Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder...

219
kkl 1 Final Permit # 04-TV-007R2, 11/09/17 Iowa Department of Natural Resources Title V Operating Permit Name of Permitted Facility: Continental Cement Company – Davenport Plant Facility Location: 301 East Front Street Buffalo, IA 52728 Air Quality Operating Permit Number: 04-TV-007R2 Expiration Date: November 8, 2022 Permit Renewal Application Deadline: May 8, 2022 EIQ Number: 92-3093 Facility File Number: 82-04-005 ________________________________________________________________________ Responsible Official Name: Joseph H. Pennings Title: Plant Manager Mailing Address: 301 E Front St. Buffalo, IA 52728 Phone #: (563) 328-6201 Permit Contact Person for the Facility Name: Bonita Goode Title: Environmental & Public Affairs Manager Mailing Address: 301 E Front St. Buffalo, IA 52728 Phone #: (563) 328-6204 ________________________________________________________________________ This permit is issued in accordance with 567 Iowa Administrative Code Chapter 22, and is issued subject to the terms and conditions contained in this permit. For the Director of the Department of Natural Resources ________________________________________________________________________ Lori Hanson, Supervisor of Air Operating Permits Section Date

Transcript of Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder...

Page 1: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 1 Final Permit # 04-TV-007R2, 11/09/17

Iowa Department of Natural Resources Title V Operating Permit

Name of Permitted Facility: Continental Cement Company –

Davenport Plant Facility Location: 301 East Front Street Buffalo, IA 52728 Air Quality Operating Permit Number: 04-TV-007R2 Expiration Date: November 8, 2022 Permit Renewal Application Deadline: May 8, 2022 EIQ Number: 92-3093 Facility File Number: 82-04-005 ________________________________________________________________________ Responsible Official Name: Joseph H. Pennings Title: Plant Manager Mailing Address: 301 E Front St. Buffalo, IA 52728 Phone #: (563) 328-6201 Permit Contact Person for the Facility Name: Bonita Goode Title: Environmental & Public Affairs Manager Mailing Address: 301 E Front St. Buffalo, IA 52728 Phone #: (563) 328-6204 ________________________________________________________________________ This permit is issued in accordance with 567 Iowa Administrative Code Chapter 22, and is issued subject to the terms and conditions contained in this permit. For the Director of the Department of Natural Resources ________________________________________________________________________ Lori Hanson, Supervisor of Air Operating Permits Section Date

Page 2: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 2 Final Permit # 04-TV-007R2, 11/09/17

Table of Contents I. Facility Description and Equipment List……………………………………………..4 II. Plant - Wide Conditions ................................................................................................ 11 III. Emission Point Specific Conditions .............................................................................. 15

A. Fugitives Subject to Fugitive Dust Rule Only...................................................15 B. Fugitives Subject to Fugitive Dust Rule and IDNR ACO 98-AQ-08………...17 C. Fugitives Subject to 40 CFR 63 Subpart LLL……………………………...….21 D. Haulroads Subject to ACO 98-AQ-08…………………………….……………24 E. Conveying System Transfer Points\Raw and Finish Mills\Storage Bins\Bulk

Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL………….27 F. Storage Tanks……………………………………………………………………34 G. Miscellaneous Sources…………………………………………………………..36

IV. General Conditions……………………………………………………………………..90 G1. Duty to Comply G2. Permit Expiration G3. Certification Requirement for Title V Related Documents G4. Annual Compliance Certification G5. Semi-Annual Monitoring Report G6. Annual Fee G7. Inspection of Premises, Records, Equipment, Methods and Discharges G8. Duty to Provide Information G9. General Maintenance and Repair Duties G10. Recordkeeping Requirements for Compliance Monitoring G11. Evidence used in establishing that a violation has or is occurring. G12. Prevention of Accidental Release: Risk Management Plan Notification and Compliance Certification G13. Hazardous Release G14. Excess Emissions and Excess Emissions Reporting Requirements G15. Permit Deviation Reporting Requirements G16. Notification Requirements for Sources That Become Subject to NSPS and NESHAP Regulations G17. Requirements for Making Changes to Emission Sources That Do Not Require Title V Permit Modification G18. Duty to Modify a Title V Permit G19. Duty to Obtain Construction Permits G20. Asbestos G21. Open Burning G22. Acid Rain (Title IV) Emissions Allowances G23. Stratospheric Ozone and Climate Protection (Title VI) Requirements G24. Permit Reopenings G25. Permit Shield G26. Severability G27. Property Rights G28. Transferability

Page 3: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 3 Final Permit # 04-TV-007R2, 11/09/17

G29. Disclaimer G30. Notification and Reporting Requirements for Stack Tests or Monitor Certification G31. Prevention of Air Pollution Emergency Episodes G32. Contacts List V. Appendix A: Administrative Consent Order No. 98-AQ-08…………………..……..103

Appendix B: Operation & Maintenance Plans..............................................................132 Appendix C: CAM Plans.................................................................................................209 Appendix D: 40 CFR Part 60 Subpart DDDD

Emission Limitations and Compliance Determination Methods…………..……..217 Appendix E: Weblinks to Standards……………………………………………..........220

Page 4: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 4 Final Permit # 04-TV-007R2, 11/09/17

Abbreviations acfm ........................... actual cubic feet per minute CFR ........................... Code of Federal Regulation dscf………………….dry standard cubic feet dscm…………………dry standard cubic meters oF ............................... degrees Fahrenheit EIQ ............................ emissions inventory questionnaire gr./dscf ....................... grains per dry standard cubic foot hp./hr………………...horsepower hours IAC ............................ Iowa Administrative Code IDNR ......................... Iowa Department of Natural Resources KWH………………..kilowatts per hour mg/dscm…………….milligrams per dry standard cubic meter N/A.............................not applicable ng/dscm……………..nanograms per dry standard cubic meter NSPS ......................... new source performance standard ppmv .......................... parts per million by volume lb/hr ........................... pounds per hour lb/MMBtu .................. pounds per million British thermal units MMcf/hr……………..million cubic feet per hour scfm ........................... standard cubic feet per minute TEQ…………………toxicity equivalents TPY ........................... tons per year tons/hr……………….tons per hour USEPA ...................... United States Environmental Protection Agency VMT/hr……………..vehicle miles traveled per hour Pollutants PM ............................. particulate matter PM10 .......................... particulate matter ten microns or less in diameter SO2 ............................ sulfur dioxide NOx ............................ nitrogen oxides VOC .......................... volatile organic compound CO ............................. carbon monoxide HAP ........................... hazardous air pollutant D/F…………………..dioxins and furans

Page 5: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 5 Final Permit # 04-TV-007R2, 11/09/17

I. Facility Description and Equipment List Facility Name: Continental Cement Company – Davenport Plant Permit Number: 04-TV-007R2 Facility Description: Portland Cement Plant (SIC 3241)

Equipment List A. Fugitives Subject to Fugitive Dust Rule Only

Emission Point Number

Emission Unit Number

Emission Unit Description IDNR Construction Permit Number

0040-0-F 0040-3-F Raw Materials Screening N/A 0060-0-F 0060-1-F Overburden Removal N/A

B. Fugitives Subject to Fugitive Dust Rule and Iowa DNR Administrative Consent Order 98-AQ-08

Emission Point Number

Emission Unit Number

Emission Unit Description IDNR Construction Permit Number

0070-0-F 0070-1-F Raw Materials Loading in Quarry N/A 0081-0-F 0081-1-F Quarry Drilling N/A

0110-0-F 0110-1-F Raw Materials Storage Pile N/A 0110-2-F Storage Pile Load In/Out

0120-0-F 0120-1-F Raw Materials Storage Pile N/A 0120-2-F Storage Pile Load In/Out

0130-0-F 0130-1-F Raw Materials Storage Pile N/A 0130-2-F Storage Pile Load In/Out

0200-0-F

0200-1-F Front End Loader Filling Clay Hopper

N/A

0200-2-F Front End Loader Filling Stone Hopper 0200-3-F Raw Material Transfer to Apron Feeder 0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt Transfer to 0208 0200-8-F 0225 Primary Crusher Fugitives

0203-0-F 0203-1-F Raw Material Transfer-Conveyor to Conveyor N/A

0300-0-F

0300-1-F Raw Material Transfer-Conveyor to Conveyor

N/A 0300-2-F Raw Material Transfer-Conveyor to Conveyor 0300-3-F Raw Material Transfer-Conveyor to Pile 0300-4-F Raw Material Transfer-Pile to Conveyor

0387-0-F 0387-1-F Raw Material Transfer-Conveyor Over Road N/A

Page 6: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 6 Final Permit # 04-TV-007R2, 11/09/17

C. Fugitives Subject to 40 CFR 63 Subpart LLL

Emission Point Number

Emission Unit Number

Emission Unit Description IDNR Construction Permit Number

0400-0-F 0400-1-F 0491, 0494, 0496 Weigh Feeders to 0489 Belt N/A 0420-0-F 0420-1-F 0489 Belt Transfer to 0480 Roller Mill N/A 0487-0-F 0487-1-F 0487 Slide Gate Truck Loading N/A 0488-0-F 0488-1-F 0488 Manual Flop Gate Truck Loading N/A 0576-0-F 0576-1-F 0576 Manual Flop Gate-Truck Loading N/A 0718-0-F 0718-1-F Clinker Bin Load Out-Truck Loading N/A 0745-0-F 0745-1-F West Silo Loadout Chute N/A 0746-0-F 0746-1-F East Silo Loadout Chute N/A 0766-0-F 0766-1-F 0766 Feeder Transfer to 0722 Belt Conveyor N/A

0800-0-F

0706-1-F 757 and 719 -Bucket Elevators N/A 0800-1-F Finish Mill Building Fugitives

N/A 0889-1-F 886 Belt Transfer to 0905 Belt 0826-1-F 826 Belt Conveyor

0906-0-F 0906-1-F 0905 Belt Transfer to 0908 Hopper N/A 0926-0-F 0926-1-F 0914 Belt Transfer to 0916 Hopper N/A

1300-0-F 1300-1-F Rail Loading Fugitives N/A 1300-2-F Truck Loading Fugitives 2601-0-F 2601-1-F Barge Loading Spout Fugitives N/A

D. Haulroads Subject to Administrative Consent Order No. 98-AQ-08

Emission Point Number

Emission Unit Number

Emission Unit Description IDNR Construction Permit Number

0155-0-F 0155-1-F Quarry Haulroad-Rock Hauling N/A 0160-0-F 0160-1-F Quarry Haulroad-Clay Hauling N/A 0165-0-F 0165-1-F Haulroad-Clay from Storage Piles to Crusher N/A 0691-0-F 0691-1-F Haulroad-Rail Unloading Raw Materials N/A 0692-0-F 0692-1-F Haulroad-Rail Unloading Clinker N/A 0695-0-F 0695-1-F Haulroad-Rail Unloading Fuel N/A

0765-0-F 0765-1-F Unpaved Haulroad to 0765 Feeder N/A 0765-2-F Paved Haulroad to 0765 Feeder 1301-0-F 1301-1-F Haulroad-Truck Loadout of Cement N/A

E. New Haulroad

Emission Point Number

Emission Unit Number

Emission Unit Description IDNR Construction Permit Number

LMM LMM Plant Haul Road- Unpaved Road Segment LMM 17-A-461

Page 7: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 7 Final Permit # 04-TV-007R2, 11/09/17

F. Conveying System Transfer Points\ Raw and Finish Mills\ Storage Bins\ Bulk Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL

Emission Point Number

Emission Unit Number

Emission Unit Description IDNR Construction Permit Number

0404-0 0404-1 Raw Material Transfer- Conveyor to Homogenization Silos 78-A-229-S3

0420-0 0420-1 Raw Material Transfer- Airslides to Vertical Conveyor 78-A-228-S4 G. Conveying System Transfer Points\ Raw and Finish Mills\ Storage Bins\ Bulk Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL (cont)

Emission Point Number

Emission Unit Number

Emission Unit Description IDNR Construction Permit Number

0498-0 0498-1 Raw Material Transfer- Conveyors to Preblend Bin 78-A-226-S5

0504-0 0504-1 Raw Material Transfer- Airslides/Separator/Bin to Kiln 78-A-230-S4

0709-0 0709-1 Drag Conveying Clinker 80-A-012-S3 0723-0-F 0723-1-F Clinker Reclaim Vibrating Feeders 78-A-236-S4 0743-0 0743-1 Drag Conveying Clinker 78-A-235-S4 0811-0 0811-1 Finish Mill Holding Bin 80-A-013-S3

0817-0 0817-1 Finish Mill (Particulate Emissions) 78-A-237-S4 0817-2 Finish Mill (VOC Emissions) 0822-0 0822-1 Finish Mill Air Separator 78-A-238-S5 0950-0 0950-1 Barge Loading Silo 85-A-050-S3 1007-0 1007-1 A&E Silos 16 and 18-30 76-A-003-S4 1009-0 1009-1 A&E Silos 15 and 17 11-A-175 1008-0 1008-1 Slag Transfer Airslide Dust Collector 05-A-634 1017-0 1017-1 Conebottom Silos # 31-40 76-A-004-S4 1027-0 1027-1 Cement Silo 76-A-051-S1 1033-0 1033-1 Cement Silo 80-A-011-S1 1037-0 1037-1 Cement Silo 91-A-326-S1 1041-0 1041-1 Rail Car Loading System- Silo # 41 88-A-076-S3

1044-0 1044-0 North Truck Loading Spout

86-A-015-S4 1440-03 Airslide Conveyor 1442-05 Airslide Conveyor

1045-0 1045-1 South Bulk Truck Loadout System 86-A-014-S3 1047-0 1047-1 Rail Car Loading System- Silos # 47 & 48 83-A-041-S3 1053-0 1053-1 West Overtrack Silos 78-A-242-S6 1449-0 1449-1 Silo 42 05-A-635-S1 2000-0 2000-1 SO2 Lime Injection Tank 07-A-949-S1 2001-0 2001-1 SO2 Lime Injection Bin 07-A-950-S1 2601-0 2601-1 Barge Loading Spout System 85-A-052-S5

Page 8: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 8 Final Permit # 04-TV-007R2, 11/09/17

H. Storage Tanks

Emission Point Number

Emission Unit Number

Emission Unit Description IDNR Construction Permit Number

EPT-1 EUT-1 Storage Tank 1 07-A-1515 EPT-2 EUT-2 Storage Tank 2 07-A-1516 EP T-3 EU T-3 Storage Tank 3 07-A-1517 EP T-4 EU T-4 Storage Tank 4 07-A-1518

I. Miscellaneous Sources

Emission Point Number

Emission Unit Number

Emission Unit Description IDNR Construction Permit Number

0020-0 0020-1 Emergency Generator 99-A-136-S2 0030-0 0030-1 Diesel Water Pump 99-A-137-S1 0081-0 0081-1 Quarry Drill 87-A-080-S2

0203-0 0203-1 Raw Material Transfer in Transfer House-Conveyor to Conveyor 78-A-221-S6

0218-0 0218-1 Crushing and Conveying of Raw Materials 78-A-218-S7 0327-0-F 0327-1-F Raw Material Transfer- Vibrating Feeder to Conveyor 78-A-223-S4

0466-0 0466-1 Preheater/Precalciner/Kiln/Raw Mill System 99-A-579-P6 0466-2 Alkali Bypass 0499-0 0499-1-F 20,000 gallon Fuel Oil Tank 98-A-1055-S1 0535-0 0535-1 CKD Handling Silo 97-A-789-S2 0611-0 0611-1 Clinker Cooler and Drag Conveyor 01-A-878-P1

0667-0 0667-1 Coal Mill and Bins 78-A-232-S3 0667-2 Coal Mill and Bins 0684-0 0684-1 Coal Silo 78-A-248-S6 0684-0-F 0684-1-F Raw Material Transfer-Conveyor to Conveyor N/A 0690-0-F 0690-3-F Coal Hopper/Weigh Feeder-Load In/Out 96-A-645-S3 1310-0 1310-1 Pavement Cleaning 86-A-084-S1 1320-0 1320-1 Pavement Cleaning 86-A-085-S1

Page 9: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 9 Final Permit # 04-TV-007R2, 11/09/17

Insignificant Activities Equipment List

Insignificant Emission Unit Number

Insignificant Emission Unit Description

0040-1-F Raw Materials Storage Pile 0040-2-F Raw Materials Storage Pile Load In/Out 0040-4-F Load Out of Screened Material 0082-1-F Quarry Blasting 0204-1-F Road Stone/Mason Stone Stockpile 0204-2-F Storage Pile Load in/Load out 0207-1-F Raw Material Transfer-Flop Gate 0538-1-F CKD Load Out 0538-2-F Haulroad-CKD to Landfill 0538-3-F CKD Landfill Load Out 0655-1-F Barge Load In/Out (Coal) 0655-2-F Haulroad - Barge to Coal Stockpile 0677-1-F 0677 Manual Flop Gate-Truck Loading 0690-1-F Coal Transfer-Conveyor to Conveyor 0690-2-F Coal Piles - Wind Erosion 0690-4-F Coal Stockpile Load In/Out 0696-1-F Raw Materials Stockpiles Wind Erosion 0696-2-F Stockpile Load in/Load out 0697-1-F Rail Unloading Fuels, Raw Materials 0697-2-F Rail Unloading: Clinker 0760-1-F Stockpiles (North of Silo) – Wind Erosion 0760-2-F Clinker Stockpile Load in /Load out 0760-3-F Raw Material Stockpile-Load In/Out 0761-1-F Unloading Gypsum Into Gypsum Hopper 0761-2-F Unloading into Gypsum Hopper: Clinker 0770-1-F Storage Hall Stockpile – wind Erosion 0770-2-F Stockpile Load in/Load out – Clinker 0770-3-F Stockpile Load in/Load out – Raw Materials I-12 2,000 gal Waste Mtr Oil Storage Tank I-14 Two 5,524 Gallon #2 Fuel Oil Storage Tank

I-15 Two 10,000 Gallon Grinding Aid Storage Tanks (maximum vapor pressure 0.00003psia)

I-38 Maintenance Welding I-39 Maintenance Chute-Preheater Tower I-40 Maintenance Chute-Clinker Cooler I-41 Maintenance Chute-Coal Mill I-42 Maintenance Chute-Raw Mill I-43 Hot Water Heater (0.095 MMBtu/hr) I-44 Hot Water Heater (30 psi boiler 1.2 MMBtu/hr) I-45 Parts Washer-44 Gallon Cap. I-46 Parts Washer-44 Gallon Cap.

Page 10: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 10 Final Permit # 04-TV-007R2, 11/09/17

Insignificant Emission Unit Number

Insignificant Emission Unit Description

I-47 4,000 Bushel Grain Storage Bin I-48 Parts Washer-44 Gallon Cap.

Page 11: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 11 Final Permit # 04-TV-007R2, 11/09/17

II. Plant-Wide Conditions Facility Name: Continental Cement Company – Davenport Plant Permit Number: 04-TV-007R2 Permit conditions are established in accord with 567 Iowa Administrative Code rule 22.108 ______________________________________________________________________________ The term of this permit is: Five (5) years. Commencing on: Ending on: Amendments, modifications and reopenings of the permit shall be obtained in accordance with 567 Iowa Administrative Code rules 22.110 - 22.114. Permits may be suspended, terminated, or revoked as specified in 567 Iowa Administrative Code Rules 22.115. ______________________________________________________________________________ Emission Limits Unless specified otherwise in the Source Specific Conditions, the following limitations and supporting regulations apply to all emission points at this plant: Opacity (visible emissions): 40% opacity Authority for Requirement: 567 IAC 23.3(2)"d" Sulfur Dioxide (SO2): 500 parts per million by volume Authority for Requirement: 567 IAC 23.3(3)"e" Particulate Matter: No person shall cause or allow the emission of particulate matter from any source in excess of the emission standards specified in this chapter, except as provided in 567 – Chapter 24. For sources constructed, modified or reconstructed after July 21, 1999, the emission of particulate matter from any process shall not exceed an emission standard of 0.1 grain per dry standard cubic foot of exhaust gas, except as provided in 567 – 21.2(455B), 23.1(455B), 23.4(455B) and 567 – Chapter 24. For sources constructed, modified or reconstructed prior to July 21, 1999, the emission of particulate matter from any process shall not exceed the amount determined from Table I, or amount specified in a permit if based on an emission standard of 0.1 grain per standard cubic foot of exhaust gas or established from standards provided in 23.1(455B) and 23.4(455B). Authority for Requirement: 567 IAC 23.3(2)"a"

Fugitive Dust: Attainment and Unclassified Areas - A person shall take reasonable precautions to prevent particulate matter from becoming airborne in quantities sufficient to cause a nuisance as defined in Iowa Code section 657.1 when the person allows, causes or permits any materials to be handled, transported or stored or a building, its appurtenances or a construction haul road to be used, constructed, altered, repaired or demolished, with the exception of farming operations or dust generated by ordinary travel on unpaved roads. Ordinary travel includes routine traffic and road maintenance activities such as scarifying, compacting, transporting road maintenance surfacing

Page 12: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 12 Final Permit # 04-TV-007R2, 11/09/17

material, and scraping of the unpaved public road surface. (the preceding sentence is State Only) All persons, with the above exceptions, shall take reasonable precautions to prevent the discharge of visible emissions of fugitive dusts beyond the lot line of the property on which the emissions originate. The public highway authority shall be responsible for taking corrective action in those cases where said authority has received complaints of or has actual knowledge of dust conditions which require abatement pursuant to this subrule. Reasonable precautions may include, but not be limited to, the following procedures. 1. Use, where practical, of water or chemicals for control of dusts in the demolition of existing

buildings or structures, construction operations, the grading of roads or the clearing of land. 2. Application of suitable materials, such as but not limited to asphalt, oil, water or chemicals on

unpaved roads, material stockpiles, race tracks and other surfaces which can give rise to airborne dusts.

3. Installation and use of containment or control equipment, to enclose or otherwise limit the emissions resulting from the handling and transfer of dusty materials, such as but not limited to grain, fertilizer or limestone.

4. Covering, at all times when in motion, open-bodied vehicles transporting materials likely to give rise to airborne dusts.

5. Prompt removal of earth or other material from paved streets or to which earth or other material has been transported by trucking or earth-moving equipment, erosion by water or other means.

6. Reducing the speed of vehicles traveling over on-property surfaces as necessary to minimize the generation of airborne dusts.

Authority for Requirement: 567 IAC 23.3(2)"c" __________________________________________________________________________ Operational Limits & Requirements The owner/operator of this facility shall comply with the operational limits and requirements listed below. The Permittee shall comply with all applicable requirements of Iowa Department of Natural Resources Administrative Consent Order No. 98-AQ-08. Applicable Limits and Requirements From Iowa Department of Natural Resources Administrative Consent Order No. 98-AQ-08 See Appendix A Authority for Requirement: Iowa Department of Natural Resources Administrative Consent Order No. 98-AQ-08 __________________________________________________________________________

Page 13: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 13 Final Permit # 04-TV-007R2, 11/09/17

NSPS and NESHAP Applicability 40 CFR 60 Subpart A This facility is an affected source and these General Provisions apply to the facility. The affected units are emission units 0327-1-F, 0667-1, 0667-2, 0684-1-F, 0466-1, 0466-2, 0400-1-F, 0420-1-F, 0487-1-F, 0488-1-F, 0576-1-F, 0718-1-F, 0745-1-F, 0746-1-F, 0766-1-F, 0706-1-F, 0906-1-F, 0926-1-F, 1300-1-F, 1300-2-F, 2601-1-F, 0404-1, 0420-1, 0498-1, 0504-1, 0709-1, 0723-1-F, 0743-1, 0811-1, 0817-1, 0817-2, 0822-1, 0950-1, 1007-1, 1009-1, 1008-1, 1017-1, 1027-1, 1033-1, 1037-1, 1041-1, 1044-0, 1045-1, 1047-1, 1053-1, 1449-1, 2000-1, 2001-1, 2601-1, 0203-1, and 0611-1. See Appendix E for a link to the Standard. Authority for Requirement: 40 CFR 60 Subpart A

567 IAC 23.1(2) 40 CFR 60 Subpart F This facility is subject to Standards of Performance for Portland Cement Plants. The affected emission units are 0327-1-F and all of the units listed under the 40 CFR 63 Subpart LLL paragraph on the following page. The emission units subject to NESHAP Subpart LLL are exempt from any otherwise applicable new source performance standard contained in Subpart F that are less stringent than NESHAP Subpart LLL requirements per 40 CFR §63.1356 of Subpart LLL. See Appendix E for a link to the Standard. Authority for Requirement: 40 CFR Part 60 Subpart F

567 IAC 23.1(2)"c" 40 CFR 60 Subpart Y This facility is subject to Standards of Performance for Coal preparation Plants . The affected units are emission units 0667-1, 0667-2, and 0684-1-F. See Appendix E for a link to the Standard. Authority for Requirement: 40 CFR Part 60 Subpart Y

567 IAC 23.1(2)"v" 40 CFR 60 Subpart DDDD The kiln, emission units 0466-1 and 0466-2, is subject to Standards of Performance for Commercial and Industrial Solid Waste Incineration Units that Commenced Construction on or before November 30, 1999. See Appendix E for a link to the Standards. Authority for Requirement: 40 CFR Part 60 Subpart DDDD

Page 14: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 14 Final Permit # 04-TV-007R2, 11/09/17

40 CFR 61 Subparts A and E The kiln, emission unit 0466-1, is subject to subpart A (General Provisions; 40 CFR §61.1 through 40 CFR §61.19) and Subpart E (National Emission Standard for Mercury; 40 CFR §61.50 through 40 CFR §61.56) of the NESHAP when the kiln uses materials in the Water & Waste Treatment Byproducts category listed in Emission Point-Specific Conditions section. See Appendix E for a link to the Standard. Authority for Requirements: 40 CFR 61 Subpart A

567 IAC 23.1(3) 40 CFR 61 Subpart E 567 IAC 23.1(3)"d"

40 CFR 63 Subpart A This facility is an affected source and these General Provisions apply to the facility. The affected units are emission units 0400-1-F, 0420-1-F, 0487-1-F, 0488-1-F, 0576-1-F, 0718-1-F, 0745-1-F, 0746-1-F, 0766-1-F, 0706-1-F, 0906-1-F, 0926-1-F, 1300-1-F, 1300-2-F, 2601-1-F, 0404-1, 0420-1, 0498-1, 0504-1, 0709-1, 0723-1-F, 0743-1, 0811-1, 0817-1, 0817-2, 0822-1, 0950-1, 1007-1, 1009-1, 1008-1, 1017-1, 1027-1, 1033-1, 1037-1, 1041-1, 1044-0, 1045-1, 1047-1, 1053-1, 1449-1, 2000-1, 2001-1, 2601-1, 0203-1, 0611-1, 0020-1, 0030-1, and 0667-2. See Appendix E for a link to the Standard. Authority for Requirement: 40 CFR Part 63 Subpart A

567 IAC 23.1(4) 40 CFR 63 Subpart LLL This facility is subject to the National Emission Standards for Hazardous Air Pollutants from the Portland Cement Manufacturing Industry. The affected units are emission units 0400-1-F, 0420-1-F, 0487-1-F, 0488-1-F, 0576-1-F, 0718-1-F, 0745-1-F, 0746-1-F, 0766-1-F, 0706-1-F, 0906-1-F, 0926-1-F, 1300-1-F, 1300-2-F, 2601-1-F, 0404-1, 0420-1, 0498-1, 0504-1, 0709-1, 0723-1-F, 0743-1, 0811-1, 0817-1, 0817-2, 0822-1, 0950-1, 1007-1, 1009-1, 1008-1, 1017-1, 1027-1, 1033-1, 1037-1, 1041-1, 1044-0, 1045-1, 1047-1, 1053-1, 1449-1, 2000-1, 2001-1, 2601-1, 0203-1, and 0611-1. See Appendix E for a link to the Standard. Authority for Requirements: 40 CFR 63 Subpart LLL 567 IAC 23.1(4)"bl" 40 CFR 63 Subpart ZZZZ Emission units 0020-1 and 0030-1 are subject to the National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines (RICE NESHAP) [40 CFR Part 63 Subpart ZZZZ]. See Appendix E for a link to the Standard. Authority for Requirement: 40 CFR Part 63 Subpart ZZZZ

567 IAC 23.1(4)"cz"

40 CFR 63 Subpart DDDDD Emission unit 0677-2 is subject to the National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters . See Appendix E for a link to the Standard. Authority for Requirement: 40 CFR Part 63 Subpart DDDDD

Page 15: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 15 Final Permit # 04-TV-007R2, 11/09/17

I. Emission Point-Specific Conditions Facility Name: Continental Cement Company – Davenport Plant Permit Number: 04-TV-007R2 ______________________________________________________________________________

Emission Point ID Number: See Table: Fugitives Subject to Fugitive Dust Rule Only Associated Equipment Associated Emission Unit ID Numbers: See Table: Fugitives Subject to Fugitive Dust Rule Only ______________________________________________________________________________ Table: Fugitives Subject to Fugitive Dust Rule Only

Emission Point

Number

Associated Emission Unit

Number Emission Unit Description Raw Material Rated Capacity

(tons/hr)

0010-0-F 0010-1-F HC Soils Storage Pile HC Soils 46.0

0040-0-F 0040-3-F Raw Materials Screening Raw Materials(1) 76.0

0060-0-F 0060-1-F Overburden Removal Topsoil 2,000

(1) Raw materials refers to any one or a mixture of the kiln-stock materials used to produce cement, which are primarily limestone, clay, or alternative raw materials such as hydrocarbon contaminated soils. Coal and other primary fuel sources are not included in this category.

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from these emission points shall not exceed the levels specified below. Pollutant: Fugitive Dust Emission Limit: No person shall allow, cause or permit any materials to be handled, transported or stored; or a building, its appurtenances or a construction haul road to be used, constructed, altered, repaired or demolished, without taking reasonable precautions to prevent a nuisance. All persons shall take reasonable precautions to prevent the discharge of visible emissions of fugitive dusts beyond the lot line of the property on which the emissions originate. Authority for Requirement: 567 IAC 23.3(2)"c"

Page 16: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 16 Final Permit # 04-TV-007R2, 11/09/17

Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 17: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 17 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: See Table: Fugitives Subject to Fugitive Dust Rule And Iowa DNR Administrative Consent Order 98-AQ-08

Associated Equipment Associated Emission Unit ID Numbers: See Table: Fugitives Subject to Fugitive Dust Rule and Iowa DNR Administrative Consent Order 98-AQ-08 ______________________________________________________________________________ Table: Fugitives Subject to Fugitive Dust Rule and Iowa DNR Administrative Consent Order 98-AQ-08

Emission Point

Number

Associated Emission Unit

Number Emission Unit Description Raw Material Rated Capacity

0070-0-F 0070-1-F Raw Materials Loading in Quarry Raw Materials(1) 2,000 tons/hr

0081-0-F 0081-1-F Quarry Drilling Limestone 2,500 tons/hr

0110-0-F 0110-1-F Raw Materials Storage Pile Raw Materials(1) 0.60 acres

0110-2-F Storage Pile Load In/Out Raw Materials(1) 210 tons/hr

0120-0-F 0120-1-F Raw Materials Storage Pile Raw Materials(1) 0.41 acres

0120-2-F Storage Pile Load In/Out Raw Materials(1) 210 tons/hr

0130-0-F 0130-1-F Raw Materials Storage Pile Raw Materials(1) 2.75 acres

0130-2-F Storage Pile Load In/Out Raw Materials(1) 210 tons/hr

0200-0-F

0200-1-F Front End Loader Filling Clay Hopper Clay 210 tons/hr

0200-2-F Front End Loader Filling Stone Hopper Limestone 1,400 tons/hr

0200-3-F Raw Material Transfer to Apron Feeder Raw Materials(1) 210 tons/hr

0200-4-F Dump Hopper to Apron Feeder Raw Materials(1) 1,400 tons/hr

0200-5-F Apron Feeder Transfer to Primary Crusher Raw Materials(1) 1,400 tons/hr

0200-6-F 0225 Crusher Transfer to 0221 Raw Materials(1) 1,400 tons/hr

0200-7-F 0221 Belt Transfer to 0208 Raw Materials(1) 1,400 tons/hr

0200-8-F 0225 Primary Crusher Fugitives Raw Materials(1) 1,400 tons/hr

0203-0-F 0203-1-F Raw Material Transfer-Conveyor to Conveyor Raw Materials(1) 1,400 tons/hr

0300-0-F 0300-1-F Raw Material Transfer-Conveyor to Conveyor Raw Materials(1) 1,400 tons/hr

Page 18: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 18 Final Permit # 04-TV-007R2, 11/09/17

Emission Point

Number

Associated Emission Unit

Number Emission Unit Description Raw Material Rated Capacity

0300-2-F Raw Material Transfer-Conveyor to Conveyor Raw Materials(1) 1,400 tons/hr

0300-3-F Raw Material Transfer-Conveyor to Pile Raw Materials(1) 1,400 tons/hr

0300-4-F Raw Material Transfer-Pile to Conveyor Raw Materials(1) 300 tons/hr

0387-0-F 0387-1-F Raw Material Transfer-Conveyor Over Road Raw Materials(1) 1,400 tons/hr

(1) Raw materials refers to any one or a mixture of the kiln-stock materials used to produce cement, which are primarily limestone, clay, or alternative raw materials such as hydrocarbon contaminated soils. Coal and other primary fuel sources are not included in this category.

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from these emission points shall not exceed the levels specified below. Pollutant: Fugitive Dust Emission Limit: No person shall allow, cause or permit any materials to be handled, transported or stored; or a building, its appurtenances or a construction haul road to be used, constructed, altered, repaired or demolished, without taking reasonable precautions to prevent a nuisance. All persons shall take reasonable precautions to prevent the discharge of visible emissions of fugitive dusts beyond the lot line of the property on which the emissions originate. Authority for Requirement: 567 IAC 23.3(2)"c" Operational Limits & Requirements The owner/operator of this equipment shall comply with the operational limits and requirements listed below in Table: Fugitives Subject to Fugitive Dust Rule and Iowa DNR Administrative Consent Order 98-AQ-08-Operational Limits & Requirements.

Table: Fugitives Subject to Fugitive Dust Rule and Iowa DNR Administrative Consent Order 98-AQ-08 -Operational Limits & Requirements

Emission Point

Number

Associated Emission Unit

Number

Process Throughput Limit

Reporting & Recordkeeping(1)

Authority for Requirements

0070-0-F 0070-1-F 365,000 tons of raw

material to the crusher per month

The quantity of raw materials crushed shall be

recorded monthly.

Section IV(2) Iowa Department of

Natural Resources Administrative

Consent Order No. 98-AQ-08

Page 19: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 19 Final Permit # 04-TV-007R2, 11/09/17

Table: Fugitives Subject to Fugitive Dust Rule and Iowa DNR Administrative Consent Order 98-AQ-08 -Operational Limits & Requirements (Cont.)

Emission

Point Number

Associated Emission Unit

Number

Process Throughput Limit

Reporting & Recordkeeping(1)

Authority for Requirements

0081-0-F 0081-1-F 365,000 tons of raw

material to the crusher per month

The quantity of raw materials crushed shall be

recorded monthly.

Section IV(2) Iowa Department of

Natural Resources Administrative

Consent Order No. 98-AQ-08

0110-0-F 0110-1-F 55,480 tons of clay to the

crusher per month

The quantity of clay crushed shall be recorded

monthly. 0110-2-F

0120-0-F 0120-1-F 55,480 tons of clay to the

crusher per month The quantity of clay crushed shall be recorded

monthly.

0120-2-F

0130-0-F 0130-1-F 55,480 tons of clay to the

crusher per month 0130-2-F

0200-0-F

0200-1-F

365,000 tons of raw materials to the crusher

per month and transferred to the kiln, of which 128,480 tons may be

alternative raw materials and clay.

The quantity of raw material and clay crushed shall be recorded monthly

0200-2-F

0200-3-F

0200-4-F

0200-5-F

0200-6-F

0200-7-F

0200-8-F

0203-0-F 0203-1-F 365,000 tons of raw

material to the crusher per month

The quantity of raw material crushed shall be

recorded monthly.

0300-0-F

0300-1-F 365,000 tons of raw

material to the crusher per month

The quantity of raw materials crushed shall be

recorded monthly.

0300-2-F

0300-3-F

0300-4-F

0387-F 0387-1-F 365,000 tons of raw material crushed per

month

The quantity of raw materials crushed shall be

recorded monthly. (1) The records shall be kept on site for a minimum of five years, and shall be available for inspection by the Department.

Page 20: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 20 Final Permit # 04-TV-007R2, 11/09/17

Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 21: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 21 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: See Table: Fugitives Subject to 40 CFR 63 Subpart LLL

Associated Equipment Associated Emission Unit ID Numbers: See Table: Fugitives Subject to 40 CFR 63 Subpart LLL ______________________________________________________________________________ Table: Fugitives Subject to 40 CFR 63 Subpart LLL

Emission Point

Number

Associated Emission Unit

Number Emission Unit Description Raw Material

Rated Capacity (tons/hr)

0400-0-F 0400-1-F 0491, 0494, 0496 Weigh Feeders to 0489 Belt

Raw Materials(1) 300

0420-0-F 0420-1-F 0489 Belt Transfer to 0480 Roller Mill

Raw Materials(1) 300

0487-0-F 0487-1-F 0487 Slide Gate-Truck Loading

Raw Materials(1) 10

0488-0-F 0488-1-F 0488 Manual Flop Gate-Truck Loading

Raw Materials(1) 300

0576-0-F 0576-1-F 0576 Manual Slide Gate Load Out Clinker 30

0718-0-F 0718-1-F Clinker Bin Load Out-Truck Loading Clinker 180

0745-0-F 0745-1-F West Silo Loadout Chute Clinker 180

0746-0-F 0746-1-F East Silo Loadout Chute Clinker 180

0766-0-F 0766-1-F 0766 Feeder Transfer to 0722 Belt Conveyor

Clinker, Gypsum 180

0800-0-F

0706-1-F 757 and 719 Bucket Elevators Clinker 220 0800-1-F Finish Mill Building Fugitives Clinker 180

0889-1-F 0886 Belt Conveyor Transfer to 0905 Belt Cement 200

0826-1-F 826 Belt Conveyor Clinker 180

0906-0-F 0906-1-F 0905 Belt Conveyor Transfer to 0908 Hopper Cement 200

0926-0-F 0926-1-F 0914 Belt Conveyor Transfer to 0916 Hopper Cement 200

1300-0-F 1300-1-F Rail Loading Fugitives Cement 600

1300-2-F Truck Loading Fugitives Cement 300

2601-0-F 2601-1-F Barge Loading Spout Fugitives Cement 100 (1) Raw materials refers to any one or a mixture of the kiln-stock materials used to produce cement, which are primarily limestone, clay, or alternative raw materials such as hydrocarbon contaminated soils. Coal and other primary fuel sources are not included in this category.

Page 22: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 22 Final Permit # 04-TV-007R2, 11/09/17

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from these emission points shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 10% Authority for Requirement: 567 IAC 23.1(4)"bl"

40 CFR 63.1345 NSPS and NESHAP These emission units are subject to Subpart LLL (National Emission Standards for Hazardous Air Pollutants from the Portland Cement Manufacturing Industry; 40 CFR §63.1340 – §63.1358), but per 40 CFR §63.1356 of Subpart LLL these units are exempted from any otherwise applicable new source performance standard contained in 40 CFR 60 Subpart F, to which they are also subject. An O & M plan is required by Subpart LLL for these emission units. Relevant requirements of O & M plan for this equipment: Opacity - see Appendix B. Authority for Requirements: 40 CFR 60 Subpart F

567 IAC 23.1(2)"c" 40 CFR 63 Subpart LLL 567 IAC 23.1(4)"bl"

Operational Limits & Requirements The owner/operator of this equipment shall comply with the operational limits and requirements listed below.

Emission Point

Number

Associated Emission Unit

Number

Process Throughput Limit

Reporting & Recordkeeping(1)

Authority for Requirements

0400-0-F 0400-1-F 365,000 tons of raw

material to the crusher per month

The quantity of raw materials crushed shall be

recorded monthly. Section IV(2) Iowa Department of

Natural Resources Administrative

Consent Order No. 98-AQ-08

0800-0-F 0800-1-F 17,082 tons of gypsum usage per month

The quantity of gypsum used shall be recorded

monthly.

1300-0-F 1300-1-F

262,800 tons of cement production per month

The quantity of cement produced shall be recorded monthly.

1300-2-F

2601-0-F 2601-1-F

(1) The records shall be kept on site for a minimum of five (5) years, and shall be available for inspection by the Department.

Page 23: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 23 Final Permit # 04-TV-007R2, 11/09/17

Additional Reporting & Recordkeeping: A. Recordkeeping for NESHAP 40 CFR 63 Subpart LLL at the facility shall be done per

40 CFR 63.1355. Authority for Requirement: 567 IAC 23.1(4)"bl" 40 CFR 63.Subpart LLL Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. With the exception of emission points 0400-0-F and 1300-0-F, which are totally enclosed and thus exempt from periodic opacity monitoring [40 CFR 63.1350(f)(v)], the facility shall check the opacity as described in 40 CFR 63.1350 (f). Authority for Requirement - 567 IAC 23.1(4)"bl" 40 CFR 63.1350 Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 24: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 24 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Numbers: See Table: Haulroads Subject to Administrative Consent Order No. 98-AQ-08

Associated Equipment Associated Emission Unit ID Numbers: See Table: Haulroads Subject to Administrative Consent

Order No. 98-AQ-08 ______________________________________________________________________________ Table: Haulroads Subject to Administrative Consent Order No. 98-AQ-08

Emission Point

Number

Associated Emission Unit

Number Emission Unit Description Raw Material

Rated Capacity (VMT/hr)

0155-0-F 0155-1-F Quarry Haulroad-Rock Hauling Unpaved Road 16.47

0160-0-F 0160-1-F Quarry Haulroad-Clay Hauling Unpaved Road 2.47

0165-0-F 0165-1-F Haulroad-Clay from Storage Piles to Crusher Unpaved Road 3.31

0691-0-F 0691-1-F Haulroad-Rail Unloading Raw Materials Paved Road 14.77

0692-0-F 0692-1-F Haulroad-Rail Unloading Clinker Paved Road 2.27

0695-0-F 0695-1-F Haulroad-Rail Unloading Fuel Paved Road 4.55

0765-0-F 0765-1-F Unpaved Haulroad to 0765

Feeder Unpaved Road 0.63

0765-2-F Paved Haulroad to 0765 Feeder Paved Road 0.63

1301-0-F 1301-1-F Haulroad-Truck Loadout of Cement Paved Road 0.93

Applicable Requirements

Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from these emission points shall not exceed the levels specified below. Pollutant: Fugitive Dust Emission Limit: No person shall allow, cause or permit any materials to be handled, transported or stored; or a building, its appurtenances or a construction haul road to be used, constructed, altered, repaired or demolished, without taking reasonable precautions to prevent a nuisance. All persons shall take reasonable precautions to prevent the discharge of visible emissions of fugitive dusts beyond the lot line of the property on which the emissions originate. Authority for Requirement: 567 IAC 23.3(2)"c"

Page 25: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 25 Final Permit # 04-TV-007R2, 11/09/17

Operational Limits & Requirements The owner/operator of this equipment shall comply with the operational limits and requirements listed below. Process throughput: See Section IV(2.) Iowa Department of Natural Resources Administrative Consent Order No. 98-AQ-08 in Appendix A. Work practice standards: See Section IV(1.) Iowa Department of Natural Resources Administrative Consent Order No. 98-AQ-08 in Appendix A. Reporting & Record keeping Records as specified in Section IV(1.) and (2.) Iowa Department of Natural Resources Administrative Consent Order No. 98-AQ-08 in Appendix A shall be kept on site for a minimum of five years. The records shall be available for inspection upon request by representatives of the Department of Natural Resources. Authority for Requirement: Iowa Department of Natural Resources Administrative Consent Order

No. 98-AQ-08 Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 26: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 26 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: LMM Associated Equipment Associated Emission Unit ID Numbers: LMM ______________________________________________________________________________ Emission Unit vented through this Emission Point: LMM Emission Unit Description: Plant Haul Road Segment LMM Raw Material: Unpaved Road

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from these emission points shall not exceed the levels specified below. Pollutant: Fugitive Dust Emission Limit: No person shall allow, cause or permit any materials to be handled, transported or stored; or a building, its appurtenances or a construction haul road to be used, constructed, altered, repaired or demolished, without taking reasonable precautions to prevent a nuisance. All persons shall take reasonable precautions to prevent the discharge of visible emissions of fugitive dusts beyond the lot line of the property on which the emissions originate. Authority for Requirement: 567 IAC 23.3(2)"c" Pollutant: Particulate Matter (PM10) Emission Limit: 8.45 lb/day (1) Authority for Requirement: DNR Construction Permit 17-A-461

(1) Correlates to a total surface silt content of 2.1 percent, maximum truck traffic travel distance and 75 percent reduction for dust suppressant application as specified in the Operating Requirements with Associated Monitoring and Recordkeeping section condition 5 below.

Operating Requirements with Associated Monitoring and Recordkeeping for EP LMM Only The owner/operator of this equipment shall comply with the operational limits and requirements listed below. All records as required by this permit shall be kept on-site for a minimum of five (5) years and shall be available for inspection by the DNR. Records shall be legible and maintained in an orderly manner. The owner/operator shall maintain the following records for Unpaved Road Segment LMM: A. The owner or operator is limited to hauling 500,000 tons per rolling 12-month period, not to

exceed 100,000 tons in any one month on unpaved road segment (LMM). i. The owner or operator shall maintain record of the tons of material hauled on unpaved road

segment (LMM) for each calendar month of use. ii. The owner or operator shall calculate and record 12-month rolling month totals of material

hauled on unpaved road segment (LMM) in tons. B. The owner or operator shall utilize control measures to achieve 75 percent reduction of

particulate emissions generated on unpaved road segment LMM while in use except as noted in conditions iii and iv below. These measures include any of the following

Page 27: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 27 Final Permit # 04-TV-007R2, 11/09/17

i. Chemical dust suppressant application. The owner or operator shall apply chemical dust suppressant to the road surface at minimum frequency twice per calendar month,

ii. Water application: The owner or operator shall apply water to the road surface as a rate to maintain the road surface as a wet surface at all times during use.

iii. If the suppressant application cannot be applied because the ambient air temperature (as measured at the facility during daylight operating hours) will be less than 35° F (1.7° C) or conditions due to weather could create hazardous driving conditions, then the suppressant application shall be postponed and applied immediately after the scheduled date as the conditions preventing the application have abated

iv. Suppressant application need not occur when a rain gauge located at the site indicates that at least 0.2 inches of precipitation (water equivalent) has occurred within the preceding 24-hour time period. However, suppressant application shall resume within 24-hours after the precipitation event has ended

C. If visible emissions are observed from Unpaved Road Segment LMM during use, the owner or operator shall immediately apply water or chemical dust suppressant to haul road segment LMM.

D. The total surface material silt content shall not exceed 2.1 percent on unpaved road segment LMM. i. Within 90-days after construction permit 17-A-461issuance (September 20, 2017),

performance testing on the haul road surface silt content shall be completed on a quarterly basis. Performance testing shall be completed prior to any suppressant application. The silt content sampling shall be conducted according to the procedures outlined in AP-42, Appendix C.1 Procedures for Sampling Surface/Bulk Dust Loading and Appendix C.2 Procedures for Laboratory Analysis of Surface/Bulk Dust Loading Samples.

ii. The owner or operator shall maintain a log of each silt load sampling event that contains the following: a) The date of silt sampling event; b) The location of the sample taken; c) The measured silt content as percent d) Sample area used for silt sampling in feet; and, e) The operator’s initials.

iii. The owner or operator shall maintain record of the silt content results expressed as percent for each quarter.

E. The owner or operator shall maintain as record of the suppressant application on unpaved road segment LMM. The record shall include suppressant application frequency, quantity applied and suppressant utilized. If suppressant is not applied due to weather as specified in conditions B.iii and B.iv above, a written record must be kept on site outlining the conditions and when suppressant application resumed.

F. Best Management Practices (BMP) – The owner or operator shall implement “good housekeeping” or best management practices to minimize fugitive emissions from unpaved road segment LMM. Such practices may include but are not limited to: i. Clean up spills of materials on the road surface as expeditiously as possible and in a manner

consistent with good practice for minimizing dust emissions, ii. Post and maintain speed limit (5 mph) signs,

iii. Apply additional suppressant to material unloading/loading areas as necessary to prevent track out of material on the traveled road surface.

G. The owner or operator shall develop a written plan to implement, at a minimum, the Best Management Practices as specified in condition F above. The written plan and any documentation as required by the plan shall be maintained onsite and available for inspection.

Page 28: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 28 Final Permit # 04-TV-007R2, 11/09/17

Authority for Requirement: DNR Construction Permit 17-A-461 Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 29: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 29 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Numbers: See Table: Conveying System Transfer Points\ Raw and Finish Mills\ Storage Bins\ Bulk Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL

Associated Equipment Associated Emission Unit ID Numbers: See Table: Conveying System Transfer Points\ Raw and Finish Mills\ Storage Bins\ Bulk Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL Emissions Control Equipment ID Number: See Table: Conveying System Transfer Points\ Raw and Finish Mills\ Storage Bins\ Bulk Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL Emissions Control Equipment Description: See Table: Conveying System Transfer Points\Raw and Finish Mills\Storage Bins\ Bulk Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL __________________________________________________________________________ Table: Conveying System Transfer Points\ Raw and Finish Mills\ Storage Bins\ Bulk Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL

Emission Point

Number

Associated Emission

Unit Number

Emission Unit Description Control

Equipment Number

Control Equipment Description

Raw Material

Rated Capacity

0404-0 0404-1 Raw Material Transfer- Conveyor to Homo. Silos 0404-C Baghouse Raw

Materials(1) 280 tons/hr

0420-0 0420-1 Raw Material Transfer- Airslides to Vert. Conveyor 0420-C Baghouse Raw

Materials(1) 290 tons/hr

0498-0 0498-1 Raw Material Transfer- Conveyors to Preblend Bin 0498-C Baghouse Raw

Materials(1) 280 tons/hr

0504-0 0504-1 Raw Material Transfer- Airslides/Separator/Bin to Kiln 0504-C Baghouse Raw

Materials(1) 300 tons/hr

0709-0 0709-1 Drag Conveying Clinker 0709-C Baghouse Clinker 220 tons/hr

0723-0-F 0723-1-F Clinker Reclaim Vibrating Feeders

0723-C Baghouse

Clinker 90 tons/hr

0724-C Baghouse 0725-C Baghouse 0726-C Baghouse 0727-C Baghouse 0732-C Baghouse

0743-0 0743-1 Drag Conveying Clinker 0743-C Baghouse Clinker 220 tons/hr

0811-0 0811-1 Finish Mill Holding Bin 0811-C Baghouse Cement 75 Tons

0817-0 0817-1 Finish Mill

(Particulate Emissions) 0817-C Baghouse

Clinker, Gypsum 75 tons/hr

0817-2 Finish Mill (VOC Emissions)

Grinding Aid 26 gal/hr

Page 30: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 30 Final Permit # 04-TV-007R2, 11/09/17

Emission Point

Number

Associated Emission

Unit Number

Emission Unit Description Control

Equipment Number

Control Equipment Description

Raw Material

Rated Capacity

0822-0 0822-1 Finish Mill Air Separator 0822-C Baghouse Cement 75 tons/hr

0950-0 0950-1 Barge Loading Silo 0950-C Baghouse Cement 100 tons/hr 1007-0 1007-1 A.E. Silos # 16 & 18-30 1007-C Baghouse Cement 200 tons/hr 1008-0 1008-1 Slag Transfer Airslide 1008-C Baghouse Slag 200 tons/hr 1009-0 1009-1 Slag Storage Silo 15/17 1093-C Baghouse Slag 200 tons/hr 1017-0 1017-1 Conebottom Silos # 31-40 1017-C Baghouse Cement 102.8 tons/hr 1027-0 1027-1 Cement Silo 1027-C Baghouse Cement 11.08 tons/hr 1033-0 1033-1 Cement Silo 1033-C Baghouse Cement 75 tons/hr 1037-0 1037-1 Cement Silo 1037-C Baghouse Cement 70 tons/hr

1041-0 1041-1 Rail Car Loading System- Silo # 41 1041-C Baghouse Cement 300 tons/hr

1044-0 1044-0 North Truck Loading Spout

1044-C Baghouse Cement 150 tons/hr

1440-03 Airslide Conveyor 150 tons/hr 1442-05 Airslide Conveyor 150 tons/hr

1045-0 1045-1 South Bulk Truck Loadout System 1045-C Baghouse Cement 150 tons/hr

1047-0 1047-1 Rail Car Loading System- Silos # 47 & 48 1047-C Baghouse Cement 3,200 tons/hr

1053-0 1053-1 West Overtrack Silos 1053-C Baghouse Cement 200 tons/hr 1449-0 1449-1 Silo 42 1449-C Baghouse Cement 300 tons/hr 2000-0 2000-1 SO2 Lime Injection Tank 2301-C Baghouse Lime 135 Tons 2001-0 2001-1 SO2 Lime Injection Bin 2311-C Baghouse Lime 10 Tons 2601-0 2601-1 Barge Loading System Spout 2601-C Baghouse Cement 250 tons/hr

(1) Raw materials refers to any one or a mixture of the kiln-stock materials used to produce cement, which are primarily limestone, clay, or alternative raw materials such as hydrocarbon contaminated soils. Coal and other primary fuel sources are not included in this category.

Page 31: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 31 Final Permit # 04-TV-007R2, 11/09/17

Applicable Requirements Emission Limits (lb/hr, gr/dscf, lb/MMBtu, % opacity, etc.) The emissions from these emission points shall not exceed the levels specified in Table: Conveying System Transfer Points\ Raw and Finish Mills\ Storage Bins\ Bulk Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL -Emission Limits Table: Conveying System Transfer Points\ Raw and Finish Mills\ Storage Bins\ Bulk Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL-Emission Limits.

Emission Point

Number

Associated Emission Unit

Number

Opacity Limit(3)

PM10 Limit (lb/hr)

PM Limit (lb/hr)

Construction Permit #

0404-0 0404-1 10 %(1) 3.33 N/A 78-A-229-S3 0420-0 0420-1 10 %(1) 0.56 N/A 78-A-228-S4 0498-0 0498-1 10 %(1) 1.16 N/A 78-A-226-S5 0504-0 0504-1 10 % 2.08 N/A 78-A-230-S4 0709-0 0709-1 10 %(1) 0.64 N/A 80-A-012-S3

0723-0-F 0723-1-F 10 %(1) 0.43 N/A 78-A-236-S4 0743-0 0743-1 10 %(2) 3.02 N/A 78-A-235-S4 0811-0 0811-1 10 %(1) 0.62 N/A 80-A-013-S3

0817-0 0817-1 10%(1) 6.17 N/A 78-A-237-S4 0817-2 0822-0 0822-1 10%(1) 2.66 N/A 78-A-238-S5 0950-0 0950-1 10 %(1) 2.05 N/A 85-A-050-S3 1007-0 1007-1 10 %(1) 0.60 N/A 76-A-003-S4 1009-0 1009-1 10 %(1) 0.86 N/A 11-A-175 1008-0 1008-1 10% 0.47 0.47 05-A-634 1017-0 1017-1 10 %(1) 0.60 N/A 76-A-004-S4 1027-0 1027-1 10%(2) 0.08 N/A 76-A-051-S1 1033-0 1033-1 10%(2) 0.10 N/A 80-A-011-S1 1037-0 1037-1 10%(2) 0.21 N/A 91-A-326-S1 1041-0 1041-1 10 %(1) 0.34 N/A 88-A-076-S3

1044-0 1044-0

10 %(1) 0.52 N/A N/A 86-A-015-S4 1440-03

1442-05 1045-0 1045-1 10 %(1) 0.52 N/A 86-A-014-S3 1047-0 1047-1 10 %(1) 0.38 N/A 83-A-041-S3 1053-0 1053-1 10 %(1) 1.44 N/A 78-A-242-S6 1449-0 1449.1 10% 2.14 2.14 05-A-635-S1 2000-0 2000-1 10 %(1) 0.22 N/A 07-A-949-S1 2001-0 2001-1 10 %(1) 0.09 N/A 07-A-950-S1 2601-0 2601-1 10 %(1) 1.71 N/A 85-A-052-S5

(1) If opacity greater than that observed in the initial performance test is viewed other than startup, shutdown, or malfunction, a stack test may be required to demonstrate compliance with the particulate standard. (2) An exceedence of the indicator opacity of no visible emissions will require the owner/operator to promptly investigate the emission unit and make corrections to operations or equipment associated

Page 32: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 32 Final Permit # 04-TV-007R2, 11/09/17

with the exceedence. If exceedences continue after the corrections, the DNR may require additional proof to demonstrate compliance (e.g., stack testing). (3) Additional authority for requirement: 567 IAC 23.1(4)”bl” and 40 CFR 63.1345. Pollutant: Particulate Matter(PM) Emission Limit: 0.1 gr/dscf Authority for Requirement: DNR Construction Permits specified in Table: Conveying System

Transfer Points\ Raw and Finish Mills\ Storage Bins\ Bulk Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL -Emission Limits 567 IAC 23.3(2)”a”

NSPS and NESHAP These emission units are subject to Subpart LLL (National Emission Standards for Hazardous Air Pollutants from the Portland Cement Manufacturing Industry; 40 CFR §63.1340 – §63.1358), but per 40 CFR §63.1356 of Subpart LLL these units are exempted from any otherwise applicable less restrictive new source performance standard contained in 40 CFR 60 Subpart F, to which they are also subject. An O & M plan is required by Subpart LLL for these emission units. Relevant requirements of O & M plan for this equipment: Opacity-see Appendix B. Authority for Requirements: 40 CFR 60 Subpart F

567 IAC 23.1(2)"c" 40 CFR 63 Subpart LLL 567 IAC 23.1(4)"bl"

Operational Limits & Requirements The owner/operator of this equipment shall comply with the operational limits and requirements listed below. Operating Limits For Emission Unit 1037-1 only Hours of operation: A. The source shall be limited to a maximum operating time of 4,800 hours per twelve month rolling

period. Reporting & Record keeping All records as required by this permit shall be kept on-site for a minimum of five (5) years and shall be available for inspection by the DNR. Records shall be legible and maintained in an orderly manner. The owner/operator shall maintain the following records: A. The date, time of startup, time of shutdown, and the total hours the emission unit operated on that

day. B. Determine the annual hours of operation on a rolling 12-month basis for each month of operation.

Page 33: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 33 Final Permit # 04-TV-007R2, 11/09/17

Authority for Requirement DNR Construction Permit 91-A-326-S1 Operating Limits For Emission Units 0498-1, 0709-1, 0743-1, 0822-1, 0950-1, 1007-1, 1008-1, 1009-1, 1017-1, 1041-1, 1044-0, 1440-03, 1442-05, 1045-1, 1047-1, 1053-1, 1449-1, 2000-1, 2001-1, and 2601-1 Control equipment parameters: A. The baghouse shall be operated and maintained per the manufacturer’s recommendations. Reporting & Record keeping All records as required by this permit shall be kept on-site for a minimum of five (5) years and shall be available for inspection by the DNR. Records shall be legible and maintained in an orderly manner. The owner/operator shall maintain the following records: A. The owner or operator shall keep records of all maintenance conducted on the baghouse. Authority for Requirement: DNR Construction Permits 78-A-226-S5, 80-A-012-S3, 78-A-235-S4,

78-A-238-S5, 85-A-050-S3, 11-A-175, 05-A-634, 76-A-003-S4, 76-A-004-S4, 88-A-076-S3, 86-A-015-S4, 86-A-014-S3, 83-A-041-S3, 78-A-242-S6, 05-A-635-S1, 07-A-949-S1, 07-A-950-S1, 85-A-052-S2, and 05-A-634

For all emission sources A. Monitoring for NESHAP Subpart LLL at the facility (plant number 82-04-005) shall be done

per 40 CFR §63.1350. B. Recordkeeping for NESHAP 40 CFR 63 Subpart LLL at the facility shall be done per 40 CFR§

63.1355 Authority for Requirement: DNR Construction Permits specified in Table: Non-Fugitive Sources Subject to 40 CFR 63 Subpart LLL-Emission Limits 567 IAC 23.1(4)"bl" 40 CFR 63.Subpart LLL

Page 34: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 34 Final Permit # 04-TV-007R2, 11/09/17

Emission Point Characteristics These emission points shall conform to the conditions specified in Table: Conveying System Transfer Points\Raw and Finish Mill\Storage Bins\Bulk Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL-Emission Point Characteristics Table: Conveying System Transfer Points\Raw and Finish Mill\Storage Bins\Bulk Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL-Emission Point Characteristics

Stack Characteristics

Emission Point

Number

Emission Unit

Number

Construction Permit #

Stack Height (feet from

Ground)

Stack Opening (inches)

Exhaust Flow Rate

(scfm)

Exhaust Temp.

(oF) Discharge Style

0404-0 0404-1 78-A-229-S3 133 25 x 46 19,500 70 Vertical, Unobstructed 0420-0 0420-1 78-A-228-S4 97 12 x 18 2,700 200 Vertical, Unobstructed 0498-0 0498-1 78-A-226-S5 75 22.3 6,750 75 Vertical Unobstructed 0504-0 0504-1 78-A-230-S4 322 21 x 29 10,500 150 Vertical, Unobstructed 0709-0 0709-1 80-A-012-S3 101 17.1 3,750 70 Vertical Unobstructed

0723-0-F 0723-1-F 78-A-236-S4 Vents Inside

Vents Inside

Vents Inside

Vents Inside Vents Inside

0743-0 0743-1 78-A-235-S4 208 35.5 17,600 70 Vertical Unobstructed 0811-0 0811-1 80-A-013-S3 116.5 56 2,900 200 Vertical, Unobstructed

0817-0 0817-1 78-A-237-S4 116.5 21 x 52 28,900 200 Vertical, Unobstructed 0817-2 0822-0 0822-1 78-A-238-S5 140 36.6 12,471 200 Vertical, Unobstructed 0950-0 0950-1 85-A-050-S3 96 16.6 9,564 200 Vertical Unobstructed 1007-0 1007-1 76-A-003-S4 105 12.7 3,041 150 Vertical Unobstructed 1009-0 1009-1 11-A-175 115 15.4 5,000 70 Vertical Unobstructed

1008-0 1008-1 05-A-634 Vents Inside 12 1,100 Ambient Vents Inside

1017-0 1017-1 76-A-004-S4 120 16 2,811 200 Vertical Unobstructed 1027-0 1027-1 76-A-051-S1 84 11 x 24 2,600 150 Horizontal 1033-0 1033-1 80-A-011-S1 85 10 x 12 3,200 150 Horizontal 1037-0 1037-1 91-A-326-S1 86 15 x 18 6,700 150 Horizontal 1041-0 1041-1 88-A-076-S3 120 8 2,000 70 Vertical Unobstructed

1044-0 1044-0

86-A-015-S4 120 12 3,000 70 Vertical Unobstructed 1440-03 1044-0

1045-0 1045-1 86-A-014-S3 120 12 3,000 70 Vertical Unobstructed 1047-0 1047-1 83-A-041-S3 120 8 2,190 70 Vertical Unobstructed 1053-0 1053-1 78-A-242-S6 140 15 6,300 150 Vertical Unobstructed 1449-0 1449-1 05-A-635-S1 175 18 5,000 70 Vertical, Unobstructed 2000-0 2000-1 07-A-949-S1 80 9 1,300 70 Vertical Unobstructed 2001-0 2001-1 07-A-950-S1 300 5.6 500 70 Vertical Unobstructed 2601-0 2601-0 85-A-052-S5 100 34 20,000 72 Vertical Unobstructed

Page 35: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 35 Final Permit # 04-TV-007R2, 11/09/17

Authority for Requirement: DNR Construction Permits specified in Table: Conveying System Transfer Points\ Raw and Finish Mills\ Storage Bins\ Bulk Loading and Unloading Units Subject to 40 CFR 63 Subpart LLL –Emission Point Characteristics. The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements The facility shall check the opacity as described in 40 CFR 63.1350 (f). Authority for Requirement: DNR Construction Permits specified in Table: Non-Fugitive Sources Subject to 40 CFR 63 Subpart LLL-Emission Limits 567 IAC 23.1(4)"bl" 40 CFR 63.1350

Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Facility operation and maintenance plans must be sufficient to yield reliable data from the relevant time period that are representative of the source’s compliance with the applicable requirements. The data pertaining to the plan maintained on site for at least 5 years. The plan and associated recordkeeping provides documentation of this facility’s implementation of its obligation to operate according to good air pollution control practice. Good air pollution control practice is achieved by adoption of quality control standards in the operation and maintenance procedures for air pollution control that are comparable to industry quality control standards for the production processes associated with this emission point. Authority for Requirement: 567 IAC 22.108(3)

Page 36: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 36 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Numbers: See Table: Storage Tanks Associated Equipment Associated Emission Unit ID Numbers: See Table: Storage Tanks __________________________________________________________________________ Table: Storage Tanks

Emission Point

Number

Associated Emission

Unit Number

Emission Unit Description Raw Material

Rated Capacity (gallons)

Construction Permit

Number

T-1 EU T-1 Storage Tank 1 Glycerine Byproducts 30,000 07-A-1515

T-2 EU T-2 Storage Tank 2 Glycerine Byproducts 30,000 07-A-1516

T-3 EU T-3 Storage Tank 3 Glycerine Byproducts 30,000 07-A-1517

T-4 EU T-4 Storage Tank 4 Glycerine Byproducts 30,000 07-A-1518

Applicable Requirements

Emission Limits (lb/hr, gr/dscf, lb/MMBtu, % opacity, etc.) The emissions from these emission points shall not exceed the levels specified below. There are no emission limits at this time. Operational Limits & Requirements The owner/operator of this equipment shall comply with the operational limits and requirements listed below. Process throughput: A. The maximum true vapor pressure of any material stored in these units shall be less than 15.0

kPa (2.18 psi). Reporting & Record keeping: All records as required by this permit shall be kept on-site for a minimum of five (5) years and shall be available for inspection by the DNR. Records shall be legible and maintained in an orderly manner. The owner/operator shall maintain the following records: A. A log of all materials stored in these units and their maximum true vapor pressure. B. A copy of the Material Safety Data Sheets for each material stored in these units.

Authority for Requirement: DNR Construction Permits specified in Table: Storage Tanks

Page 37: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 37 Final Permit # 04-TV-007R2, 11/09/17

Emission Point Characteristics These emission points shall conform to the conditions specified below. Stack Height, (ft, from the ground): 20 Stack Opening, (inches, dia.): 2.5 Exhaust Flow Rate (scfm): Displacement Air Exhaust Temperature (oF): 100 Discharge Style: Unobstructed Vertical Authority for Requirement: DNR Construction Permits specified in Table: Storage Tanks The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements Agency Approved Operation & Maintenance Plan Required? Yes No

Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 38: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 38 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0020-0 Associated Equipment Associated Emission Unit ID Numbers: 0020-1 ______________________________________________________________________________ Emission Unit vented through this Emission Point: 0020-1 Emission Unit Description: Emergency Generator Raw Material/Fuel: #2 Fuel Oil Rated Capacity: 250 KW, 335 HP

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limits: 40 %(1)

Authority for Requirement: DNR Construction Permit 99-A-136-S2 567 IAC 23.3(2)"d" (1) An exceedence of the indicator opacity of 25% will require the owner/operator to promptly investigate the emission unit and make corrections to operations or equipment associated with the exceedence. If exceedences continue after the corrections, the DNR may require additional proof to demonstrate compliance (e.g., stack testing). Pollutant: Particulate Matter (PM10) Emission Limits: 0.74 lb/hr Authority for Requirement: DNR Construction Permit 99-A-136-S2 Pollutant: Particulate Matter (PM) Emission Limit(s): 0.1 gr/dscf Authority for Requirement: DNR Construction Permit 99-A-136-S2

567 IAC 23.3(2)"a" Pollutant: Sulfur Dioxide (SO2) Emission Limit(s): 2.5 lb/MMBtu Authority for Requirement: DNR Construction Permit 99-A-136-S2 567 IAC 23.3(3)"b"

Page 39: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 39 Final Permit # 04-TV-007R2, 11/09/17

NSPS and NESHAP The emergency engine is subject to 40 CFR 63 Subpart ZZZZ - National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines (RICE). According to 40 CFR 63.6590(a)(1)(ii) this compression ignition emergency engine, located at a major source, is an existing stationary RICE as it was constructed prior to June 12, 2006. Compliance Date Per 63.6595(a)(1) you must comply with the provisions of Subpart ZZZZ that are applicable by May 3, 2013. Operation and Maintenance Requirements 40 CFR 63.6602, 63.6625, 63.6640 and Tables 2c and 6 to Subpart ZZZZ

1. Change oil and filter every 500 hours of operation or annually, whichever comes first. (See 63.6625(i) for the oil analysis option to extend time frame of requirements.)

2. Inspect air cleaner every 1000 hours of operation or annually, whichever comes first, and replace as necessary.

3. Inspect all hoses and belts every 500 hours of operation or annually, whichever comes first, and replace as necessary.

4. Operate and maintain the stationary RICE and after-treatment control device (if any) according to the manufacturer's emission related written instructions or develop your own maintenance plan which must provide to the extent practicable for the maintenance and operation of the engine in a manner consistent with good air pollution control practice for minimizing emissions.

5. Install a non-resettable hour meter if one is not already installed. 6. Minimize the engine's time spent at idle during startup and minimize the engine's startup

time to a period needed for appropriate and safe loading of the engine, not to exceed 30 minutes.

Operating Limits 40 CFR 63.6640(f)

1. Any operation other than emergency operation, maintenance and testing and operation in non-emergency situations (up to) 50 hours per year is prohibited.

2. There is no time limit on the use of emergency stationary RICE in emergency situations. 3. You may operate your emergency stationary RICE up to 100 combined hours per calendar

year for maintenance checks and readiness testing. See 40 CFR 63.6640(f)(2) for additional information and restrictions.

4. You may operate your emergency stationary RICE up to 50 hours per calendar year for non-emergency situations, but those 50 hours are counted toward the 100 hours of maintenance and testing. The 50 hours per year for non-emergency situations cannot be used for peak shaving, or to generate income for a facility to supply power to an electric grid or otherwise supply power as part of a financial arrangement with another entity.

Recordkeeping Requirements 40 CFR 63.6655 1. Keep records of the maintenance conducted on the stationary RICE. 2. Keep records of the hours of operation of the engine that is recorded through the non-

resettable hour meter. Document how many hours are spent for emergency operation,

Page 40: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 40 Final Permit # 04-TV-007R2, 11/09/17

including what classified the operation as emergency and how many hours are spent for non-emergency operation. See 40 CFR 63.6655(f) for additional information.

Notification and Reporting Requirements 40 CFR 63.6645, 63.6650 and Table 2c to Subpart ZZZZ

1. An initial notification is not required per 40 CFR 63.6645(a)(5). 2. A report may be required for failure to perform the work practice requirements on the

schedule required in Table 2c. (See Footnote 1 of Table 2c for more information.) Authority for Requirement: 40 CFR Part 63 Subpart ZZZZ

567 IAC 23.1(4)"cz" Operational Limits & Requirements The owner/operator of this equipment shall comply with the operational limits and requirements listed below. Hours of operation: A. This emission unit shall operate no more than 500 hours per twelve (12) month period, rolled

monthly. Process throughput: B. The fuel used shall not have a sulfur content greater than 0.5%. Reporting & Record keeping All records as required by this permit below shall be kept on site for five (5) years and shall be available for inspection by the DNR. Records shall be legible and maintained in an orderly manner. A. For each fuel shipment received, maintain a copy of the vendor’s certification or other

documentation of the sulfur content of the fuel received. B. At the end of each month, record the reading of the hour meter on this unit. C. At the end of each month, record the number of hours this unit has operated over the previous

month. D. At the end of each month, record the number of hours this unit has operated over the previous

twelve (12) months. Authority for Requirement: DNR Construction Permit 99-A-136-S2

Page 41: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 41 Final Permit # 04-TV-007R2, 11/09/17

Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): 50 Stack Opening, (inches, dia.): 6 Exhaust Flow Rate (scfm): 442 Exhaust Temperature (oF): 500 Discharge Style: Unobstructed Vertical Authority for Requirement: DNR Construction Permit 99-A-136-S2 The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 42: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 42 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0030-0 Associated Equipment Associated Emission Unit ID Numbers: 0030-1 ______________________________________________________________________________ Emission Unit vented through this Emission Point: 0030-1 Emission Unit Description: Diesel Water Pump Raw Material/Fuel: #2 Fuel Oil Rated Capacity: 182 hp

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limits: 40 %(1)

Authority for Requirement: DNR Construction Permit 99-A-137-S1 567 IAC 23.3(2)"d"

(1) An exceedence of the indicator opacity of 20% will require the owner/operator to promptly investigate the emission unit and make corrections to operations or equipment associated with the exceedence. If exceedences continue after the corrections, the DNR may require additional proof to demonstrate compliance (e.g., stack testing). Pollutant: Particulate Matter (PM) Emission Limit(s): 0.1 gr/dscf Authority for Requirement: 567 IAC 23.3(2)"a" Pollutant: Particulate Matter (PM10) Emission Limits: 0.43 lb/hr Authority for Requirement: DNR Construction Permit 99-A-137-S1 Pollutant: Sulfur Dioxide (SO2) Emission Limit(s): 2.5 lb/MMBtu Authority for Requirement: DNR Construction Permit 99-A-137-S1 567 IAC 23.3(3)"b" NSPS and NESHAP The emergency engine is subject to 40 CFR 63 Subpart ZZZZ - National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines (RICE). According to 40 CFR 63.6590(a)(1)(ii) this compression ignition emergency engine, located at a major source, is an existing stationary RICE as it was constructed prior to June 12, 2006.

Page 43: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 43 Final Permit # 04-TV-007R2, 11/09/17

Compliance Date Per 63.6595(a)(1) you must comply with the provisions of Subpart ZZZZ that are applicable by May 3, 2013. Operation and Maintenance Requirements 40 CFR 63.6602, 63.6625, 63.6640 and Tables 2c and 6 to Subpart ZZZZ

1. Change oil and filter every 500 hours of operation or annually, whichever comes first. (See 63.6625(i) for the oil analysis option to extend time frame of requirements.)

2. Inspect air cleaner every 1000 hours of operation or annually, whichever comes first, and replace as necessary.

3. Inspect all hoses and belts every 500 hours of operation or annually, whichever comes first, and replace as necessary.

4. Operate and maintain the stationary RICE and after-treatment control device (if any) according to the manufacturer's emission related written instructions or develop your own maintenance plan which must provide to the extent practicable for the maintenance and operation of the engine in a manner consistent with good air pollution control practice for minimizing emissions.

5. Install a non-resettable hour meter if one is not already installed. 6. Minimize the engine's time spent at idle during startup and minimize the engine's startup

time to a period needed for appropriate and safe loading of the engine, not to exceed 30 minutes.

Operating Limits 40 CFR 63.6640(f)

1. Any operation other than emergency operation, maintenance and testing and operation in non-emergency situations (up to) 50 hours per year is prohibited.

2. There is no time limit on the use of emergency stationary RICE in emergency situations. 3. You may operate your emergency stationary RICE up to 100 combined hours per calendar

year for maintenance checks and readiness testing. See 40 CFR 63.6640(f)(2) for additional information and restrictions.

4. You may operate your emergency stationary RICE up to 50 hours per calendar year for non-emergency situations, but those 50 hours are counted toward the 100 hours of maintenance and testing. The 50 hours per year for non-emergency situations cannot be used for peak shaving, or to generate income for a facility to supply power to an electric grid or otherwise supply power as part of a financial arrangement with another entity.

Recordkeeping Requirements 40 CFR 63.6655 3. Keep records of the maintenance conducted on the stationary RICE. 4. Keep records of the hours of operation of the engine that is recorded through the non-

resettable hour meter. Document how many hours are spent for emergency operation, including what classified the operation as emergency and how many hours are spent for non-emergency operation. See 40 CFR 63.6655(f) for additional information.

Notification and Reporting Requirements 40 CFR 63.6645, 63.6650 and Table 2c to Subpart ZZZZ

3. An initial notification is not required per 40 CFR 63.6645(a)(5). 4. A report may be required for failure to perform the work practice requirements on the

schedule required in Table 2c. (See Footnote 1 of Table 2c for more information.)

Page 44: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 44 Final Permit # 04-TV-007R2, 11/09/17

Authority for Requirement: 40 CFR Part 63 Subpart ZZZZ 567 IAC 23.1(4)"cz"

Operational Limits & Requirements The owner/operator of this equipment shall comply with the operational limits and requirements listed below. Hours of operation: A, This unit shall operate no more than 500 hours per twelve (12) month period, rolled monthly. Process throughput: B. The fuel consumed in this unit shall have a sulfur content not greater than 0.5% by weight. Reporting & Record keeping All records as required by this permit below shall be kept on site for five (5) years and shall be available for inspection by the DNR. Records shall be legible and maintained in an orderly manner. A. For each shipment received, maintain a copy of the vendor’s certification or other

documentation of the sulfur content of the fuel received. B. At the end of each month, record the reading of the hour meter on this unit. C. At the end of each month, record the number of hours this unit has operated over the previous

month. D. At the end of each month, record the number of hours this unit has operated over the previous

twelve (12) months.. Authority for Requirement: DNR Construction Permit 99-A-137-S1 Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): 12.75 Stack Opening, (inches, dia.): 6 Exhaust Flow Rate (scfm): 800 Exhaust Temperature (oF): 500 Discharge Style: Unobstructed Vertical Authority for Requirement: DNR Construction Permit 99-A-137 The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit.

Page 45: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 45 Final Permit # 04-TV-007R2, 11/09/17

Monitoring Requirements The owner/operator of this equipment shall comply with the periodic monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 46: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 46 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0081-0 Associated Equipment Associated Emission Unit ID Numbers: 0081-1 Emissions Control Equipment ID Number: 0081-C Emissions Control Equipment Description: Bag Filter ______________________________________________________________________________ Emission Unit vented through this Emission Point: 0081-1 Emission Unit Description: Quarry Drill Raw Material/Fuel: N/A Rated Capacity: N/A

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limits: 40 %(1)

Authority for Requirement: DNR Construction Permit 87-A-080-S2 567 IAC 23.3(2)"d"

(1)If visible emissions are observed other than startup, shutdown or malfunction, a stack test may be required to demonstrate compliance with the particulate standard. Pollutant: Particulate Matter (PM10) Emission Limits: 0.13 lb/hr Authority for Requirement: DNR Construction Permit 87-A-080-S2 Pollutant: Particulate Matter (PM) Emission Limit(s): 0.1 gr/scf Authority for Requirement: DNR Construction Permit 87-A-080-S2 567 IAC 23.3(2)"a" Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): 8 Stack Opening, (inches, dia.): 8 Exhaust Flow Rate (scfm): 2,700 Exhaust Temperature (oF): 70 Discharge Style: Unobstructed Vertical Authority for Requirement: DNR Construction Permit 87-A-080-S2

Page 47: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 47 Final Permit # 04-TV-007R2, 11/09/17

The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 48: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 48 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0203-0 Associated Equipment Associated Emission Unit ID Numbers: 0203-1 Emissions Control Equipment ID Number: 0203-C Emissions Control Equipment Description: Baghouse ______________________________________________________________________________ Emission Unit vented through this Emission Point: 0203-1 Emission Unit Description: Raw Material Transfer in Transfer House-Conveyor to Conveyor Raw Material/Fuel: Raw Materials(1)

Rated Capacity: 1,300 tons/hr (1) Raw materials refers to any one or a mixture of the kiln-stock materials used to produce cement, which are primarily limestone, clay, or alternative raw materials such as hydrocarbon contaminated soils. Coal and other primary fuel sources are not included in this category.

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 10%

Authority for Requirement: 40 CFR 60.62(c) 567 IAC 23.1(2)"c"

Pollutant: Opacity Emission Limit(s): 40%(1)

Authority for Requirement: DNR Construction Permit 78-A-221-S6 567 IAC 23.3(2)"d" (1) An exceedence of the indicator opacity of 10% will require the owner/operator to promptly investigate the emission unit and make corrections to operations or equipment associated with the exceedence. If exceedences continue after the corrections, the DNR may require additional proof to demonstrate compliance (e.g., stack testing). Pollutant: Particulate Matter (PM10) Emission Limits: 0.72 lb/hr Authority for Requirement: DNR Construction Permit 78-A-221-S6 Pollutant: Particulate Matter (PM) Emission Limits: 0.1 gr/dscf Authority for Requirement: DNR Construction Permit 78-A-221-S6 567 IAC 23.3(2)"a"

Page 49: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 49 Final Permit # 04-TV-007R2, 11/09/17

NSPS and NESHAP This emission unit is subject to Subpart LLL (National Emission Standards for Hazardous Air Pollutants from the Portland Cement Manufacturing Industry; 40 CFR §63.1340 – §63.1358), but per 40 CFR §63.1356 of Subpart LLL this unit is exempted from any otherwise applicable new source performance standard contained in Subpart F, to which it is also subject. An O & M plan is required by Subpart LLL for these emission units. Relevant requirements of O & M plan for this equipment: Opacity - see Appendix B. Authority for Requirements: 40 CFR 60 Subpart F

567 IAC 23.1(2)"c" 40 CFR 63 Subpart LLL 567 IAC 23.1(4)"bl"

Operational Limits & Requirements The owner/operator of this equipment shall comply with the operational limits and requirements listed below. Process throughput: This process is limited to transferring 365,000 tons of raw materials per month. Reporting & Record keeping The quantity of raw material transferred to the crusher shall be recorded monthly, records shall be kept on site for a minimum of five years, and shall be available for inspection by the Department. Authority for Requirement: Section IV(2) Iowa Department of Natural Resources

Administrative Consent Order No. 98-AQ-08 Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): 5.6 Stack Opening, (inches, dia.): 7.8 Exhaust Flow Rate (scfm): 4,200 Exhaust Temperature (oF): Ambient Discharge Style: Unobstructed Vertical Authority for Requirement: DNR Construction Permit 78-A-221-S6 The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit.

Page 50: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 50 Final Permit # 04-TV-007R2, 11/09/17

Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Facility operation and maintenance plans must be sufficient to yield reliable data from the relevant time period that are representative of the source’s compliance with the applicable requirements. The data pertaining to the plan maintained on site for at least 5 years. The plan and associated recordkeeping provides documentation of this facility’s implementation of its obligation to operate according to good air pollution control practice. Good air pollution control practice is achieved by adoption of quality control standards in the operation and maintenance procedures for air pollution control that are comparable to industry quality control standards for the production processes associated with this emission point. Authority for Requirement: 567 IAC 22.108(3)

Page 51: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 51 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0218-0 Associated Equipment Associated Emission Unit ID Numbers: 0218-1 Emissions Control Equipment ID Number: 0218-C Emissions Control Equipment Description: Baghouse ______________________________________________________________________________ Emission Unit vented through this Emission Point: 0218-1 Emission Unit Description: Crushing and Conveying of Raw Materials Raw Material/Fuel: Raw Materials(1) Rated Capacity: 1,300 tons/hr (1) Raw materials refers to any one or a mixture of the kiln-stock materials used to produce cement, which are primarily limestone, clay, or alternative raw materials such as hydrocarbon contaminated soils. Coal and other primary fuel sources are not included in this category.

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 40%(1)

Authority for Requirement: DNR Construction Permit 78-A-218-S7 567 IAC 23.3(2)"d" (1) An exceedence of the indicator opacity of 10% will require the owner/operator to promptly investigate the emission unit and make corrections to operations or equipment associated with the exceedence. If exceedences continue after the corrections, the DNR may require additional proof to demonstrate compliance (e.g., stack testing). Pollutant: Particulate Matter (PM10) Emission Limits: 5.59 lb/hr Authority for Requirement: DNR Construction Permit 78-A-218-S7 Pollutant: Particulate Matter (PM) Emission Limits: 0.1 gr/dscf Authority for Requirement: DNR Construction Permit 78-A-218-S7 567 IAC 23.3(2)"a"

Page 52: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 52 Final Permit # 04-TV-007R2, 11/09/17

Operational Limits & Requirements The owner/operator of this equipment shall comply with the operational limits and requirements listed below. Process throughput: The following supplemental materials may be utilized in the crushers as listed below:

Material Maximum Tons Per Hour 1. Coal Combustion Residue 400 2. Foundry By-Products 1300 3. Hydrocarbon Containing Soils 210 4. Refinery By-Products 105 5. Oils and Greases 0 Total Feed 1300

Reporting & Record keeping All records, as required by this permit, shall be kept on site for a minimum of five (5) years and be available for inspection by the DNR. Records shall be legible and maintained in an orderly manner. The records shall show the following: Materials utilized by the crushers. This record shall show the individual material, the amount of that material (in tons), the percentage of the total for that material, and the total of all materials (in tons/hr). Authority for Requirement: DNR Construction Permit 78-A-218-S7 Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): 4.0 Stack Opening, (inches.): 12 x 30 Exhaust Flow Rate (scfm): 32,600 Exhaust Temperature (oF): Ambient Discharge Style: Horizontal Authority for Requirement: DNR Construction Permit 78-A-218-S7 The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit.

Page 53: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 53 Final Permit # 04-TV-007R2, 11/09/17

Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No See Appendix C Authority for Requirement: 567 IAC 22.108(3)

Page 54: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 54 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0327-0-F Associated Equipment Associated Emission Unit ID Numbers: 0327-1-F ______________________________________________________________________________ Emission Unit vented through this Emission Point: 0327-1 Emission Unit Description: Raw Material Transfer-Vibrating Feeder to Conveyor Raw Material/Fuel: Raw Materials(1)

Rated Capacity: 250 tons/hr (1) Raw materials refers to any one or a mixture of the kiln-stock materials used to produce cement, which are primarily limestone, clay, or alternative raw materials such as hydrocarbon contaminated soils. Coal and other primary fuel sources are not included in this category.

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 10%(1)

Authority for Requirement: DNR Construction Permit 78-A-223-S4 40 CFR 60.62(c) 567 IAC 23.1(2)”c” (1) If opacity greater than that observed in the initial performance test is viewed other than startup, shutdown, or malfunction, a stack test may be required to demonstrate compliance with the particulate standard. Pollutant: Particulate Matter (PM10) Emission Limits: 0.34 lb/hr Authority for Requirement: DNR Construction Permit 78-A-223-S4 Pollutant: Particulate Matter (PM) Emission Limits: 0.1 gr/dscf Authority for Requirement: DNR Construction Permit 78-A-223-S4 567 IAC 23.3(2)"a" NSPS and NESHAP This emission unit is subject to NSPS Subpart A:General Provisions and NSPS Subpart F: Standards of Performance for Portland Cement Plants. Authority for Requirement: 40 CFR 60 Subpart F

567 IAC 23.1(2)”c”

Page 55: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 55 Final Permit # 04-TV-007R2, 11/09/17

Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): Vents into preblend storage dome Stack Opening, (inches, dia.): Vents into preblend storage dome Exhaust Flow Rate (scfm): Vents into preblend storage dome Exhaust Temperature (oF): Vents into preblend storage dome Discharge Style: Vents into preblend storage dome Authority for Requirement: DNR Construction Permit 78-A-223-S4 The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the periodic monitoring requirements listed below. Opacity Monitoring Visible emissions shall be observed on a monthly basis using EPA Method 22 to ensure there are none when the emission unit on this emission point is at or near full capacity. If visible emissions are observed corrective action will be taken as soon as possible, but no later than eight hours from the observation of visible emissions. If corrective action does not return the observation to no visible emissions, then a Method 9 observation will be required. If an opacity (>10 %) is observed, this would be a violation and corrective action will be taken as soon as possible, but no later than eight hours from observation of the violation. Maintain a written record of the observation and any action resulting from the observation for a minimum of five years. Authority for Requirement: 567 IAC 22.108(14) Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 56: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 56 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0466-0 Associated Equipment Associated Emission Unit ID Numbers: 0466-1 Emissions Control Equipment ID Number: 0466-C, 0466-2-C and 0594-C Emissions Control Equipment Description: Dry Absorbent Addition (DAA, CE 0466-2-C), Roller

Mill Baghouse (CE 0466-C) & Alkali Bypass Baghouse (CE 0594-C) in parallel

Continuous Emissions Monitors ID Numbers: 0466-1-M, 0466-2-M ______________________________________________________________________________ Emission Unit vented through this Emission Point: 0466-1 Emission Unit Description: Preheater/Precalciner/Kiln/Raw Mill System Raw Material/Fuel: Raw Materials(1) and Fuel Rated Capacity: 145.3 tons clinker/hr (1) Raw materials refers to any one or a mixture of the kiln-stock materials used to produce cement, which are primarily limestone, clay, or alternative raw materials such as hydrocarbon contaminated soils. Coal and other primary fuel sources are not included in this category.

Applicable Requirements BACT Emission Limits When Production is Less Than or Equal to 108 Tons of Clinker per Hour (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) Pollutant: Nitrogen Oxides (NOx) Emission Limit(s): 58.67 grams/second and 465.65 lb/hr (expressed as a 3-hour average) Authority for Requirement: DNR Construction Permit 99-A-579-P6 BACT Emission Limits When Production is Greater Than 108 Tons of Clinker per Hour (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 10% Authority for Requirement: DNR Construction Permit 99-A-579-P6 Pollutant: Particulate Matter (PM10) Emission Limit(s): 0.516 lb/ton of clinker Authority for Requirement: DNR Construction Permit 99-A-579-P6 Pollutant: Particulate Matter (PM) Emission Limit(s): 0.516 lb/ton of clinker

Authority for Requirement: DNR Construction Permit 99-A-579-P6

Page 57: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 57 Final Permit # 04-TV-007R2, 11/09/17

Pollutant: Sulfur Dioxide (SO2) Emission Limit(s): 4,850 tons/yr (1) (2)

Authority for Requirement: DNR Construction Permit 99-A-579-P6 Pollutant: Nitrogen Oxides (NOx) Emission Limit(s): 2,546 tons/yr (1) (2), 4.0 lb/ton of clinker (3)

Authority for Requirement: DNR Construction Permit 99-A-579-P6 Pollutant: Carbon Monoxide (CO) Emission Limit(s): 4.5 lb/ton of clinker

Authority for Requirement: DNR Construction Permit 99-A-579-P6 (1) Limit is a 12-month rolling total. Applies at all times including periods of startup, shutdown, or malfunction. (2) Compliance with the applicable emission standards of this permit are based on the CEM data from the owner/operator. Hourly emissions shall be the average of four 15-minute averages analyzed and recorded by the CEM. (3) Limit is a monthly rolling average. Limit does not apply during startup, shutdown, or malfunction. Compliance with this emission standard shall be calculated by the owner/operator by: • Totaling the pounds of NOx recorded by the CEMS during normal operation over the last twelve

months of operation. • Totaling the tons of clinker produced over the last twelve months operation. • Dividing the pounds of NOx by the tons of clinker produced. Other Emission Limits Pollutant: Particulate Matter (PM10) Emission Limit(s): 75.0 lb/hr (6)

Authority for Requirement: DNR Construction Permit 99-A-579-P6 Pollutant: Sulfur Dioxide (SO2) Emission Limit(s): 2,900 lb/hr (4); 66,500 lb/day (4,5); and 4,850 tons/yr (4,7)

Authority for Requirement: DNR Construction Permit 99-A-579-P6 Pollutant: Mercury (Hg) Emission Limit(s): 3.2 kg/24 hr period (8)

Authority for Requirement: DNR Construction Permit 99-A-579-P6 40 CFR 61 Subpart E 567 IAC 23.1(3)"d"

(4) Compliance with the applicable emission standards of this permit are based on the CEM data from the owner/operator. Hourly emissions shall be the average of four 15-minute averages analyzed and recorded by the CEM. (5) Standard is expressed as a 24-hour rolling total. The limit applies at all times including periods of startup, shutdown, or malfunction. (6) Emission rate used in the facility-wide SIP (State Implementation Plan) maintenance plan dispersion modeling to demonstrate no exceedences of the National Ambient Air Quality Standards (NAAQS).

Page 58: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 58 Final Permit # 04-TV-007R2, 11/09/17

(7) Facility-wide limit per the consent decree entered into between the United States and Lafarge North America, Inc. [Civil Action 3:10-cv-00044-JPG-CJP, United States District Court for the Southern District of Illinois (March 18, 2010)] (8) Per 40 CFR 61.52(b). Standard applies when the kiln uses materials in the Water & Waste Treatment Byproducts category listed under Operating Limits, below. 40 CFR Part 60 Subpart DDDD Emission Limitations See Appendix D Authority for Requirement: 40 CFR 60 Subpart DDDD NSPS and NESHAP Both the emission unit and the source (plant number 82-04-005) are subject to Subpart A (General Provisions; 40 CFR §60.1 through 40 CFR §60.19) of the New Source Performance Standards (NSPS) and Subpart A (General Provisions; 40 CFR §63.1 through 40 CFR §63.15) of the National Emission Standards for Hazardous Air Pollutants (NESHAP) for Source Categories. This source (plant number 82-04-005) is subject to Subpart LLL (National Emission Standards for Hazardous Air Pollutants from the Portland Cement Manufacturing Industry; 40 CFR §63.1340 – 40 CFR §63.1358). Please note that EPA amended NESHAP Subpart LLL on February 12, 2013 and the source (plant number 82-04-005) may be subject to requirements in those amendments. This emission unit is not subject to the requirements of NESHAP Subpart LLL as it is subject to the Commercial and Industrial Solid Waste Incinerator (CISWI) Rule (either 40 CFR Part 60 Subpart CCCC or 40 CFR Part 60 Subpart DDDD) according to an August 6, 2014 determination made by the Environmental Protection Agency (EPA). If the owner or operator discontinues the combustion of solid waste in this emission unit and the emission unit is no longer considered a solid waste incineration unit as defined in 40 CFR Part 241 the emission unit will then be subject to the requirements of NESHAP Subpart LLL. This emission unit is an affected facility per NSPS Subpart F (Standards of Performance for Portland Cement Plants; 40 CFR §60.60 through 40 CFR §60.66). Per 40 CFR §60.62(d), if an owner or operator has an affected source subject to Subpart F with a different emission limit or requirement for the same pollutant under another regulation in Title 40 of CFR, the owner or operator must comply with the most stringent emission limit or requirement and is not subject to the less stringent requirement. Please note that EPA amended NSPS Subpart F on February 12, 2013 and this emission unit may be subject to requirements in those amendments. This emission unit is subject to Subpart A (General Provisions; 40 CFR §61.1 through 40 CFR §61.19) and Subpart E (National Emission Standard for Mercury; 40 CFR §61.50 through 40 CFR §61.56) of the NESHAP when the kiln uses materials in the Water & Waste Treatment Byproducts category listed below in Operational Limits & Requirements Condition F. Authority for Requirement: DNR Construction Permit 99-A-579-P6

40 CFR 60 Subpart F

Page 59: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 59 Final Permit # 04-TV-007R2, 11/09/17

567 IAC 23.1(2)"c" 40 CFR Subpart CCCC 40 CFR Subpart DDDD 40 CFR 61 Subpart E 567 IAC 23.1(3)"d" 40 CFR 63 Subpart LLL 567 IAC 23.1(4)"bl"

Operational Limits & Requirements The owner/operator of this equipment shall comply with the operational limits and requirements listed below. A. The kiln is limited to firing on the following fuels and alternative fuels:

• Coal • Coke • Natural gas • Fuel oil • Used oil • Used oil filter media from the shredding of used oil filters • Glycol distillation bottoms • Tire derived fuel (TDF) • Plastic derived fuel (PDF) • Any obsolete seed with up to 0.75% by mass coating of seed treatment including fungicide &

insecticide. • Ethanol, distiller’s dried grains with solubles (DDGS) • Biodiesel products/byproducts (BDPB) • Fatty glycerins from tallow soap manufacturing • Animal meat and bone meal (MBM) • Diatomaceous earth filters from Alcoa • Auto fluff with a chlorine (Cl) content less than 1.0% (by weight) • Solid waste derived fuel (SWDF). The following materials under this category are approved

without further review: o Off-spec industrial hose and SMI Fuel Briquettes from the SMI East Troy Plant in East

Troy, WI; o Waste material from Iowa West Liberty Foods plants; o Rollprint packaging products scrap plastic and foil laminates; o A-Line E.D.S. Cellulose Fluff; o Quincy Recycling sandwich wrap paper; o General Mills foil wrappers and bags; o Advanced Waste Services, Inc. facility cleanup material; o John Deere seeding oil absorbents, dried paint items (plastic, filters), and personal

protective equipment (PPE); o Dry paint waste, dry paint filters, and oil absorbents from John Deere Harvester Works

in East Moline, IL; o Carpet scrap from carpet manufacturing from Clear, Inc.; o Nitrile gloves from body care product manufacturing from Raining Rose, Inc.;

Page 60: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 60 Final Permit # 04-TV-007R2, 11/09/17

o #4 – 7 plastic from Harvest Technologies, Inc.; o Protective equipment from Sivyer Steel; o John Deere swarf and filter media; o Injection mold resin scrap from injection molding; o Polyurethane foam packaging from Hy-Capacity, Inc.; o IAC scrap baled auto carpet; o Nestlé beverage food packaging; o River Cities Business Park Wood Boiler Ash; o Laminate Film Scrap from Marck Industries; o Molded Reject Scrap from Interplex Daystar; o Paper and Plastic Trim from Quincy Recycle; o Friction Paper from B.L. Duke; o Wood boiler ash from River Bend Industrial Center; o Empty Juice Pouches from Kraft; and o Nylon Fiber from Liberty Tire Recycling.

• Comparable fuel (Comp) – Any comparable fuel used must be certified as non-hazardous according to US EPA Resource Conservation and Recovery Act (RCRA) rules. The following materials under this category are approved without further review: o Mixed Distillation Residues [mixture of ethanolamine (141-43-5) and polymers of

vinylpyrolidone (88-12-0); 2-pyrrolidone (616-45-5); 1,4,-butanediol (110-63-4); 2-butene-1,4-diol (110-64-5); and 2(3H) furanone, dihydro (96-48-0)]

B. The feed rate of obsolete seed shall not exceed 5.0 tons/hr. C. The roller mill air heater is limited to firing on fuel oil, natural gas, used oil, ethanol, and BDPB. D. Any fuel used shall not have a lead (Pb) content greater than 500 ppm. E. The following supplemental materials may be utilized by the roller mill and kiln as listed below:

MAXIMUM TONS PER HOUR

Material Roller Mill Kiln

1 Coal Combustion Residue 30 30 2 Foundry By-Products 30 30 3 Hydrocarbon Containing

Soils 46 46

4 Refinery By-Products 30 30 5 Oils and Greases 0 2 Total Feed 300 300

F. The following supplemental materials may also be utilized in the roller mill and kiln:

• Agricultural Products/Byproducts. The following materials under this category are approved without further review: Egg shells, rice hulls, and rice hull ash.

• Mining and Energy Products/Byproducts. The following materials under this category are approved without further review: Cut stone, stone products, limestone fines, potash fines, refractory, sand & gravel fines, and sand & gravel off spec rejects.

• Manufacturing Products/Byproducts. The following materials under this category are approved without further review: Boiler ash, refractory, clay fiber, broken glass, Kaolin, whey, iron fines, clay & ceramic tiles, bricks, lime & cement kiln dust, clay, porcelain, coke

Page 61: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 61 Final Permit # 04-TV-007R2, 11/09/17

fines, used abrasives, grinding media, slag, foundry sand, shot/blast media, alumina dust, Pet coke, dross, and off-spec bauxite.

• Water & Waste Treatment Byproducts. The following materials under this category are approved without further review: lime sludge from Alcoa’s Davenport, IA plant; waste filter cake from Toyota’s Georgetown, KY plant.

G. Per 40 CFR §279.63, used oil that contains a total halogen concentration greater than 1,000 ppm is presumed to be a hazardous waste and a rebuttal demonstration is required to burning the used oil. To ensure that the used oil managed at a used oil burner facility is not hazardous waste under the rebuttable presumption of 40 CFR §279.10(b)(1)(ii), a used oil burner must determine whether the total halogen content of used oil managed at the facility is above or below 1,000 ppm.

H. The polychlorinated biphenyl (PCB) concentration of any used oil combusted shall be less than 50 ppm.

I. Used oil shall only be burned while the kiln system is at normal operating temperatures and not during start-up or shutdown.

J. Simultaneous feeding of the alternative materials listed in Conditions E and F above is allowed, but the combined total of the materials shall not exceed twenty (20) percent of the total material being fed to the kiln at any given time. See 40 CFR §63.1349(e) for performance testing requirements.

K. Prior to use of any fuels or materials that fall under the categories listed in Conditions A, E or F above, unless otherwise specified in those conditions, the owner or operator shall supply material data to the Department for review and approval. This data shall include, but is not limited to: • A description of the alternative fuel or alternate raw material, • A complete chemical analysis of the material, and • Evaluation of the impact on air emissions.

L. In accordance with Subpart F (Standards of Performance for Portland Cement Plants), the source (plant number 82-04-005) shall record its daily production rates and kiln feed rates.

M. Per Paragraph 75 of USA v. Lafarge North America, Inc. (1) et al, 3:10-cv-00044, No. 45 (S.D. Ill. Mar. 18, 2010), Lafarge shall continuously operate the Dry Absorbent Addition (DAA) technology during all times of kiln operation except during period of DAA technology malfunction.

N. Per Paragraph 92 of USA v. Lafarge North America, Inc. et al, 3:10-cv-00044, No. 45 (S.D. Ill. Mar. 18, 2010), emission reductions of SO2 and/or NOx resulting from compliance with the requirements of the Consent Decree shall not be considered as a creditable contemporaneous emission decrease for the purpose of obtaining a netting credit under the Clean Air Act’s Nonattainment New Source Review (NA NSR) and Prevention of Significant Deterioration (PSD) programs.

O. Lafarge shall submit a “Profile Analysis Plan” to the Department for approval at least thirty (30) days prior to the use of a “Profile Analysis” in lieu of testing each shipment of alternative fuel. At a minimum the “Profile Analysis Plan” shall contain the following: • A detailed explanation of the “Profile Analysis”, • The procedures to be used for the “Profile Analysis”, • The constituents (i.e. heat content, Pb content, S content, Hg content, etc.) to be measured

and tracked, • The frequency of testing, and • The information to be stored by Lafarge and retention time of that information.

Page 62: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 62 Final Permit # 04-TV-007R2, 11/09/17

Lafarge shall not use the “Profile Analysis” until it is approved by the Department. Any amendments to the “Profile Analysis Plan” shall be submitted to and approved by the Department prior use.

(1) Lafarge North America, Inc. is the previous plant name for Continental Cement Company – Davenport Plant.

Reporting & Record keeping All records, as required below, shall be satisfactory for demonstrating compliance with all applicable operating limits. Records shall be maintained on site for five (5) years and be available for inspection upon request by representatives of the Department of Natural Resources. These records shall show the following: A. The sulfur content (in lb/MMBTU) of all individual fuels and the total sulfur (in lb/MMBTU) of

any combination of fuels that are fired in the kiln and roller mill air preheater. The fuel analysis sent with the fuel shipment or the most recent profile information collected and maintained according to the “Profile Analysis Plan” in Operational Limits & Requirements condition O. can be an adequate demonstration for this record.

B. The Pb content of each batch of used oil or other alternative fuel fired in the kiln or roller mill air preheater. The fuel analysis sent with the fuel shipment or the most recent profile information collected and maintained according to the “Profile Analysis Plan” in Operational Limits & Requirements condition O. can be an adequate demonstration for this record. If these fuels have been received from a single supplier and a uniform process for a period of at least six (6) consecutive months, the Pb sampling frequency can be reduced to once per week or once every ten (10) loads, whichever occurs earlier, under the following conditions: a. At least twenty-four (24) loads have been received and analyzed over the 6-month period; b. All samples analyzed during the 6-month period show lead concentrations to be less that 50

ppm; and c. A statement is obtained from the fuel supplier certifying the following:

(i) The alternative fuel is a product of a consistent process, and (ii) If the process is altered in any manner that would result in an increase in the Pb

concentration of the alternative fuel by 50 ppm or more, the supplier will notify Lafarge prior to sending the fuel.

If a sample is found to contain more than 50 ppm Pb, the permittee will be required to revert back to sampling each batch of fuel until conditions B.a through B.c directly above are met once again.

C. The daily kiln production rates and kiln feed rates. D. Copies of the semiannual excess emissions reports per 40 CFR § 60.65. E. Materials (including fuels) utilized by the roller mill and kiln. This record shall show the

individual material, the amount of that material (in tons/hr), the percentage of the total for that material, the total of all materials (in tons/hr), and whether the roller mill or kiln or both were utilizing the material.

F. A record showing the PCB content meets the requirements of Operational Limits & Requirements section condition H above. This record shall be either: • Testing to determine the PCB concentration on individual samples, or in accordance with

the testing procedures described in 40 CFR 761.60(g)(2), or • Other information documenting that the used oil fuel does not contain PCBs in a

Page 63: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 63 Final Permit # 04-TV-007R2, 11/09/17

concentration equal to or greater than 50 ppm, including either personal, special knowledge of the source and composition of the used oil, or a certification from the person generating the used oil claiming that the used oil contains no detectable PCBs.

G. The owner or operator shall maintain a record of the total halogen content concentration (in ppm) for all of the used oil burned. If the total halogen concentration is greater than or equal to 1,000 ppm, the owner or operator shall also maintain the rebuttal demonstration for the used oil showing that it does not contain hazardous waste. The owner or operator shall determine the halogen content of the used oil by: • Testing the used oil; • Applying knowledge of the halogen content of the used oil in light of the materials or

processes used, or • If the used oil has been received from a processor/re-refiner subject to regulation under

subpart F of 40 CFR Part 279, using information provided by the processor/re-refiner. H. The owner or operator shall develop written operating procedures to ensure that used oil is not

burned during start-up or shutdown. The owner or operator shall document any deviations from the written operating procedures.

I. Determine the total SO2 emissions for each operating day. An operating day is defined as a 24-hour period between 12:00 midnight and the following midnight during which any clinker is produced at any time in the kiln. It is not necessary for clinker to be produced continuously by the kiln for the entire 24-hour period.

J. Upon issuance of construction permit # 99-A-579-P6 and prior to the kiln modification, Lafarge shall calculate the monthly rolling average for the pounds of NOx/ton of clinker emission limit for the previous full 12 months. Lafarge shall continue to determine the 12-month rolling average each month thereafter.

K. After the kiln modification, Lafarge shall restart the calculation for the monthly rolling average for the pounds of NOx/ton of clinker. The calculation shall start the first full month after the modification to the kiln and Lafarge shall continue to determine the monthly rolling average for each month thereafter.

L. Upon issuance of construction permit # 99-A-579-P6 calculate the total NOx emissions for the twelve (12) months previous to the issuance of the permit.

M. After the issuance of construction permit # 99-A-579-P6, determine the annual NOx emissions on a rolled-12-month total for each month of operation.

N. For the first twelve months after the kiln modification, calculate the cumulative SOx emissions for each month of operation.

O. After the first twelve months after the kiln modification, calculate the total SOx emissions on a rolling-12-month total for each month of operation.

Authority for Requirement: DNR Construction Permit 99-A-579-P6

Page 64: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 64 Final Permit # 04-TV-007R2, 11/09/17

Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): 340 Stack Opening, (inches, dia.): 108 Exhaust Flow Rate (scfm): 175,000 Exhaust Temperature (oF): 300 Discharge Style: Unobstructed Vertical Authority for Requirement: DNR Construction Permit 99-A-579-P6 The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Stack Testing

Pollutant – Mercury (Hg) (1)

Stack Test to be Completed by – For each new water or waste treatment byproduct approved for use in the kiln (2)

Test Method - 40 CFR 60, Appendix A, Method 18 Authority for Requirement – DNR Construction Permit 99-A-579-P6 (1) Stack test or sludge sampling. Per 40 CFR §61.53(d), unless a waiver of emission testing is

obtained under 40 CFR §61.13, testing is required within ninety (90) days of use of any sludge in the kiln. Sludge means sludge produced by a treatment plant that processes municipal or industrial waste waters (40 CFR §61.51). This includes materials in the Water & Waste Treatment Byproducts category listed in condition F of the Operating Limits section above. Testing shall be conducted in accordance with the procedures set forth either in 40 CFR §61.53(d) or in 40 CFR §61.54.

(2) Unless specifically waived by the Department testing is required for each new water or waste treatment byproduct approved for use in the kiln.

The owner of this equipment or the owner’s authorized agent shall provide written notice to the Director, not less than 30 days before a required stack test or performance evaluation of a continuous emission monitor. Results of the test shall be submitted in writing to the Director in the form of a comprehensive report within 6 weeks of the completion of the testing. 567 IAC 25.1(7) Stack Testing is required to be performed annually per 40 CFR 60.2145(b) and 60.2710(b). See Appendix D Authority for Requirement: 40 CFR 60 Subpart DDDD

Page 65: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 65 Final Permit # 04-TV-007R2, 11/09/17

Continuous Emissions Monitoring: In accordance with the New Source Performance Standards (NSPS) Subpart F (Standards of Performance for Portland Cement Plants), the facility (plant number 82-04-005) shall install, calibrate, maintain, and operate a continuous emission monitoring system (CEMS) for measuring the opacity of the emissions discharged to the atmosphere and record the output of the system. The system shall be designed to meet the 40 CFR 60, Appendix B, Performance Specification 1 (PS1). In accordance with NESHAP Subpart LLL [40 CFR §63.1350(g)(1)], the facility (plant number 17-01-005) shall install, calibrate, maintain, and continuously operate a continuous monitor to record the temperature of the exhaust gases from the kiln at the inlet to or upstream of the kiln particulate matter control device. Per 40 CFR §63.1350(g)(1), the following shall be done: The recorder response range must include zero and 1.5 times either of the average

temperatures established according to the requirements in 40 CFR §63.1349(b)(3)(iv). The reference method must be a National Institute of Standards and Technology calibrated

reference thermocouple-potentiometer system or alternate reference, subject to approval by the Administrator.

The three-hour average temperature shall be calculated as the average of 180 successive one-minute average temperatures.

Periods of time when one-minute averages are not available shall be ignored when calculating three-hour rolling averages. When one-minute averages become available, the first one-minute average is added to the previous 179 values to calculate the three-hour rolling average.

The calibration of all thermocouples and other temperature sensors shall be verified at least once every three months.

Compliance with the sulfur dioxide emission limits of this permit shall be continuously demonstrated by the owner/operator through the use of a CEMS. Therefore, the facility (plant number 82-04-005) shall install, calibrate, maintain, and operate a CEMS for measuring sulfur dioxide emissions discharged to the atmosphere and record the output of the system. The system shall be designed to meet the 40 CFR 60, Appendix B, Performance Specification 2 (PS2) and Performance Specification 6 (PS6) requirements. The specifications of 40 CFR Appendix F (Quality Assurance/Quality Control) shall apply. Appendix F requirements shall be supplemented with a quarterly notice to the Department with the dates of the quarterly cylinder gas audits and annual relative accuracy test audit. Compliance with the nitrogen oxide emission limits of this permit shall be continuously demonstrated by the owner/operator through the use of a CEMS. Therefore, the facility (plant number 82-04-005) shall install, calibrate, maintain, and operate a CEMS for measuring nitrogen oxides emissions discharged to the atmosphere and record the output of the system. The system shall be designed to meet the 40 CFR 60, Appendix B, Performance Specification 2 (PS2) and Performance Specification 6 (PS6) requirements. The specifications of 40 CFR Appendix F (Quality Assurance/Quality Control) shall apply. Appendix F requirements shall be supplemented with a quarterly notice to the Department with the dates of the quarterly cylinder gas audits and annual relative accuracy test audit. The following conditions shall apply:

(1) The CEMS required by this permit shall be operated at all times except for CEM breakdowns, repairs, calibration checks, and zero span adjustments. Data is recorded during

Page 66: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 66 Final Permit # 04-TV-007R2, 11/09/17

calibration checks and zero span adjustments. (2) The 1-hour average SO2 and NOx emission rates measured by the CEMS required by this

permit shall be used to calculate compliance with the emission standards of this permit. At least 2 data points must be used to calculate each 1-hour average.

(3) For each hour of missing emission data (NOx or SO2), the owner or operator shall substitute data by: A. If the monitor data availability is equal to or greater than 95.0%, the owner or operator

shall calculate substitute data by means of the automated data acquisition and handling system for each hour of each missing data period according to the following procedures: i) For the missing data period less than or equal to twenty-four (24) hours, substitute

the average of the hourly concentrations recorded by a pollutant concentration monitor for the hour before and the hour after the missing data period.

ii) For a missing data period greater than twenty-four (24) hours, substitute the greater of: (a) The 90th percentile hourly concentration recorded by a pollutant concentration

monitor during the previous 720 quality-assured monitor operating hours; or (b) The average of the hourly concentrations recorded by a pollutant concentration

monitor for the hour before and the hour after the missing data period. B. If the monitor data availability is at least 90.0% but less than 95.0%, the owner or

operator shall calculate substitute data by means of the automated data acquisition and handling system for each hour of each missing data period according to the following procedures: i) For a missing data period of less than or equal to eight (8) hours, substitute the

average of the hourly concentrations recorded by a pollutant concentration monitor for the hour before and the hour after the missing data period.

ii) For the missing data period of more than eight (8) hours, substitute the greater of: (a) The 95th percentile hourly pollutant concentration recorded by a pollutant

concentration monitor during the previous 720 quality-assured monitor operating hours; or

(b) The average of the hourly concentrations recorded by a pollutant concentration monitor for the hour before and the hour after the missing data period.

C. If the monitor data availability is less than 90.0%, the owner or operator shall obtain actual emission data by an alternate testing or monitoring method approved by the Department.

If requested by the Department, the owner/operator shall coordinate the quarterly cylinder gas audits with the Department to afford the Department the opportunity to observe these audits. The relative accuracy test audits shall be coordinated with the Department. Authority for Requirement - DNR Construction Permit 99-A-579-P6 The owner of this equipment or the owner’s authorized agent shall provide written notice to the Director, not less than 30 days before a required stack test or performance evaluation of a continuous emission monitor. Results of the test shall be submitted in writing to the Director in the form of a comprehensive report within 6 weeks of the completion of the testing. 567 IAC 25.1(7)

Page 67: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 67 Final Permit # 04-TV-007R2, 11/09/17

Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No See Appendix C Authority for Requirement: 567 IAC 22.108(3)

Page 68: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 68 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0499-0 Associated Equipment Associated Emission Unit ID Numbers: 0499-1-F ______________________________________________________________________________ Emission Unit vented through this Emission Point: 0499-1-F Emission Unit Description: 20,000 gal Fuel Oil Tank Raw Material/Fuel: Fuel Oil Rated Capacity: 2,400 gal/hr

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 40%(1)

Authority for Requirement: DNR Construction Permit 98-A-1055-S1 567 IAC 23.3(2)"d"

(1) An exceedence of the indicator opacity of 25% will require the owner/operator to promptly investigate the emission unit and make corrections to operations or equipment associated with the exceedence. If exceedences continue after the corrections, the DNR may require additional proof to demonstrate compliance (e.g., stack testing). Pollutant: Particulate Matter (PM) Emission Limits: 0.1 gr/scf Authority for Requirement: DNR Construction Permit 98-A-1055-S1

567 IAC 23.3(2)"a" Operational Limits & Requirements The owner/operator of this equipment shall comply with the operational limits and requirements listed below. Process throughput: A. The storage tank is limited to storing distillate fuel oil. Reporting & Record keeping All records, as required by this permit, shall be kept on site for a minimum of five (5) years and be available for inspection by the DNR. Records shall be legible and maintained in an orderly manner. The records shall show the following A. The type of fuel stored in the tank. B. Records showing the dimensions of the storage vessel and the capacity.

Page 69: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 69 Final Permit # 04-TV-007R2, 11/09/17

Authority for Requirement: DNR Construction Permit 98-A-1055-S1 Emission Point Characteristics The emission point shall conform to the specifications listed below. Source: Storage Tank Tank Shell Diameter: 11 ft Tank Shell Height: 28 ft Tank Volume (Gallons): 20,000 Exhaust Flow Rate: Fugitive Authority for Requirement: DNR Construction Permit 98-A-1055-S1 The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 70: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 70 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0535-0 Associated Equipment Associated Emission Unit ID Numbers: 0535-1 Emissions Control Equipment ID Number: 0535-C Emissions Control Equipment Description: Baghouse ______________________________________________________________________________ Emission Unit vented through this Emission Point: 0535-1 Emission Unit Description: CKD Handling Silo Raw Material/Fuel: CKD Rated Capacity: 405 tons/hr

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 40%(1)

Authority for Requirement: DNR Construction Permit 97-A-789-S2 567 IAC 23.3(2)"d" (1) If opacity greater than that observed in the initial performance test is viewed other than startup, shutdown, or malfunction, a stack test may be required to demonstrate compliance with the particulate standard. Pollutant: Particulate Matter (PM10) Emission Limits: 0.55 lb/hr Authority for Requirement: DNR Construction Permit 97-A-789-S2 Pollutant: Particulate Matter (PM) Emission Limits: 0.1 gr/scf Authority for Requirement: DNR Construction Permit 97-A-789-S2

567 IAC 23.3(2)"a" Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): 102 Stack Opening, (inches, dia.): 16 x 7 Exhaust Flow Rate (scfm): 2,900 Exhaust Temperature (oF): 140 Discharge Style: Unobstructed Vertical Authority for Requirement: DNR Construction Permit 97-A-789-S2

Page 71: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 71 Final Permit # 04-TV-007R2, 11/09/17

The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the periodic monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No See Appendix C Authority for Requirement: 567 IAC 22.108(3)

Page 72: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 72 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0611-0 Associated Equipment Associated Emission Unit ID Number: 0611-1 Emissions Control Equipment ID Number: 0611-C Emissions Control Equipment Description: Baghouse Continuous Emissions Monitors ID Number: 0611-1-M ______________________________________________________________________________

Emission Unit vented through this Emission Point: 0611-1 Emission Unit Description: Clinker Cooler Raw Material/Fuel: Clinker Rated Capacity: 145.3 tons of clinker/hr

Applicable Requirements BACT Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 5%(1)

Authority for Requirement: DNR Construction Permit 01-A-878-P1 (1) The averaging period for this standard is one (1) hour. Pollutant: Particulate Matter (PM10) Emission Limit(s): 0.015 gr/dscf Authority for Requirement: DNR Construction Permit 01-A-878-P1 Pollutant: Particulate Matter (PM) Emission Limit(s): 0.015 gr/dscf Authority for Requirement: DNR Construction Permit 01-A-878-P1 Other Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 40% (2)

Authority for Requirement: DNR Construction Permit 01-A-878-P1 567 IAC 23.3(2)"d"

(2)An exceedance of the indicator opacity of 10% will require the owner or operator to promptly investigate the emission unit and make corrections to operations or equipment associated with the exceedance. If exceedances continue after the corrections, the Department may require additional proof to demonstrate compliance (e.g., stack testing).

Page 73: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 73 Final Permit # 04-TV-007R2, 11/09/17

Pollutant: Particulate Matter (PM10) Emission Limit(s): 17.92 lb/hr (3)

Authority for Requirement: DNR Construction Permit 01-A-878-P1 (3) Emission rate used in the facility-wide SIP (State Implementation Plan) maintenance plan dispersion modeling to demonstrate no exceedences of the National Ambient Air Quality Standards (NAAQS). Pollutant: Particulate Matter (PM) Emission Limit(s): 0.07 lb/ton clinker Authority for Requirement: 40 CFR 63.1343

567 IAC 23.1(4)"bl" NSPS and NESHAP Both the emission unit and the source (plant number 82-04-005) are subject to Subpart A (General Provisions; 40 CFR §60.1 through 40 CFR §60.19) of the New Source Performance Standards (NSPS) and Subpart A (General Provisions; 40 CFR §63.1 through 40 CFR §63.15) of the National Emission Standards for Hazardous Air Pollutants (NESHAP) for Source Categories. This source (plant number 82-04-005) is subject to Subpart LLL (National Emission Standards for Hazardous Air Pollutants from the Portland Cement Manufacturing Industry; 40 CFR §63.1340 – 40 CFR §63.1358). Please note that EPA amended NESHAP Subpart LLL on February 12, 2013 and the source (plant number 82-04-005) may be subject to requirements in those amendments. An O & M plan is required by Subpart LLL for these emission units. Relevant requirements of O & M plan for this equipment: Particulate Matter and Opacity-see Appendix B. This emission unit is an affected facility per NSPS Subpart F (Standards of Performance for Portland Cement Plants; 40 CFR §60.60 through 40 CFR §60.66). Per 40 CFR §63.1356, any affected source subject to the provisions of NESHAP Subpart LLL is exempted from any otherwise applicable new source performance standard contained in 40 CFR Part 60, Subpart F. Please note that EPA amended NSPS Subpart F on February 12, 2013 and this emission unit may be subject to requirements in those amendments. Authority for Requirements: DNR Construction Permit 01-A-878-P1

40 CFR 60 Subpart F 567 IAC 23.1(2)"c" 40 CFR 63 Subpart LLL 567 IAC 23.1(4)"bl"

Operational Limits & Requirements The owner/operator of this equipment shall comply with the operational limits and requirements listed below. A. The owner or operator shall schedule a PM10 compliance test within thirty (30) days if this

emission point exceeds the 5% (1- hour averaging period) BACT opacity limit.

Page 74: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 74 Final Permit # 04-TV-007R2, 11/09/17

Reporting & Record keeping All records as required by this permit shall be kept on-site for a minimum of five (5) years and shall be available for inspection by the DNR. Records shall be legible and maintained in an orderly manner. The records shall show the following: A. A log of:

• One (1) hour opacity averages, • Dates and times of any exceedances, and • Dates of any PM10 compliance tests.

B. A copy of all PM CPMS and corresponding opacity test results if a PM CPMS is used for compliance.

C. Monitoring for NESHAP Subpart LLL at the facility (plant number 82-04-005) shall be done in accordance with 40 CFR §63.1350.

D. Recordkeeping for NESHAP Subpart LLL at the facility (plant number 82-04-005) shall be done in accordance with 40 CFR §63.1355.

Authority for Requirement: DNR Construction Permit 01-A-878-P1 Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): 113 Stack Opening, (inches, dia.): 126 Exhaust Flow Rate (scfm): 133,000 Exhaust Temperature (oF): 340 Discharge Style: Unobstructed Vertical Authority for Requirement: DNR Construction Permit 01-A-878-P1 The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Continuous Emissions Monitoring: A. The following monitoring systems are required to demonstrate compliance with the NSPS,

NESHAP, and Best Available Control Technology (BACT) requirements listed in this permit: o Opacity:

In order to demonstrate compliance with the applicable opacity standards the owner or operator shall either:

Page 75: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 75 Final Permit # 04-TV-007R2, 11/09/17

1. Install, calibrate, maintain, and operate a continuous emission monitoring system (CEMS) for measuring the opacity of the emissions discharged to the atmosphere and record the output of the system. The system shall be designed to meet the 40 CFR 60, Appendix B, Performance Specification 1 (PS1). And/or

2. Install, calibrate, maintain, and operate a continuous parametric monitoring system for particulate matter (PM CPMS). The owner or operator shall conduct Method 9 opacity testing annually to establish a correlation between the PM CPMS milliamp (mA) output and opacity from the stack (EP 0611-0). The PM CPMS shall provide a 4 – 20 mA output. The PM CPMS operating range must be capable of reading PM concentrations from zero (0) to a level equivalent to three (3) times the allowable emission limit.

Authority for Requirement – DNR Construction Permit 01-A-878-P1

40 CFR Subpart LLL 567 IAC 23.1(3)"bl

The owner of this equipment or the owner’s authorized agent shall provide written notice to the Director, not less than 30 days before a required stack test or performance evaluation of a continuous emission monitor. Results of the test shall be submitted in writing to the Director in the form of a comprehensive report within 6 weeks of the completion of the testing. 567 IAC 25.1(7) Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Facility operation and maintenance plans must be sufficient to yield reliable data from the relevant time period that are representative of the source’s compliance with the applicable requirements. The data pertaining to the plan maintained on site for at least 5 years. The plan and associated recordkeeping provides documentation of this facility’s implementation of its obligation to operate according to good air pollution control practice. Good air pollution control practice is achieved by adoption of quality control standards in the operation and maintenance procedures for air pollution control that are comparable to industry quality control standards for the production processes associated with this emission point. Authority for Requirement: 567 IAC 22.108(3)

Page 76: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 76 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0667-0 Associated Equipment Associated Emission Unit ID Numbers: 0667-1, 0667-2 Emissions Control Equipment ID Number: 0667-C Emissions Control Equipment Description: Baghouse ______________________________________________________________________________ Emission Unit vented through this Emission Point: 0667-1 Emission Unit Description: Coal Mill and Bins Raw Material/Fuel: Coal Rated Capacity: 20 tons/hr Emission Unit vented through this Emission Point: 0667-2 Emission Unit Description: Coal Mill Air Heater Raw Material/Fuel: Natural Gas Rated Capacity: 0.01 MMcf/hr

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 20%(1)

Authority for Requirement: DNR Construction Permit 78-A-232-S3 567 IAC 23.1(2)"v" 40 CFR 60.252(c) (1) If opacity greater than that observed in the initial performance test is viewed other than startup, shutdown, or malfunction, a stack test may be required to demonstrate compliance with the particulate standard. Pollutant: Particulate Matter (PM10) Emission Limits: 5.76 lb/hr Authority for Requirement: DNR Construction Permit 78-A-232-S3 Pollutant: Particulate Matter (PM) Emission Limits: 0.1 gr/scf Authority for Requirement: DNR Construction Permit 78-A-232-S3 567 IAC 23.3(2)"a"

Pollutant: Sulfur Dioxide (SO2) Emission Limit(s): 500 ppmv Authority for Requirement: 567 IAC 23.3(3)"e"

Page 77: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 77 Final Permit # 04-TV-007R2, 11/09/17

NSPS and NESHAP This unit is subject to Subpart A (General Provisions) and Subpart Y- Standards of Performance for Coal preparation Plants of the New Source Performance Standards (NSPS). Authority for Requirement: 40 CFR 60 Subpart Y

567 IAC 23.1(2)"v" The Coal Mill Air Heater is subject to National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters [40 CFR Part 63 Subpart DDDDD], and 40 CFR Part 63 Subpart A, General Provisions. Authority for Requirement: 40 CFR 63 Subpart DDDDD

Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): 113 Stack Opening, (inches, dia.): 11 x 14 Exhaust Flow Rate (scfm): 29,000 Exhaust Temperature (oF): 140 Discharge Style: Unobstructed Vertical Authority for Requirement: DNR Construction Permit 78-A-232-S3 The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Facility Periodic Opacity Monitoring On a weekly basis, the facility will have a certified smoke reader conduct a Method 22 visible emissions check on the Coal Mill building. If there are visible emissions, the smoke reader will conduct a standard EPA Method 9 observation. If an opacity ≥20% is observed, it would be considered a violation and corrective action will be taken as soon as possible, but no later than eight hours from the time of the observation of visible emissions. If weather conditions prevent the observer from conducting an opacity observation, the observer shall note such conditions on the data observation sheet. At least three attempts shall be made to retake opacity readings at approximately two-hour intervals throughout the day. If all observation tests for the week have been unsuccessful due to weather, an observation shall be made the next operating day when weather permits.

Page 78: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 78 Final Permit # 04-TV-007R2, 11/09/17

All opacity observations and any resulting actions shall be recorded and the records maintained for a minimum of five years. Authority for Requirement: 567 IAC 22.108(14) Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No See Appendix C Authority for Requirement: 567 IAC 22.108(3)

Page 79: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 79 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0684-0 Associated Equipment Associated Emission Unit ID Numbers: 0684-1 Emissions Control Equipment ID Number: 0684-C Emissions Control Equipment Description: Baghouse ______________________________________________________________________________ Emission Unit vented through this Emission Point: 0684-1 Emission Unit Description: Coal Silo Raw Material/Fuel: Coal Rated Capacity: 200 tons/hr

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 20%(1)

Authority for Requirement: DNR Construction Permit 78-A-248-S6 567 IAC 23.1(2)"v" 40 CFR 60.252(c) (1) If opacity greater than that observed in the initial performance test is viewed other than startup, shutdown, or malfunction, a stack test may be required to demonstrate compliance with the particulate standard. Pollutant: Particulate Matter (PM10) Emission Limits: 0.67 lb/hr Authority for Requirement: DNR Construction Permit 78-A-248-S6 Pollutant: Particulate Matter Emission Limits: 0.1 gr/scf Authority for Requirement: DNR Construction Permit 78-A-248-S6 567 IAC 23.3(2)"a" NSPS and NESHAP This unit is subject to Subpart A (General Provisions) and Subpart Y- Standards of Performance for Coal preparation Plants of the New Source Performance Standards (NSPS). Authority for Requirement: 40 CFR 60 Subpart Y

567 IAC 23.1(2)"v"

Page 80: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 80 Final Permit # 04-TV-007R2, 11/09/17

Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): 142 Stack Opening, (inches, dia.): 12 x 21 Exhaust Flow Rate (scfm): 4,000 Exhaust Temperature (oF): 70 Discharge Style: Unobstructed Vertical Authority for Requirement: DNR Construction Permit 78-A-248-S6 The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Facility Periodic Opacity Monitoring On a weekly basis, the facility will have a certified smoke reader conduct a Method 22 visible emissions check on the coal silo. If there are visible emissions, the smoke reader will conduct a standard EPA Method 9 observation. If an opacity ≥20% is observed, it would be considered a violation and corrective action will be taken as soon as possible, but no later than eight hours from the time of the observation of visible emissions. If weather conditions prevent the observer from conducting an opacity observation, the observer shall note such conditions on the data observation sheet. At least three attempts shall be made to retake opacity readings at approximately two-hour intervals throughout the day. If all observation tests for the week have been unsuccessful due to weather, an observation shall be made the next operating day when weather permits. All opacity observations and any resulting actions shall be recorded and the records maintained for a minimum of five years. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Facility operation and maintenance plans must be sufficient to yield reliable data from the relevant time period that are representative of the source’s compliance with the applicable requirements. The data pertaining to the plan shall be maintained on site for at least 5 years. The plan and associated recordkeeping provides documentation of this facility’s implementation of its obligation to operate according to good air pollution control practice.

Page 81: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 81 Final Permit # 04-TV-007R2, 11/09/17

Good air pollution control practice is achieved by adoption of quality control standards in the operation and maintenance procedures for air pollution control that are comparable to industry quality control standards for the production processes associated with this emission point. Authority for Requirement: 567 IAC 22.108(3)

Page 82: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 82 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0684-0-F Associated Equipment Associated Emission Unit ID Numbers: 0684-1-F ______________________________________________________________________________ Emission Unit vented through this Emission Point: 0684-1-F Emission Unit Description: Belt transfer to coal silo Raw Material/Fuel: Coal Rated Capacity: 200 tons/hr

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from this emission point shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 20%

Authority for Requirement: 567 IAC 23.1(2)"v" 40 CFR 60.252(c) NSPS and NESHAP This unit is subject to Subpart A (General Provisions) and Subpart Y- Standards of Performance for Coal preparation Plants of the New Source Performance Standards (NSPS). Authority for Requirement: 40 CFR 60 Subpart Y

567 IAC 23.1(2)"v"

Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Periodic Opacity Monitoring On a weekly basis, the facility will have a certified smoke reader conduct a Method 22 visible emissions check on the belt transfer of coal to the coal silo. If there are visible emissions, the smoke reader will conduct a standard EPA Method 9 observation. If an opacity ≥20% is observed, it would be considered a violation and corrective action will be taken as soon as possible, but no later than eight hours from the time of the observation of visible emissions. If weather conditions prevent the observer from conducting an opacity observation, the observer shall note such conditions on the data observation sheet. At least three attempts shall be made to retake opacity readings at approximately two-hour intervals throughout the day. If all observation tests for the week have been unsuccessful due to weather, an observation shall be made the next operating day when weather permits. All opacity observations and any resulting actions shall be recorded and the records maintained for a minimum of five years.

Page 83: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 83 Final Permit # 04-TV-007R2, 11/09/17

Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 84: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 84 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 0690-0-F Associated Equipment Associated Emission Unit ID Numbers: 0690-3-F ______________________________________________________________________________ Emission Unit vented through this Emission Point: 0690-3-F Emission Unit Description: Hopper/Weigh Feeder Raw Material/Fuel: Coal Rated Capacity: 200 tons/hr

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from these emission points shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 40%(1)

Authority for Requirement: DNR Construction Permit 96-A-645-S3 567 IAC 23.3(2)"d" (1) An exceedence of the indicator opacity of 20% emissions will require the owner/operator to promptly investigate the emission unit and make corrections to operations or equipment associated with the exceedence. If exceedences continue after the corrections, the DNR may require additional proof to demonstrate compliance (e.g., stack testing). Pollutant: Particulate Matter (PM10) Emission Limits: 0.95 lb/hr and 0.52 tons/yr Authority for Requirement: DNR Construction Permit 96-A-645-S3 Pollutant: Particulate Matter (PM) Emission Limits: 0.1 gr/dscf Authority for Requirement: 567 IAC 23.3(2)"a" Operational Limits & Requirements The owner/operator of this equipment shall comply with the operational limits and requirements listed below. Process throughput: A. The transfer of coal associated with this source (EU SO690-3F) shall not exceed the rate of 200

tons per hour. B. The transfer of coal associated with this source (EU SO690-3F) shall not exceed the rate of 600

tons per day.

Page 85: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 85 Final Permit # 04-TV-007R2, 11/09/17

Reporting & Record keeping Records shall be maintained on site for five (5) years and be available for inspection upon request by representatives of the Department of Natural Resources. The records shall show the following: A. A log shall be kept showing the date, the amount of coal (in tons/day) transfer associated with

source 0690-4-F on that date, the total hours (in hrs/day) of operation for source 0690-3-F on that date, and the average rate (in tons/hr) of coal transfer for source 0690-3-F for that day.

Authority for Requirement: DNR Construction Permit 96-A-645-S3 Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): N/A Stack Opening, (inches, dia.): N/A Exhaust Flow Rate (scfm): N/A Exhaust Temperature (oF): Ambient Discharge Style: N/A Authority for Requirement: DNR Construction Permit 96-A-645-S3 The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 86: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 86 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 1310-0 Associated Equipment Associated Emission Unit ID Numbers: 1310-1 Emissions Control Equipment ID Number: 1310-C Emissions Control Equipment Description: Mobile Industrial Vacuum ______________________________________________________________________________ Emission Unit vented through this Emission Point: 1310-1 Emission Unit Description: Pavement Cleaning Raw Material/Fuel: Dust Rated Capacity: 15 tons/hr

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from these emission points shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 40%(1)

Authority for Requirement: DNR Construction Permit 86-A-084-S1 567 IAC 23.3(2)"d" (1) An exceedence of the indicator opacity of 10% emissions will require the owner/operator to promptly investigate the emission unit and make corrections to operations or equipment associated with the exceedence. If exceedences continue after the corrections, the DNR may require additional proof to demonstrate compliance (e.g., stack testing). Pollutant: Particulate Matter (PM10) Emission Limits: 0.06 lb/hr Authority for Requirement: DNR Construction Permit 86-A-084-S1 Pollutant: Particulate Matter (PM) Emission Limits: 0.1 gr/dscf Authority for Requirement: DNR Construction Permit 86-A-084-S1 567 IAC 23.3(2)"a" Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): 8 Stack Opening, (inches, dia.): 8 Exhaust Flow Rate (scfm): 2,300 Exhaust Temperature (oF): 70 Discharge Style: Unobstructed Vertical Authority for Requirement: DNR Construction Permit 85-A-084-S1

Page 87: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 87 Final Permit # 04-TV-007R2, 11/09/17

The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 88: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 88 Final Permit # 04-TV-007R2, 11/09/17

Emission Point ID Number: 1320-0 Associated Equipment Associated Emission Unit ID Numbers: 1320-1 Emissions Control Equipment ID Number: 1320-C Emissions Control Equipment Description: Mobile Industrial Vacuum ______________________________________________________________________________ Emission Unit vented through this Emission Point: 1320-1 Emission Unit Description: Pavement Cleaning Raw Material/Fuel: Dust Rated Capacity: 15 tons/hr

Applicable Requirements Emission Limits (lb./hr, gr./dscf, lb./MMBtu, % opacity, etc.) The emissions from these emission points shall not exceed the levels specified below. Pollutant: Opacity Emission Limit(s): 40%(1)

Authority for Requirement: DNR Construction Permit 86-A-085-S1 567 IAC 23.3(2)"d" (1) An exceedence of the indicator opacity of 10% emissions will require the owner/operator to promptly investigate the emission unit and make corrections to operations or equipment associated with the exceedence. If exceedences continue after the corrections, the DNR may require additional proof to demonstrate compliance (e.g., stack testing). Pollutant: Particulate Matter (PM10) Emission Limits: 0.06 lb/hr Authority for Requirement: DNR Construction Permit 86-A-085-S1 Pollutant: Particulate Matter (PM) Emission Limits: 0.1 gr/dscf Authority for Requirement: DNR Construction Permit 86-A-085-S1 567 IAC 23.3(2)"a" Emission Point Characteristics The emission point shall conform to the specifications listed below. Stack Height, (ft, from the ground): 8 Stack Opening, (inches, dia.): 8 Exhaust Flow Rate (scfm): 2,300 Exhaust Temperature (oF): 70 Discharge Style: Unobstructed Vertical Authority for Requirement: DNR Construction Permit 86-A-085-S1

Page 89: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 89 Final Permit # 04-TV-007R2, 11/09/17

The temperature and flowrate are intended to be representative and characteristic of the design of the permitted emission point. The Department recognizes that the temperature and flow rate may vary with changes in the process and ambient conditions. If it is determined that either the temperature or flowrate above are different than the values stated, the owner or operator shall submit a request to the Department within thirty (30) days of the discovery to determine if a permit amendment is required or submit a permit application requesting to amend the permit. Monitoring Requirements The owner/operator of this equipment shall comply with the monitoring requirements listed below. Agency Approved Operation & Maintenance Plan Required? Yes No Facility Maintained Operation & Maintenance Plan Required? Yes No Compliance Assurance Monitoring (CAM) Plan Required? Yes No Authority for Requirement: 567 IAC 22.108(3)

Page 90: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 90 Final Permit # 04-TV-007R2, 11/09/17

IV. General Conditions This permit is issued under the authority of the Iowa Code subsection 455B.133(8) and in accordance with 567 Iowa Administrative Code chapter 22. G1. Duty to Comply 1. The permittee must comply with all conditions of the Title V permit. Any permit noncompliance constitutes a violation of the Act and is grounds for enforcement action; for a permit termination, revocation and reissuance, or modification; or for denial of a permit renewal application. 567 IAC 22.108(9)"a" 2. Any compliance schedule shall be supplemental to, and shall not sanction noncompliance with, the applicable requirements on which it is based. 567 IAC 22.105 (2)"h"(3) 3. Where an applicable requirement of the Act is more stringent than an applicable requirement of regulations promulgated under Title IV of the Act, both provisions shall be enforceable by the administrator and are incorporated into this permit. 567 IAC 22.108 (1)"b" 4. Unless specified as either "state enforceable only" or "local program enforceable only", all terms and conditions in the permit, including provisions to limit a source's potential to emit, are enforceable by the administrator and citizens under the Act. 567 IAC 22.108 (14) 5. It shall not be a defense for a permittee, in an enforcement action, that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of the permit. 567 IAC 22.108 (9)"b" 6. For applicable requirements with which the permittee is in compliance, the permittee shall continue to comply with such requirements. For applicable requirements that will become effective during the permit term, the permittee shall meet such requirements on a timely basis. 567 IAC 22.108(15)"c" G2. Permit Expiration 1. Except as provided in rule 567—22.104(455B), permit expiration terminates a source’s right to operate unless a timely and complete application for renewal has been submitted in accordance with rule 567—22.105(455B). 567 IAC 22.116(2) 2. To be considered timely, the owner, operator, or designated representative (where applicable) of each source required to obtain a Title V permit shall submit on forms or electronic format specified by the Department to the Air Quality Bureau, Iowa Department of Natural Resources, Air Quality Bureau, 7900 Hickman Rd, Suite #1, Windsor Heights, Iowa 50324, two copies (three if your facility is located in Linn or Polk county) of a complete permit application, at least 6 months but not more than 18 months prior to the date of permit expiration. An additional copy must also be sent to U.S. EPA Region VII, Attention: Chief of Air Permits, 11201 Renner Blvd., Lenexa, KS 66219. Additional copies to local programs or EPA are not required for application materials submitted through the electronic format specified by the Department. The application must include all emission points, emission units, air pollution control equipment, and monitoring devices at the facility. All emissions generating activities, including fugitive emissions, must be included. The definition of a complete application is as indicated in 567 IAC 22.105(2). 567 IAC 22.105 G3. Certification Requirement for Title V Related Documents Any application, report, compliance certification or other document submitted pursuant to this permit shall contain certification by a responsible official of truth, accuracy, and completeness. All certifications shall state that, based on information and belief formed after reasonable inquiry, the statements and information in the document are true, accurate, and complete. 567 IAC 22.107 (4) G4. Annual Compliance Certification By March 31 of each year, the permittee shall submit compliance certifications for the previous calendar year. The certifications shall include descriptions of means to monitor the compliance

Page 91: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 91 Final Permit # 04-TV-007R2, 11/09/17

status of all emissions sources including emissions limitations, standards, and work practices in accordance with applicable requirements. The certification for a source shall include the identification of each term or condition of the permit that is the basis of the certification; the compliance status; whether compliance was continuous or intermittent; the method(s) used for determining the compliance status of the source, currently and over the reporting period consistent with all applicable department rules. For sources determined not to be in compliance at the time of compliance certification, a compliance schedule shall be submitted which provides for periodic progress reports, dates for achieving activities, milestones, and an explanation of why any dates were missed and preventive or corrective measures. The compliance certification shall be submitted to the administrator, director, and the appropriate DNR Field office. 567 IAC 22.108 (15)"e" G5. Semi-Annual Monitoring Report By March 31 and September 30 of each year, the permittee shall submit a report of any monitoring required under this permit for the 6 month periods of July 1 to December 31 and January 1 to June 30, respectively. All instances of deviations from permit requirements must be clearly identified in these reports, and the report must be signed by a responsible official, consistent with 567 IAC 22.107(4). The semi-annual monitoring report shall be submitted to the director and the appropriate DNR Field office. 567 IAC 22.108 (5) G6. Annual Fee 1. The permittee is required under subrule 567 IAC 22.106 to pay an annual fee based on the total tons of actual emissions of each regulated air pollutant. Beginning July 1, 1996, Title V operating permit fees will be paid on July 1 of each year. The fee shall be based on emissions for the previous calendar year. 2. The fee amount shall be calculated based on the first 4,000 tons of each regulated air pollutant emitted each year. The fee to be charged per ton of pollutant will be available from the department by June 1 of each year. The Responsible Official will be advised of any change in the annual fee per ton of pollutant. 3. The following forms shall be submitted annually by March 31 documenting actual emissions for the previous calendar year.

a. Form 1.0 "Facility Identification"; b. Form 4.0 "Emissions unit-actual operations and emissions" for each emission unit; c. Form 5.0 "Title V annual emissions summary/fee"; and d. Part 3 "Application certification."

4. The fee shall be submitted annually by July 1. The fee shall be submitted with the following forms:

a. Form 1.0 "Facility Identification"; b. Form 5.0 "Title V annual emissions summary/fee"; c. Part 3 "Application certification."

5. If there are any changes to the emission calculation form, the department shall make revised forms available to the public by January 1. If revised forms are not available by January 1, forms from the previous year may be used and the year of emissions documented changed. The department shall calculate the total statewide Title V emissions for the prior calendar year and make this information available to the public no later than April 30 of each year. 6. Phase I acid rain affected units under section 404 of the Act shall not be required to pay a fee for emissions which occur during the years 1993 through 1999 inclusive. 7. The fee for a portable emissions unit or stationary source which operates both in Iowa and out of state shall be calculated only for emissions from the source while operating in Iowa. 8. Failure to pay the appropriate Title V fee represents cause for revocation of the Title V permit as indicated in 567 IAC 22.115(1)"d".

Page 92: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 92 Final Permit # 04-TV-007R2, 11/09/17

G7. Inspection of Premises, Records, Equipment, Methods and Discharges Upon presentation of proper credentials and any other documents as may be required by law, the permittee shall allow the director or the director's authorized representative to: 1. Enter upon the permittee's premises where a Title V source is located or emissions-related activity is conducted, or where records must be kept under the conditions of the permit; 2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of the permit; 3. Inspect, at reasonable times, any facilities, equipment (including monitoring and air pollution control equipment), practices, or operations regulated or required under the permit; and 4. Sample or monitor, at reasonable times, substances or parameters for the purpose of ensuring compliance with the permit or other applicable requirements. 567 IAC 22.108 (15)"b" G8. Duty to Provide Information The permittee shall furnish to the director, within a reasonable time, any information that the director may request in writing to determine whether cause exists for modifying, revoking and reissuing, or terminating the permit or to determine compliance with the permit. Upon request, the permittee also shall furnish to the director copies of records required to be kept by the permit, or for information claimed to be confidential, the permittee shall furnish such records directly to the administrator of EPA along with a claim of confidentiality. 567 IAC 22.108 (9)"e" G9. General Maintenance and Repair Duties The owner or operator of any air emission source or control equipment shall: 1. Maintain and operate the equipment or control equipment at all times in a manner consistent with good practice for minimizing emissions. 2. Remedy any cause of excess emissions in an expeditious manner. 3. Minimize the amount and duration of any excess emission to the maximum extent possible during periods of such emissions. These measures may include but not be limited to the use of clean fuels, production cutbacks, or the use of alternate process units or, in the case of utilities, purchase of electrical power until repairs are completed. 4. Schedule, at a minimum, routine maintenance of equipment or control equipment during periods of process shutdowns to the maximum extent possible. 567 IAC 24.2(1) G10. Recordkeeping Requirements for Compliance Monitoring 1. In addition to any source specific recordkeeping requirements contained in this permit, the permittee shall maintain the following compliance monitoring records, where applicable:

a. The date, place and time of sampling or measurements b. The date the analyses were performed. c. The company or entity that performed the analyses. d. The analytical techniques or methods used. e. The results of such analyses; and f. The operating conditions as existing at the time of sampling or measurement. g. The records of quality assurance for continuous compliance monitoring systems (including but not limited to quality control activities, audits and calibration drifts.)

2. The permittee shall retain records of all required compliance monitoring data and support information for a period of at least 5 years from the date of compliance monitoring sample, measurement report or application. Support information includes all calibration and maintenance records and all original strip chart recordings for continuous compliance monitoring, and copies of all reports required by the permit. 3. For any source which in its application identified reasonably anticipated alternative operating scenarios, the permittee shall:

Page 93: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 93 Final Permit # 04-TV-007R2, 11/09/17

a. Comply with all terms and conditions of this permit specific to each alternative scenario. b. Maintain a log at the permitted facility of the scenario under which it is operating. c. Consider the permit shield, if provided in this permit, to extend to all terms and conditions under each operating scenario. 567 IAC 22.108(4), 567 IAC 22.108(12)

G11. Evidence used in establishing that a violation has or is occurring. Notwithstanding any other provisions of these rules, any credible evidence may be used for the purpose of establishing whether a person has violated or is in violation of any provisions herein. 1. Information from the use of the following methods is presumptively credible evidence of whether a violation has occurred at a source:

a. A monitoring method approved for the source and incorporated in an operating permit pursuant to 567 Chapter 22; b. Compliance test methods specified in 567 Chapter 25; or c. Testing or monitoring methods approved for the source in a construction permit issued pursuant to 567 Chapter 22.

2. The following testing, monitoring or information gathering methods are presumptively credible testing, monitoring, or information gathering methods:

a. Any monitoring or testing methods provided in these rules; or b. Other testing, monitoring, or information gathering methods that produce information comparable to that produced by any method in subrule 21.5(1) or this subrule. 567 IAC 21.5(1)-567 IAC 21.5(2)

G12. Prevention of Accidental Release: Risk Management Plan Notification and Compliance Certification If the permittee is required to develop and register a risk management plan pursuant to section 112(r) of the Act, the permittee shall notify the department of this requirement. The plan shall be filed with all appropriate authorities by the deadline specified by EPA. A certification that this risk management plan is being properly implemented shall be included in the annual compliance certification of this permit. 567 IAC 22.108(6) G13. Hazardous Release The permittee must report any situation involving the actual, imminent, or probable release of a hazardous substance into the atmosphere which, because of the quantity, strength and toxicity of the substance, creates an immediate or potential danger to the public health, safety or to the environment. A verbal report shall be made to the department at (515) 281-8694 and to the local police department or the office of the sheriff of the affected county as soon as possible but not later than six hours after the discovery or onset of the condition. This verbal report must be followed up with a written report as indicated in 567 IAC 131.2(2). 567 IAC Chapter 131-State Only G14. Excess Emissions and Excess Emissions Reporting Requirements 1. Excess Emissions. Excess emission during a period of startup, shutdown, or cleaning of control equipment is not a violation of the emission standard if the startup, shutdown or cleaning is accomplished expeditiously and in a manner consistent with good practice for minimizing emissions. Cleaning of control equipment which does not require the shutdown of the process equipment shall be limited to one six-minute period per one-hour period. An incident of excess emission (other than an incident during startup, shutdown or cleaning of control equipment) is a violation. If the owner or operator of a source maintains that the incident of excess emission was due to a malfunction, the owner or operator must show that the conditions which caused the incident of excess emission were not preventable by reasonable maintenance and control measures. Determination of any subsequent enforcement action will be made following review of this report. If excess emissions are occurring, either the control equipment causing the excess emission shall be repaired in an expeditious manner or the process generating the emissions shall be shutdown within

Page 94: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 94 Final Permit # 04-TV-007R2, 11/09/17

a reasonable period of time. An expeditious manner is the time necessary to determine the cause of the excess emissions and to correct it within a reasonable period of time. A reasonable period of time is eight hours plus the period of time required to shut down the process without damaging the process equipment or control equipment. A variance from this subrule may be available as provided for in Iowa Code section 455B.143. In the case of an electric utility, a reasonable period of time is eight hours plus the period of time until comparable generating capacity is available to meet consumer demand with the affected unit out of service, unless, the director shall, upon investigation, reasonably determine that continued operation constitutes an unjustifiable environmental hazard and issue an order that such operation is not in the public interest and require a process shutdown to commence immediately. 2. Excess Emissions Reporting

a. Initial Reporting of Excess Emissions. An incident of excess emission (other than an incident of excess emission during a period of startup, shutdown, or cleaning) shall be reported to the appropriate field office of the department within eight hours of, or at the start of the first working day following the onset of the incident. The reporting exemption for an incident of excess emission during startup, shutdown or cleaning does not relieve the owner or operator of a source with continuous monitoring equipment of the obligation of submitting reports required in 567-subrule 25.1(6). An initial report of excess emission is not required for a source with operational continuous monitoring equipment (as specified in 567-subrule 25.1(1) ) if the incident of excess emission continues for less than 30 minutes and does not exceed the applicable emission standard by more than 10 percent or the applicable visible emission standard by more than 10 percent opacity. The initial report may be made by electronic mail (E-mail), in person, or by telephone and shall include as a minimum the following:

i. The identity of the equipment or source operation from which the excess emission originated and the associated stack or emission point. ii. The estimated quantity of the excess emission. iii. The time and expected duration of the excess emission. iv. The cause of the excess emission. v. The steps being taken to remedy the excess emission. vi. The steps being taken to limit the excess emission in the interim period.

b. Written Reporting of Excess Emissions. A written report of an incident of excess emission shall be submitted as a follow-up to all required initial reports to the department within seven days of the onset of the upset condition, and shall include as a minimum the following:

i. The identity of the equipment or source operation point from which the excess emission originated and the associated stack or emission point. ii. The estimated quantity of the excess emission. iii. The time and duration of the excess emission. iv. The cause of the excess emission. v. The steps that were taken to remedy and to prevent the recurrence of the incident of excess emission. vi. The steps that were taken to limit the excess emission. vii. If the owner claims that the excess emission was due to malfunction, documentation to support this claim. 567 IAC 24.1(1)-567 IAC 24.1(4)

3. Emergency Defense for Excess Emissions. For the purposes of this permit, an “emergency” means any situation arising from sudden and reasonably unforeseeable events beyond the control of the source, including acts of God, which situation requires immediate corrective action to restore

Page 95: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 95 Final Permit # 04-TV-007R2, 11/09/17

normal operation, and that causes the source to exceed a technology-based emission limitation under the permit due to unavoidable increases in emissions attributable to the emergency. An emergency shall not include non-compliance, to the extent caused by improperly designed equipment, lack of preventive maintenance, careless or improper operation or operator error. An emergency constitutes an affirmative defense to an action brought for non-compliance with technology based limitations if it can be demonstrated through properly signed contemporaneous operating logs or other relevant evidence that:

a. An emergency occurred and that the permittee can identify the cause(s) of the emergency; b. The facility at the time was being properly operated; c. During the period of the emergency, the permittee took all reasonable steps to minimize levels of emissions that exceeded the emissions standards or other requirements of the permit; and d. The permittee submitted notice of the emergency to the director by certified mail within two working days of the time when the emissions limitations were exceeded due to the emergency. This notice fulfills the requirement of paragraph 22.108(5)"b." – See G15. This notice must contain a description of the emergency, any steps taken to mitigate emissions, and corrective actions taken.

In any enforcement proceeding, the permittee seeking to establish the occurrence of an emergency has the burden of proof. This provision is in addition to any emergency or upset provision contained in any applicable requirement. 567 IAC 22.108(16) G15. Permit Deviation Reporting Requirements A deviation is any failure to meet a term, condition or applicable requirement in the permit. Reporting requirements for deviations that result in a hazardous release or excess emissions have been indicated above (see G13 and G14). Unless more frequent deviation reporting is specified in the permit, any other deviation shall be documented in the semi-annual monitoring report and the annual compliance certification (see G4 and G5). 567 IAC 22.108(5)"b" G16. Notification Requirements for Sources That Become Subject to NSPS and NESHAP Regulations During the term of this permit, the permittee must notify the department of any source that becomes subject to a standard or other requirement under 567-subrule 23.1(2) (standards of performance of new stationary sources) or section 111 of the Act; or 567-subrule 23.1(3) (emissions standards for hazardous air pollutants), 567-subrule 23.1(4) (emission standards for hazardous air pollutants for source categories) or section 112 of the Act. This notification shall be submitted in writing to the department pursuant to the notification requirements in 40 CFR Section 60.7, 40 CFR Section 61.07, and/or 40 CFR Section 63.9. 567 IAC 23.1(2), 567 IAC 23.1(3), 567 IAC 23.1(4) G17. Requirements for Making Changes to Emission Sources That Do Not Require Title V Permit Modification 1. Off Permit Changes to a Source. Pursuant to section 502(b)(10) of the CAAA, the permittee may make changes to this installation/facility without revising this permit if:

a. The changes are not major modifications under any provision of any program required by section 110 of the Act, modifications under section 111 of the act, modifications under section 112 of the act, or major modifications as defined in 567 IAC Chapter 22. b. The changes do not exceed the emissions allowable under the permit (whether expressed therein as a rate of emissions or in terms of total emissions); c. The changes are not modifications under any provisions of Title I of the Act and the changes do not exceed the emissions allowable under the permit (whether expressed therein as a rate of emissions or as total emissions); d. The changes are not subject to any requirement under Title IV of the Act (revisions

Page 96: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 96 Final Permit # 04-TV-007R2, 11/09/17

affecting Title IV permitting are addressed in rules 567—22.140(455B) through 567 - 22.144(455B));. e. The changes comply with all applicable requirements. f. For each such change, the permitted source provides to the department and the administrator by certified mail, at least 30 days in advance of the proposed change, a written notification, including the following, which must be attached to the permit by the source, the department and the administrator:

i. A brief description of the change within the permitted facility, ii. The date on which the change will occur, iii. Any change in emission as a result of that change, iv. The pollutants emitted subject to the emissions trade v. If the emissions trading provisions of the state implementation plan are invoked, then Title V permit requirements with which the source shall comply; a description of how the emissions increases and decreases will comply with the terms and conditions of the Title V permit. vi. A description of the trading of emissions increases and decreases for the purpose of complying with a federally enforceable emissions cap as specified in and in compliance with the Title V permit; and vii. Any permit term or condition no longer applicable as a result of the change. 567 IAC 22.110(1)

2. Such changes do not include changes that would violate applicable requirements or contravene federally enforceable permit terms and conditions that are monitoring (including test methods), record keeping, reporting, or compliance certification requirements. 567 IAC 22.110(2) 3. Notwithstanding any other part of this rule, the director may, upon review of a notice, require a stationary source to apply for a Title V permit if the change does not meet the requirements of subrule 22.110(1). 567 IAC 22.110(3) 4. The permit shield provided in subrule 22.108(18) shall not apply to any change made pursuant to this rule. Compliance with the permit requirements that the source will meet using the emissions trade shall be determined according to requirements of the state implementation plan authorizing the emissions trade. 567 IAC 22.110(4) 5. No permit revision shall be required, under any approved economic incentives, marketable permits, emissions trading and other similar programs or processes, for changes that are provided for in this permit. 567 IAC 22.108(11) G18. Duty to Modify a Title V Permit 1. Administrative Amendment.

a. An administrative permit amendment is a permit revision that does any of the following: i. Correct typographical errors ii. Identify a change in the name, address, or telephone number of any person identified in the permit, or provides a similar minor administrative change at the source; iii. Require more frequent monitoring or reporting by the permittee; or iv. Allow for a change in ownership or operational control of a source where the director determines that no other change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, coverage and liability between the current and new permittee has been submitted to the director.

Page 97: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 97 Final Permit # 04-TV-007R2, 11/09/17

b. The permittee may implement the changes addressed in the request for an administrative amendment immediately upon submittal of the request. The request shall be submitted to the director. c. Administrative amendments to portions of permits containing provisions pursuant to Title IV of the Act shall be governed by regulations promulgated by the administrator under Title IV of the Act.

2. Minor Title V Permit Modification. a. Minor Title V permit modification procedures may be used only for those permit modifications that satisfy all of the following:

i. Do not violate any applicable requirement; ii. Do not involve significant changes to existing monitoring, reporting or recordkeeping requirements in the Title V permit; iii. Do not require or change a case by case determination of an emission limitation or other standard, or an increment analysis; iv. Do not seek to establish or change a permit term or condition for which there is no corresponding underlying applicable requirement and that the source has assumed in order to avoid an applicable requirement to which the source would otherwise be subject. Such terms and conditions include any federally enforceable emissions caps which the source would assume to avoid classification as a modification under any provision under Title I of the Act; and an alternative emissions limit approved pursuant to regulations promulgated under section 112(i)(5) of the Act; v. Are not modifications under any provision of Title I of the Act; and vi. Are not required to be processed as significant modification under rule 567 - 22.113(455B).

b. An application for minor permit revision shall be on the minor Title V modification application form and shall include at least the following:

i. A description of the change, the emissions resulting from the change, and any new applicable requirements that will apply if the change occurs; ii. The permittee's suggested draft permit; iii. Certification by a responsible official, pursuant to 567 IAC 22.107(4), that the proposed modification meets the criteria for use of minor permit modification procedures and a request that such procedures be used; and iv. Completed forms to enable the department to notify the administrator and the affected states as required by 567 IAC 22.107(7).

c. The permittee may make the change proposed in its minor permit modification application immediately after it files the application. After the permittee makes this change and until the director takes any of the actions specified in 567 IAC 22.112(4) "a" to "c", the permittee must comply with both the applicable requirements governing the change and the proposed permit terms and conditions. During this time, the permittee need not comply with the existing permit terms and conditions it seeks to modify. However, if the permittee fails to comply with its proposed permit terms and conditions during this time period, the existing permit terms and conditions it seeks to modify may be enforced against the facility.

3. Significant Title V Permit Modification. Significant Title V modification procedures shall be used for applications requesting Title V permit modifications that do not qualify as minor Title V modifications or as administrative amendments. These include but are not limited to all significant changes in monitoring permit terms, every relaxation of reporting or recordkeeping permit terms, and any change in the method of measuring compliance with existing requirements. Significant Title V modifications shall meet all

Page 98: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 98 Final Permit # 04-TV-007R2, 11/09/17

requirements of 567 IAC Chapter 22, including those for applications, public participation, review by affected states, and review by the administrator, as those requirements that apply to Title V issuance and renewal. The permittee shall submit an application for a significant permit modification not later than three months after commencing operation of the changed source unless the existing Title V permit would prohibit such construction or change in operation, in which event the operation of the changed source may not commence until the department revises the permit. 567 IAC 22.111-567 IAC 22.113 G19. Duty to Obtain Construction Permits Unless exempted in 567 IAC 22.1(2) or to meet the parameters established in 567 IAC 22.1(1)"c", the permittee shall not construct, install, reconstruct or alter any equipment, control equipment or anaerobic lagoon without first obtaining a construction permit, or conditional permit, or permit pursuant to rule 567 IAC 22.8, or permits required pursuant to rules 567 IAC 22.4, 567 IAC 22.5, 567 IAC 31.3, and 567 IAC 33.3 as required in 567 IAC 22.1(1). A permit shall be obtained prior to the initiation of construction, installation or alteration of any portion of the stationary source or anaerobic lagoon. 567 IAC 22.1(1) G20. Asbestos The permittee shall comply with 567 IAC 23.1(3)"a", and 567 IAC 23.2(3)"g" when activities involve asbestos mills, surfacing of roadways, manufacturing operations, fabricating, insulating, waste disposal, spraying applications, demolition and renovation operations (567 IAC 23.1(3)"a"); training fires and controlled burning of a demolished building (567 IAC 23.2). G21. Open Burning The permittee is prohibited from conducting open burning, except as provided in 567 IAC 23.2. 567 IAC 23.2 except 23.2(3)"j"; 567 IAC 23.2(3)"j" - State Only G22. Acid Rain (Title IV) Emissions Allowances The permittee shall not exceed any allowances that it holds under Title IV of the Act or the regulations promulgated there under. Annual emissions of sulfur dioxide in excess of the number of allowances to emit sulfur dioxide held by the owners and operators of the unit or the designated representative of the owners and operators is prohibited. Exceedences of applicable emission rates are prohibited. “Held” in this context refers to both those allowances assigned to the owners and operators by USEPA, and those allowances supplementally acquired by the owners and operators. The use of any allowance prior to the year for which it was allocated is prohibited. Contravention of any other provision of the permit is prohibited. 567 IAC 22.108(7) G23. Stratospheric Ozone and Climate Protection (Title VI) Requirements 1. The permittee shall comply with the standards for labeling of products using ozone-depleting substances pursuant to 40 CFR Part 82, Subpart E:

a. All containers in which a class I or class II substance is stored or transported, all products containing a class I substance, and all products directly manufactured with a class I substance must bear the required warning statement if it is being introduced into interstate commerce pursuant to § 82.106. b. The placement of the required warning statement must comply with the requirements pursuant to § 82.108. c. The form of the label bearing the required warning statement must comply with the requirements pursuant to § 82.110. d. No person may modify, remove, or interfere with the required warning statement except as described in § 82.112.

2. The permittee shall comply with the standards for recycling and emissions reduction pursuant to 40 CFR Part 82, Subpart F, except as provided for MVACs in Subpart B:

Page 99: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 99 Final Permit # 04-TV-007R2, 11/09/17

a. Persons opening appliances for maintenance, service, repair, or disposal must comply with the required practices pursuant to § 82.156. b. Equipment used during the maintenance, service, repair, or disposal of appliances must comply with the standards for recycling and recovery equipment pursuant to § 82.158. c. Persons performing maintenance, service, repair, or disposal of appliances must be certified by an approved technician certification program pursuant to § 82.161. d. Persons disposing of small appliances, MVACs, and MVAC-like appliances must comply with reporting and recordkeeping requirements pursuant to § 82.166. ("MVAC-like appliance" as defined at § 82.152) e. Persons owning commercial or industrial process refrigeration equipment must comply with the leak repair requirements pursuant to § 82.156. f. Owners/operators of appliances normally containing 50 or more pounds of refrigerant must keep records of refrigerant purchased and added to such appliances pursuant to § 82.166.

3. If the permittee manufactures, transforms, imports, or exports a class I or class II substance, the permittee is subject to all the requirements as specified in 40 CFR part 82, Subpart A, Production and Consumption Controls. 4. If the permittee performs a service on motor (fleet) vehicles when this service involves ozone-depleting substance refrigerant (or regulated substitute substance) in the motor vehicle air conditioner (MVAC), the permittee is subject to all the applicable requirements as specified in 40 CFR part 82, Subpart B, Servicing of Motor Vehicle Air Conditioners. The term "motor vehicle" as used in Subpart B does not include a vehicle in which final assembly of the vehicle has not been completed. The term "MVAC" as used in Subpart B does not include the air-tight sealed refrigeration system used as refrigerated cargo, or system used on passenger buses using HCFC-22 refrigerant, 5. The permittee shall be allowed to switch from any ozone-depleting substance to any alternative that is listed in the Significant New Alternatives Program (SNAP) promulgated pursuant to 40 CFR part 82, Subpart G, Significant New Alternatives Policy Program. 40 CFR part 82 G24. Permit Reopenings 1. This permit may be modified, revoked, reopened, and reissued, or terminated for cause. The filing of a request by the permittee for a permit modification, revocation and reissuance, or termination, or of a notification of planned changes or anticipated noncompliance does not stay any permit condition. 567 IAC 22.108(9)"c" 2. Additional applicable requirements under the Act become applicable to a major part 70 source with a remaining permit term of 3 or more years. Revisions shall be made as expeditiously as practicable, but not later than 18 months after the promulgation of such standards and regulations.

a. Reopening and revision on this ground is not required if the permit has a remaining term of less than three years; b. Reopening and revision on this ground is not required if the effective date of the requirement is later than the date on which the permit is due to expire, unless the original permit or any of its terms and conditions have been extended pursuant to 40 CFR 70.4(b)(10)(i) or (ii) as amended to May 15, 2001. c. Reopening and revision on this ground is not required if the additional applicable requirements are implemented in a general permit that is applicable to the source and the source receives approval for coverage under that general permit. 567 IAC 22.108(17)"a", 567 IAC 22.108(17)"b"

3. A permit shall be reopened and revised under any of the following circumstances:

Page 100: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 100 Final Permit # 04-TV-007R2, 11/09/17

a. The department receives notice that the administrator has granted a petition for disapproval of a permit pursuant to 40 CFR 70.8(d) as amended to July 21, 1992, provided that the reopening may be stayed pending judicial review of that determination; b. The department or the administrator determines that the Title V permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or other terms or conditions of the Title V permit; c. Additional applicable requirements under the Act become applicable to a Title V source, provided that the reopening on this ground is not required if the permit has a remaining term of less than three years, the effective date of the requirement is later than the date on which the permit is due to expire, or the additional applicable requirements are implemented in a general permit that is applicable to the source and the source receives approval for coverage under that general permit. Such a reopening shall be complete not later than 18 months after promulgation of the applicable requirement. d. Additional requirements, including excess emissions requirements, become applicable to a Title IV affected source under the acid rain program. Upon approval by the administrator, excess emissions offset plans shall be deemed to be incorporated into the permit. e. The department or the administrator determines that the permit must be revised or revoked to ensure compliance by the source with the applicable requirements. 567 IAC 22.114(1)

4. Proceedings to reopen and reissue a Title V permit shall follow the procedures applicable to initial permit issuance and shall effect only those parts of the permit for which cause to reopen exists. 567 IAC 22.114(2) 5. A notice of intent shall be provided to the Title V source at least 30 days in advance of the date the permit is to be reopened, except that the director may provide a shorter time period in the case of an emergency. 567 IAC 22.114(3) G25. Permit Shield 1. The director may expressly include in a Title V permit a provision stating that compliance with the conditions of the permit shall be deemed compliance with any applicable requirements as of the date of permit issuance, provided that:

a. Such applicable requirements are included and are specifically identified in the permit; or b. The director, in acting on the permit application or revision, determines in writing that other requirements specifically identified are not applicable to the source, and the permit includes the determination or a concise summary thereof.

2. A Title V permit that does not expressly state that a permit shield exists shall be presumed not to provide such a shield. 3. A permit shield shall not alter or affect the following:

a. The provisions of Section 303 of the Act (emergency orders), including the authority of the administrator under that section; b. The liability of an owner or operator of a source for any violation of applicable requirements prior to or at the time of permit issuance; c. The applicable requirements of the acid rain program, consistent with Section 408(a) of the Act; d. The ability of the department or the administrator to obtain information from the facility pursuant to Section 114 of the Act. 567 IAC 22.108 (18)

G26. Severability The provisions of this permit are severable and if any provision or application of any provision is found to be invalid by this department or a court of law, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected by such finding. 567 IAC 22.108 (8)

Page 101: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 101 Final Permit # 04-TV-007R2, 11/09/17

G27. Property Rights The permit does not convey any property rights of any sort, or any exclusive privilege. 567 IAC 22.108 (9)"d" G28. Transferability This permit is not transferable from one source to another. If title to the facility or any part of it is transferred, an administrative amendment to the permit must be sought consistent with the requirements of 567 IAC 22.111(1). 567 IAC 22.111 (1)"d" G29. Disclaimer No review has been undertaken on the engineering aspects of the equipment or control equipment other than the potential of that equipment for reducing air contaminant emissions. 567 IAC 22.3(3)"c" G30. Notification and Reporting Requirements for Stack Tests or Monitor Certification The permittee shall notify the department's stack test contact in writing not less than 30 days before a required test or performance evaluation of a continuous emission monitor is performed to determine compliance with applicable requirements of 567 – Chapter 23 or a permit condition. Such notice shall include the time, the place, the name of the person who will conduct the test and other information as required by the department. If the owner or operator does not provide timely notice to the department, the department shall not consider the test results or performance evaluation results to be a valid demonstration of compliance with applicable rules or permit conditions. Upon written request, the department may allow a notification period of less than 30 days. At the department’s request, a pretest meeting shall be held not later than 15 days prior to conducting the compliance demonstration. A testing protocol shall be submitted to the department no later than 15 days before the owner or operator conducts the compliance demonstration. A representative of the department shall be permitted to witness the tests. Results of the tests shall be submitted in writing to the department's stack test contact in the form of a comprehensive report within six weeks of the completion of the testing. Compliance tests conducted pursuant to this permit shall be conducted with the source operating in a normal manner at its maximum continuous output as rated by the equipment manufacturer, or the rate specified by the owner as the maximum production rate at which the source shall be operated. In cases where compliance is to be demonstrated at less than the maximum continuous output as rated by the equipment manufacturer, and it is the owner's intent to limit the capacity to that rating, the owner may submit evidence to the department that the source has been physically altered so that capacity cannot be exceeded, or the department may require additional testing, continuous monitoring, reports of operating levels, or any other information deemed necessary by the department to determine whether such source is in compliance. Stack test notifications, reports and correspondence shall be sent to: Stack Test Review Coordinator

Iowa DNR, Air Quality Bureau 7900 Hickman Road, Suite #1 Windsor Heights, IA 50324 (515) 725-9545

Within Polk and Linn Counties, stack test notifications, reports and correspondence shall also be directed to the supervisor of the respective county air pollution program. 567 IAC 25.1(7)"a", 567 IAC 25.1(9) G31. Prevention of Air Pollution Emergency Episodes The permittee shall comply with the provisions of 567 IAC Chapter 26 in the prevention of excessive build-up of air contaminants during air pollution episodes, thereby preventing the occurrence of an emergency due to the effects of these contaminants on the health of persons. 567 IAC 26.1(1)

Page 102: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 102 Final Permit # 04-TV-007R2, 11/09/17

G32. Contacts List The current address and phone number for reports and notifications to the EPA administrator is:

Chief of Air Permits U.S. EPA Region 7 Air Permits and Compliance Branch 11201 Renner Blvd. Lenexa, KS 66219 (913) 551-7020

The current address and phone number for reports and notifications to the department or the Director is:

Chief, Air Quality Bureau Iowa Department of Natural Resources 7900 Hickman Road, Suite #1 Windsor Heights, IA 50324 (515) 725-9500

Reports or notifications to the DNR Field Offices or local programs shall be directed to the supervisor at the appropriate field office or local program. Current addresses and phone numbers are:

Field Office 1 909 West Main – Suite 4

Manchester, IA 52057 (563) 927-2640

Field Office 2 2300-15th St., SW

Mason City, IA 50401 (641) 424-4073

Field Office 3

1900 N. Grand Ave. Spencer, IA 51301

(712) 262-4177

Field Office 4 1401 Sunnyside Lane Atlantic, IA 50022

(712) 243-1934

Field Office 5 7900 Hickman Road, Suite #200

Windsor Heights, IA 50324 (515) 725-0268

Field Office 6 1023 West Madison Street

Washington, IA 52353-1623 (319) 653-2135

Polk County Public Works Dept.

Air Quality Division 5885 NE 14th St.

Des Moines, IA 50313 (515) 286-3351

Linn County Public Health Air Quality Branchs

501 13th St., NW Cedar Rapids, IA 52405

(319) 892-6000

Page 103: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

Appendix A: Administrative Consent Order #98-AQ-08

kkl 103 Final Permit # 04-TV-007R2, 11/09/17

Page 104: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 104 Final Permit # 04-TV-007R2, 11/09/17

Page 105: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 105 Final Permit # 04-TV-007R2, 11/09/17

Page 106: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 106 Final Permit # 04-TV-007R2, 11/09/17

Page 107: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 107 Final Permit # 04-TV-007R2, 11/09/17

Page 108: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 108 Final Permit # 04-TV-007R2, 11/09/17

Page 109: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 109 Final Permit # 04-TV-007R2, 11/09/17

Page 110: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 110 Final Permit # 04-TV-007R2, 11/09/17

Page 111: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 111 Final Permit # 04-TV-007R2, 11/09/17

Page 112: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 112 Final Permit # 04-TV-007R2, 11/09/17

Page 113: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 113 Final Permit # 04-TV-007R2, 11/09/17

Page 114: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 114 Final Permit # 04-TV-007R2, 11/09/17

Page 115: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 115 Final Permit # 04-TV-007R2, 11/09/17

Page 116: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 116 Final Permit # 04-TV-007R2, 11/09/17

Page 117: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 117 Final Permit # 04-TV-007R2, 11/09/17

Page 118: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 118 Final Permit # 04-TV-007R2, 11/09/17

Page 119: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 119 Final Permit # 04-TV-007R2, 11/09/17

Page 120: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 120 Final Permit # 04-TV-007R2, 11/09/17

Page 121: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 121 Final Permit # 04-TV-007R2, 11/09/17

Page 122: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 122 Final Permit # 04-TV-007R2, 11/09/17

Page 123: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 123 Final Permit # 04-TV-007R2, 11/09/17

Page 124: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 124 Final Permit # 04-TV-007R2, 11/09/17

Page 125: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 125 Final Permit # 04-TV-007R2, 11/09/17

Page 126: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 126 Final Permit # 04-TV-007R2, 11/09/17

Page 127: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 127 Final Permit # 04-TV-007R2, 11/09/17

Page 128: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 128 Final Permit # 04-TV-007R2, 11/09/17

Page 129: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 129 Final Permit # 04-TV-007R2, 11/09/17

Page 130: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 130 Final Permit # 04-TV-007R2, 11/09/17

Page 131: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 131 Final Permit # 04-TV-007R2, 11/09/17

Page 132: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

Appendix B: Operation & Maintenance Plans

kkl 132 Final Permit # 04-TV-007R2, 11/09/17

Page 133: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 133 Final Permit # 04-TV-007R2, 11/09/17

Page 134: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 134 Final Permit # 04-TV-007R2, 11/09/17

Page 135: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 135 Final Permit # 04-TV-007R2, 11/09/17

Page 136: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 136 Final Permit # 04-TV-007R2, 11/09/17

Page 137: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 137 Final Permit # 04-TV-007R2, 11/09/17

Page 138: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 138 Final Permit # 04-TV-007R2, 11/09/17

Page 139: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 139 Final Permit # 04-TV-007R2, 11/09/17

Page 140: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 140 Final Permit # 04-TV-007R2, 11/09/17

Page 141: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 141 Final Permit # 04-TV-007R2, 11/09/17

Page 142: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 142 Final Permit # 04-TV-007R2, 11/09/17

Page 143: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 143 Final Permit # 04-TV-007R2, 11/09/17

Page 144: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 144 Final Permit # 04-TV-007R2, 11/09/17

Page 145: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 145 Final Permit # 04-TV-007R2, 11/09/17

Page 146: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 146 Final Permit # 04-TV-007R2, 11/09/17

Page 147: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 147 Final Permit # 04-TV-007R2, 11/09/17

Page 148: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 148 Final Permit # 04-TV-007R2, 11/09/17

Page 149: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 149 Final Permit # 04-TV-007R2, 11/09/17

Page 150: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 150 Final Permit # 04-TV-007R2, 11/09/17

Page 151: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 151 Final Permit # 04-TV-007R2, 11/09/17

Page 152: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 152 Final Permit # 04-TV-007R2, 11/09/17

Page 153: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 153 Final Permit # 04-TV-007R2, 11/09/17

Page 154: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 154 Final Permit # 04-TV-007R2, 11/09/17

Page 155: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 155 Final Permit # 04-TV-007R2, 11/09/17

Page 156: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 156 Final Permit # 04-TV-007R2, 11/09/17

Page 157: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 157 Final Permit # 04-TV-007R2, 11/09/17

Page 158: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 158 Final Permit # 04-TV-007R2, 11/09/17

Page 159: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 159 Final Permit # 04-TV-007R2, 11/09/17

Page 160: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 160 Final Permit # 04-TV-007R2, 11/09/17

Page 161: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 161 Final Permit # 04-TV-007R2, 11/09/17

Page 162: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 162 Final Permit # 04-TV-007R2, 11/09/17

Page 163: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 163 Final Permit # 04-TV-007R2, 11/09/17

Page 164: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 164 Final Permit # 04-TV-007R2, 11/09/17

Page 165: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 165 Final Permit # 04-TV-007R2, 11/09/17

Page 166: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 166 Final Permit # 04-TV-007R2, 11/09/17

Page 167: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 167 Final Permit # 04-TV-007R2, 11/09/17

Page 168: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 168 Final Permit # 04-TV-007R2, 11/09/17

Page 169: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 169 Final Permit # 04-TV-007R2, 11/09/17

Page 170: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 170 Final Permit # 04-TV-007R2, 11/09/17

Page 171: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 171 Final Permit # 04-TV-007R2, 11/09/17

Page 172: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 172 Final Permit # 04-TV-007R2, 11/09/17

Page 173: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 173 Final Permit # 04-TV-007R2, 11/09/17

Page 174: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 174 Final Permit # 04-TV-007R2, 11/09/17

Page 175: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 175 Final Permit # 04-TV-007R2, 11/09/17

Page 176: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 176 Final Permit # 04-TV-007R2, 11/09/17

Page 177: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 177 Final Permit # 04-TV-007R2, 11/09/17

Page 178: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 178 Final Permit # 04-TV-007R2, 11/09/17

Page 179: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 179 Final Permit # 04-TV-007R2, 11/09/17

Page 180: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 180 Final Permit # 04-TV-007R2, 11/09/17

Page 181: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 181 Final Permit # 04-TV-007R2, 11/09/17

Page 182: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 182 Final Permit # 04-TV-007R2, 11/09/17

Page 183: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 183 Final Permit # 04-TV-007R2, 11/09/17

Page 184: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 184 Final Permit # 04-TV-007R2, 11/09/17

Page 185: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 185 Final Permit # 04-TV-007R2, 11/09/17

Page 186: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 186 Final Permit # 04-TV-007R2, 11/09/17

Page 187: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 187 Final Permit # 04-TV-007R2, 11/09/17

Page 188: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 188 Final Permit # 04-TV-007R2, 11/09/17

Page 189: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 189 Final Permit # 04-TV-007R2, 11/09/17

Page 190: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 190 Final Permit # 04-TV-007R2, 11/09/17

Page 191: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 191 Final Permit # 04-TV-007R2, 11/09/17

Page 192: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 192 Final Permit # 04-TV-007R2, 11/09/17

Page 193: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 193 Final Permit # 04-TV-007R2, 11/09/17

Page 194: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 194 Final Permit # 04-TV-007R2, 11/09/17

Page 195: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 195 Final Permit # 04-TV-007R2, 11/09/17

Page 196: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 196 Final Permit # 04-TV-007R2, 11/09/17

Page 197: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 197 Final Permit # 04-TV-007R2, 11/09/17

Page 198: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 198 Final Permit # 04-TV-007R2, 11/09/17

Page 199: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 199 Final Permit # 04-TV-007R2, 11/09/17

Page 200: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 200 Final Permit # 04-TV-007R2, 11/09/17

Page 201: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 201 Final Permit # 04-TV-007R2, 11/09/17

Page 202: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 202 Final Permit # 04-TV-007R2, 11/09/17

Page 203: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 203 Final Permit # 04-TV-007R2, 11/09/17

Page 204: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 204 Final Permit # 04-TV-007R2, 11/09/17

Page 205: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 205 Final Permit # 04-TV-007R2, 11/09/17

Page 206: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 206 Final Permit # 04-TV-007R2, 11/09/17

Page 207: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 207 Final Permit # 04-TV-007R2, 11/09/17

Page 208: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 208 Final Permit # 04-TV-007R2, 11/09/17

Page 209: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

Appendix C: CAM Plans

kkl 209 Final Permit #04-TV-007R2, 11/09/17

CAM Plan for 0218-1, 0218-0 and 0218-C Baghouse Emissions Unit Emission Unit: Primary Crusher (0218-1) Facility: Continental Cement Company Pollutant: Opacity, PM10 & PM Emission Control Technique: Baghouse Control Device Identification Number: 0218-C Emission Egress Point Identification Number: 0218-0 Applicable Requirements: Pollutant: PM10 Emission Limit(s): 5.59 lb/hr Authority for Requirement: DNR Construction Permit 78-A-218-S7 Pollutant: Particulate Matter (PM) Emission Limit(s): 0.1 gr/dscf Authority for Requirement: DNR Construction Permit 78-A-218-S7

567 IAC 23.3(2)”a” Monitoring Approach:

Applicable Requirements PM Limits Opacity

General Monitoring Approach Pressure drop readings Visible emissions observations

Daily Check dust collector differential Pressure

Weekly

Method 22 visible emissions observations are performed to ensure no visible emissions during the material handling operations of this unit

Monthly

Inspect cleaning sequence, air delivery system, and hopper functions to insure equipment is operating properly.

Quarterly Inspect bags for leaks and wear.

Semi-Annually All baghouse components are

inspected every 6 months to insure proper operation.

Page 210: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 210 Final Permit # 04-TV-007R2, 11/09/17

Applicable Requirements PM Limits Opacity

Indicator Range/Source Pressure Range: 4 to 5 inches of water column.

Presence of visible emissions.

Data Collection Frequency

Daily: Pressure range observations Quarterly and Semiannually: Equipment inspections.

Monthly: Visible emissions observations. Quarterly and Semiannually: Equipment inspections.

Recordkeeping

Daily logs of differential pressure readings. Weekly logs of emissions observations. All daily, monthly, and quarterly and semi-annually required inspections and maintenance. The date, time and the location of the bag in relationship to the other bags must document bag replacement. All corrective actions resulting from compliance indicators and inspections and maintenance. Excursion, indicator opacity exceedence, and excess emissions reports. Maintenance and inspection records will be kept for at least five (5) years and be available to the IDNR upon request.

QA/QC

The baghouse and monitoring equipment will be operated and maintained according to manufacturer’s recommendations and/or as outlined in the above requirements. Continental Cement Company will maintain an adequate inventory of spare parts. Visible emissions observer trainer per Method 22.

Page 211: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 211 Final Permit # 04-TV-007R2, 11/09/17

CAM Plan for 0466-1, 0466-2, 0466-C, and 0594-C Baghouses Emissions Unit Emission Unit: Preheater/Precalciner/Kiln/Raw Mill System (0466-1) and Alkali Bypass (0466-2) Facility: Continental Cement Company Pollutant: Opacity, PM10 & PM Emission Control Technique: Baghouses Control Device Identification Numbers: 0466-C and 0594-C Emission Egress Point Identification Number: 0466-0 Applicable Requirements: Pollutant: PM10 Emission Limit(s): 0.516 lb/ton clinker Authority for Requirement: DNR Construction Permit 99-A-579-P6 Pollutant: Particulate Matter (PM) Emission Limit(s): 0.516 lb/ton clinker Authority for Requirement: DNR Construction Permit 99-A-579-P6

567 IAC 23.3(2)”a” Monitoring Approach:

Applicable Requirements PM Limits Opacity

General Monitoring Approach Pressure drop readings Visible emissions observations

Daily Check dust collector differential Pressure

Weekly

Method 22 visible emissions observations are performed to ensure no visible emissions during the material handling operations of this unit

Monthly

Inspect cleaning sequence, air delivery system, and hopper functions to insure equipment is operating properly.

Quarterly Inspect bags for leaks and wear.

Semi-Annually All baghouse components are

inspected every 6 months to insure proper operation.

Page 212: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 212 Final Permit # 04-TV-007R2, 11/09/17

Applicable Requirements PM Limits Opacity

Indicator Range/Source Pressure Range: 4 to 5 inches of water column.

Presence of visible emissions.

Data Collection Frequency

Daily: Pressure range observations Quarterly and Semiannually: Equipment inspections.

Monthly: Visible emissions observations. Quarterly and Semiannually: Equipment inspections.

Recordkeeping

Daily logs of differential pressure readings. Weekly logs of emissions observations. All daily, monthly, and quarterly and semi-annually required inspections and maintenance. The date, time and the location of the bag in relationship to the other bags must document bag replacement. All corrective actions resulting from compliance indicators and inspections and maintenance. Excursion, indicator opacity exceedence, and excess emissions reports. Maintenance and inspection records will be kept for at least five (5) years and be available to the IDNR upon request.

QA/QC

The baghouse and monitoring equipment will be operated and maintained according to manufacturer’s recommendations and/or as outlined in the above requirements. Continental Cement Company will maintain an adequate inventory of spare parts. Visible emissions observer trainer per Method 22.

Page 213: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 213 Final Permit # 04-TV-007R2, 11/09/17

CAM Plan for 0535-1, 0535-0 and 0535-C Baghouse Emissions Unit Emission Unit: CKD Handling System (0535-1) Facility: Continental Cement Company Pollutant: Opacity, PM10 & PM Emission Control Technique: Baghouse Control Device Identification Number: 0535-C Emission Egress Point Identification Number: 0535-0 Applicable Requirements: Pollutant: PM10 Emission Limit(s): 0.55 lb/hr Authority for Requirement: DNR Construction Permit 97-A-789-S2 Pollutant: Particulate Matter (PM) Emission Limit(s): 0.1 gr/dscf Authority for Requirement: DNR Construction Permit 97-A-789-S2

567 IAC 23.3(2)”a” Monitoring Approach:

Applicable Requirements PM Limits Opacity

General Monitoring Approach Pressure drop readings Visible emissions observations

Daily Check dust collector differential Pressure

Weekly

Method 22 visible emissions observations are performed to ensure no visible emissions during the material handling operations of this unit

Monthly

Inspect cleaning sequence, air delivery system, and hopper functions to insure equipment is operating properly.

Quarterly Inspect bags for leaks and wear.

Semi-Annually All baghouse components are

inspected every 6 months to insure proper operation.

Page 214: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 214 Final Permit # 04-TV-007R2, 11/09/17

Applicable Requirements PM Limits Opacity

Indicator Range/Source Pressure Range: 4 to 5 inches of water column.

Presence of visible emissions.

Data Collection Frequency

Daily: Pressure range observations Quarterly and Semiannually: Equipment inspections.

Monthly: Visible emissions observations. Quarterly and Semiannually: Equipment inspections.

Recordkeeping

Daily logs of differential pressure readings. Weekly logs of emissions observations. All daily, monthly, and quarterly and semi-annually required inspections and maintenance. The date, time and the location of the bag in relationship to the other bags must document bag replacement. All corrective actions resulting from compliance indicators and inspections and maintenance. Excursion, indicator opacity exceedence, and excess emissions reports. Maintenance and inspection records will be kept for at least five (5) years and be available to the IDNR upon request.

QA/QC

The baghouse and monitoring equipment will be operated and maintained according to manufacturer’s recommendations and/or as outlined in the above requirements. Continental Cement Company will maintain an adequate inventory of spare parts. Visible emissions observer trainer per Method 22.

Page 215: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 215 Final Permit # 04-TV-007R2, 11/09/17

CAM Plan for 0667-1, 0667-0 and 0667-C Baghouse Emissions Unit Emission Unit: Coal Mill (0667-1) Facility: Continental Cement Company Pollutant: Opacity, PM10 & PM Emission Control Technique: Baghouse Control Device Identification Number: 0667-C Emission Egress Point Identification Number: 0667-0 Applicable Requirements: Pollutant: PM10 Emission Limit(s): 5.76 lb/hr Authority for Requirement: DNR Construction Permit 78-A-232-S3 Pollutant: Particulate Matter (PM) Emission Limit(s): 0.1 gr/dscf Authority for Requirement: DNR Construction Permit 78-A-232-S3

567 IAC 23.3(2)”a” Monitoring Approach:

Applicable Requirements PM Limits Opacity

General Monitoring Approach Pressure drop readings Visible emissions observations

Daily Check dust collector differential Pressure

Weekly

Method 22 visible emissions observations are performed to ensure no visible emissions during the material handling operations of this unit

Monthly

Inspect cleaning sequence, air delivery system, and hopper functions to insure equipment is operating properly.

Quarterly Inspect bags for leaks and wear.

Semi-Annually All baghouse components are

inspected every 6 months to insure proper operation.

Page 216: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 216 Final Permit # 04-TV-007R2, 11/09/17

Applicable Requirements PM Limits Opacity

Indicator Range/Source Pressure Range: 4 to 5 inches of water column.

Presence of visible emissions.

Data Collection Frequency

Daily: Pressure range observations Quarterly and Semiannually: Equipment inspections.

Monthly: Visible emissions observations. Quarterly and Semiannually: Equipment inspections.

Recordkeeping

Daily logs of differential pressure readings. Weekly logs of emissions observations. All daily, monthly, and quarterly and semi-annually required inspections and maintenance. The date, time and the location of the bag in relationship to the other bags must document bag replacement. All corrective actions resulting from compliance indicators and inspections and maintenance. Excursion, indicator opacity exceedence, and excess emissions reports. Maintenance and inspection records will be kept for at least five (5) years and be available to the IDNR upon request.

QA/QC

The baghouse and monitoring equipment will be operated and maintained according to manufacturer’s recommendations and/or as outlined in the above requirements. Continental Cement Company will maintain an adequate inventory of spare parts. Visible emissions observer trainer per Method 22.

Page 217: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

Appendix D: 40 CFR Part 60 Subpart DDDD Emission Limitations and Compliance Demonstration Methods

kkl 209 Final Permit #04-TV-007R2, 11/09/17

Table 8 to Subpart DDDD of Part 60—Model Rule—Emission Limitations That Apply to Waste-Burning Kilns After May 20, 2011 [Date to be specified in state plan.]1

For the air pollutant

You must meet this emission limitation2

Using this averaging time

And determining compliance using

this method4

Cadmium 0.0014 milligrams per dry standard cubic meter3

3-run average (collect a minimum volume of 2 dry standard cubic meters)

Performance test (Method 29 at 40 CFR part 60, appendix A-8).

Carbon monoxide

110 (long kilns)/790 (preheater/precalciner) parts per million dry volume

3-run average (1 hour minimum sample time per run)

Performance test (Method 10 at 40 CFR part 60, appendix A-4).

Dioxins/furans (total mass basis)

1.3 nanograms per dry standard cubic meter

3-run average (collect a minimum volume of 4 dry standard cubic meters)

Performance test (Method 23 at 40 CFR part 60, appendix A-7).

Dioxins/furans (toxic equivalency basis)

0.075 nanograms per dry standard cubic meter3

3-run average (collect a minimum volume of 4 dry standard cubic meters)

Performance test (Method 23 at 40 CFR part 60, appendix A-7).

Hydrogen chloride

3.0 parts per million dry volume3

3-run average (collect a minimum volume of 1 dry standard cubic meter) or 30-day rolling average if HCl CEMS is being used

Performance test (Method 321 at 40 CFR part 63, appendix A of this part) or HCl CEMS if a wet scrubber or dry scrubber is not used, as specified in §60.2710(j).

Lead 0.014 milligrams per dry standard cubic meter3

3-run average (collect a minimum volume of 2 dry standard cubic meters)

Performance test (Method 29 at 40 CFR part 60, appendix A-8).

Mercury 0.011 milligrams per dry standard cubic meter

30-day rolling average

Mercury CEMS or sorbent trap monitoring system (performance specification 12A or 12B, respectively, of appendix B of this part), as specified in §60.2710(j).

Page 218: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

kkl 218 Draft permit # 04-TV-007R2, 10/02/17

Oxides of nitrogen

630 parts per million dry volume

3-run average (for Method 7E, 1 hour minimum sample time per run)

Performance test (Method 7 or 7E at 40 CFR part 60, appendix A-4).

Particulate matter filterable

13.5 milligrams per dry standard cubic meter

30-day rolling average

PM CPMS (as specified in §60.2710(x)).

Sulfur dioxide 600 parts per million dry volume

3-run average (for Method 6, collect a minimum of 20 liters; for Method 6C, 1 hour minimum sample time per run)

Performance test (Method 6 or 6c at 40 CFR part 60, appendix A-4).

1The date specified in the state plan can be no later than 3 years after the effective date of approval of a revised state plan or February 7, 2018. 2All emission limitations are measured at 7 percent oxygen (except for CEMS data during startup and shutdown), dry basis at standard conditions. For dioxins/furans, you must meet either the total mass basis limit or the toxic equivalency basis limit. 3If you are conducting stack tests to demonstrate compliance and your performance tests for this pollutant for at least 2 consecutive years show that your emissions are at or below this limit, you can skip testing according to §60.2720 if all of the other provisions of §60.2720 are met. For all other pollutants that do not contain a footnote “3”, your performance tests for this pollutant for at least 2 consecutive years must show that your emissions are at or below 75 percent of this limit in order to qualify for skip testing, with the exception of annual performance tests to certify a CEMS or PM CPMS. 4Alkali bypass and in-line coal mill stacks are subject to performance testing only, as specified in 60.2710(y)(3). They are not be subject to the CEMS, sorbent trap or CPMS requirements that otherwise may apply to the main kiln exhaust.

Page 219: Iowa Department of Natural Resources...0200-4-F Dump Hopper to Apron Feeder 0200-5-F Apron Feeder Transfer to Primary Crusher 0200-6-F 0225 Crusher Transfer to 0221 0200-7-F 0221 Belt

Appendix E: Weblinks to Standards

kkl 220 Draft permit # 04-TV-007R2, 10/02/17

A. 40 CFR Part 60 Subpart A-General Provisions

http://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&r=SUBPART&n=sp40.7.60.a]

B. 40 CFR Part 60 Subpart F-Standards of Performance for Portland Cement Plants http://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&r=SUBPART&n=sp40.7.60.f

C. 40 CFR Part 60 Subpart Y-Standards of Performance for Coal Preparation Plants

http://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&r=SUBPART&n=sp40.7.60.y

D. 40 CFR Part 60 Subpart DDDD–Standards of Performance for Commercial and Industrial Solid Waste Incineration Units that Commenced Construction on or before November 30, 1999 http://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&r=SUBPART&n=sp40.7.60.dddd

F. 40 CFR Part 61 Subpart E - National Emission Standards for Hazardous Air Pollutants for Mercury https://www.ecfr.gov/cgi-bin/text-idx?SID=b24e38c2e97db4baec982828e8929d3a&mc=true&node=sp40.10.61.e&rgn=div6

G. 40 CFR Part 63 Subpart A-General Provisions

http://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&r=SUBPART&n=sp40.10.63.a

H. 40 CFR Part 63 Subpart LLL-National Emission Standards for Hazardous Air Pollutants from the Portland Cement Manufacturing Industry http://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&r=SUBPART&n=sp40.12.63.lll

I. 40 CFR Part 63 Subpart ZZZZ-National Emission Standards for Hazardous Air Pollutants for

Stationary Reciprocating Internal Combustion Engines http://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&r=SUBPART&n=sp40.14.63.zzzz

J. 40 CFR Part 63 Subpart DDDDD- National Emission Standards for Hazardous Air Pollutants for Industrial, Commercial, And Institutional Boilers and Process Heaters https://www.ecfr.gov/cgi-bin/retrieveECFR?gp=&SID=&mc=true&r=PART&n=pt40.15.63#sp40.15.63.ddddd