Transcript of Investment Project Construction of Multi-purpose Marine Complex of Terminals (MMCT) “Galitsyno”
Investment Project
Construction of Multi-purpose Marine Complex of Terminals (MMCT) “Galitsyno”
www.titul.net.ua2
About project
Limited Liability Company “MMCT “Galitsyno” was established in 2007. The company owns incomplete construction projects and other assets of “MMCT “Galitsyno”, and also accomplishes functions of a customer in project development, fulfills licensing procedures and implementation of the project “MMCT “Galitsyno”. In future LLC “MMCT “Galitsyno” will accomplish functions of a port and cargo-carrying operator.Two Ukrainian companies own 50% each of equity rights of LLC “MMCT “Galitsyno”.
www.titul.net.ua3
Structure of platforms of MMCT
SEA PORT9 specialized terminals for cargo
handling
RAILWAY STATION32 railroads for receiving and
sending of railroad trains
LOGISTICS CENTERWarehouses for storage,
assortment and other types of handling of goods
TECHNOLOGICAL COMPLEXPlants for для mid handling, sub
assembly etc., types of cargo handling
www.titul.net.ua4
Port characteristics
Number of landing places 32
Total length of landing places 5 945 m
Maximum depth close to landing places 15 m
Width of access board (from a landing place into the depth of a terminal)
650 – 850 m
Number of located warehouses (stacks) From 5 to 8
Capacity 1-2 steps: 35 mln. t per year
3 step: up to 100 mln. t per year
www.titul.net.ua5
Location peculiarity
Nikolayev has access to important European and international directions
www.titul.net.ua6
Location peculiaritySea and land ways of Eurasia lay through Nikolayev
www.titul.net.ua7
Location peculiarity
Number of water and land routes, going through three main sea regions of Ukraine
Illichevsk Odessa Nikolayev
Railway direction ++ ++ ++++
Auto direction +++ +++ ++++
Inner river routes +++
Intransit river routes ++
River – sea + + ++
Oversea shipment + + +
Air transportation + + +
www.titul.net.ua8
Location peculiarity
Crossing of 4 transport directions through Nikolayev region and amount of operating railway stations
www.titul.net.ua9
Location peculiarity
MMCT “Galitsyno” will be located within 8 km from Nikolayev and 36 km from the Black Sea between operating sea ports “Oktyabrsk” and “Dnieper-Bug”.
www.titul.net.ua10
Location peculiarity
The platform where the port is located was formed in the result of sand recultivation after dredging works
www.titul.net.ua11
A map from the satellite
www.titul.net.ua12
Major premises, business provisions and risks
Legislative warranties of private ownership of port objects Prospective market in the basin of the Black Sea –14 countries, ~ 250 mln. people Lack of port capacities in the northern part of the Black Sea Deficiency of a big port with logistical and technological terminals in the basin of the Black Sea Deficiency of opportunities to enlarge operating ports in countries of the Black Sea basin MMCT is located along an elongation vector of the VII Danube alley way towards water way
along the river Dnieper MMCT is located along the logistical route of a ring road around the Black Sea Availability of areas for leveed platforms and water area of the port on the water area of the
Dnieper-Bug basin Availability of areas for composition of port objects (railway stations, logistical warehouses and
plants) Legislative opportunity to grant the status of free trade zone to these territories Application of new approaches and technologies in complex handling of goods
www.titul.net.ua13
General layout on the map from the satellite
www.titul.net.ua14
Implementation plan
General layout: The 1st phase of the project – red color, the 2nd – green, the 3rd – yellow
www.titul.net.ua15
Implementation plan
Approved scheme of zoning of the plot for construction of the port and logistics terminal, railway and auto entry on the 1st and the 2nd phases of the project
www.titul.net.ua16
Photofixation
View overlooking a coastal zone and prospective MMCT from a roof
of a five-storied administrative building of LLC “MMCT “Galitsyno”
www.titul.net.ua17
Photofixation
Coastline of the territory of “MMCT “Galitsyno”
www.titul.net.ua18
Photofixation
Warehouse equipment and technologies
www.titul.net.ua19
Photofixation
Administrative building
www.titul.net.ua20
Financial indexation
Overall costs – 2,7 bln. $ Cost of the 1st step – 0,55 bln.$ Total construction period – 4,5 years Payback period – from 5 to 10 years
www.titul.net.ua21
Plan of investor entry into the project
1. Memorandum ratification between Investor and Owner of LLC “MMCT “Galitsyno” on entry into the Project.
2. Purchase of not less than 76 % of equity rights and effective assets of LLC “MMCT “Galitsyno” by the Investor on contractual terms of the contract of purchase and sale.
3. Establishment of An Asset Management Company (out of the territory of Ukraine), where Investor will own 76% of equity rights.
www.titul.net.ua22