Investing in our schools · 2020. 8. 20. · Innovative learning prepares students across all...

6
NSW Department of Education – School Infrastructure schoolinfrastructure.nsw.gov.au For more information phone: 1300 482 651 Email: [email protected] Kingscliff Public School upgrade Investing in our schools A project is underway to upgrade Kingscliff Public School to cater for future growth in the area. The upgrade will include: Artist impression of the Kingscliff Public School upgrade 32 new permanent innovative and flexible learning spaces New play spaces and outdoor amphitheatre Extended school hall New library Redeveloped school entry

Transcript of Investing in our schools · 2020. 8. 20. · Innovative learning prepares students across all...

Page 1: Investing in our schools · 2020. 8. 20. · Innovative learning prepares students across all curriculum areas and learning stages with skills and capabilities to thrive in a rapidly

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Kingscliff Public School upgrade

Investing in our schools

A project is underway to upgrade Kingscliff Public School to cater for future growth in the area.

The upgrade will include:

Artist impression of the Kingscliff Public School upgrade

32 new permanentinnovative and flexible learning spaces

New play spaces and outdoor amphitheatre

Extended school hall New library

Redeveloped school entry

Page 2: Investing in our schools · 2020. 8. 20. · Innovative learning prepares students across all curriculum areas and learning stages with skills and capabilities to thrive in a rapidly

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Kingscliff Public School upgrade

EXISTING HALL AND CANTEEN RETAINED

ENTRY

EX. CAR PARKING

SUTHERLAND STREET

ORIENT STREET

EX. AMENITIES RETAINED

EX.

STO

RE

R

ETA

INE

D

AF

C D

E

G

ENTRYENTRY EXIT

LEGEND

DEMOLISHED

EXISTING

SJB ArchitectsL2, 490 Crown StSurry Hills NSW2010 AustraliaT 61 2 9380 9911www.sjb.com.au

0

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

In accepting and utilising this document the recipient agrees that SJBArchitecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain allcommon law, statutory law and other rights including copyrightand intellectualproperty rights. The recipient agrees not to use this documentfor any purposeother than its intended use; to waive all claims against SJB Architects resultingfrom unauthorised changes; or to reuse the document on other projectswithout prior written consent from SJB Architects. Under no circumstancesshall transfer of this document be deemed a sale. SJB Architects makes nowarranties of fitness for any purpose. The Builder/Contractor shall verify jobdimensions prior to any work commencing. Use figured dimensionsonly. Donot scale drawings.

Drawing Name

Project

FOR INFORMATION

Client

105 25m

1:500 @A1

@ A1

Drawing No.

Scale

Drawn Chk.

Sheet SizeDate

Revision

Job No.

As indicated

/ 2

31.01.20

KINGSCLIFF PUBLIC SCHOOL

12 ORIENT STREETKINGSCLIFF NSW 2487

SITE PLAN - EXISTINGAND DEMOLITION

0111

BM CM

A-

6181

Rev Date Revision By Chk.

1 20.12.19 DRAFT CONCEPT DESIGN BM CM2 31.01.20 ISSUED FOR INFORMATION BM CM

Existing school

Page 3: Investing in our schools · 2020. 8. 20. · Innovative learning prepares students across all curriculum areas and learning stages with skills and capabilities to thrive in a rapidly

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Kingscliff Public School upgrade

ENTRY

ENTRY

EXISTING CAR PARKING

SUTHERLAND STREET

ORIENT STREET

STAFF/ADMIN

NEW LIBRARY AND CLASSROOMS

EXISTING HALL AND CANTEEN EXTENDED

NEW CLASSROOM BUILDING

NEW CLASSROOM BUILDING

EX. AMENITIES

EX.

STO

RA

GE

COLA

1

D

3

G

2

4

BIKE STORE

AND ENTRY

PAVILION

RELOCATED WASTE PAD

E

ENTRY EXIT

NEW PLAYING COURT

SJB ArchitectsL2, 490 Crown StSurry Hills NSW2010 AustraliaT 61 2 9380 9911www.sjb.com.au

0

Nominated Architects: Adam Haddow-7188 | John Pradel-7004

In accepting and utilising this document the recipient agrees that SJBArchitecture (NSW) Pty. Ltd. ACN 081 094 724 T/A SJB Architects, retain allcommon law, statutory law and other rights including copyrightand intellectualproperty rights. The recipient agrees not to use this documentfor any purposeother than its intended use; to waive all claims against SJB Architects resultingfrom unauthorised changes; or to reuse the document on other projectswithout prior written consent from SJB Architects. Under no circumstancesshall transfer of this document be deemed a sale. SJB Architects makes nowarranties of fitness for any purpose. The Builder/Contractor shall verify jobdimensions prior to any work commencing. Use figured dimensionsonly. Donot scale drawings.

Drawing Name

Project

FOR INFORMATION

Client

105 25m

1:500 @A1

@ A1

Drawing No.

Scale

Drawn Chk.

Sheet SizeDate

Revision

Job No.

1 : 500

/ 4

31.01.20

KINGSCLIFF PUBLIC SCHOOL

12 ORIENT STREETKINGSCLIFF NSW 2487

SITE PLAN - PROPOSED

0112

BM CM

A-

6181

Rev Date Revision By Chk.

1 20.12.19 DRAFT CONCEPT DESIGN BM CM2 16.01.20 ISSUED FOR INFORMATION BM CM3 20.01.20 ISSUED FOR COORDINATION BM CM4 31.01.20 ISSUED FOR INFORMATION BM CM

Proposed site plan

Page 4: Investing in our schools · 2020. 8. 20. · Innovative learning prepares students across all curriculum areas and learning stages with skills and capabilities to thrive in a rapidly

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Kingscliff Public School upgrade

Concept Design Completed

January 2020

Tender for Early Works Package

February 2020

Early Works Completion

June 2020

Early Works Commencement

March 2020

Tender for Main Works

April 2020

Main Works Commencement

Mid 2020

Opening

Late 2021

TimelineWe are here

Artist impression of the Kingscliff Public School upgrade

Page 5: Investing in our schools · 2020. 8. 20. · Innovative learning prepares students across all curriculum areas and learning stages with skills and capabilities to thrive in a rapidly

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.auFor more information phone: 1300 482 651Email: [email protected]

Kingscliff Public School upgrade

Consultative designThe Kingscliff Public School upgrade will deliver 32 new, permanent innovative learning spaces.

The new library will also feature a variety of study, teaching and learning spaces that have the potential to open onto an outdoor terrace and garden.

Workshops were held with staff, students and parents to ensure that all spaces meet the educational and service delivery requirementsof the Kingscliff Public School community.

An example of an innovative learning environment

Page 6: Investing in our schools · 2020. 8. 20. · Innovative learning prepares students across all curriculum areas and learning stages with skills and capabilities to thrive in a rapidly

NSW Department of Education – School Infrastructure

schoolinfrastructure.nsw.gov.au

What are innovative learning spaces?

Space

■ There are zones for differentactivities, with variedfurniture and resources – such as booths, standing tables, studios and bean bags.

■ Spaces can be connectedby glass or sliding doorswith furniture in corridorsand on balconies to extendthe learning space.

■ No front of classroom.

■ Spaces are designed to beshared by multiple classes.

Students

■ Students have the ability tomove around the learningspace to encouragecollaborative learning.

■ Students working across a range of projects simultaneously.

■ Students engaged in handson learning, building andtesting.

Teachers

■ Movement around thelearning space rather thanthe teacher being at thefront of the room.

■ Teachers planning learningtogether, for example instage or faculty teams.

■ Teachers teaching togetherto better meet the needs ofstudents.

Learning

■ Personalised learning, soeach student is learning attheir own level and pace.

■ Students learning in large groups, small groups or individually.

■ Students are workingtowards the same projectin different subjectareas, encouraging crossdisciplinary learning.

Technology

■ Technology integratedinto the space to extendlearning.

■ Accessibility of technologyto suit different activities at point of need, for example filming and recording equipment.

■ WiFi accessible across alllearning areas.

Our children’s education is vital – they are the next leaders, the future workforce and the foundation of communities for generations to come.

Innovative learning prepares students across all curriculum areas and learning stages with skills and capabilities to thrive in a rapidly changing and interconnected world. It connects students and engages their sense of curiosity and allows flexible, technology-rich spaces for one-to-one, small group and whole class activities. Innovative learning fosters collaborative learning between students and teachers.