Introduction to Vital Energi

15
Introduction to Vital Energi

Transcript of Introduction to Vital Energi

Page 1: Introduction to Vital Energi

Introduction to Vital Energi

Page 2: Introduction to Vital Energi

INTRODUCTION

Principles of District Heating

Page 3: Introduction to Vital Energi

Vital Energi – The Business

INTRODUCTION

Page 4: Introduction to Vital Energi

Services

INTRODUCTION

Page 5: Introduction to Vital Energi

Services

INTRODUCTION

Page 6: Introduction to Vital Energi

Project Milestones In Our History

INTRODUCTION

Page 7: Introduction to Vital Energi

INTRODUCTION

Project Milestones In Our History

Page 8: Introduction to Vital Energi

RECOGNITION

Recognition and Achievement

24 Awards in a Decade

15 Awards in Innovation

4 Awards in Health and Safety

5 Awards for Business Recognition

Page 9: Introduction to Vital Energi

PROJECTS

Design and Build Energy Centres/District Heating

Contract Value - £6m £650 million development by Peel Holdings Europe’s first purpose built creative and media

development Main anchor tenant was the BBC First development in the World to achieve BREEAM

“Excellent” community rating New University of Salford building connected

Page 10: Introduction to Vital Energi

PROJECTS

Design and Build Energy Centres/District Heating

Contract Value - £11m 67 acre Central London Project £2 billion mixed use development New buildings to achieve BREEAM “Excellent” rating 2,000 metres of pre-insulated pipe Temporary energy centre facilitated market changes T1 energy centre recently commissioned 2MW CHP engine (3 x 2MW CHP when built out) 3 x 10MW gas boilers & 150m3 thermal store

Page 11: Introduction to Vital Energi

PROJECTS

Design and Build Energy Centres/District Heating

Contract Value - £9m 704 homes, NISA Stadium and Care Home Phase 2 – 750 homes 2 x 844kWe CHP Unit 3 x 3MW Boilers 70m3 Thermal Store 28,000 metres of district heating pipe Future proofed

Page 12: Introduction to Vital Energi

PROJECTS

Crystal Palace

Contract build value - £1m Guaranteed performance contract 15 year contract term £370,000 guaranteed annual savings Guaranteed 1,650 tonnes of CO2 One of the most efficient CHP engines in the UK 93% Efficiency Level

Page 13: Introduction to Vital Energi

Natural History Museum

PROJECTS

Vital Energi Solution

Contract Value - £12m Guaranteed performance contract 16 year contract term (11.5 years remaining) Financed by Vital Energi £570,000 guaranteed savings per annum (index linked) Achieved closer to £1m in 2011 Guaranteed 1800 tonnes of Co2 Achieved 2300 tonnes in 2011

Page 14: Introduction to Vital Energi

PROJECT

Blackpool Hospital ESCo

16 Year contract term (14 years remaining)

£1,500,000 Finance arranged by Vital Energi £75,000 Grant Funding

1 x 1.2MWe Gas Engine

1 x S&T Steam Combination Boiler

2 x 1MW Abs Chillers

High Voltage Electrical