCS. The user ID, name,

password and other personal information are entered in

the system and the proof of identity is scanned and

attached.

2. The PCS Administrator will verify the details and creates

the user Ids.

3. The notification is sent to the Corporate of the

application status

Alternate Flow Alternate flow #1 – Validation Errors

5. The validation errors are thrown by the system if there is

incomplete or inappropriate information entered.

6. The validation errors are rectified by the user and the

application is submitted again.

Alternate flow #1 – Application is rejected

7. A notification is sent to the user if his application is

rejected.

8. The user can retrieve his application and make the

necessary amendments to submit the application

again.

9. The application will be re-submitted and sent for

evaluation.

Page 191: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 191 of 291

7.2.5 IMPORT & EXPORT USE CASES DESCRIPTIONS

5.1. Voyage Registration

5.1.1 Register Vessel

Use Case Register Vessel

Actors Shipping Agent

Port

Description To register the Vessel profile with Port

Trigger SA provides the details of the Vessel to the Port

Pre-Condition The vessel is calling any of the Indian Ports for First Time,SA

should be registered with the specific Port

Post-Condition Any changes occur in the vessel profile to be amended or

every six months the same to updated

Normal Flow 1. SA sends VESPRO message to PCS or selects the

Vessel Profile page

2. SA enters the IMO code and proceeds for further

data entry.For the first voyage of any vessel at that

Port , SA should select IMO code from PCS portal

and proceds for amendment if any or submit the

details

3. System checks if the profile already exist by

checking the IMO code, if IMO code exist, the

details of vessel profile is displayed for amendment

if any or the use case ends

4. SA enters all the details of the Vessel and submits

the details

5. A Vessel profile message is generated and the

same is sent to Ports internal system or the staging

database as the case may be

6. Port opens the Vessel Profile page of their internal

system or PCS and verifies the same against the

manual document whenever the vessel visit the

Page 192: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 192 of 291

Port, if the details are correct

7. Confirms the Vessel registration by sending a

message to PCS or clicking on the Confirm. In case

there are any amendments, the same is updated

and the amended details are sent to PCS or online

amendment is done by the Port official only.

Alternate Flow 1. Port officer verifies all the supporting documents

submitted by SA for the Vessel registration

2. Port officer selects the Vessel Profile page and

enters the details of the Vessel

3. Port officer confirms the registration and sends the confirmation if the supporting documents are okay or a message is sent to PCS from Port internal system

4. SA receives approval alert / Views the registered

Vessel Profile

Exceptions -

Assumptions -

Notes and Issues Marine Dept. insist on hard copy of Tonnage Certificate for verification.On Behalf of the port, Pilot verifies the documents submitted by the Shipping Agent and confirms through port internal system.

Page 193: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 193 of 291

5.1.2 Allot VCN

Use Case Allot VCN

Actors Shipping Agent

Port

Description To register the voyage of a vessel to a port.

Whenever a vessel arrives to the Port, to uniquely identify

the voyage Vessel Call Number (VCN), a unique number is

given to the voyage

Trigger Vessel heading to a port.

Pre-Condition Vessel profile registration should be done and Ports

advance payment is done in case of JNPT Port

Post-Condition -

Normal Flow 1. SA opens the Voyage entry page

2. SA enters Voyage details and click on submit / SA

sends CALINF message to PCS

3. System checks for certain parameters like ETA and

ETD of vessel, in case of error Use case ends

4. GRT and NRT , SBT (oil tankers) of the vessel are

checked from the vessel profile and in case of error

Use case ends with request to amend he vessel

profile and submit the documentary proof.

5. Foreign and coastal flag is Marked

6. Port officer receives and verifies the Voyage details

entered by the SA and the Port Internal system

generates a unique number VCN and sends to PCS

using CALINV message

7. SA views the VCN allotted.

Alternate Flow 1. Port officer opens the Voyage entry page of Ports

internal system or PCS

2. Port officer enters the Voyage details given by the

SA in the internal system or PCS

3. If the details are entered through PCS, PCS sends

the CALINF message to the concerned port.

Page 194: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 194 of 291

4. Port officer assigns the VCN or PCS generates the

VCN and communicates (CALINV) the same to the

port.

5. SA views the VCN

Exceptions

Assumptions

Notes and Issues -

Page 195: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 195 of 291

5.1.3 Assessment of Charges

Use Case Assessment of charges

Actors Shipping Agent

Port

CHA / Importer / Exporter / Stevedore

Description This is used by the SA,CHA and Port. SA assesses the

amount to be paid towards Vessel related, Container

related , Stevedore related . The CHA/Importer/Exporter

assess for Cargo related charges

Trigger Voyage registration

Pre-Condition Voyage registration should be done.

Post-Condition Bill for the advance charges is raised and SA can receive/

view the same. CONFCHARGE message is sent to SA.

Normal Flow 1. If SA uses the web form to assess payment

charges, the following steps are executed.

If SA uses the message upload channel to assess

payment charges, Alternate Flow #1 is executed.

2. SA opens the Advance Charges Bill page.

3. SA enters the Voyage Number and select the

service (Marine – Port , Vessel , Stevedore ,

Container, Cargo )

4. PCS makes a call to the concerned Port Internal

System for calculation of payment charges via 2

modes:

• Mode 1 - Message transfer between PCS &

Port Internal System

• Mode 2 - Web Service call to Port Internal

System

5. Mode 1

5.1 PCS prepares a VESSELCHG message based

on web form inputs and sends it to the Port

Internal System for assessment charges

calculation

Page 196: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 196 of 291

5.2 Port Internal System calculates the charge

amount and sends a CONFCHARGE message

back to PCS.

5.3 SA verifies charges due.

6. Mode 2:

6.1 PCS formulates a SOAP request to make a

Web Service call to the Port Internal System.

a. Port Internal System processes SOAP request,

calculates the charge amount and

formulates a SOAP response back to PCS.

6.3 PCS processes the SOAP response and

displays the charges due to the SA.

Alternate Flow 1. SA sends the VESSELCHG message via his internal

system to Port through PCS.

2. PCS forwards message to designated Port Internal

System.

3. Port Internal System calculates the charge amount

and sends a CONFCHARGE message back to PCS.

4. PCS relates message back to SA internal system, which

processes the message for internal display to the SA,

on the charges due.

Exceptions

Assumptions Port should have their internal system and able to

generate the bills for advance charges for sending to PCS

system.

Port who wants to use the Web Service mode of

connecting with the PCS should be capable of exposing

their charges calculation as a Web Service, and is able to

process SOAP request and response accordingly.

Notes and Issues Few ports are neither using the VESSELCHG message nor

sending the request for assessment of charges.

Page 197: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 197 of 291

Page 198: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 198 of 291

5.1.4 Pay advance charges

Use Case Pay advance charges

Actors Shipping Agent

Port

Bank

CHA / Exporter / CA

Description To pay the Marine (Vessel, Port) , Container , Stevedore

related and Cargo related charges by SA , CHA , Exporter

Trigger 1. Unique ID /Bill no. for a particular payment is generated

by the system along with the amount. SA sends request to

Port to generate a bill for the advance charges.

Pre-Condition Voyage registration should be done

Post-Condition Bill is raised and sent to the SA.

Normal Flow 1. SA receives unique ID along with payment details

after completing self assessment form / Receives

CONFCHARGE message as acknowledgement to

VESSELCHG message

2. Port forwards the bill details to Bank(SA selects the

Payment Bank ,the system sends a string to the

bank against which selected bank accepts

payment)

3. SA instructs the Bank to debit his account

4. Bank debits SA’s account and credits the Port’s

account

5. Bank sends a Debit advice(DEBADV) to SA (Port

officer opens the PCS page to view if the payment

is made, PCS sends message to Port ( Credit advice

/ Debit advice)

6. Bank sends the Credit advice (CREADV message)

to Port

Alternate Flow 1. SA receives the bill / CONFCHARGE message from

the Port.

2. SA pays the bill at the Bank

Page 199: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 199 of 291

3. Bank debits SA’s account and credits the Port’s

account

4. Bank sends a Debit advice (DEBADV) to SA

5. Bank sends the Credit advice (CREADV) to Port

Exceptions • In case if SA maintains an PD account with Port, Port

has to debit the account and generates the receipt

and sends it to the PCS

Assumptions • In the alternate Flow, there should be tri-party

agreement between SA, Port and Bank.

• Payment should be done through Bank

Notes and Issues -

Page 200: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 200 of 291

5.1.5 Apply for IGM Number

Use Case Apply for IGM Number

Actors Shipping Agent

Customs

Port

Description For all vessels entering Indian waters , SA applies for IGM

number

Trigger SA sends IGM to the customs through the PCS

Pre-Condition All Vessels entering Indian water

Post-Condition --

Normal Flow 1. SA sends the IGM to Customs through PCS

2. Customs receives the IGM from the SA through PCS

3. Customs verifies the IGM

4. Customs send IGM along with IGM number to SA

and Port

Alternate Flow 1. SA submits the IGM to Customs

2. Customs sends the IGM details to Port through PCS

Exceptions --

Assumptions Interaction between Customs and PCS should be

available and Customs has to accept the messages from

the PCS

Notes and Issues Interface between Customs and PCS has to be finalized in

order to run this normal flow.

Page 201: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 201 of 291

5.1.6 Apply for Rotation Number

Use Case Apply Rotation number

Actors Shipping Agent

Customs

Port

Description For all Vessels leaving Indian Water SA applies for Rotation

number.

Trigger

Pre-Condition For all Vessels leaving Indian Water

Post-Condition --

Normal Flow 5. SA sends the Application For rotation Number to

Customs through PCS

6. Customs receives the Application from the SA

through PCS

7. Customs verifies the Application

Alternate Flow 1. SA applies the Rotation Number with Customs

2. Customs sends the Rotation Number details to Port

through PCS

Exceptions --

Assumptions Interaction between Customs and PCS should be

available and Customs has to accept the messages from

the PCS

Notes and Issues Interface between Customs and PCS has to be finalized in

order to run this normal flow.

Page 202: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 202 of 291

5.1.7 Assign IGM Number (Import) / Rotation number (Export)

Use Case Assign IGM / Rotation number

Actors Shipping Agent / Importer / Exporter

Port

Customs

Description Customs to assigns IGM Number (Import) / Rotation

number (Export) and SA to view the IGM / Rotation

number

Trigger SA files IGM with Customs / SA files a request for Rotation

Number

Pre-Condition IGM should be filed by the SA / SA files a request for

Rotation Number (A_ROTN_NO message)

Post-Condition --

Normal Flow 1. Customs assigns an IGM number (for Import) /

Rotation number (for export)

2. Customs sends the IGM number (IGMNO

message)/ Rotation number (ROTN_NO message)

to the PCS

3. SA and Port receives / views the IGM number /

Rotation Number through PCS from the Customs

Alternate Flow --

Exceptions

Assumptions -

Notes and Issues -

Page 203: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 203 of 291

5.2. Vessel Berthing

5.2.1 File IGM

Use Case File IGM

Actors Shipping Agent

Customs

Port

Description To File/Amend/Cancel Import General Manifest (IGM)

details to Customs in order to get Customs clearance for

import.

Trigger

Pre-Condition Vessel Profile registration and voyage registration needs to

be completed.

Post-Condition IGM No is allocated by Customs.

Normal Flow 1. Shipping Agent sends the IGM Details to customs via

PCS.

2. Shipping Agent sends the required documents along

with IGM.

3. PCS forwards the IGM Details to Customs.

4. Customs verifies the IGM particulars and allocates

the IGM number.

5. PCS sends the IGM No to the Shipping Agent once it

is received from Customs.

Alternate Flow Cancellation of IGM No

1. Once the IGM is filed, Shipping agent can either

amend the IGM particulars or cancels the IGM.

2. If the Shipping agent cancels the IGM, Customs

send it to the port via PCS. Port acknowledges it with

Vessel arrival message.

3. If the vessel is not arrived yet, Customs cancels the

IGM No and send the message to PCS and PCS

forwards it to the Shipping Agent.

Page 204: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 204 of 291

Amendment/Supplement

4. Shipping Agent Amends/supplements IGM Details.

5. Shipping Agent sends the required documents along

with the amended/supplemented IGM.

6. PCS sends the amended/supplemented IGM Details

to Customs.

Exceptions While in the process of filing IGM, the system is down for

some reason, Shipping Agent will not be able to perform this

function.

Assumptions All the supporting documents are uploaded with IGM.

Interaction between Customs and PCS should be available

and Customs has to accept the messages from the PCS

Notes and Issues For the Charted vessels, Importer/exporter can file the IGM.

Customs Message formats are used to file the IGM.

Page 205: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 205 of 291

5.2.2 Apply Berth

Use Case Apply Berth

Actors Shipping Agent

Port

Description After the availability of ETA information, Shipping Agent files

the Berthing Application.

Trigger

Pre-Condition Vessel Profile registration and voyage registration needs to

be completed.

Post-Condition Application status needs to be shown to the user.

Normal Flow 1. Shipping Agent sends Vessel details and ETA Details

along with Berthing Application.

2. Shipping Agent sends the required documents along

with the berthing application.

3. PCS sends the Berth Details to Port and vessel

movement message will be sent to the SA.

Alternate Flow 1. Shipping Agent cancels Berthing Application or

amends ETA.

2. PCS forwards cancel request or New ETA to Port and

vessel movement message will be sent to the SA.

Exceptions While in the process of submitting Berthing Application,

the system is down for some reason, Shipping Agent will

not be able to perform this function.

Assumptions Port user’s roles are well defined.

Notes and Issues In case the SA requests for shifting of vessel from one berth

to other berth, the Same Vessel Movement Message is used

for this.

BERMAN is used to file Berthing application. PAXLIST is used

to send the Crew/Passenger list along with Berthing

Application.

Page 206: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 206 of 291

5.2.3 Request Regulatory Certificates

Use Case Request Regulatory Certificates

Actors Shipping Agent

PHO

PQD

MMD

Immigration

Description To get the Entry inward permission from Customs, Shipping

Agent should submit the regulatory certificates from MMD,

PQ, PHO, and Immigration.

Trigger Berthing Application

Pre-Condition Vessel Profile registration and voyage registration needs to

be completed.

Post-Condition Application status need to shown to the user.

Normal Flow 1. Shipping Agent sends the required documents to the

regulatory body to which he needs to submit the

certificates.

2. PCS forwards the request to the particular regulatory

body.

Alternate Flow --

Exceptions While in the process of submitting Regulatory Certificates

Application, the system is down for some reason, Shipping

Agent will not be able to perform this function.

Assumptions All the supporting documents need to be uploaded with

the Request.

Regulatory Bodies are configured in PCS.

Notes and Issues -

Page 207: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 207 of 291

5.2.4 Issue Regulatory Certificates

Use Case Issue Regulatory Certificates

Actors Shipping Agent

PHO

PQD

MMD

Immigration

Port

Customs

Description To issue Regulatory Certificates from different regulatory

authorities. Shipping Agent should get the regulatory

certificates from MMD, PQ, PHO, and Immigration to get the

Entry inward permission from Customs.

Trigger Application for regulatory certificates from MMD, PQ, PHO,

and Immigration.

Pre-Condition Vessel Profile registration and voyage registration needs to

be completed.

Request from Shipping Agent for the regulatory certificates

Post-Condition Certificates need to be saved in PCS and same should be

forwarded to User.

Normal Flow 1. Regulatory body receives the documents and

request submitted by the Shipping agent.

2. Regulatory Body checks all documents submitted by

Shipping Agent.

3. Regulatory Body issues the Certificate.

4. PCS forwards the certificate to the Shipping Agent.

Alternate Flow 1. Regulatory body receives the documents and

request submitted by the Shipping agent.

2. Regulatory Body checks all documents submitted by

Shipping Agent.

3. Regulatory Body rejects the request.

4. PCS forwards the status and the reason for the

rejection to the Shipping Agent.

Page 208: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 208 of 291

Exceptions While in the process of submitting Regulatory Certificates

Application, the system is down for some reason,

Regulatory Bodies will not be able to perform this

function.

Assumptions Regulatory Bodies are configured in PCS.

Notes and Issues In some cases(Ex: if the vessel is not coming from Yellow

Fever area), radio free pratique is issued by PHO.

Page 209: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 209 of 291

5.2.5 Allot Berth

Use Case Allot Berth

Actors Port

Shipping Agent

Description Port to allot berth. After the availability of ETA & ETD

Trigger Shipping Agent filing the Berthing Application.

Pre-Condition Vessel Profile registration and voyage registration needs to

be completed.

Berths needs to be configured in PCS.

Post-Condition -

Normal Flow 1. Port receives and verifies the documents submitted

along with Berthing application by the Shipping

Agent.

2. Port allots the berth and enters the berthing details.

3. PCS Forwards the Berthing details to the Shipping

Agent.

Alternate Flow --

Exceptions While in the process of allotting Berthing Application, the

system is down for some reason, Port will not be able to

perform this function.

Assumptions Port user’s roles are well defined. The Berthing Application is

forwarded to the traffic Manager as per the role.

Notes and Issues Allotment of berth is done by the Port’s Internal system and

sends the VESDEP message to SA through PCS.

Can withdraw the Operational group meeting/Berthing

Meeting process.

Page 210: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 210 of 291

5.2.6 Allocate Resources

Use Case Allocate Resources

Actors All Stakeholders

Description The Port allots resources after stakeholder request for the

resources like Crane, Gang etc.

Trigger The request from all stakeholders.

Pre-Condition Vessel Profile registration and voyage registration needs to

be completed.

Post-Condition -

Normal Flow 1. Port receives and checks the request submitted by

the different stakeholders for the resources.

2. Port allocates the resources and sends the resource

allocation details.

3. PCS Forwards the resource allocation details to the

stakeholders.

Alternate Flow -

Exceptions While in the process of allocating resources, the system is

down for some reason, Port will not be able to perform

this function.

Assumptions Provided the resources are handled by Port. If the resources

are handled by Dock level Working group, the request will

be forwarded to the Dock level Working group.

If the Stevedoring activities are done by private stevedores,

Stevedores will submit the Gang Indent to the Port/Dock

level Working group.

Notes and Issues -

Page 211: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 211 of 291

5.2.7 Grant Entry Inward

Use Case Grant Entry Inward

Actors Customs

Shipping Agent

Port

Description To issue the entry inward for the vessel.

Trigger As per the request for Entry Inward from Shipping Agent

Pre-Condition Vessel Profile registration and voyage registration needs to

be completed.

Berth is allocated.

Entry Inward request is submitted by Shipping Agent.

Vessel is berthed.

Post-Condition Entry inward need to be passed to Port.

Normal Flow 1. Customs views the request submitted by the

Shipping Agent for the Entry Inward.

2. Customs checks the Regulatory Body certificates

sent along with the request by Shipping Agent.

3. Customs verifies the certificates

4. Customs Grants Entry Inward.

5. PCS Forwards the Entry Inward permission to the

Shipping Agent, Port.

Alternate Flow 1. Customs views the request submitted by the

Shipping Agent for the Entry Inward.

2. Customs checks the Regulatory Body certificates

sent along with the request by Shipping Agent.

3. Customs verifies the certificates

4. Customs rejects Entry Inward.

5. PCS Forwards the Entry Inward Rejection details to

the Shipping Agent, Port.

Page 212: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 212 of 291

Exceptions While in the process of grant entry Inward, the system is

down for some reason, Customs will not be able to

perform this function.

Assumptions Shipping Agent submits all the No objection certificates from

regulatory bodies to the Customs and there should be

message exchange between Customs and PCS.

Notes and Issues Customs Message Format is used.

Page 213: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 213 of 291

5.3. Cargo/Container Loading & Unloading

5.3.1 Send Bay Plan / Stowage Plan

Use Case Send Bay Plan / Stowage Plan

Actors Shipping Agent

Port

Stevedores

Description Bay Plan / Stowage Plan is sent by SA to port and vice

versa to perform the unloading and loading operations

Trigger

Pre-Condition IGM for Import

Bay Plan and tally sheet for export

Post-Condition -

Normal Flow 1. SA sends the bay plan (BAPLIE) to port.

2. BAPLIE message is received by port.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 214: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 214 of 291

5.3.2 Unload Cargo/Container

Use Case Unload Cargo/Container

Actors Shipping Agent

Port

Stevedores

Description Cargo/Container are unloaded from vessel

Trigger Vessel Berthing

Pre-Condition IGM, Bay Plan and Advance Container List

Post-Condition Tally sheet and Stevedoring report

Normal Flow 1. SA sends COPRAR message to port.

2. The unloading of the cargo takes place as per the

IGM.

3. The port sends tally sheet to the shipping agent.

4. The Stevedoring Report is sent to SA.

5. The shipping agent views the Stevedoring Report

and Tally report / OTR.

6. COARRI message received by SA.

7. Port sends landed tally report / OTR message to

customs.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 215: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 215 of 291

5.3.3 Send Bill of Lading / DO

Use Case Send Bill of Lading / DO

Actors Shipping Agent

Port

CHA / Importer

Description SA sends the Bill of Lading / DO to the CHA / Importer to

Port

Trigger

Pre-Condition BL with BE

Post-Condition -

Normal Flow 1. SA sends BL (BILLOFL) / DO to CHA / Importer

2. CHA surrenders BL while taking forwarding/delivery

from the Port

3. The three documents are verified BL, BE and IGM,

before the BL is taken into custody and

forwarding is given.

4. Charges are collected prior to delivery.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues CHA surrenders BL to Port after he receive the same from

SA. SA releases BL on payment of his charges and stamp

duty , which is paid only after customs CHA files the BE so

that Custom duty etc an be known based on which stamp

duty is calculated

Page 216: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 216 of 291

5.3.4 Excess Landing Cargo

Use Case Excess landing of cargo

Actors

Container Agent / SA

Customs

Port

Surveyor

Tank Form Operator

Description Surveyor declares excess landing in case of Dry Bulk cargo

Tank firm Operator declares excess landing in case of

Liquid Bulk cargo

Container Operator declares excess landing in case of

Container which helps SA to file for additional entries to

IGM

Trigger When the cargo is unloaded and verified against delivery

and Tally Sheet and physical status

Pre-Condition

Post-Condition

Normal Flow 1 Tally is recorded by port / Surveyor

2 Delivery of cargo takes place

3 Port verifies physical position /lying of cargo

4 Compares the delivery , tally , manifested , lying and

declares

5 Excess cargo , Short Landed ,Landed but missing

6. Port sends the Excess landed cargo message to

customs.

7. COARRI message received by SA.

Alternate Flow 1. Port generates excess landed cargo details.

2. SA, Customs receives excess landed cargo details.

Page 217: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 217 of 291

Exceptions

Assumptions -

Notes and Issues -

Page 218: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 218 of 291

5.3.5 Filing Supplementary / Additional IGM

Use Case Filing Supplementary IGM

Actors Shipping Agent

Customs

Port

Description Supplementary / Additional IGM is filed by SA.

Note: Additional IGM is to be submitted after IGM has

been finalized and Entry Inward has been granted.

Prior to the above 2 conditions, Supplementary IGM is to

be submitted.

Trigger When the cargo is excess landed.

Pre-Condition -

Post-Condition -

Normal Flow 1. SA files for the Supplementary / Additional IGM to

the customs.

2. Customs approves and send the IGM to Port.

3. Port receives the supplementary / additional IGM

from the Customs.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 219: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 219 of 291

5.3.6 Apply for Entry Outward

Use Case Apply for entry outward

Actors Shipping Agent

Port

Customs

Description This use case is used by SA to request customs for the entry

outward.

Trigger To commence loading operations.

Pre-Condition Export Cargo register received from port (optional)

Post-Condition -

Normal Flow 1. SA applies for entry outward to customs.

2. Customs approves/sends the entry outward for the

sailing of vessel.

3. SA, Port receives the approval of entry outward

message.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 220: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 220 of 291

5.3.7 Load Cargo/Container

Use Case Load Cargo/Container

Actors Shipping Agent

Port

Stevedores

Description After getting Entry Outward permission loading of cargo

take place in to the vessel

Trigger After Entry Outward approval is received

Pre-Condition Bay Plan and Advance Container List

Post-Condition Tally sheet and Stevedoring report

Normal Flow 1. The loading of the cargo takes place as per the

export sequence list.

2. The port sends the tally sheet to the shipping agent

of the cargo loaded in to the vessel.

3. The Stevedoring Report is send to SA.

4. SA views the details of stevedores report.

5. SA sends COPRAR message to port.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 221: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 221 of 291

5.3.8 Short Shipment

Use Case Short Shipment

Actors Shipping Agent

Customs

Port

CHA

Stevedore

Description Port notifies the short shipment of cargo to SA and

Customs

Trigger When the cargo is not loaded in to the vessel

Pre-Condition Tally Sheet and SB or Mate Receipt

Post-Condition Amended SB, New SB / Back to Town

Normal Flow 1. SA files for the amendment of the SB, to move the

cargo in to another vessel, with a fresh SB.

2. Customs approve the request and forwards to Port.

3. SA receives the notification.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 222: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 222 of 291

5.3.9 Filing EGM

Use Case Filing EGM

Actors Shipping Agent

Customs

Port

Description EGM will be filed, after the clearance is issued by port and

customs.

Trigger After vessel sails.

Pre-Condition Mate Receipt (MR) is issued to Port by SA and Port forwards

MR to CHA and CHA submits MR to SA

Post-Condition -

Normal Flow 1. SA files EGM with Customs

2. Customs approves the EGM.

3. SA views the approval.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues Some of the Ports are receiving the EGM .

Page 223: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 223 of 291

5.4. Import Cargo Clearance & Export Cargo Clearance

5.4.1 Intimate Cargo Location

Use Case Intimate Cargo Location

Actors Shipping Agent

Container Agent

Port

CFS

Customs

CHA

Terminal Operator

Description This use case is used for sending cargo location

information to various stakeholders

Trigger Port / CFS informs to the SA about the location of the

cargo in the Port / CFS

Pre-Condition Cargo locations should be entered in the System

Post-Condition --

Normal Flow 1. CFS / Port sends the location of the

cargo/container (LOCATION message) to PCS

2. SA searches for the cargo /container in PCS

3. SA, Customs receive the location details in the yard

4. CHA can also view the Container Location after

searching for the cargo /container

Alternate Flow -

Exceptions

Assumptions Cargo track and trace is maintained through web services

provided by the each Port. Each Port should maintain

cargo location data OR

Instead of web services , Port may provide message to PCS as and when the cargo location is changed

Notes and Issues Some times movement of the containers are done within

the Port / Yard premises, in this case instead of sending

message every time to PCS, it’s suggestible to store the

location details in the Port internal system and provide a

Page 224: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 224 of 291

web service to PCS

5.4.2 Issue Agent Delivery Order

Use Case Issue Agent Delivery Order

Actors Shipping Agent

CHA

CFS

Port

Description For sending and receiving the B/L or / and Delivery Order

Trigger Cargo/container discharge or cargo location intimation

by CFS / Port

Pre-Condition Cargo location should be known to the CHA

Post-Condition --

Normal Flow 1. SA creates a delivery order

2. SA sends the delivery order (BILLOFL message) to

CHA

3. CHA receives the Delivery Order

4. CFS / Port views the Delivery Order ; CFS / Port

receives the BILLOFL message from the CHA

Alternate Flow --

Exceptions

Assumptions --

Notes and Issues --

Page 225: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 225 of 291

5.4.3 File Bill of Entry

Use Case File Bill of Entry

Actors Customs

CHA

Port

Terminal Operator

CFS

Description Once Bill of Entry is filed by the CHA to the Customs, it can

be viewed by the Port and CFS or BE message is sent to

Port / Terminal Operator / CFS

Trigger

Pre-Condition IGM should have been filed.

Customs should be intimated about the cargo/container

location and CHA submits the Delivery Order / Bill of

Lading.

Post-Condition Bill of Entry is viewed / received by the Port / CFS

Normal Flow 1. CHA files Bill of Entry at Customs service center

2. Customs sends (BE message) the Bill of Entry details

to PCS

3. PCS forwards the message to Port / Terminal

Operator / CFS

Alternate Flow 1. CHA creates Bill of Entry

2. CHA submits the Bill of Entry to Customs through

PCS

3. Customs receives the Bill of Entry from PCS

4. Customs sends Bill of Entry details to PCS

5. Port or CFS or Terminal Operator views /receives Bill

of Entry or Delivery Order

Exceptions

Assumptions -

Notes and Issues For alternate flow, there should be message exchange

Page 226: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 226 of 291

between PCS and Customs

Page 227: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 227 of 291

5.4.4 Issue Customs Out-Of-Charge

Use Case Issue Customs Out-Of-Charge

Actors Customs

CHA / Importer

Port

Terminal Operator

CFS

Description Customs issues Out-Of-charge order after examining the

import cargo and sends the Out-Of-Charge through EDI

message to PCS. PCS receives the EDI message and sends

to the respective CHA, CFS , Port.

Trigger

Pre-Condition Customs should receive the Bill of Entry from the CHA and

Cargo Location should be known to the Customs from the

Terminal Operator or CFS.

Post-Condition Cargo / Container can be moved to Importer’s location

Normal Flow 1. Customs physically examines the import cargo in

the CFS / Terminal

2. The SA / CHA pays the shifting charges to the Port/

Terminal Operator, if the container needs to be

shifted for Customs examination.

3. Customs issues Out-Of-Charge order

4. CFS, Port, Terminal Operator and CHA receives the

Out-Of-Charge order (OOC message)

Alternate Flow -

Exceptions

Assumptions -

Notes and Issues -

Page 228: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 228 of 291

5.4.5 Issue Let Export Order (LEO)

Use Case Issue Let Export Order (LEO)

Actors Customs

CHA / Exporter

Port

CFS

Description Customs issues Let Export Order (LEO) after examining the

export cargo and sends the Let Export Order (LEO) through

EDI message to PCS. PCS receives the EDI message and

sends to the respective CHA / Exporter, CFS / Port

Trigger

Pre-Condition CHA / Exporter should file the Shipping Bill to Customs

Post-Condition Stuffing can be done after getting the Let Export Order

Or Customs issues LEO after stuffing

Normal Flow 1. CHA / Exporter moves the cargo to the CFS / Port

2. Customs physically examines the cargo in the CFS/

Port

3. Customs issues Let Export Order(LEO)

4. CFS/ Port/ CHA/Exporter receives the Let Export

Order (LEO) (STUFFREP message)

Alternate Flow --

Exceptions

Assumptions -

Notes and Issues The use case ‘Cargo Clearance’ covers the cargo

clearance for both import and export cargo.

Filing of shipping Bill is not covered in the Use Case as it is

covered in ‘Carting Cargo’ Use Case

Page 229: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 229 of 291

5.5. Container Movement to CFS & Container Movements to Port

5.5.1. Request for Container Movement to/From CFS

Use Case Request for Container Movement to/From CFS

Actors Terminal Operator / Port

Shipping Agent

Container Agent

Transporter

CFS

Description To request the permission to move the containers from CFS

to Terminal Operator and also from Terminal Operator to

CFS

Trigger

Pre-Condition IGM details should be available with CFS.

The Shipping Bill and LEO formalities must have been

completed.

Post-Condition -

Normal Flow 1. Container Agent sends the details about the

containers to be moved to/From CFS along with the

request.

2. PCS Forwards the request to Terminal Operator /

Port.

Alternate Flow 1. The CFS pre-advises the containers details to the port / TO through PCS.

2. CFS sends the container to port / terminal.

Exceptions

Assumptions IGM details are available with CFS.

Notes and Issues -

Page 230: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 230 of 291

5.5.2. Grant Container Movement to/From CFS

Use Case Grant Container Movement to/From CFS

Actors Terminal Operator / Port

Shipping Agent

Container Agent

Customs

CFS

Description To grant permission to move the containers from CFS to

Container Terminal and from Container Terminal to CFS

Trigger

Pre-Condition IGM details should be available with Container Terminal.

Post-Condition -

Normal Flow 2. Terminal Operator views the request entered by

Container Agent for Container movement.

3. Terminal Operator grants Container Movement.

4. PCS Forwards the grant to the Container Agent, CFS.

Alternate Flow

2. Terminal Operator views the request entered by

Container Agent for Container movement.

3. Terminal Operator Rejects Container Movement.

4. PCS Forwards the rejection details to the Container

Agent, CFS.

Exceptions

Assumptions IGM details are available with Container Terminal.

Notes and Issues -

Page 231: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 231 of 291

5.5.3. Send Advance Container List

Use Case Send Advance Container List

Actors Terminal Operator

Shipping Agent / CA

CFS

Transporter

Description To submit the advance container list to be moved either to

CFS / ICD / Factories or to Container Terminal

Trigger Containers are stuffed and ready to move to CFS/Container

Terminal.

Pre-Condition 1. For import containers the IGM has to be filed by SA with Customs.

2. For export containers the SB and LEO formalities need to be completed.

Post-Condition -

Normal Flow 1. Shipping Agent /CA sends the Advance Container

List.

2. PCS Forwards the Advance container List to the

recipients.

Alternate Flow -

Exceptions

Assumptions -

Notes and Issues -

Page 232: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 232 of 291

5.5.4. Job Order

Use Case Job Order

Actors CFS

Shipping Agent

Transporter

Terminal Operator

Description To issue the Job order to the Transporter for the movement

of containers to and from Container Terminal to CFS on

receipt of Advance container List from Shipping Agent.

Trigger Receipt of Advance container List from Shipping Agent.

Pre-Condition

Post-Condition Job Order should be passed to all default recipients.

Normal Flow 1. CFS Selects the Container List and Transporter details.

2. CFS Issues Job Order.

3. PCS Forwards the Job Order to Transporter.

Alternate Flow

Exceptions

Assumptions CFS is authorized by the Shipping Agent.

Notes and Issues -

Page 233: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 233 of 291

5.5.5. Gate-In/Gate-out Port

Use Case Gate-In/Gate-out Port

Actors Terminal Operator

Transporter

Shipping Agent / CA

Port

Customs

CFS

CHA

Description This use case is for the Port/Terminal Operator to issue the

Gate-In/Gate-Out Passes.

Trigger

Pre-Condition 1. For import containers Import Advance List is submitted to Terminal.

2. Export containers are pre-advised.

Post-Condition -

Normal Flow

1. Terminal Operator selects the Container and

Transporter details.

2. Terminal Operator Issues Gate Pass. In case of the

Cargo, Port issues the Gate Pass.

3. PCS Forwards the Gate Pass to CHA and CHA

forwards gave pass to Transporter and Shipping

Agent.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues In Some Cases EIR is issued in place of Gate Pass.

Page 234: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 234 of 291

5.5.6. Gate-In/Gate-out CFS

Use Case Gate-In/Gate-out CFS

Actors CFS

Transporter

Shipping Agent

CHA

Port

Description This use case to issue the CFS Gate-In/Gate-Out Passes

Trigger On receipt of Advance container List from Shipping Agent,

CFS Prepares Yard plan and issues Gate Pass.

Pre-Condition

Post-Condition -

Normal Flow 1. CFS Selects the Container and Transporter details.

2. CFS Issues Gate Pass.

3. PCS Forwards the Gate Pass to Transporter, Shipping

Agent/ CHA.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 235: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 235 of 291

5.6. Stuffing & De-stuffing

5.6.1. Request for resources (for Stuffing / De-stuffing)

Use Case Request for resources for stuffing/ De-stuffing

Actors Shipping Agent / CA

CFS

CHA / Importer / Exporter

Description SA/CA requests for the resources for stuffing and de-

stuffing of containers

Trigger When containers are taken inside CFS for loading and

unloading the cargo.

Pre-Condition The container is moved to CFS.

Post-Condition -

Normal Flow • Shipping Agents informs about the container cargo

to CFS

• Request resources for Stuffing and De-Stuffing,

based on Export and Import(RESREQ).

Alternate Flow

Exceptions

Assumptions SA will provide resources (equipment) in case of deficiency

of resources from CFS. CFS will provide labors.

Notes and Issues Stuffing/ De stuffing may be done within Dock

Page 236: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 236 of 291

5.6.2. Allocate resources (for stuffing / De-stuffing)

Use Case Allocate resources for stuffing / de-stuffing

Actors Shipping Agent /CA

CFS

CHA / Importer / Exporter

Description The CFS allots the resources for stuffing and de-stuffing of

containers as requested by SA

Trigger When containers are taken inside CFS for loading and

unloading the cargo.

Pre-Condition 1. The container is moved to CFS.

2. Request for Resources from SA

Post-Condition 1. Acknowledgement received from CFS

Normal Flow 1. CFS accepts the request / CFS receives RESREQ

message .

2. Allocates the resources based on stuffing and de-

stuffing(ALORES).

3. SA can view / receive resources allocation details

(ALORES).

Alternate Flow

Exceptions

Assumptions

Notes and Issues SA will provide resources (equipment) in case of deficiency

of resources from CFS. CFS will provide labors.

Page 237: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 237 of 291

5.6.3. Send Container Load Plan (CLP)

Use Case Send Container Load Plan(CLP)

Actors Shipping Agent / CA

CFS

CHA

Port

Description Container Load Plan is mainly used for de-stuffing and

after the stuffing process is done.

Trigger When containers are taken inside CFS for loading and

unloading the cargo.

Pre-Condition Import

1. The container is moved to CFS.

2. CLP to be handed over to CFS by SA

Export

1. The container is moved to CFS.

2. SA/CA sends CLP to CFS for LCL container

Post-Condition

Normal Flow 1. CFS Allocates Resources.

2. SA/CA sends the CLP to CFS.

3. Receives CLP for de-stuffing and for LCL Stuffing.

Alternate Flow

Exceptions

Notes and Issues SA will provide resources (equipment) in case of deficiency

of resources from CFS. CFS will provide labors.

Page 238: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 238 of 291

5.6.4. Requests De-Stuffing Container

Use Case Requests De-Stuffing Container

Actors Shipping Agent

Container Agent

CFS

CHA

Customs

Port

Description SA / CA requests CFS / Port to carry de-stuffing of the

container

Trigger When containers are taken inside CFS / Port for unloading

the cargo.

Pre-Condition SA / CA sends CLP to CFS / Port for container to unload

Post-Condition --

Normal Flow 1. SA / CA agent requests the CFS / Port to do de-

stuffing (COSTOR).

2. CFS / Port sends the reply of the request to SA / CA.

3. SA / CA views the reply (approval / rejection).

Alternate Flow

Exceptions

Notes and Issues SA / CA will provide resources (equipment) in case of

deficiency of resources from CFS. CFS will provide labors.

Page 239: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 239 of 291

5.6.5. De-Stuff Process

Use Case De-Stuff Process

Actors Shipping Agent

Container Agent

CFS

Customs

Surveyors

CHA

Port

Description CFS/Port does the de-stuffing process requested by SA /

CA

Trigger When containers are taken inside CFS for unloading the

cargo.

Pre-Condition • SA / CA sends CLP to CFS / Port for container to

unload

Customs permission is required

Post-Condition Tally sheet is send to SA / CA by CFS / Port and surveyors

Normal Flow 1. CLP is received by CFS to do de-stuffing.

2. The customs examines the cargo (for de-stuffing

and direct delivery from the mouth of Container for

the FCL cargo. For LCL cargo , customs examines

at the shed).

3. Surveyor along with CFS prepares the Tally sheet

and uploads to the system.

4. SA / CA views the details of the cargo de-stuffed.

Alternate Flow

Exceptions

Notes and Issues SA / CA will provide resources (equipment) in case of

deficiency of resources from CFS. CFS will provide labors.

Page 240: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 240 of 291

5.6.6. De-Stuff Report

Use Case De-Stuff Report

Actors Shipping Agent

Container Agent

CFS

Surveyors

CHA

Port

Description Port/ CFS generates the de-stuff report.

Trigger After the cargo are unloaded from the container

Pre-Condition

Post-Condition

Normal Flow 1. Port / CFS generates the report and send to SA /

CA.

2. SA / CA receives the COSTCO Message.

3. SA / CA views the de-stuffing report.

Alternate Flow

Exceptions

Notes and Issues SA / CA will provide resources (equipment) in case of

deficiency of resources from CFS. CFS will provide labors.

Page 241: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 241 of 291

5.6.7. Requests Stuffing Container

Use Case Requests Stuffing Container

Actors Shipping Agent

Container Agent

CFS

CHA

Port

Description SA /CA requests CFS /Port to do stuffing of the container

Trigger When containers are taken inside CFS for loading the

cargo.

Pre-Condition SA / CA sends CLP to CFS for container to load for LCL

containers.

LEO from Customs is received

Post-Condition --

Normal Flow 1. SA /CA agent requests the CFS / Port to do stuffing

(COSTOR Message).

2. CFS accepts the request and informs SA / CA.

3. SA / CA receives the information from CFS.

Alternate Flow

Exceptions

Notes and Issues SA / CA will provide resources (equipment) in case of

deficiency of resources from CFS. CFS will provide labors.

Page 242: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 242 of 291

5.6.8. Stuff Process

Use Case Stuff Process

Actors Shipping Agent

Container Agent

CFS

Customs

Surveyors

CHA

Port

Description CFS /Port does the stuffing process requested by SA

Trigger When containers are taken inside CFS for loading the

cargo.

Pre-Condition SA / CA sends CLP to CFS / Port

Post-Condition Tally sheet is send to SA / CA by CFS

Normal Flow 1. LEO (stuffrep message) from customs will received

by CFS/Port.

2. Port/CFS checks if LEO exists before allowing cargo

to stuff.

3. The containers are stuffed as per the request.

4. Surveyor along with CFS prepares the Tally sheet

and uploads the report.

Alternate Flow

Exceptions

Notes and Issues SA / CA will provide resources (equipment) in case of

deficiency of resources from CFS. CFS will provide labors.

Page 243: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 243 of 291

5.6.9. Stuff Report

Use Case Stuff Report

Actors Shipping Agent

CFS

Surveyors

CHA

Port

Description CFS /Port generates the stuffing report of the cargo in

container.

Trigger After the cargo are loaded in to the container

Pre-Condition 1. SA sends CLP to CFS / Port for container to load

2. Tally sheet given by surveyors

Post-Condition 1. Stuff report sends to SA by CFS / Port.

Normal Flow 1. CFS /Port generates the report and send to SA.

2. SA receives the COSTCO Message.

3. SA views the stuffing report.

Alternate Flow

Exceptions

Other Special

Requirements

SA / CA will provide resources (equipment) in case of

deficiency of resources from CFS. CFS will provide labors.

Page 244: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 244 of 291

5.7. Cargo / Container Release

5.7.1. Permission for taking the containers / cargo

Use Case Permission for taking the containers

Actors CFS

CHA

Port

Description Request to take the containers / cargo out and for

CFS/Port to grant the permission

Trigger Customs issues Out-Of-Charge order after examining the

container / cargo

Pre-Condition 1. Customs Out-Of-Charge order

2. Delivery order and letter authorizing the transporter

to take delivery issued by SA / CA

3. Gang Letter issued by SA / CA to the port.

Post-Condition --

Normal Flow 1. Customs issue Out-Of-Charge order

(OOCONT,OOCITEMS) after examination

2. CHA receives/views the Out-Of-Charge sent by

customs

3. CFS / Port gets the Out-Of-Charge issued by the

customs

4. CHA requests to CFS / Port to take the containers

cargo

5. CFS / Port receives the request sent by CHA

Alternate Flow -

Exceptions

Assumptions -

Notes and Issues -

Page 245: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 245 of 291

5.7.2. Pay charges

Use Case Pay charges

Actors CFS

CHA

Port

Description Paying charges for the services rendered from CFS/ Port

and for the CFS / Port to issue bill for the services provided

to CHA

Trigger CHA sends a request to CFS/ Port for generating the bill for

the services rendered.

Pre-Condition CHA should request CFS/ Port for taking the containers

/cargo to the importer’s location

Post-Condition Payment receipt should be given

Normal Flow 1. CHA requests the CFS / Port for taking the

containers / cargo

2. CFS / Port generates the bill for the services

provided to the CHA

3. CHA receives/views the bill and pays the charges

to CFS / Port

4. CFS / Port sends receipt for the charges collected.

Alternate Flow --

Exceptions

Assumptions -

Notes and Issues -

Page 246: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 246 of 291

5.7.3. Issue Job Order

Use Case Issue Job Order

Actors CHA

CFS

Transporter

Port

Description CFS issues the Job Order to move the containers / cargo

from Port to the CFS area. The Port in turn sends the Job

Order to the CHA.

CHA issues Job Order to Transporter after paying all the

charges to CFS/ Port.

Trigger Customs issues clearance.

Pre-Condition CHA should pay all the charges to CFS / Port

Post-Condition -

Normal Flow 1. CFS issues Job Order to the port to move the

containers /cargo to container yard (JOBORDER)

2. Port in turn issues the Job Order to the CHA who

issues Job Order to Transporter

3. Transporter receives Job Order

Alternate Flow --

Exceptions

Assumptions -

Notes and Issues -

Page 247: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 247 of 291

5.7.4. Issue Gate Pass

Use Case Issue Gate Pass

Actors CHA

Port

CFS

Transporter

Customs

Description CFS/ Port issues the Gate-Pass to CHA/ Transporter after

collecting all the charges from him

Trigger CHA pays the charges to CFS / Port

Pre-Condition All charges should be paid

Post-Condition

Normal Flow 1. CHA pays all the charges to CFS / Port for the

services rendered.

2. CHA / CFS / Port generates the Gate-Pass

(GATEPASS) which is sent to the Customs / CHA.

3. CHA in turn forwards the Gate-Pass to Transporter

4. Transporter, Customs receives the Gate-Pass

Alternate Flow -

Exceptions

Assumptions -

Notes and Issues -

Page 248: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 248 of 291

5.7.5. Permission for Direct Delivery

Use Case Permission for Direct Delivery

Actors CHA

Port

Customs

SA

CA

Description CHA sends the request to Customs for direct delivery and

Customs gives permission for Direct Delivery.

Trigger

Pre-Condition Cargo/ Container should be unloaded from the Vessel

Post-Condition SA gives the Delivery Order to CHA

Normal Flow 1. CHA sends a request to Customs for direct delivery

2. Customs gives permission for Direct Delivery

3. CHA receives Delivery Order from the SA/CA

4. CHA files the Bill of Entry to Customs

5. From then on, the Cargo clearance process follows

Alternate Flow -

Exceptions

Assumptions -

Notes and Issues -

Page 249: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 249 of 291

5.7.6. SMTP

Use Case SMTP

Actors Shipping Agent

Container Agent

Port

Customs

CONCOR/ RAIL OPERATORS

Transporter

CHA

Description Request to Customs for Sub Manifest Transshipment Permit

(SMTP)

Trigger SA requests the Customs for the SMTP

Pre-Condition

Post-Condition -

Normal Flow 1. SA / CA / CHA sends SMTP request to Customs

2. Customs issues SMTP to SA / CA /CHA

3. SA / CA / CHA receives the SMTP

4. Port views the SMTP issued by the customs

5. SA / CA / CHA issues Job Order to Transporter

6. SA / CA / CHA sends Job Order to Transporter, If

container movement is by Road

7. Transporter receives the Job Order

8. SA / CA / CHA pays all the charges to Port

9. Port generates Gate-Pass to SA / CA / CHA to take

the cargo

Alternate Flow 1. SA / CA / CHA submits SMTP request

2. Customs issues SMTP to SA

3. SA / CA / CHA receives the SMTP

4. Port views the SMTP issued by Customs

5. If container movement is by train , Port generates

Railway Receipt to CONCOR/ RAIL OPERATORS

Exceptions

Page 250: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 250 of 291

Assumptions -

Notes and Issues -

Page 251: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 251 of 291

5.7.7. Issue Railway Receipt

Use Case Issue Railway Receipt

Actors Shipping Agent

Container Agent

Port

CONCOR/ RAIL OPERATORS

CHA

Description After getting the SMTP from the Customs, SA moves the

container / cargo by train though CONCOR/ RAIL

OPERATORS. Port can view the SMTP and issues Railway

Receipt to CONCOR/ RAIL OPERATORS.

Trigger Issuance of the SMTP and movement of the containers /

cargo is through trains.

Pre-Condition SMTP by the Customs

Forwarding Note by SA.

Post-Condition -

Normal Flow 1. Port receives SMTP from Customs.

2. SA / CA / CHA sends Forwarding Note to

CONCOR/ RAIL OPERATORS / Port.

3. Port issues Railway Receipt (RAILRECEIPT), based on

SMTP and Forwarding Note received.

4. Port sends Railway Receipt to CONCOR/ RAIL

OPERATORS.

Alternate Flow -

Exceptions

Assumptions -

Notes and Issues COPINO can be used for placement memo/Inland way

bill.

Page 252: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 252 of 291

5.7.8. Issue Train Summary

Use Case Issue Train Summary

Actors Shipping Agent

Port

CONCOR/ RAIL OPERATORS

Description After Containers are loaded into the Rake, Port maintains

daily Pendency List. Once loading of containers are done,

Railway out report is given to SA by the Port.

Trigger Loading of the containers into the Rail

Pre-Condition

Post-Condition -

Normal Flow 1. Port enters loaded Containers details

2. Port generates pendency list against the IGM

3. Port sends the pendency list (PENDENCY OF

CONTAINERS) to SA

4. Port generates Train Summary after train leaving

the Port.

5. SA receives the Train Summary.

Alternate Flow --

Exceptions

Assumptions -

Notes and Issues -

Page 253: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 253 of 291

5.7.9 Ingress Permission

Use Case Request and Issuance of Ingress Permission

Actors CHA

Port

Barge Operator

SA

Description To delivery/remove the cargo through barges, CHA /SA

applies for Ingress Permission and Port issues Ingress

Permission.

Trigger -

Pre-Condition -

Post-Condition -

Normal Flow 1) CHA/SA applies for Ingress Permission or sends a

Ingress Permission Message to Port

2) Port receives the request or Ingress message

3) Port issues Ingress Permission to CHA / SA or sends

the Ingress Permission message

4) CHA / SA receive the message or view the Ingress

Permission.

Alternate Flow --

Exceptions

Assumptions After verification of the certificates and collection of

barge related charges only port issues the permission

Notes and Issues For Delivery of cargo by Barge, CHA files Over side

Discharge Guarantee with the Customs and Customs

accepts it.

Page 254: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 254 of 291

5.7.10 Egress Permission

Use Case Issue Egress Permission

Actors CHA

Port

SA

Barge Operator

Description To allow barge to move after loading of the cargo on the

Barge, CHA /SA applies for Egress Permission and Port

issues Engress Permission.

Trigger -

Pre-Condition

Post-Condition Barge sails out

Normal Flow 1) CHA / SA applies for Egress Permission or sends a

Request for Egress Permission Message to Port

2) Port receives the request or Request for Egress

Permission message

3) Port issues Egress Permission to CHA / SA or sends

the Egress Permission message

1) CHA / SA receive the message or view the Egress

Permission.

Alternate Flow --

Exceptions

Assumptions -

Notes and Issues Customs appraises and issues BBN in case of Delivery and

GBN incase of removal.

Page 255: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 255 of 291

5.8. Carting Cargo

5.8.1. Request for Space Allocation and Carting

Use Case Request for Space Allocation and Carting

Actors Port

Shipping Agent

CHA / Exporter

CFS

Description To request for space allocation for carting the cargo for

exporting the cargo. Shipping Agent / CHA / Exporter

should submit the application for the specific location in

Port area to move the cargo.

Trigger

Pre-Condition

Post-Condition Location need to be forwarded to the recipients.

Normal Flow 1. Shipping Agent/CHA sends the request for the space

allocation and the request for carting.

2. PCS Forwards the Application to the Port / CFS.

3. Port / CFS allocate the space and sends the details.

4. The Space allocation details are forwarded to the

SA/CHA.

Alternate Flow

Exceptions

Assumptions

Notes and Issues Even without a Shipping Bill, A Carting Request can be

made.

Carting Permission message will be modified.

Page 256: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 256 of 291

5.8.2. Issue Permission for carting

Use Case Issue Permission for carting

Actors Port

CHA

CFS

Shipping Agent /CA

Description Based on the request submitted by the CHA for the carting

permission, the Port / CFS grant the permission to the CHA /

Transporter to move the cargo into the Port area.

Trigger The request for the carting permission.

Pre-Condition

Post-Condition Permission for carting should be forwarded to all the

recipients selected by CHA along with default recipients.

Normal Flow 1. Port / CFS receive the requests submitted by

SA/CHA.

2. Port / CFS verify the request and issues permission.

3. PCS Forwards the permission to the SA/CHA.

4. If CHA needs to provide details of transporter to port,

alternate flow is executed.

Alternate Flow CHA provides Transporter details to the Port.

Exceptions

Assumptions Specific location is allocated for the Shipping Agent by Port.

And this Location is informed to the CHA, Transporter by the

Shipping Agent.

Notes and Issues Port permission as well as multiple locations may be

requested/granted

Page 257: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 257 of 291

5.8.3. File Shipping Bill

Use Case File Shipping Bill

Actors Customs

CHA / Exporter

Port

Description To Export the cargo, CHA / Exporter should file the Shipping

Bill against the cargo to be exported, CHA needs to

file/Amend/Cancel Shipping bill.

Trigger

Pre-Condition

Post-Condition -

Normal Flow 1. CHA files cargo declaration to the Customs.

2. Customs forward SB message to the Port.

Alternate Flow 1. CHA sends the amendment/cancellation request to

the SB to the Customs.

2. After the Approval from the Customs,

amended/cancelled SB will be forwarded to the

recipients

Exceptions

Assumptions CHA provide the agreement with his exporter to Customs.

Notes and Issues Customs Message Format is used to file SB.

Some ports accept Export Application.

Page 258: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 258 of 291

5.8.4. Gate-In Permission Port

Use Case Gate-In Permission Port

Actors CHA

Port

Transporter

Description To provide the Gate-Pass for the cargo / container comes

directly to the Port.

Trigger Carting Order

Pre-Condition CHA Details

Post-Condition Gate Pass should be passed to all default recipients.

Normal Flow 1. Port checks Shipping Bill,if available.

2. Cart Chit / Ticket is given by CHA.

.

Alternate Flow

Exceptions

Assumptions some of Terminal operator accept Form 13

Notes and Issues -

Page 259: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 259 of 291

5.8.5. Request to move cargo to Dock

Use Case Request to move cargo to Dock

Actors CHA

Port

Transporter

Description To request the Port for the permission to move the Cargo

from pre-Shipment area to the Dock Area.

Trigger

Pre-Condition Shipping Bill may be filed with Customs.

Post-Condition -

Normal Flow 1. CHA requests to move the Cargo to the Dock along

with the Shipping Bill, cargo and Transporter details.

2. Request is forwarded to Port.

Alternate Flow -

Exceptions

Assumptions -

Notes and Issues -

Page 260: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 260 of 291

5.8.6. Issue movement Order

Use Case Issue movement Order

Actors CHA

Port

Transporter

Description To issue movement order to move the Cargo from pre-

Shipment area to the Dock Area.

Trigger

Pre-Condition Request from CHA to move the cargo from pre-shipment

area to the Dock.

Post-Condition Movement Order should be passed to all default recipients.

Normal Flow 1. Port receives the request submitted by CHA and

verifies the details.

2. Port Issues Movement Order to CHA.

3. CHA forwards movement order to Transporter.

Alternate Flow -

Exceptions 1. Port rejects request of CHA.

2. A notification is sent to CHA.

Assumptions Transporter gets the movement order online.

Yard plan is available with the Port.

Notes and Issues Pre-shipment area can also be within the Dock.

Page 261: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 261 of 291

5.8.7. Intimation to move Empty Containers

Use Case Intimation to move Empty Containers

Actors Shipping Agent

Container Agent

CFS / ICD / CONCOR / Transporter

Customs

Port / Terminal Operator

Description To obtain Customs permission for the movement of empty

containers.

Trigger

Pre-Condition -

Post-Condition -

Normal Flow 1. Shipping Agent/CA sends the details about the

empty container.

2. PCS forwards the list of empty containers to be

moved to CFS, Customs, Port/Terminal Operator and

ICD.

Alternate Flow

Exceptions List of empty containers are not required.

Assumptions

Notes and Issues New empty containers are treated as cargo.

Page 262: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 262 of 291

5.8.8. Gate-In Permission for Empty Containers

Use Case Gate-In Permission for Empty Containers

Actors Shipping Agent

Container Agent

CFS / ICD / CONCOR / Transporter

Customs

Port / Terminal Operator

Description To provide the Gate-Pass for the empty Containers. coming

to the CFS, Port / Terminal and ICD.

Trigger

Pre-Condition List of Empty Containers should be sent by Shipping Agent /

CA to CFS/Port.

Post-Condition

Normal Flow 1. CFS / Port selects empty Container and Transporter

details.

2. CFS / Port Issues the Gate Pass.

3. Gate Pass is forwarded to SA / CA / CHA / CFS / ICD.

Alternate Flow 2. CFS / Port selects empty Container and Transporter

details

3. CFS / Port rejects the Gate Pass.

4. Gate Pass rejection details are forwarded to CHA,

Transporter.

Exceptions List of empty containers are not required.

Assumptions -

Notes and Issues -

Page 263: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 263 of 291

5.8.9. Request for bringing Factory Stuffed Container to CFS / Port

Use Case Request for bringing Factory Stuffed Container to CFS / Port

Actors CHA

CFS

Port

Customs

Description This use case is for CHA to request for the permission to the

CFS to move the Factory Stuffed container to the CFS area.

Trigger

Pre-Condition --

Post-Condition --

Normal Flow 2. CHA sends the request for FCL Container movement

permission with Cargo, Container details and

Shipping Bill Details if available.

3. PCS Forwards the request to CFS / Port.

Alternate Flow

1. CHA sends the request for FCL Container movement

permission with Cargo, Container details and

Shipping Bill Details.

2. PCS Forwards the request to Terminal Operator.

Exceptions

Assumptions Assumed that Factory stuffed containers are moved to CFS

for Customs examination.

Notes and Issues If the FCL is moved directly to the Container Terminal, the

request is sent to the Terminal Operator.

If Shipping Bill is not available, any document required by

the Port should be submitted.

Page 264: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 264 of 291

5.8.10. File Pre-Advice of ICD Containers

Use Case File Pre-Advice of ICD Containers

Actors Shipping Agent

Terminal Operator / Port

Rail Operator / CONCOR

ICD

Transporter

Description To inform Terminal Operator the list of ICD containers

coming by Rail.

Trigger

Pre-Condition

Post-Condition -

Normal Flow 1. Shipping Agent pre-advices the details about the

ICD container coming by rail.

2. PCS forwards the list of ICD containers coming by rail

to the Terminal Operator

Alternate Flow -

Exceptions

Assumptions All the Customs formalities have been completed at ICD.

Notes and Issues In Some cases, Shipping Bill is submitted by the ICD stations

like ICD Amingaon.

Page 265: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 265 of 291

5.9. Port Clearance

5.9.1. Request port clearance

Use Case Request port clearance

Actors Shipping Agent

Customs

Port

Description SA request’s custom and port for port clearance for

sailing of the vessel

Trigger Clearance certificate required for sailing of vessel

Pre-Condition -

Post-Condition -

Normal Flow 1. SA request for NOC with port.

2. Port issues NOC to SA.

3. SA request for port clearance with Customs.

4. Customs approves the port clearance and send to

SA and Port.

Alternate Flow 1. SA request for port clearance with Customs.

1. Customs approves the port clearance and send to

SA and Port

Exceptions

Assumptions -

Notes and Issues -

Page 266: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 266 of 291

5.9.2. Send Sailing Report

Use Case Send Sailing Report

Actors Shipping Agent

Customs

Port

Description port sends the vessel sailing report to customs

Trigger Sailing of Vessel

Pre-Condition • Port clearance from customs

• Vessel has sailed

Post-Condition Vessel sailing report send to customs by port

Normal Flow 1. Port reviews the custom clearance and sends the

final clearance to SA.

2. SA receives the clearance from port.

3. Vessel sailing report is send by port to customs.

4. Customs receives the vessel sailing report.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 267: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 267 of 291

5.9.3. Send Stowage Plan / Bay Plan

Use Case Send Stowage Plan/Bay Plan

Actors Shipping Agent

Customs

Port

CHA

Stevedores

Terminal Operator

Description Port receives and sends updated stowage plan / Bay

Plan to the SA

Trigger When the vessel is ready to sail the stowage plan needs to

be issued to SA

Pre-Condition -

Post-Condition -

Normal Flow 1. SA sends the stowage plan.(BAPLIE)

2. Port receives / views the stowage plan.

3. Port / Stevedore sends the updated bay plan

/stowage plan to SA/CHA.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 268: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 268 of 291

5.9.4. Request for Shut Out

Use Case Request for Shut Out

Actors Shipping Agent

Container Agent

Customs

Port

Terminal Operator

Description SA request the customs to process the shut out cargo

Trigger When the cargo is not loaded in to the vessel.

Pre-Condition

Post-Condition -

Normal Flow 1. Port issues Shut-out advice to SA.

2. SA files request for shut out cargo to customs.

3. Customs receives the information from SA.

4. Customs approves the shut out cargo and

message is sent to Port directly(SHUTOUT and

SHUTCONT message is sentby customs to port).

5. SA and port receives the approval.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 269: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 269 of 291

5.9.5. Amendment of Shipping Bill

Use Case Amendment of Shipping Bill

Actors Shipping Agent

Customs

Port

CHA

Description The cargo is transferred to another vessel, by performing

amendment of shipping bill

Trigger When the cargo is not loaded in to the vessel.

Pre-Condition Tally Sheet and Shipping Bill

Post-Condition Shipping Bill

Normal Flow 1. CHA files for the amendment of the SB to customs.

2. Customs accepts the amendment.

3. Customs approves the amendment.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 270: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 270 of 291

5.9.6. Filing EGM

Use Case Filing EGM

Actors Shipping Agent

Customs

Port

Description SA files EGM for the amended cargo in SB.

Trigger When the cargo is not loaded in to the vessel, due to

space constraint.

Pre-Condition Tally Sheet and SB

Post-Condition SB and EGM

Normal Flow 1. SA files for the Supplementary EGM to the customs.

2. Customs approves and send the EGM to Port.

3. Port receives the supplementary EGM from the

Customs.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 271: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 271 of 291

5.9.7. Request for back to town

Use Case Request for back to town

Actors Shipping Agent

Container Agent

Customs

Port

CHA

Description SA/CHA request customs and port for the cargo to be

taken back to town

Trigger When the cargo is not loaded in to the vessel.

Pre-Condition

Post-Condition

Normal Flow 1. CHA files for the request of taking the cargo back

to town to Customs.

2. Customs approves the request and inform CHA

and Port.

3. The details are entered/sent by customs and notify

the port, CHA and SA.

4. Port,CHA and SA views the details.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 272: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 272 of 291

5.9.8. Pay Charges

Use Case Pay Charges

Actors Shipping Agent

Bank

Port

CHA

Stevedores

Rail Transport Operator

Description SA and CHA pay the final charges issued by port.

Trigger For getting port clearance from port.

Pre-Condition Final Bills

Post-Condition

Normal Flow 1. Port sends the final bill to CHA

2. CHA pays the bill charges in bank / Port (INVOIC)

3. Bank informs the port.

4. Port views the details and sends clearance

certificate to CHA.

5. CHA views the clearance send by port.

Alternate Flow

Exceptions

Assumptions -

Notes and Issues -

Page 273: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 273 of 291

7.3 ANNEXURE III - REQUIREMENT COMPLIANCE WITH TENDER The compliance checklist with the Functional and Technical requirements of the tender specification has given below. ID Description Compliance

(Y/N) Remarks

M-001 The system shall support XML, UNEDIFACT, Proprietary (Fixed Length, Variable Length, CSV), ANSI X.12 standards as defined by IPA for EDI messages

Y

M-002 The system shall support backward compatibility of UNEDIFACT Message directories i.e. if IPA decides to implement d00B, the system shall be capable of handling all the previous directory structure for the messages

Y

M-003 The system shall be capable of translating / transforming the messages as per the requirements of the individual stakeholder

Y

M-004 The system shall be able to Validate each message for the syntax and semantic errors

Y

M-005 The system shall be able to generate acknowledgements for the messages (Both positive and negative acknowledgement)and transmit it to the stakeholder in the desired format and the protocol of the stakeholder

Y

M-006 The system shall update the central database to facilitate track and trace and to be used as central repository for the stakeholders

Y

M-007 The system shall be able to transmit message to the multiple stakeholders as per the business rule and the stakeholder agreement in the desired format using the desired protocol

Y

M-008 The system shall allow the stakeholders to send information/messages to the PCS to update the Central Database

Y

M-009 The system shall allow the stakeholders to submit information using web forms. The system shall be capable of generating a message from the web form and forward the same to the stakeholders as per the defined business rules and agreement

Y

Page 274: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 274 of 291

ID Description Compliance (Y/N)

Remarks

M-010 The stakeholders shall also have an option of downloading the message file in the desired format from the web portal. The system shall have the capability of generating a message in the requested format from the database and allow the stakeholder to download the same using a browser interface

Y

M-011 The stakeholders shall also have an option to view the information contained in the message using a browser

Y

M-012 The system shall provide Option for Uploading/Downloading the message in the desired format over HTTP/HTTPS using the Web Browser

Y

M-013 Shall be able to import data from e-mail, save it in database and also translate it into an EDI Message

Y

M-014 System shall have the capability of converting the EDI message to FAX, SMS, e-mail.

Y

M-015 The system shall facilitate secure exchange of transactions/messages using digital signatures. The system shall validate the digital signature of the sender and shall be able to append its signature as well before forwarding the same to the receivers.

Y

M-016 The system shall provide intuitive graphical user interface to create and mange the translation / transformation maps, stakeholder agreements and business rules. There shall not be any programming required for creating the maps.

Y

M-017 The translation/transformation of the data and its validation shall be done in real time. The system shall also facilitate real time manipulation of data

Y

M-018 The system shall provide full audit trail life cycle of each transaction/message.

Y

M-019 The users shall be able to view the audit trail life cycle of their transactions over the web.

Y

Page 275: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 275 of 291

ID Description Compliance (Y/N)

Remarks

M-020 The PCS shall guarantee the receipt of message by the destinations even in the event of failure of the system/network. The application shall be able to detect such situations and take corrective measures.

Y

M-021 The system shall be capable of routing the EDI messages down to the data in the message level and not only on the basis of header or envelop level

Y

M-022 The system shall support multiple protocols like HTTP, HTTPS, FTP, OFTP, SMTP/MIME, MQ Series, SOAP, BizTalk Messaging Services, ebMS, Java Messaging Services.

Y

M-023 The system shall support alert messages from the stakeholders and integrate them with the application

Y

M-024 The system shall process the transactions without any manual intervention

Y

M-025 The system shall provide option for automatic job scheduling and re-transmission of messages.

Y

D-001 The system shall store the information in

the messages for later retrieval. Y

D-002 The database shall maintain information related to the vessels, containers, stakeholders etc.

Y

D-003 The system shall only allow access to the information depending on the privileges and roles of the users.

Y

D-004 The centralized database shall facilitate the track and trace and shipment/service visibility.

Y

D-005 The database shall be accessed through web-based interface to provide integrated view of the information.

Y

D-006 The database shall store the profiles of the stakeholders along with the access information and usage details for billing purposes.

Y

D-007 The system shall provide the option to the stakeholders to publish reports and shall be flexible enough to allow generation of adhoc reports and queries using the graphical interface.

Y

D-008 System shall have a comprehensive reporting and query system to facilitate detailed reporting and adhoc queries.

Y

Page 276: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 276 of 291

ID Description Compliance

(Y/N) Remarks

W-001 The System shall provide Web Forms for the messages. The user shall be able to login to the application and enter the information like vessel profile, cargo details, container details (As per the messages specified) etc. as per his profile.

Y

W-002 The user shall be able to register securely with the system by providing the relevant details. The login will be of two types: • Login for the ordinary users who will visit

PCS. The access rights for these users will be limited to white papers, notifications, some standard reports, procedures, news etc. The user shall not have any access to stakeholders data.

• The stakeholders will be registered by

providing the relevant details. The accounts will be activated only after proper manual authorization from the ports.

Y

W-003 The user shall also register its digital certificates in the form of smart card/USB token.

Y

W-004 The user shall be able to view the messages content , download the message in the desired format (UNEDIFACT/XML/Proprietary)

Y

W-005 The user shall be able to view and modify the profile parameters which are permitted for modification. Important parameters like Registration No, PAN No,, Business type etc. are not allowed to be modified. The modification of these parameters shall only be allowed to the Administrator and system shall keep the details of the information modified.

Y

W-006 The system shall provide option for uploading the alert messages to the PCS for maintaining the record.

Y

W-007 The user shall also be able to update the central database by using the web forms for the above alerts.

Y

W-008 The system shall be able to generate alert Y

Page 277: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 277 of 291

ID Description Compliance (Y/N)

Remarks

messages and forward to the e-mail, SMS, FAX of the user.

W-009 The system shall provide to check the status of different information like container status, vessel status, cargo status. The user shall be able to view information related to vessel, cargo, container by providing the number.

Y

W-010 The system shall provide the default document templates for the messages.

Y

W-011 The system shall log all the transactions /messages to generate statistical reports.

Y

W-012 The system shall provide the management of users along with their roles and their access rights for messages/information.

Y

W-013 The system must allow the IPA, Ministries and other authorized users to extract statistical information like use of system, average delays in transactions, average time taken for the messages, percentage of successful/unsuccessful transactions etc..

Y

W-014 The system shall provide the web forms for management of the master directories like location code, vessel, Port, shipping agents, shipping lines, notifications etc by the administrators at the PCS. The system shall maintain log of the modifications carried out.

Y

W-015 The system shall have the billing module to produce bills for the services rendered by the PCS to the stakeholders along with an option to procure documents, reports etc.

Y

W-016 Stakeholder shall be able to make payment for the charges using the Internet Banking

Y

W-017 System shall be able to provide reporting on the port performance indicators like average berthing time, turn around time, average pre-berthing time, average stay at berth, total cargo, container, vessels handled. The reports shall only be available to a specific category of users like port, IPA and Ministry officials.

Y

W-018 The system shall also provide options to the stakeholders like ports to upload and manage the content of the portal other

Y

Page 278: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 278 of 291

ID Description Compliance (Y/N)

Remarks

than the messages. Eg. Port shall be able to manage the information related to the facilities in the ports, the tariff structure, latest news, notifications, manuals etc.

W-019 The system shall have single sign –on facility for the stakeholders.

Y

W-020 The system shall have personalization features and shall be able to customize the content based on the user profile of the visitors.

Y

W-021 The stakeholders other than ports shall also have option to advertise their services. The option for management of the advertisement shall be easy to use

Y

W-022 The system shall have option for generating the bills for the advertisements put up by the stakeholders and make the payment to the PCS.

Y

W-023 The system shall have a search engine enabling the users to search the content as per their access rights

Y

W-024 The system must provide at application level full security and encryption policy compatible with the level of security required in such situation. The use of HTTPS and digital certificates is proposed as mechanism for exchanging messages. User Name and Password over SSL shall be used to authenticate users connected via the web portal

Y

W-025 The portal shall provide link to the other sites like ports, IPA, stakeholders and other international web sites.

Y

W-026 The system shall provide view to limited profile information related to the stakeholders data to the stakeholders and search on the same.

Y

W-027 Ports shall be able to publish/update reports, notifications, manuals and other data related to the port in a secure environment

Y

W-028 System shall provide graphical interface for adhoc queries and reports from the PCS

Y

W-029 PCS shall generate alerts for the critical events and forward the same to the stakeholders over e-mail, SMS, FAX.

Y

W-030 System shall provide Registration Form for the user to apply for online registration as

Y

Page 279: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 279 of 291

ID Description Compliance (Y/N)

Remarks

a stakeholder. W-031 System shall provide personalization

features on the portal

Y

W-032 The ports shall be able to manage and update their own content on the web portal

Y

W-033 System shall have the allow total control over what content can be viewed and changed by the users

Y

W-034 System shall provide APIs to allow developers to extend the portal server framework

Y

W-035 The portal shall provide a web browser interface to create and manage the content

Y

W-036 The system shall provide single sign-on facility for all the services.

Y

W-037 The system shall maintain audit security log to store all access to the data and message transactions

Y

W-038 PCS shall facilitate distributed development and management of the content by the stakeholders.

Y

W-039 The workflow in the content management shall be able to manage the tasks list of each user, and provide total access control over what a user can view and change.

Y

W-040 The system shall support mobile devices by generating pages in WML and cHTML to provide alert information to the stakeholders over the mobile devices.

Y

W-041 The user shall have a facility for updating / maintenance his profile other than some key parameters.

Y

W-042 The directory of the stakeholders will be available on the portal for search and query by the registered users.

Y

Page 280: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 280 of 291

ID Description Compliance

(Y/N) Remarks

S-001 System shall provide complete web services infrastructure for publishing and discovery of web services by the stakeholders.

Y

S-002 System shall provide registry facility to the stakeholders to publish and subscribe the web services. The services shall be privately owned and allow only the authorized users to publish and discover services.

Y

S-003 PCS shall provide APIs for the stakeholders to publish and locate the services.

Y

S-004 PCS shall provide web services for container tracking. The user shall be able to access and integrate the Container Tracking Web Service

Y

S-005 Individual ports shall also be able to publish web services for container tracking, vessel status, cargo status, charges calculation etc.

Y

S-006 The main services which PCS can provide are: • Ship Schedules • Berthing details • Container tracking • Demmurage information and

payment details • Routing Details

Y

S-007 PCS shall also provide web services to facilitate track and trace of cargo, containers etc and access to its central database for the stakeholders to integrate with their internal applications.

Y

S-008 The main services may also include: • Truck appointments (especially for

container terminals) for transporters. • Export yard status (for shipping

lines/agents)

Y

Page 281: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 281 of 291

ID. Description Compliance

(Y/N) Remarks

P-001 System shall provide option to the stakeholders to make the payment through their bank for the services utilized from the ports.

Y

P-002 The system shall have the provision to carry out secured online transactions through the payment gateway.

Y

P-003 The system shall have the facility for billing for the transactions carried out the services used by the users on PCS.

Y

P-004 The system shall be able to integrate both the conventional mode and the payment gateway.

Y

P-005 The system shall provide the facility for e-payment using the secure payment gateway.

Y

P-006 The system shall provide the following options to the stakeholder for making the payments: • Maintain the Deposit Account

maintained by the port • Make payment against the bill/challan

issued by the port through the bank interface of PCS

• Make direct payment against the challan in the bank physically.

Y

P-007 PCS shall provide an option to the stakeholders to make payment using credit card.

Y

A-001 System shall provide single administration

facility with easy to use graphical interface to manage the application and its components.

Y

A-002 System shall provide facility for managing the application securely from the remote site.

Y

A-003 System shall provide tools for monitoring the hardware/software for its functioning and generate alerts in case of problem.

Y Hardware spec

A-004 System must provide the management of users along with their roles and access rights and registration of digital certificates.

Y

A-005 The administrator shall be able to activate/deactivate the profile of a user

Y

Page 282: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 282 of 291

ID Description Compliance

(Y/N) Remarks

T-001 PCS shall be based on a flexible, n-tier, component based web services user friendly architecture with sufficient initial processing power that also has significant processing and storage headroom in anticipation of future growth

Y Technical Architecture

T-002 PCS shall be Fully secure and Internet-aware, capable of using the Internet, mobile devices as well as communications to traditional EDI Value-Added Networks (VANs) with stringent policy based security

Y Technical Architecture

T-003 PCS shall be capable of facilitating the stakeholders in information exchange using multiple EDI formats like UNEDIFACT, XML, Proprietary etc using multiple protocols with any-to any data transformation and EDI translation capabilities

Y

T-004 PCS shall be capable of intelligent routing, down to the data in the message level, not just header or envelope level

Y

T-005 PCS shall maintain complete audit trail to track the messages

Y

T-006 PCS shall be flexible with user-configurable business rules engine and a suitable data transformation engine for EAI/EC needs.

Y

T-007 PCS shall provide comprehensive message brokering services to facilitate information exchange with the external stakeholders and among applications at the PCS and Ports

Y

T-008 PCS shall be integrated with a comprehensive Portal and EC gateway

Y

T-009 PCS shall have robust communications options to meet both internal communications needs and external EC communications needs.

Y

T-010 PCS should be built using object-oriented architecture

Y Technical architecture

T-011 PCS should be integrated with database interface.

Y Technical Architecture

T-012 The stakeholders and users shall be able to connect to the PCS using the Internet, leased lines or VAN services.

Y Infrastructure, Hard ware and s/w spec

Page 283: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 283 of 291

ID Description Compliance (Y/N)

Remarks

T-013 The PCS shall support the protocols like HTTP, HTTPS, FTP, Secure FTP, OFTP, SMTP/MIME, MQ Series, BizTalk Messaging Services, Java Messaging Services, SOAP, ebMS etc. as per the requirement of the trading partner for message exchange.

Y

T-014 The system shall provide the message audit, verify that the message is received by the intended recipient and provide alerts in the event of system failure.

Y

T-015 PCS shall be completely integrated by design to cover all PCS functionalities comprehensively in a single system.

Y Technical Architecture

T-016 PCS shall be built on well proven core modules to perform the key tasks including message routing, translation, portal framework, database interface, EC/ EDI engine, payment gateway etc.

Y Technical Architecture

T-017 PCS shall ensure that all operations are performed in real time

Y Technical Architecture

T-018 The system shall ensure all data is stored once (no duplicate data) and delivered in real-time with no batch feeds to update various parts of the system

Y Technical Architecture

T-019 The PCS data shall be stored in single database

Y Technical Architecture

T-020 PCS shall be 100% Unicode compliant for all kind of data representation

Y Technical Architecture

T-021 PCS shall be able to handle ANY binary data

Y Technical Architecture

T-022 PCS shall be able to be able to work with and attach any form of digital data, regardless of size or format

Y

T-023 The application shall run on common hardware and support standard operating systems

Y Hardware spec

T-024 The application shall be platform independent

Y Technical Architecture

Page 284: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 284 of 291

ID Description Compliance (Y/N)

Remarks

T-025 The application shall be adaptable and flexible (although a component-based architecture is not an explicit requirement, the component based applications generally provide greater flexibility than monolithic architecture) to modify or add additional components, functionalities or features.

Y Technical Architecture

T-026 The application shall provide for interoperability with utilities, third party tools and systems to achieve seamless integration and extensibility.

Y Technical Architecture

T-027 The application shall use Object-oriented approach, preferably for the entire solution or at least for the new modules to be developed during this contract.

Y Technical Architecture

T-028 The application shall maximize reusability and provide for mix and match tools within a project.

Y Technical Architecture

T-029 The application shall have a common, intuitive, easy-to-use user interface across all applications.

Y Technical Architecture

T-030 The application shall use intuitive tools, aids, or wizards that guide user through a set of steps to achieve a desired end result.

Y Technical Architecture

T-031 The application shall provide for the use of workflow applications wherever required.

Y Technical Architecture

T-032 The application shall provide for creating a log of events occurring in user sessions.

Y

T-033 The Portal of the PCS application shall have application Programming Interface (API) to allow developers to extend the Portal Server Framework.

Y

T-034 The Portal of the PCS application shall have Web Content Publishing component within the Portal providing a Web Browser Interface to create, manage and contribute content for portal.

Y

Page 285: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 285 of 291

ID Description Compliance (Y/N)

Remarks

T-035 The central database PCS shall facilitate storage and retrieval of the entire data passing through PCS. Access to central database in secure fashion shall be through custom built and well designed web based application.

Y RDBMS

T-036 The database service shall seamlessly distribute event information in real time to all the stakeholders who desire that. When a single information source is updated, changes should be distributed immediately to all affected parties who need it.

Y

T-037 The EC/ EDI system of PCS shall be able to access all popular RDBMS systems like Oracle, Sybase, MS SQL Server, Informix, DB2 etc.

Y Technical Architecture

T-038 The EC/ EDI system of PCS shall be able to allow integration with different application packages through APIs

Y Technical Architecture

T-039 The EC/ EDI system of PCS shall be able to support interface using JDBC, ODBC, ADO, C/C++, Java, CORBA, COM, DCOM etc.

Y Technical Architecture

T-040 The EC/ EDI system of PCS shall be able to process EDI transactions concurrently without the manual intervention.

Y Technical Architecture

T-041 The EC/ EDI system of PCS shall be able to support EDI and non EDI audit tracking and event notification.

Y Technical Architecture

T-042 The EC/ EDI system of PCS shall be able to store all messages in internal database format and other EDI formats.

Y Technical Architecture

T-043 The EC/ EDI system of PCS shall be able to facilitate remote maintenance of the system

Y Technical Architecture

T-044 The EC/ EDI system of PCS shall be able to provide automated job scheduling and re-transmission of messages

Y Technical Architecture

T-045 The EC/ EDI system of PCS shall be able to handle digital certificates and signatures as well as data encryption

Y Technical Architecture

T-046 The EC/ EDI system of PCS shall be able to process business transactions securely when sending via the Internet using HTTPS and PKI protocols

Y Technical Architecture

Page 286: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 286 of 291

ID Description Compliance (Y/N)

Remarks

T-047 The EC/ EDI system of PCS shall be able to Establish secure E-payment services for the stakeholders over the internet

Y Technical Architecture

T-048 The O/S shall be any one of the major commodity operating system platforms viz. Microsoft Windows 2003, Linux O.S., or any other flavour of Unix operating system like HP-Unix or substantially equivalent and portable to commodity hardware.

Y Infrastructure, Hardware & Software spec

T-049 The O/S shall be proven in the field, preferably with the core modules of the application software already running on it.

Y Infrastructure, Hardware & Software spec

T-050 The O/S shall be compatible with the latest versions of popular RDBMSs like Oracle, SQL, and cluster management, middleware products etc.

Y Infrastructure, Hardware & Software spec

T-051 The O/S shall be compatible with third party tools and utilities for administration and management of IT infrastructure.

Y Infrastructure, Hardware & Software spec

T-052 The O/S shall be Reliable and stable with a guaranteed up time of 99.9%.

Y Infrastructure, Hardware & Software spec

T-053 The O/S shall be Scalable, especially when the PCS becomes fully operational.

Y Infrastructure, Hardware & Software spec

T-054 The O/S shall be Secure. Y Infrastructure, Hardware & Software spec

T-055 The O/S shall be easy to Manage and user friendly.

Y Infrastructure, Hardware & Software spec

T-056 The O/S shall be able to support WMI, Smart Card Technology, Terminal Services etc.

Y Infrastructure, Hardware & Software spec

T-057 The O/S shall be cost effective. Y Infrastructure, Hardware & Software spec

T-058 The O/S shall be able to perform real time data replication to another remote online backup server through built in utilities or through add on products.

Y Infrastructure, Hardware & Software spec

Page 287: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 287 of 291

ID Description Compliance (Y/N)

Remarks

T-059 The RDBMS of the system shall be from market leaders in this segment, popular and the version shall be field proven.

Y RDBMS

T-060 The RDBMS of the system shall be capable

of handling process-intensive and mission-

critical workloads.

Y RDBMS

T-061 The RDBMS of the system shall offer high

degrees of security and application

integrity,

Y RDBMS

T-062 The RDBMS of the system shall have the ability to perform complex transactions against large data sets.

Y RDBMS

T-063 The RDBMS of the system shall allow housekeeping tasks to be performed online, without any downtime and with negligible system impact.

Y RDBMS

T-064 The RDBMS of the system shall be capable of running on multiple hardware types

Y RDBMS

T-065 The RDBMS of the system shall support Clustered Database Server configuration to ensure high reliability and availability.

Y RDBMS

T-066 The RDBMS of the system shall support online replication to another location to enable disaster recovery.

Y RDBMS

T-067 The hardware equipment on which the PCS is expected to function shall be State of the Art.

Y Infrastructure, Hardware & Software spec

T-068 The hardware equipment on which the PCS is expected to function shall be Highly Available for 24x7 operations.

Y Infrastructure, Hardware & Software spec

T-069 The hardware equipment on which the PCS is expected to function shall be powerful to deliver the High Performance required for running the PCS with minimum response time.

Y Infrastructure, Hardware & Software spec

Page 288: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 288 of 291

ID Description Compliance (Y/N)

Remarks

T-070 The hardware equipment on which the PCS is expected to function shall be scalable with capability to handle the increase in workload while maintaining good response-time without adding complexity.

Y Infrastructure, Hardware & Software spec

T-071 The hardware equipment on which the PCS is expected to function shall be flexible to add additional components as required with minimum interruption and without any adverse impact on performance.

Y Infrastructure, Hardware & Software spec

T-072 The hardware equipment on which the PCS is expected to function shall be reliable for an intensive 24x7 operations to deliver high performance

Y Infrastructure, Hardware & Software spec

T-073 The hardware equipment on which the PCS is expected to function shall be easily configurable and manageable with one central administrator console for different servers

Y Infrastructure, Hardware & Software spec

T-074 The hardware equipment on which the PCS is expected to function shall be supported by a readily accessible Strong Technical Support Team with Web based and telephonic support round the clock.

Y Infrastructure, Hardware & Software spec

T-075 The application server addressing the middle-tier shall support for business and application logic achieved through component technologies like .NET, COM, CORBA and the Java-specific RMI - applied in a framework like Microsoft Windows DNA or Enterprise Java Beans or substantially equivalent or superior technology.

Y Technical Architecture

T-076 The application server addressing the middle-tier shall support multithreaded access and Database connection pooling, Creation of COM and / or CORBA objects.

Y Technical Architecture

T-077 The application server addressing the middle-tier shall support ability to deploy on the web and serve users over the Internet, Intranet and Extranet.

Y Technical Architecture

T-078 The application server addressing the middle-tier shall support transaction Integrity.

Y Technical Architecture

Page 289: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 289 of 291

ID Description Compliance (Y/N)

Remarks

T-079 The application server addressing the middle-tier shall support Connectivity to legacy systems like mainframes and older transaction and database systems

Y Technical Architecture

T-080 The application server addressing the middle-tier shall support secure transactions and support for SSL / HTTPS

Y Technical Architecture

T-081 The application server addressing the middle-tier shall support clustering support, load balancing and fail over features

Y Technical Architecture

T-082 The application server addressing the middle-tier shall support capability for load balancing of different middle-tier servers.

Y Technical Architecture

T-083 The application server addressing the middle-tier shall support transaction processing monitors

Y Technical Architecture

T-084 The application server addressing the middle-tier shall support for working with other application servers

Y Technical Architecture

T-085 The application server addressing the middle-tier shall support integration with development tools and features oriented towards accelerating development

Y Technical Architecture

T-086 The application should provide policy based security management. A policy management server shall provide single and global sign-on for multiple systems, which will eliminate the need for the users to have multiple passwords. This will also help in managing the security independently from the individual applications, with User authentication/ authorization administered and managed at a single location.

Y

T-087 The application should provide directory Services Integration – user passwords are not stored or displayed anywhere in PCS. The login mechanism shall be based entirely on Directory or Naming services.

Y

T-088 The application should provide configurable encryption mechanism for the data passed between the clients and the middle tier using PKI techniques.

Y

Page 290: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 290 of 291

ID Description Compliance (Y/N)

Remarks

T-089 The application should provide Digital Security Certificates, for different levels of individual user validation, depending on the application or data being accessed in addition to the basic password authorization.

Y

T-090 The application should provide features such as IPSec and various encryption and VPN options.

Y

T-091 The application should provide Audit Security log to store all access to all parts of the data and message transactions.

Y

T-092 The application should provide protection against virus threats, DoS, Intruders, Trojans and other security threats.

Y Infrastructure, Hardware & Software spec

T-093 The system shall provide easy to use interface of functions like • Application administration and

management, Managing profiles of the stakeholders,

• Generating message mapping, • Security and system features, • Online Help and support features.

Y

T-094 The communication network shall be based on the bandwidth requirement of the application software.

Y Infrastructure, Hardware & Software spec

T-095 The communication network shall have redundant links from different ISPs with automatic fail over to maintain high availability.

Y Infrastructure, Hardware & Software spec

T-096 The communication network shall have network components manageable from a central location through Network Management Software.

Y Infrastructure, Hardware & Software spec

T-097 The communication network shall have the option of linking directly through leased lines for large volume users like Ports.

Y Infrastructure, Hardware & Software spec

T-098 The communication network shall provide for linking the primary facilities with the DR site.

Y Infrastructure, Hardware & Software spec

T-099 The storage boxes for back up shall be linked using Fiber Channel or superior technology.

Y Infrastructure, Hardware & Software spec

Page 291: IPA PCS Software Requirements Specification V3

System Requirements Specification for PCS Release 3.0 - June 2007

CrimsonLogic Pte Ltd Copyright - Private Page 291 of 291

ID Description Compliance (Y/N)

Remarks

T-100 Suitable firewalls at the internet gateways shall be included to make the network secure.

Y Infrastructure, Hardware & Software spec