Introduction to the future document lifecycle tool User point of view 27/11/2012Introduction to the...
-
Upload
roderick-kelly -
Category
Documents
-
view
218 -
download
1
Transcript of Introduction to the future document lifecycle tool User point of view 27/11/2012Introduction to the...
Introduction to the future document lifecycle toolUser point of view
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 1
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 2
Contents
1. Scope
2. Why a lifecycle process for the 2D and 3D?
3. Pre-requisite - The Profile Card
4. Pre-requisite - Statuses and links between Catia documents
5. The ‘Ready for Check’
6. Case 1 - Control of a 2D in link with a 3D part
7. Case 2 - Control of a 2D in link with a 3D product
8. Case 3 - Control of a 3D alone
9. Case 4 - Control of a 2D/3D in link with another 3D
10. Global view - Examples
11. The ‘Cancelled’
12. Impact of the ‘Cancelled’
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 3
1. Scope
Mechanical Design Offices Integration Design Offices
2D + 3D 3D 2D
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 4
2. Why a lifecycle process for the 2D and 3D?
• To synchronise the documents in all databases: Reference + Index Þ To have the same database for the design offices (Smarteam/Catia = Design Tools) and the downstream services (CDD/EDMS/CDN = visibility of the documentation)Þ To have archived what has been controlled
• To manage easily old/new references if necessaryÞ A drawing evolves (so its in-link 3D)Þ In the future, to follow up the parts of the accelerators/cern-projects through the 3D
• To use the same 3D for another designÞ To avoid duplicatesÞ To count the use-cases in any top assembly
Þ Traceability
Furthermore,
• To use the correct tools for the quality control/lifecycle process• To re-place the ‘Preliminary’ status
3. Pre-requisite - The Profile Card
ITEM
2D 3D
CDD Number
First Save Smarteam
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 5
Update
Cartweb
Reminder
Filling the attributes correctly
PRE REQUIS
4. Pre-requisite - Statuses and links between Catia documents
3D Product2D Product
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 6
3D Part
3D Part3D Part 3D Part
2D Part 2D Part 2D
2D PartIn
work
Last version
Check In
In Work
Date of last Check In
In work
AUTOMATIC CONTROL
Cancelled
« Children first!! »
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 7
Drawing
5. The Ready for Check
What is it?
• A function used by the designer to say : “ My data is ready to be controlled”
• A function who verify the states with the Parent Children Links.
• A function which freeze the data during the Control process. What is archived is what has been checked
Nota: For modifying a part in ‘ Ready For Check ‘ , the function will be used (see later)RFC
In work
Date
→
Product Component
RFC RFC
RFCIF
Part or Product
RFC→
RFC
RFC RFC
RFCIF
RFC→
RFC
Part in link Parent Children
RFC RFC
RFCIF
RFC→
RFC
Parent Children Links and Ready For Check
Cancelled
Ready For Check
Propagation Facility-Ready For Check from Parent to all children.+ children Drawings.
Part 2D Part 3D
CDD/CDN
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 8
6. Case 1 - Control of a 2D in link with a 3D part
RFC
Checked
R
Cancelled
In work
PRE-REQUISITE
Smarteam
ISO ControlC1
END
Ready For Check
Checked
Released
Cancelled
Functional ControlC2
OK
OK
KO
KO
KO
Date
MAIL MAIL
AUTOMATIC
AUTOMATIC
MAILFor the parent
and the children
RFC
Checked
R
RFCReady For Check =
ISO Control (C1) →Checke
d
RFunctional Control (C2) →
3D Part 2D Part
Propagation Facility-Ready For Check from Drawing to all children+ children drawings.-Checked or Released from Drawing to 3D in Link.
Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13
Product2D
Product3D
Part 3D/2D
CDD/CDN
27/11/2012 9
7. Case 2 - Control of a 2D in link with a 3D product
RFC
Checked
R
Cancelled
In work
PRE-REQUISITE
Smarteam
ISO ControlC1
END
Ready For Check
Checked
Released
Cancelled
Functional ControlC2
OK
OK
KO
KO
KO
Date
MAIL MAIL
AUTOMATIC
AUTOMATIC
MAILFor the parent
and the children
RFC
Checked
R
RFCReady For Check =
ISO Control (C1) → Checked
RFunctional Control (C2) →
RFC
Checked
R
2D Product3D Parts 3D Product2D Parts
Propagation Facility-Ready For Check from Drawing to all children+ children drawings.-Checked or Released from Drawing to 3D in LinkIf state of children ≥ state of parents
R
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 10
8. Case 3 - Control of a 3D alone
Checked
R
Cancelled
In work
PRE-REQUISITE
Smarteam
Ready For Check
Checked
Released
Cancelled
KO
RFCKO
Nota: - No control in CDD- For the commercial parts, don’t forget to give them to the Librarian responsible (Raphael)
3D
Part in link2D
Part in Link3D
Part2D/3D
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 11
9. Case 4 - Control of a 2D/3D in link with a other 3D
+RFC
Checked
R
RFCReady For Check =
ISO Control (C1) → Checked
RFunctional Control (C2) →
2D Part3D Part 3D Part in Link
CDD/CDN
RFC
Checked
R
Cancelled
In work
PRE REQUIS
Smarteam
ISO ControlC1
END
Ready For Check
Checked
Released
Cancelled
Functional ControlC2
OK
OK
KO
KO
KO
Date
MAIL MAIL
AUTOMATIC
AUTOMATIC
MAILFor the parent
and the children
Checked
R
RFC
2D Part
Propagation Facility-Ready For Check from Drawing to all children+ children drawings.-Checked or Released from Drawing to 3D in LinkIf state of children ≥ state of parents
R
10. Global view: Ready For Check3D Product 2D Product
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 12
3D Part
3D Part3D Part 3D Part
2D Part
2D Part
2D Part
OK
Ready For Check
In work
DatePRE-REQUISITE
RFC
Checked Checked
RReleased
OK
RFCRFC
RFC
RFC
RFC RFC RFC
RFC RFC
10. Global view: Checked3D Product 2D Product
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 13
3D Part
3D Part3D Part 3D Part
2D Part
2D Part
2D Part
OK
Ready For Check
In work
DatePRE-REQUISITE
RFC
Checked Checked
RReleased
OK
OK
Checked
Checked
Checked
Checked
R
R R
R
Smarteam Control
CDD Control
CDD Control
Checked
CDD Control
CDD Control
Smarteam Control
CDD Control
CDD Control
CDD Control
CDD Control
10. Global View : Released3D Product 2D Product
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 14
3D Part
3D Part3D Part 3D Part
2D Part
2D Part
2D Part
OK
Ready For Check
In work
DatePRE-REQUISITE
RFC
Checked Checked
RReleased OK
OK
OK
R
R R
R
R
Nota: CDD/CDN control = components must be controlled BEFORE doing the assembly validation
Release= a.01 become a.
11. The ‘Cancelled’
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 15
When? - During the quality control..
… when the designer wants to modify the 3D/2D while the documents are in RFC / Checked
Designer: ”Ok my documents are ready to be controlled “ → Mail
Designer: ”Excuse me but I want to modify my document” → Mail
New version in Work (Old is cancelled)
… when the controller for the ISO refuses to validate the 2D (thus also the 3D)
ISO Controller: “It’s not correct for me” → Mail
Designer begins the modifications.
New version in Work (Old is cancelled)
… when the controller for the Functional refuses to validate the 2D (thus also the 3D)
Controller for Functional: “It’s not correct for me” → Mail Designer begins the modifications.
New version in Work (Old is cancelled)
RFC
CDD: ISO
Cancelled
C.O C.I
RFC
Cancelled
C.O C.I
Checked
RFC
RFC
CDD: ISORFC
Cancelled
C.O C.I
CDD: Functionnal
RFC
a.01
a.01
a.02 a.02a.02
a.01
a.01
a.02 a.02a.02
a.01
a.01
a.02 a.02
a.02
3D Part3D Part 3D Part
12. Impact of the ‘Cancelled’3D Product 2D Product
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 16
3D Part2D Part
2D Part
2D Part
OKPRE-REQUISITE RFC
Cancelled
Checked
OK
RFC
R
Cancelled
Checked
RFC
Checked
Cancelled
Cancelled
Cancelled
Cancelled
Cancelled
C.O
C.I
RFC
27/11/2012 Introduction to the future document lifecycle tool G. Villiger PLM-WG / Forum Catia n°13 17
Conclusion
A new process tool is going to be born:
With this tool, we’ll be able to validate the 2D/3D parts or the 3D alones.
Through this presentation, you can see where our - PLM-WG members - thoughts are leading us to. Your suggestions are welcome! Please, contact the PLM-WG.
Thanks.
Gilles