Introduction to Vital Energi
-
Upload
vital-energi -
Category
Technology
-
view
12.706 -
download
1
Transcript of Introduction to Vital Energi
Introduction to Vital Energi
INTRODUCTION
Principles of District Heating
Vital Energi – The Business
INTRODUCTION
Services
INTRODUCTION
Services
INTRODUCTION
Project Milestones In Our History
INTRODUCTION
INTRODUCTION
Project Milestones In Our History
RECOGNITION
Recognition and Achievement
24 Awards in a Decade
15 Awards in Innovation
4 Awards in Health and Safety
5 Awards for Business Recognition
PROJECTS
Design and Build Energy Centres/District Heating
Contract Value - £6m £650 million development by Peel Holdings Europe’s first purpose built creative and media
development Main anchor tenant was the BBC First development in the World to achieve BREEAM
“Excellent” community rating New University of Salford building connected
PROJECTS
Design and Build Energy Centres/District Heating
Contract Value - £11m 67 acre Central London Project £2 billion mixed use development New buildings to achieve BREEAM “Excellent” rating 2,000 metres of pre-insulated pipe Temporary energy centre facilitated market changes T1 energy centre recently commissioned 2MW CHP engine (3 x 2MW CHP when built out) 3 x 10MW gas boilers & 150m3 thermal store
PROJECTS
Design and Build Energy Centres/District Heating
Contract Value - £9m 704 homes, NISA Stadium and Care Home Phase 2 – 750 homes 2 x 844kWe CHP Unit 3 x 3MW Boilers 70m3 Thermal Store 28,000 metres of district heating pipe Future proofed
PROJECTS
Crystal Palace
Contract build value - £1m Guaranteed performance contract 15 year contract term £370,000 guaranteed annual savings Guaranteed 1,650 tonnes of CO2 One of the most efficient CHP engines in the UK 93% Efficiency Level
Natural History Museum
PROJECTS
Vital Energi Solution
Contract Value - £12m Guaranteed performance contract 16 year contract term (11.5 years remaining) Financed by Vital Energi £570,000 guaranteed savings per annum (index linked) Achieved closer to £1m in 2011 Guaranteed 1800 tonnes of Co2 Achieved 2300 tonnes in 2011
PROJECT
Blackpool Hospital ESCo
16 Year contract term (14 years remaining)
£1,500,000 Finance arranged by Vital Energi £75,000 Grant Funding
1 x 1.2MWe Gas Engine
1 x S&T Steam Combination Boiler
2 x 1MW Abs Chillers
High Voltage Electrical
LTHW
Chilled Water
Introduction to Vital Energi